Loading...
2007NEWS LETTER Public Works Ennineerin4 Code Enforcement Public Works The Pipeline January 4, 2007 The Parks Crew checked the rinks and warming houses daily. Snow was removed from the rinks and flooding continues. The door and lock at the Marie Park warming house was repaired. The pedways were cleaned up where needed. Rich cut roots from the sanitary sewer lines on Kay Avenue, Walsh Lane and Glen Hill Road. The Street Crew is clearing snow from around the fire hydrants. The snow banks are being winged back in the industrial park. Enaineerina Sue and Ryan met with three residents who live on Kay Avenue and Walsh Lane to discuss their concerns regarding the upcoming street reconstruction project. All concerns were addressed. Pilot Knob Update The City recently received Grant Funds from the DNR Environmental Partnership Grant Fund ($14,800.00) and the Lower Minnesota River Watershed District ($6,700.00) for restoration work and volunteer events on the 8.5 acre Pilot Knob Phase 1 site accomplished during 2007. The applications were prepared and applied for under the contract the City has with Great River Greening for management and oversight of the restoration efforts to return this site to an oak savannah similar to what the site looked like when European settlers arrived in the 1850's. NEWS LETTER Public Works Enaineerina Code Enforcement Public Works he Pipeline December 28, 2007 The Parks Crew checked the parks and warming houses daily. They continue to flood rinks. They swept the skating rinks and plowed the cul-de-sacs, pedways and parking lots. Rich plowed the snow in the middle area streets and lift station parking lots. He used the jet to cut roots in the sanitary sewer lines on Wagon Wheel Trail, Valley Curve and Dodd Road. Grease from the middle school was removed in the Mendota Heights Road sanitary sewer lines. The Street Crew plowed and salted the roads on December 22, 23 and 26th. They started to clean off the bridge decks on Mendota Heights Road and Wagon Wheel Trail. Broken mailboxes were fixed. Date: Saturday, December 22 Monday, December 24 Wednesday, December 26 Enoineerin4 Snow Events of the Week: Event/Amount: Response: Rain and 3" of snow 3.4" 3" Sand and plow all areas Plow all areas Plow all areas (4:00 A.M. snow emergency declared) The Marie Creek stabilization project has been substantially completed. Attached is a project fact sheet with photos. Engineering staff is preparing for a January 9th neighborhood meeting for the Callahan Street Reconstruction project. " E `" 5 The Pi elin LETTER Public Works cont. Page 2 Enaineerino December 28, 2007 Code Enforcement Tom Knuth is off for the next month enjoying time on the beach and golf courses in Florida. PILOT KNOB Purchase of 15 acres of land east of Pilot Knob Road from Acacia Cemetery has been delayed until mid -January. Thursday morning demolition crews had removed the two out -buildings of the house located at the end of the gravel cul-de-sac. Workers were removing / salvaging the windows and casements (installed several years ago by MAC for sound attenuation) before demolishing the house. Crews will separate wood, metal, and masonry items to be recycled or disposed in a landfill. Removal of asbestos from the 1-1/2 story stucco house is underway and removal of underground fuel tanks and several sites where excavation and removal of contaminated soil and materials have been identified. The demolition crews are working with another firm which performs soil testing and oversight of removal and clean up efforts to assure that all work conforms to Minnesota PCA and Dakota County requirements. Attachment: Please see the attached Marie Creek Streambank Stabilization Project Fact Sheet 0,30V SO/t Gq tiO S�RVATION 0�5� Cost: The total project cost was $45,240. Project: A 200 foot streambank stabilization project that incorporated hard armor and bioengineering techniques. A series of pools and riffl created to dissipate energy and slow stream velocities, was used with soil wraps, live staking, seeding, and planting of native woodland shrubs Financial Assistance: Dakota County SWCD provided Incentive Payment Practice funding in the amount of $17,998.50. L on:Heights, Oa ° ' ° 0. Dakota County Soil and Water Conservation District 4100 22011 St. W., Suite 102, Farmington, MR 55124 651-480-7777 www.dakotaswed.org Dakota County Soil and Water Conservation District Revised 12/OS/07 4100 220"' St. W., Suite 102, Farmington, MN 55124 651-480-7777 www.dakotaswcd.org NEWS LETTER Public Works Engineering Code Enforcement Public Works The Pipelin December 21, 2007 The Parks Crew are flooding the skating rinks. A broken board was replaced on the hockey rink at Wentworth Park. The hockey nets were put out on the rinks for their opening (rinks were opened on December 14th). The new furnaces were installed in all the warming houses. The lights were repaired on plow truck #503. Rich assisted Cliff with repairing the crane on truck #409. The homeowner at 1068 Overlook Road called and said they cleaned their service so Rich jetted it. Jetti cleaned Sunset Lane after St. Paul Regional Water Services broke the sanitary sewer line at 1255 Dodd Road. There were a lot of rocks and parts of the clay pipe in the line. After the line was cleaned it was lamped and televised. Rich cut roots in the sanitary sewer lines at Chippewa Avenue and Annapolis, Winston Court, Downing Street and Somerset Road. He also cleaned the grease of the floats at the Veronica lift station. The Street Crew cleaned snow off the bridge decks and sidewalks on Mendota Heights Road and Wagon Wheel Trail. The cutting edges were changed on the plow trucks. John Ambrose welded a new lifting bracket for the chipper box. The streets were salted because of the water main break. A dead deer was picked up on Marie Avenue. Engineering St. Paul Regional Water Services replaced a fire hydrant on Mohican Court this past week. There was a water main break on Dodd Road and Mears Avenue. Engineering and Public Works had radio training on the new 800 MHz radios. The traffic signals are out at Mendota Heights Road and Pilot Knob Road. Temporary stop signs have been put out at the intersection. NEWS LETTER Public Works Engineering Code Enforcement Public Works The Pipeline The Parks Crew hauled hoses and fittings out to the warming houses for flooding ice rinks, which has already started. The warming house furnaces were started up. The cul-de-sacs, pedways, skating rinks, and parking lots where plowed by the Parks Crew on Saturday and Wednesday. Rich plowed the middle area of the City and the plow lift station parking lots on Saturday and Wednesday. St. Paul Regional Water Services broke a sewer line service on 1255 Dodd Road, which they repaired. Rich did a sewer inspection at 750 Main Street. The Street Crew plowed and sanded over the weekend and on Wednesday. They repaired mailboxes. John Ambrose did welding on the plows for the Parks Crew. Crosswalk signs were put up on the pedway on Decorah and Huber Drive. Snow Events• Date: a Amount: Resoonse: o o �< e Saturday, December 1 4" Plow and sand all areas Tuesday, December 5 6" Plow and sand all areas The first winter event of 2006 was December 21st, when there was snow/ice and the streets were sanded. Engineering Sue received only a handful of plowing complaints: 3 were mailbox complaints, 2 - too much snow at end of driveway and one resident who wants the use of salt discontinued because it hurts his dog's paws. There were two water main breaks this week: Sunset Lane and Aztec Lane. e a o • y NEWS The Pipeline =� LETTER Public Works R Enoineering November 30, 2007 Code Enforcement Public Works The Parks Crew finished mulching leaves in the parks, where needed. The shrubs around the park signs were trimmed up and leaves removed. The Xmark mulching kit and decks on mowers were rewelded. Small engines were serviced and prepared for winter storage. They finished cutting and trimming up trees along the pedways. Rich put in a new phase monitor in the St. Thomas lift station after the old one went out on Sunday at 2:00 A.M., November 18th. He put root killer in the sanitary sewer line on Lexington Avenue from Cullen to Wagon Wheel Trail. Micheals Pipe Services finished the sanitary sewer lining project, most of the areas had a lot of tree roots and groundwater infiltration. The areas relined were: 360 feet on Highway 13, Spring Street, Ivy Hill and easement, Dodd Road easements, Clement Street easement, Wentworth Avenue and Callahan Place. McNamara Contracting cleaned dirty manholes in Copperfield (manholes were dirty from the street project). Rich cut roots in the sanitary sewer lines on Keokuk Lane and Pontiac Place. The Street Crew finished up adding blacktop "blisters" around high manholes and filling potholes. A spill on Highway 13 and London Road was cleaned up. The hot box was taken out of the plow truck and the sander was put back on. Tree stumps were cleaned up that were dumped in the area of Trail Road and Bachelor Avenue. Stump grinding from trees that were taken down was cleaned up and black dirt put down. Various street name signs were made that were missing. Enaineerina There was a watermain break this past weekend on Mohican Lane. St. Paul Regional Water Services fixed it over the weekend. Stocker Excavating, Inc. substantially finished the Marie Creek project this week. Assessments payments are being made on this past year's projects. Eight out of 58 homeowners have paid their assessments in the Ivy Falls project and 55 of the 198 homeowners have paid in the Copperfield project. NEWS The Pipeline LETTER Public Works Engineering Code Enforcement Public Works November 16, 2007 The Parks Crew brought their "You Are Here" sign to City Hall for the Parks and Recreation Commission to look at. All of the Parks and Recreation Commissioners really liked the design of the sign. A tree limb was removed from the pedway on Mendota Heights Road. There were downed tree limbs at Rogers Lake, Friendly Hills and Ivy Falls parks to pick up also. Rich did a sanitary sewer inspection at 659 South Freeway Road. He mowed the grass and mulched leaves at the Veronica lift station. The Street crew finished mounting all plow blades on the dump trucks along with the sanders and wing blades. With Dave Sorby off, George Noack directed pot hole repairs and adding blacktop "blisters" around high manhole castings in streets maintained by City plows. They should be finished by the first of next week. Engineering Sod work is being done on the Ivy Falls project. Scherff, Inc. excavated the ditch along Victoria Road north of Marie Avenue. The ditch was filled with silt and sand. Stone rip -rap was added to prevent future erosion problems. Work was completed this week. Contractor mobilized equipment for the Marie creek stream bank stabilization project. Trees have been cleared and the contractor is anticipating to complete most of the project during the short holiday week. Sue is attending the MPWA seminar at the Earle Brown Center in Brooklyn Park. The seminar covers innovative techniques in Public Works Management. N E W S LETTER Public Works Engineering Code