2006N E W S
LETTER
Public Works
Engineering
Code Enforcement
Public Works
December 30, 2005
The Parks Crew installed "thin ice" warning signs on Rogers Lake for
the aeration system. They plowed the cul-de-sacs, pedways, rinks and
parking lots. They checked the warming houses and rinks daily. With
the weather permitting they flooded the rinks. With the warm weather
recently the rinks aren't in the best of shape, but are good for boot
hockey.
Rich changed out the heater at the Centre Pointe Lift Station. He also
plowed the cul-de-sacs this week.
Engineering
Application for State Aid monies was sent in this week for the Town
Center project.
Have a safe and happy New Year!!
NEWS
LETTER i The Pipeline
Public Works F Ez,
Enaineering
Code Enforcement December December 23, 2005
Public Works
The skating rinks opened on Saturday, December 17th. The Parks Crew worked
hard by flooding the rinks and sweeping them daily. They plowed the cul-de-sacs,
pedways, skating rinks and parking lots.
The Street Crew changed the cutting edges on the grader, plow #312, plow #302,
and put on curb shoes on wings #304 and 312. They brought office cubicles from
the water tower to the Police Department. They brought the bobcat to the bobcat
dealer for repairs.
Rich had to pull pump 2 for repairs at the Marie Avenue storm water lift station
which had water in it and the seals will be replaced. The electrical meter box was
also replaced. Xcel Energy needed to place the meter in the box.
Code Enforcement
Six building permits were issued for two twin homes (each permit) for The Summit
of Mendota Heights. Four of the six permits were issued previously for
footing/foundation only. The other two permits were for the full building. The
permits were issued to Opus NWR Construction, LLC. Each permit had a valuation
of $650.000.00.
Engineering
A water main break at 1134 Dodd Road (corner of Beebe and Dodd) was repaired
on December 19th. Veit and Company completed the demolition of the Ecolab
buildings.
NEWS
LETTER
Public Works
Engineering
Code Enforcement
Public Works
December 15, 2005
Since December 1s' the Parks Crew has been hard at work doing routine maintenance on
the warming houses. All of our rinks and warming houses will open on Saturday,
December 17th. Furnaces were cleaned and tuned up; mats were brought up for the front
doors of warming houses at Friendly Hills and Marie for the skaters. The hoses and fittings
have been inspected and the bad flooding hose at Wentworth Park has been replaced.
The hockey nets have also been re -netted for the Wentworth hockey rink. Washed all
trucks and replaced the blower/fans on truck #503.
Rich plowed and checked all lifts. F
for the grate was changed out and
Cul-de-sacs, Sunday in the AM al_<
pump at Lift Station #1 located on
The Street Crew mounted chai
Industrial Park, repaired and n
overI-35E.
Code Enforcement
A new construction buildin
rambler located at 703 Hi(
XX
o`
Wednesd
Thursday
catch basin on Northland Dri , the frame
�d the blacktop around it. also plowed
d 15th. Repairs were e sump
iqhts Roc -
which is used" sYthe
es and remov fF9 bridges
U
Plow all st
Started at
Plowed A
cu
Builders for a
Dakota County opened bids for the Delaware Avenue/TH110 intersection improvements
on December 7, 2005. The low bidder was Max Steininger, Inc. in the amount of
$468,098.46. Mendota Height's share of the cost is $47,773.83 less the $17,500.00 that
we will receive from Sun Fish Lake. The work will be completed in the 2006 construction
season.
N E W S
LETTER
Public Works
Engineering
Code Enforcement
Public Works
The Parks Crew installed a new bench at Mendakota Park that was donated. They
attended a seminar and open house at Turf Werks. Turf Werks sells us our
fertilizer and chemicals for spraying weeds in the parks. Demonstrations on
equipment and factory representatives were on site. The warming house furnaces
were started up and cleaned. Preparation is under way for getting skating rinks
ready for the season by driving on them to pack the snow down. We're hoping
for an opening date of December 17th. They switched over the mower by replacing
the mowing deck with the snow blower on unit 505. All pedways were plowed
after the snowfalls.
Rich cut roots on Kay Avenue and Walsh Street. He did a sanitary sewer
inspection at 630 and 635 Hidden Creek. Rich also cleaned part of the sanitary
sewer line in Hidden Creek.
The Street Crew ditched down stream from a culvert to allow for storm water
drainage on Orchard Place. They trimmed trees where school buses were hitting
low, overhanging branches.
Date:
11-25-05
11-29-05
12-1-05
Engineering
Snow Events of the Week:
Amount:
2"
rain and dusting
1"
Response:
Plow main lines and sand other areas
Scrape main lines and sand other areas
Plow main lines and sand other areas
Out of 140 properties being assessed in the 2005 street project this year, 80
homeowners prepaid their assessments leaving 60 properties to certify.
No parking signs were installed on Emerson Avenue.
In the Somerset area the sanitary sewer lines were cleaned.
LETTER ' The Pipeline
Public Works
Engineering
°F November 17 2005 .°
Code Enforcement �:y,��� ,
Public Works
The Parks Crew hauled in dirt around the new bench pad, leveled it out and put
seed down. They put the new bench together and routed out a square for the
donation sign which will be installed later. They put the summer equipment for
winter storage in the water tower.
Rich checked the sanitary sewers in the Somerset area, where Mendota Heights'
sewers were raised, and found some dirty areas. The contractor will be contacted
to have them cleaned. Rich flushed the storm sewers in the Somerset area.
Pipe Services cleaned the greasy lift station on Mendota Heights Road and Lloyd's
Meats will pay for it.
The Street Crew mounted the plows, wings and sanders on 303 and 308. They
removed the hot box and tray for the asphalt on 312 and put on the plow and
sander on 312. They fixed some street lights in the industrial park that had bad
lamps and ballasts.
Snow Events of the Week
Date: Event: Response:
11-16-05 Dusting Check all areas
First of the year!
Code Enforcement
Paul issued a new construction building permit to R] Ryan Construction for 2425
Waters Drive. The estimated cost of the building is $750,000.00. He also issued a
building permit for 1354/1356 Riverside Lane to Opus NWR Construction. This is a
foundation permit for twin homes in the Summit of Mendota Heights.
NEWS
LETTER
Public Works
Engineering
Code Enforcement
Public Works
The Pipel
`2
,vNovember
The Parks Crew brought in concrete, poured it and set up forms for a new bench at
Mendakota Park. They repaired a broken board at the Friendly Hills hockey rink.
They brought down the plows from the water tower and stored the cushmans and
sweeper.
The Street Crew patched the man holes and gate boxes where they were high.
They took care of pothole complaints and patched the utility cut on the pedway at
Wentworth Park. They put in marker posts for the low lying catch basins so they
could be easily identified during rain or thawing spells. Locates were called for
and marked for Orchard Place to open the end of the culvert for drainage.
Rich cut roots on Kay Avenue, Walsh Lane, and Callahan Place. In Control worked
on the pump starters at the Mendota Heights Road lift station to fix a problem.
Rich did sanitary sewer inspections at 1877 Victoria Road and 2540 Arbor Court.
Code Enforcement
Paul issued a building permit to Mihm Custom Homes for a new home at 685
Hidden Creek in the Hidden Creek Estates subdivision. The estimated cost of the
new home is $975,000.00.
Engineering
Sue and Ryan hosted the Delaware Avenue reconstruction project informational
meeting on Tuesday. Matt Saam, WSP's Public Works Director, was also in
attendance. Eighteen residents attended (9 from MH and 9 from WSP). They are
looking forward to the street improvements and were happy to hear that it will not
involve widening.
The Kingsley Sanitary Sewer Protection project is scheduled to begin construction
on Friday.
NEWS
LETTER
Public Works
Engineering
Code Enforcement
Public Works
The Pipeline
C�n November 3, 2005 a_Q
The Parks Crew ordered the satellites for the Halloween bonfire at the South Plaza
site. They cut up leaves at Friendly Hills Park behind the backstop at the north
end of Ivy Falls Park. With the summer season ending, the Kensington and
Mendakota buildings were cleaned out. They blew out the sprinkler systems and
had to replace broken sprinkler heads at City Hall and Mendakota Park. The tennis
nets were removed from the parks. They set up the aerator at Rogers Lake and
tested it for use this winter.
The Street Crew took down the fencing and signs at the Halloween bonfire site.
They pushed in any unburned brush. This year, the wind was in our favor and
there were no complaints. The Fire Department put the remaining fire out on
Wednesday night after their drill. John Ambrose repaired the tail gate on the
parks trailer. They pushed up the debris at our dump site to make room for the
Halloween bonfire debris. They finished hauling out demo debris to the demolition
site.
Code Enforcement
A building permit was issued to United Properties Construction for a 73,160 square
foot tenant space finish at 1285 and 7, 940 square foot tenant space finish at
1295 Northland Drive. The tenant space is for State Farm Insurance. The
valuation of the building permit is $1,200,000.00. A certificate of occupancy was
issued on October 25, 2005, for Kawalskis Wine Market at 702-724 Main Street
Suite #101 in Town Center.
Engineering
There was a water main break on William Court on Saturday. St. Paul Regional
Water Services had it repaired on Sunday. There was another water main break
on Aztec Lane on Wednesday.
F.Y.I.
Public Works did their first sanding last year on November 27th. The first plowable
snow fall, curb to curb, was on January 2°d of this year.
L E T T'E R The Polpefine
Public Works
Enciiineering
Code Enforcement - October 27, 2005
Public Works
The Parks Crew hooked up the fertilizer spreader to #510, the John Deere tractor
and fertilized all the parks. St. Paul Regional Water Services removed the meters
from the buildings at Kensington South and Mendakota Park.
Rich was called in on Wednesday at 12:00 A.M. to the Mendota Heights Road lift
station because the pump starters weren't working. It was a loose power wire
which was fixed. The machine shop resleeved the wear ring on the impellor for
the St. Thomas lift station. Rich put the impellor back and put in the new stainless
steel chain and power cable holders.
The Street Crew pushed up the bonfire materials. Large tree stumps, trunks, and
limbs were removed and taken to All Wood Disposal Company. (See attached
pictures). They reinstalled stop signs at Deer Trail and Wachtler Avenue and
reinstalled street name signs at Dodd Road and Mears Avenue. They patched
curbs at High Ridge Circle, High Ridge and Warrior Drive.
Code Enforcement
Paul issued a building permit to Rochon Corporation for 720 Main Street. The
permit is for a tenant finish (H & R Block) in Town Center with 1,366 square feet.
Paul also issued building permits to Rochon Corporation for building shells in Town
Center (buildings D and E). The valuation for building D is $217,500.00 and the
valuation for building E is $562,500.00.
Paul also issued building permits to Veit & Company, Inc. to demo all buildings at
the old Ecolab site.
Engineering
Ace Blacktop paved Ivy Hill Drive, Maple Park Drive, Linden Street, Main Street
and Maple Street on Thursday and Friday. Sod work was completed on Sunset
Lane and Ivy Falls Avenue this week.
Guy and Sue met with Mary Jackson from Dakota County to discuss a new option
for the NURT. Mary plans to give a presentation to the Council on November 15th
Happy Halloween!! O
NEWS �*o'S*0 '**0 October 20, 2005
LETTER
�R
TFM NE
Public Works � PIPE LI � E E 1Q��r�O
Eneineering %� �/t ��
Code Enforcement (yfyf
Public Works
The Parks Crew blew out the sprinkler systems at City Hall, the Fire Hall,
Mendakota Park and Kensington South. They trimmed the hedges at
Kensington South and then blew off the pedway. They aerated the soc-
cer fields at Kensington South and all the neighborhood soccer fields.
The soccer goals were taken down and put in winter storage.;
Rich mowed the Veronica lift station. He cut roots and jetted the Victoria
easement, South Freeway Road, Valley Curve to trunk line and Somer-
set Road.
The Street Crew pushed up the Halloween bonfire. A person was caught
disposing of a willow tree at the bonfire site; the tree trunk was in excess
of 40" in diameter. They fenced and signed the bonfire site. +Potholes
were patched in the City Hall parking lot. Old street names signs on
Delaware Avenue and the Somerset area were taken down, Dakota
County is going to put up new ones.
Engineering
The prepayment of assess
closed on Thursday. 40 of
Residents who came in and paid their a
things to say aboutthe projects and the
On Tuesday night, the City Council hetc
Dodge Lane, Ivy Falls Avenue, Sunset 1
Drive and Ridgewood Drive and approv
Huber Drive wa
place earlier thi
Sod installation
and Somerset i Court
aid their assessment
,thing but nic
:he field.
'k Drive,
ent rolls
i at the site of the storm sewer repairs that took
r.
