2002NEWS
Public Works
Engineering
Code Enforcement
LETTER
Parks Report
The Parks Crew picked up
the trash daily from the
parks. They also com-
pleted the following other
tasks this week:
• Chipped brush at Ivy
and Wentworth
neighborhood parks
Trimmed trees at City
Hall
Repaired a mower
Installed clocks in the
warming houses
Converted the large
mower to be a snow
blower for the winter
to clear trails and rinks
Street Report
The Street Crew accom-
plished the following
tasks this week:
• Replaced some street
name signs, stop signs
and crime watch signs
Began testing back -
hoes —a new one is
budgeted for next year
The Pipeline
December 20, 2002
Fixed a pothole with
temporary cold mix as-
phalt
Utility Report
Rich checked the City's
seven sanitary sewer lift
stations daily. He com-
pleted a sanitary sewer in-
spection for a home at
1744 Dodd Road. He
worked with St. Paul Re-
gional Water Services to
repair two broken water
valves. He inspected the
sanitary sewer line in Hid-
den Creek with Tom
Knuth.
Code Enforcement Re-
port
Dick Gill and Paul Kaiser
performed a final inspec-
tion for the classroom ad-
dition at Visitation Con-
vent's school this week.
They are allowing the
school to move in their
furniture, however there
are still a few minor cor-
rections to be made.
Town Center
The footings for the CDA's
senior facility have all
been poured and in-
spected and the masonry
walls are now being layed
up.
Watermain Break Sea-
son is Here
Every fall and spring when
the frost is going in or
coming out of the ground,
it causes watermain
breaks. Wednesday
morning, Tom Knuth dis-
covered a watermain
break on Marie Avenue
just east of Dodd Road.
St. Paul Regional Water
Services shut down the
watermain from Callahan
Place to Dodd Road and
repaired the line. The line
was out of service from
about 11:00 A.M. to 5:00
P.M. The street is still not
repaired.
E
NEWS
Public WorksEngineering The Pipeline
Code Enforcement
LETTER December 13, 2002
Parks Repo
The Parks Crew picked up
the trash daily from the
parks. They worked on
opening up the warming
houses at the ice skating
rinks this week (started
up furnaces, put in shov-
els, repaired broken
locks, etc.). They worked
on flooding the ice skat-
ing rinks (this warm
weather should ruin a►I
that).
Utility Report
Rich checked the City's
seven sanitary sewer lift
stations daily. He worked
with a contractor to re-
place the heater in Lily -
dale's sanitary sewer lift
station. He replaced 20
broken hydrant markers
this week. He coordi-
nated with St. Paul Re-
gional Water Services to
repair a watermain break
by 657 First Avenue.
Tom Knuth was called for
an emergency Gopher
One Call at 5:30 A.M. on
Thursday. Water was
shut down from Laura
Lane to Vandall Street.
St. Paul Regional Water
Services completed their
repairs by noon and water
supply was restored to the
residents.
Hidden Creek
Imperial Developers con-
ducted a mandrel test of
the sanitary sewers in
Hidden Creek this week.
They flushed and cleaned
the lines. All lines passed
the test and the sewer is
now in service. The old
Ridder residence was con-
nected to the new sewer
line after the test. They
were also connected to
City water this week. The
owner reported that "they
can now wash white
clothes and not run their
water softener every day".
MCES Meeting
I attended a meeting on
Wednesday, sponsored by
Metropolitan Council Envi-
ronmental Services
(MCES) to discuss Infiltra-
tion and Inflow (I/I) into
the sanitary sewers. This
summer was an extremely
wet one and the flows at
their sanitary sewer treat-
ment plants were up dra-
matically (see attached
letter). MCES is going to
have to address these ex-
traordinary flows —either
by increasing their capac-
ity or by decreasing the
flows from the cities.
The least expensive way
to address the problem is
for cities to decrease their
I/I. MCES is putting to-
gether a Task Force com-
prised of communities,
MCES Staff and an AMM
representative to assess
the problem and recom-
mend solutions. MCES
feels that the biggest con-
tributor to their problem is
sump pumps and founda-
tion drains that go directly
into the sanitary sewer.
The Task Force will be
formed in January with a
goal of arriving at a sug-
gested solution by May.
NEWS
Public WorksEngineering The Pipeline
Code Enforcement
LETTER December 6, 2002
Parks Report
The Parks Crew picked up
the trash daily from the
parks. They started
flooding hockey rinks.
Utility Report
Rich checked the City's
seven sanitary sewer lift
stations daily. He worked
with John Ambrose to
raise a manhole cover on
Knollwood Lane that had
been buried 3-1/2' by a
homeowners yard grad-
ing. He then cleaned the
line. He responded to a
call from Diamond Jim's
Mall of a sewer backup
(the problem was within
their private service). He
installed some new hy-
drant markers.
Street Report
The Street Crew accom-
plished the following
tasks this week:
Repaired the sander
on truck #312
Changed bulbs at the
Mendota Heights
Road/Dodd Road traf-
fic signal
Prepared the driveway
at Town Center for the
ground breaking cere-
mony (it was too cold,
and was held at Park -
view Plaza)
Continued to try and
solve a street light
problem in the Indus-
trial Park (breaker
keeps tripping out)
Code Enforcement Re-
port
Paul issued a permit last
week to Heaver Design
and Construction to con-
struct a new home at
1423 Knollwood Lane.
This is the home that was
approved by Council to
have garage entrances at
two levels.
He also issued the footing
and foundation permit to
CBS Construction Ser-
vices, Inc. to begin con-
struction of the 60 unit
CDA senior facility at
Town Center. The ground
breaking ceremony was
held at the Parkview Plaza
senior facility on Monday.
Town Center
CBS Construction Ser-
vices, Inc. began excava-
tion for the CDA's 60 unit
senior facility this Thurs-
day. Richard Knutson is
in the process of submit-
ting their contract and in-
surance documents so
that they can begin this
their work also. Before
they can begin they need
their MnDOT permits
which are currently being
reviewed.
Snow Events
Date: Event: Response:
12/2/02 dusting sanded streets
12/4/02 dusting sanded streets
Note: Last year we did our first sanding on 11/26/01 and plowed a 3"
snow fall on 11/27/01
NEWS
Public Works Engineering The Pipeline
Code Enforcement
LETTER November 22, 2002
Parks Report
The Parks Crew picked up the
trash daily from the parks and
mulched grass and leaves.
They also completed the fol-
lowing other tasks this week:
Finished installing the do-
nated park bench at Ivy
Park
Set up lake aerator at
Rogers Lake —tested it to
make sure it worked
Removed tennis nets for
season
Removed an apple tree in
Ivy Park and trimmed
overhaning limbs from the
pedway in Valley Park
Utility Report
Rich checked the City's seven
sanitary sewer lift stations
daily. He applied a grease re-
ducer (grease eating bacteria)
to the liftstations where he has
trouble with grease (Mendota
Heights Road, Northland Drive,
St. Thomas and Veronica
Lane).
Street Report
The Street Crew worked on the
following tasks this week:
• Street light repairs in the
Industrial Park
Patched potholes on Men-
dota Heights Road, the
"Avenues", and the north
end
Prepared snowplows
Installed missing street
signs
Code Enforcement Report
Paul issued a permit to Johns
Smaby Custom Homes, Inc.
this week to begin construction
of the second home on Fox -
wood Lane, 554 Foxwood
(evaluation = $800K).
Paul and Dick received their re-
certification as building officials
this week (through 2005).
Town Center
Bids were opened last Friday
for the Town Center public im-
provements. Richard Knutson,
Inc. was the contractor who
was the low bidder and his bid
matched Marc's estimate.
Council awarded the bid this
Tuesday.
The project is located at the in-
tersection of TH110 and TH149,
so several MnDOT permits are
required before we can begin
work. Marc and I met with
MnDOT staff members Wednes-
day this week to begin with ac-
quiring these permits. We
learned that there are four per-
mits required:
1. For utility borings under
Dodd Road (sanitary and
storm sewer).
2. A drainage permit.
3. An access permit for the
frontage road and off ramp
from TH110.
4. An access permit for street
connections to Dodd Road.
We received all the blank forms
and will submit them to MnDOT
immediately. The contractor
could begin work as soon as we
get the permits back.
Hidden Creek
Crew number 1 (pipe crew) in-
stalled the drain tile, placed rip -
rap at the end of culverts and
other storm water outlets, air
tested all the 8" sanitary sewer
mains and services (all
passed), dug the last seven wa-
ter services for St. Paul Re-
gional Water and poured con-
crete inverts in manholes and
catchbasins. This crew is com-
pleted with their work.
Crew number 2 (grading crew)
subcut the street subgrade and
began placing geotextile fabric
(prevents clay from migrating
up and contaminating the good
sand and spreads the load from
the street). They began placing
granular burrow in the roadway
above this fabric. They are
bringing in over 100 truck loads
of this borrow every day.
NEWS
Public Works Engineering The Pipeline
Code Enforcement
LETTER November 15, 2002
Parks Report
The Parks Crew picked up the
trash daily from the parks and
mowed grass. They fertilized
the ballfields in all the
neighborhood parks, Menda-
kota Park, Kensington Park,
City Hall and the Fire Station.
They serviced all their small
engines, changed oil, stabilized
gas, and put in storage for the
winter.
Utility Report
Rich checked the City's seven
sanitary sewer lift stations
daily. He performed inspec-
tions this week at 2178 and
2182 LeMay Lake Road for
new private connections to the
City's sanitary sewer main. He
worked with Barr Engineering
to perform inspections at Lily -
dale's lift station, he pulled the
pumps and he removed and
replaced a bad circuit breaker.
He replaced a broken storm
sewer grate on Ocala Court.
Street Report
The Street Crew accomplished
the following tasks this week:
Removed a dead boulevard
tree at 2290 Copperfield
Drive
Mixed sand and salt
• Removed a landscape
mound from the center is-
land at Lockwood Drive and
Mendota Heights Road to
improve sight distance
• Patched streets at Delaware
and Emerson and Copper -
field Drive and Stone Road
• Replaced some street name
signs
• Repaired the snowplow wing
to truck 308
• Removed Halloween bonfire
ash
Ecolab Drainage
Ecolab has trouble with surface
water drainage from their park-
ing lots. Because their facility
is so close to bedrock, they can
not correct the problem eco-
nomically by adding storm
sewer. They have hired a con-
tractor to grade a drainage
ditch around the lots for the
water to drain into. Because
the slopes in this ditch are so
flat, they will still have trouble
with standing water, but at
least the water will be off their
parking lots. Marc met with
their contractor this week to re-
view the project. He informed
them, that as long as the pro-
ject does not remove or bring
in over 400 cubic yards of
earth, they do not need a city
permit. He requested that they
contact the adjoining property
owners, describe what they
have planned, and explain the
expected impacts that will oc-
cur as a result of the project.
Code Enforcement Report
Paul issued permits this week
for Hoffman Homes to construct
another of their two unit town -
homes at 2170 and 2174 Le -
May Lake Drive. He issued a
sign permit to Spectrum Signs
Systems, Inc. for Honeywell to
occupy space at 2120 Centre
Pointe Boulevard.
Hidden Creek Report
Crew number one finished in-
stalling the sanitary sewer
mains and services (now all
done with sanitary sewer).
They then finished installing the
watermain. (They still have six
services to install). They in-
stalled all the storm sewer pip-
ing except the flared end sec-
tions, which need to be in-
stalled on sheet piling which is
not on the job.
Crew number two dug all the
water service trunks west of
Nature Way for a St. Paul Re-
gional Water crew to install
them. This crew also installed
a four inch diameter drain tile
behind the curb on the north
side of Hidden Creek Path to re-
move ground water and provide
access for homeowner's to con-
nect their private drain tiles.
There was a meeting held
Wednesday to arrive at a solu-
tion for building a stable road-
way on top of the soft soils.
There was a mutual decision of
all parties (Braun Intertec,
Loucks, Imperial Developers
and Tom Knuth) to place geo-
textile fabric covered with 18
inches of granular borrow
topped with 12" of Class 5 rock.
NEWS
Public Works
Engineering
Code Enforcement
LETTER
Parks Report
The Parks Crew picked
up the trash daily from
the parks and mowed
grass. They removed
downed tree limbs from
the parks this week and
put them in the bonfire
pile.
They had
to repair the
door to
the women's
restroom
at Kensington
Park North
(the restroom
provided
by Quest).
Vandals
had bashed
down the
door and de-
stroyed everything in-
side —toilets, sinks, etc.
They cleaned up the ga-
rage area and worked
with the highway patrol
to conduct a child pas-
senger safety checkup
event (see attached).
Utility Report
Rich checked the City's
seven sanitary sewer lift
stations daily. He re-
sponded to an inquiry
from the Country Day
Care about two signifi-
cant sink holes that had
formed over the City's
The Pipeline
November 1, 2002
sanitary sewer line lo-
cated in the old Victoria
Road right-of-way. (It
was suspicious). West
St. Paul agreed to work
with Rich and use their
television equipment to
inspect the line. They did
the inspection Wednes-
day and found nothing —
so we will just fill the
holes. He also worked
with the Parks Crew to
help cut up and remove
some willow trees that
blew down in the last
wind storm.
Street Report
The Street Crew regularly
pushed the bonfire pile
up this week. The dump-
ing was closed as of
Tuesday evening, so
Wednesday morning the
Crew closed up the
fences. The residents
were good this year
about only dumping what
they were supposed to (a
few fences, pallets and
plywood did show up
though).
They had to maintain all
the metal parts on the
overhead door to the salt
storage room this week
(that salt is really corro-
sive). They worked on
converting dump trucks
to snow plows.
Hidden Creek
Imperial Developers still
has two crews working on
the Hidden Creek project.
These crews concentrated
worked on installing sani-
tary sewer services and
stubs this week. Both
crews also worked on in-
stalling watermain and
hydrants, storm sewer
mains and catch basins.
Town Center
Marc received Minnesota
State Aid's review com-
ments back this week on
the frontage road and the
off ramp from TH110. He
will be able to make their
changes in time for a No-
vember 15th bid opening.
Consideration of a bid
award will be on the City
Council's November 19th
agenda.
Attachment
I:
All
LJ
.-+
O
r"'
O
�
a
oxa
o�o,x
mod.
�
PC
00
•�
4.4
W'
U
�
O
=F...4
J.4
vs
N
ti
o
O
p�
PC..
a�
c�
.P
POO
C
PC
W
04
x
.� 45
� U
x,
c
� Q a
U o �
� s
O � tj
�kn
Cd
U o
o
NEWS
Public Works
Engineering
Code Enforcement
LETTER
Parks Report
The Parks Crew picked
up the trash daily from
the parks and mowed
grass. They also com-
pleted the following
other tasks:
Brought in the soccer
goals for winter stor-
age
Brought in picnic ta-
bles for winter storage
Began installing plows
on their pickups to be
ready to plow the cul-
de-sacs this winter
Utility Report
Rich checked the City's
seven sanitary sewer lift
stations daily. He also
replaced the heater at
the Culligan Lane lift sta-
tion. The heaters are
needed to keep moisture
out of the control panels.
Street Report
The Street Crew accom-
plished the following
tasks this week:
9
October 25, 2002
Installed new chipping
knives in chipper
Kept bonfire brush
pushed together
Cleaned ditch at TH13
and Garden Lane
Reinstalled some
street name signs
Put Class 5 around ra-
dius of corner at Upper
Colonial Drive and
Wachtler Avenue
Hidden Creek
The third crew working
on installing public im-
provements at Hidden
Creek, completed boring
for the 24" diameter steel
casing under Dodd Road.
They installed the sani-
tary sewer main in the
casing. This crew then
left the job.
The contractor's second
crew, installed sanitary
sewer services and storm
sewer and on Thursday
began on installing water -
main.
The first crew, spent the
entire week installing
sanitary sewer mains.
The crew is battling ex-
tremely wet conditions
from a high water table.
This crew will work two or
three more days on sani-
tary sewer main then
work with the other crew
to try and complete all
the utilities located west
of the existing home's
driveways.
On Thursday, North West
Bituminous repaired
Marie Avenue where St.
Paul Regional Water had
tapped into the water -
main for the project.
Enjoy the Halloween
Bonfire!
NEWS
Public Works
Engineering
Code Enforcement
LETTER
Parks Report
The Parks Crew picked up
trash daily from the parks.
They also dragged and
chalked fields and striped foul
lines on an as needed basis.
The Parks Crew also ac-
complished the following other
tasks this week:
• Repaired the players
benches at Kensington
Park
• Removed damaged picnic
tables from Kensington
Park for repair
• Aerated soccer fields at
Kensington Park
• Repaired the women's toi-
let at Mendakota Park
• Planted pine trees behind
new bench on Wachtler
Avenue to provide screen
from neighbor (as re-
quested)
Utility Report
Rich checked the City's seven
sanitary sewer lift stations
daily. He worked with the
Parks Crew in aerating Ken-
sington Park, Friendly Hills
Park and Hagstrom King Park.
Rich hired Pipe Services to jet
and vac the sanitary sewer
line on the 'old" frontage road
in the Freeway Road area.
The line was filled with sand
and gravel that had been
il I i I D 9 Ah Ift
October 4, 2002
there for years. It had several
large rocks and another huge
root- ball that had been re-
cently cut out of a resident's
private service Iine.
(Fortunately, he was able to
remove that rootball before it
caused another backup). They
also cleaned the sanitary sewer
main in Dodd Road from Mears
to Ivy Falls Avenue where Rich
was aware of a build up of
rocks and sand but could not
jet the line clean himself be-
cause a resident has an un-
vented bathroom in that area
that "blows the toilet" when
he jets.
He attended the mandatory
confined space entry class put
on by Safe Assure on Thurs-
day.
Code Enforcement Report
Paul issued a permit this week
to Scott Thomas to construct a
new home at 1223 Knollwood
Lane. The home is located
within the Mississippi River
Critical Area and had received
Planning Commission review
and City Council approval prior
to issuance of the permit.