Enforcement Public Works The Polpelmine watemm The Parks Crew worked on the "You Are Here" signs for the Park's Commission meeting next Tuesday. The donated bench has been installed in Valley Park. Black dirt was hauled in, leveled out and seed put down around the bench area. They attended the Safe Assure meeting on Wednesday morning. PARK "YOU ARE HERE" SIGNS The Parks and Recreation Commission desires to place new signs, sort of a "You Are Here" sign in City Parks or along significant trail segments throughout the City. The sign will include a color map of the City's parks and trail system along with other information such as Dog Leash, Motor Vehicle or Motorized Boat Restrictions, etc. John Boland and Park Leadsperson, Terry Blum have assembled a `prototype sign design" for review by the Parks Commission next Tuesday that will be on display outside the front entrance at City Hall. If the Commission approves of this prototype and City Council authorizes funding for materials, Public Works staff will assemble the signs during "slow or down time" this winter for installation next summer. Micheals pipe liner is half way done relining the sanitary sewer lines on the north end of the City. Rich worked on the Mendota Heights Road lift station heating system for winter by putting in a new filter, a new fan belt and greasing the unit. The Street Crew relamped the red arrow that was out north bound on Dodd Road and Mendota Heights Road. The catch basin at 105 Douglas Road was cleaned of leaves. Snow removal equipment was mounted on the dump trucks. A dead goose was picked up on Mendota Heights Road. The new 304 truck was brought to Kramer Spring to be DOT inspected and certified. Enaineerina A preconstruction meeting was held on Thursday for the Marie creek bank restoration project. Construction starts on Monday. Sod work continues on the Ivy Falls street reconstruction project. Park Construction is raising manholes. Public Works The Parks Crew stored the soccer goals, soccer nets and picnic tables for the winter season. The parks throughout the City were fertilized. A cement pad was installed for a donated bench in Valley Park off the pedway. Tennis nets were taken down and the gates locked at the tennis courts. Rich checked the manholes in the Copperfield neighborhood because of the street construction project. There was some dirty sanitary sewer lines found that will need to be cleaned. A broken manhole cover was changed on First Avenue and Brookside Lane. A water box was fixed on South Plaza Drive. The Street Crew reinstalled street name signs on Emerson Avenue and Hingham Circle. Three downed trees were removed by the creek on Spring Creek Circle. Pot holes were patched on Stanwich Lane, Douglas Road, Victoria Curve and Lilac Lane. Preparation work and black top was put down at the entrance to the Civic Center ball field and pedway, Mendota Height_ ,.,ad and Huber Drive, and in front of the Qwest building. The new dump truck was picked up that is replacing #304. The Halloween bonfire was extinguished and hauled out. This year there were not a lot of large limbs in the bonfire pile. Engineering There was a water main break on TH 13 last weekend near Happy Hallow causing a road closure. Boulevard restoration started on the Ivy Falls Street Project. Staff learned how to operate the new projector in the Council Chambers. IV E iN SThe Pipeline LETTER Public Works Engineering October 26, 2007 code Enforcement Public Works The Parks crews cut grass and collected trash. Irrigation systems were repaired at Mendakota, Kennsington and City Hall. They also repaired a light on the fire marshals truck and installed new tires on one of the squad cars. The Streets crew restored boulevard areas in several locations were curbing was replaced. They are administering the cleanup for the Halloween bonfire and piling brush. Locates were called for stump removal on city property and catch basins were cleared of leaves. Streets signs were reinstalled on Huber drive at Decorah and Mendota Heights Rd. Met with contractor about proposed ditch improvements on Victoria Rd north of Marie Ave. Rich checked sanitary sewer lift stations daily and cleaned grease off of floats @ Veronica lift. Completed fall inspection of Lilydale storm sewer and exercised pumps at Marie Park. Winterized tank sprayer used for spraying weeds. Engineering Streets were paved in the Copperfield mill and overlay project and sod is being placed. Ryan attended the Minnesota water resource conference which covers innovative storm water management techniques. The remaining storm sewer was installed in the ivy falls neighborhood and sod is planned to be placed early next week. Crews from Prairie Restorations began over -spraying for new / young Buckthorn plants in City parks where mature plants have been removed. During the past four years removal and eradication efforts have been ongoing in all City parks except Valley Park. Once mature plants are removed from an area, over -spraying to prevent re-emergence of new plants must continue for three or more years. In addition to chemical treatments at other parks, work on removing mature plants in Valley Park will begin in November / December once snow is on the ground. Removal efforts will focus on areas 50 to 100 out from existing trails. Valley Park is over ninety acres in size and will require several years to remove all mature plants with over -spraying of cut areas in following years. IU C \A/ C � ■ � M ■ N Public Works The Parks Crew finished blowing out th out of the pipes in Mendakota Park and were removed. A downed tree was ren Wentworth Park and Fourth Avenue. It ANN Op� Rich cut tree r e ana uaiiahan Place. He Jett h" the Street Crew. A new pump leverlex Pipe. Rich did a sewer inspection on Wagon Wheel Court. The Street Crew cleaned catch basins. The fence was put up for the Halloween bonfire site. Street name signs were put up because they were missing' at Brookside &Laura and Ocala & Decorah. Prep work and patches were put in by the new curbs for catch basin repair,at Garden &`'Hiawatha and Park Place & Boardwalk. Potholes were filled on Mendota Heights Road east' of the 35E bridge and at Wesley Lane and Wesley Court. Code Enforcement Patterson corporate headquarters at 1031 Mendota Heights Road applied for a building permit for two additions to heir building. The scope of the project includes anaddition shell on the south and`east side of the existing structure and an interior demolition of the first and second floor. The estimated cost of the project is $4,000,1000.00. cots, sanitary sewer on ,Flex ThE &o the ed� the storm sewer line o and cable was installed sprinkler systems. The water was drained Kensington Park after the water meters oved from the pedwau between ,v was cut up and chipF r lines on Keokuk Lan Hill Road wit on the jet truck by, aerinq in has limited the amount of progress on the ongoing reconstruction and mill lay projects. Let's hope for some nice weather before the snow flies to get )jects completed. iment Attached is a letter from a happy resident thanking Sam new rain garden. for their LETTER The Pipeline Public Works Enaineerinc> October 12, 2007 Code Enforcemeni �,114 Public Works The Parks Crew striped the soccer fields, cut grass and mulched leaves. Sprinkler systems were winterized at Mendakota Park, Kensington Park, City Hall and the Fire Hall. They attended Turf Works Fields Days and got information on new products and new equipment. Rich cut roots in the Victoria Road easement. He was called in at 4:30 A.M., Tuesday because of a power outage at the Northland Drive lift station. Power was restored at 1:00 P.M. He inspected the manholes on First Avenue, Second Avenue, Third Avenue, Fourth Avenue, Vandall Street, Clement Street. Sam from Engineering helped Rich measure barrel sections and count rings on those streets for Engineering. The Street Crew cleaned storm grates. A beehive was cleaned in the runoff pond behind Cherry Hill Road. It was draining slow because the pipe was plugged and Rich will jet it. Missing street name signs were put up on Victoria Road and Summit Lane. Street name signs were made up for Ocala Lane, Decorah Lane, First Avenue, Brookside Lane, Laura Street, and Apache Street. They attended a safety meeting with Safe Assure the topics were "Personal Protective Equipment" and "{Cold Weather Awareness". The traffic signal on Mendota Heights Road and Highway 149 "don't walk" light is out. The Street Crew relamped it and it was still out. Upon further investigation, they found mice were chewing on the wiring harness and MnDOT Electrical Services was notified. ENGINEERING Restoration has continued on the Ivy Falls Reconstruction project. Driveways have all been patched and boulevards have been graded with new topsoil. The NURT trail construction has begun near town center with the contractor excavating to place the base for the new trail. Weather limited the amount of work the contractor could complete in the Copperfield Neighborhood. Paving is expected to be completed late next week. Ryan met with Mn/DOT regarding three separate drainage issues on Dodd Rd (TH 149). Mn/DOT is working on funding and design for the three locations which should be constructed sometime in 2010. Two of the areas are where drainage leaves the Somerset Country Club. The new system should greatly reduce the amount of erosion currently experienced by several homes. NEWS LETTER Public Works Engineering Code Enforcement Public Works The Pipeline * + October 5, 2007 Columbus Day , The Parks crew marked all tree stumps in the parks for grinding. Broken hockey boards were replaced at Wentworth and Friendly Hills hockey rinks. All mowers were serviced. The mulching kit was put on the xmark. Rich was called in Wednesday night for a high water alarm. Grease was caught on the floats causing them not to work. He cut roots in the sanitary sewer lines on Highway 13 from Garden Lane to Fremont Avenue, Annapolis Street east of Chippewa Avenue, Hingham Circle and Downing Street. The Street Crew attended the annual Fall Maintenance Expo in St. Cloud. Sessions included snow and ice control on roadways, dealing with the public, and street sweeping dos and don'ts. Catch basins were cleaned of leaves. Tim cleaned up an excessive amount of leaves off Marie Avenue by Valley Park. Temporary street name signs were put up at Wagon Wheel Trail and Wagon Wheel Court. Garbage was picked up on Mendota Heights Road and Lake Drive. Engineering Streets in the Ivy Falls neighborhood were paved this week. Work continues on both the Ivy Falls project and the Copperfield mill and overlay. The Engineering Department held a public informational meeting for the proposed street reconstruction meetings for the Avenues neighborhood and Kay Avenue/Walsh Lane. The meeting was well attended with 39 properties represented and at least 50 people present. Public Works The Parks Crew trimmed trees along the pedways on Lexington Avenue, Marie Avenue and Victoria Curve. Downed tree limbs were picked up in the parks and chipped up. Rich was called in on Thursday at 6:00 P.M. because of a power outage at the Lilydale lift station. The power was out until 11:30 P.M. He inspected manholes on Kay Avenue, Walsh Lane, Summit Lane, Victoria Court, Vandall Street, and First, Second, Third and Fourth Avenues. He helped the Parks Crew pick up downed trees and chip them up. The Street Crew patched potholes on Knollwood Court. Stop signs and street name signs were reinstalled on Mendota Heights Road and LeMay Lake Road. Street name signs were reinstalled at Stanwich and Dodd Road, Ivy Falls Avenue and Sylvandale Road. Trees were cut up that were down from Monday night's storms. Trees were down on Kirchner, Hampshire and the end of Victory Lane. Dead elms were removed from Marie Avenue east of Dodd Road. Engineering Pine Bend Paving removed damaged trail areas, patched and overlaid approximately 1100 feet of trail south of Marie Avenue beginning at the Marie Avenue pedestrian underpass tunnel opening. Several sections of trail had been damaged during the Xcel Energy power line and pole replacement project completed in early summer. Xcel Energy crews repaired disturbed turf areas and have been asked to reimburse the City for this trail repair/overlay. Refreshing of paint striping on City streets was completed on Wednesday of this week. Each year the City refreshes/repaints approximately one-third of the total striping and paint markings on City streets with an epoxy based paint that, on average, provides from three to five years of visible coverage. This year over 39,000 lineal feet (7.4 miles) of four inch wide yellow and white striping was applied to Lake Drive, Centre Pointe Drive, Mendakota Drive, Dakota Drive, Victoria Road, and portions of Centre Pointe Curve, Hunter/Orchard and Pilot Knob Road north of Hwy 13. NEWS LETTER Public Works Engineering Code Enforcement Public Works The Pipelml NZN :3 September 21, 2007, The Parks Crew trimmed trees along the pedways. Pilot Knob trash barrels were picked up. They serviced the mowers. The roots from the trees were sprayed along the pedway on Huber Drive. Rich cleaned the sanitary sewer lines on John Street, Ivy Hill, and Highway 13. All of these are being relined by Micheals Pipe. Micheals Pipe also started the sanitary sewer line rehabilitation work. The rootsaw broke down and was taken to ABM Equipment for repair. The Street Crew repaired a broken catch basin and curb at High Ridge and Warrior Drive. A gate box extension was put in, the depression was filled in, and blacktop put down at Pilot Knob Road and Mendota Heights Road. A street patch was put in at Park Place and Farmdale Road. Engineering The contractor on the Copperfield mill and overlay project replaced the concrete and curb panels this week. Milling of the streets will begin on Monday, September 24tn and last through Wednesday, September 26tn Storm sewers were installed on Woodridge Drive for the Ivy Falls reconstruction project. Phase I of the project has new blacktop. Gravel was put down on 3/4 of the streets of Phase II. The contractor has been slowed down this week with the heavy rain. Sam and Ryan have been busy all week surveying the project. Repairs to the trail in Valley Park, south of Marie Avenue, began on Thursday of this week and will resume next week. City Council on Tuesday night authorized Pine Bend Paving to do the repairs and overlay 11,000 feet of the trail in this park. Street striping and markings at 10 locations throughout the City may begin today and work will be completed next week. Engineering hosted a fabulous cookout for City employees on Thursday. The weather was chilly at lunch time, but the food was excellent!! Please see the attached thank you letter from a resident on Emerson Avenue regarding their new rain garden. 9 o rf O P P R � NEWS LETTER Public Works Engineering Code Enforcement Public Works The Pipeline f September 14, 2007 The Park Crew sprayed the pedway on Huber Drive for weeks that were growing in the cracks. John Boland helped install in the rain gardens in the Somerset neighborhood. The irrigation system was added on to at City Hall in the newly planted shrub areas. Rich was called in Saturday morning for a phase failure at the Lilydale lift station. He reset the phase monitor. He helped with the rain gardens also. He helped plant plants and watered them. Rich raised a manhole up 1' on the Apache Court easement. He attended Safe Assure's confined space training. The Street Crew removed trees from the storm. School zone signs were installed. Crosswalks were painted. Engineering The majority of the rain gardens were planted this week. Sam put in many hours with assistance from Rich, John Boland, Nancy, Sue, Guy, Ryan and residents. The remaining gardens will be planted by the homeowners. McNamara Contracting worked on the Delaware Avenue/Huber Drive turn lane, sidewalk, curb and gutter, and removal and replacement in the Copperfield neighborhood. Park Construction installed curb and gutter on the first phase of the Ivy Falls street reconstruction project. Paving is scheduled for Monday. Please see the attached Dakota County newsletter regarding the North Urban Regional Trail, Phase II. North Urban Regional Trail, Phase II September 4, 2007 Bids were received on July 3, 2007 for the second phase of the North Urban Regional Trail (NURT) project. The County Board awarded the project to Max Steininger, Inc. Work on this project will begin on September 10, 2007. C�A What's Being Done? The North Urban Regional Trail (NURT) is a paved bicycle and pedestrian trail that connects the cities of Lilydale, Mendota Heights, West St. Paul, and South St. Paul. Phase II of the project continues the trail along TH 110 from Dodd Road to Charlton Street in Mendota Heights and West St. Paul. This trail will connect to two existing trails, one along the east side of Dodd Road, and the other along the north side of T H 110 east of Charlton Street. What Should I Expect? On Monday, September 10, survey crews will begin construction staking for the project. Clearing of trees and brush within the construction limits will begin. Some trees and plants will be relocated. This project includes some storm sewer work in various locations, installation of curb and gutter, and several retaining walls will be constructed. Paving and landscaping will take place toward the end of the project. Private utility work may begin prior to September 10 and continue throughout the project. For the safety of both the construction workers and I►1 When Will The Work Be Completed? It is anticipated all work will be complete by the end of October. More Information This construction update is being delivered to residents and businesses near the vicinity of the construction. The following names and phone numbers are for your use if you have questions or concerns about the project. For notification by email of any updates to the website, email your request to the Project Inspector. If you have any special needs, don't hesitate to call or visit: htt :/h"n x,,dakotacounLy.us/EnvironiiientRoads/RoadConstruction/Current PROJECT INSPECTORS Erin Borchert 952.891.7908 Erin.Borchert@co.dakota.mn.us Mark Jelinek 952.891.7916 Mark.Jelinek@co.dakota.mn.us EMPIRE TRANSPORTATION OFFICE 952.891.7900 Monday through Friday 7 a.m. to 3:30 p.m. NEWS LETTER Public Works Engineering Code Enforcement Public Works The Pipeline August 31, 2007 After Tuesday morning's storms there were a lot of trees down throughout the City. The Parks Crew chipped up trees from Rogers Lake Park and Friendly Hills Park which were the worst hit parks. Graffiti was cleaned up at Valley Park. The Par 3 mower was repaired as was the big Toro, 580d and the Xmark. The soccer fields were laid out and striped. The water tower storage area was cleaned. There was damage to the backstop at Mendakota Park. Rich checked Lilydale's bad sewer line every day. There were power outages Tuesday morning from the storms at all lift stations. Rich was called back Tuesday evening at 5:30 p.m. because the power was out at the Veronica lift station until 7:30 P.M. He cleaned sanitary sewer lines on Wentworth and Winston Court at the easement. Both had roots in them. Rich helped the Parks Crew clean up the water tower storage area. The Street Crew cleaned up after numerous reports of trees blocking the streets. The hardest hit neighborhoods were Curley and Friendly Hills. The four summer helpers last day at Public Works was August 30`h. All the summer employees are going back to school. Engineering Wagon Wheel Trail is still closed as curb and gutter is being put in the Kipp Addition. Street reconstruction continues in the Ivy Falls neighborhood with installation of storm sewer and grading. The Copperfield neighborhood mill and overlay project starts next week with construction of the right turn lane at Delaware Avenue and Huber Drive. Code Enforcement Paul Berg was in a motorcycle accident yesterday. He is in the hospital with broken bones in his right hand, a bruised liver, and a couple of broken ribs. Luckily he was wearing his helmet or it could have been a lot worse. LETTER Public Works Enciineering Code k August 00 Public Works The Parks Crew made playground repairs in Ivy Falls Park. They performed routine maintenance on the mowers. Rich checks the Lilydale sewer line daily because it is partially broken and needs to be dug up and repaired. He cleaned sewers on William Court (found roots), Victoria Court easement and Glen Hill Road. He put landscaping and wood chips around the Marie Park storm lift station. The root saw broke down and Lenny rebuilt it with new bearings and seals. The Street Crew cleaned catch basins and repaired one at Medora and Emerson. Low hanging limbs were cut on Mendota Heights Road and Executive Drive. Crime watch signs were replaced on Upper Colonial and Knollwood Lane north of Emerson. Stop signs were replaced at Huber and Decorah. Engineering On Wednesday, a water main broke on the west end of Ivy Falls Avenue. The preconstruction meeting for the Copperfield neighborhood project was held at City Hall on Thursday. McNamara Contracting plans to start construction right after Labor Day beginning with the right turn lane at Delaware Avenue and Huber Drive. Dakota County held a preconstruction meeting for the NURT (Northern Urban Regional Trail). The contractor has 30 working days to finish construction. Construction is planned to begin September loth Ryan and Sam are continuing to survey the Ivy Falls neighborhood. Sam "the awesome bee whisperer" was stung five times in one day while surveying this week. NE`"s - LETTER `�f The Pipeline o Public Works ' 0 0 p ° Engineering 0 °a p0 �A Code Enforcement August 17, 2007 0 Public Works The Parks Crew removed rec rocks from the infield at Mendakota Park on field #3, put down new rec rock, and leveled it out. Old turf was removed from in front of the soccer goal on the west field at Kensington Park and new sod put in. Other areas were resodded as needed. Downed tree limbs were picked up from parks and along pedways from the storms that came through. Lines were painted on basketball courts in the neighborhood parks. Fields were dragged for a church league tournament. The soccer fields were fertilized at South Kensington