NEWS
LETTER
Public Works
Enaineerinci
Code Enforcement
Public Works
The Piplefine
Safety Assure held a meeting at the Public Works Garage regarding personal
protective equipment and hearing conservation.
The Parks Crew removed boards along the edge of the tennis court at Valley Park.
They trimmed lilacs along the pedway on Lexington Avenue between Marie and
Overlook. A fall workshop in Prior Lake was attended on play equipment
demonstrations and displays. Dirt was hauled out to the Fire Hall and fill brought
in to the washout on the north side of the building where it was leveled out and
seed put down.
Rich took out the impeller at the St. Thomas lift station (pump 1) and brought it to
a machine shop for re-sleeving of the wear ring. He flushed the Biel easement to
Abbey Way. He replaced the belt on the furnace at the Mendota Heights Road lift
station, changed the air filters, greased the fan motor and prepared the furnace
for the upcoming winter season.
The Street Crew patched Park Place and Park Circle where curbs were removed
and patched other pothole complaints. They marked street lights on Mendota
Heights Road east of the 35 E bridge that aren't working, and called an electrical
contractor to fix the breaker that trips the transformer. They opened the beehive
storm grate detention pond behind Cherry Hill Road. They also cleaned storm
grates. A sofa was disposed of that was dropped off on the side of the road on
Valencour Circle.
Engineerinci
Sue attended a meeting at MnDOT to discuss 2006 construction (money) needs
data that has been complied by MnDOT utilizing information provided by all MSA
cities. The estimated total apportionment that Mendota Heights will receive in
2006 is $385,483.00. This is an increase of $38,177.00 over what we received in
2005.
Driveways were paved on Sunset, Dodge, and Ivy Falls. Boulevard restoration is
scheduled for next week.
Jared, a.k.a., "The Crack Man" from Iworq Systems in Logan, Utah spent the week
rating the condition of all our City streets. Dave and Sam spent time in the field
with him learning the rating system. On Friday, he trained staff on how to
manipulate the data in the pavement management system program.
NEWS
LETTER
Public Works
Engineering
Code Enforcement
Public Works
The Pipeli
/I October 6, 2005
ne
With the big rain storm on Tuesday, Public Works was called in
because the pumps were out at the Northland Drive lift station,
Mendota Heights Road lift station, and Lilydale lift station. Catch
basins were plugging up and needed to be opened with all of the rain.
On Wednesday morning, lightning struck the St. Thomas lift station
and blew out all the fuses and the lighting arrestors. The power was
out until 7:00 P.M., Wednesday evening.
The Parks Crew cleaned up after the 5 inch rain storm on Tuesday
night. They repaired a washout by the culvert in Valley Park - north of
Marie Avenue. Rip rap was hauled in and fill was put in around the
culvert. They trimmed overhanging limbs on the Marie Avenue trail
near Valley Park.
Rich repaired the sidewalk at Public Works by digging out the base,
putting in a new base, compacting and then put the concrete back. He
also assisted the Parks Crew with the culvert repair in Valley Park.
The Street Crew cleaned storm sewer grates. There was a damaged
curb at Park Circle and Park Place which was cut so it can be replaced.
They prepared the area for the curb to be replaced by the dual culvert
on Huber Drive. Vandalized yield signs were replaced on Ellen, John
and Chippewa Avenue. The Street Crew also attended the annual Fall
Maintenance Expo.
Engineering:
Concrete curb and gutter was installed on Ivy Falls Drive, Sunset Drive
and Dodge Lane. Paving of all of the streets will be completed next
week, weather permitting.
LETTER / The Pipeline
Public Works .fit,=a
Engineering
Code Enforcement September 29, 2005
Public Works
The Parks Crew put new shrubs, edging and rock around the sign at
Wentworth Park. They trimmed trees along the pedway on Lexington
Avenue, north of Marie Avenue. They replaced the dead lilacs at Kensington
South Park on the south end of the soccer fields.
Rich worked with Braun Pump to do the annual lift station check ups. The
pumps, panels, and wet wells were all in good condition. He did a new
sanitary sewer inspection for Visitation at the new warming house for their
winter sports. He also did a new inspection at 1205 Culligan Lane.
The Street Crew put up new crime watch signs at the entrance to Mayfield
Heights Road and added a missing "keep right" island sign at Market Street
and Dodd Road. They took out the apartment number sign and reinstalled
the "Lexington Apartments" sign next to the new trail, so the City can
receive its share of state aid money for construction of the trail. They
cleaned storm grates. On Thursday, they put the plow on truck 303 and
brought it over to the District 197 bus garage. Governor Pawlenty gave a
press conference about using biodiesel, a soybean alternative. Channels 4,
9 and 11 had news crews there to cover the event. The Governor was
giving four presentations and Mendota Heights was their first stop. (See
attached article).
Code Enforcement
A building permit was issued to Klingelhutz Construction Company for a six
unit walkout building in Waters Drive Business Park. The total cost of the
permit was $10,398.56 with a valuation of $600,000.00.
Engineering
Sue published a public hearing notice for the 2005 street projects and
scheduled the hearing for the October 18th City Council meeting. Notices
were mailed to all affected property owners.
MINNESOTA _MAKES HISTORY WITH NEW BIODIESEL-BLENDED FUEL --September 29, 2005 Page 1 of 1
I Print This Page ] I. Close Window I
MINNESOTA MAKES HISTORY WITH NEW BIODIESEL-BLENDED FUEL -- September 29, 2005
- Starting today, diesel fuel sold in state contains two percent biodiesel -
St. Paul -Today Minnesota became the first state in the nation to require that diesel fuel sold in the state contain two -percent biodiesel - a
homegrown, renewable fuel made primarily from soybeans. Governor Tim Pawlenty and Agriculture Commissioner Gene Hugoson kicked off
the biodiesel standard today at a school bus garage in suburban Mendota Heights, before traveling to biodiesel plants in Albert Lea and
Brewster and stopping in Moorhead.
Biodiesel is a clean -burning, alternative fuel made from domestic, renewable oils and fats. In Minnesota it is made primarily from soybean oil.
Mixtures of biodiesel and petrodiesel are called "biodiesel blends," with B2 being two -percent biodiesel. Biodiesel blends are already used by
hundreds of vehicle fleets, including the U.S. military, Yellowstone National Park, and various Minnesota cities and counties.
"Today, Minnesota takes another step toward reducing our dependence on foreign oil while improving our environment and our rural
economy," Governor Pawlenty said. "Greater use of renewable fuels means that more of our energy comes from farm fields rather than oil
fields. Biodiesel is another tool in our arsenal as we look for clean, diverse sources of energy."
The 2002 Minnesota Legislature passed a law requiring that diesel fuel sold in Minnesota contain at least two -percent biodiesel (B2). The
requirement was designed to take effect one month after the state had certified that it had the capacity to produce 8 million gallons of
biodiesel. Minnesota Department of Agriculture (MDA) Commissioner Gene Hugoson certified this production capacity in the August 29 edition
of the state register, and the requirement kicks in today - September 29, 2005.
"Biodiesel will provide significant economic benefits to the state through reduced reliance on imported oil and increased demand for
Minnesota -grown soybeans," said Agriculture Commissioner Hugoson. "It will also benefit the state's natural resources and public health
through a reduction in harmful vehicle emissions."
B2 can be used in conventional vehicles without any engine modifications. According to the National Biodiesel Board, all diesel engine makers
with equipment in North America support the use of up to 5 percent biodiesel meeting national and local specifications. Independent tests
have shown that biodiesel reduces harmful vehicle emissions such as unburned hydrocarbons, carbon monoxide and particulate matter.
Biodiesel exhaust also has a significantly less harmful impact on human health than exhaust from petroleum diesel.
,vnnesota has three biodiesel plants, located in Albert Lea, Brewster and Redwood Falls. They have a combined annual production capacity
of nearly 63 million gallons, making Minnesota the number one producer of biodiesel in the U.S.
According to Governor Pawlenty, one of the important benefits of biodiesel use is that it helps reduce dependence on foreign fossil fuels.
"Right now, America is importing petroleum to meet more than 60 percent of its needs," Governor Pawlenty said. "By 2025, it is projected that
we will import 77 percent of our petroleum. When you pair these supply concerns with a rapid increase in oil demand from emerging countries
like China and India, you have a recipe for sky-high fuel prices. For our long-term economic stability, we must start breaking our unhealthy
dependence on foreign oil. I'm proud that Minnesota is showing the way by using more homegrown biodiesel."
There are a few exceptions to the new B2 requirement, including railroad locomotives, off -road taconite and copper mining equipment and
heating equipment. The MDA has set up a website with information about biodiesel, as well as links to other sources of information about the
fuel. The website can be found at http://www.mda.state.mn us/biodiesel/b2/default htm.
http://www.governor.state.mn.us/tpaw_Print%20Article.asp 9/30/2005
NEWS
LETTER
Public Works
Enoineerino
Code Enforcement
Public Works
September 22, 2005
The Parks Crew took down the nets at Mendakota Park in preparation for winter.
They weed whipped around the signs along the pedways on Mendota Heights
Road, Marie Avenue, Lexington Avenue, Huber Drive, Wachtler Avenue and
Wentworth Avenue. They replaced dog waste signs at Mendakota Park on the
west end of the park by the pedway entrance. Downed tree limbs needed to be
cleaned up after Wednesday night's storms came through.
Rich cleaned sewers on Wachtler Avenue after the sewer line was repaired and he
found some gravel. On Saturday evening, there was a power outage at the
Northland lift station. John Boland responded to the alarm and the power was out
for four hours. On Sunday morning, the alarm went off again at the Northland lift
station and Tom Olund responded. Tom hit the reset button and the pumps
starting working. Rich graded and regraded the area of the Wachtler Avenue
sewer repair and then put down black dirt and seed.
The Street Crew patched potholes on Butler Avenue, Spring Street, John Street,
Ellen and Junction Lane. They attended a construction expo. Seminars attended
were; Equipment Safety, Tree Trimming and Chainsaw Safety, Loading Equipment,
and, Chains and Load Binders. Old, unnecessary signs (yellow diamond) were
removed from the Somerset neighborhood. A dead elm tree was removed from
the right-of-way of the Victoria Townhomes. They also, cleaned up tree branches
and catch basins from Wednesday night's storms.
Enaineerina
Century Fence completed street striping on Wednesday.
Code Enforcement
Paul issued a building permit to Verne V. Olson, Inc. for a tenant finish space in
the Town Center development. The tenant space is for Caribou Coffee. The
estimated value of the permit is $167,000.00.
NEWS
LETTER
Public Works
Engineering
Code Enforcement
Public Works
The Pipeline
With the storm that went through this week, the Parks Crew had to pick up and chip up
the downed limbs at Rogers Lake Park, Friendly Hills Park and Ivy Falls Park. They
worked on replacing the broken axel on truck 505 and serviced the mowers.
Rich cleaned the sanitary sewer lines at Hilltop Road, Valley Curve Road, Arvin Drive and
Wachtler Avenue. He did a sanitary sewer inspection for 746 Knollwood. He raised the
manhole on the Victoria storm sewer easement. A sanitary sewer line collapsed on Ridge
Place, east of Ridge Place and the Wachtler intersection. Northdale Construction was
called in to repair it.
The Street Crew cleaned catch basins and cleaned up branches and limbs from Monday's
storm. They filled potholes on Junction Lane, Kirchner Avenue, View Lane and Butler
Avenue. They assisted Rich with emergency locates and removed a couple of sings that
would in the way during excavation of the collapsed sanitary sewer line.
Code Enforcement
A building permit was issued to Manley Brothers for a new home at 1205 Culligan Lane
with an estimated cost of $205,000.00. The CAO was approved by the City Council for
this permit.
A building permit was issued to National Contractors, Inc. for a 1,160 square foot tenant
space finish at 720 Main Street, Suite 106. The tenant will be Fantastic Sams. The
estimated cost is $3,700.00.
Engineering
Sue, Tom Olund, and Dave Sorby attended the 2005 APWA International Public Works
Congress and Exposition. There were numerous educational topics and roundtable
discussion groups that included; Street Sweeping, Street Sweeping Policies, Fueling for
the Future, New Diesel Standards Affect Budgets, Owning vs. Leasing Your Equipment,
and What's New in Public Works Equipment.
The Public Hearing for the Somerset area project is scheduled for the September 20th, City
Council meeting. Work is substantially complete with the wear course being completed
next year.
Northdale Construction finished the storm sewer installation on Dodge Lane, Sunset Lane
and Ivy Falls Avenue. Road construction will begin next week.
NEWS
{ LETTER
Public Works
En4ineerina
Code Enforcement
Public Works
The Parks Crew dragged fields, cut grass and picked up the trash. They worked
on maintaining the equipment by servicing all mowers and cleaning equipment.
Rich dug out and raised two manholes in the Ivy Hill easement. The Street Crew
blacktopped around one the raised manholes and Rich put dirt and grass seed
around the other. Rich and Tom Knuth inspected the sanitary sewer lines in the
Somerset neighborhood.
The Street Crew cut and chipped up over hanging trees on Valley Curve between
Willow Lane and Hilltop. They trimmed trees where there were sight distance
problems on eastbound Marie Avenue and Wachtler Avenue. Two patches were
put down for Rich around a manhole by the Ivy Falls town homes, a final lift patch
was put down on Mendota Heights Road west of Lake Drive and patching was done
on Mendota Heights Road. Street name and regulatory signs are starting to be
replaced in the Somerset neighborhood. They also cleaned catch basins.
Enaineerina
The 2005 Street improvement project is underway. Northdale Construction started
storm sewer on Dodge Lane this week. Residents on Dodge have experienced
interruption to their utilities as Northdale severed cable and telephone. When
Qwest was fixing the phone lines, they hit the gas and electric! Northdale will start
on Sunset Lane storm sewer today.
The Engineering Department has received several calls about the "water spurting
out of the ground" at Town Center!
Sue and Tom Olund will be attending the American Public Works Association
National Congress from September 12 to 14 at the Minneapolis Convention Center
Code Enforcement
A new single family home building permit was issued for 2540 Arbor Court. The
estimated cost for the new home is $365,000.00. A wetlands permit was
approved by City Council for this home on August 2, 2005.
LETTER / The Pipel i ne
Public Works
Engineering
Code Enforcement September 1, 2005
Public Works
The Parks Crew removed weeds and plantings around the Wentworth Park sign
and prepared the area for new plantings and rocks. They serviced all mowers.
Pipe Services cleaned and vacuumed the Mendota Heights Road lift station to get
rid of a big build up of grease. Rich raised a manhole casting for the City of
Lilydale.
The Street Crew repaired two street lights in the business park area. A tree limb
came down and blocked the westbound driving lane on Marie Avenue west of Dodd
Road which was removed. Hoping to curtail student parking on High Ridge Circle
and Sibley Court three "No Student Parking" signs were installed. The Street Crew
also repaired the inside of a deteriorated storm grate and put on the first lift of
asphalt on Mendota Heights Road just west of Lake Drive. They patched potholes
on Mendota Heights Road west of Dodd and on Warrior Drive.
Code Enforcement
A building permit was issued for the first commercial tenant space finish at 702-
724 Main Street, Suite 101, Kowalski Wine Market in Town Center. The builder's
estimate is for $175,000.00 for a 2,556 square foot tenant space.
Engineering
Ace Blacktop paved the final wear course on Emerson Avenue and Colshire today.
Sue attended the Lilydale City Council meeting and the Lower Minnesota River
Watershed District meeting to request monetary support to repair the Kingsley
Court slope erosion problem. Both organizations will contribute to the project.
Northdale Construction will begin storm sewer work on Dodge Lane on Tuesday,
m September 6
NEWS
LETTER
Public Works
Engineering
Code Enforcement
Public Works
The Pipeline
4 kAugust 25, 2005 4
The Parks Crew worked on the sprinkler system at the Fire Hall, repaired the sprinkler
system on field #4 at Mendakota Park, and replaced a sprinkler head at City Hall. They
trimmed tree limbs along the pedway between Swan Court and Mendakota Park. Because
of vandalism the bar at the skateboard park had to be replaced. They chipped up brush
at Rogers Lake. Soccer season is upon us, so the Parks Crew hauled out the soccer goals
to the neighborhood parks and installed the nets on the goals.
The alarm went off Friday morning at the Mendota Heights Road lift station because the
relays tripped out and had to be reset. Rich cleaned sewers at Spring Creek Court, Valley
Curve and the Valley Curve easement. Rich finished spraying the weeds for the Parks
Crew.
The Street Crew added class 5 on Huber Drive's dual culverts. They filled and graded the
wash outs on West Perron Road. They finished the final lift on the patch on Mendota
Heights Road and Enterprise Drive. They also cleaned storm grates.
Engineering
Sue attended the Gun Club Lake WMO meeting with Mary Jeanne as they were discussing
our Surface Water Management Plan. The managers directed their engineers to prepare
comments. They did not anticipate any major issues and thought the Plan was good.
Sue attended the Lower Minnesota River Watershed District boat tour along with Jim,
Mary Jeanne and Patrick. Representatives of the Watershed District, Mdewakanton
Community, US Fish & Wildlife Service, MAC, Met Council, and barge industry provided
informative comments as we enjoyed the great views and perfect weather.
A couple of weeks ago Tom Knuth discovered some severe erosion behind the Kingsley
Court townhomes. There is runoff from both Mendota Heights and Lilydale that has
created a 6-foot deep gully through our sanitary sewer easement leaving only 3 feet of
cover over our sewer pipe. Our initial construction cost estimate to complete the repairs is
$25,000. Sue has contacted Terry Schwalbe at the Lower Minnesota River Watershed
District for monetary assistance for the slope repair since it is an intercommunity problem.
Sue has also contacted Lilydale. This issue will be discussed at the Lilydale City Council
meeting on Monday, August 2gth and at the Watershed District meeting on Wednesday,
August 31st. Sue will attend both meetings and report back to council at the September 6th
meeting.
All punch list items have been completed on the Lexington Trail project.
NEWS
LETTER
Public Works
Enaineerinci
Code Enforcement
Public Works
The Pipeline
August 18, 2005
The Parks Crew pulled the irrigation lines at Mendakota Park
and at the Fire Hall. Sprinkler valves and pipes were installed
to sprinkle the east yard of the Fire Hall (Warnke site). They
began laying out and striping soccer fields for fall soccer.
580, the big mower broke down and needed repairing.
The power went out at the Lilydale lift station at 11:30 P.M.
and was out for an hour because of the storm. Rich sprayed
Roundup (total weed killer) around guard rails and in our
right-of-ways. He also sprayed the parks for broadleaf
weeds.
The Street Crew opened the depression on Enterprise Drive
and Mendota Heights Road. They found the frame for the
storm sewer manhole was broken, replaced it with a new one,
backfilled, compacted and put down the first lift of asphalt.
There were complaints about potholes on Diego Lane,
Bachelor Avenue, Orchard and Mendota Heights Road and
they filled them. A stop sign was replaced that was down on
Nashua and Decorah from a tree that feel during the last
storm. They cleaned storm grates and looked at an erosion
problem at LCS, on Highway 13.
NEWS
LETTER
Public Works
Engineering
Code Enforcement
Public Works
The Pipeline
_
August 11, 2005 _
Public Works hosted their annual "super summer barbeque" at Public Works this
week. Thank you for a wonderful meal and time. Most employees from City Hall
attended this great summer get together.
The Parks crew fertilized Kensington Park, Mendakota Park, the Fire Hall, City Hall
and at Public Works. They cleaned up downed limbs and trees at Friendly Hills
Park which were then chipped up and hauled away. They cleaned up the shop and
back lot.
There have been a lot of downed limbs and trees this season because of storms,
see the attached email thank you from a resident in Copperfield thanking Public
Works for their help with storm clean up.
The alarm went off at the Mendota Heights Road lift station because the low level
float went out. Rich called Braun Pump to change it out. Rich cleaned sanitary
sewers on Hilltop Road, Hilltop Court, Willow Lane and Mager Court. The power
went out at the Veronica Lane lift station on Tuesday, because of storms passing
through, and the power was quickly restored.
The Street Crew cut down a boulevard maple tree at 15 Dorset Road which was
split down the middle. They patched potholes on the north end of the City and
overlaid the intersection of Kirchner Avenue and View Lane. They called in
locates for stumps that need to be ground with a total of six stumps needing to be
ground. Sod was put down on Stone Road where a cottonwood tree was removed
because the roots were heaving the sidewalk.
Engineering
Xcel Energy is starting to relocate gas mains on Sunset Lane and will relocate
mains on Ivy Falls Avenue next week.
Tom Knuth and Sue met with Terry Schwalbe of the Lower Minnesota River
Watershed District to discuss the participation in an erosion control project
adjacent to Kingsley Estates. The City of Lilydale is also being asked to participate
in the project.
Page 1 of 1
Tom Olund
From: "Kathleen Swanson" <KathyS@mendota-heights.com>
To: "James Danielson" <JimD@mendota-heights.com>; "Sue McDermott" <SueM@mendota-heights.com>;
"Tom Olund" <pwsuper@infinetivity.com>
Sent: Monday, Augus: 08, 2005 9:37 AM
Subject: FW: A Big Thank You
From: Lkfitzer@cs.com [mailio:Lkfitzer@cs.com]
Sent: Thursday, August 04, 2005 4:25 PM
To: Web Site Email
Subject: A Big Thank You
What a pleasant surprise when I came home from work today and saw my tree that was damaged from the storm last
night was removed. My neighbor told me that the city had come down the street and helped most of us with downed trees.
Tease extend a thank l(OU to workers who helped out. Going through Friendly Hills early this morning, it looked
like a nature war zone with so many trees down. Those winds were tough on the trees last night.
Gregg and I appreciate your viork and want to thank everyone again.
Laurie And Gregg Fitzer
2213 Copperfield Drive
Mendota Heights
NEWS
LETTER
Public Works
Engineering
Code Enforcement
Public Works
With Wednesday night's storm there were a lot of trees down, which kept the
Street Crew busy with clean up and most trees downed were south of 110. Here
is a list of downed trees:
9 in the copperfield area 1 on Park Lane and Mendota Heights Road
1 in Bunker Hills 1 on Apache and Pueblo
1 on Wesley Lane 1 on Douglas east of Lexington Avenue
1 on Callahan 1 on Patricia; and
1 stop sign was down at Nashua and Decorah because of a downed tree.
The Street Crew also reswept the chip seal because of numerous complaints about
loose rock; Huber Drive, Marie Avenue, Wentworth Park, Junction and Kirchner
Avenue were also swept.
The Parks Crew attended the MN Turf and Grounds Field Day at the University of
Minnesota. The seminar topic was about different types of soils and drainage
problems that may arise on athletic fields. The end of the year softball play offs
were held for men's, women's and over 30 leagues and the fields were prepared.
The ballfields at Mendakota Park, City Hall and the soccer fields at Mendakota Park
and Kensington Park were aerated. All four ball fields at Mendakota Park were top
dressed. The Parks Crew also removed downed limbs and brush from the parks on
the south end of the City after Wednesday night's storms.
Rich was on vacation for part of the week and while he was off having fun -
Infratech finished lining the sanitary sewer on Ivy Hill. The power went out at the
main lift station causing the alarm to go off and Len responded and took care of
the problem. The power also went out at the Centre Pointe lift station and John
Ambrose responded to that alarm.
Code Enforcement
A new single family building permit was issued to Cardinal Homebuilders, Inc. for
746 Knollwood Court. The estimated cost of building the house is $510,000.00.
Engineering_
Braun Turf Farms finished installing the sod as part of the Somerset project.
N E W S
LETTER
Public Works
Engineering
Code Enforcement
Public Works
The Pipeline
July 28, 2005
The Parks Crew sprayed total weed kill along the fence lines at all neighborhood ball fields
and back stops and they finished spraying the warning tracks at Mendakota Park. They
started aerating neighborhood ballfields. Extra picnic tables were hauled to Mendakota
Park for a large picnic. They chipped up brush along the pedway at Summit and Marie.
On Tuesday, the alarm went off at the Mendota Heights Road lift station. Grease was
stuck on the walls and was cleaned off. Rich cleaned the sewers on Dodd Road from
Wentworth to Marie and some roots needed to be cut. Rich repaired the concrete in the
manhole on Marie and put in a new step where the old one rusted off.
The Street Crew got a report of a sink hole at Enterprise Drive and Mendota Heights Road.
A warning flasher was put over it and it will be checked out soon to discover the problem.
The storm sewer pipe on Huber Drive was opened and numerous joint separations were
reset with approximately eight pieces of pipe and 2 aprons. After making the repairs,
bedding rock and class 5 was laid and compacted. They cleaned dirt and debris from
culverts on Huber.
There was a sight distance problem caused by brush at Summit and Victoria and the
Street Crew removed the brush and overgrowth. MnDOT Electrical Services was called
because there was a problem with the red traffic light being out on southbound Highway
13 and Mendota Heights Road; the cause of the problem was discovered - mice were
chewing on the wiring harness. They opened the outlet at Lockwood Pond, cut a trail to
the outlet and marked with a post for an entrance.