Town Center
There was no work completed
at Town Center this week.
Hidden Creek
Imperial Developers have been
working all week on building
and improving the temporary
access road serving the three
existing residents. Because of
the unstable soil, they have to
begin incorporating engineer-
ing fabric in the construction of
this access road. They worked
on NURP pond 2 (the one clos-
est to Willow Creek). They
hauled excess material from
building lot 1 to the NURP pond
2 area.
Street Report
The Street Crew accomplished
the following task this week:
Replaced some missing
signs
• Patched potholes in the Ivy
Falls neighborhood
Attended the Fall Mainte-
nance Expo put on by the
State of Minnesota and at-
tended classes on:
0 Chain saw safety
0 Snow and ice control
o Snowplow and wing
operations
0 "Getting passionate about
winter street maintenance"
• Worked on repairs to street
lights
• Some welding repairs to
equipment
NEWS
Public Works Th
le Npefi n e
Engineering
Code Enforcement
LETTER September 20, 2002
Parks Report
The Parks Crew picked up
trash daily from the
parks. They also dragged
and chalked fields and
striped foul lines on an as
needed basis. T h e y
also installed the con-
crete pads for the do-
nated park benches this
week.
Utility Report
Rich checked the City's
seven sanitary sewer lift
stations daily. He at-
tended the preconstruc-
tion meeting for the Hid-
den Creek project and
then cleaned and in-
spected the City's sani-
tary sewer line on Dodd
Road where Hidden Creek
will be "hooking in" to it.
Now, if the line is blocked
or otherwise damaged,
we are assured that it
was not our doing.
Street Report
The Street Crew accom-
plished the following
tasks this week:
Repaired a storm water
catch basin on Medal-
lion Drive
Repaired a settlement
behind a curb on Blue -
bill Drive
Patched potholes on
Somerset and Freeway
Road neighborhoods
(minimum only in the
Freeway Road
neighborhood)
Code Enforcement Re-
port
Paul issued sign permits
this week to Sign Art
Company, Inc. to replace
the "Dakota Bank" signs
with "American Bank"
which is Dakota Bank's
new name.
Town Center
Turner Excavating was re-
moving some excess fill
from the site this week.
They are basically finished
with their grading work at
Town Center.
Fire Station
Removed the uneces- The parking lot stalls were
sary signage from restriped this week at the
around Town Center
Fire Station.
Hidden Creek
The preconstruction meet-
ing for the streets and
utility work for this project
was held at City Hall on
Tuesday this week. The
contractor for the work is
Imperial Developers, who
are also doing the mass
grading for the site. The
meeting was attended by
City Staff, the developer's
consultants, other utilities
involved and Chris Mueller
and Litton Field, two of
the affected homeowners.
The earliest possible start
date for this work is Sep-
tember 27th, but we still
do not have MnDOT's per-
mits, and the mass grad-
ing is not completed.
Imperial Developers com-
pleted construction of the
temporary access road for
the existing homeowners
this week (it is still a little
soft). They also continued
to grade NURP ponds and
streets. The soil is ex-
tremely wet and some of
the compaction tests are
failing.
NEWS
Public Works
Enaineerina
Code Enforcement
LETTER
Parks Report
The Parks Crew picked up
trash daily from the
parks. They also dragged
and chalked fields and
striped foul lines on an as
needed basis.
The crew completed the
following other tasks this
week:
Delivered extra picnic
tables to Friendly Hills
Park for a block party
Removed unused soc-
cer goals from Ivy
Park
Installed new irrigation
lines at the Fire Sta-
tion
Helped out at Fire Sta-
tion for 9-11 ceremo-
nies
Utility Report
Rich checked the City's
seven sanitary sewer lift
stations daily. He also
repaired a pump that was
plugged at the Northland
Drive lift station. He ap-
plied the fall spray of
chemicals to kill the
The Pipeline
September 12, 2002
weeds at City Hall, Fire
Station, Hagstrom-King
Park and Curley's tot lot.
Rich contacted the West
St. Paul Utility Depart-
ment and they agreed to
use their camera to ana-
lyze a sanitary sewer line
on Lexington Avenue at
Cullen Lane to see if the
blockage in a resident's
sewer line was caused by
the City. It was not, it
was caused by a huge
mass of roots from her
service that were growing
all the way down to our
line (West St. Paul cut
them off in our line).
Town Center
This week, Turner finished
grading the north pond
and worked on the south
pond at Town Center.
They worked on the
"finished" site grading
(spreading top soil, etc).
Turner plans on complet-
ing all their work next
week. Because Xcel was
unable to relocate their
power lines located along
TH110 before Turner fin-
ished their work, we will
have the public improve-
ments contractor com-
plete the south pond at
the intersection of TH110
and Dodd Road with their
work.
Fire Station
The Parks Crew installed
the lawn irrigation system
in the island at the front
of the building this week.
Hidden Creek
Imperial Developers
worked this week on in-
stalling a temporary ac-
cess road for the three ex-
isting homeowners that
live in the project. They
installed temporary cul-
verts for drainage pur-
poses and they continued
to work on building the
NURP ponds. They used
the NURP pond excavation
for street fill.
Traffic Calming
Traffic calming is an issue
that we are always dealing
with at City Hall.
Neighbors wanting speed
bumps, stop signs, slow
children signs, etc. At-
tached is an article on the
subject that was in this
week's Pioneer Press.
NEWS
Public Works
Engineering
Code Enforcement
LETTER
Parks Report
The Parks Crew picked up
trash daily from the
parks. They also dragged
and chalked fields and
striped foul lines on an as
needed basis. T h e
Parks Crew completed
the following other tasks
this week:
Painting and sealing
park signs
Hauled black dirt to
the fire station lev-
eled, smoothed and
seeded it.
• Hauled black dirt to
Wentworth Park to
level some depres-
sions and seeded it.
• Striped parking lot
lines in neighborhood
parks
Installed new tennis
nets at Marie Park
Utility Report
Rich checked the City's
seven sanitary sewer lift
stations daily. He
sprayed for broadleaf
weeds in the parks this
September 6, 2002
week and sprayed
Roundup around man-
holes that have buckthorn
and other weeds growing
around them.
He met with Barr Engi-
neering Engineers on
Wednesday to analyze the
Mendota Heights Road
sanitary sewer lift station.
Barr had an electrical en-
gineer, a mechanical engi-
neer, a structural engineer
and a general project
manager who were all
performing tests on the
station. The station is
over 30 years old and
many of it's major compo-
nents are now either worn
out or obsolete. We have
budgeted $150,000 to
complete a major over-
haul of the station next
year.
Rich was called back on
Wednesday evening to fix
a power outage at the
Centre Pointe lift station.
Street Report
The Street Crew com-
pleted pothole patching on
Eagle Ridge Drive and on
Sunset Lane this week.
They also replaced some
signs and repaired a
washout on Sunset Lane.
Fire Hall
Pine Bend Paving paved
the entire Fire Station
parking lot and trail on
Thursday. All that re-
mains to be completed on
this project is some side-
walk that has to be re-
paired by mud jacking and
restriping of the parking
stalls.
Hidden Creek
Imperial Developers be-
gan constructing a tempo-
rary access road to be
used by the three existing
residents during construc-
tion of the City's public
improvements.
Town Center
Turner Excavating spent
the entire week working
on ponds, streets, parking
lots and other general site
grading. It appears as if
they will complete all their
work next week.
NEWS
Public Works
Engineering
Code Enforcement
LETTER
Parks Report
The Parks Crew picked up
trash daily from the
parks, mowed grass and
dragged and chalked
fields and striped foul
lines on an as needed ba-
sis.
They also completed the
following other tasks this
week:
Delivered rec rock to
the Civic Center site to
repair a washout
Cleaned pedways
Removed downed
limbs from Parks
Applied natural toner
to park signs
Utility Report
Rich checked the City's
seven sanitary sewer lift
stations daily. Rich com-
pleted an inspection for a
new sanitary sewer con-
nection at 545 Huber
Drive.
He responded to an alarm
at the Lilydale lift station
and had to work all day
The Pipeline
August 29, 2002
with an electrician until
the problem was solved.
He prepared the chemical
sprayer for fall spraying of
the parks.
Street Report
The Street Crew com-
pleted the following tasks
this week:
Patched the street in
front of curb replace-
ments
Trimmed bushes and
trees to improve sight
distances at some in-
tersections
• Cleaned catch basin
inlets
Code Enforcement Re-
port
Paul issued a permit this
week to LeRoy Signs for
them to install a new sign
to be located at the en-
trance to Brown College,
1440 Northland Drive.
The new sign will an-
nounce Brown's Le Cordon
Bleu Culinary School.
Town Center
Turner Excavating finished
grading and compacting
the building pads for the
two condominiums, town-
house #3 and the Senior
Building this week. This
completes the soil correc-
tions, backfilling and com-
pacting for all of the build-
ing pads. All that remains
for them to finish are
streets, parking lots,
ponds and general site
grading.
Fire Station
Pine Bend
Paving re-
claimed and
graded the
west parking
lot at the
Fire Station
this week.
They also completed the
patching and
did the edge
milling in preparation for
the overlay.
The overlay
is scheduled
to be done
next week.
Hidden Creek
Imperial, the Hidden
Creek grading contractor,
has not been on the site
all week.
NEWS
Public Works
Engineering
Code Enforcement
LETTER
Parks Report
The Parks Crew picked up
trash daily from the parks.
They also dragged and
chalked fields and striped
lines on an as needed basis.
The Parks Crew completed
the following other tasks
this week:
Painted the hockey
boards at Friendly Hills
and Wentworth Parks
Painted the warming
houses at Friendly Hills
and Wentworth Parks
Removed a tree from the
pedway along Marie
Avenue that was downed
by the strong winds
• Worked on restoring the
plantings around the
park signs at Kensington
Park
Power washed the park
signs to restore natural
color
• Acquired some more
trash barrels for parks —
drilled drainholes in
them and painted them
Street Report
The Street Crew accom-
plished the following tasks
this week:
• Cleaned storm grates af-
ter the storms
• Installed some signs
• Worked on curb replace-
ment restoration
Utility Report
Rich checked the City's
seven sanitary sewer lift sta-
tions daily. He and his
helper cleaned sanitary sew-
ers on Mendota Heights
Road west of Trunk Highway
55 and in the Kennedy/Biel
easement this week. He
also responded to the follow-
ing after hours lift station
alarms this week:
• Friday, August 16th at
7:30 PM there was a
power outage at the Cul-
ligan Lane lift station.
• At 12:00 A.M. there was
a power outage at the
Veronica Lane lift station.
• On Wednesday, August
21st there was a power
outage at the Veronica
Lane lift station at 4:15
A.M.
9 -
August 22, 2002
He also opened two storm
sewer pipes after the
Wednesday storm.
Town Center
Turner pumped water all
week long from the Senior
Center excavation, first to
remove water from Friday
night's storm, and then from
Tuesday night's storm. They
started preparing the two
condominium building pads
this week. Qwest began
splicing their 500 pair cable
in order to have their line
out of the way of the Senior
Building.
Fire Station
Bids were received this week
from four paving contractors
to repave the Fire Station
parking lot. Pine Bend Pav-
ing was the low bidder and
was sent a purchase order to
do the work.
Hidden Creek
Imperial, the grading con-
tractor for Hidden Creek,
worked on excavating a
NURP pond this week.
(Mostly they did not work
because of the wet
weather —only to do damage
control).
NEWS
Public Works
Engineering
Code Enforcement
LETTER
Parks Report
The Parks Crew picked up
trash daily from the parks.
They also dragged and
chalked fields and striped
foul lines on an as needed
basis.
The Parks Crew accom-
plished the following other
tasks this week:
• They hauled in extra
picnic tables for a large
party at Mendakota
Park
• Weed whipped along
the pedways around
signs, fire hydrants
etc.
• Set up fields for fall
soccer - installed goals,
nets and striped fields
• Hauled and leveled
black dirt for repairs to
the lawns at the Fire
Station and Wentworth
Park
Street Report
The Street Crew accom-
plished the following tasks
this week:
• They cut up and re-
moved a large tree limb
M Am
and removed it from the
street at 625 Ivy Falls
Avenue
• They patched potholes
and repaired Ivy Hill
Drive
• Replaced some missing
street signs
• Began repairing streets
where the curb and gut-
ters were replaced last
week
Utility Report
Rich was on vacation this
week, so his summer
helper maintained the lift
stations.
Code Enforcement Re-
port
Paul issued a permit this
week to Scheiber Mullaney
Construction to construct
the addition to Velmont Ap-
plied Coating Technology
located at 2411 Pilot Knob
Road. The addition will be
9300 square feet and be
used to paint light poles.
Valuation is $330K.
Town Center Grading
Turner Excavating is con-
tinuing to concentrate on
August 16, 2002
completion of the senior
center soil correction and
doing some more street
grading.
Hidden Creek Grading
Imperial Developer is
still
working on grading
the
same building pads
and
street areas that they were
working on last week.
We
discovered this week
that
they are short of good
dirt
and will have to lower
the
street grades by as much
as two feet.
Go Tiger!
NEWS
Public Works
Engineering
Code Enforcement
LETTER
Parks Report
The Parks Crew picked up
trash daily from the parks.
They also dragged and
chalked fields and striped
foul lines on an as needed
basis.
They also accomplished the
following tasks this week:
• Top dressed the soccer
fields at Mendakota and
Kensington Parks
• Installed lawn sprinkler
heads east of the Fire Hall
• Cleaned up around tennis
courts
• Prepared Mendakota Park
for National Night Out
(250 people)
• Trimmed trees by Menda-
kota Pavilion
• Removed boulders from
Friendly Hills Park
Utility Report
Rich checked the City's seven
sanitary sewer lift stations
daily. Rich and his summer
helper cleaned sanitary
sewer lines this week at the
following locations:
• Chippewa Avenue
• Hiawatha Avenue
• Garden Lane
• Fremont Avenue
The Pipeline
and at the following trouble
spots:
Dodd Road near 4th Ave-
nue
• Callahan Place
• Walsh Lane near Kay Ave-
nue
• Easement behind Eagle
Ridge
End of Knob Road
• South Freeway near
Alphonso's house
Street Report
The Street Crew accomplished
the following tasks this week:
• Repaired broken curb at
1689 Celia Road
• Repaired catch basins on
Mendakota Court and
Fieldstone Drive
• Fixed potholes on Mears,
Dorset, Kirchner and ]unc-
tion Lanes
Code Enforcement Report
Paul issued a permit this week
to Ryan Construction to com-
plete a 12 classroom addition
at the School of the Visitation
Convent valued at $2M.
August 9, 2002
Town Center Grading
Turner Excavating spent Mon-
day morning pumping water
from their excavations that
was there as a result of last
weekends' 3" rainstorms. Af-
ter pumping they concen-
trated on sub cutting the bad
material from underneath the
senior building. They were
also working on the extension
of North Freeway Road and
the TH 110 Frontage Road
this week.
Fire Hall
CurbMaster poured 100' of
new curb and gutter around
the landscape island near
Dodd Road and removed and
replaced 75' of curb and side-
walk that had settled near the
front entrance of the Fire Sta-
tion. They also removed and
replaced settled or badly bro-
ken curb and gutter at seven
other locations around the
City.
Hidden Creek
Imperial Developers, the
grading contractor, is working
on the first 400 feet of street
(Hidden Creek Trail) east of
Dodd Road and the first four
building pads located north of
Hidden Creek Trail and east of
Dodd Road. They also in-
stalled temporary culverts to
handle creek water flows dur-
ing construction.
NEWS
Public Works
Engineering
Code Enforcement
LETTER
Parks Report
The Parks Crew picked up
trash daily from the parks.
They also dragged and chalked
fields and striped foul lines on
an as needed basis. They ac-
complished the following other
tasks this week:
• Worked with the DNR at
Roger's Lake to pickup
weeds
• Swept the fields at Ken-
sington Park to prepare
them for topdressing and
reseeding
• Attended an U of M spon-
sored Field Day on turf
maintenance
Utility Report
Rich checked the City's seven
sanitary sewer lift stations
daily. He was called in Sunday
evening to respond to a power
outage at the Veronica sani-
tary sewer lift station. He and
his summer helper cleaned
sanitary sewers located on
Miriam Street, Simard Street
and on the easement from
Douglas Road to Mayfield
Heights Road. This week they
also unplugged a catch basin
behind 1366 Cherry Hill Road
at Ecolab (they put on their hip
waders and removed sticks
and leaves).
Rich and John Ambrose re-
paired the sump pump at the
main sanitary sewer lift station
this week.
The Pipeline
Street Report
This week the Street Crew ac-
complished the following tasks:
• Reinstalled some missing
and damaged signs
• Graded Dodge Lane
• Worked with Tom Knuth on
the Fire Station parking lot
improvements:
0 Delivered storm pipes
0 Installed class 5 rock
• Worked with a resident to
discover what was causing
the hole in Delaware Ave-
nue pavement
• Removed and chipped dead
trees at 919 Delaware Ave-
nue and 1198 Falls View
Court
Town Center
Turner Contracting finished
grading and compacting the
building pads for commercial
buildings E and F this week.
They continue to subcut poor
soil from the senior housing
site. They are working on
Townhouse sites #1, 4 and 5
and are continuing to work on
Town Center Boulevard and
started working on grading the
North Freeway Road extension.
Qwest began relocating their
communications line off from
the old Freeway Road to get it
out of the way for the senior
center building. Protec, the
August 1, 2002
City's environmental consult-
ant, visited the site this week
to evaluate the work and train
the workers. The contractor re-
used salvaged 12" watermain
from Freeway Road to install a
temporary storm sewer to drain
the site. They use this pipe to
drain their building excavations
after rainfalls.
The Ridder barn was parked on
the site Thursday night after
the movers were unable to get
the barn under the last set of
overhead wires (an MCI line
was discovered and no MCI
workers were there to move it).
Hidden Creek
Imperial Developers began
mass grading for the Hidden
Creek project this week. They
are excavating some of their
NURP ponds and building
streets. The Fire Chief had the
Developer spread the large
woodchip pile in order to stop
the steaming or smoking that
was coming from it.
Fire Hall Parking Lot
New storm water piping and
three catch basins were in-
stalled by SW Lee at the front
island of the Fire Station this
week. The Parks Crew installed
a new irrigation pipe to the is-
land to get that piping out of
the way of the new storm water
pipe. The next phase in the fire
station parking lot reconstruc-
tion will be installing the curb
and gutter and sidewalk.
NEWS
Public Works
Engineering
Code Enforcement
LETTER
Parks Report
The Parks Crew picked up
trash daily from the parks.
They also dragged and chalked
fields and striped foul lines on
an as needed basis. T h e y
worked over the weekend to
prepare the fields at Menda-
kota Park and City Hall for the
State AAU 11-13 year old
baseball tournament (Friday
morning through late Sunday).
They removed the pitcher's
mounds, extra picnic tables
were brought in for the tour-
nament, and did other after
the event clean up on Monday.
They performed maintenance
to all the other neighborhood
park fields this week (hauled
and leveled new rec rock etc.).
They delivered wood chips for
the neighbors who are doing
the volunteer gardening in Ivy
Park (see picture). They re-
paired the lawn sprinkler at
City Hall.
Utility Report
Rich checked the City's seven
sanitary sewer lift stations
daily. He performed an in-
spection for a new sanitary
sewer connection on Pilot Knob
Road. Note: Rich and his
summer helper were both on
vacation most of this week.
Street Report
The Street Crew repaired five
street lights in the Industrial
Park that were not operating.
They cleaned out a storm wa-
ter ditch near Callahan Place.
They cut up and removed a
The Pipeline
large cottonwood tree limb that
had fallen at 625 Ivy Falls Ave-
nue. They replaced the barri-
cades at the end of Mayfield
Heights Road. They patched
potholes on Dorset Road and
Ivy Hill Drive.
Town Center
Turner Contracting, the grading
contractor for Town Center, is
progressing well. They are cur-
rently working on the frontage
road, the Senior Center, Build-
ing F, and Town Center Court
building pads. St. Paul Water
plugged the existing 12" water -
main that was located in Free-
way Road. Xcel Energy
plugged a gas main that was in
Freeway Road.
Monday morning it was discov-
ered that vandals had broken
windows in all the contractor's
equipment, set the cab of the
water truck on fire, and ruined
the engine on their compactor.
They also threw the "Road
Closed" signs in the woods and
removed many of the City's
survey stakes. These problems
delayed starting work several
hours on Monday while
the equipment that
had the windows bro-
ken were repaired or
cleaned. The water
truck is a total loss
and the compactor
was repaired on Tues-
day.
Ivy Park
Installation of new
winches and nets com-
July 26, 2002
pletes the resurfacing project at
Ivy Park tennis courts. Three
residents contacted City Staff
to express their satisfaction
with the completed project.
The contractor also reapplied
court markings at the Marie
Park tennis courts this week.
Several area residents have re-
established a small butterfly
garden located east of the
pathway and holding pond.
The city roto-tilled the area and
dropped off wood chips and
topsoil. The residents, who
have offered to adopt and care
for this garden removed weeds,
installed plant materials, and
placed wood chip mulch around
the flowers.
Another group of residents wish
to develop a landscape plan for
the tennis court area. Staff will
review their concept plan, and
if it is appropriate to the site,
they will provide plant materi-
als, topsoil, wood chips and sal-
vaged landscape blocks. The
residents propose to provide
the labor for construction and
future maintenance.
The butterfly garden at Ivy Park
NEWS
Public Works
Engineering
Code Enforcement
LETTER
Parks Report
The Parks Crew picked up
trash daily from the parks.
They also dragged and
chalked fields and striped
foul lines on an as needed
basis. The Parks Crew
trimmed trees and shrubs
overhanging the trails this
week. They repaired the re-
taining wall and removed the
trees damaged by vandals in
Rogers Lake Park this week.
They repaired sprinkler heads
at the Fire Hall, Mendakota
Park, and City Hall this week.
They prepared the fields at
City Hall and Mendakota Park
for the State AAU 11-13 year
old tournament starting Fri-
day this week.
Utility Report
Rich checked the City's seven
sanitary sewer lift stations
daily. He hired Infratech to
install a fiberglass liner to the
sanitary sewer line located
on Douglas Road east of Lex-
ington Avenue. This section
of line is in an easement area
and is continually being infil-
trated and blocked by tree
roots, the liner will prevent
future root growth into the
line.
Rich asked the West St. Paul
Utility Department to televise
the sanitary sewer line on
Brookside Lane where the
City had a back-up last week.
The LMCIT insurance adjuster
- 9
July 19, 2002
had requested that we do the
televising to ensure that there
was no problem within the
City's line that would have
caused the back-up there
were none and the adjuster
denied the homeowner's
claims.
Rich has been working with
Lilydale's contractor to up-
grade their lift station. The
work is done and they had a
start up "ceremony" this
week. The remodeling work
had been taking a lot of Rich's
time so he is glad that the
work is finally finished.
He and his summer helper
cleaned sewer lines on Cherry
Hill Road and Wachtler Ave-
nue this week. He also per-
formed a new sanitary sewer
service inspection on Knoll -
wood Lane.
Street Report
John Ambrose cut the old well
head off in Wentworth Park
and repaired the lawn area
around it. The Crew
removed two dead
boulevard trees and re-
paired the yards. They
trimmed trees and
bushes to improve
sight distances at An-
napolis and Chippewa
and Roundhill and
Dodd Roads. They
worked with the Parks
Crew to haul rec rock
to fields to prepare the
parks for the State AAU
11-13 year old baseball tour-
nament starting this Friday.
They patched potholes on
Chippewa Avenue, Dorset
Road, Mendota Heights Road
and repaired the flume to the
catch basin at Dodd Road and
Wagon Wheel Trail.
Code Enforcement Report
Paul issued a permit this week
to Delly Construction for a re-
modeling for Brown College.
They are remodeling 2535 Pi-
lot Knob Road located in the
northwest corner of Pilot Knob
Road and Northland Drive, to
accommodate ten new class-
rooms. He issued a footing
and foundation permit to RI
Ryan Construction for Visita-
tion Convent to begin their
new 12 classroom addition.
Finally, he issued a permit to
Hoffman Homes to begin con-
struction of townhomes at
2146 and 2150 LeMay Lake
Road (they now have only 14
lots remaining).
Tom and Brent surveying for the
Town Center grading project.
NEWS
Public Works
Engineering
Code Enforcement
LETTER
Parks Report
The Parks Crew picked up
trash daily from the parks.
They also dragged and chalked
fields and striped foul lines on
an as needed basis. The Parks
Crew accomplished the follow-
ing tasks this week:
• repaired damaged picnic
tables
• repaired washed out warn-
ing track at the civic center
site
• brought extra picnic tables
to Kensington Park for a
big party
• they hauled some wood
chips for use at Ivy Park
• they installed some drains
on field #2 at Mendakota
Park to eliminate some
ponding water
• they removed some over-
hanging tree limbs at Ivy
Falls Park
• they repaired some broken
sprinkler heads at Menda-
kota Park
• they repainted the foul
poles at Mendakota Park
• repaired sod damaged at
Mendakota Park
Street Crew
The Street Crew accomplished
the following tasks this week:
D 9 - Ah
July 10, 2002
• provided barricades and
cones to Mendakota Coun-
try Club for the fireworks
display
• repaired a late snow plow
damage complaint
• installed missing street
name signs
• trimmed branches at sev-
eral locations that were
causing site obstructions
• cut patches to repair de-
pressions at several water
valves and catch basins
• cleaned and repaired ditch
to drain properly on Calla-
han Place
Utility Report
Rich checked the City's seven
sanitary sewer lift stations
daily. He and his summer
helper cleaned sanitary sewers
in Lower Colonial Drive,
Farmdale Road, Upper Colonial
Drive and Brookside Lane this
week.
There was a sewer backup on
Friday night that affected two
homes on Brookside Lane.
John Boland and Mike Maczko
jetted the line open. The
homeowner that was affected
the worst was not home, so the
backup was not detected until
the next homeowner upstream
noticed it. Rich was unable to
find any other cause than a
build up of sand and gravel.
Both homeowners have finished
basements that were affected.
I have turned their claim over
to LMCIT, but the adjuster tells
me that they will have to find
the City negligent in order to
approve the claim, which is
hard to do.
MENDAKOTA PARK BALL
FIELD CONTAINMENT NET-
TING
Installation of the support ca-
bles will begin next week and is
expected to take a couple of
weeks to complete due to pos-
sible coordination problems
working "around" the ball tour-
naments scheduled for this
park on each of the next four
weekends. Following installa-
tion of the cables, hardware
measurements will be taken for
the netting. Sixteen custom
nets in three distinct shapes
are required. The nets, al-
though similar in shape may
vary in size by one or two feet
due to the distances of the
backstops in relation to each
other and to the center hub
building. Each net segment will
be attached, by removable clips
on all four sides, to support ca-
bles attached to the building
and the backstop posts. The
contractor working on this pro-
ject is Fenc-Co, Inc. This firm
has done numerous projects for
the City and was the firm that
installed the original backstops
and outfield fences at this park
in 1989.
NEWS
Public Works
Engineering
Code Enforcement
LETTER
Parks Report
The Parks Crew picked up
trash daily from the parks.
They also dragged and chalked
fields and striped foul lines on
an as needed basis. They re-
placed some service berry
plants that had died on the
border of Ivy Park, they also
reseeded the old hockey rink
area in that Park. They re-
paired the soccer field at Men-
dakota Park by filling in some
holes and resodding them, re-
paired a sprinkler head, re-
paired the drain to the sink in
the concession stand and built
the pitcher's mounds for the
National AAU qualifier baseball
tournament held there last
weekend. They then removed
the mounds on Monday morn-
ing. They brought in new rec
rock to repair the ballfield at
Ivy Park. They hauled in black
dirt around the tree island In
Ivy Park and leveled and
seeded it.
They put down the second ap-
plication of crabgrass pre -
venter and fertilized the ball -
fields and soccer fields at Men-
dakota Park, Kensington Park
and City Hall.
Utility Report
Rich checked the City's seven
sanitary sewer lift stations
daily. Rich had to run the Ve-
ronica Lane sanitary sewer lift
station on Wednesday after-
noon with the portable genera-
tor because the power was out
from 1:00 P.M. to 5:00 P.M.
He worked with Luke, his sum-
mer helper, to clean sanitary
sewer mains on Victoria Curve,
Hunter Lane, Glen Hill Road,
Culligan Lane, Veronica Lane,
Orchard Hill and Orchard Place
all this week. He planted a re-
placement crab apple tree for
one that had died on the Lilac
Lane center boulevard.
Street Report
The Street Crew worked
Wednesday and all day Thurs-
day to clean up trees and limbs
downed from Wednesday's high
winds. They graded Dodge
Lane (the City's one remaining
gravel street). They reinstalled
some missing street name
signs and called for locations to
install the new "No Parking"
signs by the SuperAmerica sta-
tion on Mendota Heights Road
and TH55. They patched pot-
holes on Ellen, Chippewa and
Miriam Streets.
North Urban Regional Trail
Marc Mogan and Guy Kullander
met on Wednesday with Mary
Jackson from the Dakota
County Physical Development
Department to discuss the rout-
ing and scheduling of the pro-
posed NURT trail along Highway
110 from Dodd Road easterly to
Delaware Avenue. The regional
trail will be designed and built
by the County with funding re-
imbursement from Met Council
or Federal funding sources. The
project's current emphasis is
directed on a bridge connection
June 21, 2002
over Hwy 52 connecting the
County trails in South St. Paul
and West St. Paul. Another ef-
fort is being directed at extend-
ing a trail connection westerly
from the soon to be completed
Government Center in West St.
Paul. This effort would extend
the trail to our Town Center site
then continue on through Valley
Park to Lilydale and the Big
Rivers Regional Trail. Design of
the segment adjacent to Town
Center is scheduled to begin in
2003 with construction in 2004
or 2005. The present Federal
funding for this overall project
expires in 2005 and must be
reapplied for if work is not com-
pleted in 2005.
This meeting was arranged to
determine if any conflicts exist
between the County's plan and
our Town Center and Freeway
Road street reconstruction pro-
ject. With no definitive County
plan to review staff will proceed
with these projects as previ-
ously directed by Council.
At press time, Friday,10:15 A.M. ,
the rain gauge at City Hall was
about to reach 2" accumulation
since 6:30 A.M. this morning
NEWS
Public Works
Engineering
Code Enforcement
LETTER
Parks Report
The Parks Crew picked up
trash daily from the parks.
They also dragged and
chalked fields and striped
foul lines on an as needed
basis. The Crew serviced
their mowers this week, they
hauled away the old concrete
footings from the playground
equipment at Friendly Hills
Park. They cleaned up the
Mendakota Park comfort sta-
tion and began preparing the
park grounds for a big AAU
baseball tournament this
weekend.
Utility Report
Rich checked the City's seven
sanitary sewer lift stations
daily. Rich responded to a
sanitary sewer backup into
the home at 653 Callahan
Place this week. The backup
was difficult to locate be-
cause a manhole cover had
been paved over by the
slurry seal contractor. He
discovered the backup was
caused by a large comb and
rags. He was called in at
11:00 PM on Monday night
because of a power outage at
the Centre Pointe lift station.
Power was restored at 1:30
A.M. He cleaned the sewers
with the jetter on Callahan
Place and Oxford Court this
week.
Street Report
The Street Crew replaced
some burned out light bulbs
for the traffic signal at TH55
and Mendota Heights Road.
They patched potholes on the
"Avenue" streets this week.
They replaced some missing
street name signs.
Code Enforcement Report
Paul issued a permit this week
for Socon Construction to
complete a MAC Part 150
noise mitigation remodeling
upgrade for the home located
at 2218 Lexington Avenue
South.
As a result of the hail damage
from a storm in May, Paul has
issued a large number of re-
roofing permits in the Copper -
field and Hampshire neighbor-
hoods recently. Note: Some
of these contractors are solic-
iting more work from home-
owners who may or may not
have hail damage. (We have
received several complaints
from homeowners about over-
aggressive contractors).
Suburban Dakota County
Greenway Project
Suburban Dakota County
Greenway Project staff has
mailed invitations to specific
property owners and munici-
pal officials that own property
within the identified Greenway
Corridor between Lilydale and
June 7, 2002
both Rosemount or Apple Val-
ley to attend a landowner
workshop (see attached).
This workshop is scheduled
for 7:00 pm on Wednesday,
June 12, at the Dodge Nature
Center at 365 Marie Avenue
West, West St. Paul where the
purpose and findings of this
project will be presented to
the public. Greenways are
defined as privately or pub-
licly owned corridors of open
space which often follow natu-
ral land or water features and
which are managed to protect
and enhance natural re-
sources. The goal of this
workshop will be to educate
willing landowners in the
benefits and positive impacts
that can be achieved by pre-
serving or restoring these
greenway corridors. This vol-
untary program will hopefully
generate interest with willing
landowners that would then
lead to an implementation
program that would fund
natural resource preservation
or restoration projects.
Engineerino Summer Aide
On Wednesday of this week,
Brent Larson started work for
the Engineering Department.
Brent is a senior in the Civil
Engineering undergraduate
program at the University of
Minnesota. With the heavy
workload anticipated this
summer we're glad to have
Brent working here. Welcome
aboard Brent!
NEWS
Public Works
Engineering
Code Enforcement
LETTER
Parks Report
The Parks Crew picked up
trash daily from the parks.
They also mowed grass,
dragged and chalked fields and
striped foul lines on an as
needed basis. They repaired
the City Hall sprinkler system,
removed and replaced some
dead trees in Marie Park and
some dead limbs in Friendly
Hills Park. They planted flow-
ers at Mendakota Park.
Utility Report
Rich checked the City's seven
sanitary sewer lift stations
daily. He sprayed broadleaf
weeds at Mendakota Park,
North and South Kensington
Park, Hagstrom King Park, the
vacant right-of-way located at
Pontiac and Cheyenne Lane
and the tot lot. He cleaned
sewers on Victory Avenue,
Furlong Avenue and Kendon
Lane. He removed some trees
that were impacting a sanitary
sewer manhole on William
Court.
Street Report
The Street Crew patched pot-
holes this week, they ordered
Gopher One -Call locations to
install the "No Parking" signs
on Warrior Drive. They re-
moved two dead crab apple
trees from the median on Lilac
Lane. They trimmed over-
hanging trees in the Friendly
Hills neighborhood where
school buses were hitting
them.
affm
0 , — —
Valley Park Trail Paved
On Tuesday of this week, Pine
Bend Paving paved the bitumi-
nous trail connecting the new
pedestrian bridge to the exist-
ing trails in the north end of
Valley Park. The bridge was
constructed late last summer to
replace some under designed
culverts that were continually
washing out. The new bridge
and trail are very attractive and
we invite everyone to go there
and see for yourself.
Town Center Tree Removal
Tuesday evening, the City
Council awarded a purchase or-
der to Precision Landscape and
Tree to remove the trees from
the Town Center site. Precision
is a firm that has been in busi-
ness for many years and comes
highly recommended from the
other cities they have worked
for (Edina, New Brighton and
Minneapolis). They tentatively
plan on beginning work June
3rd. Their work hours are lim-
ited from 7:00 AM to 8:00 PM
Monday through Friday and
9:00 AM to 8:00 PM, if they
have to work the weekend.
New Play Equipment
This week, new play equipment
was installed at Friendly Hills
and Valley Parks. The synthetic
resilient rubberized surface will
be installed in the next two
weeks —after the concrete sur-
face has a chance to cure. New
pathways from the existing bi
tuminous to the new rubberized
surface will be excavated by
Public Works.
May 24, 2002
Suburban Dakota County
Greenway Project
Guy Kullander, Marc Mogan and
John Tran attended the third
meeting with the advisory
group of the Suburban Dakota
County Greenway Project on
Wednesday at City Hall. This
study has identified natural ar-
eas in the suburban areas of
Dakota County and greenway
corridors that extend from Lily -
dale south to Lebanon Hills,
and southeast to areas in east-
ern Rosemount. They will be
mailing out invitations to 300
key landowners that have prop-
erty within this greenway corri-
dor inviting them to a attend a
meeting scheduled for 7:00 pm
on Wednesday, June 12, at the
Dodge Nature Center at 365
Marie Avenue West, West St.
Paul where the purpose and
findings of this project will be
presented. The goal of this
meeting will be to educate will-
ing landowners in the benefits
and positive impacts that can
realized by preserving and pro-
tecting these greenway corri-
dors, or restoring these areas
with trees and vegetation
suited to their property. This
voluntary program will hope-
fully generate interest and mo-
mentum with willing landown-
ers that would then lead to an
implementation program that
would fund natural resource
preservation or
restoration pro-
jects.
Enjoy the Memo-
rial Day Weekend!
Public Works
Engineering
Code Enforcement
LETTER
Parks Report
The Parks Crew picked up
trash daily from the parks.
They also mowed grass,
dragged and chalked fields and
striped foul lines on an as
needed basis. They replaced
some dead pine trees in Marie
Park. They repaired a broken
toilet in the women's restroom
at Kensington Park, and tilled
the garden in Ivy Falls Park for
the Ivy Falls Townhomes Gar-
den Club to plant. They re-
paired some broken lines and
sprinkler heads for the lawn
sprinkler system at the Fire
Station. They continued to
spray for dandelions as the
weather allowed (wind and
rain).
They attended a spring work-
shop for Turf Managers and
learned more about lawn irri-
gation, trouble shooting, in-
stallation and maintenance
techniques.
Utility Report
Rich checked the City's
seven sanitary sewer lift
stations daily. Rich's sum-
mer helper started this
Monday so he was able to
begin cleaning sanitary
sewers this week. Rich's
helper this year is Luke
Carlson who is a resident
of the Curley neighbor-
hood. They cleaned sew-
ers in the Curley neighbor-
hood; on Theresa Street,
Timmy Street, William
Court, Patricia Street, Mary
M Ah An
Fm =9
Adele Avenue and Cullen
Street. He found and cleared a
build up of roots from the lines
on Theresa, Cullen and Timmy
Streets.
Street Report
The Street Crew reviewed the
sweeping bill this week.
McPhillips used six machines
over four days working about
12 hours per day for a total of
234 hours. They charged us
$75/hour for a total cost of
about $17,000 this year. The
Crew was worked on patching
pot holes this week.
Foundation and Slope Repair
at 739 Knollwood Lane
Code Enforcement was asked to
make a final inspection of the
foundation underpinning and
slope repair work this Friday
that has been under construc-
tion at 739 Knollwood Lane
since last August. This proved
to be one long, complicated,
Foundation/slope repairs at
739 Knollwood Lane as of 5/10/02
May 17, 2002
and expensive repair project.
The property owner will surely
rest easier now that the work is
completed.
Code Enforcement Report
Paul issued a sign permit this
week to Sign Maintenance
Lighting and Electric to install
the new sign on the east side of
Mendota Plaza for 'Royal Star
Liquidators". (Approved by the
City Council on May 7th).
Paul Berg and Paul Kaiser met
with architect Gary Ostberg this
week to review his plans for
two floors of new classrooms
and a basement storage area at
Visitation Convent. Visitation
hopes to begin constructing the
addition this summer for com-
pletion and use this winter after
Christmas break.
Engineering Summer Aide
The Engineering Department
hired Peter Daniels as
the summer engineering
aide and he started work
on Monday of this week.
We are sad to report that
Peter turned in his resig-
nation and his last day is
Friday of this week. He
is leaving to pursue an-
other employment op-
portunity. The Engineer-
ing Department and
Emmy are scrambling to
hire another engineering
summer aide to help with
this summer's heavy
workload.
NEWS
Public Works
Engineering
Code Enforcement
LETTER
Parks Report
The Parks Crew picked up
trash daily from the parks.
They also mowed grass,
dragged and chalked fields
and striped foul lines on an
as needed basis. The Parks
Crew also aerated the infield
at the City Hall ballfield and
fertilized it. They prepared
the fields at Mendakota Park
for the Cretin Durham Hall
fast pitch softball tourna-
ment that was held last
weekend.
They picked up and planted
three trees that were do-
nated by the Mendota
Heights Garden Club —
Friends of the Parks (trees
have been donated by them
for many years). They re-
paired the drain for the sink
in the women's restroom at
Mendakota Park.
Utility Report
Rich checked the City's
seven sanitary sewer lift sta-
tions daily. He performed
some maintenance on truck
#404, (the sewer jetter) this
week. He performed a sani-
tary sewer service connec-
tion inspection for a new
connect at 2154 LeMay Lake
Road. He installed the
sprayer and tank on the
Cushman so that he can be-
gin spraying dandelions as
The Pipeline
soon as the wind slows
down. He is working with
Lilydale's contractor to up-
grade their sanitary sewer lift
station —they left the door
open all weekend long.
Street Report
The Street Crew disposed of
a dead deer, installed some
new street signs, put new
tires on the bobcat and
worked on cleaning up the
back lot located behind the
Public Works Garage this
week. They repaired a few
mailboxes that had been
damaged by snowplows and
had been overlooked.
Keen the Lakes and Ponds
"Blue"
Dakota County participated
in a metro wide effort to pub-
lish the attached brochure.
They supplied us with 500
copies which we will have
available on our rack located
in the lobby of City Hall.
Town Center Update
Marc, Tom and I met with
Ross Feffercorn and Kari Gill
on Wednesday of this week
to review Dan Hughes', Land -
form Engineer, latest adjust-
ments to the Town Center
grading plan. His original
grading plan resulted in a
+50,000 cubic yard shortfall
May 10, 2002
of dirt. Dan lowered the site
approximately 3 feet and
now the site is roughly at a
cut/fill balance. Ross and
Kari's architects will review
the changes to make sure
they fit with their building
designs. I am currently
working with Brian Watson of
the Dakota County Soil and
Water District to process the
wetlands permits to fill part
of three wetlands located on
the site. We think the
amount of filling that we are
proposing will be "exempt",
from needing a permit how-
ever the City still needs to
process a "Certificate of Ex-
emption".
Code Enforcement Resort
The City received a complaint
this week about a contrac-
tor's trailer that was parked
at 1938 Dodd Road. The
trailer had advertising on the
site of it and almost ap-
peared like it was an adver-
tising billboard. Paul con-
tacted the owner and he re-
moved it promptly.
Paul issued a permit to Lu-
loff, Inc. to construct a single
family dwelling at 2165 Glen
Toro Road. This was Dewy
Thorbeck's third home, there
are seven lots remaining.
NEWS
Public Works
Engineering
Code Enforcement
LETTER
Parks Report
The Parks Crew picked up the
trash daily from the parks
and dragged and chalked ball
fields. A homeowner (Ira
Kipp) donated some roses for
Roger's Lake Park and the
Crew planted them this
week. The Crew also started
up the lawn sprinkler sys-
tems this week at Kensington
and Mendakota Parks, City
Hall and the Fire Station
(heads were repaired where
needed).
Utility Report
Rich checked the City's seven
sanitary sewer lift stations
daily. Rich had to assist Xcel
in sewer line clean up on
Dodd Road.
He investigated a sewer
backup for a homeowner on
North Freeway Road. The
problem was roots in the
homeowner's private service
line not the City's main. He
will have to flush our line out
once the roots are routed out
so that we do not get an-
other backup in our line like
we did recently on South
Lane.
Street Report
The Street Crew worked with
McPhillips, the City's street
sweeping contractor, to
sweep the streets this week.
McPhillips used six sweepers
and were finished in four 12
hour days. The Street Crew
worked with the sweepers to
dispose of the street sweep-
ings.
The Street Crew disposed of
two loads of wood chips, a
homeowner wanted them.
They received their new
pickup truck —the replacement
for #302.
SWPPP Coming
I attended a workshop this
week on Storm Water Man-
agement Plans (SWMP) and
Storm Water Pollution Preven-
tion Plans (SWPPP). I was
trained on, and given an one
inch thick workbook and a CD
on SWPPP. SWPPP is a feder-
ally mandated program that
requires cities to first submit a
permit or plan, and then has a
continuing annual duties and
reporting requirement. The
presenters estimate that
SWPPP will cost cities $10/
year/household. The MPCA
has known of this requirement
for three years, however they
have been dragging their feet
on getting the requirements
out to the cities. Now, they
are going through their public
process to establish the re-
quirements, they have wa-
tered them down as much as
they can. During the com-
ment period, some environ-
mental "whackos" surfaced in -
May 3, 2002
sisting that their regulations
be tightened up. (It's being
reviewed in the courts). If
the MPCA plan survives un-
changed it will be sent to the
cities December 9th, then the
cities have until March 9,
2003 to submit their plan
back to the MPCA. (We do
not know if we will be able to
meet that deadline).
Delaware Avenue & TH110
Intersection
Sunfish Lake has requested
that a MnDOT Traffic Engineer
attend their June 4th meeting
to discuss their traffic con-
cerns about Delaware Avenue
and TH110 (see attached let-
ter from Mayor Tiffany). I re-
cently discussed the intersec-
tion with the Dakota County
Transportation and Planning
Departments and asked that
they add the upgrade to their
5 year CIP. They told me that
they would be unable to do
any improvements in 2003 or
2004, but that they would
consider putting it in for some
future year.
Enjoy Cinco de Mayo
NEWS
Public Works
Engineering
Code Enforcement
Parks Report
The Parks Crew picked up the
trash daily from the parks
and dragged and chalked ball
fields. The Crew chipped up
brush and downed limbs in
the parks this week. They
removed a limb from the
pedway on Lexington Avenue
at Marie Avenue. They
started cutting grass this
week!
Utility Report
Rich checked the City's seven
sanitary sewer lift stations
daily. He flushed sanitary
sewer lines on Winston Court
(a problem line with paper
buildups) Diego Lane (paper
and roots in the line from a
homeowner's roto rooter ac-
tivities), Knollwood Court and
Spring Creek Court ease-
ments (known slow flow
lines). He also performed an
inspection for a new connec-
tion to the sanitary sewer at
2166 LeMay Lake Road.
Street Report
The Street Crew replaced
some missing signs this
week. They finished their
mailbox repairs and patched
some potholes. The sweep-
ing contractor began sweep-
ing streets this week (with
six machines). They are pro-
jected to be completed by
the middle of next week.
" I uft 9 Aft M
Town Center Grading Plan
City Staff met with Dan
Hughes, Landform Engineer,
on Monday to discuss final
changes to the Town Center
grading plan. Dan had in-
formed us that there was a
significant shortfall in the
earth work quantities, so we
met to discuss the possibility
of lowering the site to make
up the difference. Matching
the project to the Freeway
Road neighborhood and sani-
tary sewer service elevations
are some the limiting factors
to lowering the site, however
we were able to find some ar-
eas to adjust. Dan promised
to make these adjustments
the highest priority in his
work load. We need a final
grading plan as soon as possi-
ble so that we can apply for
the needed permits (MnDOT,
MPCA, Corps. Of Engineers)
and prepare the Plans and
Specifications to go out for
bids.
Lexington Bridge Update
MnDOT informed us this week
that they had finalized a
change order with their con-
tractor that will minimize the
closure of the ramps to and
from I-35E. They made these
changes at Lilydale's insis-
tence and the changes are ex-
pensive ($500K). The new
schedule calls for the
northbound loop to I-35E to
April 26, 2002
be closed for 3-4 weeks start-
ing in mid -September this
year and for 3 months in
2004, the southbound I-35E
to TH13 ramp is to be closed
in 2003 for the month of May
and for 3 months in the fall in
2003.
Dakota County CIP Meet-
ing
Marc and I met with members
of the Dakota County Trans-
portation and Planning De-
partments this week to dis-
cuss Dakota County's 2003-
2007 CIP. We informed them
that Mendota Heights is plan-
ning on constructing the Lex-
ington Avenue Trail project
this year along with the North
Urban Regional Trail as it goes
through our Town Center. We
also asked them to add the
Delaware/TH110 signal im-
provements to their program
in as early a year as they
could. They informed us that
they were working toward
turning Delaware Avenue (CR
63) north of Dodd Road and
Victoria Road (CR 45) back to
Mendota Heights this year.
They told us, that due to
some overly aggressive
spending the last few years,
their spending would have to
be greatly reduced for a few
years to get them out of the
hole.
NEWS
Public Work
Engineering
Code Enforcement
LETTER
Street Report
The City's street sweep-
ing contractor is pro-
jected to be starting next
week, so the street crew
worked on repairs to the
access drive at the Resur-
rection Cemetery street
sweeping disposal site
this week. They began
patching potholes this
week, working on mail-
box repairs and sod dam-
aged by snow plow op-
erations. They replaced
some burned out light
bulbs at the Dodd Road
(TH149) and Mendota
Heights Road traffic sig-
nal.
Utility Report
Rich checked the City's
seven sanitary sewer lift
stations daily. He re-
sponded to a power out-
age last Sunday at the
Culligan Lane and Veron-
ica Lane lift stations —
power was restored
within 30 minutes and he
did not have to bring out
the portable generator to
operate the stations. He
lowered a water valve
box on the pedway at
The Pipeline
Stratford Lane and Victo-
ria Road that was pro
truding above the surface
by two inches ( a tripper).
Rich checked Lilydale's
storm sewer system as
the City agreed to do for
Lilydale in the spring and
fall (at a cost). He per-
formed inspections for
new sanitary sewer con-
nections at 2158 and
2162 Lemay Lake Road.
Parks Report
The Parks Crew picked up
the trash daily from the
parks. The Park Crew re-
paired the drinking foun-
tain at Rogers Lake Park.
They dragged and chalked
ballfields for a Visitation
High School tournament
this week. They prepared
all the ballfields for use
this week.
They had to repair the as-
phalt trail that leads to
the fishing pier in Rogers
Lake Park this week ( it
was damaged by the pier
this winter).
They replaced basketball
April 19, 2002
nets this week. They re-
moved all the thirty year
old wood timber play
structures from Friendly
Hills and Valley Parks.
Council authorized re-
placement equipment last
December, and that
equipment will be deliv-
ered and installed late
April or early May by Earl
F. Anderson the equip-
ment supplier.
Terry supervised a tree
removal contractor who
was hired to remove the
overhanging tree limbs
that were shading the play
areas.
The Parks Crew will be ex-
cavating for additional
paved pathways to be ex-
tended from existing
paved areas to these new
play structures and make
the structures handi-
capped accessible.
Code Enforcement
Report
Paul issued three swim-
ming pool permits this
week— spring is definitely
here!
NEWS
Public Works
Engineering
Code Enforcement
LETTER
Parks Report
The Parks Crew picked up
the trash daily from the
parks. They finished
sweeping all the pedways
this week. They cleaned
up the tennis courts, re-
moved the leaves and
branches and put up the
nets. They hooked up
the water meters at Men-
dakota and Kensington
Parks —cleaned and
opened the restrooms for
the season —spring is
here FINALLY!
Utility Report
Rich checked the City's
seven sanitary sewer lift
stations daily. Rich as-
sisted the Parks Crew
with sweeping the trails
by wetting down the trails
for dust control. He had
to work with Braun Pump
to repair a pump switch
at the Mendota Heights
Road lift station.
Rich worked on cleaning
the sewer lines on May-
field Heights Road and
Douglas Road as a follow
up action to the sewer
back up we had last
week. He found a large
The Pipeline
April 12, 2002
rootball and removed it.
He is analyzing how to fix
the bad joint to prevent a
root blockage again.
He attended a sanitary
sewer collection system
operators seminar this
week. The seminar up-
dated him on the new
rules that are to be imple-
mented by the USEPA.
Street Report
The Street Crew worked
this week on repairing sod
damaged by snowplows.
They removed marker
guide posts from the
boulevard areas, and they
dismantled the plows and
wings from the trucks.
They also installed the as-
phalt "hot box" to truck
#312. The asphalt plants
are open now, so we can
begin making permanent
pothole repairs.
Code Enforcement Re-
port
Dick attended a confer-
ence Wednesday, and
Paul goes April 24th. This
conference is put on by
the State of Minnesota in-
troducing the new Inter-
national Residential Code
to Building Inspectors.
The IRC is a new code
that is being adopted to
standardize construction
worldwide. The State is
still looking at the legal
ramifications of adopting
this new code and subject
to the State not finding
any legal problems, they
will require that all Cities
adopt this new code in
July 2002. There are no
major changes in this new
code from the existing
code but there are numer-
ous changes throughout
the entire code.
Attachment:
Gun Club Lake WMO 2002
Newsletter
April Showers Brings
May's
Flowers
NEWS
Public Works
Engineering
Code Enforcement
LETTER
Parks Report
The Parks Crew picked up the trash
daily from the parks. They ordered
placement of the porta potties in the
parks this week. We normally have
them placed starting in April (this is
the first time there has been this
much snow on the ground this late
since April 1983). Softball practices
start next week —believe it or not!
The Parks Crew attended a Turf
Seminar this week covering: spe-
cies of grass, blends and mixtures,
and how to minimize winter damage
to lawns in order to maximize spring
usage of fields.
Utility Report
Rich checked the City's seven sani-
tary sewer lift stations daily. He
and John Boland helped Tom Olund
rearrange his office so that it can
accommodate Tom's new computer.
Rich also helped Tom Knuth with
some Gopher State One call locates
for sewer cleanouts.
Rich responded to a sanitary sewer
backup at 1151 Douglas Road this
Thursday night (between the second
and third period of the Gopher
hockey game). This has been a
problem line for us. We are plan-
ning to televise the line this summer
to see if we can locate what is caus-
ing the problems.
Street Report
Dave Sorby gathered information
this week for making a claim in
Small Claims Court to recover the
City's costs from a sodding contrac-
tor who cut the underground wires
for our street lights on Centre Pointe
Blvd and then refused to pay the
costs for repairing them. The Crew
worked on repairing mailboxes that
were damaged from snowplowing.
They stripped one snowplow down
and prepared it for summer use.
The Plpeline
April 5, 2002
On Monday, they were out plowing
and sanding all day, however they
started plowing the entire City after
lunch and were totally finished by
9:00 PM. On Tuesday, they just
plowed during normal work hours.
Spring Road Restrictions
The State of Minnesota has adopted
a new law that now applies road re-
strictions to all roads in the State.
Now, unless local governments take
separate action to the to the con-
trary, road restrictions are imposed
by the State every spring on all roads
including City and County roads. De-
pending on weather and frost condi-
tions, the State establishes a begin-
ning and ending date that these re-
strictions apply. This year load re-
strictions were put in effect beginning
February 18th. The ending date will
be established based on weather and
ground conditions in the future (see
attached MnDot bulletin). The load
limit on all affected roads during this
time is 5 tons per axel.
Snow Events:
Date: Amount: Respons
4-1-02 5"* Plow sn
4-2-02 3" Plow sn
*attached see Dave Dahl's forecast from
Sunday, March 31
Street Project Poll Result Notices
The Engineering Department mailed
letters to roughly 300 residents in 8
different areas this week that de-
scribed the results of the street pro-
ject poll that was conducted this
March soliciting property owners'
views relative to the need and timing
of potential future street construction
projects throughout the City (see at-
tached). Those areas surveyed in-
cluded the Somerset and Avenues
neighborhoods, and residents abut-
ting Walsh Avenue and Kay Avenue,
Ivy Falls Avenue, Spring Street, Sun-
set Lane, Callahan Place, and Dodge
Lane. Staff has updated the project
poll with a few additional responses
that have arrived at City Hall since
the issue was first considered at the
March 19th Council meeting. These
additional responses did not change
the results in any of the areas polled
except for the Ivy Falls Avenue area.
Property owners on Ivy Falls Avenue
initially favored a street improvement
project by a narrow majority, but af-
ter including the additional votes re-
ceived, those results now show that
residents are evenly split between
their support and opposition for a
street improvement project.
Tom Thumb —Demolition
On Tuesday evening, the City Council
selected Minnesota Petroleum Ser-
vices to perform demolition and clean
up of hazardous materials of the Tom
Thumb "mini -mall" at
1944-48 Dodd Road.
The contractor picked
e: up keys to the building
on Wednesday morn-
ing ow -all areas g and informed me
that they would begin
ow -all areas removal of the asbes-
tos -containing building
materials next week.
Following removal of
hazardous materials
from the site, the Fire - Department
will conduct training drills using their
infared cameras, ventilation of a
commercial structure by cutting holes
through the roof and search and res-
cue of downed firefighter. The train-
ing exercises could begin as early as
April 15. Following the Fire Depart-
ments training drills the building will
be demolished. A May 1st target
date has been set for completion of
this project.
%
LID
+
Spring Thaw Monitoring and Load Restrictions, Spring Load Restrictions Page t of
�R Spring Thaw Monitoring and Load Restrictions
Office of
Materials and
Road Research
Search I E-mail
Minnesota
Road Research
Spring Load
Restrictions
Special Notes
Placement Dates
Zone Boundaries
2002 SLR Map
Text of
SLR Map (long)
Text of
SLR Map (short)
Map Contacts
SLR Probability
North MN
Central MN
Metro MN
South MN
Southeast MN
Introduction
SLR Policy
SLR Statute
Weight Statute
Forecasts
Forecast
Research
R/WIS Intro
Historical Dates
Fact Sheet
Definitions
Questions
AASHTO
SDDOT SLR
VvsDOT SLL
NEW LOCAL NUMBER: The local number has CHANGED to (651)
747-2253.
2002 Spring Load Restriction Starting/Ending Dates'
Frost Zone
Starting Date
Ending Date 2
North
March 27, 2002 (12:01 AM)
N/A
Central
February 19, 2002 (12:01
NIA
AM)
Metro
February 18, 2002 (12:01
N/A
AM)
South
February 18, 2002 (12:01
N/A
AM)
Southeast
I February 18, 2002 (12:01
N/A
AM)
' The Starting/Ending dates of spring load restrictions are preceded by at least a
3-day advance notice. Advance notice is available on this website and via
recorded messages at (651) 747-2253 or toll free at 1-800-723-6543.
2 The END of the spring load restriction period is no longer fixed at 8 weeks.
> Special_Not_es - Updated April 1, 2002
Current_ Estimated/Actual Placement Dates - Updated March 22, 2002
Zone Boundary_ Descriptions
200.2 Spring _Load _Restrictions Map
2002 Text Description of SLR Map_(with 10 ton roads)
2002 Text Description..of SLR Map without 10 ton roads)
> Contacts, Paper. Copy of 2002-Spring Load Restriction Map
Visit the SL_R_Prob_ability_Chart to view the percentage likelihood that spring load
restrictions (SLR) will be placed for the North or South Zones on any given day this
spring.
Mn/DOT Home in general, spring load restrictions on local roads (county, city, and township roads)
FAQ follow the same dates as the State Trunk Highways, however any local road can be
Site Map restricted at any time during the year so long as the restricted load limit is posted.
Search Mn/DOT This depends on the condition of the road. The local road authority can keep spring
Info@DOT restrictions on longer if they deem them necessary. It is always a good idea to
City 1
Mendota He1
April 4, 2002
Subject: Mendota Heights Street Project Poll Results
Dear Mendota Heights Resident:
The Engineering Department is mailing this letter to residents of the Somerset
neighborhood to inform them of the results of the street improvement project poll survey that
was mailed out this March. The March correspondence that was mailed to 104 property
owners abutting streets in the Somerset neighborhood by the Engineering Department included
a letter describing street improvement projects, and a self addressed postage paid postcard that
residents were asked to fill out and to mail back to City Hall indicating their support or
opposition for a street improvement project for properties in the area. These project survey
responses were compiled, and a summary of this data is shown on the back of this letter.
Council has decided not to proceed with a street construction project in your area at the
present time based on the results of the project poll survey that was conducted this March.
Council might be inclined to reconsider this decision if a majority of the affected property
owners in a particular area took it upon themselves to circulate, sign, and submit a petition to
the City requesting a street improvement project. In the meantime, Public Works and
Engineering will be monitoring street conditions in the area, and the issue concerning any
future street improvement project will be re-evaluated if circumstances change.
If you have any questions or comments relative to the above project information, please
contact Jim Danielson or myself either by telephone (651-452-1850), in writing, or by email at
marcm@mendota-heights.com.
Sincerely,
Marc S. Mogan, P.E.
Civil Engineer
1101 Victoria Curve o Mendota Heights, MN 55118 (651) 452-1850 • FAX (651) 452.8940
Street Project Poll Results
58%
Somerset Neighborhood
® Support
❑ Do Not Support
Surveyed Support Do Not Support Percent Reporting
Somerset 104 31 43 71.2%
Support This Year
N
N
0
Support Next Year
s
v Support 2004 or Beyond
0
n' Don't Support Any Time Soon
Poll Data Details
0 10 20 30 40 50
Number of Responses
4/3/2002
City of
,Fvlendota
April 4, 2002
Subject: Mendota Heights Street Project Poll Results
Dear Mendota Heights Resident:
The Engineering Department is mailing this letter to residents of the Avenues
neighborhood to inform them of the results of the street improvement project poll survey that
was mailed out this March. The March correspondence that was mailed to 95 property owners
abutting streets in the Avenues neighborhood by the Engineering Department included a letter
describing street improvement projects, and a self addressed postage paid postcard that
residents were asked to fill out and to mail back to City Hall indicating their support or
opposition for a street improvement project for properties in the area. These project survey
responses were compiled, and a summary of this data is shown on the back of this letter.
Council has decided not to proceed with a street construction project in your area at the
present time based on the results of the project poll survey that was conducted this March.
Council might be inclined to reconsider this decision if a majority of the affected property
owners in a particular area took it upon themselves to circulate, sign, and submit a petition to
the City requesting a street improvement project. In the meantime, Public Works and
Engineering will be monitoring street conditions in the area, and the issue concerning any
future street improvement project will be re-evaluated if circumstances change.
If you have any questions or comments relative to the above project information, please
contact Jim Danielson or myself either by telephone (651-452-1850), in writing, or by email at
marcm@mendota-heights.com.
Sincerely,
Marc S. Mogan, P.E.
Civil Engineer
1101 Victoria Curve- Mendota Reights, MN 55118 (651) 452.1850 • FAX (651) 452�8940
Street Project Poll Results
53%
Avenues Neighborhood
®Support
❑ Do Not Support
Surveyed Support Do Not Support Percent Reporting
Avenues 95 27 31 61.1%
a Support This Year
m
o Support Next Year
r
U Support 2004 or Beyond
0
Q. Don't Support Any Time Soon
Poll Data Details
0 5 10 15 20 25 30 35
Number of Responses
4/3/2002
City 1
Mendota
April 4, 2002
Subject: Mendota Heights Street Project Poll Results
Dear Mendota Heights Resident:
The Engineering Department is mailing this letter to residents of Walsh Lane and Kay
Avenue to inform them of the results of the street improvement project poll survey that was
mailed out this March. The March correspondence that was mailed to 20 property owners
abutting Walsh Lane and Kay Avenue by the Engineering Department included a letter
describing street improvement projects, and a self addressed postage paid postcard that
residents were asked to fill out and to mail back to City Hall indicating their support or
opposition for a street improvement project for properties abutting Walsh Lane and Kay
Avenue. These project survey responses were compiled, and a summary of this data is shown
on the back of this letter.
Council has decided not to proceed with a street construction project in your area at the
present time based on the results of the project poll survey that was conducted this March.
Council might be inclined to reconsider this decision if a majority of the affected property
owners in a particular area took it upon themselves to circulate, sign, and submit a petition to
the City requesting a street improvement project. In the meantime, Public Works and
Engineering will be monitoring street conditions in the area, and the issue concerning any
future street improvement project will be re-evaluated if circumstances change.
If you have any questions or comments relative to the above project information, please
contact Jim Danielson or myself either by telephone (651-452-1850), in writing, or by email at
marcm@mendota-heights. com.
Sincerely,
Marc S. Mogan, P.E.
Civil Engineer
1101 Victoria Curve ^ Mendota heights, MN 55118 (651) 452.1850 • FAX (651) 452-8940
Street Project Poll Results
Support This Year
N
0
Support Next Year
t
U Support 2004 or Beyond
0
M Don't Support Any Time Soon
Poll Data Details
0 2 4 6 8 10
Number of Responses
4/3/2002
•
Mendota 1
April 4, 2002
Subject: Mendota Heights Street Project Poll Results
Dear Mendota Heights Resident:
The Engineering Department is mailing this letter to residents of Ivy Falls Avenue to
inform them of the results of the street improvement project poll survey that was mailed out
this March. The March correspondence that was mailed to 19 property owners abutting Ivy
Falls Avenue by the Engineering Department included a letter describing street improvement
projects, and a self addressed postage paid postcard that residents were asked to fill out and to
mail back to City Hall indicating their support or opposition for a street improvement project
for properties abutting Ivy Falls Avenue. These project survey responses were compiled, and
a summary of this data is shown on the back of this letter.
Council initiated the process for a street construction project under the statutory
provisions for public improvements by ordering the preparation of a feasibility report on
March 19th based on the results of this project poll survey. The Engineering Department will
be collecting preliminary survey data in the neighborhood, preparing the feasibility report,
conducting the public hearing, and developing final design plans and specifications for the
project over a period of time. The next correspondence you will receive will be a notice of a
public hearing for the proposed street improvement project. The street improvement project,
estimated costs, and schedule will be discussed in greater detail at that public hearing.
If you have any questions or comments relative to the above project information, please
contact Jim Danielson or myself either by telephone (651-452-1850), in writing, or by email at
marcm@mendota-heights.com.
Sincerely,
Marc S. Mogan, P.E.
Civil Engineer
1101 Victoria Curve • Mendota Heights, MN 55118 (651) 452-1850 • FAX (651) 452.8940
Street Project Poll Results
50%
Ivy Fails Avenue
50% a Support
❑ Do Not Support
Surveyed
Support
Do Not Support
Percent Reporting
Falls Ave. 19
8
8
84.2%
m
Support This Year
v
Support Next Year
a
r
v Support 2004 or Beyond
0
IL Don't Support Any Time Soon
Poll Data Details
0 1 2 3 4 5 6 7 8 9
Number of Responses
4/4/2002
,AAA2AA JA
April 4, 2002
Subject: Mendota Heights Street Project Poll Results
Dear Mendota Heights Resident:
The Engineering Department is mailing this letter to residents of Spring Street to
inform them of the results of the street improvement project poll survey that was mailed out
this March. The March correspondence that was mailed to 9 property owners abutting Spring
Street by the Engineering Department included a letter describing street improvement projects,
and a self addressed postage paid postcard that residents were asked to fill out and to mail back
to City Hall indicating their support or opposition for a street improvement project for
properties abutting Spring Street. These project survey responses were compiled, and a
summary of this data is shown on the back of this letter.
Council has decided not to proceed with a street construction project in your area at the
present time based on the results of the project poll survey that was conducted this March.
Council might be inclined to reconsider this decision if a majority of the affected property
owners in a particular area took it upon themselves to circulate, sign, and submit a petition to
the City requesting a street improvement project. In the meantime, Public Works and
Engineering will be monitoring street conditions in the area, and the issue concerning any
future street improvement project will be re-evaluated if circumstances change.
If you have any questions or comments relative to the above project information, please
contact Jim Danielson or myself either by telephone (651-452-1850), in writing, or by email at
marcm@mendota-heights.com.
Sincerely,
Marc S. Mogan, P.E.
Civil Engineer
1101 Victoria Curve • Mendota Heights, MN 55118 (651) 452-1850 • FAX (651) 452.8940
Street Project Poll Results
M
71
Spring Street
®Support
❑ Do Not Support
Surveyed Support Do Not Support Percent Reporting
Street 9 2 5 77.8%
N Support This Year
d
'o
Support Next Year
s
v Support 2004 or Beyond
0
a Don't Support Any Time Soon
Poll Data Details
0 1 2 3 4 5 6
Number of Responses
4/3/2002
®®a,kl®®
April 4, 2002
A
Mendota tA
g
Subject: Mendota Heights Street Project Poll Results
Dear Mendota Heights Resident:
The Engineering Department is mailing this letter to residents of Sunset Lane to inform
them of the results of the street improvement project poll survey that was mailed out this
March. The March correspondence that was mailed to 14 property owners abutting Sunset
Lane by the Engineering Department included a letter describing street improvement projects,
and a self addressed postage paid postcard that residents were asked to fill out and to mail back
to City Hall indicating their support or opposition for a street improvement project for
properties abutting Sunset Lane. These project survey responses were compiled, and a
summary of this data is shown on the back of this letter.
Council has decided not to proceed with a street construction project in your area at the
present time based on the results of the project poll survey that was conducted this March.
Council might be inclined to reconsider this decision if a majority of the affected property
owners in a particular area took it upon themselves to circulate, sign, and submit a petition to
the City requesting a street improvement project. In the meantime, Public Works and
Engineering will be monitoring street conditions in the area, and the issue concerning any
future street improvement project will be re-evaluated if circumstances change.
If you have any questions or comments relative to the above project information, please
contact Jim Danielson or myself either by telephone (651-452-1850), in writing, or by email at
marcm@mendota-heights . com.
Sincerely,
Marc S. Mogan, P.E.
Civil Engineer
1111 01 Victoria Curve • Mendota Heights, MN 55118 (651) 452.1850 • FAX (651) 452-8940
Street Project Poll Results
50%
Sunset Lane
=Not50%
Surveyed Support Do Not Support Percent Reporting
Sunset Lane 14 6 6 85.7%
W
Support This Year
d
Support Next Year
0
s
U Support 2004 or Beyond
0
a. Don't Support Any Time Soon
Poll Data Details
0 1 2 3 4 5 6
Number of Responses
4/3/2002
ciety of
Mendota - g
April 4, 2002
Subject: Mendota Heights Street Project Poll Results
Dear Mendota Heights Resident:
The Engineering Department is mailing this letter to residents of Callahan Place to
inform them of the results of the street improvement project poll survey that was mailed out
this March. The March correspondence that was mailed to 30 property owners abutting
Callahan Place by the Engineering Department included a letter describing street improvement
projects, and a self addressed postage paid postcard that residents were asked to fill out and to
mail back to City Hall indicating their support or opposition for a street improvement project
for properties abutting Callahan Place. These project survey responses were compiled,, and a
summary of this data is shown on the back of this letter.
Council has decided not to proceed with a street construction project in your area at the
present time based on the results of the project poll survey that was conducted this March.
Council might be inclined to reconsider this decision if a majority of the affected property
owners in a particular area took it upon themselves to circulate, sign, and submit a petition to
the City requesting a street improvement project. In the meantime, Public Works and
Engineering will be monitoring street conditions in the area, and the issue concerning any
future street improvement project will be re-evaluated if circumstances change.
If you have any questions or comments relative to the above project information, please
contact Jim Danielson or myself either by telephone (651-452-1850), in writing, or by email at
marcm@mendota-heights.com.
Sincerely,
Marc S. Mogan, P.E.
Civil Engineer
(651) 452.89
1101 Victoria Curve • Mendota Heights, MN 55118 (651) 452-1850 • FAX
Street Project Poll Results
Support This Year
N
N
Support Next Year
0
s
U Support 2004 or Beyond
0
IL Don't Support Any Time Soon
Poll Data Details
0 2 4 6 8 10 12 14 16
Number of Responses
4/312002
City o.:
Mendota
April 4, 2002
Subject: Mendota Heights Street Project Poll Results
Dear Mendota Heights Resident:
The Engineering Department is mailing this letter to residents of Dodge Lane to inform
them of the results of the street improvement project poll survey that was mailed out this
March. The March correspondence that was mailed to 4 property owners abutting Dodge Lane
by the Engineering Department included a letter describing street improvement projects, and a
self addressed postage paid postcard that residents were asked to fill out and to mail back to
City Hall indicating their support or opposition for a street improvement project for properties
abutting Dodge Lane. These project survey responses were compiled, and a summary of this
data is shown on the back of this letter.
Council initiated the process for a street construction project under the statutory
provisions for public improvements by ordering the preparation of a feasibility report on
March 19th based on the results of this project poll survey. The Engineering Department will
be collecting preliminary survey data in the neighborhood, preparing the feasibility report,
conducting the public hearing, and developing final design plans and specifications for the
project over a period of time. The next correspondence you will receive will be a notice of a
public hearing for the proposed street improvement project. The street improvement project,
estimated costs, and schedule will be discussed in greater detail at that public hearing.
If you have any questions or comments relative to the above project information, please
contact Jim Danielson or myself either by telephone (651-452-1850), in writing, or by email at
marcm@mendota-heights. com.
Sincerely,
'-�eaze' S, r-2 �
Marc S. Mogan, P.E.
Civil Engineer
1101 victoria Curve • Mendota Heights, MN 55118 (651) 452-1850 • FAX (651) 452-8940
Street Project Poli Results
3301
7%
Dodge Lane
❑Suppo
DoN
Surveyed Support Do Not Support Percent Reporting
Lane 4 2 1 76.0%
a Support This Year
Support Next Year
0
s
v Support 2004 or Beyond
0
Q. Don't Support Any Time Soon
Poll Data Details
0 1 2 3
Number of Responses
4/3/2002
NEWS
Public WorksEngineering The Pmpel
i n e
Code Enforcement
LETTER March 29, 2002
Parks Report
The Parks Crew picked up
the trash daily from the
parks. They worked on get-
ting ready for summer this
week —hauled more trash
barrels to the parks, pur-
chased fertilizer and crab
grass preventor.
Mice have taken up resi-
dence at the Public Works
Garage and Tom has been
at war with them all week —
so far the mice are winning.
Utility Report
Rich checked the City's
seven sanitary sewer lift
stations daily. Rich was
called in at 6:30 P.M. on
Tuesday evening to respond
to a sanitary sewer backup
at 697 South Freeway
Road. The sewer was
backed up in the City's main
and Rich jetted it open.
The problem was found to
be a tree rootball. The
Freeway Road neighborhood
is an older neighborhood
and homeowners have been
having problems with tree
roots in their private ser-
vices. We think that what
may have happened in this
case is that a resident up-
stream had Roto Rooter or
some other cleaner out to
clear the roots from their
line and that this rootball
was pushed into our main
where it got hung up and
blocked our line. The resi-
dent that had the back up
told us that he currently has
to have Roto Rooter out two
times a year to clean his
service of roots. We are
planning on putting a notice
in the next Heights Highlites
asking residents who have
their service cleaned to call
City Hall and report it so that
we can come in and clear
their rootball from our line.
Rich also performed mainte-
nance on his sewer jetter
this week.
Street Report
The Street Crew patched pot
holes with cold mix this
week. They replaced some
missing street name signs.
They disposed of a road
killed deer. They removed
the sand and salt from the
plow trucks and cleaned
them out —hopefully for the
last time. The bids are back
for this spring's street
sweeping and McPhillips was
the low bidder again
(they've had the bid for 10
out of the last 11 years and
they always do a good job).
They plan on beginning
sweeping the middle of April
and, because they are going
to use six sweepers, will be
done in three or four days.
Code Enforcement Report
Paul issued a permit this
week to United Properties
Construction for an 8,516
square foot office tenant
space finish to be occupied
by Digital Data Voice at
1210 Northland Drive
(Mendota Heights Office
Complex III).
He also issued a permit to
Socon Construction for a
MAC Part 150 noise abate-
ment remodeling job to be
completed at 2164 Trunk
Highway 13 (Robert Larson
residence owner/operator of
Larson's Greenhouse). Per-
mit valuation was $38,000.
NEWS
Public Works
EngineeringThe Pipel i n e
Code Enfforcorc
ement
LETTER March 15, 2002
Parks Report
The Parks Crew picked up
the trash daily from the
parks. The Parks Crew
plowed cul-de-sacs and ped-
ways from the March 9th
storm. They also removed
tree limbs downed from the
March 9th ice storms in the
parks and on the pedways.
They attended a seminar to
learn about new techniques
for safely applying pesticides
in the parks.
Utility Report
Rich checked the City's
seven sanitary lift stations
daily. The resident living at
1051 Marie Avenue called
the City to inform us that
they had had trouble with
their sewer line and that we
should clean our line of their
mess. Rich cleaned the line
in front of their home (good
work resident)!
Rich had to use the sewer
jetter to open up frozen
catch basins and lines on
Winston Court, Ivy Falls
Court and Overlook Road
this week.
Street Report
The Street Crew worked on
maintenance to the vehicles
this week (replaced a hy-
draulic line on #310 etc.)
They worked on mail box re-
pairs, pothole complaints and
opened frozen catch basins
and culverts.
Down By the Oasis...
Bolander and Sons, Inc. be-
gan the demolition of the for-
mer Oasis Station at 1960
Dodd Road on Monday morn-
ing at 7:05 a.m. At 7:15 a.
m. the 1,600 square foot
building and steel canopy
had been transformed into a
pile of rubble. Planning
Commissioner Friel captured
all the "action" on film and
video. The pile of rubble was
pushed, piled, and twisted to
compress the rubble and dis-
member the steel connec-
tions. The loader operator
separated the steel from the
piles, which was loaded into
trucks and hauled away to be
recycled. The remaining rub-
ble and concrete was also
hauled away to be recycled
or land filled. Concrete foun-
dations were removed except
for the light pole and sign
Date: Event:
base located adjacent to the
bituminous bike path. Re-
moving them now, with the
frost still in the ground, could
damage the adjacent bike
path. The only "hitch" oc-
curred when an uncapped
well was discovered in the
northeast corner of the site.
We surmise that it is a moni-
toring well that did not show
up on previous site surveys.
Keys Well Drilling is re-
searching this matter for the
City and will seal the well ac-
cording to Dakota County
regulations.
o—
C�C�� C�
Snow Events
3/9 1-1/2" snow & ice
Response:
Sanded streets in morning —
plowed all areas during day
NEWS
Public Works Pipeline
Engineering The Code Enforcement
LETTER March 8, 2002
Parks Report
The Parks Crew picked up the
trash daily from the parks. The
Crew returned more trash cans
to parks in anticipation of
spring weather. They removed
the Minnesota DNR lake aerator
from Rogers Lake this week.
They needed to remove it be-
fore the frost was out of the
ground. The aerator is stored
during the summer at the Pub-
lic Works Garage back lot.
They plowed the pedways after
the snow fell on March 3rd.
Utility Report
Rich checked the City's seven
sanitary lift stations daily. He
had to replace the plumbing
vent for the Northland Drive
lift station (in Brown College
parking lot). A car had slid off
the driveway and broken the
existing one.
Rich inspected both of the Su-
perAmerica Station's car wash
sand traps and found them to
be cleaned out as directed.
Street Report
The Street Crew attended a
"Work Zone Traffic Control"
workshop and were updated
on the following topics: New
OSHA standards on high visi-
bility garments, correct work
zone signing and flagging,
proper safety in work zones
and an overview on traffic con-
trol. They made some fire
safety improvements to the
Public Works Garage as re-
quested by Fire Marshal Paul
Kaiser. They performed some
maintenance to truck #303 and
replaced a burned out light bulb
to the traffic signal at TH55 and
Mendota Heights Road.
Snow Event
excavation was backfilled and
now awaits a blacktop patch.
Wetlands Education Series
Attached are two notices from
the Dakota County Environ-
Date: Amount: Response:
2/5/02 3/4" Scraped main roads and
sanded slippery spots (4:00 A.M. start)
Construction Proiect Update
I attended a meeting this
Thursday sponsored by MnDOT
and Dakota County to update
the communities on the con-
struction projects that they
have going on this summer that
may impact the Cities (MnDOT
map attached). There were no
Dakota County projects planned
that will affect Mendota Heights
this summer, and the Lexington
Avenue Bridge project will be
the only MnDOT project affect-
ing us.
Water main Break
In what seems to be a weekly
occurrence, St. Paul Regional
Water Services had a crew re-
spond to another 6" water main
break, this time on Creek Ave-
nue next to Dodd Road. The
break occurred before sunrise
Wednesday and the main was
repaired and back in service by
1:00 P.M. the same day. The
mental Education Program an-
nouncing upcoming free pro-
grams. I attended the one on
frogs and toads last year and it
was great! The one on Ecology
of the Mississippi will be con-
venient for us because it's to be
held at City Hall on March 20th.
Street Proiect Poll Notices
This week the Engineering De-
partment sent out street pro-
ject poll questionnaires to 298
residents in 8 different areas to
solicit their views relative to the
need and timing of potential fu-
ture street construction pro-
jects throughout the City.
Those areas included the Som-
erset and Avenues neighbor-
hoods, and residents abutting
Walsh Avenue and Kay Avenue,
Ivy Falls Avenue, Spring Street,
Sunset Lane, Callahan Place,
and Dodge Lane. A separate
notice is being drafted for the
Freeway Road area and will be
mailed out shortly.
• • •
1SS1SS1
Presentation by:
Tom Lewanski
Conservation Director
Friends of the Mississippi River
Wednesday, March 20, 2002 — 7:00 p.m. — 9:00 p..
Mendota Heights City Hall, Council Chambers
1101 Victoria Curve, Mendota Heights
Also:
Learn more about the 2002 Wetland Health Evaluation Project
and sign up for the summer monitoring season!
All programs are free and open to the public
Sponsored by:
The Dakota County Environmental Education Program
4100 220th Street West, Farmington, MN 55024 (651) 480-7734
The Hennepin Conservation District
6900 Wedgwood Rd., Maple Grove, MN 55311 (763) 420-2157
I
-"7!Frogs and Toads
of Minnesota
Presentation by:
John Morriarity
Natural Resource Specialist, Ramsey County Parks
Monday, March 11, 2002 - 7:00 p.m. - 9:00 p.m.
Minnesota Valley National Wildlife Refuge
3815 E. 80th St., Bloomington
Also:
Learn more about the 2002 Wetland Health Evaluation Project
and sign up for the summer monitoring season!
All programs are free and open to the puhlic
Sponsored hy:
The Dakota County Environmental Education Program
4100 220th Street West, Farmington, MN 55024 (651) 430-7734
The Hennepin Conservation District
6900 Wedgwood Rd., Maple Grove, MN 55311 (763) 420-2157
2002 Construction Project Descriptions
1 «y]On iX J4om'Ad". PP: A.., m LP.6
M:Gady.aurlacng, d of
s�.�Fm�a�anllzxP.6alszmx
'Alf, Ad, IAra'WaPe rv6513aE 1]62
re 411.11
CIEr I.I.
z NAYS ..'AdIddA m. I,I-Amd,
.A.1 Suxnsge
61anArare W012W2-WOIRO]J
i.a ne l.ryact f emor'Id- Ili A.
' cosr Exl:la3
] Hry 5 Hal lv LSAN 1I
aairq.aunanrq.e¢vl
San Iti 6YU1. OlA 12Wz
Ill".1-All M.mc Mai em 651.1Hn1 ]62
Cvxl ESllaSlz]ttNJVaM1
wor Nw AorxuY.SM rncen
ex9n, eegxe Ervlge d eNr
SarvF.nNn aR6'2mE� Iv01RW2
iM al w�TN 5 bat rxgoeOCwaN � Oerov
Casl EMnaS]0.U%COVa ker 651.562�1]62
sIM.EN;, rove 11.1 Ogsolrzmx
Trallc req .., NovI., tA.
�T. A -.A
Coal Ea111ara �XreaxeB 6. H»y Bea, PA. 601. snWu;al in LNeece Gh
Svon: Pec'ay.un avd wbav TH S
sran-Flmrn aNbE W 2 � @012pAJ
'mr, Me+.lainaw wed A-Aln
I=All. Ilwr✓e and 651.51t1]N
Lwl Extl 5I . ar
i. nrvy to IAd.. Ave N Ali 1. IIAI It
filan 1m1.1l)" za10o"Ad,
i AlI AdAlA Darc keoA(Iff-w fil"Al
�dflll. All.
d. my 21 iH 191e C5AN ]] in New Prayve
Sran Fid-II.lAdd-�03'IS2-
T'All d acl. F4no.. Po. LbsM DAdA
,a518B2Wrry n: LoI ryI'd'
C SI ErII-
9 YIfveadawt/md Ll re A It »I.,-
'' M 6:ar rmnnor ar
sanAmmoslol�i6oi-mmrzn6z
Trams At Lervr. rker It' It"
Coel EslIf"i'T
'i 10. a]z 185rn, Lt:o C5AH a61n lane..l;e
6dmeina.sa 9]R2'2 W 2. 0& 1 C2 W z
Tulle lrryx Mvnr. Enw'.der a:an cwuree
' .Fer 65TSex-tJ6x
' Casl EzeraSaSMV�nV a
11 a]SOver Uae Alar.ov
1.11 1.
Sran FlA.
-l. M:P}3501]OiNE z
w5P ems l:0lane
Ill ,Fer fill+.px-I 6z
Cosl Ill 1.'d0.Xt]IXI d
12 r ]SE TH 77 m Eaian 10 Ill- All m 61law
vory Symng.romcemau
T.,M1A ImoA mmazmE a,aA«mad„_r
aFArd61-51-1]6x
e ,r�E.ilasd X�. r,.
rl t]5E Ensoa•A nsz W.er B me
sr;.1,Av I,�a�rrvl2x,.wgrzcv-
TNnelmaxl. anw.. drro.d. zD]zaav
aIII' ....... ...
odr CEll 1]50C.
14. : W9We $[bH 11"A"Addlov
IIAieragy..tl°an .aau,.nbveb
,.d7 Wr=fA.,d-.1.
Tladf lrgdddt a n.'I.. a We[bfuras
Snge Ww... ArIweek
PWICAXyrxratl.-A 611d62�1965
LwI EM:$1W1V
15. 3]Sly Ia ¢tivl S1 N Bbawr9lan
Wan:69yesaum:llon
Zll.o].V1Rm211/1.
,AIi 11 All Liwe w.e lave el4]Avla.
I.
t-,Arum,
y-}M1Xlamaeci651.5021e65
,.A III 11Y! W
1&IJSW wewvp A.CwmYPwe 52 N Avoka
vlaM lma<Xvy recurMluclbn eve
A . .
s W 1FukN N•t5'M¢ ..11W ]
It.,, Np6 At Llofursol NaertNvga
WC Ad-DaveeN At (Al 65160x�1i15
Loll . ¢AYAb
1I, H..yM RAAA ,l. it lne it, C:vc III
Wart&tlya r.1 Aid veul'rAd
6umFlrvN WIS2mZ�t62SQWx
n.ttA At Mw,. AIIxA.ey nna. I.w ar,rmq
.vre.M Aav
Pu6YAIWm Xenl Bamern fl14Y2�1]G
Con Eae. f#.DW
IB. HW e1 Enper 11Ub LH 5
Add: aem+rr[.r. mu a "All -11
sun Nx0401RS2'OTpIrZM2
"Ali All did d. Ill di I. der'....
Alt""t
P.A., I.. XeN W elver Sd2
Coil E,l 11UKN
1q. NW wrx ss1diH xDm D.kwe cmrmv
,At
St.
e Il6 Ali
SunFmN O]AYEO]E. W.r1YEx1
me eNSPW NeAdd
alweJ lolrvovyn lrellC
I11 XwN Wahar 651�SA2�1J@
MI,]RPU
EO Mry 5x3aq[Ie1N 551n must Greve Mmgnla
eUa.-A ml6avMsy
rggrryyy 6apwamenu
sIM{.:a movmm-paoa26oz
TmttA Mex-1.-A"d nwr I.. rwv[d.e
e1651�1ex�1%R
Lu1 EH. al0E0AJ We
x1. H.ry'3Mo+sual Or to PNb Dr In M1led.na
W -And
A p.ka.azvm.WMnfdx/
Sun{'nN I'd 1. 1.".}raX<, Addi Mainlein Ilene ea PAzvur
Ad -.-II C.I l]W�SI51561
Lm1 Ert3 H
1E. Wry SS E Y.A 1. TH d28 An 631r.]b A. iff 55
'cl, f✓Maq.vdxlrq Al A..
s ecewrzwo�xl
nmc mvxt uapr. M.d.d z mnw re d-dl-
-Ild ®di[y.ee a rX 6z
XnmA,ce fill �5621 a65
Cw1Eat SIEFAOTJ
2>. 1, 61 NHazupa mMel Alf J161e lit
, relay
.µ®dry NCf�o nmentn
Sr M.FMvdlMC61D]x. W152mz
}rat A1arrclm
11 III. Waker Al"AI....
xa. It, 61 AidAli H:va to rH 10 rlealleHin9e
I.AFOAUAn�r«rmdl d -,III
illd-
A,s pe .PA1]6a
lddlyd 651.S
L6n Ell Sd
35.IIry 61 aA9n10 51. Parrl A-1 Boen m l d-.
w F:N.+q.aWaCn9d Arw9aa
II.ff
Ccmfurel.q.r sl<mxnrpw
san.f:.. wrmxDz. lam2xa
rA n- :.Ia i� .........
e, .....A. d'.-
.nlP.rnnd 6ssxznx[
C,ad�En: v .
M.Hry61 H9a lACavu Ave.Ae
11" .1.1 eruu[IA "Loge,
Hare rA[«AlA aIA�zn f -A Air mrre <wrr,lw
c��EIf.- A.Illilli
iAmwnm
E i.1, 61 Id. lu. A, to Posemwe Ave.
WAF:.1-d-s m06 overlay
sramFNHa mmszeoz � raro266z
Tranc lnpxl: Mnor. Wmbb I.A. II.....
py4 pllava: DaneeFa M�ueMv 651�50EIPS
Cwl Esl: ENPWA
x8.Ill 61 Ar[aoeovm.,f, Py rA Sl Paw
Wank: fil AAdge d Avca.[xef
6un4`wf1..11W2- IIr.-I
i. We Irryx1: lAepr, Poan Cbf en . Debvr
qye pllava:0eneeka M.CWen. 6515BDit]5
Lm1ESI: SaW]W]
29. I"ill f.JAE
WM li reXa..dAA
S.,.di lax/I.Wx-.IRWx
TlAddd plrl: Mepr. Madam..... ea dreclbn
P+nA^s � SFOmueea
P2Mp11a.e. Xann Wahae 651.S6E�1]62
Lwlffc SIO20.1tl
'A, Nay II Onr Mvmeada Prve,
,di :&JypaAf
SwANA W I..-..,
'Al. 'At Mlew, I.. [Iwwe+ avU
aA.IOfA [Awes
All Allisre. 1. x,aeea['c 65158E.
C1[81
wI EM: YOLW]
If, "17..--A Bner
&qge mNdemtion
maee�pnsb 1
son Fw o]ral2wx12w2
TN]c Inyx.I: Mlmr. Manf.A No lanes ea dmaro
PAk Allaln: TMx Xeemexi 851361 Ia65
Cwl Efl: 3156W]
J2. 1, rl Af-i l6vn1.m 6z
Wpk &Nmmwa mlCaavenq.
1Mttrcnla relreM;talan
$umGnlsA 01A4'20J3-0.W2)Rm2
Imll,d Inyx[.1.Snouaarb we tlmorva
pv'se AllYr.e:iwW Wurosce e5TG8t1a65
Cw161'. 821WN
Sl 4w Lmx Hluar to wal ryrcum al l ABa
Ww.a: Pru[IMe MMneW
swFm;enowlamz.loolrzmz
NAIIUH: Oanee4MOpuenaa 651382f 1711
1. Eel: S19'J'.10
][. 4M AI Cs.WBllHerrAacklnllauaweAAA-
At I rAlartna,.
id i'eeNOBCNAm1'IW01RWz
Hette lrKSl: Malor. Nan maAAowlana<Iwurea
pverc Alldn: Den AAA a MLquenW Al I5.- 1115
Ill $'It YA
JS. SM TH "I A. Earle Ave,
Work. Pxmarrvct Add All I'd Mne
sraNEWaA6591Rmz 0l. Aff
TmI[Impal'. u.id.. vomrusnnwrlan. [Nrww
. Om2eAl.1-ido65T56z 1115
tdsi En!reu S2d"A
]6.FMAI L6AH B18 al6raaU«ay
k: 1"..A 1". er'bgw [u
6ramFrvaX O]�Wtml �GVIa2WJ
inllc lrryx.Nalo., umlam lrolareawd.ecw
(Ia
n: Daeeedra- Ivuen.61t�562-1])5
n1E nIt.
J1. 69[ Fbm M9a to fit Lmra Pner
Stan FlSnxnvrvl e^lacemenl
Henc Irpar rl.rcr. Aev.mum Av Ic rdi
Earle55: am Al -'A 61......
Lwl
]]. L9a ln»ex/XAl iunnela P.:-, Ave tunas.
urn Erman Illrv�Ja z � larzzmz
Han[In'vocx. M.mr, N:gm.ne [Ndwex
u.i Ell n �awroAm a-, 111.56aw65
J9. n»Y Iw Gennmd Ar. b Dadev v9mv XU
n: Gra61tg1d a<iny,drgges ro
61. Fle'H�C6ro1rzOx "Idldi
1A�en1'ra.pr. namrw narrnarre<Iwww.
^e Aff I caanrrIam Mf 1" -1 L"1"Lon a . l. I IfAf A
Preliminary Draft -- Feb-25-2002
W Hwy 1 W DwvlA sl:o 291a. Ave N
k:OraalnA.
q.ru cmg UrNges
Slerol-".I,r.,ii x a; I.,f. ]
I,.". Alvrlane cb AwesAli.
WM 5
PIIar pM Pv[1651.6W65 z-
Col.ES: 119MCOMram
11. HA, diffli ve 10 RMAve
work: aaaAm.Ar,nazmq.e.wgw la
s., „y:rmer.rg A`dff
late E;n. fill"fill".� aro 1Rmx
IA
LA Aapr.N .bne<wswas,
6.,'.I-I'MIAe
LoY All M TOXnma 651Sex�1aG5
l Est SzAI.
ax. Hwy JNXAre IONOI Trvm lakeadve C54H 61
n: Gmdy.Sr.ncmg.Mvlges la I
6 i+ne rUry.rnler[narye al6t I
S.mFlrvaxoWo4rzW1�4 12VA
elrpxl:..Al. Nev.-IAll, rdA.... A.-
}N 1 WW ..A -.,Cos.
c Iurs: T..'-All 651hdz-la65
Losl Erl: SSGN"N
a1 Nrvy I., Ne ovei A4ax Hrver near Elt if
I, A .,.-A llU - 6 aopmacves
Sun Frnrsn 0]MERW I � WRW2Wx
Halle lmpxl: Mnp..sa Ax (A.A. ov 58 di"
llaonee P.. Ars'. DI1-0yeevN 861�562�1]]5
I.,..: SJ91IXil]
a. xwy Iw.ml.w
n:Gudvy,. dA. Ad or xvouwo
mn diA,, 1-Id all srzcoz - oimMzooz
I.". "All: Mvw,Norv.uxlr nwrlay.Coined
pWue Adana TAl XlA,u Ill.58P 11.
Lw1 Ed, . Ill.
AS. ,, 169lMxlidAil rPrver b TN An -A
k:..dv9au xm9.egvalxer<
Of M
SIan""Iff1/I"'A" INISRWx
aUk di Mwr. fr Iram Mam ll, A Tx 10
ANernaIael......
all Sgz.lii5
CowIarn:Oaneeu M1l�Cvuenao661�
Est 56565W]
e6. x«/Ill P.mml]bd to Vaua/Vie+r Onve
SbrvFu.15A0T21Y2WE o03g120R
nMm"Al.Luaor. Add Nan Aaw All. [Iworea
sea fill III.1.65
Losl EnI:151J0]m}Xbm
AI. xwy xa2 Loon Ck SAv I. Panvnye id, I. -Nap
IdIA Covsrr.el A. Ali one apw
Sun Ermar.,..I.I dAl
Tra1M f1.1 All Full di In 200]
Cosl EAIIIIA2 fid va 11 Cvuenao d"di ....
A61Y9e AI P.nn Ave n P¢A161b®amnuglan
Wan Heaxe avwexAerlld,dt�l 1-di
Illf
Hall[ ve CalJ.Pesvuuanr on
,.,,A',A, mmne+wuon
21 ioel Xramnsa 651.562-Ia65
CmI ESI: Sz10CW.tl
19. 1411 TN.:o v esl prclbn If FY
Won. &Iuminevr mzldove ay
sumfmun 05'1SEW2-ION12x3
I.d elmpae ap. SmA weekend mne c.ozueer
Pli AdAr'cT11 Xramad<i 651 N2 Iasi
T
50 La9a vale, Iff., PaAd 1. l-9a rn"Ad d-,
d.
Wrge.
Sue F rv,I C6ovtxl` claotz6Z
Lw1E3LAll illffI rd 6515A'
51. n.v/ 610 A1rsizd.cN Pwer:o Goan Pao.ar Biva
Wan dm4 r[nacn9 moemn9
soovUgertorru�UnAec
mFrmxn anszxl.gn162xz
ar. va Aror«n. rnr rrda
�4neaorvrexe.
., waexa al.aweAll, 6sl-mz-vs
codsl Ea�asllEcu'A.G
Ez. 1.,If Fla-rH V).aI'll Y.l Jsv
wAli
All qunrlUraJ I'd
.memzAd,
E m:r"A"Id6CO2me-ogr26RLd]
.r. care I.6sa a�a mr .n, rare
'l If':,,�e:a wcdrrenm As:.56z. f }5
A, Ill
s2VIdAiro
S}.1.1 .1, fit ..It I«amr BrvU., ..
n: WldSn relax and pame 1
12 Illl W,dgar
SmrtArmA d, 151.1-Od01.].1
:lsperd� P ova d 6515P2vn Ed A NO
1A
c n 11 1,.ar
NEWS
Public WorksEngineering The Pipeline
Code Enforcement
LETTER March 1, 2002
Parks Report
The Parks Crew picked up the
trash daily from the parks.
They attended the Annual Min-
nesota Toro Conference in
Brooklyn Center this week. At
the conference, they attended
classes on lawn irrigation,
chemical application, turf and
landscape maintenance, pond
and lake management and turf
equipment applications and
use. The class on turf diseases
was particularly interesting and
should be very useful in keep-
ing the City's lawns healthy.
Utility Report
Rich checked the City's seven
sanitary sewer lift stations
daily. He purchased some
"grease eating" bacteria this
week and put it in the wet wells
at four sanitary sewer lift sta-
tions (Mendota Heights Road,
Northland Drive, Veronica and
St. Thomas). He learned about
this type of treatment at his re-
cent Wastewater Operator's
Conference held in Blooming-
ton. We have been having
trouble with grease build up at
all of these stations and have
had to vacuum them out on a
regular basis. Another city told
Rich that this bacteria was an
effective treatment, and that
they used it —so Rich thought
he would buy some and give it
a try.
Rich responded this week to a
complaint on Ridge Place. A
resident complained that he
could smell "sewer". Rich could
find no problem, but he
plugged the "pick hole" and
caulked around the rim of a
nearby sanitary sewer manhole.
Street Report
The Street Crew patched pot-
holes with "cold mix" asphalt
this week, and trimmed trees in
the Bunker Hills neighborhood.
They worked on repairs to truck
#312 (one of the snow plowing
trucks).
Marc Mogan spent some time
this week with Street Crew per-
sonnel at the Public Works Ga-
rage resolving some problems
that they were having with the
software program and hardware
that the City uses to create
street signs. The hardware set-
tings that the cutting device
uses to generate the actual
street signs and the software
program settings that are used
to create the text lettering had
to be changed to produce the
signs in the desired format.
Those issues seem to be re-
solved, and the Street Crew
personnel should now be able to
produce street signs relatively
quickly.
Water Main and Utility Re-
pairs
Repair crews for Xcel Energy
were called out to repair gas
line leaks in the Ivy Hill Town -
home development on Monday
and another one at the corner of
Chippewa Avenue and Junction
Lane on Tuesday. The water
main repair work that St. Paul
Regional Water Services per-
formed last week was merely a
warm up for what took place
this week. St. Paul Regional
Water Services started work on
Tuesday morning to repair a
water main break on the 6-inch
cast iron water main on the
north end of Knob Road in the
Freeway Road neighborhood.
They were just finishing up that
repair early Tuesday afternoon
when they were called to repair
another broken 6-inch cast iron
water at the intersection of Sec-
ond Avenue and Vandall Street
in the Avenues neighborhood.
The repair work on that break
continued into the evening.
Code Enforcement Report
Paul issued sign permits to Law-
rence Sign to install the Su-
perAmerica logo signs at 2060
Centre Pointe Boulevard. This is
the new corporate headquarters
location for SuperAmerica in
Minnesota.
He also issued a building permit
to Mr. Cliff Kirchner to replace
his canopy located at 2156
Dodd Road that was damaged
as a result of a vehicle striking
it. (Note:
Cliff insisted
that he
needed the
permit im-
mediately
back in Au-
gust.)j
Did March come in like a
lion or a lamb?
NEWS
Public Works Pipeline
Engineering
Code Enforcement
LETTER February 22, 2002
Parks Report
The Parks Crew picked up the
trash daily from the parks.
They removed the "thin ice"
signs from Roger's Lake this
week. The signs were installed
to warn the public about the
possibility of thin ice near the
lake aerator. The aerator was
furnished to the City in 1999
by the Minnesota DNR. The
aerator is turned on when the
oxygen levels get to a point in
the lake that it will not support
fish life. The DNR monitors
the oxygen level on a weekly
basis and notifies the City
when operation of the aerator
is required. The oxygen did
not reach the low levels this
year and we never had to op-
erate the aerator which saved
the City money. When the ice
and snow cover blocks the
sunlight penetration, it causes
the vegetation to die and the
decaying process uses up all
the oxygen in the lake.
The Crew continued to work on
repairs to the picnic tables.
They plowed all the pedways
and park parking lots this
week.
Utility Report
Rich checked the City's seven
sanitary lift stations daily. He
was called in at 11:40 PM
Monday evening to respond to
a high water alarm at the Ve-
ronica sanitary sewer lift sta-
tion. He received two more
alarms on Tuesday. Rich dis-
covered that the problem was
with Electro Watchman's equip-
ment (the alarm company).
They came in Tuesday after-
noon and repaired their equip-
ment.
He finished walking and check-
ing the sanitary sewer trunk
main this week, he did not find
any problems.
Street Report
The Street Crew patched some
potholes with "cold mix" this
week. The asphalt plants are
not open so "cold mix" is used
as a temporary patch until
spring arrives and the plants
reopen. Dave attended the
Minnesota Street Superinten-
dents Association (MSSA)
meeting this week. The topic
this month was street sweeping
policies.
Snow Events:
Date: Amount: Respon
day thereby minimizing the in
convenience to the affected
residents.
Suburban Dakota County
Greenway Proiect
2/20 1" Sand an
2121 Trace Sand an
needed.
Water Main Break
A water main break occurred on
the 6-inch cast iron water main
on Theresa Street in the Curley
neighborhood on Monday,
Presidents' Day. St. Paul Re-
gional Water Services repair
crews were able to repair the
water main break that same
Guy Kullander and Marc Mogan
attended a second meeting with
the advisory group of the Sub-
urban Dakota County Greenway
Project on Wednesday at City
Hall. This study will identify
natural areas and prioritize res-
toration efforts in greenway
corridors in the suburban areas
of Dakota County. The data
being compiled in this study
identifies soil types, grade and
slope aspect, and historical and
existing vegetative cover down
to a 10 by 10 meter grid within
the developed suburban areas
of Dakota County. This infor-
mation will be made available
to landowners to
educate them in the
benefits and posi-
tive impacts that
can be realized by
d scrape preserving and pro-
tecting these green-
d scrape as way corridors or re-
storing these areas
with trees and
vegetation suited to
their site. This work will com-
pliment the Natural Resource
Inventory and Management
Project being developed for
Mendota Heights by Barr Engi-
neering. The results of this
project will hopefully lead to an
implementation program that
will fund natural resource pres-
ervation or restoration projects
with willing landowners.
NEWS
Public Works
Engineering
Code Enforcement
LETTER
Parks Report
The Parks Crew picked up the
trash daily from the parks. The
ice rinks were closed for the sea-
son on Monday, February 11. This
was one of, if not the, worst years
for maintaining the ice skating
rinks. It was also one of, if not
the, shortest ice skating seasons
on record. The Crew was continu-
ally having to fight the warm
weather's damage to the ice.
They worked this week on closing
up the rinks for the season. They
cleaned up inside the warming
houses, brought the flooding
hoses, hydrant wrenches and fit-
tings in for storage. They also be-
gan repairs to the old picnic tables
this week, for placement in the
parks.
Utility Report
Rich checked the City's seven
sanitary sewer lift stations daily.
He cleaned the sanitary sewer lift
station located near St. Thomas
Academy and worked on repairs
to the ventilation louvers at the
main lift station on Mendota
Heights Road.
He began his annual inspection of
the trunk sanitary sewer this
week. Every spring, Rich walks
the lines, opens and checks every
manhole to make sure they are all
ok.
Street Report
The Street Crew continued trim-
ming overhanging trees along the
streets this week. They also
worked on other miscellaneous
duties such as disposing of road
killed deer, welding repairs to
equipment and clean up to snow
plows.
The Pipeline
February 15, 2002
City Hall Generator Serviced
Public Works Mechanic, Lenny
Kanitz, completed servicing the
emergency backup generator at
City Hall this week. Len replaced
the radiator, fuel and heater hoses,
belts, anti -freeze, fuel filters and
load tested the batteries. Although
Len checks the generator periodi-
cally, this was the first replacement
of all the belts and hoses since the
equipment was installed in 1988.
When activated, the generator runs
essential equipment and lights at
the City Hall, primarily in the Police
Department.
CAD Software
Most Engineering firms use some
type of computer aided drafting
(CAD) design software that saves
information in an AutoCAD drawing
file format. The City purchased a
CAD software program in late 1998
that was considerably cheaper than
AutoCAD, but was able to open and
save drawings in an AutoCAD file
format. AutoCAD has been up-
graded three times since the City
purchased its software package in
1998. The Engineering Depart-
ment recently requested the latest
versions of all of the CAD files that
Westwood Professional Services,
Inc. developed in conjunction with
the title and survey work they
completed on the Town Center pro-
ject to date. Westwood Profes-
sional Services, Inc. sent these
CAD files to the Engineering De-
partment by email, but we discov-
ered that we could not open their
AutoCAD compatible format files
with the version of the CAD soft-
ware that the City had been using.
Fortunately, the company that de-
veloped the CAD program that we
purchased it from back in 1998 has
released a new and affordable ver-
sion of the software that is com-
patible with the latest AutoCAD file
format. In order to use the CAD
information supplied by Westwood
Professional Services, Inc. for this
project, and CAD data for other
projects that we may get in the fu-
ture from other Engineering and
surveying firms we decided to pur-
chase the latest version of the soft-
ware that we acquired back in
1998. The software arrived this
week and we installed it on the En-
gineering Department computer.
We encountered some problems in-
stalling the software initially, but
we believe that we now have them
resolved and now the software ap-
pears to be working correctly.
Attachments:
Wetlands Exploration Presenta-
tion Flyer
• Thank you letter from the Men-
dota Heights MOMS Club
Happy Presidents Day
l
N'ef�lo,
�ftlu�i�.
--- I Wetland Birds
Presentation by
Steve Weston
Minnesota Ornithological Union
Tuesday, February 19, 2002 — 7:00 p.m. — 9,00 p.m.
Apple Valley Municipal Center, City Council Chamber
7100 West 147th Street, Apple Valley
Also:
Learn more about the 2002 Wetland Health Evaluation Project,
a citizen volunteer wetland monitoring program
and sign up for summer monitoring season!
All programs are free and open to the public
Sponsored by:
The Dakota County Environmental Education Program
4100 220'h Street West, Farmington, MN 55024 (651) 480-7734
The Hennepin Conservation District
6900 Wedgwood Rd., Maple Grove, MN 55311 (763) 420-2157
NEWS
Public Works Engineering The Pipeline
Code Enforcement
LETTER February s, 2002
Parks Report
The Parks Crew picked up the
trash from the parks and
checked the ice skating rinks
and warming houses daily.
They are continuing to flood,
sweep and otherwise maintain
the ice skating rinks. They
also worked on repairs to the
snow blower this week and a
ice rink flooding valve at Marie
Park.
The Crew cleaned and repaired
all the wood duck houses this
week. There are twelve
houses and all twelve had
been used.
Utility Report
Rich checked the City's seven
sanitary sewer lift stations
daily. He replaced the heaters
at the Centre Pointe and St.
Thomas Academy sanitary
sewer lift stations. When ex-
ercising the Mendota Heights
Road emergency generator he
noticed that the exhaust lou-
vers were not working. He
contacted Total Electric to ar-
range to have them repaired.
Street Report
The Street Crew trimmed
overhanging tree branches in
the Bunker Hills and Friendly
Hills neighborhoods this week.
They repaired some potholes
with cold mix bituminous
patching material (temporary
potholes). Dave conducted a
tour of the Public Works Garage
for the "Mom's Club of Mendota
Heights". There were seven
moms and 12 children. Four
dump trucks plowed snow last
Friday morning. We felt that if
the streets were plowed they
would melt and dry off quicker.
Code Enforcement Report
Paul issued a building permit
this week to Deily Construction
to remodel the building located
at 2422 Enterprise Drive. The
building is owned and occupied
by Pioneer Engineering.
Town Center
Guy sent out bids this week to
seven contractors requesting
bids for removal of hazardous
materials and demolition of the
Oasis Market. The environ-
mental survey found no asbes-
tos that required removal be-
fore demolition. There is very
little hazardous removal re-
quired —just "run of the mill"
items like smoke detectors,
ballasts, fluorescent bulbs,
cleaning products, etc.
Protec Environmental began
their hazardous material survey
of the Tom Thumb building on
Thursday and will be taking
samples to be tested for asbes-
tos. Test results and a final re-
port are expected in early
March, after which we can pro-
ceed with the cleanup and
demolition of that building.
New Traffic Signal
I was contacted this week by
Mark Lindeberg, MnDOT Traffic
Engineer. Mark informed me
that MnDOT was preparing the
plans to install a traffic signal at
the intersection of Mendota
Heights Road and TH13. He
said that MnDOT was intending
to take bids on the project this
fall, the successful low bidder
would then likely order the
equipment this winter and in-
stall it beginning next spring.
Old Traffic Signal
Last Friday morning, there was
an accident with a fatality that
occurred at the Delaware Ave-
nue and TH110 intersection.
City officials received several
calls from concerned residents
as a result of the accident. The
accident occurred on TH110,
not Delaware Avenue, however
the City Council remembered a
similarly bad accident that oc-
curred on Delaware Avenue in
1999. After that accident, the
Council had requested MnDOT
to upgrade the intersection's
traffic signals. MnDOT then
determined that the upgrade
was not justified at that time.
The Council directed me Tues-
day evening to forward another
letter to MnDOT asking them to
revisit that decision.
U
M
NEWS
Public Works
Engineering
Code Enforcement
LETTER
Parks Report
The Parks Crew picked up the
trash from the parks and
checked the skating rinks and
warming houses daily. The
Parks Crew plowed the cul de
sacs on Monday morning (115
cul de sacs) and cleaned snow
from the trails, skating rinks
and parking lots when they
were done. They flooded the
skating rinks every morning.
They performed maintenance
to the electrical breakers at
the Friendly Hills warming
house and the power take off
on 505 (the snowblower).
Utility Report
Rich checked the City's seven
sanitary sewer lift stations
daily. Rich also plowed the
north end streets (his normal
route) Monday morning. Then
he plowed all his lift station
driveways and parking lots
when he was done.
Watermain Break
A resident notified the City
Wednesday morning of a wa-
termain break on Valley Lane.
St Paul Regional Water Service
responded quickly to repair the
break and by early afternoon
restored water service to the
residents in the area. Tom
Knuth was at the site and ob-
served that the frost depth in
the street was about 1/2 the
depth of what it would nor-
mally be this time of year. (1-
2 feet deep versus 3-4 feet)
Street Report
The Street Crew changed the
traffic signal light bulbs at Men-
dota Heights Road and TH55
because they were notified by
MnDoT to do it. We are re -
January 18, 2002
its condition. Tom Olund, Rich
Burrows and I met with Brian
LeMond and Ann Ferris of Barr
Engineering on Tuesday to
show them our station so that
they could give us a proposal to
complete the study. They
Weekly Snow Event
Amount:
5" snow
1/15/02 light snow
1/16/02 1/2" snow
quired by agreement that this
is the City's responsibility.
They repaired mailboxes dam-
aged during snow plow opera-
tions.
Code Enforcement
Paul issued a permit this week
to United Properties Construc-
tion to alter a space for a new
tenant at 2425 Enterprise
Drive. The permit was for
14,000 square feet of office and
28,000 square feet of ware-
house space to be occupied by
IKON (a sales and service office
products company).
Lift Station Study
The City's main sanitary sewer
lift station located on Mendota
Heights Road is over 30 years
old now, and the life of a lift
station is thought to be about
50 years. Because of that, we
budgeted money within the
Utility Fund this year to have
the station studied to analyze
Response:
Plow and Sand all areas
Sand slippery areas
Scrape as Required
Sand and Scrape
found that the building itself is
in very good condition, however
many of its components are
original equipment that will
probably need replacing/
updating in the near future.
We asked to have them plan for
completing their report in time
for consideration during 2003
budget preparation.
Photo taken inside Mendota
Heiahts Road Lift Station
NEWS
Public Works
Engineering
Code Enforcement
LETTER
Parks Report
The Parks Crew picked
up the trash daily from
the parks. They
worked with the help of
the rink attendants and
started flooding the out-
door skating rinks begin-
ning this Tuesday. Resi-
dents are already skat-
ing on the rink in
Friendly Hills Park
(because it has a bitumi-
nous base, this rink is
the first one to be ready
for skating). The ice on
this rink is still not the
best, but it will be very
soon. The other two
rinks (Wentworth Park
and Marie Park) will be
ready for use this week-
end (hopefully) or if not,
early next week.
The Parks Crew plowed
snow from the cul-de-
sacs on Sunday. They
plowed the pedways
(where needed) on Mon-
day.
Street Report
The Street Crew sanded
on Saturday and plowed
The Pipeline
December 28, 2001
on Sunday. (They began
plowing at 10:00 am and
were finished by 7:00
pm). They worked on
mail box repairs and
changed the cutting edge
on plow #312 on Mon-
day.
Weekly Snow Event
Date: Amount:
12/22/01 rain/ice
12/23/01 2" snow
Utility Report
Rich checked the City's
seven sanitary lift sta-
tions daily. He sanded
slippery spots on Satur-
day, and plowed the
north end streets on
Sunday. He plowed out
his lift stations on Mon-
day.
Watermain Break
The frost going into the
ground always results in
watermain breaks. Early
Thursday morning we re-
ceived a call from a resi-
dent reporting water run-
ning down a gutter. We
investigated, and discov-
ered that a watermain
break had occurred south
of Miriam Street on Diego
Lane. We reported the
break to St. Paul Regional
W a t e r
Utility
and they
Response: informed
Sand where needed us that
they will
Plow all areas repair it
Thursday
night.
Someone (Santa?) decorated this
tree in Valley Park for Christmas
NEWS
Public Works
Engineering
Code Enforcement
LETTER
Parks Report
The Parks Crew picked up the
trash daily from the parks. They
also had to install markings by the
recently installed DNR plantings
along Rogers Lake to prevent peo-
ple from driving over them. We
officially opened the ice rinks on
Saturday, January 5th, we then
had to close them Tuesday
through Thursday. We will try to
reopen them on Friday. (This is
turning out to be the shortest
skating season on record). The
crew worked on trimming trees in
Friendly Hills Park.
Utility Report
Rich checked the City's seven
sanitary lift stations daily. He
cleaned built up grease from the
floats at the Veronica and Centre
Pointe sanitary sewer lift stations.
The floats are switches that oper-
ate the lift station pumps based
on the level of the liquid in the
wet well. He also worked with the
Parks Crew this week to chip
branches trimmed in Friendly Hills
Park.
Street Report
The Street Crew worked on trim-
ming trees this week. They also
worked on equipment repair to
the chipper, backhoe/tractor and
bobcat. They were able to work
on some sod damage repairs too.
John Ambrose used his welding
skills to complete some repairs to
the soccer goals.
Code Enforcement Report
Paul issued a permit this week to
Thompson Homes, Inc. to com-
plete a MAC Part 150 aircraft
noise attenuation project at 1062
Cullen Avenue. This work is paid
The Pipeline
for by the MAC to mitigate aircraft
noise. The mitigation is accom-
plished by changing the windows
or by adding storm doors and
storm windows, increasing attic in-
sulation, sealing attic by-passes,
baffling roof vents and replacing
the furnace and installing a com-
plete air conditioning system.
County Surveyor Ouits
Gary Stevenson, who has been the
Dakota County Surveyor for the
past 15 years has quit to accept a
job with Westwood Engineering.
Gary will be relocating to West -
wood's St. Cloud office, which is his
hometown area. I attended Gary's
farewell reception on Tuesday,
January 8th to thank him for all his
help and wish him well in his new
job.
Brian Birch Drainage Issue
Last week Brian Birch submitted an
estimate from Southview Design to
stabilize stream bank erosion in the
natural drainage channel that flows
through his rear yard at 755 Willow
Lane. The estimate submitted by
Brian Birch from Southview Design
came in higher than expected, and
so the Engineering Department
asked Fischer's Contracting, Inc. to
submit a quote of their own to ad-
dress this situation. There is a sig-
nificant difference in cost between
the two estimates quoted for this
work. Given the fact that City
Council had offered to reimburse
Brian Birch for the cost of this work
last fall, now the issue left to be
worked out is the resolution of the
differences between these two esti-
mates or Brian Birch's acceptance
of this alternate quote from
Fischer's Contracting, Inc.
January 11, 2002
Survey Equipment
JP Letourneau of Sokkia Measuring
Systems met with Marc Mogan,
Tom Knuth, and John Tran to dem-
onstrate the use and operation of
their current survey equipment line
in the Freeway Road neighborhood
this week. This survey equipment
measures horizontal and vertical
angles like the Engineering Depart-
ment's existing equipment, but
measures distances electronically
with a reflecting prism as opposed
to using a measuring tape to deter-
mine distances like we do cur-
rently. All this information is
stored in the equipments memory
that is then downloaded directly to
the office computer or vice versa.
Another advantage offered by this
survey equipment is that this field-
work can be performed with two
people as opposed to the three -
person crew that is often necessary
using our existing survey equip-
ment.
Robins Fooled
Councilmember Schneeman, Pat
and I saw a large flock of robins
out of the large conference room
windows this week. They were
feeding on the crabapple trees.
These guys must have either
known winter was going to be mild
this year and never left, or were
fooled into venturing back too
soon. Let's hope they are right!
NEWS
Public Works
Engineering
Code Enforcement
LETTER
Parks Report
The Parks Crew picked up
the trash daily from the
parks. They have also been
working hard flooding the
ice skating rinks to prepare
them for their official open-
ing this weekend. Although
the rinks are not yet offi-
cially open, the ice has been
very good since last week-
end and residents have al-
ready been using them.
They installed the hockey
nets, trash barrels and
phones in the warming
houses this Thursday.
Utility Report
Rich checked the City's
seven sanitary lift stations
daily. He worked this week
on completing documenta-
tion forms provided to the
City by LMCIT (the City's in-
surance carrier). These
forms are used to document
which sanitary sewer mains
were cleaned during the
year, so that the City can
prove that preventative
maintenance is occurring
should there be a lawsuit.
He installed a new hour me-
ter on the pump panel for
the lake aerator at Rogers
Lake Park. He also installed
the "thin ice" signs by
where there will be open
water. The DNR monitors
The Pipeline
January 5, 2002
the dissolved oxygen levels
in the lake and informs us
when to turn on the aerator.
So far this year, because of
the mild winter, the dis-
solved oxygen is still high
and we have not been di-
rected to turn on the aera-
tor.
Street Report
Several of the Street Crew
took advantage of the lack
of snow and ice and took
some time off this week.
The remaining workers have
mainly worked on mainte-
nance to the chipper and
trucks.
Code Enforcement Report
Paul issued a permit to Hoff-
man Homes this week for
construction of another two
unit townhome (2162 and
2166 LeMay Lake Road).
Town Center Demolition
Plans
ProTec Environmental Con-
sultants have been directed
to begin an asbestos and
hazardous materials survey
of the Oasis gas station.
They will be sampling and
completing an analysis of
suspected asbestos contain-
ing materials along with a
complete survey of hazard-
ous materials at the site. All
hazardous materials that are
required by the Minnesota
Pollution Control Agency to
be removed prior to demoli-
tion activities, will be com-
pleted within three weeks.
Contract documents will then
be sent out for bids from
demolition contractors and
be presented to City Council
for review in February.
Demolition and site restora-
tion could be completed by
early April.
Brian Birch Drainage Ts -
sue
Surface runoff drains
through a natural drainage
channel through Brian
Birch's rear yard at 755 Wil-
low Lane. The flow in this
natural drainage channel is
causing some stream bank
erosion that needs to be sta-
bilized. This fall, City Coun-
cil offered to reimburse Brian
Birch for the costs necessary
to stabilize this stream bank
erosion. He submitted an
estimate for this work from
Southview Design. We are
expecting a second estimate
from Fischer's Landscaping,
Inc. for comparable work
sometime next week. A
comparison of the materials
and methods identified in
these estimates hopefully
will help determine what is
ultimately constructed to ad-
dress this situation.
NEWS
Public Works
Engineering
Code Enforcement
LETTER
Parks Report
The Parks crew picked up the
trash daily from the parks.
The Crew picked up materials
and made signs warning about
"thin ice" for placement on
Rogers Lake, if and when,
there is any ice and the lake
aerator is turned on. They
performed maintenance and
repair work on their equip-
ment.
Utility Report
Rich checked the City's seven
sanitary sewer lift stations
daily. He obtained bids from
contractors to repair the trans-
fer switch at the City's main lift
station located on Mendota
Heights Road. The station cur-
rently will not automatically
transfer from Xcel power to the
on -site generator when there
are power outages. He in-
spected the new sanitary
sewer connection for the new
office building currently under
construction at Resurrection
Cemetery. He inspected the
sanitary sewer that was
capped at 1250 Dodd Road
where the home is being
moved to accommodate for the
development of the Ridder site.
He also checked the City's
sanitary sewer line at 1065
Highway 110 (Hugo Blackfel-
ner's house) because he was
having trouble with his service.
The problems was found not to
be as a result of the City's line.
Street Report
The Street Crew removed the
sand/salt from the trucks and
The Pipeline
-J
December 21, 2001
washed out the boxes in order
to avoid having them being
corroded. They trimmed trees
in the Curley neighborhood
where branches are striking the
trucks when they are plowing.
They repaired the broken "trip
spring" on the plow blade for
truck number 312.
Code Enforcement Report
Paul issued a permit this week
to Crossroad Construction, Inc.
to complete MAC Part 150 noise
mitigation project at 1053
Wagon Wheel Trail (Palme resi-
dence). He issued a permit to
Parkos Construction to do some
interior remodeling at 2455
Visitation Drive (Visitation
School). He issued two permits
to Deily Construction, Inc. for
1110 Centre Pointe Curve (the
old GNB building) for interior
and exterior remodeling pro-
jects.
Engineering Department
The Engineering Department is
currently in the process of filling
out a number of surveys from
different agencies and working
on a number of different pro-
jects. The Engineering staff has
begun work on the Metropolitan
Council Environmental Services
survey that comes in December
requiring that metro area com-
munities compile and update
data relative to new sanitary
sewer connections, water us-
age, records of individual sew-
age treatment systems, and
calculations of sewage flows for
the past year. The Engineering
Department will also begin up-
dating and certifying mileage
for streets in Mendota Heights
at the end of the current year to
comply with Minnesota Munici-
pal State Aid Street reporting
requirements. Engineering staff
is also begun work on gathering
preliminary survey data infor-
mation for the Freeway Road
neighborhood.
Survey Equipment
Lee Thompson of Contactors
and Surveyors Supply (CSS) of
Eagan met with Marc Mogan,
Tom Knuth, and John Tran to
demonstrate the operation and
use of some survey equipment
that the Engineering Depart-
ment might be interested in us-
ing for design and construction
purposes on the Town Center
project. The survey equipment
that the Engineering Depart-
ment currently uses is 1970's
technology, and this new survey
equipment promises to provide
better accuracy in a fraction of
the time. CSS will let the Engi-
neering Department use the
equipment on a trial basis to
see if it is everything as adver-
tised, and whether or not it
would be something the Engi-
neering Department would be
interested in owning.