Park. A pump was plugged with a hand towel at the Lilydale lift station. The towel was removed by Braun Pump. Rich cleaned sewers on Mary Adele, Patricia Street, Theresa Street, and Timmy Street. There were roots found on Timmy Street and Theresa Street. Rich did a sewer inspection at the Mendota Heights Par 3 Golf Course. There were power outages on Saturday, August 11, at the Lilydale lift station - Mike Maczko responded, Center Pointe on Saturday morning - Terry Blum responded and Centre Pointe on Saturday evening - George Noack responded. The Street Crew met with a John Deere factory warranty representative because the backhoe is settling and the representative authorized to have it repaired. Brush was trimmed back to clear sight distance on Douglas and Victoria. Catch basins were cleaned. Trees were cleaned up after Monday night's storms. Trees blocked streets on South Lane, Summit Lane, end of Spring Street, and Delaware Avenue. A permanent pedway sign was installed on Wachtler and Highway 13. Engineering Tom Knuth, Ryan and Sam staked curb in the Kipp Addition. Storm sewer is being installed this week in the Kipp Addition. Ryan and Sam are surveying the Ivy Falls neighborhood. Water main is being replaced this week in the neighborhood. Thursday was Mandy's last day as she is returning to school in Ames, Iowa. NEWS LETTER Public Works Engineering Code Enforcement Public Works August 10, 2007 The Parks Crew aerated the soccer and ball fields throughout the City. The hockey boards were painted at Wentworth Park to cover up graffiti. The fields at the Civic Center and Mendakota Park were top dressed. Rich's summer helper, Andy, filled in for Rich while he was on vacation. Andy trimmed trees in the sewer easement in Friendly Hills. He painted fire hydrants on Lexington Avenue, Centre Point Curve and Centre Point Blvd. Public Works treated the City Hall and Police employees to a summer picnic. The food was excellent and the day beautiful. Thanks to Public Works employees!! A great time was had by all who attended. Engineering There was a water main break on Monday at the east end of Lakeview Avenue. On Wednesday, Sue, Guy, Sam, and Mandy toured the Shakopee Mdwankanton Sioux Community's Wastewater Reclamation Facility. The $20 million facility is the cleanest, most advanced wastewater plant in Minnesota. Effluent from the facility is used to irrigate the community's golf course and other areas. It also features a 31,000 sf green roof that contains more than 45,000 seedlings along with seeds from native prairie grasses and flowers. Sue will be on vacation in sunny California the week of August 13`h Sam is out of the office until Tuesday, he is hiking the Rockies in Laramie, Wyoming. NEWS LETTER Public Works Engineering Public Works The Pipelin August 3, 2007 The Parks Crew cleaned up the back shop. Trees were trimmed along the pedways and in the parks. A swing was repaired at Rogers Lake Pa rk. Rich painted the storm sewer lift station panels and fire hydrants. He jetted the sanitary sewer lines on Wagon Wheel Trail and in the Curley's easement. The veronica lift station floats were cleaned. He did a sanitary sewer inspection at 2130 Timmy Street. He inspected the raised manholes on Lexington Avenue after the overlay project was completed. The Street Crew helped the Parks Crew clean up the back shop. The debris was cleaned out of the ditch on the south end of Celia Road and Victoria. Signs were made for the Police and installed. Pot holes were patched on Evergreen Knoll. Engineering Bids were opened on Wednesday for the Copperfield Addition Rehabilitation project. The low bidder is McNamara Contracting in the amount of $541,761.30. Water services are being constructed at the Kipp Addition. Dakota County came to City Hall on Thursday to show staff the new web -based GIS program. NEWS LETTER i he tolpeiine Public Works Engineerinci July 27, 2007 Code Enforcement Public Works The Parks crew worked the state baseball tournament for the Mendota Heights Baseball Association. They trimmed trees and ground stumps along pedways and in parks were needed. Trash was collected from parks, mowing, etc... The Streets crew replaced stop sign on Mendota Rd and at the entrance to Mendakota Country club. Installed a new yield sign, cleaned storm grates, cleared a downed tree on Delaware and Huber Dr (notified Dakota County), and removed a topsoil edge on Hunter Ln (temporary fix until curb and gutter can be installed). Dave and Sue also inspected the ditch on Victoria Rd between Marie Ave and Douglas Rd, Rip rap should be installed. Rich checked sanitary sewer lift stations daily. Rich cleaned he sewer main using the jet truck on Overlook Rd, Overlook Ln, Vicki Ln, Douglas Ct, and Douglas Rd. On Wednesday Gartzke Construction replaced the 42" storm sewer pipe at Wachtler and TH 13 and placed rip rap In the TH 13 ditch. The portion of the trail that was disturbed by the construction will be repaired by Opus. Bituminous Roadways completed the mill and overlay of the trail on Wachtler south of Cherry Hill Road. Dakota County's mill and overlay project on Lexington between Vail and TH 13 was completed this week. Installation of the Sports Tile surfacing material at Valley Park tennis court was completed on Thursday. The new court surfacing will be available for use Friday afternoon. Earlier in the week Public Works removed a number of dead elms trees along the easterly stream side of the courts which has "opened up" the area. The mile long trail from Marie Ave. northerly to Hwy 13 is the most heavily used trail segment (bikers, walkers and canine companions) in the City. Signs will be placed in the all of the City's tennis courts next week asking residents to try the new surfacing at Valley Park and to provide feedback to City staff. NEWS LETTER Public Works Enaineerinq Code Enforcement Public Works The Pipeline July 20, 2007 The Parks Crew trimmed trees in the parks and along pedways throughout the City. Graffiti at Rogers Lake Park was cleaned up. A broken chalker was repaired from Mendakota Park. A torn home plate on field 4 was replaced at Mendakota Park. Weeds were trimmed along pedways and around sign posts and hydrants. Rich cleaned the sanitary sewer lines on Stratford Road, Coventry Court, Walsh Lane, Avanti Drive, Faro Lane, Summit Lane and Marie Avenue. Two manholes were raised in the easement at Ivy Hills Townhomes. The Street Crew patched potholes on Mendota Heights Road between Dodd Road, and Delaware Avenue and on Evergreen Knolls. A catch basin was repaired at Wachtler Avenue and Emerson Avenue. Enaineerinq Sue attended meetings on both the Eagan -Inver Grove Heights North/South Corridor Study and the Robert Street Transit Corridor Study. Sewer and water were installed at the Wagon Wheel Trail intersection. Class 5 should be installed on Monday. One lane is open, but the road is still closed. Lexington Avenue mill and overlay will start tomorrow (Saturday). Ryan has taken some time off and is on vacation in Colorado. 11 NEWS The Pipeline F `' LETTER ... I Public Works AftJ Enaineerina July 13, 2007 S Code Enforcement ' Public Works The Parks Crew trimmed trees along the pedway on Wentworth Avenue. The sprinkler system at City Hall and Mendakota Park was worked on. Broken boards were repaired on the park bench at Mendakota Park along the pedway. Enaineerina The retaining wall along Wentworth Avenue west of Dodd Road, which had deteriorated due to road salt, was replaced on Monday by Blaeser Landscape and Construction. This trail section and retaining wall were originally installed adjacent to Wentworth in 1990 near the Somerset 19 Condominiums. Approximately one hundred and fifty feet of old concrete modular block wall was removed and replaced with a natural stone product and drain pipe, that will not be affected by winter road salt. The foreman of the five man crew reported that many of the residents at Somerset 19 favorably commented on the new wall construction. Six contractors submitted bids last week to Dakota County for construction of the NURT trail along the north Highway 110 frontage road from Dodd Road easterly to Delaware Avenue. This federally funded project, administered by Dakota County, had a construction estimate of $750,000. The low bidder, Max Steininger, Inc. (Eagan, MN) submitted the successful low bid of $682,213.69. Work is scheduled to begin later in July with completion expected in September. City staff plans to attend the contractor's pre -construction meeting and will periodically monitor the project and provide assistance, if requested. The trail segment along Town Center will be illuminated by light bollards identical to ones in the Village at Mendota Heights / Town Center development located on the northeast corner of Highway 110 and Dodd Road / Highway 149. On Tuesday a representative from EMI gave a presentation on a new product for street overlaying. The process is similar to the slurry seal which has been utilized in the past with poor results. It is a cheaper application than a full mill and overlay but until performance over time is tested and positive feedback received the city has no plans to install it on any streets. There were two bid openings on Wednesday. The first was for the Ivy Falls reconstruction project, seven bids were submitted for the project. The low bidder was Park Construction at $819,000, well below the estimate of $940,000. The project should get started before the end of the month. The other opening was for the sewer lining project. Last year a portion of the cities sewer system was cleaned and televised and problem areas were noted for repair (problems in the sewer are generally infiltration of groundwater, cracked pipes, missing pieces, etc...). A liner will be installed in the deficient areas to extend the life of the system and reduce the quantity of water sent to the treatment plant. The low bidder for this project was Michel's Corporation with a bid of $89,000 with the estimate being $107,000. It appears to be a good year to have projects going and contractors being competitive for the work. An application was submitted to Dakota County SWCD for a stream bank restoration project along Marie Creek. A number of properties have been experiencing major erosion after storm events and the project would install innovative armoring and greening techniques to stabilize the banks and minimize further damage. The Kipp addition project is getting underway. Clearing trees started on Thursday and the contractor expects to get the utilities started early next week. NEWS L E T T E Public Works Engineering Public Works e Pi pel'i June 30, 2007 The Parks Crew pulled weeds around the park signs throughout the parks. A bad sprinkler head was replaced at Mendakota and Kensington Parks. Basketball courts were washed down and prepared for line painting. Rich cleaned sanitary sewer lines at Mendakota Park, Warrior Drive easement, Dodd Road easement, Park Drive, Hampshire Drive and Hampshire Court. The sanitary sewer line was visually inspected from the Mendakota Golf Course down to Wagon Wheel Trail. There was a lot of grease built up. The grease build up will be reported to Mendakota Golf Course. Rich did a sewer inspection on Centre Pointe Drive. Rich attempted to plug a five gallon a minute leak of ground water into the manhole on Hampshire Drive. The attempt didn't work. Visu-Sewer is coming out to look at the leak and provide a bid. The Street Crew patched Ellen, Chippewa, John, and Junction Lane. The pedway and bridge were blacktopped behind Somerset School. A dead tree was removed on city property at Pagel Road and Havenview Court. Engineering The final lift of bituminous pavement was installed on Delaware Avenue on Wednesday. Crack filling and court surface repairs were completed this week at the tennis courts in Ivy Hill, Marie, Wentworth and Friendly Hills Parks. Valley Park courts will be resurfaced using a sports -tile system installed on/over the existing court surface in mid -July. Great River Green conducted a "controlled burn' of the Pilot Knob site on Thursday morning. Originally scheduled for Wednesday, the burn was delayed until Thursday when wind conditions would be better. On Wednesday, the GRG crews watered and soaked areas adjacent to the site, especially the large stockpile of trees and debris Acacia Cemetery has accumulated west of Pilot Knob Road. The first light -up began at 9:30 and was basically completed around 11:30. Wetting down and control of smoldering wood embers to prevent a possible re -start of a fire, once the crew had left the site, continued until around 1:30 pm. Gail Lewellan and Deborah Karasov, GRG Director, were on site and Guy captured a number of photos of the burn operation. The next step of the restoration plan will be to prepare the site for physical improvements (walking trail, overlook, parking, etc) followed by restoration of native plants and grasses. Another clean up of the site by staff to remove debris left from prior uses (old bottles, metals, wood, etc), that is now visible thanks to the burn will be done early next week. On Friday night, June 29th, the Skate Shop (located on Ford Parkway in St. Paul) is holding a FREE barbeque (hot dogs, brats, etc) at the Skate Park in Roger's Lake Park beginning at 5:00 pm until sundown. The event is named "Familia" (Family in Spanish) and the sponsors hold a similar event each week at various skate parks throughout the area during the summer. Tomorrow night is Mendota Heights turn. Last years event was well attended with the upper parking lot completely filled with cars. Please see attached thank you letter from a happy resident in Mendota Heights. NEWS LETTER Public Works Engineering Code Enforcement Public Works Jhe Pipelin June 21, 2007 The Parks Crew worked a tournament for Mendota Heights Baseball Association by dragging fields and chalking the foul lines. Newly planted and young trees were watered. Rec rock was hauled in and put down in the infields at Mendakota Park and all fields were graded. All irrigated parks were fertilized (Mendakota, Kensington, Fire Hall and City Hall). The signs and fire hydrants along the pedways were weed whipped. Rich jet cleaned the sanitary sewer lines on Abbey Way, Haverton Road, Haverton Court, Canton Court, Winthrop Court, Morson Court, Pond Circle West, Pond Circle East, Stockbridge Road and Whitfield Drive. Two fire hydrant flags on Abbey Way and one on Whitfield Drive were changed. The Street Crew trimmed trees, on Emerson Avenue and Delaware Avenue that were causing sight distance problems; and on Chippewa and Simard that were blocking street name signs. Old sign posts were pulled out on Knob Road, Highway 110, Northland Drive and Mendota Heights Road. They hauled in the rec rock and black dirt for the Parks Crew. Pearson Bros. returned to sweep up the chip seal rock. NEWS LETTER Public Works Enaineerina Code Enforcement Public Works The Pipeline June 15, 2007 The Parks Crew cleaned Mendakota Park around the building and cleaned up rec rock off the cement area. They worked the USSSA tournament. The irrigation systems at Mendakota Park and Kensington Park were tested. The door handle on the concession stand at Mendakota Park was repaired after vandalism. A downed oak tree was cut up and cleaned up at Friendly Hills Park. Mulch was put down around newly planted trees. Rich sprayed round up (total weed killer) in the right-of-ways for the Street Crew and around fence lines for the Parks Crew. He cleaned sanitary sewer lines on Copperfield Drive, Fieldstone Drive, Stone Road, High Pointe Road, Watersedge Terrace, Pond View Drive, Pond View Court and Fieldstone Court. The Street Crew patched potholes on Wagon Wheel Trail, Eagle Ridge Drive, Downing Street, Brompton Court and Highway 13, Kay Avenue and Walsh Lane. McPhillips was called in to sweep up debris after a vehicle fire on Laura Court. Gartzke Construction did major catch basin repair on Boardwalk and Park Place, Hiawatha and Garden Lane, and Victoria Road south of Highway 13. George helped the Parks Crew with the bobcat and grapple bucket to pick up a downed tree. Enaineerina Sue met with Lynn Clarkowski, the new MnDOT area manager for the south metro area. We discussed local highway issues. Lynn also provided contact information for MnDOT's landscape partnership program. Sue will look into a potential landscaping project along TH 110. A preconstruction meeting was held for the Somerset Rain Garden Project. The concrete and paving work is finished at the Mendota Heights Road/Pilot Knob Road traffic signal project. NEWS LETTER Public Works Engineering Code Enforcement Public Works The Parks Crew worked the Parks Celebration on Saturday - setting up and cleaning up. Tree limbs were removed at Wentworth Park around the foul line pole. A damaged foul line pole was removed from Valley Park. Rich jetted the sanitary sewer lines on Mendota Heights Road (Dodd to Huber Drive), Arbor Court, Arbor Court easement, Mendota Heights Circle, Westview Terrace, Pond Haven Lane, Bridgeview Court, Brookfield Lane, Heritage Drive, Concord Way, Bedford Court, Lockwood Drive, Kensington Park easement and Wilshire Court. The Street Crew cleaned up downed limbs from Sunday's winds. Catch basins were cleaned. The street lights were out on Northland Drive after the contractor, who is installing the traffic signals, broke the conduit and wires. Patching of potholes was done on Wagon Wheel Trail. John Ambrose and John Boland helped install countertops in the Police Department. Engineering Sue met with Bruce McManus to discuss a potential creek bank stabilization project on Marie Creek. Sue and Ryan also met with Dakota County SWCO for funding these types of projects through their community conservation cost share program. Sue had a chance to visit both Somerset and Mendakota Country Clubs to discuss potential projects they have planned. The contractor working on the Pilot Knob Road/Mendota Heights Road traffic signal hit underground power lines and telephone lines. The seal coating in Curley's Addition and Bridgeview Addition was completed on Tuesday. Memorial Day NEWS LETTER Public Works Engineerinq Code Enforcement Public Works he Pipelin May 25, 2007 The Parks Crew prepared the fields at Kensington Park South for a Lacrosse tournament. Sprinkler heads were repaired at Mendakota Park on fields one and three. Trees were planted in the parks to replace ones that had died. The broken swings at Friendly Hills Park and Rogers Lake Park were repaired. Downed tree limbs were picked up in the parks after Wednesday afternoon storms. Rich cut roots at Sunset Lane, South and North Freeway Road, Knob Road, Winston Court easement, Miriam Street, Simard Avenue, Downing Street, Walsh Lane and Kay Avenue, Glen Hill Road and Highway 13 at Brompton Place to Sylvandale. He watered trees in the parks and helped the Parks Crew plant trees. The Street Crew did street patching in the Avenues, Vandall Street, and Laura Street. Two holes were patched on the pedway between Overlook and Marie Avenue. The pothole at Dodd Road and Roundhill Road was filled. A bituminous berm at 745 Hilltop Road was built to prevent erosion in the yard. Catch basins were cleaned. Engineerinq Sue McDermott, Mike Maczko and Guy Kullander met Tuesday morning at Valley Park with Excel Energy and their contractor to coordinate restoration efforts along the recently upgraded power lines in Mendakota Park and Valley Park north to Highway 13. Turf restoration, grading rutted disturbed areas began Tuesday afternoon and weather permitting should be completed by mid -June. City staff will coordinate replacement of severely damaged trail segments (billable to Excel) through the bituminous contractor hired by the City to repair city trails. Minor trail edge damage caused by Excel's contractors will also be evaluated by staff and a 'cost -per -foot" value determined, invoiced to Excel and the funds earmarked to offset costs of a future trail overlay. Sue and Tom Knuth met with Ross Fefercorn and Dakota County CDA staff to discuss grading issues at Town Center. Sue met with Brian Birch to discuss a creek bank stabilization project in his yard. Sue and Ryan have been working with Dakota County and SWCD on a grant application to fund the work. NEp Sp �/+� ■M■ /ram ■y■ TT LEE ■ Public Works Engineering May 17, 2007 Code Enforcement Public Works The Parks Crew removed downed tree limbs on pedways in Rogers Lake Park and Hagstrom King Park. Permanent home plates were installed in all the neighborhood parks. Fields at Mendakota Park were prepared for the Visitation Softball tournament. Rich finished spraying the dandelions at the Friendly Hills Tot Lot and Curley's Tot Lot. He trimmed tress at the Culligan lift station in put down wood mulch. He repaired the lawn on Swan drive in the storm sewer easement by putting in black dirt and grass seed. The streets crew hauled out sweeping and other debris from city property(approx. 190 cubic yards). Planted trees along Delaware Avenue. Patched blacktop on Medora Ct., Clement St. & 1st Avenue. Mailbox repairs were completed with the installation of a $200.00 mailbox. John Boland's a Father Again John and his wife, Lori, had a baby boy on Monday evening. He was 9 Ibs 7 oz. This is the first boy in the family - they have three girls!! Congratulations!! City Council authorized installation of high impact polypropylene sports surfacing tiles over the existing tennis courts at Valley Park. This product allows drainage through and under the surfacing tiles making the courts usable soon after a rain fall event. The base asphalt surface may still exhibit cracking but this will not affect the sports tile surfacing that in effect "floats" on the old court's asphalt surface. Last week fence repairs and addition of a large access gate to the court were completed. SKATE PARK IN ROGER'S LAKE PARK Three new ramps will be added to the skate park suitable for the beginner or novice skate boarders. Existing Tier One rated skateboard equipment (maximum height is three feet) does not require "full time supervision" will remain and the new components 7" 12" and 14" high are to be located on the north side of the Skate Park, within the fenced area. WACHTLER AVE. & IVY HILL PARK TRAIL WORK Trail repairs, patching and addition of a two inch bituminous overlay will occur on the Wachtler Ave. trail from Wentworth Ave. to Cherry Hill Rd. and similar work, including an access trail segment to the recently completed playground reconstruction, will be done in Ivy Hill Park from Maple Park Dr. to Butler Ave. Other minor trail repairs will also be done at three locations. NEWS LETTER Public Works Enoineerina Code Enforcement Public Works The Pipeline May 11, 2007 Nappy Birthday Minnesota 149Years The Parks Crew cleaned up downed limbs in the parks and pedways from the heavy winds on Sunday. Netting was hung in the batting cage at the Civic Center ball field. Home plate and matting was also installed at the Civic Center ball field. Sprinkler heads were repaired at Mendakota Park, City Hall and Kensington Park. The irrigation timers were replaced at Mendakota Park. Rich sprayed weeds in Marie Park, Valley Park, Victoria Highlands Park, Wentworth Park and Hagstrom-King Park. A manhole was sealed in the Ridgewood easement. There was a large leak in the mahole, 7 g.p.m., which Visu Sewer grouted. Rich did manhole inspections on Lexington Avenue between Highway 13 and Highway 110 and found six need to be repaired. The Street Crew cleaned up and cut up downed trees and limbs from Sunday's winds. More street sweepings were hauled to Solberg's. Two new speed limit signs were installed north and south of Decorah Lane on Huber Drive. The concrete bases from the street lights were pulled out on Mendota Heights Road and Pilot Knob Road to make room for the new traffic lights. Pothole patching was done on Sylvandale Road to Maple Park Drive. Brush was cut that was obscuring signs on Victoria Road. Trees were planted in the boulevard on Delaware Avenue. Enaineerin4 Graduate students from the University of Texas were in town on Friday doing laser video testing on our plastic storm sewer pipe at Town Center. They are doing a study on the performance of plastic (HDPE) pipe throughout the country. The study is sponsored by the American Concrete Pipe Association. The Engineering Department opened bids for the Kipp Addition improvements and the Lilydale Water Main Extension. G.L. Contracting, Inc. was the low bidder on both projects. Attachments: Pilot Knob & Mendota Heights Construction Update from Dakota County NURT Trail Project Schedule and Planner 0 O N 09 W Z Z Q J CL W J W N WS W El N P m ^ N N M N P ; N m �2 N o m O N yl N O. N ro N m O n N M N M W h N P N N N N To > W n N N N N W N O n 4 m N O m O N P N m J N N o m O H N 11 � W N N M a0 n M ry q q w LyJ Q r o O O t7 O O M O O l�l O O O O O O O O O ry O o 0 N O O N y IL Q �7 L N ° ° 0 y 3 Q LU c0 � O Z Q ina O C :E< U N Q E Q N O. O U o U a < ` Et E U N a` 0) 0 ? C a O ° _ M C V m 20 Q -° 'm 0)o ° m iL W h N N IV LL n O W N N Z m O n N m N m m O n N N N Q Q W N N 9 O n V N m W h N P N N n n 0 0 n 0 n n o n O p0p N M O O Cl! n h O O m O m P O• O O n n n n l 0 0 0 0 N M t7 O 0 0 0 0 6 'o a a ° v m a u � O � E >Q O U a a ° C G v 0 0 o U 2 U 8 -2 $ 0 N` n I 0 O n 0 N O Bids were received on November 21, 2006, for road and signal work on Pilot Knob Road (CSAH 31) and Mendota Heights Road. The County Board awarded the project to Polyphase Electric Company. What's Being Done? Construction will take place at the intersection of Pilot Knob Road and Mendota Heights Road. The project includes installing a new traffic signal system, lengthening an existing turn lane, and minor roadway improvements. The purpose of the project is to alleviate congestion and provide optimum safety. Pilot Knob Road (CSAH 31) Mendota Heights Road Construction Update May 3, 2007 What Should I Expect? Some of the private utility work has already begun. The concrete signal bases at all four corners of the intersection have already been placed. The contractor is currently working on installing the electrical wiring in preparation for the signal poles. On May 14 the contractor will begin working in the median on Pilot Knob Road north of the intersection. The left turn lane will be lengthened. Traffic delays will occur for about a week while this work is occurring. Signal loops will be installed in the pavement and some curb work will be completed at each corner of the intersection. We anticipate a few week period when no work will be completed as we await delivery of the signal mast arms. Traffic delays will not occur during this time. As always, the construction schedule may vary due to weather. Traffic Both Pilot Knob Road and Mendota Heights Road will remain open during construction. There will be times when traffic lanes are constricted. While the contractor is performing some of the work, you may encounter a short delay. For the safety of both the construction workers and motorists, we ask for your patience. When will Work be Complete? The contractor is required to have all work completed by August 17. More Information This construction update is being delivered to residents/businesses in the vicinity of the construction. If you have questions or would like additional information, please call. For additional project updates, visit the following website: htto://w.dakotacounty.us/EnvironmentRoads/ RoadConstruction/Current PROJECT INSPECTOR David Thao 952-891-7917 DAKOTA COUNTY EMPIRE TRANSPORTATION OFFICE 952-891-7900 M-F 7:00 — 3:30 Public Works The Parks Crew finished working at the Civic Center ball field by leveling out the rec rock. The irrigation system was started up at Kensington and Mendakota Parks and repairs were made as needed. The Lacrosse field was set up at Kensington Park. The field at Mendakota Park was striped for the youth lacrosse team. The volleyball net was installed at Rogers Lake Park. Rich sprayed for broadleaf weeds at City Hall, Mendakota Park, Rogers Lake Park, the Fire Hall, Friendly Hills Park and Kensington Parks North and South. He did a sanitary sewer and storm sewer inspection on Centre Pointe Blvd. He cleaned out the sump pit at the Public Works Garage. The Street Crew continues to make mail box repairs. Street sweepings were hauled to Soulbergs Aggregate in Rosemount. Graffiti was removed from stop signs on Victoria and Marie, and Victoria and Caren. The new truck was brought to ]-Craft to be outfitted for the dump body, hydraulics and other equipment. Enciineering The driveway at 2400 Pilot Knob Road (slope remediation project) was paved on Tuesday. Landscaping will be completed by the end of May. Ryan and Sam completed the second round of water quality monitoring on LeMay Lake. Sue met with WSB & Associates regarding the status of the Mendota Heights Road traffic study. The report will be complete in a few weeks. The first two signal bases at Pilot Knob Road and Mendota Heights Road were poured today. The conduit has been installed on the base locations. The crack sealing in the Kingsley neighborhood was completed on Monday. NEWS LETTER Public Works Enciineerina Code Enforcement Public Works The Pipelin April 27, 2007 The Parks Crew dragged, striped and chalked ball fields. They worked the softball tournament for Sibley girl's fast pitch. The batting cage was repaired at Mendakota Park. Crab grass prevention was put down in the parks. The irrigation system was worked on at the Civic Center. Downed trees and brush from Pilot Knob Road was chipped up. Rich did sewer inspections on Waters Drive. Sump manholes (which collects debris) were vacuumed on Haverton Road, Caren Road, Mayfield Heights Road, Emerson Avenue and Lake Drive. Pipe Services vacuumed catch basins on Stockbridge Road, Whitfield Drive, and Mendakota Court. They were blocked with leaves, sticks and trash. Sweeping of the streets was done in record time this year - three days. That's because sand was not used this winter. Sue, Tom, and Dave attended the APWA North American snow conference. Everything from staff, plowing, de-icing, and safety was discussed. One interesting thing was learned - Fort Collins, Colorado does not plow residential streets until there is eight inches of snow or more. The reason being is the median temperature during the winter is 420 in the winter and in the summer it's 850. The Street Crew assisted the Parks Crew with cleaning up debris in the parks. Street lights that were out in the industrial park were worked on. En4ineerina There was work done at the JES slope remediation project this week. Curb and gutter was poured for the driveway replacement and the grading was finished for the slope. On Thursday, Sam and Ryan braved the treacherous water of LeMay Lake (in Sue's canoe) to obtain a water quality sample for the Metropolitan Council's lake monitoring program. Samples will be collected through October to measure levels of phosphorus, nitrogen and chlorophyll -a (which is an indicator of algae). So for the water is clear and no pirates were encountered! Grandpas Guy Kullander became a grandpa for the first time on Tuesday, April 24th at 6:00 A.M. His oldest daughter Christine and husband Kyle had a baby boy, 20" long and 8 Ibs 10 oz, whom they named Kaden Alexander David. Tom Olund became a grandpa for the second time this week. His son Jeff and wife Sheila had a baby boy named Jaylen. He was born at 9:05 A.M. on Thursday, April 26th. He weighed 8 Ibs, 1 oz and was 20 inches long. The Pipelinevv 1� LETTER oPy Public Works / Enaineering Code Enforcement April 20, 2006 Public Works The Parks Crew set up Mendakota Park for summer use. The bases were installed, foul lines were striped, fields were dragged and new netting was hung over the batting cage. The cement was cleaned at Mendakota Park around the concession building. The fence was removed from the Civic Center ball field and hauled away. Safety netting was hung over the hub area where spectators watch the games at Mendakota Park. Overhead backstop safety netting was hung at the Civic Center ball field to prevent foul balls from landing on Victoria Curve. Rich put rip rap along a manhole next to Valley Creek. The creek was eroding the soil along the manhole. He scraped grease off the wall at the Mendota Heights Road lift station. Rich also helped the Parks Crew remove the fence at the Civic Center ball field. He cleaned the shop floor drains. Street sweeping began on Wednesday at 6:00 A.M. The contractor brought in six machines. The Street Crew did some mail box repairs. George helped the Parks Crew with the bobcat to take down the fence at the Civic Center ball field. Wings and sanders were removed from #303 and #312. (Hopefully they won't be needed anymore). A stop sign was reinstalled at east Northland Drive and Mendota Heights Road that was hit this winter. Enaineering Ryan attended the first meeting of the MN Cities Storm Water Coalition in Monticello. The group was formed to assist cities with NPDES requirements. Veit has resumed work on the slope remediation project at 2400 Pilot Knob Road. Curb and gutter will be installed on Monday. Civic Center Field Public Works (Terry Blum, Parks Leadsperson, Rich Burrows, Utility Leadsperson, and George Noack, Streets) on Monday and part of Tuesday removed the old ball field fence and posts. Excavation began on Tuesday afternoon and completed Wednesday morning followed by installation of the fifteen foot wide rec-rock warning track that was completed on Friday morning. The fence contractor plans to be begin work early next week. Weather permitting, batting cages will be completed, including interior safety netting prior to May 1st. The first game of the season was played late Tuesday afternoon even as excavation / turf removal was ongoing in the (deep) outfield. N E W S -�� The Pipelin LETTER Public Works Enaineering April 6, 2007 Code Enforcement Public Works The Parks Crew picked up a downed tree at Marie Park and chipped it up. Burned out light bulbs were replaced on the buildings at Mendakota and Kensington Parks. Water meters were installed in the buildings at Mendakota and Kensington Parks. Steel track barrels were picked up for the parks. Unit #506's broom was changed out for next season and put in the water tower for summer storage. Rich cut roots in the sanitary sewer line on Caren Road, the Caren Road easement down to Highway 13. Grease was cleaned off the floats at the Veronica lift station. The Street Crew cleaned catch basins. Handicap parking signs were replaced in Town Center as they did not meet state requirements. A stop sign and street name sign was removed after being hit be a vehicle at Sutton Lane and Marie Avenue. A bad spinner motor on sander #303 was repaired. Snow Events of the Week: Date: Amount: Response: April 3, 2007 Dusting Sand main lines with a 2:30 A.M. start Enaineerina St. Paul Water Regional Services has begun replacing hydrants in Ivy Falls for the street reconstruction project. Tom met with Tim Hanson and a representative from Xcel Energy regarding the power lines for the Dodd Road trail. Dakota County has included Lexington Avenue from TH 110 to TH 13 to their overlay projects to be completed this summer. NEWS LETTER Public Works Engineering Code Enforcement Public Works The Pipeline March 30 2007 ` o' The Parks Crew took more trash barrels to the parks where needed. They finished sweeping the pedways. Tennis court nets were put up in the neighborhood parks and leaves were cleaned out from inside the courts. A new dog leash sign was installed at Mendakota Park. A broken bench and picnic table was repaired at Mendakota Court. A part for #504 mower was installed and John Ambrose welded it on the arm to the mower deck. Equipment was worked on preparing it for summer. Rich applied root killer on Vandall Street and Dodd Road between Third and Fourth Avenues. Roots were cut on William Court. A homeowner's service was cut off that was 2' in our manhole and the service was redirected with a 4" pvc pipe in the Dodd Road easement. The Street Crew cleaned storm grates. Marker posts were pulled out for problem catch basins due to the rapid melting. A broken barricade was pulled out at the end of Veronica Lane. A broken curb box for a catch basin on Medora and Emerson Avenue was worked on. Engineering St. Paul Regional Water Services repaired a broken water main on Maple Park Drive. Tom, Sue and Guy met with Tim Hanson of WSB & Associates. Tim is finishing up the design for the trail connections on Dodd Road and Sibley Memorial Highway. Informational letters were sent to residents on Woodridge Drive, Arcadia Drive, Maple Park Court, Falls View Court, Cascade Lane, Maple Park Drive and Sylvandale Road. This meeting is for the proposed street improvements and is Wednesday, April 11 at 6:00 P.M. in the City Council Chambers. N E W S The Pipeline LETTER Public Works Enaineerinq March 23, 2007 code Enforcement Public Works The Parks crew attended the Sherwin Williams seminar at the Minneapolis convention center. Summer equipment was brought down from storage at the water tower and winter equipment was stored for the summer. Trash was collected from parks and sweeping has started on the pedways. The Streets crew continued patching potholes. Debris was removed from Ivy Falls Creek between Dodd Rd and Laura Ct. Made brackets and put up temporary cross walk signs on Mendota Heights Rd near St. Thomas academy. Removed tree on Pilot Knob Rd and Mendota Heights Rd. Rich checked sanitary sewer lift stations daily. Rich and George cut roots in the sewer main using the jet truck on Callahan PI, Hingham Cir, Chippewa Ave, Annapolis St and Highway 13 (Fremont Ave to Garden St and Brompton PI to Sylvandale Rd). Enaineerinq Guy and Sue met with Curt Chatfield from Dakota County regarding the 30-year county park vision. Draft maps of the areas discussed will be sent to the city in the near future. Bids for the city wide street sweeping were received and prices increased by one dollar an hour. Sweeping should commence within the next couple of weeks. Tom has been able to begin a more detailed inspection of the Copperfield project area now that most of the snow and ice has melted. NEWS LETTER Public Works Engineering Code Enforcement Public Works The Pipeline HapPaitrldts Y March 16, 2007 St. Dav The Parks Crew repaired the mirrors on truck 502. Picnic tables were repaired and stained. Trucks were serviced, washed and cleaned up. They went to Gerlack Services in Hastings for seminars on new mower products and additions to the older equipment. Rich unplugged storm sewers on Kressin Avenue, Stockbridge Road, Mendakota Drive, Fourth Avenue, and Copperfield. Most of the storm sewers were blocked by leaves and Rich used the jet to clear them. The power went out on Wednesday at 10:45 P.M. at the Lilydale lift station, the power was out until 12:15 A.M. He cut roots in the sanitary sewer line on Pontiac Place and Valley Curve. He checked the sanitary sewer line down stream of the Mendakota Golf Course — there was some grease but mostly looked good. The Street Crew put up flashers on Lake Drive and Dodd Road. St. Paul Regional Water Services was called because behind the water main break the street is settling. Potholes were filled with cold mix. A plugged storm grate was opened that caused water to pond on the street on Stockbridge Road. Enaineerina Sue attended a meeting for the Robert Street Corridor Technical Advisory Committee. The north ditch of State Highway 110 flooded and was nearing the traffic lanes. MN/DOT called in emergency locates to re -grade the ditch. It was determined that work by MN/DOT last summer covered the outlet which in turn caused the drainage problem. The city's seal coat project has been scaled back due to the high bids received. It was determined that the prices submitted are the best available this season. Plans are being finalized for the Copperfield mill and overlay project and design has started for the Ivy Falls neighborhood reconstruction. Plans have also begun on redesigning the storm water outlet at State Highway 13 and Wachtler Road. There is a public hearing for the Kipp Addition at Tuesday's City Council meeting. L E T T'E R The Pipeline Public Works Engineering C >.T March 9, 2007 Public Works The Street Crew plowed the cul-de-sacs, parking lots and pedways. The cutting edge on truck 501 was replaced. A broken hose was repaired on the ground master with the broom. The flooding hoses and fittings were picked up from the warming houses and brought back to the shop. They attended the Tessman Turf Academy at Edinburgh golf course in Brooklyn Park. The academy was an intro to new turf products and new chemicals for 2007. The alarm went off at the Lilydale lift station due to a power outage on Sunday, March 4th. A MnDOT plow hit a power pole on Highway 13. Rich checked the manholes in the Copperfield area to look for deteriorating manholes. He cut tree roots in the sanitary sewer line on Vandall and Brookside Lanes. The Street Crew cleaned up after last week's storm. Mailbox repairs were done, and snow was removed from troubled catch basins. Snow was pushed from the street lights that will come down next week to make room for the new traffic signals at Mendota Heights Road and Pilot Knob Road. Engineering Sue met with both St. Thomas Academy and Visitation regarding traffic concerns on Mendota Heights Road. Sue attended a )PA meeting regarding bids for the 2007 seal coating. The bids for this project were 30% above estimated costs and bids may possibly be rejected. Workers complained of a sewer gas smell at a new home on Wesley Lane. Workers have been using water and the bathrooms however, no records can be found of the house being connected to the city sanitary sewer nor is there a visible patch over the sewer main. The problem was referred back to the contractor and workers were advised not to use the home's facilities. NEWS LETTER he Pipelin Public Works Engineering Code Enforcement March 2, 2007 Public Works Public Works had a busy week this week with all the snow. They came in on Saturday, February 24, at 10:00 A.M. and stayed until 1:00 P.M. Sunday, February 25. With this week's second storm they came in at 7:00 A.M. Thursday, March 1, and stayed through the night trying to keep up with falling snow. A resident dropped off a couple of pies and ice cream on Thursday evening for the guys. One of the axels on truck 303 shifted and had to be brought to Kremer Springs. A serpentine belt and wing broke on truck 304. See the email from a happy resident about the snow plowing. Snow Events of the Week: Day: Amount: Response: Saturday/Sunday 101, Plow all streets Thursday/Friday 9" Plow all streets Engineering The ice rinks were closed on February 28, 2007. Tom Knuth attended a seminar on reclaiming bituminous pavement. SEH demonstrated their web based MS4 tracking program for Ryan and Sue which will help with our NPDES permit. From: Dave Vierling[mailto:DVierling@bixproduce.com] Sent: Friday, March 02, 2007 9:50 AM To: Sue McDermott Subject: snow removal Dear Sue, My name is Dave Vierling and I live at 2550 Whitfield Drive. I am writing to express my appreciation for the wonderful job your folks are doing plowing our street. The semi cul-de-sac I live on has very few places for the plowed snow to go. It would be very easy for the Snowplow Driver to dump a huge amount of snow on our entrance and force us to spend hours digging out. The Snowplow Guys do a great job of putting this snow in a place where nobody gets socked. I know this takes extra time, but I certainly appreciate it. Thanks again. dv L E T T/E R The Pipeline Public Works* Engineering February 23, 2007 0*0 Code Enforcement *a Public Works The Parks Crew continues to flood the ice rinks. The rinks are swept and broomed daily. They also are working on repairing picnic tables. The hockey goals at the Marie rink were repaired. Rich checked the sanitary sewer line on Kressin Avenue downstream on Bluebill to Lake and it looked good. A homeowner on Kressin called and said their service was blocked. The homeowner also said Rooter Rooter had pushed a small slipper into the City's line. There were no sign of the slipper. Pipe Services cleaned and vacuumed the storm sewer and catch basins on Victoria. They were packed with ice and leaves. Rich assisted Len with replacing the radiator hoses, thermostat, and motor belts on the portable generator for the lift stations. The Street Crew picked up a dead deer on Delaware Avenue, and Marie Avenue by 35E. Pot holes were filled with cold mix. Ice was scraped off Victoria Avenue and hauled away. Callahan Place was sanded for runoff water that froze. They are getting the trucks ready for this weekend's storm. Enaineerina The Copperfield mill and overlay project was unanimously approved to proceed with construction plans. The biggest concern of residents from the public hearing was the speed and amount of crosswalks on Huber Drive. The Council also approved the go ahead to advertise a public hearing for the Kipp Addition. Lots of robins have been spotted around City Hall eating last year's crap apples. NEWS he LETTER Public Works �►u „ Engineering Code Enforcement;_r�'; Public Works Pipeline 1 February 16, 2007 J `' The Parks Crew checked the ice rinks and warming houses daily. Snow was broomed and blown from the rinks. They were flooded, as needed. Parts on plow 503 were replaced, as needed. Rich changed the condensation heater at the Centre Pointe lift station. He finished his record keeping for sanitary sewer cleaning in 2006, this included filling out utility maintenance cards for each street or easement line cleaned. The Street Crew put down salt on Mendakota Drive where there was a water main break. The Mendakota Park parking lot was salted because it was used as a detour. Trash was picked up in the Bunker Hills neighborhood where someone had dumped it. Salt was put down on Victoria Road where ice had formed across from the County Day School. Cold mix was put in the hole from the water main break on Dodd Road and Lake Drive. Engineering There was a water main break on Sunday at Mendakota Drive. Traffic had to be detoured through the parking lot at Mendakota Park. St. Paul Regional Water was working on fixing the damages. A neighborhood meeting was held on Thursday to discuss the Copperfield street rehabilitation project. 12 residents were in attendance. Time Warner Telecommunication is completing a directional bore for high speed internet on Pilot Knob Road between Pilot Knob Road and Executive Drive. NEWS LETTER Public Works Engineering Code Enforcement Public Works The Parks Crew continues to flood the rinks. The rinks are also broomed and kept clear of snow. They plowed the pedways Tuesday after the snowfall. Rich scrapped grease off the walls at the Mendota Heights Road lift station. Grease was scrapped off the floats at the Veronica lift station. He ran the standby generator at Mendota Heights Road #1 lift. The Street Crew made temporary mailbox stands. Stop signs, yield signs and speed limit signs were refaced. Snow Events for the Week: Date: Event: Response: 2-6-07 1.5" fluffy snow salt/plow Engineering Thursday night there was a water main break at Overlook Road and Lexington Avenue. WSB & Associates started surveying for the trail projects on Dodd Road and Sibley Memorial Highway. Jim, Jake, Sandra and Sue attended the Transportation Forum at Southview Country Club on Thursday. Chairs of both the state senate and house transportation committees (Senator Murphy and Representative Lieder) spoke about upcoming legislation regarding a 10� gas tax and 0.5% sales tax increase. Funding is needed for high priority state highway construction projects. Approximately 30 city and county officials and staff were in attendance. Engineering is holding an informational meeting on Thursday, February 15th at 6:30 P.M. regarding the Copperfield rehabilitation work. NEWS LETTER Public Works Enaineerina Code Enforcement Public Works The Pipeline February 2, 2007 4W The Parks Crew continued to flood skating and hockey rinks. The rinks were also broomed and snow was blown off as needed. A repair was made on an electrical breaker in the warming house at Friendly Hills. Rich jetted the storm sewer on Lake Drive after the water main break on Tuesday. Our jet got stuck (pipe was full of rocks, gravel and mud). South St. Paul came with their vac and jet and helped get our truck out. He checked out the sanitary sewer line on Delaware Avenue where 1153 had service troubles in the main line. i ne street crew continue to make Snow Events of the Week: mail box repairs. The Street Crew Day. Event: Response: was called in for the water main 1-29-07 Dusting Sand streets break to barricade the road and clean up. Temporary street name signs were put up (they were run over) at Lakeview and LeMay Lake Road. Enaineerina There was a water main break on Tuesday, January 30th at Dodd Road and Lakeview Avenue. Kare 11 News did a short blurb on the water main break on their 5:00 news. Sue and Ryan are attending the Annual Meeting of the City Engineers Association of Minnesota. The conference is put on by the University of Minnesota. Attendance at the conference will give them continuing education credits. Pictures of the water main break NEWS LETTER Public Works Enaineerinci Code Enforcement Public Works The Pipeli-9-e January 25, 2007 The Parks Crew checked the ice rinks and warming houses daily. The hockey and general rinks were flooded, broomed and cleaned of snow. The pedways and parking lots were plowed. Snow was removed from around the retaining walls in the industrial park area where the pedways are located between the street and the retaining wall. Rich cut tree roots on Highway 13 (Brompton to Sylvandale) and on Dodd Road (Mager Court to Marie Avenue). He looked at the video tapes of 14 miles of televised sanitary sewer pipe from Northland Drive. Rich looked for bad spots and many spots need repair. Pipe Services televised the line last fall. The Street Crew did mailbox repairs. Truck #303 was brought to Kramer Spring for broken rear springs on both sides of the truck. A breaker for the Bobcat was rented and the old footings from the LP tank were broken up. A street sign was made for Main Street and replaced (fourth time the sign had to be replaced). Snow Events of the Week Date: Event: Response: 1-21-07 Dusting Scrape main line and sand rest of streets - 12:30 PM. start Engineering Our 2007 MSA construction allotment is $290,503.00. Portions of this allotment will be used to fund the Huber Drive overlay and the Pilot Knob Road/Mendota Heights Road traffic signal. A survey was sent to the Woodridge Drive residents regarding the type of curb and gutter residents preferred. Out of 20 possible respondents, 18 residents sent back the survey. The results are: 12 for surmountable curb and gutter, 4 for B618 curb & gutter, 3 residents want no curb and gutter and one resident didn't care what type of curb and gutter was used. See attached article regarding Mendota Heights' first snow emergency. Snow, but no emergency Page 1 of 2 Posted on Tue, Jan. 16, 2007 Snow, but no emergency Public works officials in St. Paul and Minneapolis sized up Sunday night's storm and opted not to declare snow emergencies. But even on a holiday, the plows rolled. BY NANCY YANG and EMILY GURNON Pioneer Press Neither St. Paul nor Minneapolis declared a snow emergency Monday, but that didn't mean plow drivers stayed home on the Rev. Dr. Martin Luther King Jr. holiday. Crews were out plowing, sanding and salting the roads to combat the 3 to 5 inches of snow that fell Sunday night and Monday morning. Public works officials also battled the misconception that if there's no snow emergency, there's no plowing. "Nothing could be further from the truth," said Mike Kennedy, director of winter operations for the Minneapolis Public Works Department. Crews are on the road, doing back-to-back 12-hour shifts, plowing and sanding, he said. St. Paul crews got started at midnight Sunday. "We had about 28 equipment pieces out and then followed that up with an additional 14 at 8:30 a.m.," said St. Paul public works supervisor Jeff Sanchez. He said plows finished clearing and sanding 90 percent of primary streets by 4:30 p.m. About 25 plows continued the work Monday night. Some cities, such as Mendota Heights and West St. Paul, declared snow emergencies. So why didn't St. Paul or Minneapolis? The big cities try to coordinate with one another to minimize confusion, Kennedy said. So it's likely that if one sounds the alarm, the other will, too. One big factor is the amount of snow. Generally, Minneapolis declares an emergency if the accumulation is 4 inches or more. If it's 5 inches, "it's a no-brainer," Kennedy said. But in the 3- to 5-inch range, public works officials also look at other weather conditions, such as current and predicted temperatures. Officials also look at the time, intensity and duration of snowstorms, as well as how consistent conditions are around the cities. Kennedy said Monday being a holiday did not play into the decision about whether to declare an emergency. While 4.2 inches of snow was officially recorded at the Twin Cities airport, storm totals increased to the south and decreased to the north. Farmington reported 6 inches, Lakeville got 6.7 and Burnsville saw 8. St. lames, in southwestern Minnesota, also recorded 8 inches. But the north metro communities of Andover, Forest Lake and Maple Grove saw less than 2 inches. The snow made for a messy morning commute in the Twin Cities, with dozens of spinouts and minor crashes reported by 7 a.m. Nancy Yang can be reached at nyang@pioneerpress.com or 651-228-5480. Emily Gurnon can be reached at egurnon@pioneer press.com or 612-338-6516. htip://www.twincities.com/mld/twincities/news/local/I 6468808.htm?temp1ate=comcntMo... 1 / 19/2007 NEWS LETTER Public Works Enaineerina Code Enforcement Public Works e Pipeline January 18, 2007 To The Parks Crew checked all the warming house rinks and opened them for the skating season. Flooding of all rinks is now being done. Monday they plowed cul- de-sacs, parking lots, hockey rinks, general rinks and all pedways. Equipment maintenance work was done on the new 510 tractor. Wire and an add switch for the water sprayer attachment for dust control was installed for use when dragging all fields. Rich and Tom Olund attended their annual sanitary sewer operator's school held at the Thunderbird in Bloomington. They need to attend this school every year in order to keep their operator's license current. The Street Crew did mailbox repairs. The cutting edge on plow #312 was changed. The bridge decks were cleared of snow. Snow Events of the Week: Date: Amount: Response: 1-15-07 6" A snow emergency was declared by Public Works. Plowing of all streets started at 2:00 A.M. Personnel News Tom Olund became a grandpa for the first time on Wednesday, January loth He is the proud grandpa of a baby girl!! She was born at 9:20 A.M., weighed 7 Ibs 10 ounces and was 21 inches long. Her name is Alyssa May and was born to his youngest son Jim and his wife Joanna. Ice Rinks Friendly Hills Park skating rinks opened on Saturday, all other rinks re -opened on Monday. Terry reported that the rinks were heavily used on Monday even with some rough ice conditions. Now that the cold weather is here, the Parks Crew plan to flood the rinks everyday and part-time rink attendants are flooding at night to help build an additional base. Warming house hours are: Weekdays 4:00 to 8:30 PM, Saturday 9:00 AM to 8:30 PM and Sunday noon to 8:30 P.M. The ice rink/warming house hotline is 651-255-1174 and the ice skating lesson information line is 651-255-1173.