Code Enforcement
A tenant space permit was issued to K& S Investments, LLC for 2295 Waters Drive in
Waters Drive Business Park. The tenant space is 2,987 square feet and has an estimated
cost of $130,000.00.
Enciineerina
The bid opening was Tuesday for the 2005 street projects and two bids were received:
Arnt Construction $650,023.70 and Bituminous Roadways $757,549.04. The Engineers
estimate was $662,845.50. The bids will go to Council on Tuesday for approval.
NEWS
LETTER
Public Works
Engineering
Code Enforcement
- 0
July 21, 2005
Public Works
The Parks Crew prepared fields at Mendakota
Park for the AAU state tournament. They
cleaned up Wentworth Park and took out the old
playground equipment. They took tables to St.
Thomas Academy for the Relay for Life.
Rich did a sanitary sewer inspection at 699 North Freeway Road, 1080
Highway 110 (SuperAmerica), and 2295-2301 Water Drive. He
cleaned sewers on Bachelor Avenue, Sutton Lane, Trail Road, Lansford
Lane and Stanwich Lane.
Huber Drive is closed from Cheyenne to Bent Tree Lane so the Street
Crew can repair the storm sewer pipe.
Wentworth Park
Upgrades to the playground at this park were completed last week.
Several outdated components were removed; new individual units
were added and connected to remaining elements along with a new
structure group suitable for 2 to 5 year olds. The old border timbers
were removed as was the pea rock surfacing. New synthetic landscape
timbers made from recycled and compressed soft interior parts from
automobiles were installed, a drain tile system was placed under the
12 inches of wood chips used for the new resilient surfacing. Once the
chips settle they form a firm enough surface that meets the American
Disability Act accessibility standards.
The Public Works Park Crew was responsible for restoration of the
surrounding area. This work included removal of the outdated play
equipment, removal of several truck loads of dirt, pea rock and old
timbers. In addition, the Parks Crew removed an unnecessary asphalt
path to the play area and brought in topsoil as part of the turf
restoration around the play area. The contractor received too many
wood chips which he offered free to the City. The Parks Crew removed
several truck loads of chips and used them in other parks (the excess
chips had a value of two or three hundred dollars).
Valley Park Trail — west of Dodd Road
A recent storm caused severe erosion of a culvert near the trail. The
Parks Crew, Street Crew and Rich had to extend a 24" culvert, haul in;
fill (some of which was the pea rock from Wentworth Park), stone for
back fill, and rip -rap at the end of the culvert. They also brought in
topsoil, seeded, and placed a fiber blanket to control erosion until the
seed germinates. This is a remote area of the trail and very difficult to
reach with trucks and excavation equipment. Most of these two
projects were done during the recent sunny, hot, hot, hot, 90 plus
degree days.
The Mayor giving a greeting Sue, Nancy and John walking a
at the Relay for Life lap at the Relay for Life
NEWS N
LETTER The P1el i ne
Public Works
Engineering
Code Enforcement July 14, 2005
Public Works
The Parks Crew cleaned up
Mendakota Park after a weekend
tournament. They prepared the fields
at Mendakota Park and Civic Center
ball field for the AAU State
Tournament held this week end. A
limb fell on the Friendly Hills pedway
and was removed. Total Weed Killer was applied along fences at Mendakota Park,
Kensington Park, and sprayed on cracks in pedways where weeds are growing.
They placed picnic tables, tables and chairs at Rogers Lake for the fishing contest
on Wednesday.
Rich cleaned the sanitary sewer lines at Wentworth Avenue, Wachtler Avenue,
Evergreen Knolls, Gryc Court, Deer Trail Point and Deer Trail Court. The power
went out at the Mendota Heights Road lift station Wednesday at 5:00 A.M. and
was out for four hours.
Two red traffic lights were out at Mendota Heights Road and Highway 13, so the
Street Crew picked up some replacement bulbs at MnDOT Electric Services and
installed them. They picked up brush at 610 Ivy Falls Avenue. Old "No Parking"
signs were removed from the north side of Northland Drive. They started patching
potholes in the "Avenues" area of the City. John Ambrose made a frame for the
parks bulletin board at Mendakota Park.
Engineering
Nancy, Sue and Ryan are participating in the Relay for Life on Friday at St.
Thomas Academy. They are walking as part of Team Avengers. Mayor Huber is
also on the team. If you stop by, look for the white hats!
Sue submitted a grant request to the Metropolitan Council for $43,000 for rain
water gardens in the Ivy Falls area (next year's street reconstruction project).
The Somerset Area project is nearing completion. The contractor is waiting for
cooler weather to start placing the sod.
NEWS
LETTER
Public Works
Engineering
Code Enforcement
Public Works
July 7, 2005
The Parks Crew picked up downed tree limbs and chipped them up. Brush was
cleaned up on the pedway and overhanging limbs were trimmed in Marie Park.
Small sucker trees are growing around all the tennis courts and those were
trimmed up. Home plate was damaged at the Civic Center ball fields and that was
replaced. The warning track was washing out at Mendakota Park and the Civic
Center ball field and rec rock was hauled in, put down and leveled.
Rich did a storm sewer inspection at 720 Main Street in Town Center. He did a
sanitary sewer inspection at 620 Hidden Creek. Rich helped the Street Crew in
blacktopping the streets in the business park. He cleaned sewers at Cherry Hill
Road, Farmdale Road and Lower Colonial Drive.
The Street Crew cleaned up the stump grindings, filled the hole with black dirt and
seeded at 681 Ocala. They patched the pedway by the pavilion at Kensington
Park, filled depressions in the street at Lake Drive, Dodd Road and hole on Marie
Avenue at Callahan. Broken glass was in the street on Marie Avenue across from
Marie Park and that was cleaned up. They prepared the north side of Northland
Drive between Pilot Knob Road and Mendota Heights Road for "No Parking" on the
north side of the street including; signage, painting of curbs and patching the
street.
Engineering
There was a water main break on June 30th at the corner of Vicki Lane and
Douglas. A St. Paul Regional Water Services crew repaired the break in the
afternoon.
Code Enforcement
A building permit was issued to Gretner Construction to remodel the Convent of
Visitation dining room. The estimated cost was set at $93,000.00. A permit was
issued to Remediation Unlimited, Inc. to demo and construct a larger accessory
structure at the existing SuperAmerica station at 1080 Highway 110. This project
was approved by the City Council on May 3, 2005 and the estimated cost is
$20,000.00. A permit was issued to Stonewood Design/Build, LLC to demo and
reconstruct a single family dwelling at 806 Bachelor Avenue. This property is
owned and the home is to be constructed for Mike Cashill, one of the Par 3 Golf
Course owners. The builder estimated the construction cost to be 1.3 million.
NEWS
LETTER
Public Works
Enciineerinci
Code Enforcement
June 30, 2005
i ne
Public Works:
The Parks Crew repaired a sprinkler head at Mendakota Park. They trimmed trees along
the pedway in Valley Park for easier walking. Timbers were removed and filled in at the
Marie Park were new playground equipment was installed. A second application of
crabgrass preventive was put down at Kensington Park South, Mendakota Park, the Fire
Hall, City Hall, the ballfields at City Hall and at the Public Works Garage. After
Wednesday nights storms blew threw the Parks Crew picked up downed braches.
Rich cleaned sewers in all of the Park Place neighborhood and the Farmdale easement.
He raised a manhole 1-1/2 feet on the Farmdale easement. The alarm went off at the
Mendota Heights Road lift station on Tuesday at 10:30 a.m. due to high water. Rich
washed down the walls and cleaned up the wet well at the Mendota Heights Road lift
station.
Tim Oster from the Street Crew was called in on Monday night to remove a tree in the
roadway that blew over from the storm and it was then cut and chipped up. The Street
Crew met with the Police Chief and the Maintenance Chief of Brown College to discuss a
crosswalk on Northland Drive After the discussion, it was decided not to paint the
crosswalk now and to paint it when Northland Drive is milled and overlaid. "No Parking"
signs were installed at Brown College. Storm sewer grates were cleaned. For the second
time this week, the Street Crew also had to pick up downed tree limbs after the storm
Wednesday night.
Engineering:
Paving in the Somerset neighborhood began on Thursday. It is the contractor's intent to
have all of the streets "black" by the end of the day on Friday.
Sue and Guy attended a meeting with Dakota County and MnDOT at which they learned
that MnDOT will not allow the NURT to be located between TH 110 and the TH 110
frontage road.
Marie Park:
Improvements to the Marie Park playground were completed last week. Work included
removal of CCA treated border edging, removal of pea rock surfacing and removal of play
structure and accessories installed in 1990. Some of the removed components that are in
good shape will be reconditioned and re -installed, with additional new components, at the
Valley View Heights Park in 2006. The upgrades at the Marie playground include a new
structure and play components suitable for 5 year and older youth, new non -toxic
composite edging timbers, and non -toxic shredded wood surfacing that once compacted
will make the entire play are in conformance with the American with Disabilities Act.
Work on similar upgrade improvements will begin at Wentworth Park following the July 4th
Holiday.
L E T T,E R The Pipeline
Public Works
Engineering
Code Enforcement June 23, 2005
Public Works
Utilities
Rich Burrows monitored operation of all lift sanitary sewer lift stations.
Cleaned sanitary sewers on Medora Court, Medora Lane and Emerson Avenue and
inspected new sewer service in Water Drive Business Park (Kiingelhutz). The sanitary
sewers in the Mayfield Heights easement, Victoria Curve, Wagon Wheel Trail (35E bridge
to Lexington), Williams Court and Lexington (Cullen to Wagon Wheel Trail) were cleaned
and tree root killer was applied. Power outages occurred at the Veronica Lane, Culligan
Lane and Lilydale (under maintenance contract) sanitary lift stations due to the June 21s'
storm.
Street Department
Straightened storm sewer "trash -guard" on Swan Drive. Met with resident, tree service,
and Patrol Officer Patrick at Trail Road and Marie Avenue, to resolve traffic sight -line -
distance issue at this intersection. Removal of lower six feet of pine tree branches was
the solution arrived at. Cleaned up downed trees and branches due to Monday June 21"
afternoon storm. Most trees that were down were due to the storm and were on private
property. They also assisted Utility Department with traffic control on Lexington during
application of tree root and sewer cleaning operation. Re-lamped left turn signal arrow
head on traffic light at HWY 55 and Mendota Heights Road.
Parks
Maintained the turf in all parks and daily empty trash barrels. Installed temporary
pitching mounds at Mendakota for weekend tournament and then removed them after the
tournaments were over. Repairs were made on irrigation lines in fields #2 and # 3 in
Mendakota Park. They also removed downed limbs and trees in all the parks after the
Monday's storm. Trees were trimmed along ped-ways in Friendly Hills and Valley Park for
planned 3-Day Breast Cancer walk. Valley park parking lot will be used on Friday as one
of the water stops. Dirt was leveled and seed spread at the area around the Fire Hall.
Service and repairs were done to all turf power equipment. A flowering crab tree that was
donated by the Mendota Heights Garden Club was planted at City Hall. Turf has been
repaired from a tree in Friendly Hills Park that had blown over. The soccer goals at
Kensington Park were also repaired.
Engineering
Curb and gutter has been completed on the entire Somerset Area project.
The bid opening date for the 2005 street project has been moved to July 26, 2005.
NEWS
LETTER
Public Works
Enaineerina
The Pipeline
Code Enforcement June 16, 2005
Public Works
The Street Crew reinstalled the 40 MPH sign on west bound Marie
Avenue and Trail Road. Because of sight problems they trimmed
bushes back at Third Avenue and Dodd Road and at Trail Road and
Marie Avenue. They removed a tree limb down on Medora Road which
was blocking the street and ran it through the chipper. They patched
the end of the driveway at 1124 Orchard and staring filling potholes in
the neighborhood.
Engineering
Sue and Ryan held an informational open house to allow residents of
Ivy Falls Drive, Sunset Lane and Dodge Lane to view construction
plans and ask questions. Seventeen (17) people attended the
meeting, the majority representing Ivy Falls and Sunset. One resident
from Dodge Lane was also present.
Code Enforcement
Two permits for building shells at Waters Drive Business Park were
issued. One building will be a 2 unit slab on grade and the other
building will be a double walkout which will potentially contain four
units (two up and two down). Klingelhutz Construction Company will
be the general contractor for the project. Each building shell has been
estimated at $400,000 per building.
NEWS
LETTER
Public Works
Enaineerino
Code Enforcement
Public Works
The Pipeline
June 9, 2005
The Parks Crew picked up trash daily from the parks, dragged and chalked fields
and striped foul lines on an as needed basis. The week before and after the Parks
Celebration they were busy setting up and cleaning up after the celebration and
tournaments. After the storms on Tuesday morning, they checked the parks for
storm damage and picked up downed limbs. There were a few trees down at
Victoria Highlands Park and at Friendly Hills Park.
Rich witnessed the sewer mandrel testing at the Waters Drive project. Pipe
Services vacuumed and cleaned the lift stations. Rich did a storm sewer
inspection on Main Street at Town Center. He mowed the Veronica lift station. He
also cleaned sewer lines at Knollwood Court and Rogers Court.
The Street Crew trimmed trees and bushes to help a site distance problem at
Victoria and Douglas and at Victoria and Celia. After Tuesday morning's storms
they picked up tree limbs and branches that were blown down and ran them
through the chipper. After the seal coating project was completed last Friday, this
week the Street Crew swept up the excess rock and stockpiled it for use in the
future.
Enoineerina
Several streets in the Somerset neighborhood were paved today. Letters went out
to residents in the Dodge Lane, Sunset Lane, and Ivy Falls Avenue neighborhoods
inviting them to an informational open house on June 16th to answer resident's
questions, and show them preliminary plans.
Code Enforcement
A permit was issued to Haldeman Homme, Inc. to demo and install new flooring in
the gymnasium at 1897 Delaware Avenue (Henry Sibley High School), the
estimated cost for removal and replacement is $272,000.00.
NOW
Despite the dreary weather there was a good
turnout for the 2005 Parks Celebration
NEWS
LETTER
Public Works
Enaineerina
Code Enforcement
Public Works
The Pipeline
June 2, 2005
The Parks Crew hauled in rec rock to field #2 infield and the warming track at field
#3 at Mendakota Park. They hauled in black dirt to Mendakota and Valley Park to
fill in sink holes. They removed a dead crab apple tree at City Hall and planted a
new on in its place that was donated by the Garden Club. In preparation for the
Parks Celebration on Saturday, the Parks Crew trimmed trees and groomed
Mendakota Park. The removed a fallen tree at Valley Park.
Rich sprayed right-of-ways, signs and guard rails with round -up week killer for the
Parks Crew. Total Construction replaced the fan switch for the generator at the
Mendota Heights Road lift station. Rich cleaned off graffiti off of Lilydale's lift
station panel.
The Street Crew repaired catchbasins. The put in repaired catchbasin patches on
Concord Way and Commerce Drive. They are patching potholes on Apache Court,
Huber Drive, Eagle Ridge Road, Summit Lane, Marie Avenue, Sibley Court, and
First Avenue.
Public Works personnel will be attending Hazmat Awareness and Grounds Keeping
Training on Wednesday, June 8th at 8:00 A.M.
Engineering
8,000 feet of concrete curb and gutter was installed in the Somerset
neighborhood.
Seal coating is scheduled to be completed on Friday in the Friendly Hills
neighborhood.
Sue met with the new West St. Paul Public Works Director to discuss Delaware
Avenue reconstruction and Thompson diversion projects.
NEWS
LETTER
Public Works
Engineering
Code Enforcement
Public Works
i--ne ripenn-e
00
The Parks Crew added more wood chips around newly planted trees. They planted
flowers and repaired the sprinkler system (valve repair) at Mendakota Park. They
fertilized the following City properties: Mendakota Park, Kensington Park, Fire
Hall, old fire hall site, City Hall and the Civic Center Ballfield. They repaired the
chain link fence at Kensington Park South. They put down seed behind the Public
Works Garage where the tree farm used to be.
Rich responded to a power outage at 12:00 A.M., Thursday at the Mendota
Heights Road #1 lift station. Power was restored at 4:30 A.M. He sprayed for
weeds at: Ivy Falls Park, Marie Park, Civic Center Ballfields, City Hall, Friendly
Hills, Mendakota Park, Friendly Hills tot lot, Curleys tot lot, and by the Mendota
Heights sign on Dodd Road. Rich mowed the lawn at the Veronica lift station.
The Street Crew repaired deteriorated catch basins on Concord Way, Commerce
Drive, and Park Place. Park Place appeared to be the worst; the pipe stub into the
precast had no brick or cement. After relamping the "don't walk" signs on
Mendota Heights Road and Highway 55 and they still didn't work, MnDOT electrical
services was notified of the problem. They painted the curbs yellow on High Ridge
Circle and Sibley Court.
Engineering
Turf restoration has been completed along the Lexington Avenue trail project.
Arnt Construction had planned to begin curb and gutter installation this week, but
have been delayed due to the weather.
Code Enforcement
Paul issued a demolition permit to Lodahl, Inc. to demolish the house and
foundation at 1280 Lakeview Avenue. The fire damaged house has been removed.
All that is left on the site is a small amount of retaining wall adjacent to the
driveway. The wetland permit was approved for demo and new home construction
for Kurt Hagen on May 17, 2005 by City Council.
NEWS M
LETTER
Public Works
Engineering
Code Enforcement
Public Works
The Piel i ne
aY May 19, 2005
The Parks Crew picked up their new truck from Aspen Equipment. They
repaired valves on the sprinkler system at Mendakota Park. Two of the new
part-time summer helpers started on May 16th and they were trained in this
week. New steel trash barrels were put in the parks to replace the old, rusted
out barrels. They worked on the garage door at the back of the shop by
repairing and greasing the roller and replacing he bracket. They replaced the
pitman arm, idler arm and steering stabilizer on truck 503.
The fan belt for the air blower in the dry well was broken at the Mendota
Heights Road Lift Station. Magney Construction repaired it, which was under
warranty. Rich flushed Knollwood Court and easement to Highway 13. He
sprayed for weeds in North and South Kensington Park, Rogers Park and at the
Fire Hall. The weather only cooperated briefly on Monday.
The Street Crew worked on repairing a catch basin that was deteriorating on
the inside and caused a hole in the street. They cleaned storm grates. The
walk and don't walk signals were not lighting up, so they replaced the light
bulbs. John Ambrose did welding on some of the parks equipment.
Engineering Department
Somerset Neighborhood Reconstruction: The water main is complete on
Dorset. Class 5 has been installed on Somerset. Weather permitting, curb will
be placed next Friday on Somerset, 2 blocks of Staples, 2 blocks of Mears, 1
block of Dorset and 1 block of Hingham.
Sue met with Terry Schwalbe, the District Administrator from the Lower
Minnesota River Watershed District to get acquainted with district activities.
Terry will be a good resource to assist the City in meeting the educational
aspect of our NPDES, Phase II permit. He is also planning another boat tour at
the end of August.
NEWS
LETTER
Public Works
Engineering
Code Enforcement
The Pipeline
May 12, 2005
Public Works
The Parks Crew replaced the broken cable for the brakes on
the grounds master 345. They went through all the weed
° s % whips to make sure they are running properly for summer.
° They installed the overhead netting between the backstops
at Mendakota Park. They put down granular weed bed
control on the berms at Kensington Park North and put down
crabgrass preventor where needed. They brought picnic tables and extra trash
barrels to City Hall.
The Street Crew cleaned the storm sewer grates. They cut brush and buck thorn
over hanging the guard rails between Glen Hill Road and Highway 13. They cut up
and hauled away a downed tree blocking the street in front of 2295 Apache Street.
They cleaned up debris at the end of Spring Street.
Rich inspected Lilydale's storm sewer system and it looks good. An alarm call
went off at Mendota Heights Road #1 lift station and Rich had to scrape grease off
the walls of the wetwell. He began spraying the parks for dandelions and other
broadleaf weeds. He finished Wentworth, Valley, and Victoria Highlands parks.
The weather hasn't cooperated with him - dry, warm and windless mornings are
needed for spraying.
Engineering
The Lexington Avenue trail is paved and the majority of disturbed ground has been
sodded.
Somerset Neighborhood: The storm sewer is completed on Somerset, 1 block
of Hingham and 2 blocks of Staples. The gas and telephone relocation work is
complete. Class 5 aggregate base was installed on Coleshire Lane, 1 block of
Somerset, 1 block of Dorset, and 2 blocks of Staples. Water main construction
starts Monday on Dorset from Mears to Staples.
One foot of sand base is in place for the roads in Waters Drive Office Park.
LETTER / The Pipeline
Public Works
Engineering
Code Enforcement May 5, 2005
Public Works
The Parks Crew hauled rec rock to the civic center ball field and filled in around the grass
lines. They repaired the sprinkler system valve at Mendakota Park on field 2, repaired the
sprinkler system at the Fire Hall and started the sprinkler system at City Hall. They
planted new pine trees at Marie, Wentworth and Mendakota Parks and put down mulch
around them. They also chipped up the dead pine trees from Mendakota Park.
John Ambrose fabricated the mower deck runners for the Parks Crew. He also assisted
Rich with cutting roots in the sanitary sewer lines. The Street Crew realigned the Ivy Falls
Creek bed on Maple Park Drive and filled the ditch with rip rap to the gabion. The street is
caving in our storm and sanitary sewer in front of 679 Marie Avenue and our lines are ok.
St. Paul Regional Water Service said they couldn't detect any problems. The void was
filled with Class 5 and patched which will be monitored for future problems.
Rich pulled pump one at the Northland Drive lift station which was plugged with rags and
rocks. The high water alarm at the Mendota Heights Road lift station went off because
grease was blocking the transducer's view of the water level - so Rich had to scrape
grease off the walls. Rich raised a manhole on Lexington Avenue (in Lilydale) and on
Marie Avenue. Tom Knuth and Rich televised the City's sanitary sewer lines and the
homeowner's sanitary sewer line at 679 Marie Avenue and found no problem. Rich
inspected and air tested the newly installed sanitary sewers at the Waters Drive project
and everything was good.
Engineering
The Somerset Area reconstruction is underway! Northdale Construction is installing storm
sewer. Arnt Construction has installed the Class 5 aggregate base course on Coleshire.
Tom Knuth and Sue met with staff from Dakota County SWCD to discuss this year's
erosion control inspections. These are required as a part of the City's NPDES, Phase II
permit.
Minger Construction finished underground utility work and street construction begins next
week at Water Drive Business Park.
The Lexington Avenue bituminous trail was paved on Friday.
Code Enforcement
A building permit was issued to Mihm Custom Homes, Inc. for 700 Hidden Creek Trail.
The builders estimated cost is $775,000.00.
NEWS N
LETTER
Public Works
Engineering
Code Enforcement
Public Works
i ne ripeiine
April 28, 2005
The Parks Crew finished filling holes from removed tree stumps and then seeded
those areas. They attended the Minnesota Park Supervisors Association quarterly
meeting. The discussions focused on Turf Management. The meeting was held at
the Toro Commercial Education Center. They filled holes with black dirt and seed
in the soccer fields at Kensington and Medakota Parks. They replaced the burned
out light bulbs at Kensington and Mendakota Parks (the security lighting) around
the buildings.
There was a power outage at the Northland lift station on Tuesday in the evening.
Rich televised the Ivy Hill sanitary sewer mains and found a service tap sticking
into our line six inches, which will have to be cut off. He also found two broken
joints in the same line. Rich is waiting for bids to fix the broken joints. Rich also
prepared the sprayers for weed spraying in the parks and right-of-ways.
The Street Crew cleaned catch basins and did mailbox repair. They reinstalled
temporary stop signs that were hit during the winter on Mendota Heights Road,
Lexington Avenue, Cheyenne Lane, Huber Drive, Center Pointe Drive and Center
Pointe Blvd. They met with a resident on Swan Drive regarding the storm sewer
easement that needs black dirt and seed. John Fearing of Brown College
discussed the "No Parking" signs that are going up. Brown College would like two
days notice before the signs go up. The mounting brackets for the signs were
ordered. They picked up a down tree limb on Marie Avenue across from Valley
Park. They installed the asphalt hot box and tray on truck #312.
Engineering
The Engineering Department received construction plans from MnDOT for traffic
management system, changeable message signs, vehicle detection and camera
surveillance along T.H. 494 in Mendota Heights, Eagan, Inver Grove Heights, West
St. Paul, and South St. Paul. A changeable message sign will be installed for
westbound traffic east of the Dodd Road ramp.
Minger Construction has completed installation of sanitary sewer, water main and
pond grading at Waters Drive Business Park. They are currently installing storm
sewer.
NEWS
LETTER
Public Works
Engineering
Code Enforcement
The Pipeline
April 21, 2005
Public Works
The Parks Crew planted shrub roses where needed and replaced dead shrubs
around the park signs. They replaced the broom on truck 506, the grounds
master, after sweeping the pedways and also replaced bearings on the broom.
They cut down dead apple trees at Ivy Falls Park by the tennis courts and a
leaning tree on the pedway between Fourth Avenue and Wentworth Park. They
repaired the sprinkler systems at Mendakota Park, City Hall and the Fire Hall.
They picked up the new parks trailer at Scharber and Sons, Inc. in Rogers,
Minnesota.
Rich cleaned grease off of the floats at the Lilydale lift station. Tuesday evening
an alarm call came in from the Lilydale lift station phone line, the alarm broke and
Qwest came out and repaired it. Rich did a sanitary sewer inspection at 1161
Dodd Road. He also trimmed shrubs at Kensington Park for the Parks Crew. Len
charged the batteries on the generator and port at the Mendota Heights Road lift
station. Len and Rich then ran each of them for a half hour. Rich flushed Pilot
Knob sanitary sewer lines at the Waters Drive Business Park project to Enterprise
Drive - there was sand in the line from the project.
The Street Crew met with residents on Chippewa Avenue about the new sidewalk
concrete flaking off from salt this winter. Dave told them the concrete cured
correctly and the salt wasn't the cause. They met with a resident on High Ridge
Circle to discuss a damaged curb from plowing this winter and Dave said it would
get fixed this summer. They attended the annual Spring Maintenance Expo put on
by the U of M Center of Transportation Studies. Some of the sessions attended
were: Get Funded to Try Something New in Your Day to Day Maintenance
Operations, Chain Saw Safety, New Snow and Ice Field Guide for 2005,
Commercial Driver License Requirements for 2005, and Good, Bad and Ugly Work
Zones within the State.
Engineering
Ryan and Sam (the Engineering Department intern) assisted staff from Barr
Engineering with surveying cross sections for the Marie Creek study that was
ordered by the Lower Mississippi River WMO.
The contractor for Klinglehutz Development has been installing utilities and
completing site grading at the Waters Drive office park.
RKI completed installation of the pond liner at Town Center last Friday.
The Lexington Avenue trail will be paved on Monday.
NEWS
SETT TER
it eubl_P
Engineering pee nCodeinfo e
ment
April 14, 2005
Public Works
The Street Crew started
Pearson Brothers sweeping the street, 10 hour d � and will finish sweeping on Tuesday
Friday days on Tuesday, Wednesday/ping the whole City with the contractor,
and Thursdayd °n Friday, The
Rich and will finish b y worked
did a sewer ins Y noon on
trees and shrubs. inspection at 701 Linden
The jetter truck Street. He helped
Thep went in for the Parks
Parks Crew cleane a pump repair. Crew plant
Parks, where d ►eaves out of
Parkneeded. They es O the tennis c
storage
along with the sihea brought the aerator i frts and swept Kensington an ge for thin ice. Theyn from Rogers L leaves in the
trimmed shrubs Mendakota Parks. TheLake for
around Y planted ew fertilized the soccer summer
dragged all fields. d the park signs and trees i fields at
benches � n the parks and
A Gift of m Mendakota Park. The
Roses for Public Y also
Works
This week as h
Not the as happened f
Jason type You place in a for several years past the
(variety d Ira
Kip , who reside on but bushes to City
little
a gift of r
Kipp, vase, ,
entrance Mr. Lincoln Wagon Wheel Trail beauty to a uses.
to Pubh� to ROger's Lake Park. t0 Public Works for ' delivered nine rose park.
Park. Works if a designated Several years a Planting near the bushes
Public Works gnated planting area g0 Mr. Kipp offered west
and ever staff constructed Were established in Roger's
bush
visiting y Year since the K► constructedP s cted a large Planting Best plants
9 Rogers Lake Park have Provided g area, near the Lake
take a minute... additional plants. West entrance
Public Works Gara and stop... to smell the Next time You're
e roses.
Work is substantial)
above the vehicle storage
to re
were also installed i ge area place the roof to
n this at the Public p make-up air and furnace
disco Energy installed new or better. air Facility.Three circulation fans
disconnected from the 11 meters and the circulation in the s
,vill be r 00
emoved this 0 gallon stora propane gas lines ummer• This
summer. 9e tank, which is no longer needed and
LETTER / The Pipeline
Public Works
Engineering
Code Enforcement April 7, 2005
'ON A
Public Works
The Street Crew took the plows off the dump trucks to get them ready for
sweeping the streets which will start next Tuesday. They also got the roller fixed
and ready for fixing potholes.
The Parks Crew dragged the ball fields throughout the City. They turned the water
on in the buildings at Mendakota and Kensington Parks (a sure sign of spring).
They repaired a leaking water pipe at Kensington Park. Tennis nets were put up
throughout the parks with tennis courts. They attended the spring workshop at
Midland Hills Country Club for the Minnesota Sports Turf Managers Association.
The sump pump at the Mendota Heights Road lift station was plugged and Rich
cleaned it and it now runs good. Rich did a sewer inspection for 702 Main Street.
He flushed the sanitary sewer lines at Augusta Shores (had paper build up), LeMay
Lake easement from Augusta Shores to Enterprise Drive, and Spring Creek at
easement to Marie Avenue.
Engineering
Sue and Dave attended a preconstruction meeting for the joint powers seal
coating and crack sealing project. This method of maintaining the streets is
different than the slurry seal that the City has used in the past. The seal coating
consists of placing a thin layer of emulsified asphalt and topping it with 1/8"
granite "chips". The contractor will let the seal coat set for several days and then
sweep up the excess chips. We will be crack sealing and seal coating in the
Friendly Hills neighborhood and crack sealing in the Rogers Lake neighborhood.
The Rogers Lake neighborhood will then be seal coated next year.
Ryan attended a class on designing rain water gardens. We hope to construct rain
water gardens with future street reconstruction projects.
Sue attended a meeting with Dakota County staff to discuss their 2006-2010
Capital Improvement Program as it relates to Mendota Heights. Currently included
in the CIP is the 110/Delaware intersection which will be constructed this year and
a traffic signal at Mendota Heights Road. We also discussed the Wachtler
Avenue/TH 13 intersection and the trail proposed along Wachtler. The CIP will be
presented to the Council at an upcoming meeting.
N E W S The Pipeline
LETTER
Public Works
Engineering April 1, 2005
Code Enforcement
Public Works
The Street crew has been cleaning up the paved storage area behind Public Works and have mixed a final batch
of sand and salt in preparation of our next snow/ice event ("cross your fingers" — next November). Street
sweeping operations are scheduled to begin during the first part of April, possibly next week (weather permitting).
Potholes are being patched with a new cold mix asphalt product that appears to adhere better than what has
been used in prior years. Sod, damaged by the plows along streets without curb and gutters, has been cleaned
up so that when the weather conditions are right sod or topsoil/seed can be placed to restore damaged boulevard
areas. Low point and clogged catch basins are being cleaned on an "as needed basis'. John Ambrose has been
helping with welding repairs to various pieces of equipment used for park maintenance.
Rich Burrows preformed daily inspections and routine maintenance on all sanitary sewer lift stations and did a
visual inspection, by vehicle and foot, of the sanitary trunk sewer line from the Industrial Park to the Head House
(siphon under the river) on Lilydale Road (approximately 4.5 miles). Rich checks for any sort of damage such as
missing manhole covers, or fallen trees that may block vehicle access if repairs are required. Home owner on
Williams Court reported that he had a private sewer contractor remove (cut) tree roots from his home service line.
Rich flushed and cleaned the City's main sewer line in this area to prevent possible clogs from roots washed into
our main.
Park crew removed snow plows from their trucks and snow throwers and brooms from the mowers which are then
stored in the water tower. Trailers and other turf equipment were moved out of the water tower for maintenance,
repairs, and adjustments. A new truck will be arriving soon and all usable equipment on the existing truck is being
removed for reuse on the new vehicle. Port -a -potties have been ordered for installation at parks and ball fields.
Shipments of fertilizer and crabgrass preventer were delivered and moved into the storage building off Mendota
Heights Road in North Kensington Park. Additional trash barrels have been brought out to parks and ball fields
and the parks crew has been removing trash and debris, now visible following the melting snow, in all of the
parks.
ENGINEERING
Sue McDermott and Ryan Ruzek held neighborhood open house meetings on Monday evening at City Hall for
this year's proposed street improvement projects. Thirteen residents attended the first meeting to hear details of
the mill and overlay projects for Ivy Hill Drive, Maple Park Drive and Ridgewood Drive (93 properties will benefit
from these projects). A second meeting attended by thirty residents, scheduled an hour later, dealt with street
reconstruction projects on Dodge Lane, Sunset Lane and Ivy Falls Avenue (38 properties will benefit along these
streets. A feasibility hearing for these improvement projects will be on the Council's agenda for the upcoming
April5t meeting.
Minger Construction plans to start sanitary sewer construction at the Waters Drive Business Park (Klingelhutz
Development) next week. Tree clearing and site preparation operations are still in progress.
N E W S The Piplefine
LETTER
Public Works
Engineering March 25, 2005
Code Enforcement
Public Works
The Parks Crew continued fabrication of a new steel gate which allows passage of
walkers/bikers but not vehicles for the trail through Valley Park at the Highway 13/Lilydale
Road entrance to the Park. They checked the aerator daily at Rogers Lake and as of
today it is shut down for the season and the "open water" warning signs were removed
from the lake. Work has begun to prepare equipment such as trucks and mowers for
summer use.
Public Works removed 6 inches of snow last Friday and Saturday from City streets. Snow
removal operations were completed on the cul-de-sacs, park parking lots, and trail ways
on Saturday.
Pot holes throughout the city are being patched and a temporary stop sign was installed
at the intersection of Cheyenne and Huber. Street name signs we reinstalled up at 2
different locations, the first at Laura Street/Laura Court, the 2nd Marie/Nature Way.
Rich checked the sanitary sewer lift stations during the week and removed snow on
Saturday morning. Frozen/blocked culverts were cleaned out at Orchard, Hunter and
Veronica. John Boland was dispatched after hours on Wednesday, to handle a resident's
call regarding water coming up into her yard due to frozen storm sewer on Ashley and
Norma.
Engineering
Sue and Ryan will be hosting a neighborhood meeting on Monday March 28`h for the 2005
Street Reconstruction, and Mill/Overlay projects. Streets to be reconstructed are Ivy Falls
Avenue, Sunset Lane and Dodge Lane. The Mill and Overlay projects includes Ivy Hill
Drive and Ridgewood Drive. Affected property owners have been invited to meet with
staff in the Council chambers at 6:30pm and 7:30pm respectively.
Code Enforcement
This week a building shell permit was issued to Rochon Corporation for Building "F",
located at 702 Main Street. The estimated cost of the building shell is $2,695,000.00.
The lower level will contain parking and will be 16,048 GSF, level one 15,943GSF, will
contain retail space and the second level, which is 15,998 GSF, will contain business type
occupancies.
At
clx
® .
NEWS
LETTER
Public Works
Enaineerina
Code Enforcement
Public Works
Th_e Pipeline
49 March 17, 2005
The Parks Crew worked on the gates for the Valley Pak north end entrance. They
attended the Sherwin-Williams Pro Show at the Minneapolis Convention Center
where Sherwin-Williams introduced new and improved products and demos on
many new products. They also attended a seminar at Gerlach Service Inc.
(commercial cutter open house) and attended Polfus Commercial Event 2005.
They plowed the pedways on the north and south ends of the City. They also
started ordering chalk and fertilizer for the spring and summer.
Rich cut roots on the Mayfields Heights easement and on William Court. Two
months from now he will chemically treat the roots to stop them from growing into
the sanitary sewer pipe. He also flushed the line on Lexington Avenue where he
found a lot of paper build up.
The Street Crew is trying a new type of cold mix, U.P.M. that is suppose to stay in
place better. They picked up truck #304 from Inter State Diesel where a new
transmission was put in and remounted the plow and wing. Truck #308 went to
Kramer Spring to fix a broken overload spring. They attend the Work Zone Traffic
Control seminar and topics covered were; Overview of 2004 MnDOT Field Manual,
Working Safely in Work Zones, Updates on OSHA Standards, High Visibility
Garments and Flagging.
"Mini -Half Pipe" Installed at Skate Park
Installation of new skate park components, began Monday, at Roger's Lake Park
and was completed on Thursday. In addition to the mini -half pipe ramps a quarter
pipe ramp and grind rail were also installed. The tier one skate park opened in
2003 and has been a hit with skate boarders that use this facility. The Police
Department reports that there are very few, if any, calls generated by activities at
the skate park.
Enaineerina
Arnt Construction completed dredging of the west pond at Somerset Country Club.
Xcel Energy completed installation of an underground cable along Dodd Road from
TH 110 to Wentworth.
NEWS
LETTER
Public Works
Enaineerina
Code Enforcement
Public Works
The Pipeline
March 10, 2005
Parks truck 503 was taken to Kremer Spring for a suspension upgrade. The Parks
Crew picked up iron and started making gate/posts for the North Valley pedway.
They assisted Rich with jetting a sanitary sewer line. Len installed a ball valve and
power brakes in 2293 (grass rig) and electric brakes on the 6 wheel trailer.
Rich cut roots on Vandall between First and Second Avenue and in the Victoria
easement. He did a sewer inspection at 805 Wagon Wheel Trail. The homeowner
had a break in the line and had to replace five feet of pvc pipe. Infratech finished
putting in patches in Somerset; patches were installed at Hingham covering a
broken pipe, Dorset Road to cover an offset joint and Dorset covering a broken
and offset joint.
Snow Events of the Week:
Date: Response: Amount:
3-9-05 Plow main lines 1"
and pedways
Enaineering
Lower Mississippi River WMO submitted a grant application to BWSR requesting
$25,000 to construct a rain water garden in the Somerset neighborhood.
Tom Knuth and Sue attended a preconstruction meeting for utilities to be installed
at Waters Drive Business Park.
Code Enforcement
Paul reviewed a building permit for 620 Hidden Creek Trail to be issued to Mihm
Construction, Inc. The valuation of the new home is $1,625,000.00. The house is
being built for a Minnesota Viking player.
NEWS •
LETTER TP he 1erne
Public Works
Engineering
Code Enforcement March 3, 2005
Public Works
Public Works was called in on Sunday morning at 7:00 A.M. to plow the main lines
and sand streets.
The Parks Crew plowed the pedways after Sunday's snowfall. They rebuilt the
picnic tables by replacing boards where needed that are in the back of the shop.
They solicited bids for portable satellites to use this summer in the parks.
Rich cleaned grease off the floats at the Veronica lift station. Infratech put
patches in the sanitary sewer main at William Court to cover a broken joint and at
Mears and Delaware to cover a crack and broken pipe.
The Street Crew mixed sand and salt. They replaced a missing cross walk sign at
Maple Park Drive going on to the pedway at Ivy Park. They filled potholes with
cold mix.
Snow Events of the Week
Date: Response: Amount
2-27-05 Scrape main lines and sand 1"
Engineering
Engineering sent out letters and notices to residents regarding this summer's
street projects. Please see the attached letters and notice.
Code Enforcement
A new single family permit was issued for 1161 Dodd Road to Meisinger-Long
Development. The estimated square footage is 150,000.
March 2, 2005
RE: Public Hearing and Informational Meeting Notices
2005 Street Rehabilitation Projects — Ivy Hill Drive/Maple Park Drive (City
Project #200506), and Ridgewood Drive (City Pr6 ect #200508)
Dear Property Owner:
An Informational Meeting regarding proposed street improvements to Ivy Hill Drive,
Maple Park Drive and Ridgewood Lane is scheduled for Monday, March 28, 2005 at
6:00 P.M. at City Hall, 1101 Victoria Curve. The agenda will include discussion of
proposed street improvements, estimated construction cost and estimated assessment
amounts. Representatives from the City of Mendota Heights Engineering Department
will be available to answer your questions at this meeting. This Informational Meeting is
intended to provide a better understanding of the potential improvements in an informal
setting. Please note that this is not a Public Hearing.
A Public Hearing for the subject projects is scheduled to be held on Tuesday, April 5,
2005 at 7:30 P.M. in the City Council Chambers at 1101 Victoria Curve. Enclosed is the
Notice of Public Hearing that will be published in the Southwest Review. Your property
abuts the potential improvements and is proposed to be assessed. The feasibility report
for the project was accepted by the City Council on March 1, 2005. All persons desiring
to be heard with reference to the proposed improvements will be heard at this meeting.
Written or oral comments will be considered. Please note that this hearing is not the
Assessment Hearing. This meeting is to consider the improvement project. If the City
Council orders the improvements, a separate assessment hearing will be held after the
bids are received. All pertinent assessment information will be mailed to each affected
property owner prior to the assessment hearing.
If you have questions concerning the project, please call me at (651) 452-1850.
Sincerely,
Sue McDermott, P.E.
City Engineer
CITY OF MENDOTA HEIGHTS
Cc: Jim Danielson, City Manager
\\Server\shared\Engineering\2005 Projects\05-01Vetterpubhearingrehab.DOC
March 2, 2005
RE: Public Hearing and Informational Meeting Notices
2005 Street Reconstruction Projects — Dodge Lane (City Project #200214), Sunset
Lane (City Project 4200212), and Ivy Falls Avenue (City Project #200210)
Dear Property Owner:
An Informational Meeting regarding proposed street improvements to Dodge Lane,
Sunset Lane, and Ivy Falls Avenue is scheduled for Monday, March 28, 2005 at 7:00
P.M. at City Hall, 1101 Victoria Curve. The agenda will include discussion of proposed
street and storm sewer improvements, estimated construction cost and estimated
assessment amounts. Representatives from the City of Mendota Heights Engineering
Department will be available to answer your questions at this meeting. This Informational
Meeting is intended to provide a better understanding of the potential improvements in an
informal setting. Please note that this is not a Public Hearing.
A Public Hearing for the subject projects is scheduled to be held on Tuesday, April 5,
2005 at 7:30 P.M. in the City Council Chambers at 1101 Victoria Curve. Enclosed is the
Notice of Public Hearing that will be published in the Southwest Review. Your property
abuts the potential improvements and is proposed to be assessed. The feasibility report
for the project was accepted by the City Council on March 1, 2005. All persons desiring
to be heard with reference to the proposed improvements will be heard at this meeting.
Written or oral comments will be considered. Please note that this hearing is nat the
Assessment Hearing. This meeting is to consider the improvement project. If the City
Council orders the improvements, a separate assessment hearing will be held after the
bids are received. All pertinent assessment information will be mailed to each affected
property owner prior to the assessment hearing.
If you have questions concerning the project, please call me at (651) 452-1850.
Sincerely,
Sue McDermott, P.E.
City Engineer
CITY OF MENDOTA HEIGHTS
Cc: Jim Danielson, City Manager
\\Ser er\shned\Engineering\2005 Projects\05-01Vetterpubheuingrecon.DOC
CITY OF MENDOTA HEIGHTS
DAKOTA COUNTY, MINNESOTA
NOTICE OF HEARING ON PROPOSED STREET IMPROVEMENT PROJECTS
INCLUDING GRADING, STORM SEWER,
AGGREGATE BASE, CONCRETE CURB AND GUTTER,
BITUMINOUS SURFACING, AND APPURTENANT WORK
TO WHOM IT MAY CONCERN:
WHEREAS, the City Council of the City of Mendota Heights, Dakota County,
Minnesota deems it necessary and desirable to consider construction of the street improvements
hereinafter described.
NOW THEREFORE, notice is hereby given that the City Council of the City of
Mendota Heights will hold a public hearing on said improvements at the following time and
place with the said City:
Date and Time: Tuesday, April 5, 2005
7:30 o'clock P.M. or soon as possible thereafter
Location: Mendota Heights City Hall
1101 Victoria Curve
Mendota Heights, MN 55118
The general nature of the improvement is:
Reconstruction of Sunset Lane, Ivy Falls Avenue and Dodge Lane, including grading, storm
sewer, aggregate base, concrete curb and gutter, bituminous surfacing, and appurtenant work.
Rehabilitation of Ivy Hill Drive, Maple Park Drive and Ridgewood Drive, including milling,
bituminous overlay, and appurtenant work.
The area proposed to be assessed is every lot, piece, and parcel benefiting from said
improvement, whether abutting or not, based on benefits received without regard to cash
valuation within the following described areas:
Portions of the southeast quarter of Section 13, Township 28, Range 23, Dakota
County, Minnesota.
Portions of the southeast quarter of Section 24, Township 28, and Range 23, Dakota
County, Minnesota.
Portions of the southeast quarter of Section 25, Township 28, Range 23, Dakota County,
Minnesota.
\\Server\shned\Engineering\2005 Projects\05-01\Pubhe=oticeD0C
Specific property descriptions are included in the above described area, but not inclusive,
are as follows:
Property abutting including:
Delaware Hills
Glen Toro
Bauers Acre Lots
Olricksen Addition
Breckenridge Estates
Grappendorf lst Addition
Ivy Keep
Ivy Keep 11
Clapp-Thomssen Ivy Hill Addition
Clapp-Thomssen Ivy Hill 2❑d Addition
Kirchner Addition
The Council proposes to proceed under and pursuant to the authority granted by Minnesota State
Statutes Chapter 429.
The total estimated cost of improvements is $848,400. A reasonable estimate of the impact of
the assessment will be available at the hearing.
All persons desiring to be heard with reference to the proposed improvements will be heard at
this meeting. Written or oral comments will be considered.
Dated: March 1, 2005
BY ORDER OF THE CITY COUNCIL
Kathleen M. Swanson
City Clerk
City of Mendota Heights
Published in the Southwest Review, March 13, 2005 and March 20, 2005.
Mer edshuedEngineering\2005 Projects%05-01iPubhe=otice.D0C
NEWS
LETTER
Public Works
Engineering
Code Enforcement
Public Works
The Pipeline
February 24, 2005
With Sunday's snowfall the Parks Crew plowed the cul-de-sacs and all the
pedways. They cleaned out the warming houses after the rink attendants picked
up their things. They worked on making pitching rubbers for softball leagues at
Mendakota Park.
The Street Crew cleaned off bridge decks and worked on cleaning up after
Sunday's snowfall. They mixed salt and sand. They changed the cutting edge on
the tractor's front bucket. They also changed the cutting edges and replaced the
broken membrane on plow #312.
Snow Events of the Week:
Date: Amount: Response:
2-20-05 4" Plow all streets
Rich, Tom and Sue met with Lloyds BBQ at their plant, about the discharge of
grease into our sanitary sewer lines. Lloyds acknowledged that their grease
collection system was outdated and they are in the process of updating it. Lloyds
agreed to pay for the next cleaning of the sanitary sewer line and lift station which
is what the City was hoping for.
Engineering
Sue and Ryan met with Arnt Construction, Northdale Construction, Xcel Energy
and St. Paul Water to discuss the schedule for the completion of the Somerset
Area improvement project. Xcel plans to start gas main replacement at the
beginning of April. Northdale will start storm sewer construction in mid -April.
LETTER , The Pipeline
Public Works
Engineering
Code Enforcement February 17, 2005
Public Works
Snow Events of the Week
Date: Event: Resoonse:
2-14-05 3" plow all streets
Public Works was called in at
1:30 A.M. on Monday morning
to plow the streets after 3
inches of snow fell. The Street
Crew did mailbox repairs and
used cold mix to repair
potholes.
The Parks Crew closed the skating and hockey rinks this week. They picked up the
hoses/fittings and turned off the furnaces in the warming houses.
Rich flushed the sewers on Hilltop Court and Cullen Lane. He met with the League
of Minnesota Cities about a sewer back up at 1013 William Court. He unplugged a
culvert on Orchard Place and Kendon Lane.
Engineering
Sue attended a presentation of MnDOT's Metro District Transportation System Plan
(TSP). The TSP is performance based with an approach focused on outcomes.
Investments needed to meet the TSP performance goals are $27 billion.
Forecasted available funding is $6.4 billion. The number one priority outlined in
the TSP is preservation of the existing highway system followed by improvements
to high crash intersections and previously identified expansion projects one of
which is adding a lane on 35E between TH 110 and the river. The draft TSP will be
distributed for comment in March.
Jim and Sue met with MnDOT staff to discuss the release of several streets located
in MnDOT right-of-way. MnDOT will work on releasing the following: TH 110
frontage road between Dodd and Delaware, Waters Drive, Victoria Road between
Lexington and Stratford, Dakota Drive, Carmen Lane and Valencour Circle.
MnDOT staff will also research Center Pointe Curve and LeMay Lake Road to
determine if the streets are also in MnDOT right-of-way. The City has been
maintaining all of these streets.
Sue and Ryan attended a preconstruction meeting for site grading at Waters Drive
Office Park.
L E T T'E R The Pipeline
Public Works
Enaineering a � a � `
Code Enforcement February 11, 2005
Public Works
The Parks Crew broomed, blew off snow and flooded the hockey and general rinks. They
picked up trash from the parks and checked the aerator daily. They also serviced their
equipment and the Cushman.
Snow Events of the Week As the snow starts to melt, trash
appears and the Street Crew picked
Date: Event: Response: up trash in various areas of the City.
On Wednesday, Dave met with Blue
2-9-05 dusting sand streets Chip Tree Service and a resident at
Trail Road and Marie Avenue about
the sight distance to the east of Trail
Road on Marie Avenue. The resident agreed to trim and shape the tree which will begin
next Tuesday morning. John Ambrose and Mike are still making rear window guards and
installing them in the police squad cars. The Street Crew also brought barricades and
posted temporary "no parking" signs on Windy Ridge for the Parade of Homes.
Rich was called in last Friday night for a power outage at the Center Pointe lift station. He
was called in again on Sunday morning for a sewer backup at 1013 William Court. With
Tim Oster's help they cleared the blockage. On Monday, Rich and John Boland cleaned
the line further, televised it and found there was a lot of debris to clean without a vacuum
truck. On Thursday, Pipe Services came and cleaned and televised the line. They
vacuumed out 21/2 yards of gravel, rocks and broken sewer pipe. They then televised the
line again which showed at one time the sewer main had been broken and repaired with
someone leaving the broken pieces of pipe, rock and gravel which caused the blockage.
Braun Pump put the rebuilt pumps back in at the Centre Pointe lift station.
Enoineerino
On Wednesday crews from St. Paul Regional Water Services repaired a watermain break
on Sylvandale Ct. Water was initially surfacing through a valve box at the intersection of
Sylvandale Rd. and Sylvandale Ct. in the morning. It took St. Paul Regional Water crews
until 5:00 p.m. to pinpoint the exact location of the leak which ended up being about 250
feet away from where the water was surfacing. Their crews used amplified listening
devices in an attempt to find the rough location of the leak. Once they were in the
general area of the leak, 5 holes were drilled over the watermain roughly three feet apart
and metal rods were inserted into the holes. Again their crews utilized listening devices
and felt confident they had pinpointed the leak. They then removed the saturated soils
from the area and repaired the leak. The trench was backfilled with dry sand and a
temporary bituminous patch was installed.
Sue attended the Dakota County Plat Commission meeting on Monday. The concept plan
for the Ecolab site was discussed. County staff requested that the access point on
Wachtler be shifted to the north and will also request additional right of way along
Wachtler.
LETTER / The Pipeline
Public Works
Engineering January 27, 2005
Code Enforcement
Public Works
The Parks Crew broomed, blew off snow, and flooded the hockey and general
rinks. They plowed cul-de-sacs, parking lots and pedways. They attended
Government/Commercial day at Scharber and Sons in Rogers MN. Scharber and
Sons held a seminar on vehicle safety, traveler safety and regulations - there
were secure load rule changes.
Rich and Tom Olund attended the annual Minnesota Pollution Control Agency
refresher course for sanitary sewer operators. They need to attend this school in
order to keep their license current.
The Street Crew removed the plow, wing and post on truck #304 to bring it to
Interstate Diesel. There was a problem with a bad seal in the transmission. After
the truck was fixed they remounted all the plow equipment. They repaired
mailboxes that were damaged when they plowed Friday/Saturday and responded
to snow plow complaints.
Snow Events of the Week: —_
Date: Event: Response: �
January 21/22 7" of snow scrape main lines
plow all areas starting 10:00 PM Friday
Engineering
On Sunday, January 23`d at 6:00 A.M. there was a watermain break on Lilac Lane
and it was repaired and patched by St. Paul Regional Water Services. There was
also a watermain break on Delaware Avenue east of Sibley High School on Monday
morning, January 24th on the West St. Paul side.
MnDOT has issued their 2005 Municipal Street Apportionment Data. In 2005,
Mendota Heights will receive $260,479 for construction and $86,827 for
maintenance for a total of $347,306 down. This is approximately $5,000 less than
our 2004 allocation.
NEWS
LETTER
Public Works
Engineering
Code Enforcement
Public Works
LLLqu -LJJIi
January 20, 2005
Rich checked all seven sanitary sewer lift stations daily. He changed the
condensation heater at the Centre Point lift station. He also worked on
deicing the culvert under the trail between Fourth Avenue and Wentworth
Park.
The Parks Crew flooded and blew snow off the rinks. They worked on
cleaning off the pedways. They continued to build mallard houses. They
had to repair a bench in the warming house at Wentworth Park.
The Street Crew installed two new crime watch signs in the Mendakota
neighborhood at the Police Department's request. They relamped the
burned out northbound left turn lane red light at Dodd Road and Mendota
Heights Road. John Ambrose and Mike Maczko worked on fabricating
window guards for the police squad cars. They cleaned off sidewalks and
bridge decks of any remaining snow. They started preparing for this
Friday's snow storm. Will we get the snow as predicted or is this just more
snow hype??
Snow Events of the Week:
Date: * Event: Response:
1-20-05 Dusting Sand streets
Engineering
Ryan met with the staff at Dodge Nature Center to discuss potential storm
water ponding with the proposed Dodge Lane Construction.
Jim, Tom Knuth, and Sue met with representatives from Bonestroo and
American Engineering Testing to go over final details of the slope
remediation project.
LETTER ' The Pimpeline
Public Works
Enqineerinq
Code Enforcement January 13, 2005
Public Works
The Parks Crew flooded, swept and blew the snow off the skating rinks. Kids
pulled the clamp off the hose on the aerator which caused it to freeze up. They
thawed out the hose and hooked it back up. They also plowed parking lots to the
rinks and all the pedways. They are starting to build mallard duck houses.
Residents in attendance at the January Parks and Recreation Commission meeting
requested that the skating rink lights at Marie Park remain on until 10:00 P.M. on
Friday and Saturday evenings. Currently, rink attendants are on duty at Marie and
Friendly Hills Parks until 8:30 P.M. and at Wentworth Park until 10:00 P.M. The
Parks Commission voted 7-0 to approve extending the rink closing time from 8:30
to 10:00 P.M. at Marie Park on Friday and Saturday evenings. Rink hours at the
other two parks will not be changed at this time.
Rich painted the four floors in the Mendota Heights Road Lift Station this week.
The paint helps brighten up the inside of the drywell. He plowed and sanded the
north end streets on Tuesday and Wednesday.
The Street Crew mixed salt and sand and ordered more. They repaired a hydraulic
leak on truck #303.
Snow Events of the Week:
Date: Event: Response:
Thursday, January 6, 2005 Dusting sand streets
Tuesday, January 11, 2005 sleet/snow plow and sand
Wednesday, January 12, 2005
sleet/snow plow and sand
The cold weather has hit hard at Public Works. On Wednesday, Xcel Energy
notified Public works that they should turn off the natural gas valve on the
"interruptible service" account to the furnace in the garage area and switch the
furnace over to use propane gas from the outside storage tank owned by the City.
This situation occurs several times each year when temperatures drop and last for
several days. Usually this is not a problem, but this time the 26-year-old furnace
did not respond. Efforts to heat the fuel lines and controls with torches, up on the
exposed roof were unsuccessful. A repair technician is due out Friday to try to fix
the furnace (similar problems have plagued the unit for many years). Until then
the thermostats on roof -top furnaces in other parts of the facility, which are
supplied on a "firm gas" account basis are not required to be curtailed and have
been set to "high" and a door is left open to help warm the garage area.
Last summer, an Energy Assessment of the Public Works facility was conducted
and replacement of this aging furnace was recommended with a projected "pay-
back" in yearly energy savings of the cost of the replacement furnace in 6.3 years.
Council provided funding in the 2005 budget for this expense which may be
coming sooner rather than latter. Four contractors will evaluate heating and
ventilation needs early next week and submit bids proposals to Engineering staff.
Engineering
There was a watermain break at Dodd Road and Smith Avenue on Monday. It was
discovered because the water traveled through the telephone conduit and was
overflowing at manholes on First Avenue and Dodd, and Sunset and Dodd.
The precast concrete decking is being installed at the condominiums at Town
Center.
Removal of mature Buckthorn plants from Friendly Hills Park, North Kensington
Park and remaining areas around the Copperfield ponds has been completed in
less time than anticipated. Council approved purchase orders to Prairie
Restorations in the amount of $9,725 for this work on a "time -and -materials"
basis. Invoices submitted for the completed work are 26% or $2,560 under
budget. Continuing management efforts involving over spraying of areas
previously cut will take place this September or October.
Code Enforcement
A building permit was issued to P.F. Construction for a building shell at 2520
Lexington Avenue. Estimated cost for the future office building is $525,000.00.
The first new single family dwelling permit for the year was issued to Thermal
Boundary East Corporation for a one-story building with an attached garage. The
builder's estimated cost is $200,000.00.
NEWS LETTER The Pipeline
Public Works
Engineering January 6, 2005
Code Enforcement
Public Works
The skating rinks were closed for awhile because of rain and the Parks Crew
repaired the ice damage at all the rinks. Tom Olund and the Parks Crew attended
the annual Minnesota Green Expo at the Minneapolis Convention Center where
companies display and promote supplies and equipment for parks and grounds
improvements and maintenance.
Rich televised the storm sewer in the backyard at 1780 Dodd Road. He repaired
the p-trap on the sink in the men's bathroom at the sloop. With the dusting of
snow on Thursday, Rich swept the skating rinks.
The Street Crew reinstalled the street name signs that were down at Ocala Lane,
Ocala Court, Mendota Heights Road and LeMay Lake Road. The sander quit
working on truck #308 because of a bad pulse relay in the control box and had to
be replaced.
Snow Events of the Week:
Date: Event: Response:
1-1-05 Ice sand streets
1-2-05 Light snow and ice scrape main lines and sand
Buckthorn Removal
The work of removing buckthorn plants from the Copperfield pond area (east of
Huber Drive), south Kensington Park (south of Mendota Heights Road) and
Friendly Hills Park was completed this week by crews from Prairie Restorations.
Follow up spraying to eradicate new seedlings and small saplings will be done in
September and October. Removal operations in Friendly Hills Park included on -
site burning of plant debris while the cut and slash method was used in Kensington
Park and around the Copperfield ponds. Attached is a notice sent to residents
living next to Friendly Hills Park.
LT,, -', e T"
4Z�L. J .I N 13 -' k`
(T —FJt o s 11 9 L"v
e l-r 4 c k- 14 a v Sk1 v'
la k, pay
-`werf 4 ,j 0LJ
09 4 T I k-,.0 -T4 Y
ITT /hPLs b,., tx-v-C,4e
l�T <OL.,� i. yss 6ev CggA� of -f�i2uAJ
Awifty ll,'Axej—' ry I�ut'Ttu.sk s�o,ris F cof
"—ia2 CvrS.tGy, , OC3o Arrk 0£q
i � � � "(•�Ca o k tuF jS9-1 � �+. ^vi=rStT-��,.%��7 ✓�-�.a �../ U4T.•[D� f.
U+ iTN KL 7 ¢ Nov T /� c• Q L[ C � ,j � �13 C rl �
k1�OAC4 up , Kws P.,LL.
Ip
ST��7 Ilk OrN� MALLAh�
NCus., �4
NEWS
LETTER
Public Works
Engineering
Code Enforcement
Public Works
The Pipeline
January 6, 2005
The skating rinks were closed for awhile because of rain and the Parks Crew
repaired the ice damage at all the rinks. Tom Olund and the Parks Crew attended
the annual Minnesota Green Expo at the Minneapolis Convention Center where
companies display and promote supplies and equipment for parks and grounds
improvements and maintenance.
Rich televised the storm sewer in the backyard at 1780 Dodd Road. He repaired
the p-trap on the sink in the men's bathroom at the sloop. With the dusting of
snow on Thursday, Rich swept the skating rinks.
The Street Crew reinstalled the street name signs that were down at Ocala Lane,
Ocala Court, Mendota Heights Road and LeMay Lake Road. The sander quit
working on truck #308 because of a bad pulse relay in the control box and had to
be replaced.
Snow Events of the Week:
Date: Event: Response:
1-1-05 Ice sand streets
1-2-05 Light snow and ice scrape main lines and sand
Buckthorn Removal
The work of removing buckthorn plants from the Copperfield pond area (east of
Huber Drive), south Kensington Park (south of Mendota Heights Road) and
Friendly Hills Park was completed this week by crews from Prairie Restorations.
Follow up spraying to eradicate new seedlings and small saplings will be done in
September and October. Removal operations in Friendly Hills Park included on -
site burning of plant debris while the cut and slash method was used in Kensington
Park and around the Copperfield ponds. Attached is a notice sent to residents
living next to Friendly Hills Park.
RESIDENTS RECEIVING THIS NOTICE
ARE SHOWN SHADED
'7 17
0 iI
Friendly Hills Park
7
S: Dimensions rounded to nearest foot
Lupyright 2004, Dakota County -
This roaming is neither a legally recorded map nor a survey and is not intended to be used as one.
This drawing Is a compilation of records, information and data located in various city, county, and
state offices and other sources, affecting the area she", and is to be used for reference purpose.
only. Dakota County is not responsible for any inaccuracies herein contained. If discrepancies are
found, please contact Dakota County Survey and Land Information Department.
I
ca?l
2348
2356
2360
LU
< 2366
CL
.:r
2374
Map Date; December 13,2W Parcels Updated: 41112004 Aerial Photography: