Loading...
2006N E W S LETTER Public Works Engineering Code Enforcement Public Works December 30, 2005 The Parks Crew installed "thin ice" warning signs on Rogers Lake for the aeration system. They plowed the cul-de-sacs, pedways, rinks and parking lots. They checked the warming houses and rinks daily. With the weather permitting they flooded the rinks. With the warm weather recently the rinks aren't in the best of shape, but are good for boot hockey. Rich changed out the heater at the Centre Pointe Lift Station. He also plowed the cul-de-sacs this week. Engineering Application for State Aid monies was sent in this week for the Town Center project. Have a safe and happy New Year!! NEWS LETTER i The Pipeline Public Works F Ez, Enaineering Code Enforcement December December 23, 2005 Public Works The skating rinks opened on Saturday, December 17th. The Parks Crew worked hard by flooding the rinks and sweeping them daily. They plowed the cul-de-sacs, pedways, skating rinks and parking lots. The Street Crew changed the cutting edges on the grader, plow #312, plow #302, and put on curb shoes on wings #304 and 312. They brought office cubicles from the water tower to the Police Department. They brought the bobcat to the bobcat dealer for repairs. Rich had to pull pump 2 for repairs at the Marie Avenue storm water lift station which had water in it and the seals will be replaced. The electrical meter box was also replaced. Xcel Energy needed to place the meter in the box. Code Enforcement Six building permits were issued for two twin homes (each permit) for The Summit of Mendota Heights. Four of the six permits were issued previously for footing/foundation only. The other two permits were for the full building. The permits were issued to Opus NWR Construction, LLC. Each permit had a valuation of $650.000.00. Engineering A water main break at 1134 Dodd Road (corner of Beebe and Dodd) was repaired on December 19th. Veit and Company completed the demolition of the Ecolab buildings. NEWS LETTER Public Works Engineering Code Enforcement Public Works December 15, 2005 Since December 1s' the Parks Crew has been hard at work doing routine maintenance on the warming houses. All of our rinks and warming houses will open on Saturday, December 17th. Furnaces were cleaned and tuned up; mats were brought up for the front doors of warming houses at Friendly Hills and Marie for the skaters. The hoses and fittings have been inspected and the bad flooding hose at Wentworth Park has been replaced. The hockey nets have also been re -netted for the Wentworth hockey rink. Washed all trucks and replaced the blower/fans on truck #503. Rich plowed and checked all lifts. F for the grate was changed out and Cul-de-sacs, Sunday in the AM al_< pump at Lift Station #1 located on The Street Crew mounted chai Industrial Park, repaired and n overI-35E. Code Enforcement A new construction buildin rambler located at 703 Hi( XX o` Wednesd Thursday catch basin on Northland Dri , the frame �d the blacktop around it. also plowed d 15th. Repairs were e sump iqhts Roc - which is used" sYthe es and remov fF9 bridges U Plow all st Started at Plowed A cu Builders for a Dakota County opened bids for the Delaware Avenue/TH110 intersection improvements on December 7, 2005. The low bidder was Max Steininger, Inc. in the amount of $468,098.46. Mendota Height's share of the cost is $47,773.83 less the $17,500.00 that we will receive from Sun Fish Lake. The work will be completed in the 2006 construction season. N E W S LETTER Public Works Engineering Code Enforcement Public Works The Parks Crew installed a new bench at Mendakota Park that was donated. They attended a seminar and open house at Turf Werks. Turf Werks sells us our fertilizer and chemicals for spraying weeds in the parks. Demonstrations on equipment and factory representatives were on site. The warming house furnaces were started up and cleaned. Preparation is under way for getting skating rinks ready for the season by driving on them to pack the snow down. We're hoping for an opening date of December 17th. They switched over the mower by replacing the mowing deck with the snow blower on unit 505. All pedways were plowed after the snowfalls. Rich cut roots on Kay Avenue and Walsh Street. He did a sanitary sewer inspection at 630 and 635 Hidden Creek. Rich also cleaned part of the sanitary sewer line in Hidden Creek. The Street Crew ditched down stream from a culvert to allow for storm water drainage on Orchard Place. They trimmed trees where school buses were hitting low, overhanging branches. Date: 11-25-05 11-29-05 12-1-05 Engineering Snow Events of the Week: Amount: 2" rain and dusting 1" Response: Plow main lines and sand other areas Scrape main lines and sand other areas Plow main lines and sand other areas Out of 140 properties being assessed in the 2005 street project this year, 80 homeowners prepaid their assessments leaving 60 properties to certify. No parking signs were installed on Emerson Avenue. In the Somerset area the sanitary sewer lines were cleaned. LETTER ' The Pipeline Public Works Engineering °F November 17 2005 .° Code Enforcement �:y,��� , Public Works The Parks Crew hauled in dirt around the new bench pad, leveled it out and put seed down. They put the new bench together and routed out a square for the donation sign which will be installed later. They put the summer equipment for winter storage in the water tower. Rich checked the sanitary sewers in the Somerset area, where Mendota Heights' sewers were raised, and found some dirty areas. The contractor will be contacted to have them cleaned. Rich flushed the storm sewers in the Somerset area. Pipe Services cleaned the greasy lift station on Mendota Heights Road and Lloyd's Meats will pay for it. The Street Crew mounted the plows, wings and sanders on 303 and 308. They removed the hot box and tray for the asphalt on 312 and put on the plow and sander on 312. They fixed some street lights in the industrial park that had bad lamps and ballasts. Snow Events of the Week Date: Event: Response: 11-16-05 Dusting Check all areas First of the year! Code Enforcement Paul issued a new construction building permit to R] Ryan Construction for 2425 Waters Drive. The estimated cost of the building is $750,000.00. He also issued a building permit for 1354/1356 Riverside Lane to Opus NWR Construction. This is a foundation permit for twin homes in the Summit of Mendota Heights. NEWS LETTER Public Works Engineering Code Enforcement Public Works The Pipel `2 ,vNovember The Parks Crew brought in concrete, poured it and set up forms for a new bench at Mendakota Park. They repaired a broken board at the Friendly Hills hockey rink. They brought down the plows from the water tower and stored the cushmans and sweeper. The Street Crew patched the man holes and gate boxes where they were high. They took care of pothole complaints and patched the utility cut on the pedway at Wentworth Park. They put in marker posts for the low lying catch basins so they could be easily identified during rain or thawing spells. Locates were called for and marked for Orchard Place to open the end of the culvert for drainage. Rich cut roots on Kay Avenue, Walsh Lane, and Callahan Place. In Control worked on the pump starters at the Mendota Heights Road lift station to fix a problem. Rich did sanitary sewer inspections at 1877 Victoria Road and 2540 Arbor Court. Code Enforcement Paul issued a building permit to Mihm Custom Homes for a new home at 685 Hidden Creek in the Hidden Creek Estates subdivision. The estimated cost of the new home is $975,000.00. Engineering Sue and Ryan hosted the Delaware Avenue reconstruction project informational meeting on Tuesday. Matt Saam, WSP's Public Works Director, was also in attendance. Eighteen residents attended (9 from MH and 9 from WSP). They are looking forward to the street improvements and were happy to hear that it will not involve widening. The Kingsley Sanitary Sewer Protection project is scheduled to begin construction on Friday. NEWS LETTER Public Works Engineering Code Enforcement Public Works The Pipeline C�n November 3, 2005 a_Q The Parks Crew ordered the satellites for the Halloween bonfire at the South Plaza site. They cut up leaves at Friendly Hills Park behind the backstop at the north end of Ivy Falls Park. With the summer season ending, the Kensington and Mendakota buildings were cleaned out. They blew out the sprinkler systems and had to replace broken sprinkler heads at City Hall and Mendakota Park. The tennis nets were removed from the parks. They set up the aerator at Rogers Lake and tested it for use this winter. The Street Crew took down the fencing and signs at the Halloween bonfire site. They pushed in any unburned brush. This year, the wind was in our favor and there were no complaints. The Fire Department put the remaining fire out on Wednesday night after their drill. John Ambrose repaired the tail gate on the parks trailer. They pushed up the debris at our dump site to make room for the Halloween bonfire debris. They finished hauling out demo debris to the demolition site. Code Enforcement A building permit was issued to United Properties Construction for a 73,160 square foot tenant space finish at 1285 and 7, 940 square foot tenant space finish at 1295 Northland Drive. The tenant space is for State Farm Insurance. The valuation of the building permit is $1,200,000.00. A certificate of occupancy was issued on October 25, 2005, for Kawalskis Wine Market at 702-724 Main Street Suite #101 in Town Center. Engineering There was a water main break on William Court on Saturday. St. Paul Regional Water Services had it repaired on Sunday. There was another water main break on Aztec Lane on Wednesday. F.Y.I. Public Works did their first sanding last year on November 27th. The first plowable snow fall, curb to curb, was on January 2°d of this year. L E T T'E R The Polpefine Public Works Enciiineering Code Enforcement - October 27, 2005 Public Works The Parks Crew hooked up the fertilizer spreader to #510, the John Deere tractor and fertilized all the parks. St. Paul Regional Water Services removed the meters from the buildings at Kensington South and Mendakota Park. Rich was called in on Wednesday at 12:00 A.M. to the Mendota Heights Road lift station because the pump starters weren't working. It was a loose power wire which was fixed. The machine shop resleeved the wear ring on the impellor for the St. Thomas lift station. Rich put the impellor back and put in the new stainless steel chain and power cable holders. The Street Crew pushed up the bonfire materials. Large tree stumps, trunks, and limbs were removed and taken to All Wood Disposal Company. (See attached pictures). They reinstalled stop signs at Deer Trail and Wachtler Avenue and reinstalled street name signs at Dodd Road and Mears Avenue. They patched curbs at High Ridge Circle, High Ridge and Warrior Drive. Code Enforcement Paul issued a building permit to Rochon Corporation for 720 Main Street. The permit is for a tenant finish (H & R Block) in Town Center with 1,366 square feet. Paul also issued building permits to Rochon Corporation for building shells in Town Center (buildings D and E). The valuation for building D is $217,500.00 and the valuation for building E is $562,500.00. Paul also issued building permits to Veit & Company, Inc. to demo all buildings at the old Ecolab site. Engineering Ace Blacktop paved Ivy Hill Drive, Maple Park Drive, Linden Street, Main Street and Maple Street on Thursday and Friday. Sod work was completed on Sunset Lane and Ivy Falls Avenue this week. Guy and Sue met with Mary Jackson from Dakota County to discuss a new option for the NURT. Mary plans to give a presentation to the Council on November 15th Happy Halloween!! O NEWS �*o'S*0 '**0 October 20, 2005 LETTER �R TFM NE Public Works � PIPE LI � E E 1Q��r�O Eneineering %� �/t �� Code Enforcement (yfyf Public Works The Parks Crew blew out the sprinkler systems at City Hall, the Fire Hall, Mendakota Park and Kensington South. They trimmed the hedges at Kensington South and then blew off the pedway. They aerated the soc- cer fields at Kensington South and all the neighborhood soccer fields. The soccer goals were taken down and put in winter storage.; Rich mowed the Veronica lift station. He cut roots and jetted the Victoria easement, South Freeway Road, Valley Curve to trunk line and Somer- set Road. The Street Crew pushed up the Halloween bonfire. A person was caught disposing of a willow tree at the bonfire site; the tree trunk was in excess of 40" in diameter. They fenced and signed the bonfire site. +Potholes were patched in the City Hall parking lot. Old street names signs on Delaware Avenue and the Somerset area were taken down, Dakota County is going to put up new ones. Engineering The prepayment of assess closed on Thursday. 40 of Residents who came in and paid their a things to say aboutthe projects and the On Tuesday night, the City Council hetc Dodge Lane, Ivy Falls Avenue, Sunset 1 Drive and Ridgewood Drive and approv Huber Drive wa place earlier thi Sod installation and Somerset i Court aid their assessment ,thing but nic :he field. 'k Drive, ent rolls i at the site of the storm sewer repairs that took r. NEWS LETTER Public Works Enaineerinci Code Enforcement Public Works The Piplefine Safety Assure held a meeting at the Public Works Garage regarding personal protective equipment and hearing conservation. The Parks Crew removed boards along the edge of the tennis court at Valley Park. They trimmed lilacs along the pedway on Lexington Avenue between Marie and Overlook. A fall workshop in Prior Lake was attended on play equipment demonstrations and displays. Dirt was hauled out to the Fire Hall and fill brought in to the washout on the north side of the building where it was leveled out and seed put down. Rich took out the impeller at the St. Thomas lift station (pump 1) and brought it to a machine shop for re-sleeving of the wear ring. He flushed the Biel easement to Abbey Way. He replaced the belt on the furnace at the Mendota Heights Road lift station, changed the air filters, greased the fan motor and prepared the furnace for the upcoming winter season. The Street Crew patched Park Place and Park Circle where curbs were removed and patched other pothole complaints. They marked street lights on Mendota Heights Road east of the 35 E bridge that aren't working, and called an electrical contractor to fix the breaker that trips the transformer. They opened the beehive storm grate detention pond behind Cherry Hill Road. They also cleaned storm grates. A sofa was disposed of that was dropped off on the side of the road on Valencour Circle. Engineerinci Sue attended a meeting at MnDOT to discuss 2006 construction (money) needs data that has been complied by MnDOT utilizing information provided by all MSA cities. The estimated total apportionment that Mendota Heights will receive in 2006 is $385,483.00. This is an increase of $38,177.00 over what we received in 2005. Driveways were paved on Sunset, Dodge, and Ivy Falls. Boulevard restoration is scheduled for next week. Jared, a.k.a., "The Crack Man" from Iworq Systems in Logan, Utah spent the week rating the condition of all our City streets. Dave and Sam spent time in the field with him learning the rating system. On Friday, he trained staff on how to manipulate the data in the pavement management system program. NEWS LETTER Public Works Engineering Code Enforcement Public Works The Pipeli /I October 6, 2005 ne With the big rain storm on Tuesday, Public Works was called in because the pumps were out at the Northland Drive lift station, Mendota Heights Road lift station, and Lilydale lift station. Catch basins were plugging up and needed to be opened with all of the rain. On Wednesday morning, lightning struck the St. Thomas lift station and blew out all the fuses and the lighting arrestors. The power was out until 7:00 P.M., Wednesday evening. The Parks Crew cleaned up after the 5 inch rain storm on Tuesday night. They repaired a washout by the culvert in Valley Park - north of Marie Avenue. Rip rap was hauled in and fill was put in around the culvert. They trimmed overhanging limbs on the Marie Avenue trail near Valley Park. Rich repaired the sidewalk at Public Works by digging out the base, putting in a new base, compacting and then put the concrete back. He also assisted the Parks Crew with the culvert repair in Valley Park. The Street Crew cleaned storm sewer grates. There was a damaged curb at Park Circle and Park Place which was cut so it can be replaced. They prepared the area for the curb to be replaced by the dual culvert on Huber Drive. Vandalized yield signs were replaced on Ellen, John and Chippewa Avenue. The Street Crew also attended the annual Fall Maintenance Expo. Engineering: Concrete curb and gutter was installed on Ivy Falls Drive, Sunset Drive and Dodge Lane. Paving of all of the streets will be completed next week, weather permitting. LETTER / The Pipeline Public Works .fit,=a Engineering Code Enforcement September 29, 2005 Public Works The Parks Crew put new shrubs, edging and rock around the sign at Wentworth Park. They trimmed trees along the pedway on Lexington Avenue, north of Marie Avenue. They replaced the dead lilacs at Kensington South Park on the south end of the soccer fields. Rich worked with Braun Pump to do the annual lift station check ups. The pumps, panels, and wet wells were all in good condition. He did a new sanitary sewer inspection for Visitation at the new warming house for their winter sports. He also did a new inspection at 1205 Culligan Lane. The Street Crew put up new crime watch signs at the entrance to Mayfield Heights Road and added a missing "keep right" island sign at Market Street and Dodd Road. They took out the apartment number sign and reinstalled the "Lexington Apartments" sign next to the new trail, so the City can receive its share of state aid money for construction of the trail. They cleaned storm grates. On Thursday, they put the plow on truck 303 and brought it over to the District 197 bus garage. Governor Pawlenty gave a press conference about using biodiesel, a soybean alternative. Channels 4, 9 and 11 had news crews there to cover the event. The Governor was giving four presentations and Mendota Heights was their first stop. (See attached article). Code Enforcement A building permit was issued to Klingelhutz Construction Company for a six unit walkout building in Waters Drive Business Park. The total cost of the permit was $10,398.56 with a valuation of $600,000.00. Engineering Sue published a public hearing notice for the 2005 street projects and scheduled the hearing for the October 18th City Council meeting. Notices were mailed to all affected property owners. MINNESOTA _MAKES HISTORY WITH NEW BIODIESEL-BLENDED FUEL --September 29, 2005 Page 1 of 1 I Print This Page ] I. Close Window I MINNESOTA MAKES HISTORY WITH NEW BIODIESEL-BLENDED FUEL -- September 29, 2005 - Starting today, diesel fuel sold in state contains two percent biodiesel - St. Paul -Today Minnesota became the first state in the nation to require that diesel fuel sold in the state contain two -percent biodiesel - a homegrown, renewable fuel made primarily from soybeans. Governor Tim Pawlenty and Agriculture Commissioner Gene Hugoson kicked off the biodiesel standard today at a school bus garage in suburban Mendota Heights, before traveling to biodiesel plants in Albert Lea and Brewster and stopping in Moorhead. Biodiesel is a clean -burning, alternative fuel made from domestic, renewable oils and fats. In Minnesota it is made primarily from soybean oil. Mixtures of biodiesel and petrodiesel are called "biodiesel blends," with B2 being two -percent biodiesel. Biodiesel blends are already used by hundreds of vehicle fleets, including the U.S. military, Yellowstone National Park, and various Minnesota cities and counties. "Today, Minnesota takes another step toward reducing our dependence on foreign oil while improving our environment and our rural economy," Governor Pawlenty said. "Greater use of renewable fuels means that more of our energy comes from farm fields rather than oil fields. Biodiesel is another tool in our arsenal as we look for clean, diverse sources of energy." The 2002 Minnesota Legislature passed a law requiring that diesel fuel sold in Minnesota contain at least two -percent biodiesel (B2). The requirement was designed to take effect one month after the state had certified that it had the capacity to produce 8 million gallons of biodiesel. Minnesota Department of Agriculture (MDA) Commissioner Gene Hugoson certified this production capacity in the August 29 edition of the state register, and the requirement kicks in today - September 29, 2005. "Biodiesel will provide significant economic benefits to the state through reduced reliance on imported oil and increased demand for Minnesota -grown soybeans," said Agriculture Commissioner Hugoson. "It will also benefit the state's natural resources and public health through a reduction in harmful vehicle emissions." B2 can be used in conventional vehicles without any engine modifications. According to the National Biodiesel Board, all diesel engine makers with equipment in North America support the use of up to 5 percent biodiesel meeting national and local specifications. Independent tests have shown that biodiesel reduces harmful vehicle emissions such as unburned hydrocarbons, carbon monoxide and particulate matter. Biodiesel exhaust also has a significantly less harmful impact on human health than exhaust from petroleum diesel. ,vnnesota has three biodiesel plants, located in Albert Lea, Brewster and Redwood Falls. They have a combined annual production capacity of nearly 63 million gallons, making Minnesota the number one producer of biodiesel in the U.S. According to Governor Pawlenty, one of the important benefits of biodiesel use is that it helps reduce dependence on foreign fossil fuels. "Right now, America is importing petroleum to meet more than 60 percent of its needs," Governor Pawlenty said. "By 2025, it is projected that we will import 77 percent of our petroleum. When you pair these supply concerns with a rapid increase in oil demand from emerging countries like China and India, you have a recipe for sky-high fuel prices. For our long-term economic stability, we must start breaking our unhealthy dependence on foreign oil. I'm proud that Minnesota is showing the way by using more homegrown biodiesel." There are a few exceptions to the new B2 requirement, including railroad locomotives, off -road taconite and copper mining equipment and heating equipment. The MDA has set up a website with information about biodiesel, as well as links to other sources of information about the fuel. The website can be found at http://www.mda.state.mn us/biodiesel/b2/default htm. http://www.governor.state.mn.us/tpaw_Print%20Article.asp 9/30/2005 NEWS LETTER Public Works Enoineerino Code Enforcement Public Works September 22, 2005 The Parks Crew took down the nets at Mendakota Park in preparation for winter. They weed whipped around the signs along the pedways on Mendota Heights Road, Marie Avenue, Lexington Avenue, Huber Drive, Wachtler Avenue and Wentworth Avenue. They replaced dog waste signs at Mendakota Park on the west end of the park by the pedway entrance. Downed tree limbs needed to be cleaned up after Wednesday night's storms came through. Rich cleaned sewers on Wachtler Avenue after the sewer line was repaired and he found some gravel. On Saturday evening, there was a power outage at the Northland lift station. John Boland responded to the alarm and the power was out for four hours. On Sunday morning, the alarm went off again at the Northland lift station and Tom Olund responded. Tom hit the reset button and the pumps starting working. Rich graded and regraded the area of the Wachtler Avenue sewer repair and then put down black dirt and seed. The Street Crew patched potholes on Butler Avenue, Spring Street, John Street, Ellen and Junction Lane. They attended a construction expo. Seminars attended were; Equipment Safety, Tree Trimming and Chainsaw Safety, Loading Equipment, and, Chains and Load Binders. Old, unnecessary signs (yellow diamond) were removed from the Somerset neighborhood. A dead elm tree was removed from the right-of-way of the Victoria Townhomes. They also, cleaned up tree branches and catch basins from Wednesday night's storms. Enaineerina Century Fence completed street striping on Wednesday. Code Enforcement Paul issued a building permit to Verne V. Olson, Inc. for a tenant finish space in the Town Center development. The tenant space is for Caribou Coffee. The estimated value of the permit is $167,000.00. NEWS LETTER Public Works Engineering Code Enforcement Public Works The Pipeline With the storm that went through this week, the Parks Crew had to pick up and chip up the downed limbs at Rogers Lake Park, Friendly Hills Park and Ivy Falls Park. They worked on replacing the broken axel on truck 505 and serviced the mowers. Rich cleaned the sanitary sewer lines at Hilltop Road, Valley Curve Road, Arvin Drive and Wachtler Avenue. He did a sanitary sewer inspection for 746 Knollwood. He raised the manhole on the Victoria storm sewer easement. A sanitary sewer line collapsed on Ridge Place, east of Ridge Place and the Wachtler intersection. Northdale Construction was called in to repair it. The Street Crew cleaned catch basins and cleaned up branches and limbs from Monday's storm. They filled potholes on Junction Lane, Kirchner Avenue, View Lane and Butler Avenue. They assisted Rich with emergency locates and removed a couple of sings that would in the way during excavation of the collapsed sanitary sewer line. Code Enforcement A building permit was issued to Manley Brothers for a new home at 1205 Culligan Lane with an estimated cost of $205,000.00. The CAO was approved by the City Council for this permit. A building permit was issued to National Contractors, Inc. for a 1,160 square foot tenant space finish at 720 Main Street, Suite 106. The tenant will be Fantastic Sams. The estimated cost is $3,700.00. Engineering Sue, Tom Olund, and Dave Sorby attended the 2005 APWA International Public Works Congress and Exposition. There were numerous educational topics and roundtable discussion groups that included; Street Sweeping, Street Sweeping Policies, Fueling for the Future, New Diesel Standards Affect Budgets, Owning vs. Leasing Your Equipment, and What's New in Public Works Equipment. The Public Hearing for the Somerset area project is scheduled for the September 20th, City Council meeting. Work is substantially complete with the wear course being completed next year. Northdale Construction finished the storm sewer installation on Dodge Lane, Sunset Lane and Ivy Falls Avenue. Road construction will begin next week. NEWS { LETTER Public Works En4ineerina Code Enforcement Public Works The Parks Crew dragged fields, cut grass and picked up the trash. They worked on maintaining the equipment by servicing all mowers and cleaning equipment. Rich dug out