2003NEWS Public Works Engineering Code Enforcement LETTER Park Report The Parks Crew picked up trash daily in the parks. They also completed the following other tasks this week: • They picked up trash from the warming houses and checked them • They flooded the rinks • They repaired the shovels at the Friendly Hills ice rink by installing new handles • They plowed the pedways • They cleared snow from the ice rinks with the snow blower • They placed cell phones in the warming houses for the rink attendants • They plowed out the shop parking lot and shoveled the sidewalk to the shop Utility Report Rich checked the City's seven sanitary sewer lift stations daily. He placed fill in and around manholes on Lakeview Avenue and Furlong Avenue with class 5 gravel that were hit by the plow. This will be permanently fixed in the spring. Rich also plowed the lift station driveways and put a new vent on the lift station at Northland Drive. The old one was hit by a car sliding off the road. The Pipeline December 19, 2003 Street Report The Street Department accom- plished the following tasks this week: • Mixed salt and sand • Filled salt storage bin • Did some mailbox repairs from the plows hitting the mailboxes • Made up and installed street name signs at Douglas Road, James Road, Mendota Heights Road and Lexington Avenue • Removed plow and dumped sand out of truck #304 to take to Kramer spring to fix a broken right rear spring TV cables from their overhead power lines on the east side of Oak Street at Market Street to connections within the newly installed buried cable lines at that location. Somerset Area Street Re- construction Warmer weather towards the end of the week afforded the Engineering Department a chance to gather some more survey data in the Somerset neighborhood. The Engineering Department has completed roughly 80% of the field survey work in spite of being ham- pered by the cold and snowy weather that we have been get- ting recently. Snow Events of the Week Date: Event: Response: 12-16-03 1" Scrape streets —all areas 12-18-03 1" Scrape streets —all areas Town Center Proiect Xcel Energy and Comcast con- tinues to make progress on the task of installing the new buried power lines in the Town Center development. Construction crews of Xcel Energy and Com- cast concentrated on routing the respective existing over- head electric power and cable NEWS Public Works Engineering Code Enforcement LETTER Park Report The Parks Crew picked up trash daily in the parks. They also completed the fol- lowing tasks this week: • Checked out the warming house furnaces • Checked on the shovels at the warming houses • Replaced the cutting edge on plow #503 • Washed and waxed the trucks Utility Report Rich checked the City's seven sanitary sewer lift stations daily. He also did a sanitary sewer repair inspection on Apache where the tree roots had broken the line at the joint. The lift station at Lilydale was cleaned by pipe services. Electro Watchman repaired alarm systems at the main lift. Street Department The Street Crew accom- plished the following tasks this week: • Replaced burnt out bulbs in traffic signal heads at Mendota Heights Road and 55 on the northwest corner and center me- dian. The Pipeline • They had to call MnDOT electrical Services for the "Do Not Walk" center me- dian which will not light • Pushed and cleaned up the dump site • Mixed up salt and sand • Cleaned bridge decks and sidewalks • Replaced some old Crime Watch signs • Got saws and equipment ready for trimming trees Wagon Wheel Trail Culvert Crossing Park Construction Company cut an opening in the floating silt curtain in the open water area of Rogers Lake on each side of the culvert. This per- mits the fish a passage way to travel between the north and south portions of the lake. NPDES Phase II Permit The Engineering Department placed a notifica- tion in the Decem- ber 7, 2003 edi- tion of the South- West Review to notify the public of the January 6th, 2004 presen- tation at the City Council meeting to comply with the provisions of December 4, 2003 the Minnesota Pollution Con- trol Agency Permit for Storm Water Discharges under the Federal Clean Water Act. This presentation will provide an overview of the six minimum required control measures and a status report on the measurable goals identified in the Mendota Heights Storm Water Pollution Prevention Program (SWPPP). Town Center The manufactured temporary bank building was delivered to the Town Center project. The utility companies continue with the installation of power and other utility services to the site. Temporary Gateway Bank building at Town Center NEWS Public Works Engineering Code Enforcement LETTER Park Report The Parks Crew picked up trash daily in the parks. They completed the follow- ing other tasks this week: • Set up the aerator at Rogers Lake for the win- ter Finished fertilizing throughout parks Prepped and leveled the general ice skating rink for flooding at Friendly Hills Park Plowed the cul-de-sacs, pedways and parking lots Street Report The Street Crew fabricated warning signs for the back of the dump truck warning "Stay back 75 feet". The Crews started plowing at 2:00 A.M. on Monday and had one breakdown on truck #308 where the - D - November 26, 2003 Snow Events of Week: Date: Amount: Response: 11-23-03 slush/snow sanded and scraped all main lines sanded rest of streets 11-24-03 4" plowed snow in all areas 11-25-03 scrape streets and sand as needed mounting bolt was sheared off the front plow. The re- pair was made and truck #308 went back out. Utility Report Rich checked the City's seven sanitary sewer lift sta- tions daily. He plowed and sanded the north end streets (his normal route). Then he plowed all his lift station driveways and parking lots when he was done. There was a power outage at the Mendota Heights Road liftstation #1 Thursday eve- ning. John Boland re- sponded to the power out- age call. The emergency generator did not start. An electrician from Total Con- struction was able to get the system up and running after checking out the wiring and transfer switch. Rich jointly inspected the sanitary sewers with Impe- rial Developers throughout the Hidden Creek develop- ment. Wagon Wheel Trail Cul- vert Crossing Park Construction Company is approaching substantial completion on the Wagon Wheel Trail Culvert Crossing Project. Park Construction has installed the 45" x 73" concrete arch culvert (60" equivalent round pipe). They were in the process of backfilling and compacting the roadway section with Class 5 aggregate on Wednesday. It won't be long and the roadway will be open for through traffic on a temporary cold mix asphalt driving surface. NEWS Public Works Engineering Code Enforcement LETTER Park Report The Parks Crew picked up trash daily in the parks. They also completed the following other tasks this week: • Checked over the warming houses and got them ready for winter • Painted the warming houses where needed • Locked up the gates to all tennis courts • Fertilized the parks • Repaired hockey boards at Friendly Hills, Wentworth and Marie Avenue Parks Utility Report Rich checked the City's seven sanitary sewer lift stations daily. He also put up hydrants flags at Town Center and Free- way Road area. He jetted Lloyds Meats to the Mendota Heights Road lift sta- tion due to the buildup of heavy grease from Lloyds. He also, jetted South Freeway Road (tree roots). Street Department The Street Crew accomplished the following tasks this weeks: • Finished installing street name signs at Town Center and Freeway Road addition The Pipeline November 20, 2003 • Graded Dodge Lane, the al- ley on Hiawatha Avenue and added class 5 to the cul-de- sac at the end of Pilot Knob Road and leveled it off • Pulled out asphalt hot box on truck #312 and mounted snow removal equipment on the truck • Put in snow plowing mark- ers posts for Town Center Code Enforcement Report Paul issued a building permit this week to Rongitch Construc- tion for 2180 Lexington Avenue to demolish the house and foundation in Nater Estates. Rogers Lake This week Park Construction, the Wagon Wheel Trail/Rogers Lake project contractor, com- pleted the piling and poured the concrete pile cap. Somerset Neighborhood Marc Mogan, Tom Knuth, and John Tran have been out in the Somerset neighborhood locat- ing property irons, control points and other existing sur- vey data for the street project for 2004. Marc and Rich video taped the existing streets, driveways and landscaping features on Wednesday of this week. Engineerinq Conference On Thursday and Friday Marc and Jim attended a conference in Brooklyn Center to earn con- tinuing education credits to maintain their engineering li- censes. Weather forecasters are predicting our first measurable amount of snow for this weekend. Last year we did our first sanding of streets on December 2, 2002, after a dusting of snow. In 2001, we plowed a 3 inch snowfall on November 27th. NEWS Public Works Engineering Code Enforcement LETTER Park Report The Parks Crew picked up trash daily in the parks. They performed service maintenance on the small engines. They have begun gearing up for winter work by attaching plows to their trucks for winter snow plow- ing (they do the cul-de-sacs, trails and parking lots). Utility Report Rich checked the City's seven sanitary sewer lift stations daily. Street Report The Street Crew disposed of ashes and debris remaining from the Halloween bonfire at the Mendota Plaza. They brought seasonal equipment to the water tower for winter storage. A 3M service representative has been out to the shop, and gave the guys some ideas and tips in the use of their sign making equipment and their sign making proce- dures. The photo shown is an example of the sign style at the right and lettering that will be installed in the Town Center development. Town Center Xcel finished installing under ground electric cable and con- duit for MCI and Comcast ca- ble in a joint trench along Market Street and Oak Street. The next steps are splicing ca- bles and conduits, placing a few new poles, and removing existing poles. This work is to be done by different crews for each utility. Burow Pond Garzke Construction finished the fine grading operations and the restoration of the dis- turbed areas with seed and mulch. The Burow Pond City improvement project is now finished with the completion of this work. Nater Estates The developer's utility tractor, Minger Con- struction, installed an extension of the City's sanitary sewer main to the lot line between lots two and three and set a new manhole there with services for each lot. They then patched Cullen with blacktop. Town Center Street Signs con - November 6, 2003 Code Enforcement Report Code Enforcement has issued a footing and foundation per- mit to Carlson Levine, Inc. for a building expansion at Lloyd's Barbeque at 1455 Mendota Heights Road, Somerset Neighborhood The Engineering Department has been out in the Somerset neighborhood gathering pre- liminary survey data that is being used in the preparation of the feasibility report for this project. Rogers Lake The Rogers Lake cross culvert project started at the end of this week and consequently the Engineering Department is now involved with the inspec- tion and coordination on this project. NEWS Public Works Engineering The Pipeline Code Enforcement LETTER October 30, 2003 Park Report The Parks Crew picked up trash daily in the parks. They also completed the following other tasks this week: • They mulched leaves in parks • They cleaned up some black paint that was sprayed on doors and con- crete surfaces at Kensing- ton Park by vandals • They removed a large wasp nest from Mendakota Park • They prepared the area at Rogers Lake to move in the lake aerator • They removed the volley- ball and tennis court nets and stored them for the winter • They winterized and stored all summer equipment Utility Report Rich checked the City's seven sanitary sewer lift stations daily. He worked with Braun Pump to replace the trans- ducer at the Centre Pointe lift station this week (used for level control). He inspected the sanitary and storm sewers with RKI at Town Center this week for final acceptance — they had to clean some dirty manholes. He flushed and jetted some of the Freeway Road neighbor- hood sanitary sewers where he knows that the roots are a problem. Street Report The Street Crew preformed the following tasks this week: • They monitored and main- tained the Halloween brush pile • They repaired a broken storm sewer pipe located in a resident's yard at the end of Valley Curve • They patched the Wood- ridge Drive cul-de-sac and some potholes on Sylvan - dale Road and Maple Park Drive • They replaced some stolen street name signs • They worked with MnDOT to remove a street light at TH13 and Mendota Heights Road that is no longer needed because MnDOT in- stalled a new one with their new traffic signal light Code Enforcement Report RJ Ryan Construction has re- quested a final inspection for the St. Thomas Ice Arena. Dick says that they can use the ice but not the stands until they make some changes. Town Center Xcel Energy is working on bury- ing the overhead transmission lines that run along TH110 in front of Town Center. They are also burying the Com Cast and MCI cables that are co -located on their poles. The Xcel work- ers discovered that they do not have a permit from MnDOT to cross under Dodd Road (TH149) and completion of the project will be delayed until that permit can be obtained. Burow Pond Ace Blacktop repaved the bitu- minous trail located along Vic- toria Road this week. Sommerset Street Recon- struction Engineering continued to do surveying in this neighborhood for completing the feasibility re- port analyzing the possibility for repaving their streets next summer. Happy Halloween NEWS Public Works Engineering Code Enforcement LETTER Park Report The Parks Crew picked up trash daily in the parks, cut grass, and ground up leaves. They also completed the fol- lowing other tasks this week: They trimmed trees in Wentworth Park and on the pedway con- necting the park to Fourth Avenue. They also cleaned the cul- verts along this same pedway They removed the soccer nets and goals from the parks They attended the MSTMA conference to learn about - pavement mainte- nance, drainage and saw equipment demos Street Report The Street Crew accom- plished the following tasks this week: They made up and re- placed some stolen/ missing street name signs They put up the tem- porary fence at Men- dota Plaza for the Hal- loween Bonfire They worked on in- stalling the new street name signs for the Freeway Road and Town Center project Utility Report Rich checked the City's seven sanitary sewer lift stations daily. He worked with a homeowner on Cheyenne Lane to raise their water shut off box to match the grade of their new concrete drive- way. He flushed the sanitary sewer main on Winston Court (a known trouble spot). He is working with the new homeowner at 1065 Douglas Road to solve a sanitary sewer problem. Ah Ah October 16, 2003 Town Center The contractor brought in and spread topsoil for use in sodding around the Animal Hospital. Freeway Road Bituminous Roadways paved the last driveway in the Freeway Road area this week (Ken Peterson). Burow Farm Gartzke Construction fin- ished the site grading this week and the easement areas are ready for seed- ing. Sommerset Engineering began the surveying in the Som- merset neighborhood for use in completing a feasi- bility study. TH13 Traffic Signals The new MnDOT traffic signals located at TH13 and Mendota Heights Road are now completed and are operational. NEWS Public Works Engineering The Pipeline Code Enforcement LETTER October 9, 2003 Park Report The Parks Crew picked up trash daily in the parks, striped fields, dragged ballfields and cut grass. The parks crew also completed the following other tasks this week: • They winterized the lawn sprinkler systems at City Hall, Mendakota and Ken- sington Parks, the Fire Sta- tion and the old fire station sites • They repaired sprinkler heads on the same systems • They removed a tree from Wentworth Park • They attended a Toro work- shop to preview their new equipment Utility Report Rich checked the City's seven sanitary sewer lift stations daily. He was called in late Friday for a power -out alarm at the Culligan lift station. He found the roto phase making strange noises — the roto phase converts two phase power to three phase to run the pumps. He called in To- tal Electric to fix the problem, but they were unable to get the parts needed until Monday, so John Ambrose and Rich had to come back two times a day each to pump the station down using the portable generator. Total fixed the problem Monday morn- ing. He was called in Sunday at 10:30 A.M. for the Mendota Heights Road lift station. He found that Xcel Energy's trans- former had burned out. Xcel re- placed the generator Sunday night. Street Report The Street Crew completed the following tasks this week: • They removed some land- scaping timber from Dr. Hinson's lot for the Town Center Project • They installed the street name signs at Hidden Creek, Keokuk Lane and Pagel Road, Warrior Drive and Highway 110, and at the Freeway Road project • They patched potholes in the north end and at Somerset areas Code Enforcement Report Paul issued a permit this week to Rongitsch Construction, Inc. to construct the first new home in his new three lot development (Nater Estates) located on Cullen Lane and Lexington Avenue. He issued a permit to Turner Exca- vating to demolish the shed and garage at Nater Estates to make way for this new home. He issued a permit to Hypertect, Inc. and R.J. Ryan Construction to finish the tenant space at 1180 Centre Pointe Curve to be occupied by Health Partners. Freeway Road The contractor lowered six sani- tary sewer manholes that had been installed too high. Town Center Marc reached an agreement with Dr. Hinson and adjusted the grades at the southeast and northeast corners of his lot where the Town Center project left steep grades. The contractor also did some other minor grad- ing throughout the site. Burow Pond Garzke finished the underground utility work (storm sewer and sanitary sewer) this week and they are now completing the grading operations. Augusta Shores We included installation of the fi- nal lift of bituminous at Augusta Shores within the Town Center contract. Bituminous Roadways installed that final 1-1/2" wearing course on Friday. Centre Pointe Ryan Construction completed the final modification to the Centre Pointe Boulevard this week which included moving a street light, installing sewer and water ser- vices, and replacing the curb and gutter. Wagon Wheel Trail The Minnesota Department of Transportation has notified the City that our plans to replace the cross -culvert in Roger's Lake have been approved and we are authorized to advance the status of this project. Bids will be opened on October 16th and pre- sented to Council for award on October 21st. NEWS Public Works Engineering Code Enforcement LETTER Park Report The Parks Crew picked up trash daily in the parks, striped fields, dragged ballfields and cut grass. They also completed the following other tasks this week: • Earl F. Anderson added some new play ele- ments for the play structure at Mendakota Park this week. They also enlarged the rub- berized resilient play area (for handicapped access) and they re- painted all the play equipment that needed it • Pine Bend Paving in- stalled the bituminous pathway to the new play equipment at Hag- strom King Park this week The Mendakota Park restrooms were vandal- ized this week, and the Parks Crew had to re- pair the damage — replaced the tank and top of two toilets • The Crew replaced the corner boards to the Friendly Hills Hockey The Pipeline rink and placed dirt around the boards to help hold in the water from flooding Utility Report Rich checked the City's seven sanitary sewer lift stations daily. He and John Ambrose planted some bushes that had to be re- moved from the front yard of a home on Knob Road from curb and gutter place- ment. He worked with a private contractor to remove a cast iron service lead that was projecting into the City 's sanitary sewer main on Ivy Hill Drive. Street Report The Street Crew accom- plished the following tasks this week: • They patched potholes on Wagon Wheel Trail • Worked on repairs to the street lights on Cen- tre Pointe Boulevard • Attended the annual Fall Maintenance Expo for: Snow plow training Chain saw safety October 3, 2003 training • Gopher State One Call updates • Snow and Ice- differ- ent material options to salt North Freeway Road RKI removed the curb and gutter at the Peterson resi- dence, 645 North Freeway Road, to improve the boulevard and driveway slopes. RKI also replaced Ms. Otto's, 1954 South Lane, boulevard topsoil with screened -pulverized topsoil. (She had com- plained to the City Council about bituminous and rocks being in her topsoil). Burow Pond Gartzke the grading con- tractor ran short of dirt on this project and hauled in borrow material Thursday and Friday. Hidden Creek North West Bituminous placed the final 1-1/2 inch wearing course lift of bitu- minous on all of the streets this week. All that remains to complete on this project is striping the right turn lane off Dodd Road. NEWS Public Works Engineering Code Enforcement LETTER Park Report The Parks Crew picked up trash daily in the parks, striped fields, dragged ball - fields and cut grass. They also completed the following other tasks: • They worked on repairing skinned areas at Menda- kota Park • They sodded one roll around infields at fields 2 and 3 at Mendakota Park • They repaired sprinkler heads and lines at Menda- kota that the paving con- tractor broke while resur- facing the trails • They installed a dog waste sign at Wentworth Park Street Report The Street Crew accomplished the following tasks this week: • They removed a broken tree limb at 2151 Theresa Street • They cleaned out a culvert on Wagon Wheel Trail and resodded the ditch • They cut down a tree so that the stump could be re- moved on South Frontage Road (blown down) The Pipeline • They worked on repairing the street lights on Centre Pointe (with Total Construc- tion) (Roseville Properties new building is under con- struction and they are mov- ing a light and redoing the end of the median to re- move a conflict with their entrance) Utility Report Rich checked the City's seven sanitary sewer lift stations daily. He worked on locating some buried manholes within an easement area (trees had been planted right over the line and next to the manholes). He also uncovered a manhole that had been buried on Dodd Road. Code Enforcement Report Paul issued a permit this week to Total Service Company for repair to the LeVigne residence, 1869 Eagle Ridge Drive Unit 1. The LeVignes had used too large of a wattage light bulb in a 60 watt rated fixture, which caused a fire. He also issued a permit to Mihm Custom Homes Inc to construct a new home at 614 Hidden Creek Trail. The home is a 12,142 square foot home valued at about $2 million. September 25, 2003 Freeway Road/Town Center The sod subcontractor prepared the boulevard areas for, and laid sod this week. They were asked repeatedly to bring in a water truck to water the sod, but they did not bring one until late in the week —we hope it was not too late, (but the sod is guaranteed, so if it dies they will have to replace it). This completes sodding and seeding for the Freeway Road area. RKI conducted the mandrel testing for the sanitary sewer lines —everything passed. They are finishing invert work on manhole and catch basins and installing manhole steps. The sign contractor installed the last of the street signs. The striping subcontractor is scheduled to complete the last of the street striping work this week. RKI's work is essentially com- plete and ready for final inspec- tions and preparation of a final punch list. Burow Pond The grading of this site is about complete and utility work is scheduled to begin sometime next week. Hidden Creek The contractor is preparing to place the final lift of bituminous on this project next Tuesday. NEWS Public Works Engineering The Pipeline Code Enforcement LETTER September 18, 2003 Park Report The Parks Crew picked up trash daily in the parks, striped fields, dragged ball - fields and cut grass. They also performed the following other tasks this week: • They seeded the new berms that were installed at the general skating ice rinks • They repaired sprinkler heads at City Hall and Men- dakota Park • They removed stump grindings from Friendly Hills Park, filled the holes with black dirt and seeded them • They trimmed up a tree in Valley Park near the tennis courts and chipped up the limbs • Pine Bend Paving com- pleted repairs to and patched the trails at five locations where tree roots had heaved and damaged the surface. They over- layed 1.2 miles of trails in and around Mendakota Park and installed a new 200 foot long trail segment at Hagstrom-King Park to provide access to the new play structure Utility Report Rich checked the City's seven sanitary sewer lift stations daily. He also raised a man- hole cover located on Dodd Road. He worked with Braun Pump to perform service checks of all the sanitary sewer lift sta- tions —they all checked out OK. He worked with Xcel Energy to provide power to the new St. Thomas Academy ice hockey arena (it affected the City's lift station). He and John Ambrose cleaned a culvert on Wagon Wheel Trail. Street Report The Street Crew performed the following tasks this week: • They removed broken tree limbs at 625 Third Avenue, Marie Avenue and Sutton Lane • They finished repairing storm water catch basins • They patched around the catch basins and potholes on Northland Drive • They removed some "No Parking" signs on TH110 Frontage Road • Started to replace Freeway Road street name signs Code Enforcement Report Paul issued a building permit this week to Schomaker Con- struction Company for a garage addition at 635 Sibley Memorial Highway within the Critical area, the CAD permit was ap- proved by the City Council at their September 16 meeting. He issued three sign permits to Suburban Lighting for them to install replacement signs at the Amoco Station, 2030 Dodd Road changing their name to "BP" (British Petroleum). He issued a permit to William St. Martin for a garage addition to their home at 1933 Crown Point Drive (a front yard set- back variance was approved by City Council on September 2nd). Finally, he issued a per- mit to Steve Landry, 2085 Valencour Circle to construct a detached garage (a CUP and a front yard set back variance were issued by City Council on July 15). Town Center The signing subcontractor in- stalled new signs for the TH110 exit ramp and moved several existing signs at MnDOT's re- quest. Freeway Road The sodding subcontractor laid 2,200 square yards of sod. They completed North Freeway Road, the north half of South Lane and started on South Freeway Road. TH13/Mendota Heights Road Traffic Signal MnDOT's new traffic signal lo- cated at TH13 and Mendota Heights Road is now installed, it is not yet energized though. NEWS Public Works Engineering Code Enforcement LETTER Park Report The Parks Crew picked up trash daily in the parks, striped fields, dragged ballfields and cut grass. The Parks Crew competed the following other tasks this week: They repaired the lawn sprinkler system at Mendakota Park They replaced light bulbs at Mendakota Park The worked with a con- tractor to grind tree stumps in parks this week —removed the grindings, installed black dirt and re- seeded They brought in fill for the general skating rinks at Wentworth and Marie Parks. They lev- eled the areas and seeded them Utility Report Rich checked the City's seven sanitary sewer lift stations daily. He seal coated his Northland Drive sanitary sewer lift station driveway and marked it for The Pipeline "No Parking". (It is located within the Brown College west parking lot). He worked with a contrac- tor to raise a sanitary sewer manhole cover that had been buried in Pilot Knob Road (replaced curb and patched street). He also performed inspec- tions for new sanitary sewer connections at 2050 and 2054 Acacia Drive. Street Report The Street Crew performed the following tasks this week: Made repairs to catch basins and then patched the street on Gryc Court and Emerson Avenue Patched potholes on Staples Avenue Patched street on Pilot Knob Road where Rich raised a manhole cover Performed maintenance on grader and on chip- per Removed broken tree limbs from boulevard at September 11, 2003 570 Hiawatha Avenue and 613 Winston Court Worked on making street signs for Town Center and Freeway Road neighborhood Code Enforcement Re- port Paul issued a permit this week to Golden Construc- tion to construct a new ad- dition and remodeling of the existing building lo- cated at 780 South Plaza Drive to house Greg Bol- ton's Northwest Martial Arts Facility (Boltz Tae Quan Do). He issued a permit to Kirchner Construction for Cliff Kirchner's garage addi- tion at 737 Cheyenne Lane (variance approved by City Council). Town Center Triple A Landscaping com- pleted most of the seeding for Town Center this week. Triple A Striping completed lane markings for Market Street the frontage road, Dodd Road turn lanes and the TH 110 exit ramp this week. NEWS Public Works Engineering Code Enforcement LETTER Park Report The Parks Crew picked up trash daily in the parks, striped fields, dragged ballfields and cut grass. The Parks Crew also com- pleted the following other tasks this week: They finished striping soccer fields They cut and removed a dead apple tree from Ivy Park, a dead ash tree from Victoria Highlands Park and six dead oak trees from Friendly Hills Park (we had previously treated these trees for oak wilt but, they died any- way). Picked up and installed replacement benches in the playground ar- eas at Friendly Hills and Valley Parks Utility Report Rich checked the City's seven sanitary sewer lift stations daily. He and Tim installed nets on all the lift station hatches, as required by OSHA. The The Pipeline nets prevent someone from falling into the wet wells when they open the hatches. Rich also cleaned the built up grease from the Veron- ica Lane lift station's floats. Street Report The Street Crew accom- plished the following tasks this week: Supplied barricades for a block party on James Road Began making up street name signs for Town Center Repaired catch basins where their joints are failing causing the roadways to sink around them John Ambrose fabri- cated a hand gun clear- ing trap for the Police Department Freeway Road The contractor was pre- paring boulevards to be sodded. September 4, 2003 Town Center RKI finished constructing the TH110 exit ramp. A MnDOT traffic inspector is currently deciding on how to sign the ramp —he cur- rently can not get consen- sus in his department on how to sign it. Once the decision is made, the sign company will have to spe- cial order all the signs. The off ramp can not be opened to traffic until the signs are in place and the striping is completed. The final lift of bituminous was put on the Frontage Road, Market Street, Dodd Road turn lanes, the west 200' of Maple Street and the eight foot bituminous trail that parallels Dodd Road. They continue to raise sewer castings and gate valves in Town Cen- ter and the Freeway Road area. The seed subcon- tractor has begun seeding between Market Street and TH110. NEWS Public Works Engineering Code Enforcement LETTER Park Report The Parks Crew picked up trash daily in the parks, striped fields, dragged ball - fields and cut grass. They also completed the follow- ing other tasks this week: They repaired the plumbing in Mendakota Park's men's restroom They removed the net- ting for foul balls from Mendakota Park They setup the soccer fields for play in the neighborhood parks They repaired sprinkler heads at City Hall Utility Report Rich checked the City's seven sanitary sewer lift stations daily. He cleaned sanitary sewer mains on Dorset Road, Mears Avenue (roots) and the north half of Delaware Avenue. He cleaned out the Public Works Garage's toilet's sewer lead because they were not draining —he found sand in the line. He also painted the three fire hy- drants serving the Lexing- ton Heights Apartments. The Pipeline Street Report The Street Crew accom- plished the following tasks this week: They cleaned storm sewer inlets They removed some old unnecessary signs from the Freeway Road neighborhood They cleaned the TH13 ditch at Garden Lane They cleaned up the NE corner of Keokuk Lane and Pagel Road to im- prove the sight distance Dave worked with Com- cast to determine how to repair a storm sewer line on Ocala where they "shot" their cable through our sewer line Town Center RKI placed the last of the Class 5 gravel base on Mar- ket Street and the Dodd Road turn lane —these roads are now ready for paving with bituminous. Xcel installed the three phase power to the CDA's August 21, 2003 Senior Facility this week. Installation of the elevators had been held up pending installation of the three phase power. RKI also worked on boulevards this week and began grading for the eight foot bituminous trail along Dodd Road. Freeway Road RKI prepared the boulevards for receiving sod. They in- stalled a rip rap flume from the end of Knob Road to Warrior pond for erosion control. Bituminous Roadways fin- ished installing the last of the bituminous driveway aprons. They began patch- ing street areas where wet subgrade has caused the bi- tuminous base to crack. They removed a 20" diame- ter Chinese Elm tree from the intersection of Oak Street and North Freeway Road in order to grade the homeowners boulevard to the new curb. St, Thomas Academy Veit finished installing the City's sanitary sewer in front of the hockey arena and all of their internal utilities this week. NEWS Public Works Engineering Code Enforcement LETTER Park Report The Parks Crew picked up trash daily in the parks striped fields, dragged ball - fields and cut grass. The Parks Crew also completed the following other tasks this week: • They repaired sprinkler heads at Kensington Park, City Hall and the Fire Sta- tion • They fertilized the soccer fields at Kensington and Mendakota Parks • They began trimming overhanging trees and brush from pedways on Lexington Avenue, Marie Avenue and at Victoria Highlands. Street Crew The Street Crew accom- plished the following tasks this week: • Cleaned up around the Public Works Garage Area • Assisted with Safety Camp • Provided barricades for a block party • Patched potholes at 2nd Avenue, Eagle Ridge Drive, and Stratford Road The Pipeline Utility Report Rich checked the City's seven sanitary sewer lift stations daily. He dealt with a power outage at the Northland lift station on Wednesday for three hours and at the St. Thomas Academy lift station on Friday. He and his helper cleaned sanitary sewers on Dodd Road, Beebe Avenue, Ivy Hill Drive and by Lloyds Meats (greasy buildup). He performed a sewer inspec- tion for a new home connec- tion at 630 Hidden Creek. Code Enforcement Report Paul issued a building permit this week to Hoffman Homes for their final two townhomes. Those homes will likely be fin- ished this winter and the pro- ject will be closed out. He is- sued a permit to Mihm cus- tom Homes this week to begin construction of a one story home at 660 Hidden Creek Trail (estimated value $800K). There are now five homes un- der construction in Hidden Creek. Town Center RKI installed concrete cable- crete at the inlet to the south- west pond located in the Dodd August 14, 2003 Road/TH110 intersection to prevent erosion. Bituminous Roadway placed the bitumi- nous base for the new TH110 exit widening. Fisher Con- crete installed the last of the curb and gutter on Market Street and did the curb and gutter for the turn lane. The grading crew worked on the boulevard slope between Mar- ket Street and TH110. Freeway Road The RKI grading crew worked on fixing driveway aprons and on restoring the boulevard. Bituminous Roadways finished paving the first lift of asphalt on North Freeway Road and on Knob Road. All of the first lift of bituminous is now com- pleted installation of the sec- ond lift will be delayed until next spring to allow time for any more settlement over the watermain trenches to occur. They began work on restoring driveways. St. Thomas Academy After an approval from City Engineering to raise the sani- tary sewer elevation to be out of the ground water level, Veit made progress on installing the line. NEWS Public Works Engineering Code Enforcement LETTER Park Report The Parks Crew picked up trash daily in the parks striped fields, dragged ballfields and cut grass. The Parks Crew also accomplished the follow- ing other tasks this week: • Aerated the lawns at Ken- sington soccer fields, Men- dakota ballfields and soccer field, neighborhood park ballfields, the Public Works Garage and the Civic Cen- ter ballfield • Swept and top dressed the Kensington and Mendakota soccer fields and #3 Men- dakota softball field • Applied toner to park signs Street Report The Street Crew accomplished the following tasks this week: • Painted the crosswalks on Marie Avenue, Trail Road, Huber Drive and Mendota Heights Road • Patched street on Warrior Drive —it was at a catch ba- sin where we have been experiencing failures • Disposed of woodchip pile by giving them to the Con- gregational Church on TH110—for their play- ground that they are in- stalling for their new day care activities • Replaced burned out bulbs for traffic signal at TH55 and Mendota Heights Road The Polpelmine Utility Report Rich checked the City's seven sanitary sewer lift stations daily. Power was out Friday and Saturday at the Northland Drive lift station. Rich was out of town, so Terry Blum came in and restored the power. Rich worked with Braun Pump to replace the controller at the St. Thomas Academy lift station (the pumps were not alternat- ing). The float transducer was also not working properly and was replaced. Freeway Road Fisher Concrete, the curb and gutter subcontractor, finished all of the rest of the curb and gutter and driveways on Knob Road this week and the con- crete work is now totally com- pleted in the Freeway Road neighborhood. Bituminous Roadways, the bitu- minous contractor paved South Lane and the last 400 feet of North Freeway Road this week. They then backfilled behind the curbs. They moved all the mailboxes back in place. They are starting to replace street signs today. Town Center Bituminous Roadways com- pleted the bituminous base on the Frontage Road and the first 200' feet of the new TH110 exit ramp. August 8, 2003 The grading crew worked on in- stalling the Class 5 gravel for widening the deceleration lane for the TH110 exit ramp. They removed curb and gutter and concrete aprons on Dodd Road and placed the class 5 gravel in preparation for installing the turn lane onto Market Street. They placed gravel on the west 200 feet of Market Street adja- cent to Dodd Road, all in prepa- ration for installing the new curb and gutter and pavement. Mueller and Quality Under- ground finished phase 1 (everywhere curb and gutter has been installed and future buildings are not affected) of installing the private utility work (electric, gas, telephone, cable TV and street lights). Hidden Creek The Developer's Landscaper sodded and planted trees on the outlots adjacent to Dodd Road. Code Enforcement Paul issued a permit this week to Mihm Custom Homes, Inc. to construct a new home at 680 Hidden Creek Trail. The home has a very steep roof line that caused the home to exceed the height requirements in the R-1 Zoning District, on Tuesday evening the City Council granted a variance allowing the construction. The home's evaluation is estimated to be $900K. NEWS Public Works Engineering The Pipeline Code Enforcement LETTER July 31, 2003 Park Report The Parks Crew picked up trash daily in the parks striped fields, dragged ballfields and cut grass. The Parks Crew also accomplished the follow- ing other tasks this week: • Attended a Turf and Grounds Field Day that was sponsored by the U of M • Trimmed overhanging tree limbs at the Civic Center Site, along pedways on Marie Avenue and in Valley and Wentworth Parks • Repaired landscaping rock at Kensington Park • Trimmed hedge line along pedway in Kensington Park South • Removed weeds from around park signs and at Public Works Garage Utility Report Rich checked the City's seven sanitary sewer lift stations daily. Rich and his helper cleaned sanitary sewers at the following locations: • Maple Park Drive • Maple Park Court • Sylvandale • The easement between Woodridge Court and Maple Park Court (couldn't locate two of the manholes —he will find them later) He watered the newly planted trees in Mendakota and Marie Parks. Street Report The Street Crew accomplished the following tasks this week: • Repaired a sign and in- stalled two new bus stop signs • Attended Gopher One Call meetings • Patched potholes on 3rd Avenue, Clement Street, Dorset Road, Mears Avenue and Delaware Avenue Town Center RKI installed the class 5 gravel base for the new TH110 exit ramp serving Town Center this week, the bituminous surface will be paved next week. Muel- ler Pipeline and Quality Under- ground who are subcontractors for the private utilities (Xcel, Qwest, ComCast) began install- ing underground gas lines, electric lines, street light power, cable TV and telephone lines this week. They install all of these utilities in a common trench whenever feasible. They started this work on Oak Street. Freeway Road RKI placed the class 5 gravel and reclaimed bituminous sur- face base on Knob Road, North Freeway Road, and the TH110 Frontage Road in preparation for installing the curb and gut- ter. The curb and gutter crew finished installing curb and gut- ter on the Frontage Road, South Lane, North Freeway Road and most of Knob Road. The grading crew then began placing the class 5 base on all these streets in preparation for installing the bituminous sur- face. They also began backfill- ing the boulevards behind the new curb. Hidden Creek Southview Design, the devel- oper's landscaping contractor, worked on planting more trees, they installed an irrigation sys- tem on Nature Way, they sod- ded Nature Way and they worked on finishing the en- trance monuments. Saint Thomas Academy Ice Arena Veit Construction started instal- lation of sanitary sewer main along Mendota Heights Road — this line will be a City main that serves the Visitation property to the east. Veit encountered extremely wet conditions at the pipe level, they worked two days and were only able to in- stall 3 pipe. They halted work until well points could be in- stalled to lower the water table level. They spent the remain- der of the week installing pri- vate watermains and storm sewers for the ice arena. I-35E MnDOT opened the southbound ramp from I35 to TH13 this week. NEWS Public Works Engineering Code Enforcement LETTER Park Report The Parks Crew picked up trash daily in the parks striped fields, dragged ballfields and cut grass. The Parks Crew completed the following other tasks this week: • They prepared Mendakota Park for the AAU State 12 and 13 year old baseball tournament (installed pitching mounds and 75 foot bases on all four fields) • Trimmed shrubs at Menda- kota Park • Repaired sprinkler heads at Mendakota Park • Replaced park sign plant- ings at Marie Park and in- stalled new landscape rock Street Report The Street Crew accomplished the following tasks this week: • They prepared the street patch on Mendota Heights Road for paving (where the sanitary sewer force main was repaired) • They worked with Bitumi- nous Roadways to com- plete the first lift of the Mendota Heights Road patch • Supplied barricades for a block party on Round Hill Road The Polpefine Utility Report Rich checked the City's seven sanitary sewer lift stations daily. He also televised the fol- lowing sewer lines: • Pagel Road storm sewer — found a crushed pipe • Ocala Lane storm sewer — found a telephone wire bored through it • Ivy Hill Drive —sanitary sewer - (where the jetter got stuck) found a 6 inch service pipe protruding into the main He raised a sanitary sewer manhole that was buried by road construction on Pilot Knob Road. He watered the new plantings installed by the Parks Crew. Town Center The RKI grading crew prepared the remaining streets for a bi- tuminous surfacing. Bitumi- nous Roadways the paving sub- contractor paved Maple Street, Main Street, Karl Hohenstein Place and Oak Street this week with the first lift of bituminous. RKI started to prepare the SW storm water holding pond for its impervious liner and they in- stalled concrete cable-crete mats at the storm water inlets to the pond for erosion control. July 24, 2003 Freeway Road St. Paul Regional Water Ser- vices replaced two existing hy- drants with new hydrants on the TH110 Frontage Road. RKI prepared South Freeway Road for bituminous and Bituminous Roadways paved the bitumi- nous base. RKI prepared the Frontage Road for bituminous, South Lane for curb and gutter and they started to work on North Freeway Road for curb and gutter. (I received the at- tached letter complimenting RKI and their foreman this week). Hidden Creek Imperial Developers came back to raise more manholes and watermain gate vales in the street. The developer's land- scaper is planting trees and in- stalling entrance monuments. Traffic Counts SEH does traffic counts on the City's MSA roads (required to be done every two years by MSA). Attached is a spread sheet showing the results of those counts. Attachments: Freeway Road Letter Traffic Count Spreadsheet Michele R. Towle 636 S. Freeway Rd. Mendota Hts., MN 55118 651-456-5877 Jim Danielson, Public Works City of Mendota Heights 1101 Victoria Curve Mendota Heights, MN 55118 July 23, 2003 Dear Mr. Danielson, I am writing you this letter to thank you and many others for the work being done to our neighborhood's roads, sewer, and water system. I am looking forward to the completion of the project and I am confident it is going to be a wonderful improvement. Secondly, I want you to be aware of the courtesy and professionalism demonstrated daily by the road construction crew. I met the Foreman for the project a couple of weeks ago when she came to our front door with a notice regarding a restriction on using our driveway. She had put the notice in a plastic clear sleeve and gave it to me. I knew she was the Foreman for the road construction crew because I spoke with one of the guys on the crew at the end of May. We had planned and invited over one hundred people to our daughter's graduation party to be held on June 7"'. I was inquiring about the road status and this guy said the Foreman would know best. Then, he told me it was a woman and she was doing a great job moving things along. He said she really gets the job done and she doesn't take any grief from anybody either. He said, "I've got a lot of respect for her." I think everyone on the crew knew we were having a party that weekend and were very concerned the road was in the best shape it could be for June 7'. They even asked how the party went! Well, I have had the opportunity to observe her and that day at my door, I had the opportunity to tell her what this guy had said about her. She thanked me and with a little grin, asked if I remembered who it was. Unfortunately, I would remember if I saw him, but there are lots of guys out there everyday. I told her how much I appreciated the long hours and efficiency the road construction crew has executed daily. I have asked several times if I could get them cold water or lemonade, cookies and they always say no thanks. Someday, I am just going to make cookies and bring out some cold water and pop and tell them it is time to take a little break. They deserve it! In closing, this letter is a plug for the female Foreman. I had to write it because she is doing a great job and of course, being of the female gender, I wanted to acknowledge your wise choice in hiring her for the job. Sincerely, Michele R. Towle Cc: Bill Knutson, Inc MENDOTA HEIGHTS TRAFFIC COUNTS ON MSA ROUTES Road Location 2003 ADT 2001 AD T 1999 ADT Acacia Blvd/Pilot Knob Rd West of TH 55 1134 1168 Not in System North of TH 13 2874 Chippewa Avenue North of TH 149 621 706 331 South of TH 13 831 1997 AD T 1925 ADT 1993 ART 566 463 523 Decorah Lane East of TH 149 (Dodd Road) 1761 1954 2126 2210 Not on system Not on system West of Huber Drive No Counts No Counts 2428 1359 Not on system Not on system Emerson Avenue East of TH 149 (Dodd Road) 955 832 833 778 Not on system Not on system Huber Drive West of Delaware Ave. 1329 1470 1612 1474 1691 1393 North of Mendota Heights Road 1259 1103 1215 1141 1233 729 Lake Drive West of TH 149 (Dodd Road) 406 296 639 618 Not on system Not on system Lexington Avenue North of Wagon Wheel Trail 3794 3497 3393 3323 3273 3584 South of TH 110 9146 7543 7019 5650 5562 4883 North of TH 110 7660 5008 4912 4848 6414 3938 South of Marie Avenue 3620 3333 2985 3141 3036 2437 North of Mendota Heights Road 2750 2349 2334 No Counts 3101 2805 South of TH 113 2732 2248 No Counts Marie Avenue West of County Road 63 (Delaware Ave.) No Counts No Counts 2838 4455 2907 2802 East of TH 149 (Dodd Road) 2682 2901 2693 4653 3035 2576 West of TH 149 (Dodd Road) 3219 3288 3302 3959 3433 2966 East of Victoria Road No Counts No Counts 3519 3952 3409 3066 West of Victoria Road 1935 1825 1716 1964 1758 1778 East of Lexington Avenue 1059 1267 1104 1201 827 821 Mendota Heights Road West of Delaware Avenue 1864 1582 1952 1418 1501 1466 East of TH 149 (Dodd Road) 4387 3781 3678 3739 3304 3105 West of TH 149 (Dodd Road) No Counts No Counts 3951 2605 2940 2223 East of Lexington Avenue 4420 3294 3507 3549 2541 1983 East of TH 55 7734 6964 7519 6827 3282 3345 West of TH 55 3708 3956 3510 4246 2788 2107 East of Pilot Knob Road No Counts No Counts 4241 3895 3661 2862 East of TH 13 4180 3309 3270 2804 2504 3441 West of Visitation Drive 2922 3611 Northland Drive West of TH 55 No Counts No Counts 1241 1177 Not on system Not on system East of Pilot Knob Road (Cty Rd 31) 4040 4543 3777 1620 Not on system Not on system South Plaza Drive East of TH 149 (Dodd Road) 1009 1049 904 1855 1925 1364 Victoria Road North of Marie Avenue No Counts No Counts 3099 3412 3762 3343 Cry Rd 45 South of TH 13 2709 4114 3453 4005 4442 4122 East of Lexington Avenue 2419 1167 South of Marie Avenue 1371 Wagon Wheel Trail West of TH 149 (Dodd Road) 1085 1008 802 937 993 1022 East of Lexington Avenue 805 782 749 693 482 728 Me. IFOXIIIIII NEWS Public Works Engineering Code Enforcement LETTER Park Report The Parks Crew picked up trash daily in the parks striped fields, dragged ball - fields and cut grass. The Parks Crew also completed the following other tasks this week: Repaired the warning track at the Civic Center ballfield which washed out from the storm Repaired the women's toilet that was vandal- ized at Mendakota Park. (A cherry bomb blew out the bottom of the toilet). Repaired field 1 and field 2 at Mendakota Park — patched the rec rock ar- eas Utility Report Rich checked the City's seven sanitary sewer lift stations daily. He and Dave checked out a plastic storm sewer pipe on Pagel Road that was crushed. He will work with Marc to deter- mine the cause. He per- formed a sanitary sewer in- spection for a new connec- tion at 1423 Knollwood Lane. The Pipeline The power was out at the Lilydale lift station on Mon- day night from 8:00-10:00 P.M. He had to take the City's mobile generator to the site to operate the pumps. He and his summer helper cleaned the sanitary sewers in Valley Lane, Kirchner Ave- nue, Kirchner easement and Butler Avenue. Street Report The Street Crew completed the following tasks this week: July 3, 2003 Removed a dead boule- vard tree at 788 Pond Haven Lane Patched streets on Fourth Avenue, Third Avenue, Vandall Street and Men- dota Heights Road Repaired the driveway access to the site ac- quired from Resurrection Cemetery for storing street sweepings Hauled rec rock to Men- dakota Park for the Parks Crew Have a safe and happy Fourth of July NEWS Public Works Engineering Code Enforcement LETTER Park Report The Parks Crew picked up trash daily in the parks striped fields, dragged ball - fields and cut grass. The Parks Crew also completed the following other tasks this week: • Finished painting Friendly Hills hockey rink surface • Prepared Mendakota Park for the AAU National Qualifiers Tournament • Cut up, cleaned up, and chipped up downed trees and limbs from Tuesday night's storm • Put down the 2nd applica- tion of crab grass preven- tor to City Hall, Public Works Garage, Friendly Hills, Mendakota, Kensing- ton, Victoria Highlands Parks, and the old fire hall sites. Street Report The Street Crew accomplished the following tasks this week: • Cleaned storm grates after Tuesday's storm • Cut up and removed trees downed from Tuesday's storm Disposed of a dead deer fi it D 9 M An 3=9 • Patched potholes on Hunter Lane, Orchard Lane, Som- merset neighborhood and in the Industrial Park Utility Report Rich checked the City's seven sanitary sewer lift stations daily. He has also been busy this week dealing with power outages from the storms: at the Veronica lift station, on Tuesday at 4:30 AM, at the Northland Drive and Mendota Heights Road lift stations at 12:15 AM on Wednesday, then, 40 minutes after he re- turned home from dealing with those, he was called back again for the Veronica lift sta- tion and the Lilydale lift sta- tion. (A couple busy nights for Rich). He performed an inspection for a new connection to the sani- tary sewer for a townhouse at 2065 Acacia Drive. He pulled the pumps at the Northland lift station to re- move some rags that were stuck in them. Town Center RKI put Class 5 gravel down this week on most of Market Street, the south half of Oak Street and all of Maple Street this week. They installed curb and gutter on most of Market Street, the south half of Oak Street and the east half of Ma- ple Street. St. Paul Regional June 26, 2003 Water Services installed a two inch water service on Market Street to be used for the City's irrigation system. Freeway Road RKI reclaimed all the remain- ing bituminous surfaces within the Freeway Road area. (The next step will be grading base for curb and gutter). Wednes- day after the rain storms, they repaired driveway washouts. They began to remove mail- boxes and put them in tempo- rary locations out of the way for street construction. St. Paul Regional Water Services installed a new water service for a homeowner on North Freeway Road because his ex- isting service had a blockage after they hooked it to their new main. Hidden Creek Mueller Pipeline finished in- stalling the private utilities to this development this week (electric, telephone, cable TV and gas). Rogers Lake Pat Lynch and Rich Walsh from the DNR met with Engineering Staff this week to "brainstorm" Cliff Timm's request for im- provements to Rogers Lake. Staff will present their findings and recommendations at the second Council meeting in July. NEWS Public Works EThe Pipeline ngineering Code Enforcement LETTER June 12, 2003 Park Report The Parks Crew picked up trash daily in the parks striped fields, dragged ballfields and cut grass. The Parks Crew ac- complished the following other tasks this week: • Prepared for the Parks Celebration • Removed and chipped buckthorn in Friendly Hills Park • Fertilized lawns at Menda- kota and Kensington Parks, City Hall, Fire Department and the Public Works Ga- rage • Repaired vandalized women's restroom at Ken- sington Park Painted blacktop surface white inside hockey boards at Friendly Hills Park • Cut dead trees and chipped at City Hall, Fire Depart- ment, and at Hagstrom King, Kensington and Friendly Hills Parks Utility Report Rich checked the City's seven sanitary sewer lift stations daily. He and his summer helper used the sewer jetter to clean sanitary sewers at Junc- tion Lane, John Street, Esther Lane, and Chippewa Avenue. He worked with Pipe Services to use a vac -all to clean out the lift stations and 10 storm sewer catch basins. Street Report The Street Crew accomplished the following tasks this week: • Cleaned out culvert with the backhoe at Mendota Heights Road and Delaware Avenue and Orchard Lane west of Lexington Avenue Patched potholes on Men- dota Heights Road • Removed dead trees at 1728 Trail Road and 1791 Overlook Installed "No Parking" signs on Centre Pointe Drive Hidden Creek The Hidden Creek contractor seeded and mulched the site this week. They also began raising manhole castings and valves in the street. Code Enforcement Report Paul issued a permit this week to American Tower Company for them to install, Council ap- proved new cellular phone an- tennas for AT&T on Henry Sibley High School. He also issued a permit to Deily Construction this week to alter a space at 2535 Pilot Knob Road for Brown College to add about 10,000 square feet of new classrooms. Finally, he issued a permit to Hoffman Homes to construct another two unit townhome at 2050 and 2054 Acacia Drive. Town Center RKI finished installing curb, gutters and driveway aprons on Linden Street, 1/2 of Karl Hohenstein Place and 1/2 of Main Street this week. They are now working on grading and installing Class 5 gravel on the rest of the Town Center streets to prepare them for paving. Xcel was at the site placing new temporary power poles to relocate some that are in conflict with street construc- tion. Qwest lowered telephone cable under the new TH110 exit ramp now being constructed. CBS, Dakota County CDA's contrac- tor constructing the new senior facility, began site grading and parking lot construction this week. They also began hook- ing the building up to City sani- tary sewer and water and in- stalling their storm water pipes and catch basins. Freeway Road The water main replacement crew finished replacement of all the water main this week and began their testing procedure before putting the new mains into service. Xcel finished relo- cating their gas main on Knob Road. NEWS Public Works Engineering The Pipeline Code Enforcement LETTER June 6, 2003 Park Report The Parks Crew picked up trash daily in the parks striped fields, dragged ball - fields and cut grass. The Parks Crew completed the following other tasks this week: • Cut up and removed a downed tree in Friendly Hills Park • Repaired a sprinkler head in Kensington Park • Removed the tennis net posts from Rogers Lake Park tennis courts to pre- pare for installation of the skate park • Swept the pedway on Pi- lot Knob Road • Prepared the hockey rink surface at Friendly Hills Park to be painted Utility Report Rich checked the City's seven sanitary sewer lift stations daily. He and his summer helper cleaned the sanitary sewers in London Road, Brompton Court, Diego Lane and Winston Circle this week. The residents living at 1745 James Road called the City to report sewage backing up in their basement. We checked and the problem was in their service lead. They called Ro- tor Rooter. Rich cleaned out the City's lines after Rotor Rooter completed their work. Street Report The Street Crew accomplished the following tasks this week: • Removed a dead boule- vard tree on Decorah Lane Removed a downed tree limb from Wachtler Ave- nue at Hilltop Court • Patched a pothole on Men dota Heights Road east of Dodd Road Replaced some street name signs Installed a stop sign at Na- ture Way and Marie Worked with Rich to raise a buried sanitary manhole at TH13 and Brompton Code Enforcement Report Dick Gill reports that this week R.J. Ryan Construction finished pouring their footings for St. Thomas Academy's new ice arena now being con- structed on I-494 south of their campus on Mendota Heights Road. They have now begun laying up their ma- sonry walls. CBS Construction began painting the walls and ceilings on the third floor of the senior center now being constructed at Town Center. They are also well under way installing the dry wall on the second floor. Town Center RKI grading crew worked placing Class 5 gravel on Lin- den Street, Karl Hohenstein Place and Main Street. Sub- ject to favorable weather con- ditions, curb and gutter will be installed on all these streets this week. They started subgrade work for constructing the streets on Oak Street, Maple Street and the TH110 exit ramp this week (they hit two gas main while doing this work). They also hit the telephone line when removing the pile of ex- cess soil from along TH110. Freeway Road The water main replacement crew will finish work on North Freeway Road this week. They plan on doing South Lane next week. This will complete the water main re- placement work. Xcel Energy finished installing new gas mains on Knob Road this week and are connecting house services to the new mains. NEWS Public WorksEngineering The Pipeline Code Enforcement LETTER May 30, 2003 Park Revort The Parks Crew picked up trash daily in the parks striped fields, dragged ball - fields and cut grass. They also completed the following other tasks this week: • Repaired the sprinkler systems at City Hall and at Mendakota and Ken- sington Parks Removed the berms that had built up around the infields at Mendakota Park and removed excess rec. rock Street Revort The Street Crew patched pot- holes this week at the follow- ing locations: South Plaza Drive 2251 Copperfield Drive • Medallion Drive Mendota Heights Road east of Dodd Road Huber Drive Utility Report Rich checked the City's seven sanitary sewer lift stations daily. He completed yard restoration work at 741 Knollwood Lane where he had uncovered and raised a sanitary sewer manhole that had been buried by the home- owner. After he was done, he flushed the line clean. He jet- ted clean the sanitary sewer line from Lloyds Meats. The line was extremely greasy —he will work with Lloyds to deter- mine if there is a problem with their grease trap. Town Center RKI's pipe crew completed some odds and ends type of work this week. They in- stalled the 48" storm sewer outlet pipe located on the west side of Dodd Road. The pipe had to be redesigned be- cause of a conflict with Exxon Mobile's pipeline. The grading crew worked on preparing the subgrade for streets. Freeway Road The combined St. Paul Re- gional Water Services, RKI water replacement crew com- pleted removal of the existing 8" CIP water pipe on Freeway Road and installation of a new 8" DIP this week. They intend to start work on North Free- way Road next week. Xcel Energy crews began relocat- ing their gas mains on Knob Road this week. Hidden Creek Northwest Bituminous finished installing the Class 5 base material and the first lift of bi- tuminous on the streets this week. The developer has agreed to hold off on installing the final lift of bituminous un- til this fall or next spring due to conflicts with ongoing house construction. Code Enforcement Report Paul issued a building permit this week to Johnson Engi- neering to construct a new single family home at 2215 Alice Lane. There are now only two lots remaining in this subdivision. He also issued a permit for the Bainey Group; Inc. to con- struct an 80,744 square foot tenant space remodeling at 2360 Pilot Knob Road to be occupied by Land O Lakes. Marc Marc hurt his back playing ball with his son two weekends ago and has been out with the injury ever since. He planned on returning this week, how- ever he took a turn for the worse over last weekend and went to the hospital. There he was fed pain relief intrave- nously and received an MRI that revealed two herniated disks. He has been out all this week too and meets with his neurosurgeon next Wednesday to determine a treatment. NEWS Public Works Engineering The Pipeline Code Enforcement LETTER May 23, 2003 Park Report The Parks Crew picked up trash daily in the parks striped fields, dragged ballfields and cut grass. The Parks Crew also completed the following other tasks this week: • Replaced broken play shov- els in the sand boxes at Mendakota, Wentworth and Valley Parks (popular item) • Sprayed parks for weeds • Cleaned up around Ivy Park —trash around pond, and leaves around play- ground timbers and back- stop • Planted annual flowers at Mendakota Park • Planted crab apple trees at City Hall —donated by Gar- den Club • Cleaned the pedway in Val- ley Park where the I-35E slope had slid onto it. Utility Report Rich checked the City's seven sanitary sewer lift stations daily. He also sprayed for weeds in the following parks: Wentworth, Ivy, Friendly Hills, Rogers, Kensington and the Curley Tot Lot. He cleaned the sanitary sewer in Sutcliff Court and in TH13 from Sutcliff to Downing Street. He arranged with West St. Paul to use their TV equip- ment to televise the sanitary sewer in Lexington Avenue where he had a backup last week. He discovered our line did have roots growing in it. Street Report The Street Crew completed the following tasks this week: • Cleaned storm sewer grates • Made up street name signs • Patched streets within the Sommerset area —they are a mess and with the upcom- ing street project all the work is to be a waste. We are trying to do as little as possible while still making the streets safe and pass- able. Town Center RKI, using up to 15 belly dump trucks were loading and remov- ing the piles of excess soil from the Town Center site grading project. We estimate that there was in the neighborhood of 7000 yards of material which means there will be around 500 truck loads to be removed. RKI's pipe crew finished the last of the storm sewer lines. They moved in their grading crew and began shaping the streets to subgrade in preparation for paving. Freeway Road The combination RKI, St. Paul Regional Water watermain re- placement crew finished replac- ing the watermain on Knob Road and started replacing it on South Freeway Road at Oak Street this week. RKI had a crew rebuilding sanitary sewer manholes to fit the new street grades. Imperial Developers had a crew doing boulevard and general site grading this week. North Country Concrete, the curb and gutter crew finished installing the last of the curb and gutter this week. Northwest Bitumi- nous, the black top contractor, moved. in their grading crew this week to place the last of the Class 5 gravel base in preparation for installing the first lift of bituminous. Watermain Woes We knew from past experience with watermain replacement on Decorah that there would be problems with the watermain replacement on Freeway Road, we iust did not know how bad it could get. So far we have dealt with_: • Broken gas services • Broken sanitary sewer ser- vices and flooded basement (always on a weekend) • Gas mains in the watermain trench • Poor and wet soil conditions • Manhole castings knocked off and sanitary sewers filled with dirt and blocked • Electrical cable hit, knocking the neighborhood out of power • Temporary water mains driven over and broken • People stuck out of, or in their driveways • Wrong hydrants • Slow pace of work to name a few of the problems. NEWS Public Works Engineering The Pipeline Code Enforcement LETTER May 16, 2003 Park Report The Parks Crew picked up trash daily in the parks, striped fields, dragged ballfields and cut grass. The Parks Crew also performed the following other tasks this week: • Striped Kensington South soccer fields • Installed soccer goals at Mendakota and Friendly Hills Middle School for the Sibley Sting Soccer Program • Sprayed for weeds in the parks Utility Report Rich checked the City's seven sanitary sewer lift stations daily. He cleaned sanitary sewer lines in Winston Court, Hiawatha Ave- nue, Garden Lane and TH13 from Garden to Sutcliff this week. He was called in this weekend to respond to a sanitary sewer backup on Knob Road. It turned out that RKI, who was digging the trench for St. Paul Regional Water Service to replace the wa- termain, had broken and blocked a resident's sewer ser- vice. Their sump pump was connected to the sanitary sewer and, due to the heavy rain, had filled their basement. Rich pur- chased some supplies and redi- rected their sump pump to drain outside. He sprayed the broadleaf weeds at Mendakota Park, Fire Depart- ment, Old Fire Department site, and the Friendly Hills Tot Lot. His summer helper from last year, Luke Carlson, returned to work this week. He responded to a sanitary sewer backup at 2218 Lexington Ave- nue. He removed roots from the City's main. It appeared as if the roots had been cut from a private service and lodged in our main. He will televise the main next week to make sure the problem was not caused by roots in our line. Finally, he performed an inspec- tion at 1065 Douglas Road for a new connection to the City's main. Street Report The Street Crew accomplished the following tasks this week: • Patched potholes on Knoll - wood Court and Lane and Ivy Falls Avenue Adjusted detour signage at Town Center Worked on sod damage com- plaints • They opened the culverts un- der Huber Drive that the bea- vers had dammed and re- moved their lodge. Note: I received several calls from residents whose sump pumps were running continually be- cause of the high water ask- ing that we remove the dams. Then after they were done, I received several calls complaining that we had re- moved them. (We have to keep the drainage way open). Code Enforcement Report Paul issued a building permit this week to Timco Construction Company to remodel the Center for Diagnostic Imaging located at 910 Sibley Memorial Highway. Town Center There are still three RKI crews working at the site. Two crews are working on installing the storm sewer. All the storm sewer for Town Center is in- stalled. They are pumping the pond dry now, so that they can finish grading the pond and in- stall the pond liner. All the wa- termain tests have passed and the watermain is in service. Freeway Road One crew began installing storm sewer in South Lane this week including ditch aprons so that all driveway culverts can be re- moved. St. Paul Regional Water Services, assisted by RKI should complete replacement of the 6" CIP with 8" DIP this week in Knob Road. They plan on doing South Freeway Road next week. Hidden Creek Imperial Developers prepared the base for construction of the new road connection to Marie Avenue. They started constructing the turn lane from Dodd Road to Hid- den Creek Trail. NEWS Public WorksEngineering The Pipeline Code Enforcement LETTER May 9, 2003 Park Report The Parks Crew picked up trash daily in the parks, striped fields, dragged ball - fields and cut grass. The Parks Crew also performed the following other tasks this week: • Maintained the sprinkler systems at Mendakota Park and at City Hall • Filled holes and seeded them on the soccer fields at Mendakota Park • Started lawn sprinkler sys- tem at City Hall • Repaired the ramp to the fishing dock at Roger Lake Park • Picked up lake weeds at Rogers Lake Park • Removed leaves from be- hind backstops Utility Report Rich checked the City's seven sanitary sewer lift stations daily. He worked with John Ambrose to clean and open a storm sewer pipe that was blocked with leaves and sand. He performed inspections for new connections to the City 's sanitary sewer at 2077 and 2073 Acacia Drive. He also performed an air pressure test on the new mains at Town Center. Street Report The Street Crew performed the following tasks this week: • Removed wing posts from the dump trucks • Picked up cones, etc from Spring Clean Up • Provided barricades at Henry Sibley from mock car crash • Patched and overlayed street at Summit Lane • Maintained the road repair patch on Mendota Heights Road for the sanitary sewer repair Code Enforcement Report Paul issued a building permit this week to Hoffman Homes Construction for another build- ing of two townhomes at 2095 and 2101 Lake Augusta Drive. Hoffman tells Paul that they have two buildings/four units remaining to construct but that these units are sold and per- mits will be applied for soon. Hoffman is very happy with the results of this development and they wish that they had some more land left. Paul issued a footing and foun- dation permit to R.J. Ryan this week to begin construction of St. Thomas Academy's new ice arena. The building is to be lo- cated at 950 Mendota Heights Road, south of their school campus and adjacent to I-494 and I-35E. Town Center RKI pressure tested their new sanitary sewer mains which passed the test. They pressure tested the water main and found two leaks. They spent 6- 7 hours finding the leaks which both were at fittings. They tightened the fittings and then passed the test. They contin- ued to work on the final stages of the storm sewer. They have about two days of work left on storm sewer. They began storm sewer work on the Free- way Road neighborhood area. The third crew, a combination of RKI and St. Paul Regional Water Services began removal of the 6" CIP and installation of 8" DIP on Knob Road. Work was very slow going because of the proximity of gas mains. They encountered very poor soils which will have to be sub - cut and removed when the street work is done. RKI poured concrete inverts (bottoms) in all storm sewer manholes. EGM finished boring the 48" diameter steel casing pipe under Dodd Road for the outlet from the Dodd Road and Highway 110 storm water pond. Hidden Creek Imperial spent the week site grading and putting down class 5 gravel for curb and gutter. The curb and gutter subcon- tractor finished all the curb and gutter except for the radius and Marie Avenue and at Dodd Road. NEWS Public WorksEngineering The Pipeline Code Enforcement LETTER May 2, 2003 Park Report The Parks Crew picked up trash daily from the parks, dragged and chalked fields, striped foul lines and cut grass. The Crew also com- pleted the following other tasks this week: • Blocked up the wall at North Kensington Park comfort station • Removed the old redwood playground equipment from Wentworth Park to make way for the new one • Put down crabgrass pre- ventor at City Hall, Fire Hall, the Public Works Ga- rage and Mendakota and Kensington Parks • Started up lawn sprinklers and repaired the broken heads at Mendakota and Kensington Parks and the Fire Hall. Utility Report Rich checked the City's seven sanitary sewer lift stations daily. He cleaned the grease off the floats at Lilydale's sani- tary sewer lift station and checked their storm sewer sys- tem. He helped the Parks Crew plant trees. He prepared the sprayer for his spring spraying of broadleaf weeds in parks (plans on starting Mon- day, May Sth). Street Report The Street Crew completed the following tasks this week: • Brought barricades to the spring clean up site • Cleaned up stump grindings at 760 Keokuk Lane • Reinstalled "No Parking" signs that were taken from Warrior Drive, Marie Avenue and Ridgewood Drive Patched potholes at 1812 Valley Curve, Clement Ave- nue, First Avenue, Crown Point (all complaints), City Hall, and Delaware Avenue at Emerson Avenue Overlayed the Miriam and Chippewa Avenue intersec- tion Code Enforcement Report Paul issued a permit to Hoffman Homes Construction this week to construct another one - building, two -unit town home at 2065 and 2069 Acacia Drive in Augusta Shores. He issued a permit to Santanni Homes for a new home to be constructed at 1065 Douglas Road. This home is being constructed on a re- maining vacant lot in the old Tilsen Highland Heights neighborhood. Because it is a lot in the Critical Area, it was reviewed by the Planning Com- mission and the City Council prior to Paul issuing the permit. Town Center RKI still has two crews working at Town Center. The crews were installing storm sewer mains, stubs and catch basins this week. They have finished installing all the sanitary sewer mains and all the water mains. EIM, the boring subcontractor, completed boring a 24" diame- ter steel casing pipe under Dodd Road and installed the 8" DIP main in the casing to serve the site. They also started bor- ing a 48" diameter steel casing pipe under Dodd Road to be used to drain the southwest pond. St. Paul Regional Water Ser- vices (SPRWS) started installing a temporary plastic water main on Knob Road to keep residents supplied with water while they replace the old 6" CIP with 8" DIP. Ace Blacktop reclaimed (ground up) the old bituminous surface in the Freeway Road neighbor- hood over future water pipe and storm sewer pipe installa- tion areas. They left as many areas intact as possible to drive on. Hidden Creek Imperial Developers started fin- ish grading, storm water ponds, boulevard areas and outlot ar- eas this week. NEWS Public Works Engineering The Pipeline Code Enforcement LETTER April 25, 2003 Park Report The parks crew picked up trash daily from the parks. The Parks crew completed the following other jobs this week: Dragged ballfields and striped foul lines at the Civic Center and Men- dakota Parks Repaired the warning tracks at the Civic Cen- ter and Mendakota ball - fields Installed bases at the Civic Center ballfield Swept the Civic Center ballfield and City Hall yards Repaired the pitcher's mound at the Civic Center ballfield Performed the demoli- tion required for re- moving the restroom walls at the North Kenlsington Park rest - rooms —the restrooms were repeated targets for vandalism and are being converted to parks storage Removed a dead tree from Wentworth Park Picked up trees and planted them in Ivy Falls, Wentworth, Rogers Lake and Hag- strom-King Parks Street Report The Street Crew accom- plished the following tasks this week: • Installed some missing street name signs • Worked on sod damage repairs • Reinforced a wood re- taining wall near a creek • Finished mailbox repairs • Attended the annual maintenance expo Utility Report Rich checked the City's seven sanitary sewer lift stations daily. He and John Abmrose finished jetting the sanitary sewers clean in the Freeway Road area. He found roots in the line at two spots in South Freeway Road and gravel in the line on the 110 Frontage Road (hopefully not from a bro- ken pipe). Last week we hired Impe- rial Developers to repair a leak in the force main lo- cated on Mendota Heights Road —during the time the main was being repaired — tanker trucks were used to pump the wet well down and transport the raw sew- age around the force main. This procedure may have dislodged some "stuff' that was in the wet well be- cause this week one of the pumps was plugged with a broom handle and some carpet. Rich hired Braun Pump to help him remove the "stuff' and put the pump back in operation. Code Enforcement Re- port Paul issued a permit this week to Mihm Custom Homes, Inc. to begin con- struction of the second home in Hidden Creek Es- tates. The home will be lo- cated at 697 Hidden Creek Trail (the second lot in on the north from Dodd Road). The builder's estimated value was $575K. NEWS Public Works Engineering The Pipeline Code Enforcement LETTER April 18, 2003 Force Main Repair This Monday, Public Works was informed by the Police Department that cars were "bottoming out" on Mendota Heights Road. Tom Olund and I investigated and dis- covered a sink hole forming over the City's sanitary sewer force main. We placed barricades around the sink hole. We con- tacted St. Paul Regional Water Services to have them test to ensure that the problem was not a water main break (it was not) and we asked the Police to keep an eye on the hole to make sure it did not get worse. We called several contrac- tors to find one who could be available immediately to fix the problem. Imperial Developers, who are doing the work at Hidden Creek was located nearby and was available to do the work. They began work on Thurs- day morning (Wednesday was too rainy a day). We were concerned about what could have caused the break and how severe it was, but upon uncovering it we discovered it to be a small (1/2" diameter) hole in the top of the pipe. The hole, as best we could tell, was caused by a defect in manufacturing the pipe (over 30 years old). We were delayed in repairing the hole because the pump which was to remove sew- age from the wet well during the repairs did not work and it took several hours for the pump contractor to provide an operable replacement. The repairs were made and the road put back in service late Thursday. We will keep the surface as Class 5 gravel for awhile to allow as much settling as possible before we put on the final bitumi- nous surface. Code Enforcement Report Dick reports that the shop drawings from the window manufacturer for the CDA's Senior Building at Town Cen- ter were in error (too small an opening), so all the win- dows were too large to fit in the rough openings. Every window opening had to be enlarged (at the window manufacturer's expense). It took one week to fix the window openings. If they were to manufacture new windows, it would have been three months. Town Center Knutson added a second crew to the Town Center public improvement project this week. Both crews are working on installing sanitary sewer, water mains and storm sewers on Linden Street, Market Street and Karl Hohenstein Place. Hidden Creek ..N Imperial Developers t r finished installing a culvert under Hidden NOW Repair of the Force Main Creek Trail next to Dodd Road and they moved a fire hydrant in the cul-de-sac this week. NEWS Public Works Engineering The Pipeline Code Enforcement LETTER April 11, 2003 Parks Report The Parks Crew picked up trash daily from the parks. The Parks Crew also com- pleted the following other tasks this week: They dragged ballfields Turned on the water at Mendakota and Kensing- ton Parks Repaired some picnic ta- bles Installed the bases at the Mendakota ballfields They installed the over- head netting at Menda- kota Park Attended a training ses- sion on home plate, mound and base repairs Utility Report Rich checked the City's seven sanitary sewer lift stations daily. He and John Ambrose worked this week on cleaning the sanitary sewer lines in the Freeway Road area so that they can be televised. This week he finished Knob Road (found roots at three spots), South Lane (roots in one spot), and the 110 Frontage Road (gravel). He replaced a hydrant flag on Orchard Hill, and toured the Mendota Heights Road lift station with prospective bidders on the replacement project. Street Report The Street Crew completed the following tasks this week: Installed some "No Park- ing" signs near Brown College Removed and disposed of some large limbs that were blocking a creek by Marie Avenue Removed the plow equip- ment from truck #312 and installed the hot box to use for patching pot holes They worked on some mailbox repairs St Paul Water Agreement The City Council at their April 1st meeting, approved a Memorandum of Under- standing with St. Paul Re- gional Water Services that will turn over the City's wa- ter supply assets to St. Paul in exchange for them main- taining and improving them at no cost to Mendota Heights, and for reducing water users bills by 201/6. Bernie Bullert, General Man- ager, St. Paul Regional Wa- ter Services called me this week to inform me that his Board had approved the agreement this Tuesday. Town Center Update Marc Mogan conducted a preconstruction meeting last Friday with Richard Knutson, Inc., the City's contactor for installing the public improve- ments in Town Center. At the meeting there were rep- resentatives from all the pri- vate utilities, the developer, and his architect, the CDA's contractor, St. Paul Regional Water Services and Protec Environmental. It was a very large meeting. Richard Knutson arrived on the site with their equipment this Monday and began work Tuesday. They had in- stalled the sanitary sewer line in Linden Street by Thursday, and then began installing the watermain in Maple Street. N E W S Public Works Engineering The Pipel i n e Code Enforcement LETTER April 4, 2003 Parks Report The Parks Crew picked up trash daily from the parks. They also accom- plished the following other tasks this week: They put up the tennis nets Trimmed the shrubs from around park signs, and removed leaves Trimmed trees in the parks and disposed of the limbs They dragged the ball fields Worked on repairs to the drinking fountain in Mendakota Park — the fountain is fre- quently vandalized They installed more trash barrels in the parks Utility Report Rich checked the City's seven sanitary sewer lift stations daily. He helped the Street Crew install some new storm sewer grates for catch basins lo- cated on Bachelor Avenue and on Enterprise Drive. He worked with Visu Sewer (sewer contractor) to install a lining in the sanitary sewer near 1900 Victoria Road. Rich was having trouble with roots entering the main at this location and had two back ups that entered the basement of one of the town house units. He also helped the Parks Crew by blowing leaves off the Val- ley Park pedway. Street Report The Street Crew accom- plished the following tasks this week: Used cold -mix asphalt to install temporary patches on potholes until the asphalt plants open and permanent ones can be done John Ambrose per- formed some welding repairs Replaced some broken storm sewer grates Made plans to install some "No Parking" signs in Centre Pointe Code Enforcement Re- port Paul issued a building per- mit this week for J and D Builders to construct the 16' x 14' addition to the Country Day School. Day care in residential districts is allowed by conditional use permit and the City Council issued that permit at its last meeting. Attached is a copy of a Star & Tribune news arti- cle on rotting problems associated with new stucco homes. We are aware of a couple in- stances that this prob- lem has occurred in Men- dota Heights. We do have a large number of new stucco homes in Mendota Heights and hope the problem is not wide spread. NEWS Public Works Engineering The Popeline Code Enforcement LETTER March 28, 2003 Parks Report The Parks Crew picked up trash daily from the parks. The Parks Crew completed the following other tasks this week: Swept pedways • Removed "thin ice" signs from Rogers Lake aerator area • Removed the aerator from Rogers Lake and put in storage at the Public Works Garage. (Note: for the second winter in a row the City was not notified by the DNR to run the aerator) Trimmed the shrubs around the Public Works Garage Removed a downed tree from North Kensington Park • Stripped out the bathroom at North Kensington Park to be remodeld for storage Utility Report Rich was on vacation this week so Tom Olund checked the sanitary sewer lift stations this week for him. Street Report The Street Crew worked this week with Pearson Bros., Inc. the City's street sweeping con- tractor to sweep the City's streets. This was a new con- tractor for the City and they did a great job. They had 6 ma- chines, and worked, beginning on Monday through noon on Thursday. They began every- day at 6:00 A.M. and worked until 6:00 P.M. The sweeping contractor sweeps up the sand from the street and dumps it in the City's trucks for disposal. Code Enforcement Report Paul issued a building permit this week to Hoffman Homes to construct another one of their two unit townhomes on Acacia Drive. Hoffman Homes now only has 4 buildings remaining on 8 lots. He also issued a permit this week to Steven Hanson, Inc. to repair the fire dam- aged home at 1562 Wachtler Avenue. The home was se- verely damaged by fire on January 20, 2003. Paul said that although the struc- ture was severely damaged by the fire, they do not need to demolish the build- ing, they are able to reconstruct what was damaged — walls, rafters, wiring and plumbing. House Flooded A neighbor living next to 900 Mendakota Court called Public Works on Wednesday to report that a large quantity of water was running out of the south side of the home. We con- tacted St. Paul Regional Water Services and they shut off the water at the curb stop. The homeowner has been out of town for a long time, leaving the home vacant. The neighbor was able to contact him and in- form him of the problem. We are unsure of what caused the problem, however we sus- pect that the temperature in- side the home probably went below freezing causing a pipe to burst. St. Paul Regional Wa- ter Services informed us that the meter showed that over one million gallons of water went through it last month (half the size of the water tower). Water damaged house on Mendakota Court NEWS Public Works T h e P i e l i n e Engineering Code Enforcement LETTER March 21, 2003 Parks Report The Parks Crew picked up trash daily from the parks. They also completed the fol- lowing other tasks this week. • They worked on maintain- ing winter equipment and putting it in storage for summer and on bringing out summer equipment • They started sweeping the pedways • They worked on removing some downed trees from the pedway in Valley Park • They inspected pedways to determine which ones need repairs this summer Utility Report Rich checked the City's seven sanitary sewer lift stations daily. He worked with the Street Crew to open frozen culverts with his sewer jetter— (culverts on Hunter Lane, Cal- lahan Place, Wesley Lane, Or- chard Place, Dodd Road and Marie Avenue were all frozen). He was called in on Saturday to open a blocked outlet to a pond near Westview Court. He cleaned grease from the floats at the Veronica and Northland lift stations. He worked at the Lilydale lift station to solve a blockage that was preventing one of their pumps from operating. Street Report The Street Crew worked with Rich to open frozen culverts. They fixed some potholes in the Crown Point area. Pearson Brothers were the low bidder on this years street sweeping contract. They have notified Public Works that they will begin sweeping streets next week (the earlier the better as it prevents sand from being washed into the storm sewers). The only concern is that if we have a serious ice storm after sweeping, and we have to put down more sand it will have to be swept up. The City's Street Crew works with the sweeping contractor to haul away and dispose of the swept up sand, so they re- moved the sanders from the dump trucks this week so that they would be ready to haul and dispose of the sand on Monday. They worked on making some replacement street name signs and installing them. Water Main Repairs St. Paul Regional Water Ser- vices crews were called out Thursday morning to repair a break in the cast iron water main on Cherry Hill Road just north of the Lower Colonial Drive intersection. They fin- ished their repair work on Thursday. Flashing barricades protected the pavement area that was removed in conjunc- tion with the excavation neces- sary to expose and repair the water main. They placed a cold mix bituminous patch on the street. Skate Park On Thursday evening Guy, a representative from SkateWave (modular skatepark system), thirteen skate enthusiasts, four parents, and two park commis- sioners participated in a work- shop to select a list of obstacles that will be sent to several ven- dors for bids. The Commission has requested bids from both vendors that supply an all steel product and those using a wood/resin (super tough maso- nite) product for the skate sur- face, with steel for the support frames. Vendors bids will be re- viewed on April Sth and sent to the City Council for considera- tion and award on April 15th. If approved, the park would be open before July Vt NPDES Phase II MS4 Gen- eral Stormwater Permit Marc, Guy and Jim met, on Thursday, with Eric Ealy and Drew Budelis, the consultants preparing our permit applica- tion, to continue work on the next stage in the process to complete the City's permit document that must be submit- ted by May gth to the Minn. P.C.A. Items covered at this meeting were the "Self - Assessment Memo", "Ordinance Review", and preliminary BMP (Best Management Practices) and Measurable Goal Options". NEWS Public Works Engineering The Pipeline Code Enforcement LETTER March 14, 2003 Parks Report The Parks Crew picked up the trash daily from the parks. The Crew began changing over equip- ment from being snow removal equipment to lawn maintenance equipment. They attended an Ex - mark seminar to learn how to op- erate and maintain our new Ex - mark lawn mower, and they at- tended a seminar put on by Toro to learn how to troubleshoot and repair lawn irrigation systems. Utility Report Rich checked the City's seven sanitary sewer lift stations daily. He worked with Keating Electric Company to analyze the City's portable generator for conversion to be able to run the City's lift sta- tion on Mendota Heights Road af- ter it is remodeled this summer. He worked with a pump mainte- nance company numerous times this week to try and solve a prob- lem with the Lilydale lift station. Mendota Heights has an agree- ment with Lilydale which provides for Rich to do this work for them. Code Enforcement Report Paul issued a permit this week to R.J. Ryan Construction to remodel 2060 Centre Pointe Blvd., Suite #10 for occupancy by Permasteel. He issued a permit to Fendler Construction this week for them to remodel 1395 Commerce Drive into an office and vault area to be occupied by Associated Bank. N. U. R. T. NORTH URBAN REGIONAL TRAIL County staff met with Jim, Marc and Guy on Thursday to discuss their preliminary layout for a pro- posed trail alignment along the north side of Hwy. 110 from Dodd Rd. to Delaware Ave. Once com- pleted, the NURT trail will begin near the Lilydale Yacht Club, go through Valley Park, along Hwy 110 to the new Dakota County Government Center, then continue on through West St. Paul, cross over the Layette Freeway then down through South St. Paul to the river. Funding for design and con- struction is 80% Federal and 20% County. If a contract has not been awarded by September 2004, the Federal funding will be lost and the project put on hold. The preliminary design, with the trail located between Hwy 110 and the Frontage Road, has encoun- tered several serious conflicts that may have no solution and require the trail to be located on the north side of the Frontage Road, between Oak Street and Delaware Avenue. The County will be working on these design issues and plans to have an informational open house, possibly in May. NPDES Phase II Permit Update The City submitted an NPDES Phase II Notice of Intent Form at the end of last week to the Minne- sota Pollution Control Agency (MPCA) that was prepared by Bon- estoo Rosene Anderlik Associates (BRAA) documenting that the City is finalizing their NPDES Phase II Permit, and intends to submit it by the May 9th, Date Eve 2003 dead- line. Staff 3/8/03 5" s will be meet- ing with 3/11/03 I-1/ (BRAA) next Thursday for a second time to discuss the goals and refine the details that will be included in the final NPDES Phase II Permit application. On March 7th, the City was in- formed that we were not required to submit an industrial discharge permit to the PCA for the Public Works Garage. Town Center Update The Engineering Department is pleased to report that MnDOT started their review of the Town Center storm water system this week. The data and results that were submitted by Barr Engineer- ing to MnDOT in accordance with the method they stipulated show that the anticipated flows and flood elevations were generally reduced from those that Barr had modeled initially. We expect that this infor- mation will lead to issuance of the required MnDOT permit soon. Street Report The Street Crew worked on repairs to some "custom" mailboxes that were damaged during snowplow- ing. They worked on making some street name signs. They attended the annual "Work Zone Safety" seminar. Some of the topics cov- ered were: Traffic Control, Sign - age, OSHA Standards, and other miscellaneous work zone safety classes. Snow Event nt: Response: nowfall plowed all areas 2" snowfall sanding and scraping as required. NEWS Public Works Engineering The Pipeline Code Enforcement LETTER March 7, 2003 Parks Report The Parks Crew picked up the trash daily from the parks. They also completed the fol- lowing other tasks this week: • They worked with the Street Crew on making street signs • They maintained the com pressor • They closed down the ice skating rinks for the year effective Monday, March 3rd • They cleaned out the warming houses —dried out flooding hoses and put them in storage They repaired the power broom Utility Report Rich checked the City's seven sanitary sewer lift stations daily. He flushed the sanitary sewer line in North Freeway Road after a resident called to report that he had cut the roots out of his service lead. (Resident's roots in City lines have already caused one backup in that neighborhood). He cleaned the Public Works Garage's drains of sand. Fi- nally, he worked with Barr En- gineering to analyze the City's lift station located on Mendota Heights Road for hazardous material. They did that in an- ticipation of demolishing the station after the new one is constructed. Code Enforcement Report CBS is the CDA's contractor that is constructing their senior facility at Town Center. CBS has completed the foundations, framed the first and second floors and are beginning to work on the third floor. The building is yellow because that is the color of the fiberglass re- inforced sheathing. This is a new type of sheathing that is more weather resistant. They are also beginning to pour the floors for the parking garage (basement). Town Center The City still has not received the required MnDOT sanitary sewer and storm water permits for the Town Center Redevelop- ment Project that we had ap- plied for during the first week of December. Marc and I met on Monday with Mary Lacho of MnDot (the permit reviewer) along with several of her super- visors and co-workers in an ef- fort to expedite the process. Mary will not accept the input assumptions and results of the computer modeling that Barr Engineer- ing performed for the City, and in- sisted that Barr En- gineering model the system again using input data and modeling assumptions that meets her requirements. Staff authorized a $2000 pur- chase order for Barr Engineer- ing to complete this task, and the information she has re- quested has been provided to MnDot. Street Report The Street Crew accomplished the following tasks this week: Repaired a broken sander • Cleaned bridge deck side- walks • Removed trash "donated" on Valencourt Circle Replaced burned out light bulbs at the traffic signal on Mendota Heights Road and Dodd Road Removed a large downed tree limb from a resident's fence on Laura Court. Tree was located on unimproved Emerson Avenue • Repaired mailboxes hit by snowplows Snow Events Date: Event: Response: 2/3/03 2" Plowed all over NEWS Public Works Engineering - The Pipeline Code Enforcement LETTER February 21, 2003 Parks Report The Parks Crew picked up the trash daily from the parks. This week they also main- tained the ice skating rinks by checking warming houses and cleaning the ice. Al- though the ice has been very wet this week with the warm weather, we have kept them open (it's supposed to be cold this weekend). It will not be long now before they will have to closed for the sea- son. Utility Report Rich checked the City's seven sanitary sewer lift stations daily. He worked with the resident at 762 Lower Colo- nial Drive to analyze a sani- tary sewer backup. He deter- mined that the blockage was in their private service. He did the same thing for the resident at 1975 Walsh Lane— with the same result. He installed a replacement hydrant flag. He flushed the City's sanitation sewer line in front of 1173 Dodd Road af- ter that resident removed some roots from their private service connection. Street Report The Street crew accom- plished the following this week: Cleaned bridge decks Replaced some crime watch signs • Maintained some barri- cades • Started working on re- placement street name signs for the Freeway Road neighborhood. (They always do replace- ment signs with the street rehabilitation projects). Code Enforcement Report Paul issued a building permit this week to United Properties Construction to expand the tenant space for Fidelity Na- tional Foreclosure and Bank- ruptcy Solutions. Fidelity's new space is located at 1270 Northland Drive, Suite #250 and is to be over 30,000 square feet. He also issued a permit this week to Streeter and Associ- ates Inc. to begin constructing the first new home in the Hidden Creek Development at 645 Hidden Creek Trail. He issued a permit to C70 Builders for an office space remodeling of the first and second floors of the American Bank located kitty corner across from City Hall at 1060 Dakota Drive. Update on NPDES Phase II Permit This week the Engineering staff was asked to fill out a lengthy questionnaire form by Bonestoo Rosene Anderlik (BRA) related to the work be- ing done in conjunction with preparing the National Pollu- tion Discharge Elimination System (NPDES) Phase II Per- mit required by the Environ- mental Protection Agency as mandated under the Federal Clean Water Act. We were also recently notified by the MPCA that the deadline for submitting these NPDES Phase II Permits has been ex- tended by 60 days until May 9th, 2003. LMRWMO News Board members of the Lower Mississippi River Watershed Management Organization (LMRWMO) attended their regularly scheduled watershed meeting this week. One of the major items on the agenda was the presentation and review of the watersheds' storm water quality modeling study that was performed by Barr Engineering. The report predicts the amount of phos- phorus transported from dif- ferent land uses in the water- shed and identifies potential structural improvements and practices that could be imple- mented to improve the water quality of receiving waters. NEWS Public Works Engineering The Pipeline Code Enforcement LETTER February 14, 2003 Parks Report The Parks Crew picked up the trash daily from the parks. They also completed the following other tasks this week: Checked rinks and warming houses daily Broomed and removed snow from the skating rinks Cleaned pedways Worked on finishing painting the mechanic's area Repaired a light at the Wentworth Park warm- ing house Utility Report Rich checked the City's seven sanitary sewer lift stations daily. He had to work with Lilydale's lift sta- tion contractor to repair a starter for their pump. This work was done under war- ranty as their pump is less than one year old. He com- pleted his record keeping work this week annotating where he cleaned sewers in 2002. (Needs to be done for insurance reasons and to keep track of lines cleaned for scheduling future work). Street Report The Street Crew worked on mailbox repairs, did some clean up plowing and sand- ing of some slippery areas. Watermain Break There was a watermain break at Copperfield Drive and Stone Road on Thursday of this week. Because the ground was frozen deep, the repairs took an extra long time and residents were out of water until after dark. (This area has the new duc- tile iron pipe mains which usually don't break, but a valve failed). While there, a resident told Tom Knuth of a fish kill in Copperfield Pond. Tom investigated and found a sizable number of small sunfish and some large perch that had died. NPDES Permit Meeting Members of Public Works, Engineering and Patrick Hol- lister met with Drew Budelis of Bonestroo staff on Thurs- day to begin working on the NPDES permit. Thursday was 'self assessment" day where Drew asked questions of the City's storm system operation so that he could "fill in the blanks" on the permit. This permit will ad- dress the general quality of the storm water of Mendota Heights'. The original dead- line for submitting this per- mit to the MPCA was March 10th, however Drew in- formed us that the deadline has been extended 60 days. Industrial Permit —for PWG The City also needs a NPDES Industrial Users Permit for the Public Works Garage. We toured the area with Chad Engels, Bonstroo on Wednesday to prepare for completing that permit. The MPCA still has not finalized the permit requirements for that permit and it was sup- pose to be submitted by March loth. � Happy Presidents' Day i NEWS PEngineering ublic Works The P e l n e Code Enforcement LETTER February 6, 2003 Parks Report The Parks Crew picked up the trash daily from the parks and, plowed snow from the cul-de-sacs. The Parks Crew also cleared snow from the ice skating rinks, the parks parking lots and the pedways. They power washed the walls in the mechanics bays in preparation to paint them. They unthawed cul- verts under the pedway be- tween Fourth Avenue and Wentworth Park and at- tended a seminar on wood chipper safety. Utility Report Rich checked the City's seven sanitary sewer lift stations daily. He plowed Date: Event: 1-28-03 1/2" 1-30-03 1/2" 1-31-03 1" 2-2-03 1" 2-3-03 6" his normal route on the north end and he cleaned the snow from his lift station lots and driveways. Code Enforcement Report The City's new recreational vehicle ordinance was adopted by the City Council on December 17th and went into effect on February 2nd after it was published. Paul, Dick, Jim, Carl and Pat met on Wednesday, Febru- ary 5th, to discuss proce- dures for implementing this ordinance. At the meeting, we finalized a permit form for allowing temporary park- ing for recreational camping vehicles and designated a placard for putting in the window of the vehicles indi- cating that it is permitted. Snow Events Response: The City has already re- ceived three complaints on recreational vehicles. In- spections were made on the complaints and letters sent to the violators. Mosouito Control I received the attached letter from The Metropolitan Mos- quito Control District this week advising the City of their expanded efforts that are planned for the 2003 season. Street Report The Street Crew mixed sand and salt to put on streets, repaired mailboxes that were damaged from being hit by the wet heavy snow, and replaced a worn out spinner motor on truck #308 (for spreading salt/sand). Scrape main lines and sand neighborhoods Scrape main lines and sand neighborhoods Plow curb to curb (First of the season) Scrape main lines Plow all areas 2-6-03 2" (forecasted dusting) Plow all areas An0 A ice" Y [ U „„EP1N sr' 5EYMETROPOLITAN MOSQUITO CONTROL DISTRICT METRO COUNTIES GOVERNMENT CENTER 2099 UNIVERSITY AVENUE WEST ■ ST. PAUL, MINNESOTA 55104-3431 ...IT nA�n,A� 651-645-9149 ■ FAX 651-645-3246 TTY use Minnesota Relay Service JOSEPH F. SANZONE, BCE W.J. CAESAR Director Business Admin. January 30, 2003 James Danielson Director, Public Works City of Mendota Heights 1101 Victoria Curve Mendota Heights, MN 55118-4106 Mr. Danielson: hi December, representatives from the Metropolitan Mosquito Control District (MMCD) met with the City of St. Paul Division of Parks and Recreation Advisory Committee. Information was provided describing how MMCD controls mosquitoes, and the control materials used. In addition, the group discussed mosquito transmitted disease, including West Nile Virus, and efforts to reduce risk. After the presentation, the advisory committee voted unanimously to recommend removing any restrictions on the control of mosquitoes on land managed by the City of St. Paul Division of Parks and Recreation. MMCD's plan for 2003 is to aggressively monitor mosquito populations in the Pickerel and Crosby Lake areas, and provide control when populations exceed threshold levels. MMCD is confident these control measures will reduce the number of mosquitoes in the surrounding areas, and help make this upcoming summer more enjoyable. If you have any questions regarding MMCD's plan for 2003, please contact me. Respectfully, A� Jim Stark (651)643-8363 jimstark@visi.com cc: Patrice Bataglia,Dakota County Commissioner, Jim L. Toye, Mayor of Mendota, Tom Peine, Ivy Falls Neighborhood Association AFFIRMATIVE ACTION EMPLOYER ® Printed on recycled paper containing at least 15%post-consumer paper fibers NEWS Public Works The Pipeline Engineering Code Enforcement LETTER January 24, 2003 Parks Report The Parks Crew picked up the trash daily from the parks. They worked on ice rink maintenance this week— broomed rinks and flooded rinks. They also worked on equip- ment maintenance. Utility Report Rich checked the City's seven sanitary sewer lift stations daily. He inves- tigated a sanitary sewer backup at 1183 Dodd Road and found the prob- lem to be in the home- owner's private service. He and Tom Olund at- tended their annual sani- tary sewer operator's school held at the Radis- son Hotel in Bloomington, Minnesota. They need to attend this school every year in order to keep their operator's licenses current. Street Report The Street Crew trimmed trees located in the boule- vard in the Friendly Hills neighborhood this week. They used cold mix black- top to patch some pot- holes at various locations. A resident returned a street name sign to the City this week that they found at a garage sale? Building Maintenance Len's two maintenance stalls are cleaned out to make room for the new hoist to be installed. That work will be completed this week. Because there is no snow, there is time for public works available to do some more mainte- nance on the shop. The guys are going to buy some paint, steam clean the walls, rent a lift and repaint the shop area starting this week. Code Enforcement Re- port Paul issued the full build- ing permit this week to CBS Construction Service, Inc. to finish the CDA's new senior facility being constructed at Town Cen- ter. He also issued a permit to Lemaster Construction for completing repairs to the garage at 1295 Kendon Lane. This garage was damaged by a fire on De- cember 1, 2002. The owner's son was winteriz- ing his motorcycle and left some gas in an open con- tainer that gas was ignited after the garage heater was turned on. NEWS Public Works Engineering Code Enforcement LETTER Parks Report The Parks Crew picked up the trash daily from the parks. They also worked on flooding rinks and checking warming houses this week. They attended an expo on Parks at the Minneapolis Con- vention Center this week. Utility Report Rich checked the City's seven sanitary sewer lift stations daily. He worked with the Street Crew to clear some overgrown branches and trees from around his lift stations. He used some of the chips around his Culligan Lane lift station. A resident on Freeway Road notified Rich that they had cleared roots from their line so he cleaned the City's line afterwards. (Thanks to that resident we will The Pipeline not have another blockage in our line). Street Report The Street Crew worked on trimming boulevard trees this week. There has been a big demand for the chips from our resi- dents which saves us on disposal costs. They cleaned up leaves from the street on Val- ley Curve and on Marie Avenue. New Hoist The City's heavy duty hoist failed this fall and the City Council au- thorized a replacement. West Side Equipment was the low bidder and began installing the re- placement hoist this Wednesday. They say it will take them about one week to finish their work. Len needs this hoist for repairing all of January 9, 2003 the City's heavier equipment, but the snow plows would be the most critical this time of year. Hope- fully, the snow holds off until the work is completed. Code Enforcement Report Next week Paul and Dick will be attending their annual Institute for Building Officials Conference. This con- ference is put on by the State for building offi- cials as part of the re- quirements for main- taining their certifica- tion. The conference is being held at the Earle Brown Continuing Edu- cation Center on the University of Minnesota St. Paul Campus. As he has done in the past, Russ Wahl will be filling in for them while they are gone. NEWS Public Works Engineering Code Enforcement LETTER Parks Report The Parks Crew picked up the trash daily from the parks. They also completed the fol- lowing tasks: Flooding ice skating rinks • Put out hockey nets • Posted thin ice signs on Rogers Lake around aera- tor Utility Report Rich checked the City's seven sanitary sewer lift stations daily. He and Tom Knuth measured the infiltration in a sanitary sewer line that goes through a swamp near Ridge- wood Drive. We have com- pleted some minor repairs to the line in the past, but have not done a "lining" because of the high cost. We recently found out that the cost of lin- ing sewer pipes has been re- duced by one half. This line leaks heavily and now a good candidate for being lined. Street Report The Street Crew accomplished the following tasks this week: • Sanded some slippery spots due to melting snow • Removed some over hang- ing limbs along trails • Repaired wing on #308 truck il i 11 0 0 Ah AM January 3, 2003 Code Enforcement Report Paul issued a building permit to Janie Berg, 711 Woodridge Drive, this week to begin work on constructing a retaining wall along TH13 to repair her slope failure that occurred on June 13, 2001. Her contractor for the work is G and S Land Craf- ters, Inc. They began work this week. They are removing ± 400 cubic yards of soil and temporarily storing it at Xcel's tank farm located a short dis- tance south on TH13. They will return the soil to be used as backfill behind the wall as it is being constructed. Paul issued a permit to David Wayne Construction to com- plete tenant space finishes at 2365 Waters Drive to be occu- pied by CSI Crown (32,084 sq. feet) and 2371 Waters Drive (7,462 sq. feet) to be occupied by Burke and Associates. Year End Engineering De- partment Paper Work The Engineering Department is currently in the process of fill- ing out a number of surveys from different agencies. The Engineering staff has begun work on the Metropolitan Coun- cil Environmental Services sur- vey that comes out in Decem- ber requiring that metro area communities compile and up- date data relative to new sani- tary sewer connections, water usage, records of individual sewage treatment systems, and calculations of sewage flows for the past year. The Engineering Department has also begun updating and certifying mileage for streets in Mendota Heights as of the end of the current year to comply with Minnesota Municipal State Aid Street reporting require- ments. The Engineering staff will also begin work shortly on preparing the National Pollution Discharge Elimination System (NPDES) Phase II Permit re- quired by the Environmental Protection Agency as mandated under the Federal Clean Water Act. Snow Events Date: Event: Response: 12/24/02 Dusting Sanded slippery areas