and raised two manholes in the Ivy Hill easement. The Street Crew blacktopped around one the raised manholes and Rich put dirt and grass seed around the other. Rich and Tom Knuth inspected the sanitary sewer lines in the Somerset neighborhood. The Street Crew cut and chipped up over hanging trees on Valley Curve between Willow Lane and Hilltop. They trimmed trees where there were sight distance problems on eastbound Marie Avenue and Wachtler Avenue. Two patches were put down for Rich around a manhole by the Ivy Falls town homes, a final lift patch was put down on Mendota Heights Road west of Lake Drive and patching was done on Mendota Heights Road. Street name and regulatory signs are starting to be replaced in the Somerset neighborhood. They also cleaned catch basins. Enaineerina The 2005 Street improvement project is underway. Northdale Construction started storm sewer on Dodge Lane this week. Residents on Dodge have experienced interruption to their utilities as Northdale severed cable and telephone. When Qwest was fixing the phone lines, they hit the gas and electric! Northdale will start on Sunset Lane storm sewer today. The Engineering Department has received several calls about the "water spurting out of the ground" at Town Center! Sue and Tom Olund will be attending the American Public Works Association National Congress from September 12 to 14 at the Minneapolis Convention Center Code Enforcement A new single family home building permit was issued for 2540 Arbor Court. The estimated cost for the new home is $365,000.00. A wetlands permit was approved by City Council for this home on August 2, 2005. LETTER / The Pipel i ne Public Works Engineering Code Enforcement September 1, 2005 Public Works The Parks Crew removed weeds and plantings around the Wentworth Park sign and prepared the area for new plantings and rocks. They serviced all mowers. Pipe Services cleaned and vacuumed the Mendota Heights Road lift station to get rid of a big build up of grease. Rich raised a manhole casting for the City of Lilydale. The Street Crew repaired two street lights in the business park area. A tree limb came down and blocked the westbound driving lane on Marie Avenue west of Dodd Road which was removed. Hoping to curtail student parking on High Ridge Circle and Sibley Court three "No Student Parking" signs were installed. The Street Crew also repaired the inside of a deteriorated storm grate and put on the first lift of asphalt on Mendota Heights Road just west of Lake Drive. They patched potholes on Mendota Heights Road west of Dodd and on Warrior Drive. Code Enforcement A building permit was issued for the first commercial tenant space finish at 702- 724 Main Street, Suite 101, Kowalski Wine Market in Town Center. The builder's estimate is for $175,000.00 for a 2,556 square foot tenant space. Engineering Ace Blacktop paved the final wear course on Emerson Avenue and Colshire today. Sue attended the Lilydale City Council meeting and the Lower Minnesota River Watershed District meeting to request monetary support to repair the Kingsley Court slope erosion problem. Both organizations will contribute to the project. Northdale Construction will begin storm sewer work on Dodge Lane on Tuesday, m September 6 NEWS LETTER Public Works Engineering Code Enforcement Public Works The Pipeline 4 kAugust 25, 2005 4 The Parks Crew worked on the sprinkler system at the Fire Hall, repaired the sprinkler system on field #4 at Mendakota Park, and replaced a sprinkler head at City Hall. They trimmed tree limbs along the pedway between Swan Court and Mendakota Park. Because of vandalism the bar at the skateboard park had to be replaced. They chipped up brush at Rogers Lake. Soccer season is upon us, so the Parks Crew hauled out the soccer goals to the neighborhood parks and installed the nets on the goals. The alarm went off Friday morning at the Mendota Heights Road lift station because the relays tripped out and had to be reset. Rich cleaned sewers at Spring Creek Court, Valley Curve and the Valley Curve easement. Rich finished spraying the weeds for the Parks Crew. The Street Crew added class 5 on Huber Drive's dual culverts. They filled and graded the wash outs on West Perron Road. They finished the final lift on the patch on Mendota Heights Road and Enterprise Drive. They also cleaned storm grates. Engineering Sue attended the Gun Club Lake WMO meeting with Mary Jeanne as they were discussing our Surface Water Management Plan. The managers directed their engineers to prepare comments. They did not anticipate any major issues and thought the Plan was good. Sue attended the Lower Minnesota River Watershed District boat tour along with Jim, Mary Jeanne and Patrick. Representatives of the Watershed District, Mdewakanton Community, US Fish & Wildlife Service, MAC, Met Council, and barge industry provided informative comments as we enjoyed the great views and perfect weather. A couple of weeks ago Tom Knuth discovered some severe erosion behind the Kingsley Court townhomes. There is runoff from both Mendota Heights and Lilydale that has created a 6-foot deep gully through our sanitary sewer easement leaving only 3 feet of cover over our sewer pipe. Our initial construction cost estimate to complete the repairs is $25,000. Sue has contacted Terry Schwalbe at the Lower Minnesota River Watershed District for monetary assistance for the slope repair since it is an intercommunity problem. Sue has also contacted Lilydale. This issue will be discussed at the Lilydale City Council meeting on Monday, August 2gth and at the Watershed District meeting on Wednesday, August 31st. Sue will attend both meetings and report back to council at the September 6th meeting. All punch list items have been completed on the Lexington Trail project. NEWS LETTER Public Works Enaineerinci Code Enforcement Public Works The Pipeline August 18, 2005 The Parks Crew pulled the irrigation lines at Mendakota Park and at the Fire Hall. Sprinkler valves and pipes were installed to sprinkle the east yard of the Fire Hall (Warnke site). They began laying out and striping soccer fields for fall soccer. 580, the big mower broke down and needed repairing. The power went out at the Lilydale lift station at 11:30 P.M. and was out for an hour because of the storm. Rich sprayed Roundup (total weed killer) around guard rails and in our right-of-ways. He also sprayed the parks for broadleaf weeds. The Street Crew opened the depression on Enterprise Drive and Mendota Heights Road. They found the frame for the storm sewer manhole was broken, replaced it with a new one, backfilled, compacted and put down the first lift of asphalt. There were complaints about potholes on Diego Lane, Bachelor Avenue, Orchard and Mendota Heights Road and they filled them. A stop sign was replaced that was down on Nashua and Decorah from a tree that feel during the last storm. They cleaned storm grates and looked at an erosion problem at LCS, on Highway 13. NEWS LETTER Public Works Engineering Code Enforcement Public Works The Pipeline _ August 11, 2005 _ Public Works hosted their annual "super summer barbeque" at Public Works this week. Thank you for a wonderful meal and time. Most employees from City Hall attended this great summer get together. The Parks crew fertilized Kensington Park, Mendakota Park, the Fire Hall, City Hall and at Public Works. They cleaned up downed limbs and trees at Friendly Hills Park which were then chipped up and hauled away. They cleaned up the shop and back lot. There have been a lot of downed limbs and trees this season because of storms, see the attached email thank you from a resident in Copperfield thanking Public Works for their help with storm clean up. The alarm went off at the Mendota Heights Road lift station because the low level float went out. Rich called Braun Pump to change it out. Rich cleaned sanitary sewers on Hilltop Road, Hilltop Court, Willow Lane and Mager Court. The power went out at the Veronica Lane lift station on Tuesday, because of storms passing through, and the power was quickly restored. The Street Crew cut down a boulevard maple tree at 15 Dorset Road which was split down the middle. They patched potholes on the north end of the City and overlaid the intersection of Kirchner Avenue and View Lane. They called in locates for stumps that need to be ground with a total of six stumps needing to be ground. Sod was put down on Stone Road where a cottonwood tree was removed because the roots were heaving the sidewalk. Engineering Xcel Energy is starting to relocate gas mains on Sunset Lane and will relocate mains on Ivy Falls Avenue next week. Tom Knuth and Sue met with Terry Schwalbe of the Lower Minnesota River Watershed District to discuss the participation in an erosion control project adjacent to Kingsley Estates. The City of Lilydale is also being asked to participate in the project. Page 1 of 1 Tom Olund From: "Kathleen Swanson" <KathyS@mendota-heights.com> To: "James Danielson" <JimD@mendota-heights.com>; "Sue McDermott" <SueM@mendota-heights.com>; "Tom Olund" <pwsuper@infinetivity.com> Sent: Monday, Augus: 08, 2005 9:37 AM Subject: FW: A Big Thank You From: Lkfitzer@cs.com [mailio:Lkfitzer@cs.com] Sent: Thursday, August 04, 2005 4:25 PM To: Web Site Email Subject: A Big Thank You What a pleasant surprise when I came home from work today and saw my tree that was damaged from the storm last night was removed. My neighbor told me that the city had come down the street and helped most of us with downed trees. Tease extend a thank l(OU to workers who helped out. Going through Friendly Hills early this morning, it looked like a nature war zone with so many trees down. Those winds were tough on the trees last night. Gregg and I appreciate your viork and want to thank everyone again. Laurie And Gregg Fitzer 2213 Copperfield Drive Mendota Heights NEWS LETTER Public Works Engineering Code Enforcement Public Works With Wednesday night's storm there were a lot of trees down, which kept the Street Crew busy with clean up and most trees downed were south of 110. Here is a list of downed trees: 9 in the copperfield area 1 on Park Lane and Mendota Heights Road 1 in Bunker Hills 1 on Apache and Pueblo 1 on Wesley Lane 1 on Douglas east of Lexington Avenue 1 on Callahan 1 on Patricia; and 1 stop sign was down at Nashua and Decorah because of a downed tree. The Street Crew also reswept the chip seal because of numerous complaints about loose rock; Huber Drive, Marie Avenue, Wentworth Park, Junction and Kirchner Avenue were also swept. The Parks Crew attended the MN Turf and Grounds Field Day at the University of Minnesota. The seminar topic was about different types of soils and drainage problems that may arise on athletic fields. The end of the year softball play offs were held for men's, women's and over 30 leagues and the fields were prepared. The ballfields at Mendakota Park, City Hall and the soccer fields at Mendakota Park and Kensington Park were aerated. All four ball fields at Mendakota Park were top dressed. The Parks Crew also removed downed limbs and brush from the parks on the south end of the City after Wednesday night's storms. Rich was on vacation for part of the week and while he was off having fun - Infratech finished lining the sanitary sewer on Ivy Hill. The power went out at the main lift station causing the alarm to go off and Len responded and took care of the problem. The power also went out at the Centre Pointe lift station and John Ambrose responded to that alarm. Code Enforcement A new single family building permit was issued to Cardinal Homebuilders, Inc. for 746 Knollwood Court. The estimated cost of building the house is $510,000.00. Engineering_ Braun Turf Farms finished installing the sod as part of the Somerset project. N E W S LETTER Public Works Engineering Code Enforcement Public Works The Pipeline July 28, 2005 The Parks Crew sprayed total weed kill along the fence lines at all neighborhood ball fields and back stops and they finished spraying the warning tracks at Mendakota Park. They started aerating neighborhood ballfields. Extra picnic tables were hauled to Mendakota Park for a large picnic. They chipped up brush along the pedway at Summit and Marie. On Tuesday, the alarm went off at the Mendota Heights Road lift station. Grease was stuck on the walls and was cleaned off. Rich cleaned the sewers on Dodd Road from Wentworth to Marie and some roots needed to be cut. Rich repaired the concrete in the manhole on Marie and put in a new step where the old one rusted off. The Street Crew got a report of a sink hole at Enterprise Drive and Mendota Heights Road. A warning flasher was put over it and it will be checked out soon to discover the problem. The storm sewer pipe on Huber Drive was opened and numerous joint separations were reset with approximately eight pieces of pipe and 2 aprons. After making the repairs, bedding rock and class 5 was laid and compacted. They cleaned dirt and debris from culverts on Huber. There was a sight distance problem caused by brush at Summit and Victoria and the Street Crew removed the brush and overgrowth. MnDOT Electrical Services was called because there was a problem with the red traffic light being out on southbound Highway 13 and Mendota Heights Road; the cause of the problem was discovered - mice were chewing on the wiring harness. They opened the outlet at Lockwood Pond, cut a trail to the outlet and marked with a post for an entrance. Code Enforcement A tenant space permit was issued to K& S Investments, LLC for 2295 Waters Drive in Waters Drive Business Park. The tenant space is 2,987 square feet and has an estimated cost of $130,000.00. Enciineerina The bid opening was Tuesday for the 2005 street projects and two bids were received: Arnt Construction $650,023.70 and Bituminous Roadways $757,549.04. The Engineers estimate was $662,845.50. The bids will go to Council on Tuesday for approval. NEWS LETTER Public Works Engineering Code Enforcement - 0 July 21, 2005 Public Works The Parks Crew prepared fields at Mendakota Park for the AAU state tournament. They cleaned up Wentworth Park and took out the old playground equipment. They took tables to St. Thomas Academy for the Relay for Life. Rich did a sanitary sewer inspection at 699 North Freeway Road, 1080 Highway 110 (SuperAmerica), and 2295-2301 Water Drive. He cleaned sewers on Bachelor Avenue, Sutton Lane, Trail Road, Lansford Lane and Stanwich Lane. Huber Drive is closed from Cheyenne to Bent Tree Lane so the Street Crew can repair the storm sewer pipe. Wentworth Park Upgrades to the playground at this park were completed last week. Several outdated components were removed; new individual units were added and connected to remaining elements along with a new structure group suitable for 2 to 5 year olds. The old border timbers were removed as was the pea rock surfacing. New synthetic landscape timbers made from recycled and compressed soft interior parts from automobiles were installed, a drain tile system was placed under the 12 inches of wood chips used for the new resilient surfacing. Once the chips settle they form a firm enough surface that meets the American Disability Act accessibility standards. The Public Works Park Crew was responsible for restoration of the surrounding area. This work included removal of the outdated play equipment, removal of several truck loads of dirt, pea rock and old timbers. In addition, the Parks Crew removed an unnecessary asphalt path to the play area and brought in topsoil as part of the turf restoration around the play area. The contractor received too many wood chips which he offered free to the City. The Parks Crew removed several truck loads of chips and used them in other parks (the excess chips had a value of two or three hundred dollars). Valley Park Trail — west of Dodd Road A recent storm caused severe erosion of a culvert near the trail. The Parks Crew, Street Crew and Rich had to extend a 24" culvert, haul in; fill (some of which was the pea rock from Wentworth Park), stone for back fill, and rip -rap at the end of the culvert. They also brought in topsoil, seeded, and placed a fiber blanket to control erosion until the seed germinates. This is a remote area of the trail and very difficult to reach with trucks and excavation equipment. Most of these two projects were done during the recent sunny, hot, hot, hot, 90 plus degree days. The Mayor giving a greeting Sue, Nancy and John walking a at the Relay for Life lap at the Relay for Life NEWS N LETTER The P1el i ne Public Works Engineering Code Enforcement July 14, 2005 Public Works The Parks Crew cleaned up Mendakota Park after a weekend tournament. They prepared the fields at Mendakota Park and Civic Center ball field for the AAU State Tournament held this week end. A limb fell on the Friendly Hills pedway and was removed. Total Weed Killer was applied along fences at Mendakota Park, Kensington Park, and sprayed on cracks in pedways where weeds are growing. They placed picnic tables, tables and chairs at Rogers Lake for the fishing contest on Wednesday. Rich cleaned the sanitary sewer lines at Wentworth Avenue, Wachtler Avenue, Evergreen Knolls, Gryc Court, Deer Trail Point and Deer Trail Court. The power went out at the Mendota Heights Road lift station Wednesday at 5:00 A.M. and was out for four hours. Two red traffic lights were out at Mendota Heights Road and Highway 13, so the Street Crew picked up some replacement bulbs at MnDOT Electric Services and installed them. They picked up brush at 610 Ivy Falls Avenue. Old "No Parking" signs were removed from the north side of Northland Drive. They started patching potholes in the "Avenues" area of the City. John Ambrose made a frame for the parks bulletin board at Mendakota Park. Engineering Nancy, Sue and Ryan are participating in the Relay for Life on Friday at St. Thomas Academy. They are walking as part of Team Avengers. Mayor Huber is also on the team. If you stop by, look for the white hats! Sue submitted a grant request to the Metropolitan Council for $43,000 for rain water gardens in the Ivy Falls area (next year's street reconstruction project). The Somerset Area project is nearing completion. The contractor is waiting for cooler weather to start placing the sod. NEWS LETTER Public Works Engineering Code Enforcement Public Works July 7, 2005 The Parks Crew picked up downed tree limbs and chipped them up. Brush was cleaned up on the pedway and overhanging limbs were trimmed in Marie Park. Small sucker trees are growing around all the tennis courts and those were trimmed up. Home plate was damaged at the Civic Center ball fields and that was replaced. The warning track was washing out at Mendakota Park and the Civic Center ball field and rec rock was hauled in, put down and leveled. Rich did a storm sewer inspection at 720 Main Street in Town Center. He did a sanitary sewer inspection at 620 Hidden Creek. Rich helped the Street Crew in blacktopping the streets in the business park. He cleaned sewers at Cherry Hill Road, Farmdale Road and Lower Colonial Drive. The Street Crew cleaned up the stump grindings, filled the hole with black dirt and seeded at 681 Ocala. They patched the pedway by the pavilion at Kensington Park, filled depressions in the street at Lake Drive, Dodd Road and hole on Marie Avenue at Callahan. Broken glass was in the street on Marie Avenue across from Marie Park and that was cleaned up. They prepared the north side of Northland Drive between Pilot Knob Road and Mendota Heights Road for "No Parking" on the north side of the street including; signage, painting of curbs and patching the street. Engineering There was a water main break on June 30th at the corner of Vicki Lane and Douglas. A St. Paul Regional Water Services crew repaired the break in the afternoon. Code Enforcement A building permit was issued to Gretner Construction to remodel the Convent of Visitation dining room. The estimated cost was set at $93,000.00. A permit was issued to Remediation Unlimited, Inc. to demo and construct a larger accessory structure at the existing SuperAmerica station at 1080 Highway 110. This project was approved by the City Council on May 3, 2005 and the estimated cost is $20,000.00. A permit was issued to Stonewood Design/Build, LLC to demo and reconstruct a single family dwelling at 806 Bachelor Avenue. This property is owned and the home is to be constructed for Mike Cashill, one of the Par 3 Golf Course owners. The builder estimated the construction cost to be 1.3 million. NEWS LETTER Public Works Enciineerinci Code Enforcement June 30, 2005 i ne Public Works: The Parks Crew repaired a sprinkler head at Mendakota Park. They trimmed trees along the pedway in Valley Park for easier walking. Timbers were removed and filled in at the Marie Park were new playground equipment was installed. A second application of crabgrass preventive was put down at Kensington Park South, Mendakota Park, the Fire Hall, City Hall, the ballfields at City Hall and at the Public Works Garage. After Wednesday nights storms blew threw the Parks Crew picked up downed braches. Rich cleaned sewers in all of the Park Place neighborhood and the Farmdale easement. He raised a manhole 1-1/2 feet on the Farmdale easement. The alarm went off at the Mendota Heights Road lift station on Tuesday at 10:30 a.m. due to high water. Rich washed down the walls and cleaned up the wet well at the Mendota Heights Road lift station. Tim Oster from the Street Crew was called in on Monday night to remove a tree in the roadway that blew over from the storm and it was then cut and chipped up. The Street Crew met with the Police Chief and the Maintenance Chief of Brown College to discuss a crosswalk on Northland Drive After the discussion, it was decided not to paint the crosswalk now and to paint it when Northland Drive is milled and overlaid. "No Parking" signs were installed at Brown College. Storm sewer grates were cleaned. For the second time this week, the Street Crew also had to pick up downed tree limbs after the storm Wednesday night. Engineering: Paving in the Somerset neighborhood began on Thursday. It is the contractor's intent to have all of the streets "black" by the end of the day on Friday. Sue and Guy attended a meeting with Dakota County and MnDOT at which they learned that MnDOT will not allow the NURT to be located between TH 110 and the TH 110 frontage road. Marie Park: Improvements to the Marie Park playground were completed last week. Work included removal of CCA treated border edging, removal of pea rock surfacing and removal of play structure and accessories installed in 1990. Some of the removed components that are in good shape will be reconditioned and re -installed, with additional new components, at the Valley View Heights Park in 2006. The upgrades at the Marie playground include a new structure and play components suitable for 5 year and older youth, new non -toxic composite edging timbers, and non -toxic shredded wood surfacing that once compacted will make the entire play are in conformance with the American with Disabilities Act. Work on similar upgrade improvements will begin at Wentworth Park following the July 4th Holiday. L E T T,E R The Pipeline Public Works Engineering Code Enforcement June 23, 2005 Public Works Utilities Rich Burrows monitored operation of all lift sanitary sewer lift stations. Cleaned sanitary sewers on Medora Court, Medora Lane and Emerson Avenue and inspected new sewer service in Water Drive Business Park (Kiingelhutz). The sanitary sewers in the Mayfield Heights easement, Victoria Curve, Wagon Wheel Trail (35E bridge to Lexington), Williams Court and Lexington (Cullen to Wagon Wheel Trail) were cleaned and tree root killer was applied. Power outages occurred at the Veronica Lane, Culligan Lane and Lilydale (under maintenance contract) sanitary lift stations due to the June 21s' storm. Street Department Straightened storm sewer "trash -guard" on Swan Drive. Met with resident, tree service, and Patrol Officer Patrick at Trail Road and Marie Avenue, to resolve traffic sight -line - distance issue at this intersection. Removal of lower six feet of pine tree branches was the solution arrived at. Cleaned up downed trees and branches due to Monday June 21" afternoon storm. Most trees that were down were due to the storm and were on private property. They also assisted Utility Department with traffic control on Lexington during application of tree root and sewer cleaning operation. Re-lamped left turn signal arrow head on traffic light at HWY 55 and Mendota Heights Road. Parks Maintained the turf in all parks and daily empty trash barrels. Installed temporary pitching mounds at Mendakota for weekend tournament and then removed them after the tournaments were over. Repairs were made on irrigation lines in fields #2 and # 3 in Mendakota Park. They also removed downed limbs and trees in all the parks after the Monday's storm. Trees were trimmed along ped-ways in Friendly Hills and Valley Park for planned 3-Day Breast Cancer walk. Valley park parking lot will be used on Friday as one of the water stops. Dirt was leveled and seed spread at the area around the Fire Hall. Service and repairs were done to all turf power equipment. A flowering crab tree that was donated by the Mendota Heights Garden Club was planted at City Hall. Turf has been repaired from a tree in Friendly Hills Park that had blown over. The soccer goals at Kensington Park were also repaired. Engineering Curb and gutter has been completed on the entire Somerset Area project. The bid opening date for the 2005 street project has been moved to July 26, 2005. NEWS LETTER Public Works Enaineerina The Pipeline Code Enforcement June 16, 2005 Public Works The Street Crew reinstalled the 40 MPH sign on west bound Marie Avenue and Trail Road. Because of sight problems they trimmed bushes back at Third Avenue and Dodd Road and at Trail Road and Marie Avenue. They removed a tree limb down on Medora Road which was blocking the street and ran it through the chipper. They patched the end of the driveway at 1124 Orchard and staring filling potholes in the neighborhood. Engineering Sue and Ryan held an informational open house to allow residents of Ivy Falls Drive, Sunset Lane and Dodge Lane to view construction plans and ask questions. Seventeen (17) people attended the meeting, the majority representing Ivy Falls and Sunset. One resident from Dodge Lane was also present. Code Enforcement Two permits for building shells at Waters Drive Business Park were issued. One building will be a 2 unit slab on grade and the other building will be a double walkout which will potentially contain four units (two up and two down). Klingelhutz Construction Company will be the general contractor for the project. Each building shell has been estimated at $400,000 per building. NEWS LETTER Public Works Enaineerino Code Enforcement Public Works The Pipeline June 9, 2005 The Parks Crew picked up trash daily from the parks, dragged and chalked fields and striped foul lines on an as needed basis. The week before and after the Parks Celebration they were busy setting up and cleaning up after the celebration and tournaments. After the storms on Tuesday morning, they checked the parks for storm damage and picked up downed limbs. There were a few trees down at Victoria Highlands Park and at Friendly Hills Park. Rich witnessed the sewer mandrel testing at the Waters Drive project. Pipe Services vacuumed and cleaned the lift stations. Rich did a storm sewer inspection on Main Street at Town Center. He mowed the Veronica lift station. He also cleaned sewer lines at Knollwood Court and Rogers Court. The Street Crew trimmed trees and bushes to help a site distance problem at Victoria and Douglas and at Victoria and Celia. After Tuesday morning's storms they picked up tree limbs and branches that were blown down and ran them through the chipper. After the seal coating project was completed last Friday, this week the Street Crew swept up the excess rock and stockpiled it for use in the future. Enoineerina Several streets in the Somerset neighborhood were paved today. Letters went out to residents in the Dodge Lane, Sunset Lane, and Ivy Falls Avenue neighborhoods inviting them to an informational open house on June 16th to answer resident's questions, and show them preliminary plans. Code Enforcement A permit was issued to Haldeman Homme, Inc. to demo and install new flooring in the gymnasium at 1897 Delaware Avenue (Henry Sibley High School), the estimated cost for removal and replacement is $272,000.00. NOW Despite the dreary weather there was a good turnout for the 2005 Parks Celebration NEWS LETTER Public Works Enaineerina Code Enforcement Public Works The Pipeline June 2, 2005 The Parks Crew hauled in rec rock to field #2 infield and the warming track at field #3 at Mendakota Park. They hauled in black dirt to Mendakota and Valley Park to fill in sink holes. They removed a dead crab apple tree at City Hall and planted a new on in its place that was donated by the Garden Club. In preparation for the Parks Celebration on Saturday, the Parks Crew trimmed trees and groomed Mendakota Park. The removed a fallen tree at Valley Park. Rich sprayed right-of-ways, signs and guard rails with round -up week killer for the Parks Crew. Total Construction replaced the fan switch for the generator at the Mendota Heights Road lift station. Rich cleaned off graffiti off of Lilydale's lift station panel. The Street Crew repaired catchbasins. The put in repaired catchbasin patches on Concord Way and Commerce Drive. They are patching potholes on Apache Court, Huber Drive, Eagle Ridge Road, Summit Lane, Marie Avenue, Sibley Court, and First Avenue. Public Works personnel will be attending Hazmat Awareness and Grounds Keeping Training on Wednesday, June 8th at 8:00 A.M. Engineering 8,000 feet of concrete curb and gutter was installed in the Somerset neighborhood. Seal coating is scheduled to be completed on Friday in the Friendly Hills neighborhood. Sue met with the new West St. Paul Public Works Director to discuss Delaware Avenue reconstruction and Thompson diversion projects. NEWS LETTER Public Works Engineering Code Enforcement Public Works i--ne ripenn-e 00 The Parks Crew added more wood chips around newly planted trees. They planted flowers and repaired the sprinkler system (valve repair) at Mendakota Park. They fertilized the following City properties: Mendakota Park, Kensington Park, Fire Hall, old fire hall site, City Hall and the Civic Center Ballfield. They repaired the chain link fence at Kensington Park South. They put down seed behind the Public Works Garage where the tree farm used to be. Rich responded to a power outage at 12:00 A.M., Thursday at the Mendota Heights Road #1 lift station. Power was restored at 4:30 A.M. He sprayed for weeds at: Ivy Falls Park, Marie Park, Civic Center Ballfields, City Hall, Friendly Hills, Mendakota Park, Friendly Hills tot lot, Curleys tot lot, and by the Mendota Heights sign on Dodd Road. Rich mowed the lawn at the Veronica lift station. The Street Crew repaired deteriorated catch basins on Concord Way, Commerce Drive, and Park Place. Park Place appeared to be the worst; the pipe stub into the precast had no brick or cement. After relamping the "don't walk" signs on Mendota Heights Road and Highway 55 and they still didn't work, MnDOT electrical services was notified of the problem. They painted the curbs yellow on High Ridge Circle and Sibley Court. Engineering Turf restoration has been completed along the Lexington Avenue trail project. Arnt Construction had planned to begin curb and gutter installation this week, but have been delayed due to the weather. Code Enforcement Paul issued a demolition permit to Lodahl, Inc. to demolish the house and foundation at 1280 Lakeview Avenue. The fire damaged house has been removed. All that is left on the site is a small amount of retaining wall adjacent to the driveway. The wetland permit was approved for demo and new home construction for Kurt Hagen on May 17, 2005 by City Council. NEWS M LETTER Public Works Engineering Code Enforcement Public Works The Piel i ne aY May 19, 2005 The Parks Crew picked up their new truck from Aspen Equipment. They repaired valves on the sprinkler system at Mendakota Park. Two of the new part-time summer helpers started on May 16th and they were trained in this week. New steel trash barrels were put in the parks to replace the old, rusted out barrels. They worked on the garage door at the back of the shop by repairing and greasing the roller and replacing he bracket. They replaced the pitman arm, idler arm and steering stabilizer on truck 503. The fan belt for the air blower in the dry well was broken at the Mendota Heights Road Lift Station. Magney Construction repaired it, which was under warranty. Rich flushed Knollwood Court and easement to Highway 13. He sprayed for weeds in North and South Kensington Park, Rogers Park and at the Fire Hall. The weather only cooperated briefly on Monday. The Street Crew worked on repairing a catch basin that was deteriorating on the inside and caused a hole in the street. They cleaned storm grates. The walk and don't walk signals were not lighting up, so they replaced the light bulbs. John Ambrose did welding on some of the parks equipment. Engineering Department Somerset Neighborhood Reconstruction: The water main is complete on Dorset. Class 5 has been installed on Somerset. Weather permitting, curb will be placed next Friday on Somerset, 2 blocks of Staples, 2 blocks of Mears, 1 block of Dorset and 1 block of Hingham. Sue met with Terry Schwalbe, the District Administrator from the Lower Minnesota River Watershed District to get acquainted with district activities. Terry will be a good resource to assist the City in meeting the educational aspect of our NPDES, Phase II permit. He is also planning another boat tour at the end of August. NEWS LETTER Public Works Engineering Code Enforcement The Pipeline May 12, 2005 Public Works The Parks Crew replaced the broken cable for the brakes on the grounds master 345. They went through all the weed ° s % whips to make sure they are running properly for summer. ° They installed the overhead netting between the backstops at Mendakota Park. They put down granular weed bed control on the berms at Kensington Park North and put down crabgrass preventor where needed. They brought picnic tables and extra trash barrels to City Hall. The Street Crew cleaned the storm sewer grates. They cut brush and buck thorn over hanging the guard rails between Glen Hill Road and Highway 13. They cut up and hauled away a downed tree blocking the street in front of 2295 Apache Street. They cleaned up debris at the end of Spring Street. Rich inspected Lilydale's storm sewer system and it looks good. An alarm call went off at Mendota Heights Road #1 lift station and Rich had to scrape grease off the walls of the wetwell. He began spraying the parks for dandelions and other broadleaf weeds. He finished Wentworth, Valley, and Victoria Highlands parks. The weather hasn't cooperated with him - dry, warm and windless mornings are needed for spraying. Engineering The Lexington Avenue trail is paved and the majority of disturbed ground has been sodded. Somerset Neighborhood: The storm sewer is completed on Somerset, 1 block of Hingham and 2 blocks of Staples. The gas and telephone relocation work is complete. Class 5 aggregate base was installed on Coleshire Lane, 1 block of Somerset, 1 block of Dorset, and 2 blocks of Staples. Water main construction starts Monday on Dorset from Mears to Staples. One foot of sand base is in place for the roads in Waters Drive Office Park. LETTER / The Pipeline Public Works Engineering Code Enforcement May 5, 2005 Public Works The Parks Crew hauled rec rock to the civic center ball field and filled in around the grass lines. They repaired the sprinkler system valve at Mendakota Park on field 2, repaired the sprinkler system at the Fire Hall and started the sprinkler system at City Hall. They planted new pine trees at Marie, Wentworth and Mendakota Parks and put down mulch around them. They also chipped up the dead pine trees from Mendakota Park. John Ambrose fabricated the mower deck runners for the Parks Crew. He also assisted Rich with cutting roots in the sanitary sewer lines. The Street Crew realigned the Ivy Falls Creek bed on Maple Park Drive and filled the ditch with rip rap to the gabion. The street is caving in our storm and sanitary sewer in front of 679 Marie Avenue and our lines are ok. St. Paul Regional Water Service said they couldn't detect any problems. The void was filled with Class 5 and patched which will be monitored for future problems. Rich pulled pump one at the Northland Drive lift station which was plugged with rags and rocks. The high water alarm at the Mendota Heights Road lift station went off because grease was blocking the transducer's view of the water level - so Rich had to scrape grease off the walls. Rich raised a manhole on Lexington Avenue (in Lilydale) and on Marie Avenue. Tom Knuth and Rich televised the City's sanitary sewer lines and the homeowner's sanitary sewer line at 679 Marie Avenue and found no problem. Rich inspected and air tested the newly installed sanitary sewers at the Waters Drive project and everything was good. Engineering The Somerset Area reconstruction is underway! Northdale Construction is installing storm sewer. Arnt Construction has installed the Class 5 aggregate base course on Coleshire. Tom Knuth and Sue met with staff from Dakota County SWCD to discuss this year's erosion control inspections. These are required as a part of the City's NPDES, Phase II permit. Minger Construction finished underground utility work and street construction begins next week at Water Drive Business Park. The Lexington Avenue bituminous trail was paved on Friday. Code Enforcement A building permit was issued to Mihm Custom Homes, Inc. for 700 Hidden Creek Trail. The builders estimated cost is $775,000.00. NEWS N LETTER Public Works Engineering Code Enforcement Public Works i ne ripeiine April 28, 2005 The Parks Crew finished filling holes from removed tree stumps and then seeded those areas. They attended the Minnesota Park Supervisors Association quarterly meeting. The discussions focused on Turf Management. The meeting was held at the Toro Commercial Education Center. They filled holes with black dirt and seed in the soccer fields at Kensington and Medakota Parks. They replaced the burned out light bulbs at Kensington and Mendakota Parks (the security lighting) around the buildings. There was a power outage at the Northland lift station on Tuesday in the evening. Rich televised the Ivy Hill sanitary sewer mains and found a service tap sticking into our line six inches, which will have to be cut off. He also found two broken joints in the same line. Rich is waiting for bids to fix the broken joints. Rich also prepared the sprayers for weed spraying in the parks and right-of-ways. The Street Crew cleaned catch basins and did mailbox repair. They reinstalled temporary stop signs that were hit during the winter on Mendota Heights Road, Lexington Avenue, Cheyenne Lane, Huber Drive, Center Pointe Drive and Center Pointe Blvd. They met with a resident on Swan Drive regarding the storm sewer easement that needs black dirt and seed. John Fearing of Brown College discussed the "No Parking" signs that are going up. Brown College would like two days notice before the signs go up. The mounting brackets for the signs were ordered. They picked up a down tree limb on Marie Avenue across from Valley Park. They installed the asphalt hot box and tray on truck #312. Engineering The Engineering Department received construction plans from MnDOT for traffic management system, changeable message signs, vehicle detection and camera surveillance along T.H. 494 in Mendota Heights, Eagan, Inver Grove Heights, West St. Paul, and South St. Paul. A changeable message sign will be installed for westbound traffic east of the Dodd Road ramp. Minger Construction has completed installation of sanitary sewer, water main and pond grading at Waters Drive Business Park. They are currently installing storm sewer. NEWS LETTER Public Works Engineering Code Enforcement The Pipeline April 21, 2005 Public Works The Parks Crew planted shrub roses where needed and replaced dead shrubs around the park signs. They replaced the broom on truck 506, the grounds master, after sweeping the pedways and also replaced bearings on the broom. They cut down dead apple trees at Ivy Falls Park by the tennis courts and a leaning tree on the pedway between Fourth Avenue and Wentworth Park. They repaired the sprinkler systems at Mendakota Park, City Hall and the Fire Hall. They picked up the new parks trailer at Scharber and Sons, Inc. in Rogers, Minnesota. Rich cleaned grease off of the floats at the Lilydale lift station. Tuesday evening an alarm call came in from the Lilydale lift station phone line, the alarm broke and Qwest came out and repaired it. Rich did a sanitary sewer inspection at 1161 Dodd Road. He also trimmed shrubs at Kensington Park for the Parks Crew. Len charged the batteries on the generator and port at the Mendota Heights Road lift station. Len and Rich then ran each of them for a half hour. Rich flushed Pilot Knob sanitary sewer lines at the Waters Drive Business Park project to Enterprise Drive - there was sand in the line from the project. The Street Crew met with residents on Chippewa Avenue about the new sidewalk concrete flaking off from salt this winter. Dave told them the concrete cured correctly and the salt wasn't the cause. They met with a resident on High Ridge Circle to discuss a damaged curb from plowing this winter and Dave said it would get fixed this summer. They attended the annual Spring Maintenance Expo put on by the U of M Center of Transportation Studies. Some of the sessions attended were: Get Funded to Try Something New in Your Day to Day Maintenance Operations, Chain Saw Safety, New Snow and Ice Field Guide for 2005, Commercial Driver License Requirements for 2005, and Good, Bad and Ugly Work Zones within the State. Engineering Ryan and Sam (the Engineering Department intern) assisted staff from Barr Engineering with surveying cross sections for the Marie Creek study that was ordered by the Lower Mississippi River WMO. The contractor for Klinglehutz Development has been installing utilities and completing site grading at the Waters Drive office park. RKI completed installation of the pond liner at Town Center last Friday. The Lexington Avenue trail will be paved on Monday. NEWS SETT TER it eubl_P Engineering pee nCodeinfo e ment April 14, 2005 Public Works The Street Crew started Pearson Brothers sweeping the street, 10 hour d � and will finish sweeping on Tuesday Friday days on Tuesday, Wednesday/ping the whole City with the contractor, and Thursdayd °n Friday, The Rich and will finish b y worked did a sewer ins Y noon on trees and shrubs. inspection at 701 Linden The jetter truck Street. He helped Thep went in for the Parks Parks Crew cleane a pump repair. Crew plant Parks, where d ►eaves out of Parkneeded. They es O the tennis c storage along with the sihea brought the aerator i frts and swept Kensington an ge for thin ice. Theyn from Rogers L leaves in the trimmed shrubs Mendakota Parks. TheLake for around Y planted ew fertilized the soccer summer dragged all fields. d the park signs and trees i fields at benches � n the parks and A Gift of m Mendakota Park. The Roses for Public Y also Works This week as h Not the as happened f Jason type You place in a for several years past the (variety d Ira Kip , who reside on but bushes to City little a gift of r Kipp, vase, , entrance Mr. Lincoln Wagon Wheel Trail beauty to a uses. to Pubh� to ROger's Lake Park. t0 Public Works for ' delivered nine rose park. Park. Works if a designated Several years a Planting near the bushes Public Works gnated planting area g0 Mr. Kipp offered west and ever staff constructed Were established in Roger's bush visiting y Year since the K► constructedP s cted a large Planting Best plants 9 Rogers Lake Park have Provided g area, near the Lake take a minute... additional plants. West entrance Public Works Gara and stop... to smell the Next time You're e roses. Work is substantial) above the vehicle storage to re were also installed i ge area place the roof to n this at the Public p make-up air and furnace disco Energy installed new or better. air Facility.Three circulation fans disconnected from the 11 meters and the circulation in the s ,vill be r 00 emoved this 0 gallon stora propane gas lines ummer• This summer. 9e tank, which is no longer needed and LETTER / The Pipeline Public Works Engineering Code Enforcement April 7, 2005 'ON A Public Works The Street Crew took the plows off the dump trucks to get them ready for sweeping the streets which will start next Tuesday. They also got the roller fixed and ready for fixing potholes. The Parks Crew dragged the ball fields throughout the City. They turned the water on in the buildings at Mendakota and Kensington Parks (a sure sign of spring). They repaired a leaking water pipe at Kensington Park. Tennis nets were put up throughout the parks with tennis courts. They attended the spring workshop at Midland Hills Country Club for the Minnesota Sports Turf Managers Association. The sump pump at the Mendota Heights Road lift station was plugged and Rich cleaned it and it now runs good. Rich did a sewer inspection for 702 Main Street. He flushed the sanitary sewer lines at Augusta Shores (had paper build up), LeMay Lake easement from Augusta Shores to Enterprise Drive, and Spring Creek at easement to Marie Avenue. Engineering Sue and Dave attended a preconstruction meeting for the joint powers seal coating and crack sealing project. This method of maintaining the streets is different than the slurry seal that the City has used in the past. The seal coating consists of placing a thin layer of emulsified asphalt and topping it with 1/8" granite "chips". The contractor will let the seal coat set for several days and then sweep up the excess chips. We will be crack sealing and seal coating in the Friendly Hills neighborhood and crack sealing in the Rogers Lake neighborhood. The Rogers Lake neighborhood will then be seal coated next year. Ryan attended a class on designing rain water gardens. We hope to construct rain water gardens with future street reconstruction projects. Sue attended a meeting with Dakota County staff to discuss their 2006-2010 Capital Improvement Program as it relates to Mendota Heights. Currently included in the CIP is the 110/Delaware intersection which will be constructed this year and a traffic signal at Mendota Heights Road. We also discussed the Wachtler Avenue/TH 13 intersection and the trail proposed along Wachtler. The CIP will be presented to the Council at an upcoming meeting. N E W S The Pipeline LETTER Public Works Engineering April 1, 2005 Code Enforcement Public Works The Street crew has been cleaning up the paved storage area behind Public Works and have mixed a final batch of sand and salt in preparation of our next snow/ice event ("cross your fingers" — next November). Street sweeping operations are scheduled to begin during the first part of April, possibly next week (weather permitting). Potholes are being patched with a new cold mix asphalt product that appears to adhere better than what has been used in prior years. Sod, damaged by the plows along streets without curb and gutters, has been cleaned up so that when the weather conditions are right sod or topsoil/seed can be placed to restore damaged boulevard areas. Low point and clogged catch basins are being cleaned on an "as needed basis'. John Ambrose has been helping with welding repairs to various pieces of equipment used for park maintenance. Rich Burrows preformed daily inspections and routine maintenance on all sanitary sewer lift stations and did a visual inspection, by vehicle and foot, of the sanitary trunk sewer line from the Industrial Park to the Head House (siphon under the river) on Lilydale Road (approximately 4.5 miles). Rich checks for any sort of damage such as missing manhole covers, or fallen trees that may block vehicle access if repairs are required. Home owner on Williams Court reported that he had a private sewer contractor remove (cut) tree roots from his home service line. Rich flushed and cleaned the City's main sewer line in this area to prevent possible clogs from roots washed into our main. Park crew removed snow plows from their trucks and snow throwers and brooms from the mowers which are then stored in the water tower. Trailers and other turf equipment were moved out of the water tower for maintenance, repairs, and adjustments. A new truck will be arriving soon and all usable equipment on the existing truck is being removed for reuse on the new vehicle. Port -a -potties have been ordered for installation at parks and ball fields. Shipments of fertilizer and crabgrass preventer were delivered and moved into the storage building off Mendota Heights Road in North Kensington Park. Additional trash barrels have been brought out to parks and ball fields and the parks crew has been removing trash and debris, now visible following the melting snow, in all of the parks. ENGINEERING Sue McDermott and Ryan Ruzek held neighborhood open house meetings on Monday evening at City Hall for this year's proposed street improvement projects. Thirteen residents attended the first meeting to hear details of the mill and overlay projects for Ivy Hill Drive, Maple Park Drive and Ridgewood Drive (93 properties will benefit from these projects). A second meeting attended by thirty residents, scheduled an hour later, dealt with street reconstruction projects on Dodge Lane, Sunset Lane and Ivy Falls Avenue (38 properties will benefit along these streets. A feasibility hearing for these improvement projects will be on the Council's agenda for the upcoming April5t meeting. Minger Construction plans to start sanitary sewer construction at the Waters Drive Business Park (Klingelhutz Development) next week. Tree clearing and site preparation operations are still in progress. N E W S The Piplefine LETTER Public Works Engineering March 25, 2005 Code Enforcement Public Works The Parks Crew continued fabrication of a new steel gate which allows passage of walkers/bikers but not vehicles for the trail through Valley Park at the Highway 13/Lilydale Road entrance to the Park. They checked the aerator daily at Rogers Lake and as of today it is shut down for the season and the "open water" warning signs were removed from the lake. Work has begun to prepare equipment such as trucks and mowers for summer use. Public Works removed 6 inches of snow last Friday and Saturday from City streets. Snow removal operations were completed on the cul-de-sacs, park parking lots, and trail ways on Saturday. Pot holes throughout the city are being patched and a temporary stop sign was installed at the intersection of Cheyenne and Huber. Street name signs we reinstalled up at 2 different locations, the first at Laura Street/Laura Court, the 2nd Marie/Nature Way. Rich checked the sanitary sewer lift stations during the week and removed snow on Saturday morning. Frozen/blocked culverts were cleaned out at Orchard, Hunter and Veronica. John Boland was dispatched after hours on Wednesday, to handle a resident's call regarding water coming up into her yard due to frozen storm sewer on Ashley and Norma. Engineering Sue and Ryan will be hosting a neighborhood meeting on Monday March 28`h for the 2005 Street Reconstruction, and Mill/Overlay projects. Streets to be reconstructed are Ivy Falls Avenue, Sunset Lane and Dodge Lane. The Mill and Overlay projects includes Ivy Hill Drive and Ridgewood Drive. Affected property owners have been invited to meet with staff in the Council chambers at 6:30pm and 7:30pm respectively. Code Enforcement This week a building shell permit was issued to Rochon Corporation for Building "F", located at 702 Main Street. The estimated cost of the building shell is $2,695,000.00. The lower level will contain parking and will be 16,048 GSF, level one 15,943GSF, will contain retail space and the second level, which is 15,998 GSF, will contain business type occupancies. At clx ® . NEWS LETTER Public Works Enaineerina Code Enforcement Public Works Th­_e Pipeline 49 March 17, 2005 The Parks Crew worked on the gates for the Valley Pak north end entrance. They attended the Sherwin-Williams Pro Show at the Minneapolis Convention Center where Sherwin-Williams introduced new and improved products and demos on many new products. They also attended a seminar at Gerlach Service Inc. (commercial cutter open house) and attended Polfus Commercial Event 2005. They plowed the pedways on the north and south ends of the City. They also started ordering chalk and fertilizer for the spring and summer. Rich cut roots on the Mayfields Heights easement and on William Court. Two months from now he will chemically treat the roots to stop them from growing into the sanitary sewer pipe. He also flushed the line on Lexington Avenue where he found a lot of paper build up. The Street Crew is trying a new type of cold mix, U.P.M. that is suppose to stay in place better. They picked up truck #304 from Inter State Diesel where a new transmission was put in and remounted the plow and wing. Truck #308 went to Kramer Spring to fix a broken overload spring. They attend the Work Zone Traffic Control seminar and topics covered were; Overview of 2004 MnDOT Field Manual, Working Safely in Work Zones, Updates on OSHA Standards, High Visibility Garments and Flagging. "Mini -Half Pipe" Installed at Skate Park Installation of new skate park components, began Monday, at Roger's Lake Park and was completed on Thursday. In addition to the mini -half pipe ramps a quarter pipe ramp and grind rail were also installed. The tier one skate park opened in 2003 and has been a hit with skate boarders that use this facility. The Police Department reports that there are very few, if any, calls generated by activities at the skate park. Enaineerina Arnt Construction completed dredging of the west pond at Somerset Country Club. Xcel Energy completed installation of an underground cable along Dodd Road from TH 110 to Wentworth. NEWS LETTER Public Works Enaineerina Code Enforcement Public Works The Pipeline March 10, 2005 Parks truck 503 was taken to Kremer Spring for a suspension upgrade. The Parks Crew picked up iron and started making gate/posts for the North Valley pedway. They assisted Rich with jetting a sanitary sewer line. Len installed a ball valve and power brakes in 2293 (grass rig) and electric brakes on the 6 wheel trailer. Rich cut roots on Vandall between First and Second Avenue and in the Victoria easement. He did a sewer inspection at 805 Wagon Wheel Trail. The homeowner had a break in the line and had to replace five feet of pvc pipe. Infratech finished putting in patches in Somerset; patches were installed at Hingham covering a broken pipe, Dorset Road to cover an offset joint and Dorset covering a broken and offset joint. Snow Events of the Week: Date: Response: Amount: 3-9-05 Plow main lines 1" and pedways Enaineering Lower Mississippi River WMO submitted a grant application to BWSR requesting $25,000 to construct a rain water garden in the Somerset neighborhood. Tom Knuth and Sue attended a preconstruction meeting for utilities to be installed at Waters Drive Business Park. Code Enforcement Paul reviewed a building permit for 620 Hidden Creek Trail to be issued to Mihm Construction, Inc. The valuation of the new home is $1,625,000.00. The house is being built for a Minnesota Viking player. NEWS • LETTER TP he 1erne Public Works Engineering Code Enforcement March 3, 2005 Public Works Public Works was called in on Sunday morning at 7:00 A.M. to plow the main lines and sand streets. The Parks Crew plowed the pedways after Sunday's snowfall. They rebuilt the picnic tables by replacing boards where needed that are in the back of the shop. They solicited bids for portable satellites to use this summer in the parks. Rich cleaned grease off the floats at the Veronica lift station. Infratech put patches in the sanitary sewer main at William Court to cover a broken joint and at Mears and Delaware to cover a crack and broken pipe. The Street Crew mixed sand and salt. They replaced a missing cross walk sign at Maple Park Drive going on to the pedway at Ivy Park. They filled potholes with cold mix. Snow Events of the Week Date: Response: Amount 2-27-05 Scrape main lines and sand 1" Engineering Engineering sent out letters and notices to residents regarding this summer's street projects. Please see the attached letters and notice. Code Enforcement A new single family permit was issued for 1161 Dodd Road to Meisinger-Long Development. The estimated square footage is 150,000. March 2, 2005 RE: Public Hearing and Informational Meeting Notices 2005 Street Rehabilitation Projects — Ivy Hill Drive/Maple Park Drive (City Project #200506), and Ridgewood Drive (City Pr6 ect #200508) Dear Property Owner: An Informational Meeting regarding proposed street improvements to Ivy Hill Drive, Maple Park Drive and Ridgewood Lane is scheduled for Monday, March 28, 2005 at 6:00 P.M. at City Hall, 1101 Victoria Curve. The agenda will include discussion of proposed street improvements, estimated construction cost and estimated assessment amounts. Representatives from the City of Mendota Heights Engineering Department will be available to answer your questions at this meeting. This Informational Meeting is intended to provide a better understanding of the potential improvements in an informal setting. Please note that this is not a Public Hearing. A Public Hearing for the subject projects is scheduled to be held on Tuesday, April 5, 2005 at 7:30 P.M. in the City Council Chambers at 1101 Victoria Curve. Enclosed is the Notice of Public Hearing that will be published in the Southwest Review. Your property abuts the potential improvements and is proposed to be assessed. The feasibility report for the project was accepted by the City Council on March 1, 2005. All persons desiring to be heard with reference to the proposed improvements will be heard at this meeting. Written or oral comments will be considered. Please note that this hearing is not the Assessment Hearing. This meeting is to consider the improvement project. If the City Council orders the improvements, a separate assessment hearing will be held after the bids are received. All pertinent assessment information will be mailed to each affected property owner prior to the assessment hearing. If you have questions concerning the project, please call me at (651) 452-1850. Sincerely, Sue McDermott, P.E. City Engineer CITY OF MENDOTA HEIGHTS Cc: Jim Danielson, City Manager \\Server\shared\Engineering\2005 Projects\05-01Vetterpubhearingrehab.DOC March 2, 2005 RE: Public Hearing and Informational Meeting Notices 2005 Street Reconstruction Projects — Dodge Lane (City Project #200214), Sunset Lane (City Project 4200212), and Ivy Falls Avenue (City Project #200210) Dear Property Owner: An Informational Meeting regarding proposed street improvements to Dodge Lane, Sunset Lane, and Ivy Falls Avenue is scheduled for Monday, March 28, 2005 at 7:00 P.M. at City Hall, 1101 Victoria Curve. The agenda will include discussion of proposed street and storm sewer improvements, estimated construction cost and estimated assessment amounts. Representatives from the City of Mendota Heights Engineering Department will be available to answer your questions at this meeting. This Informational Meeting is intended to provide a better understanding of the potential improvements in an informal setting. Please note that this is not a Public Hearing. A Public Hearing for the subject projects is scheduled to be held on Tuesday, April 5, 2005 at 7:30 P.M. in the City Council Chambers at 1101 Victoria Curve. Enclosed is the Notice of Public Hearing that will be published in the Southwest Review. Your property abuts the potential improvements and is proposed to be assessed. The feasibility report for the project was accepted by the City Council on March 1, 2005. All persons desiring to be heard with reference to the proposed improvements will be heard at this meeting. Written or oral comments will be considered. Please note that this hearing is nat the Assessment Hearing. This meeting is to consider the improvement project. If the City Council orders the improvements, a separate assessment hearing will be held after the bids are received. All pertinent assessment information will be mailed to each affected property owner prior to the assessment hearing. If you have questions concerning the project, please call me at (651) 452-1850. Sincerely, Sue McDermott, P.E. City Engineer CITY OF MENDOTA HEIGHTS Cc: Jim Danielson, City Manager \\Ser er\shned\Engineering\2005 Projects\05-01Vetterpubheuingrecon.DOC CITY OF MENDOTA HEIGHTS DAKOTA COUNTY, MINNESOTA NOTICE OF HEARING ON PROPOSED STREET IMPROVEMENT PROJECTS INCLUDING GRADING, STORM SEWER, AGGREGATE BASE, CONCRETE CURB AND GUTTER, BITUMINOUS SURFACING, AND APPURTENANT WORK TO WHOM IT MAY CONCERN: WHEREAS, the City Council of the City of Mendota Heights, Dakota County, Minnesota deems it necessary and desirable to consider construction of the street improvements hereinafter described. NOW THEREFORE, notice is hereby given that the City Council of the City of Mendota Heights will hold a public hearing on said improvements at the following time and place with the said City: Date and Time: Tuesday, April 5, 2005 7:30 o'clock P.M. or soon as possible thereafter Location: Mendota Heights City Hall 1101 Victoria Curve Mendota Heights, MN 55118 The general nature of the improvement is: Reconstruction of Sunset Lane, Ivy Falls Avenue and Dodge Lane, including grading, storm sewer, aggregate base, concrete curb and gutter, bituminous surfacing, and appurtenant work. Rehabilitation of Ivy Hill Drive, Maple Park Drive and Ridgewood Drive, including milling, bituminous overlay, and appurtenant work. The area proposed to be assessed is every lot, piece, and parcel benefiting from said improvement, whether abutting or not, based on benefits received without regard to cash valuation within the following described areas: Portions of the southeast quarter of Section 13, Township 28, Range 23, Dakota County, Minnesota. Portions of the southeast quarter of Section 24, Township 28, and Range 23, Dakota County, Minnesota. Portions of the southeast quarter of Section 25, Township 28, Range 23, Dakota County, Minnesota. \\Server\shned\Engineering\2005 Projects\05-01\Pubhe=oticeD0C Specific property descriptions are included in the above described area, but not inclusive, are as follows: Property abutting including: Delaware Hills Glen Toro Bauers Acre Lots Olricksen Addition Breckenridge Estates Grappendorf lst Addition Ivy Keep Ivy Keep 11 Clapp-Thomssen Ivy Hill Addition Clapp-Thomssen Ivy Hill 2❑d Addition Kirchner Addition The Council proposes to proceed under and pursuant to the authority granted by Minnesota State Statutes Chapter 429. The total estimated cost of improvements is $848,400. A reasonable estimate of the impact of the assessment will be available at the hearing. All persons desiring to be heard with reference to the proposed improvements will be heard at this meeting. Written or oral comments will be considered. Dated: March 1, 2005 BY ORDER OF THE CITY COUNCIL Kathleen M. Swanson City Clerk City of Mendota Heights Published in the Southwest Review, March 13, 2005 and March 20, 2005. Mer edshuedEngineering\2005 Projects%05-01iPubhe=otice.D0C NEWS LETTER Public Works Engineering Code Enforcement Public Works The Pipeline February 24, 2005 With Sunday's snowfall the Parks Crew plowed the cul-de-sacs and all the pedways. They cleaned out the warming houses after the rink attendants picked up their things. They worked on making pitching rubbers for softball leagues at Mendakota Park. The Street Crew cleaned off bridge decks and worked on cleaning up after Sunday's snowfall. They mixed salt and sand. They changed the cutting edge on the tractor's front bucket. They also changed the cutting edges and replaced the broken membrane on plow #312. Snow Events of the Week: Date: Amount: Response: 2-20-05 4" Plow all streets Rich, Tom and Sue met with Lloyds BBQ at their plant, about the discharge of grease into our sanitary sewer lines. Lloyds acknowledged that their grease collection system was outdated and they are in the process of updating it. Lloyds agreed to pay for the next cleaning of the sanitary sewer line and lift station which is what the City was hoping for. Engineering Sue and Ryan met with Arnt Construction, Northdale Construction, Xcel Energy and St. Paul Water to discuss the schedule for the completion of the Somerset Area improvement project. Xcel plans to start gas main replacement at the beginning of April. Northdale will start storm sewer construction in mid -April. LETTER , The Pipeline Public Works Engineering Code Enforcement February 17, 2005 Public Works Snow Events of the Week Date: Event: Resoonse: 2-14-05 3" plow all streets Public Works was called in at 1:30 A.M. on Monday morning to plow the streets after 3 inches of snow fell. The Street Crew did mailbox repairs and used cold mix to repair potholes. The Parks Crew closed the skating and hockey rinks this week. They picked up the hoses/fittings and turned off the furnaces in the warming houses. Rich flushed the sewers on Hilltop Court and Cullen Lane. He met with the League of Minnesota Cities about a sewer back up at 1013 William Court. He unplugged a culvert on Orchard Place and Kendon Lane. Engineering Sue attended a presentation of MnDOT's Metro District Transportation System Plan (TSP). The TSP is performance based with an approach focused on outcomes. Investments needed to meet the TSP performance goals are $27 billion. Forecasted available funding is $6.4 billion. The number one priority outlined in the TSP is preservation of the existing highway system followed by improvements to high crash intersections and previously identified expansion projects one of which is adding a lane on 35E between TH 110 and the river. The draft TSP will be distributed for comment in March. Jim and Sue met with MnDOT staff to discuss the release of several streets located in MnDOT right-of-way. MnDOT will work on releasing the following: TH 110 frontage road between Dodd and Delaware, Waters Drive, Victoria Road between Lexington and Stratford, Dakota Drive, Carmen Lane and Valencour Circle. MnDOT staff will also research Center Pointe Curve and LeMay Lake Road to determine if the streets are also in MnDOT right-of-way. The City has been maintaining all of these streets. Sue and Ryan attended a preconstruction meeting for site grading at Waters Drive Office Park. L E T T'E R The Pipeline Public Works Enaineering a � a � ` Code Enforcement February 11, 2005 Public Works The Parks Crew broomed, blew off snow and flooded the hockey and general rinks. They picked up trash from the parks and checked the aerator daily. They also serviced their equipment and the Cushman. Snow Events of the Week As the snow starts to melt, trash appears and the Street Crew picked Date: Event: Response: up trash in various areas of the City. On Wednesday, Dave met with Blue 2-9-05 dusting sand streets Chip Tree Service and a resident at Trail Road and Marie Avenue about the sight distance to the east of Trail Road on Marie Avenue. The resident agreed to trim and shape the tree which will begin next Tuesday morning. John Ambrose and Mike are still making rear window guards and installing them in the police squad cars. The Street Crew also brought barricades and posted temporary "no parking" signs on Windy Ridge for the Parade of Homes. Rich was called in last Friday night for a power outage at the Center Pointe lift station. He was called in again on Sunday morning for a sewer backup at 1013 William Court. With Tim Oster's help they cleared the blockage. On Monday, Rich and John Boland cleaned the line further, televised it and found there was a lot of debris to clean without a vacuum truck. On Thursday, Pipe Services came and cleaned and televised the line. They vacuumed out 21/2 yards of gravel, rocks and broken sewer pipe. They then televised the line again which showed at one time the sewer main had been broken and repaired with someone leaving the broken pieces of pipe, rock and gravel which caused the blockage. Braun Pump put the rebuilt pumps back in at the Centre Pointe lift station. Enoineerino On Wednesday crews from St. Paul Regional Water Services repaired a watermain break on Sylvandale Ct. Water was initially surfacing through a valve box at the intersection of Sylvandale Rd. and Sylvandale Ct. in the morning. It took St. Paul Regional Water crews until 5:00 p.m. to pinpoint the exact location of the leak which ended up being about 250 feet away from where the water was surfacing. Their crews used amplified listening devices in an attempt to find the rough location of the leak. Once they were in the general area of the leak, 5 holes were drilled over the watermain roughly three feet apart and metal rods were inserted into the holes. Again their crews utilized listening devices and felt confident they had pinpointed the leak. They then removed the saturated soils from the area and repaired the leak. The trench was backfilled with dry sand and a temporary bituminous patch was installed. Sue attended the Dakota County Plat Commission meeting on Monday. The concept plan for the Ecolab site was discussed. County staff requested that the access point on Wachtler be shifted to the north and will also request additional right of way along Wachtler. LETTER / The Pipeline Public Works Engineering January 27, 2005 Code Enforcement Public Works The Parks Crew broomed, blew off snow, and flooded the hockey and general rinks. They plowed cul-de-sacs, parking lots and pedways. They attended Government/Commercial day at Scharber and Sons in Rogers MN. Scharber and Sons held a seminar on vehicle safety, traveler safety and regulations - there were secure load rule changes. Rich and Tom Olund attended the annual Minnesota Pollution Control Agency refresher course for sanitary sewer operators. They need to attend this school in order to keep their license current. The Street Crew removed the plow, wing and post on truck #304 to bring it to Interstate Diesel. There was a problem with a bad seal in the transmission. After the truck was fixed they remounted all the plow equipment. They repaired mailboxes that were damaged when they plowed Friday/Saturday and responded to snow plow complaints. Snow Events of the Week: —_ Date: Event: Response: � January 21/22 7" of snow scrape main lines plow all areas starting 10:00 PM Friday Engineering On Sunday, January 23`d at 6:00 A.M. there was a watermain break on Lilac Lane and it was repaired and patched by St. Paul Regional Water Services. There was also a watermain break on Delaware Avenue east of Sibley High School on Monday morning, January 24th on the West St. Paul side. MnDOT has issued their 2005 Municipal Street Apportionment Data. In 2005, Mendota Heights will receive $260,479 for construction and $86,827 for maintenance for a total of $347,306 down. This is approximately $5,000 less than our 2004 allocation. NEWS LETTER Public Works Engineering Code Enforcement Public Works LLLqu -LJJIi January 20, 2005 Rich checked all seven sanitary sewer lift stations daily. He changed the condensation heater at the Centre Point lift station. He also worked on deicing the culvert under the trail between Fourth Avenue and Wentworth Park. The Parks Crew flooded and blew snow off the rinks. They worked on cleaning off the pedways. They continued to build mallard houses. They had to repair a bench in the warming house at Wentworth Park. The Street Crew installed two new crime watch signs in the Mendakota neighborhood at the Police Department's request. They relamped the burned out northbound left turn lane red light at Dodd Road and Mendota Heights Road. John Ambrose and Mike Maczko worked on fabricating window guards for the police squad cars. They cleaned off sidewalks and bridge decks of any remaining snow. They started preparing for this Friday's snow storm. Will we get the snow as predicted or is this just more snow hype?? Snow Events of the Week: Date: * Event: Response: 1-20-05 Dusting Sand streets Engineering Ryan met with the staff at Dodge Nature Center to discuss potential storm water ponding with the proposed Dodge Lane Construction. Jim, Tom Knuth, and Sue met with representatives from Bonestroo and American Engineering Testing to go over final details of the slope remediation project. LETTER ' The Pimpeline Public Works Enqineerinq Code Enforcement January 13, 2005 Public Works The Parks Crew flooded, swept and blew the snow off the skating rinks. Kids pulled the clamp off the hose on the aerator which caused it to freeze up. They thawed out the hose and hooked it back up. They also plowed parking lots to the rinks and all the pedways. They are starting to build mallard duck houses. Residents in attendance at the January Parks and Recreation Commission meeting requested that the skating rink lights at Marie Park remain on until 10:00 P.M. on Friday and Saturday evenings. Currently, rink attendants are on duty at Marie and Friendly Hills Parks until 8:30 P.M. and at Wentworth Park until 10:00 P.M. The Parks Commission voted 7-0 to approve extending the rink closing time from 8:30 to 10:00 P.M. at Marie Park on Friday and Saturday evenings. Rink hours at the other two parks will not be changed at this time. Rich painted the four floors in the Mendota Heights Road Lift Station this week. The paint helps brighten up the inside of the drywell. He plowed and sanded the north end streets on Tuesday and Wednesday. The Street Crew mixed salt and sand and ordered more. They repaired a hydraulic leak on truck #303. Snow Events of the Week: Date: Event: Response: Thursday, January 6, 2005 Dusting sand streets Tuesday, January 11, 2005 sleet/snow plow and sand Wednesday, January 12, 2005 sleet/snow plow and sand The cold weather has hit hard at Public Works. On Wednesday, Xcel Energy notified Public works that they should turn off the natural gas valve on the "interruptible service" account to the furnace in the garage area and switch the furnace over to use propane gas from the outside storage tank owned by the City. This situation occurs several times each year when temperatures drop and last for several days. Usually this is not a problem, but this time the 26-year-old furnace did not respond. Efforts to heat the fuel lines and controls with torches, up on the exposed roof were unsuccessful. A repair technician is due out Friday to try to fix the furnace (similar problems have plagued the unit for many years). Until then the thermostats on roof -top furnaces in other parts of the facility, which are supplied on a "firm gas" account basis are not required to be curtailed and have been set to "high" and a door is left open to help warm the garage area. Last summer, an Energy Assessment of the Public Works facility was conducted and replacement of this aging furnace was recommended with a projected "pay- back" in yearly energy savings of the cost of the replacement furnace in 6.3 years. Council provided funding in the 2005 budget for this expense which may be coming sooner rather than latter. Four contractors will evaluate heating and ventilation needs early next week and submit bids proposals to Engineering staff. Engineering There was a watermain break at Dodd Road and Smith Avenue on Monday. It was discovered because the water traveled through the telephone conduit and was overflowing at manholes on First Avenue and Dodd, and Sunset and Dodd. The precast concrete decking is being installed at the condominiums at Town Center. Removal of mature Buckthorn plants from Friendly Hills Park, North Kensington Park and remaining areas around the Copperfield ponds has been completed in less time than anticipated. Council approved purchase orders to Prairie Restorations in the amount of $9,725 for this work on a "time -and -materials" basis. Invoices submitted for the completed work are 26% or $2,560 under budget. Continuing management efforts involving over spraying of areas previously cut will take place this September or October. Code Enforcement A building permit was issued to P.F. Construction for a building shell at 2520 Lexington Avenue. Estimated cost for the future office building is $525,000.00. The first new single family dwelling permit for the year was issued to Thermal Boundary East Corporation for a one-story building with an attached garage. The builder's estimated cost is $200,000.00. NEWS LETTER The Pipeline Public Works Engineering January 6, 2005 Code Enforcement Public Works The skating rinks were closed for awhile because of rain and the Parks Crew repaired the ice damage at all the rinks. Tom Olund and the Parks Crew attended the annual Minnesota Green Expo at the Minneapolis Convention Center where companies display and promote supplies and equipment for parks and grounds improvements and maintenance. Rich televised the storm sewer in the backyard at 1780 Dodd Road. He repaired the p-trap on the sink in the men's bathroom at the sloop. With the dusting of snow on Thursday, Rich swept the skating rinks. The Street Crew reinstalled the street name signs that were down at Ocala Lane, Ocala Court, Mendota Heights Road and LeMay Lake Road. The sander quit working on truck #308 because of a bad pulse relay in the control box and had to be replaced. Snow Events of the Week: Date: Event: Response: 1-1-05 Ice sand streets 1-2-05 Light snow and ice scrape main lines and sand Buckthorn Removal The work of removing buckthorn plants from the Copperfield pond area (east of Huber Drive), south Kensington Park (south of Mendota Heights Road) and Friendly Hills Park was completed this week by crews from Prairie Restorations. Follow up spraying to eradicate new seedlings and small saplings will be done in September and October. Removal operations in Friendly Hills Park included on - site burning of plant debris while the cut and slash method was used in Kensington Park and around the Copperfield ponds. Attached is a notice sent to residents living next to Friendly Hills Park. LT,, -', e T" 4Z�L. J .I N 13 -' k` (T —FJt o s 11 9 L"v e l-r 4 c k- 14 a v Sk1 v' la k, pay -`werf 4 ,j 0LJ 09 4 T I k-,.0 -T4 Y ITT /hPLs b,., tx-v-C,4e l�T <OL.,� i. yss 6ev CggA� of -f�i2uAJ Awifty ll,'Axej—' ry I�ut'Ttu.sk s�o,ris F cof "—ia2 CvrS.tGy, , OC3o Arrk 0£q i � � � "(•�Ca o k tuF jS9-1 � �+. ^vi=rStT-��,.%��7 ✓�-�.a �../ U4T.•[D� f. U+ iTN KL 7 ¢ Nov T /� c• Q L[ C � ,j � �13 C rl � k1�OAC4 up , Kws P.,LL. Ip ST��7 Ilk OrN� MALLAh� NCus., �4 NEWS LETTER Public Works Engineering Code Enforcement Public Works The Pipeline January 6, 2005 The skating rinks were closed for awhile because of rain and the Parks Crew repaired the ice damage at all the rinks. Tom Olund and the Parks Crew attended the annual Minnesota Green Expo at the Minneapolis Convention Center where companies display and promote supplies and equipment for parks and grounds improvements and maintenance. Rich televised the storm sewer in the backyard at 1780 Dodd Road. He repaired the p-trap on the sink in the men's bathroom at the sloop. With the dusting of snow on Thursday, Rich swept the skating rinks. The Street Crew reinstalled the street name signs that were down at Ocala Lane, Ocala Court, Mendota Heights Road and LeMay Lake Road. The sander quit working on truck #308 because of a bad pulse relay in the control box and had to be replaced. Snow Events of the Week: Date: Event: Response: 1-1-05 Ice sand streets 1-2-05 Light snow and ice scrape main lines and sand Buckthorn Removal The work of removing buckthorn plants from the Copperfield pond area (east of Huber Drive), south Kensington Park (south of Mendota Heights Road) and Friendly Hills Park was completed this week by crews from Prairie Restorations. Follow up spraying to eradicate new seedlings and small saplings will be done in September and October. Removal operations in Friendly Hills Park included on - site burning of plant debris while the cut and slash method was used in Kensington Park and around the Copperfield ponds. Attached is a notice sent to residents living next to Friendly Hills Park. RESIDENTS RECEIVING THIS NOTICE ARE SHOWN SHADED '7 17 0 iI Friendly Hills Park 7 S: Dimensions rounded to nearest foot Lupyright 2004, Dakota County - This roaming is neither a legally recorded map nor a survey and is not intended to be used as one. This drawing Is a compilation of records, information and data located in various city, county, and state offices and other sources, affecting the area she", and is to be used for reference purpose. only. Dakota County is not responsible for any inaccuracies herein contained. If discrepancies are found, please contact Dakota County Survey and Land Information Department. I ca?l 2348 2356 2360 LU < 2366 CL .:r 2374 Map Date; December 13,2W Parcels Updated: 41112004 Aerial Photography: