Loading...
2002NEWS Public Works Engineering Code Enforcement LETTER Parks Report The Parks Crew picked up the trash daily from the parks. They also com- pleted the following other tasks this week: • Chipped brush at Ivy and Wentworth neighborhood parks Trimmed trees at City Hall Repaired a mower Installed clocks in the warming houses Converted the large mower to be a snow blower for the winter to clear trails and rinks Street Report The Street Crew accom- plished the following tasks this week: • Replaced some street name signs, stop signs and crime watch signs Began testing back - hoes —a new one is budgeted for next year The Pipeline December 20, 2002 Fixed a pothole with temporary cold mix as- phalt Utility Report Rich checked the City's seven sanitary sewer lift stations daily. He com- pleted a sanitary sewer in- spection for a home at 1744 Dodd Road. He worked with St. Paul Re- gional Water Services to repair two broken water valves. He inspected the sanitary sewer line in Hid- den Creek with Tom Knuth. Code Enforcement Re- port Dick Gill and Paul Kaiser performed a final inspec- tion for the classroom ad- dition at Visitation Con- vent's school this week. They are allowing the school to move in their furniture, however there are still a few minor cor- rections to be made. Town Center The footings for the CDA's senior facility have all been poured and in- spected and the masonry walls are now being layed up. Watermain Break Sea- son is Here Every fall and spring when the frost is going in or coming out of the ground, it causes watermain breaks. Wednesday morning, Tom Knuth dis- covered a watermain break on Marie Avenue just east of Dodd Road. St. Paul Regional Water Services shut down the watermain from Callahan Place to Dodd Road and repaired the line. The line was out of service from about 11:00 A.M. to 5:00 P.M. The street is still not repaired. E NEWS Public WorksEngineering The Pipeline Code Enforcement LETTER December 13, 2002 Parks Repo The Parks Crew picked up the trash daily from the parks. They worked on opening up the warming houses at the ice skating rinks this week (started up furnaces, put in shov- els, repaired broken locks, etc.). They worked on flooding the ice skat- ing rinks (this warm weather should ruin a►I that). Utility Report Rich checked the City's seven sanitary sewer lift stations daily. He worked with a contractor to re- place the heater in Lily - dale's sanitary sewer lift station. He replaced 20 broken hydrant markers this week. He coordi- nated with St. Paul Re- gional Water Services to repair a watermain break by 657 First Avenue. Tom Knuth was called for an emergency Gopher One Call at 5:30 A.M. on Thursday. Water was shut down from Laura Lane to Vandall Street. St. Paul Regional Water Services completed their repairs by noon and water supply was restored to the residents. Hidden Creek Imperial Developers con- ducted a mandrel test of the sanitary sewers in Hidden Creek this week. They flushed and cleaned the lines. All lines passed the test and the sewer is now in service. The old Ridder residence was con- nected to the new sewer line after the test. They were also connected to City water this week. The owner reported that "they can now wash white clothes and not run their water softener every day". MCES Meeting I attended a meeting on Wednesday, sponsored by Metropolitan Council Envi- ronmental Services (MCES) to discuss Infiltra- tion and Inflow (I/I) into the sanitary sewers. This summer was an extremely wet one and the flows at their sanitary sewer treat- ment plants were up dra- matically (see attached letter). MCES is going to have to address these ex- traordinary flows —either by increasing their capac- ity or by decreasing the flows from the cities. The least expensive way to address the problem is for cities to decrease their I/I. MCES is putting to- gether a Task Force com- prised of communities, MCES Staff and an AMM representative to assess the problem and recom- mend solutions. MCES feels that the biggest con- tributor to their problem is sump pumps and founda- tion drains that go directly into the sanitary sewer. The Task Force will be formed in January with a goal of arriving at a sug- gested solution by May. NEWS Public WorksEngineering The Pipeline Code Enforcement LETTER December 6, 2002 Parks Report The Parks Crew picked up the trash daily from the parks. They started flooding hockey rinks. Utility Report Rich checked the City's seven sanitary sewer lift stations daily. He worked with John Ambrose to raise a manhole cover on Knollwood Lane that had been buried 3-1/2' by a homeowners yard grad- ing. He then cleaned the line. He responded to a call from Diamond Jim's Mall of a sewer backup (the problem was within their private service). He installed some new hy- drant markers. Street Report The Street Crew accom- plished the following tasks this week: Repaired the sander on truck #312 Changed bulbs at the Mendota Heights Road/Dodd Road traf- fic signal Prepared the driveway at Town Center for the ground breaking cere- mony (it was too cold, and was held at Park - view Plaza) Continued to try and solve a street light problem in the Indus- trial Park (breaker keeps tripping out) Code Enforcement Re- port Paul issued a permit last week to Heaver Design and Construction to con- struct a new home at 1423 Knollwood Lane. This is the home that was approved by Council to have garage entrances at two levels. He also issued the footing and foundation permit to CBS Construction Ser- vices, Inc. to begin con- struction of the 60 unit CDA senior facility at Town Center. The ground breaking ceremony was held at the Parkview Plaza senior facility on Monday. Town Center CBS Construction Ser- vices, Inc. began excava- tion for the CDA's 60 unit senior facility this Thurs- day. Richard Knutson is in the process of submit- ting their contract and in- surance documents so that they can begin this their work also. Before they can begin they need their MnDOT permits which are currently being reviewed. Snow Events Date: Event: Response: 12/2/02 dusting sanded streets 12/4/02 dusting sanded streets Note: Last year we did our first sanding on 11/26/01 and plowed a 3" snow fall on 11/27/01 NEWS Public Works Engineering The Pipeline Code Enforcement LETTER November 22, 2002 Parks Report The Parks Crew picked up the trash daily from the parks and mulched grass and leaves. They also completed the fol- lowing other tasks this week: Finished installing the do- nated park bench at Ivy Park Set up lake aerator at Rogers Lake —tested it to make sure it worked Removed tennis nets for season Removed an apple tree in Ivy Park and trimmed overhaning limbs from the pedway in Valley Park Utility Report Rich checked the City's seven sanitary sewer lift stations daily. He applied a grease re- ducer (grease eating bacteria) to the liftstations where he has trouble with grease (Mendota Heights Road, Northland Drive, St. Thomas and Veronica Lane). Street Report The Street Crew worked on the following tasks this week: • Street light repairs in the Industrial Park Patched potholes on Men- dota Heights Road, the "Avenues", and the north end Prepared snowplows Installed missing street signs Code Enforcement Report Paul issued a permit to Johns Smaby Custom Homes, Inc. this week to begin construction of the second home on Fox - wood Lane, 554 Foxwood (evaluation = $800K). Paul and Dick received their re- certification as building officials this week (through 2005). Town Center Bids were opened last Friday for the Town Center public im- provements. Richard Knutson, Inc. was the contractor who was the low bidder and his bid matched Marc's estimate. Council awarded the bid this Tuesday. The project is located at the in- tersection of TH110 and TH149, so several MnDOT permits are required before we can begin work. Marc and I met with MnDOT staff members Wednes- day this week to begin with ac- quiring these permits. We learned that there are four per- mits required: 1. For utility borings under Dodd Road (sanitary and storm sewer). 2. A drainage permit. 3. An access permit for the frontage road and off ramp from TH110. 4. An access permit for street connections to Dodd Road. We received all the blank forms and will submit them to MnDOT immediately. The contractor could begin work as soon as we get the permits back. Hidden Creek Crew number 1 (pipe crew) in- stalled the drain tile, placed rip - rap at the end of culverts and other storm water outlets, air tested all the 8" sanitary sewer mains and services (all passed), dug the last seven wa- ter services for St. Paul Re- gional Water and poured con- crete inverts in manholes and catchbasins. This crew is com- pleted with their work. Crew number 2 (grading crew) subcut the street subgrade and began placing geotextile fabric (prevents clay from migrating up and contaminating the good sand and spreads the load from the street). They began placing granular burrow in the roadway above this fabric. They are bringing in over 100 truck loads of this borrow every day. NEWS Public Works Engineering The Pipeline Code Enforcement LETTER November 15, 2002 Parks Report The Parks Crew picked up the trash daily from the parks and mowed grass. They fertilized the ballfields in all the neighborhood parks, Menda- kota Park, Kensington Park, City Hall and the Fire Station. They serviced all their small engines, changed oil, stabilized gas, and put in storage for the winter. Utility Report Rich checked the City's seven sanitary sewer lift stations daily. He performed inspec- tions this week at 2178 and 2182 LeMay Lake Road for new private connections to the City's sanitary sewer main. He worked with Barr Engineering to perform inspections at Lily - dale's lift station, he pulled the pumps and he removed and replaced a bad circuit breaker. He replaced a broken storm sewer grate on Ocala Court. Street Report The Street Crew accomplished the following tasks this week: Removed a dead boulevard tree at 2290 Copperfield Drive Mixed sand and salt • Removed a landscape mound from the center is- land at Lockwood Drive and Mendota Heights Road to improve sight distance • Patched streets at Delaware and Emerson and Copper - field Drive and Stone Road • Replaced some street name signs • Repaired the snowplow wing to truck 308 • Removed Halloween bonfire ash Ecolab Drainage Ecolab has trouble with surface water drainage from their park- ing lots. Because their facility is so close to bedrock, they can not correct the problem eco- nomically by adding storm sewer. They have hired a con- tractor to grade a drainage ditch around the lots for the water to drain into. Because the slopes in this ditch are so flat, they will still have trouble with standing water, but at least the water will be off their parking lots. Marc met with their contractor this week to re- view the project. He informed them, that as long as the pro- ject does not remove or bring in over 400 cubic yards of earth, they do not need a city permit. He requested that they contact the adjoining property owners, describe what they have planned, and explain the expected impacts that will oc- cur as a result of the project. Code Enforcement Report Paul issued permits this week for Hoffman Homes to construct another of their two unit town - homes at 2170 and 2174 Le - May Lake Drive. He issued a sign permit to Spectrum Signs Systems, Inc. for Honeywell to occupy space at 2120 Centre Pointe Boulevard. Hidden Creek Report Crew number one finished in- stalling the sanitary sewer mains and services (now all done with sanitary sewer). They then finished installing the watermain. (They still have six services to install). They in- stalled all the storm sewer pip- ing except the flared end sec- tions, which need to be in- stalled on sheet piling which is not on the job. Crew number two dug all the water service trunks west of Nature Way for a St. Paul Re- gional Water crew to install them. This crew also installed a four inch diameter drain tile behind the curb on the north side of Hidden Creek Path to re- move ground water and provide access for homeowner's to con- nect their private drain tiles. There was a meeting held Wednesday to arrive at a solu- tion for building a stable road- way on top of the soft soils. There was a mutual decision of all parties (Braun Intertec, Loucks, Imperial Developers and Tom Knuth) to place geo- textile fabric covered with 18 inches of granular borrow topped with 12" of Class 5 rock. NEWS Public Works Engineering Code Enforcement LETTER Parks Report The Parks Crew picked up the trash daily from the parks and mowed grass. They removed downed tree limbs from the parks this week and put them in the bonfire pile. They had to repair the door to the women's restroom at Kensington Park North (the restroom provided by Quest). Vandals had bashed down the door and de- stroyed everything in- side —toilets, sinks, etc. They cleaned up the ga- rage area and worked with the highway patrol to conduct a child pas- senger safety checkup event (see attached). Utility Report Rich checked the City's seven sanitary sewer lift stations daily. He re- sponded to an inquiry from the Country Day Care about two signifi- cant sink holes that had formed over the City's The Pipeline November 1, 2002 sanitary sewer line lo- cated in the old Victoria Road right-of-way. (It was suspicious). West St. Paul agreed to work with Rich and use their television equipment to inspect the line. They did the inspection Wednes- day and found nothing — so we will just fill the holes. He also worked with the Parks Crew to help cut up and remove some willow trees that blew down in the last wind storm. Street Report The Street Crew regularly pushed the bonfire pile up this week. The dump- ing was closed as of Tuesday evening, so Wednesday morning the Crew closed up the fences. The residents were good this year about only dumping what they were supposed to (a few fences, pallets and plywood did show up though). They had to maintain all the metal parts on the overhead door to the salt storage room this week (that salt is really corro- sive). They worked on converting dump trucks to snow plows. Hidden Creek Imperial Developers still has two crews working on the Hidden Creek project. These crews concentrated worked on installing sani- tary sewer services and stubs this week. Both crews also worked on in- stalling watermain and hydrants, storm sewer mains and catch basins. Town Center Marc received Minnesota State Aid's review com- ments back this week on the frontage road and the off ramp from TH110. He will be able to make their changes in time for a No- vember 15th bid opening. Consideration of a bid award will be on the City Council's November 19th agenda. Attachment I: All LJ .-+ O r"' O � a oxa o�o,x mod. � PC 00 •� 4.4 W' U � O =F...4 J.4 vs N ti o O p� PC.. a� c� .P POO C PC W 04 x .� 45 � U x, c � Q a U o � � s O � tj �kn Cd U o o NEWS Public Works Engineering Code Enforcement LETTER Parks Report The Parks Crew picked up the trash daily from the parks and mowed grass. They also com- pleted the following other tasks: Brought in the soccer goals for winter stor- age Brought in picnic ta- bles for winter storage Began installing plows on their pickups to be ready to plow the cul- de-sacs this winter Utility Report Rich checked the City's seven sanitary sewer lift stations daily. He also replaced the heater at the Culligan Lane lift sta- tion. The heaters are needed to keep moisture out of the control panels. Street Report The Street Crew accom- plished the following tasks this week: 9 October 25, 2002 Installed new chipping knives in chipper Kept bonfire brush pushed together Cleaned ditch at TH13 and Garden Lane Reinstalled some street name signs Put Class 5 around ra- dius of corner at Upper Colonial Drive and Wachtler Avenue Hidden Creek The third crew working on installing public im- provements at Hidden Creek, completed boring for the 24" diameter steel casing under Dodd Road. They installed the sani- tary sewer main in the casing. This crew then left the job. The contractor's second crew, installed sanitary sewer services and storm sewer and on Thursday began on installing water - main. The first crew, spent the entire week installing sanitary sewer mains. The crew is battling ex- tremely wet conditions from a high water table. This crew will work two or three more days on sani- tary sewer main then work with the other crew to try and complete all the utilities located west of the existing home's driveways. On Thursday, North West Bituminous repaired Marie Avenue where St. Paul Regional Water had tapped into the water - main for the project. Enjoy the Halloween Bonfire! NEWS Public Works Engineering Code Enforcement LETTER Parks Report The Parks Crew picked up trash daily from the parks. They also dragged and chalked fields and striped foul lines on an as needed basis. The Parks Crew also ac- complished the following other tasks this week: • Repaired the players benches at Kensington Park • Removed damaged picnic tables from Kensington Park for repair • Aerated soccer fields at Kensington Park • Repaired the women's toi- let at Mendakota Park • Planted pine trees behind new bench on Wachtler Avenue to provide screen from neighbor (as re- quested) Utility Report Rich checked the City's seven sanitary sewer lift stations daily. He worked with the Parks Crew in aerating Ken- sington Park, Friendly Hills Park and Hagstrom King Park. Rich hired Pipe Services to jet and vac the sanitary sewer line on the 'old" frontage road in the Freeway Road area. The line was filled with sand and gravel that had been il I i I D 9 Ah Ift October 4, 2002 there for years. It had several large rocks and another huge root- ball that had been re- cently cut out of a resident's private service Iine. (Fortunately, he was able to remove that rootball before it caused another backup). They also cleaned the sanitary sewer main in Dodd Road from Mears to Ivy Falls Avenue where Rich was aware of a build up of rocks and sand but could not jet the line clean himself be- cause a resident has an un- vented bathroom in that area that "blows the toilet" when he jets. He attended the mandatory confined space entry class put on by Safe Assure on Thurs- day. Code Enforcement Report Paul issued a permit this week to Scott Thomas to construct a new home at 1223 Knollwood Lane. The home is located within the Mississippi River Critical Area and had received Planning Commission review and City Council approval prior to issuance of the permit. Town Center There was no work completed at Town Center this week. Hidden Creek Imperial Developers have been working all week on building and improving the temporary access road serving the three existing residents. Because of the unstable soil, they have to begin incorporating engineer- ing fabric in the construction of this access road. They worked on NURP pond 2 (the one clos- est to Willow Creek). They hauled excess material from building lot 1 to the NURP pond 2 area. Street Report The Street Crew accomplished the following task this week: Replaced some missing signs • Patched potholes in the Ivy Falls neighborhood Attended the Fall Mainte- nance Expo put on by the State of Minnesota and at- tended classes on: 0 Chain saw safety 0 Snow and ice control o Snowplow and wing operations 0 "Getting passionate about winter street maintenance" • Worked on repairs to street lights • Some welding repairs to equipment NEWS Public Works Th le Npefi n e Engineering Code Enforcement LETTER September 20, 2002 Parks Report The Parks Crew picked up trash daily from the parks. They also dragged and chalked fields and striped foul lines on an as needed basis. T h e y also installed the con- crete pads for the do- nated park benches this week. Utility Report Rich checked the City's seven sanitary sewer lift stations daily. He at- tended the preconstruc- tion meeting for the Hid- den Creek project and then cleaned and in- spected the City's sani- tary sewer line on Dodd Road where Hidden Creek will be "hooking in" to it. Now, if the line is blocked or otherwise damaged, we are assured that it was not our doing. Street Report The Street Crew accom- plished the following tasks this week: Repaired a storm water catch basin on Medal- lion Drive Repaired a settlement behind a curb on Blue - bill Drive Patched potholes on Somerset and Freeway Road neighborhoods (minimum only in the Freeway Road neighborhood) Code Enforcement Re- port Paul issued sign permits this week to Sign Art Company, Inc. to replace the "Dakota Bank" signs with "American Bank" which is Dakota Bank's new name. Town Center Turner Excavating was re- moving some excess fill from the site this week. They are basically finished with their grading work at Town Center. Fire Station Removed the uneces- The parking lot stalls were sary signage from restriped this week at the around Town Center Fire Station. Hidden Creek The preconstruction meet- ing for the streets and utility work for this project was held at City Hall on Tuesday this week. The contractor for the work is Imperial Developers, who are also doing the mass grading for the site. The meeting was attended by City Staff, the developer's consultants, other utilities involved and Chris Mueller and Litton Field, two of the affected homeowners. The earliest possible start date for this work is Sep- tember 27th, but we still do not have MnDOT's per- mits, and the mass grad- ing is not completed. Imperial Developers com- pleted construction of the temporary access road for the existing homeowners this week (it is still a little soft). They also continued to grade NURP ponds and streets. The soil is ex- tremely wet and some of the compaction tests are failing. NEWS Public Works Enaineerina Code Enforcement LETTER Parks Report The Parks Crew picked up trash daily from the parks. They also dragged and chalked fields and striped foul lines on an as needed basis. The crew completed the following other tasks this week: Delivered extra picnic tables to Friendly Hills Park for a block party Removed unused soc- cer goals from Ivy Park Installed new irrigation lines at the Fire Sta- tion Helped out at Fire Sta- tion for 9-11 ceremo- nies Utility Report Rich checked the City's seven sanitary sewer lift stations daily. He also repaired a pump that was plugged at the Northland Drive lift station. He ap- plied the fall spray of chemicals to kill the The Pipeline September 12, 2002 weeds at City Hall, Fire Station, Hagstrom-King Park and Curley's tot lot. Rich contacted the West St. Paul Utility Depart- ment and they agreed to use their camera to ana- lyze a sanitary sewer line on Lexington Avenue at Cullen Lane to see if the blockage in a resident's sewer line was caused by the City. It was not, it was caused by a huge mass of roots from her service that were growing all the way down to our line (West St. Paul cut them off in our line). Town Center This week, Turner finished grading the north pond and worked on the south pond at Town Center. They worked on the "finished" site grading (spreading top soil, etc). Turner plans on complet- ing all their work next week. Because Xcel was unable to relocate their power lines located along TH110 before Turner fin- ished their work, we will have the public improve- ments contractor com- plete the south pond at the intersection of TH110 and Dodd Road with their work. Fire Station The Parks Crew installed the lawn irrigation system in the island at the front of the building this week. Hidden Creek Imperial Developers worked this week on in- stalling a temporary ac- cess road for the three ex- isting homeowners that live in the project. They installed temporary cul- verts for drainage pur- poses and they continued to work on building the NURP ponds. They used the NURP pond excavation for street fill. Traffic Calming Traffic calming is an issue that we are always dealing with at City Hall. Neighbors wanting speed bumps, stop signs, slow children signs, etc. At- tached is an article on the subject that was in this week's Pioneer Press. NEWS Public Works Engineering Code Enforcement LETTER Parks Report The Parks Crew picked up trash daily from the parks. They also dragged and chalked fields and striped foul lines on an as needed basis. T h e Parks Crew completed the following other tasks this week: Painting and sealing park signs Hauled black dirt to the fire station lev- eled, smoothed and seeded it. • Hauled black dirt to Wentworth Park to level some depres- sions and seeded it. • Striped parking lot lines in neighborhood parks Installed new tennis nets at Marie Park Utility Report Rich checked the City's seven sanitary sewer lift stations daily. He sprayed for broadleaf weeds in the parks this September 6, 2002 week and sprayed Roundup around man- holes that have buckthorn and other weeds growing around them. He met with Barr Engi- neering Engineers on Wednesday to analyze the Mendota Heights Road sanitary sewer lift station. Barr had an electrical en- gineer, a mechanical engi- neer, a structural engineer and a general project manager who were all performing tests on the station. The station is over 30 years old and many of it's major compo- nents are now either worn out or obsolete. We have budgeted $150,000 to complete a major over- haul of the station next year. Rich was called back on Wednesday evening to fix a power outage at the Centre Pointe lift station. Street Report The Street Crew com- pleted pothole patching on Eagle Ridge Drive and on Sunset Lane this week. They also replaced some signs and repaired a washout on Sunset Lane. Fire Hall Pine Bend Paving paved the entire Fire Station parking lot and trail on Thursday. All that re- mains to be completed on this project is some side- walk that has to be re- paired by mud jacking and restriping of the parking stalls. Hidden Creek Imperial Developers be- gan constructing a tempo- rary access road to be used by the three existing residents during construc- tion of the City's public improvements. Town Center Turner Excavating spent the entire week working on ponds, streets, parking lots and other general site grading. It appears as if they will complete all their work next week. NEWS Public Works Engineering Code Enforcement LETTER Parks Report The Parks Crew picked up trash daily from the parks, mowed grass and dragged and chalked fields and striped foul lines on an as needed ba- sis. They also completed the following other tasks this week: Delivered rec rock to the Civic Center site to repair a washout Cleaned pedways Removed downed limbs from Parks Applied natural toner to park signs Utility Report Rich checked the City's seven sanitary sewer lift stations daily. Rich com- pleted an inspection for a new sanitary sewer con- nection at 545 Huber Drive. He responded to an alarm at the Lilydale lift station and had to work all day The Pipeline August 29, 2002 with an electrician until the problem was solved. He prepared the chemical sprayer for fall spraying of the parks. Street Report The Street Crew com- pleted the following tasks this week: Patched the street in front of curb replace- ments Trimmed bushes and trees to improve sight distances at some in- tersections • Cleaned catch basin inlets Code Enforcement Re- port Paul issued a permit this week to LeRoy Signs for them to install a new sign to be located at the en- trance to Brown College, 1440 Northland Drive. The new sign will an- nounce Brown's Le Cordon Bleu Culinary School. Town Center Turner Excavating finished grading and compacting the building pads for the two condominiums, town- house #3 and the Senior Building this week. This completes the soil correc- tions, backfilling and com- pacting for all of the build- ing pads. All that remains for them to finish are streets, parking lots, ponds and general site grading. Fire Station Pine Bend Paving re- claimed and graded the west parking lot at the Fire Station this week. They also completed the patching and did the edge milling in preparation for the overlay. The overlay is scheduled to be done next week. Hidden Creek Imperial, the Hidden Creek grading contractor, has not been on the site all week. NEWS Public Works Engineering Code Enforcement LETTER Parks Report The Parks Crew picked up trash daily from the parks. They also dragged and chalked fields and striped lines on an as needed basis. The Parks Crew completed the following other tasks this week: Painted the hockey boards at Friendly Hills and Wentworth Parks Painted the warming houses at Friendly Hills and Wentworth Parks Removed a tree from the pedway along Marie Avenue that was downed by the strong winds • Worked on restoring the plantings around the park signs at Kensington Park Power washed the park signs to restore natural color • Acquired some more trash barrels for parks — drilled drainholes in them and painted them Street Report The Street Crew accom- plished the following tasks this week: • Cleaned storm grates af- ter the storms • Installed some signs • Worked on curb replace- ment restoration Utility Report Rich checked the City's seven sanitary sewer lift sta- tions daily. He and his helper cleaned sanitary sew- ers on Mendota Heights Road west of Trunk Highway 55 and in the Kennedy/Biel easement this week. He also responded to the follow- ing after hours lift station alarms this week: • Friday, August 16th at 7:30 PM there was a power outage at the Cul- ligan Lane lift station. • At 12:00 A.M. there was a power outage at the Veronica Lane lift station. • On Wednesday, August 21st there was a power outage at the Veronica Lane lift station at 4:15 A.M. 9 - August 22, 2002 He also opened two storm sewer pipes after the Wednesday storm. Town Center Turner pumped water all week long from the Senior Center excavation, first to remove water from Friday night's storm, and then from Tuesday night's storm. They started preparing the two condominium building pads this week. Qwest began splicing their 500 pair cable in order to have their line out of the way of the Senior Building. Fire Station Bids were received this week from four paving contractors to repave the Fire Station parking lot. Pine Bend Pav- ing was the low bidder and was sent a purchase order to do the work. Hidden Creek Imperial, the grading con- tractor for Hidden Creek, worked on excavating a NURP pond this week. (Mostly they did not work because of the wet weather —only to do damage control). NEWS Public Works Engineering Code Enforcement LETTER Parks Report The Parks Crew picked up trash daily from the parks. They also dragged and chalked fields and striped foul lines on an as needed basis. The Parks Crew accom- plished the following other tasks this week: • They hauled in extra picnic tables for a large party at Mendakota Park • Weed whipped along the pedways around signs, fire hydrants etc. • Set up fields for fall soccer - installed goals, nets and striped fields • Hauled and leveled black dirt for repairs to the lawns at the Fire Station and Wentworth Park Street Report The Street Crew accom- plished the following tasks this week: • They cut up and re- moved a large tree limb M Am and removed it from the street at 625 Ivy Falls Avenue • They patched potholes and repaired Ivy Hill Drive • Replaced some missing street signs • Began repairing streets where the curb and gut- ters were replaced last week Utility Report Rich was on vacation this week, so his summer helper maintained the lift stations. Code Enforcement Re- port Paul issued a permit this week to Scheiber Mullaney Construction to construct the addition to Velmont Ap- plied Coating Technology located at 2411 Pilot Knob Road. The addition will be 9300 square feet and be used to paint light poles. Valuation is $330K. Town Center Grading Turner Excavating is con- tinuing to concentrate on August 16, 2002 completion of the senior center soil correction and doing some more street grading. Hidden Creek Grading Imperial Developer is still working on grading the same building pads and street areas that they were working on last week. We discovered this week that they are short of good dirt and will have to lower the street grades by as much as two feet. Go Tiger! NEWS Public Works Engineering Code Enforcement LETTER Parks Report The Parks Crew picked up trash daily from the parks. They also dragged and chalked fields and striped foul lines on an as needed basis. They also accomplished the following tasks this week: • Top dressed the soccer fields at Mendakota and Kensington Parks • Installed lawn sprinkler heads east of the Fire Hall • Cleaned up around tennis courts • Prepared Mendakota Park for National Night Out (250 people) • Trimmed trees by Menda- kota Pavilion • Removed boulders from Friendly Hills Park Utility Report Rich checked the City's seven sanitary sewer lift stations daily. Rich and his summer helper cleaned sanitary sewer lines this week at the following locations: • Chippewa Avenue • Hiawatha Avenue • Garden Lane • Fremont Avenue The Pipeline and at the following trouble spots: Dodd Road near 4th Ave- nue • Callahan Place • Walsh Lane near Kay Ave- nue • Easement behind Eagle Ridge End of Knob Road • South Freeway near Alphonso's house Street Report The Street Crew accomplished the following tasks this week: • Repaired broken curb at 1689 Celia Road • Repaired catch basins on Mendakota Court and Fieldstone Drive • Fixed potholes on Mears, Dorset, Kirchner and ]unc- tion Lanes Code Enforcement Report Paul issued a permit this week to Ryan Construction to com- plete a 12 classroom addition at the School of the Visitation Convent valued at $2M. August 9, 2002 Town Center Grading Turner Excavating spent Mon- day morning pumping water from their excavations that was there as a result of last weekends' 3" rainstorms. Af- ter pumping they concen- trated on sub cutting the bad material from underneath the senior building. They were also working on the extension of North Freeway Road and the TH 110 Frontage Road this week. Fire Hall CurbMaster poured 100' of new curb and gutter around the landscape island near Dodd Road and removed and replaced 75' of curb and side- walk that had settled near the front entrance of the Fire Sta- tion. They also removed and replaced settled or badly bro- ken curb and gutter at seven other locations around the City. Hidden Creek Imperial Developers, the grading contractor, is working on the first 400 feet of street (Hidden Creek Trail) east of Dodd Road and the first four building pads located north of Hidden Creek Trail and east of Dodd Road. They also in- stalled temporary culverts to handle creek water flows dur- ing construction. NEWS Public Works Engineering Code Enforcement LETTER Parks Report The Parks Crew picked up trash daily from the parks. They also dragged and chalked fields and striped foul lines on an as needed basis. They ac- complished the following other tasks this week: • Worked with the DNR at Roger's Lake to pickup weeds • Swept the fields at Ken- sington Park to prepare them for topdressing and reseeding • Attended an U of M spon- sored Field Day on turf maintenance Utility Report Rich checked the City's seven sanitary sewer lift stations daily. He was called in Sunday evening to respond to a power outage at the Veronica sani- tary sewer lift station. He and his summer helper cleaned sanitary sewers located on Miriam Street, Simard Street and on the easement from Douglas Road to Mayfield Heights Road. This week they also unplugged a catch basin behind 1366 Cherry Hill Road at Ecolab (they put on their hip waders and removed sticks and leaves). Rich and John Ambrose re- paired the sump pump at the main sanitary sewer lift station this week. The Pipeline Street Report This week the Street Crew ac- complished the following tasks: • Reinstalled some missing and damaged signs • Graded Dodge Lane • Worked with Tom Knuth on the Fire Station parking lot improvements: 0 Delivered storm pipes 0 Installed class 5 rock • Worked with a resident to discover what was causing the hole in Delaware Ave- nue pavement • Removed and chipped dead trees at 919 Delaware Ave- nue and 1198 Falls View Court Town Center Turner Contracting finished grading and compacting the building pads for commercial buildings E and F this week. They continue to subcut poor soil from the senior housing site. They are working on Townhouse sites #1, 4 and 5 and are continuing to work on Town Center Boulevard and started working on grading the North Freeway Road extension. Qwest began relocating their communications line off from the old Freeway Road to get it out of the way for the senior center building. Protec, the August 1, 2002 City's environmental consult- ant, visited the site this week to evaluate the work and train the workers. The contractor re- used salvaged 12" watermain from Freeway Road to install a temporary storm sewer to drain the site. They use this pipe to drain their building excavations after rainfalls. The Ridder barn was parked on the site Thursday night after the movers were unable to get the barn under the last set of overhead wires (an MCI line was discovered and no MCI workers were there to move it). Hidden Creek Imperial Developers began mass grading for the Hidden Creek project this week. They are excavating some of their NURP ponds and building streets. The Fire Chief had the Developer spread the large woodchip pile in order to stop the steaming or smoking that was coming from it. Fire Hall Parking Lot New storm water piping and three catch basins were in- stalled by SW Lee at the front island of the Fire Station this week. The Parks Crew installed a new irrigation pipe to the is- land to get that piping out of the way of the new storm water pipe. The next phase in the fire station parking lot reconstruc- tion will be installing the curb and gutter and sidewalk. NEWS Public Works Engineering Code Enforcement LETTER Parks Report The Parks Crew picked up trash daily from the parks. They also dragged and chalked fields and striped foul lines on an as needed basis. T h e y worked over the weekend to prepare the fields at Menda- kota Park and City Hall for the State AAU 11-13 year old baseball tournament (Friday morning through late Sunday). They removed the pitcher's mounds, extra picnic tables were brought in for the tour- nament, and did other after the event clean up on Monday. They performed maintenance to all the other neighborhood park fields this week (hauled and leveled new rec rock etc.). They delivered wood chips for the neighbors who are doing the volunteer gardening in Ivy Park (see picture). They re- paired the lawn sprinkler at City Hall. Utility Report Rich checked the City's seven sanitary sewer lift stations daily. He performed an in- spection for a new sanitary sewer connection on Pilot Knob Road. Note: Rich and his summer helper were both on vacation most of this week. Street Report The Street Crew repaired five street lights in the Industrial Park that were not operating. They cleaned out a storm wa- ter ditch near Callahan Place. They cut up and removed a The Pipeline large cottonwood tree limb that had fallen at 625 Ivy Falls Ave- nue. They replaced the barri- cades at the end of Mayfield Heights Road. They patched potholes on Dorset Road and Ivy Hill Drive. Town Center Turner Contracting, the grading contractor for Town Center, is progressing well. They are cur- rently working on the frontage road, the Senior Center, Build- ing F, and Town Center Court building pads. St. Paul Water plugged the existing 12" water - main that was located in Free- way Road. Xcel Energy plugged a gas main that was in Freeway Road. Monday morning it was discov- ered that vandals had broken windows in all the contractor's equipment, set the cab of the water truck on fire, and ruined the engine on their compactor. They also threw the "Road Closed" signs in the woods and removed many of the City's survey stakes. These problems delayed starting work several hours on Monday while the equipment that had the windows bro- ken were repaired or cleaned. The water truck is a total loss and the compactor was repaired on Tues- day. Ivy Park Installation of new winches and nets com- July 26, 2002 pletes the resurfacing project at Ivy Park tennis courts. Three residents contacted City Staff to express their satisfaction with the completed project. The contractor also reapplied court markings at the Marie Park tennis courts this week. Several area residents have re- established a small butterfly garden located east of the pathway and holding pond. The city roto-tilled the area and dropped off wood chips and topsoil. The residents, who have offered to adopt and care for this garden removed weeds, installed plant materials, and placed wood chip mulch around the flowers. Another group of residents wish to develop a landscape plan for the tennis court area. Staff will review their concept plan, and if it is appropriate to the site, they will provide plant materi- als, topsoil, wood chips and sal- vaged landscape blocks. The residents propose to provide the labor for construction and future maintenance. The butterfly garden at Ivy Park NEWS Public Works Engineering Code Enforcement LETTER Parks Report The Parks Crew picked up trash daily from the parks. They also dragged and chalked fields and striped foul lines on an as needed basis. The Parks Crew trimmed trees and shrubs overhanging the trails this week. They repaired the re- taining wall and removed the trees damaged by vandals in Rogers Lake Park this week. They repaired sprinkler heads at the Fire Hall, Mendakota Park, and City Hall this week. They prepared the fields at City Hall and Mendakota Park for the State AAU 11-13 year old tournament starting Fri- day this week. Utility Report Rich checked the City's seven sanitary sewer lift stations daily. He hired Infratech to install a fiberglass liner to the sanitary sewer line located on Douglas Road east of Lex- ington Avenue. This section of line is in an easement area and is continually being infil- trated and blocked by tree roots, the liner will prevent future root growth into the line. Rich asked the West St. Paul Utility Department to televise the sanitary sewer line on Brookside Lane where the City had a back-up last week. The LMCIT insurance adjuster - 9 July 19, 2002 had requested that we do the televising to ensure that there was no problem within the City's line that would have caused the back-up there were none and the adjuster denied the homeowner's claims. Rich has been working with Lilydale's contractor to up- grade their lift station. The work is done and they had a start up "ceremony" this week. The remodeling work had been taking a lot of Rich's time so he is glad that the work is finally finished. He and his summer helper cleaned sewer lines on Cherry Hill Road and Wachtler Ave- nue this week. He also per- formed a new sanitary sewer service inspection on Knoll - wood Lane. Street Report John Ambrose cut the old well head off in Wentworth Park and repaired the lawn area around it. The Crew removed two dead boulevard trees and re- paired the yards. They trimmed trees and bushes to improve sight distances at An- napolis and Chippewa and Roundhill and Dodd Roads. They worked with the Parks Crew to haul rec rock to fields to prepare the parks for the State AAU 11-13 year old baseball tour- nament starting this Friday. They patched potholes on Chippewa Avenue, Dorset Road, Mendota Heights Road and repaired the flume to the catch basin at Dodd Road and Wagon Wheel Trail. Code Enforcement Report Paul issued a permit this week to Delly Construction for a re- modeling for Brown College. They are remodeling 2535 Pi- lot Knob Road located in the northwest corner of Pilot Knob Road and Northland Drive, to accommodate ten new class- rooms. He issued a footing and foundation permit to RI Ryan Construction for Visita- tion Convent to begin their new 12 classroom addition. Finally, he issued a permit to Hoffman Homes to begin con- struction of townhomes at 2146 and 2150 LeMay Lake Road (they now have only 14 lots remaining). Tom and Brent surveying for the Town Center grading project. NEWS Public Works Engineering Code Enforcement LETTER Parks Report The Parks Crew picked up trash daily from the parks. They also dragged and chalked fields and striped foul lines on an as needed basis. The Parks Crew accomplished the follow- ing tasks this week: • repaired damaged picnic tables • repaired washed out warn- ing track at the civic center site • brought extra picnic tables to Kensington Park for a big party • they hauled some wood chips for use at Ivy Park • they installed some drains on field #2 at Mendakota Park to eliminate some ponding water • they removed some over- hanging tree limbs at Ivy Falls Park • they repaired some broken sprinkler heads at Menda- kota Park • they repainted the foul poles at Mendakota Park • repaired sod damaged at Mendakota Park Street Crew The Street Crew accomplished the following tasks this week: D 9 - Ah July 10, 2002 • provided barricades and cones to Mendakota Coun- try Club for the fireworks display • repaired a late snow plow damage complaint • installed missing street name signs • trimmed branches at sev- eral locations that were causing site obstructions • cut patches to repair de- pressions at several water valves and catch basins • cleaned and repaired ditch to drain properly on Calla- han Place Utility Report Rich checked the City's seven sanitary sewer lift stations daily. He and his summer helper cleaned sanitary sewers in Lower Colonial Drive, Farmdale Road, Upper Colonial Drive and Brookside Lane this week. There was a sewer backup on Friday night that affected two homes on Brookside Lane. John Boland and Mike Maczko jetted the line open. The homeowner that was affected the worst was not home, so the backup was not detected until the next homeowner upstream noticed it. Rich was unable to find any other cause than a build up of sand and gravel. Both homeowners have finished basements that were affected. I have turned their claim over to LMCIT, but the adjuster tells me that they will have to find the City negligent in order to approve the claim, which is hard to do. MENDAKOTA PARK BALL FIELD CONTAINMENT NET- TING Installation of the support ca- bles will begin next week and is expected to take a couple of weeks to complete due to pos- sible coordination problems working "around" the ball tour- naments scheduled for this park on each of the next four weekends. Following installa- tion of the cables, hardware measurements will be taken for the netting. Sixteen custom nets in three distinct shapes are required. The nets, al- though similar in shape may vary in size by one or two feet due to the distances of the backstops in relation to each other and to the center hub building. Each net segment will be attached, by removable clips on all four sides, to support ca- bles attached to the building and the backstop posts. The contractor working on this pro- ject is Fenc-Co, Inc. This firm has done numerous projects for the City and was the firm that installed the original backstops and outfield fences at this park in 1989. NEWS Public Works Engineering Code Enforcement LETTER Parks Report The Parks Crew picked up trash daily from the parks. They also dragged and chalked fields and striped foul lines on an as needed basis. They re- placed some service berry plants that had died on the border of Ivy Park, they also reseeded the old hockey rink area in that Park. They re- paired the soccer field at Men- dakota Park by filling in some holes and resodding them, re- paired a sprinkler head, re- paired the drain to the sink in the concession stand and built the pitcher's mounds for the National AAU qualifier baseball tournament held there last weekend. They then removed the mounds on Monday morn- ing. They brought in new rec rock to repair the ballfield at Ivy Park. They hauled in black dirt around the tree island In Ivy Park and leveled and seeded it. They put down the second ap- plication of crabgrass pre - venter and fertilized the ball - fields and soccer fields at Men- dakota Park, Kensington Park and City Hall. Utility Report Rich checked the City's seven sanitary sewer lift stations daily. Rich had to run the Ve- ronica Lane sanitary sewer lift station on Wednesday after- noon with the portable genera- tor because the power was out from 1:00 P.M. to 5:00 P.M. He worked with Luke, his sum- mer helper, to clean sanitary sewer mains on Victoria Curve, Hunter Lane, Glen Hill Road, Culligan Lane, Veronica Lane, Orchard Hill and Orchard Place all this week. He planted a re- placement crab apple tree for one that had died on the Lilac Lane center boulevard. Street Report The Street Crew worked Wednesday and all day Thurs- day to clean up trees and limbs downed from Wednesday's high winds. They graded Dodge Lane (the City's one remaining gravel street). They reinstalled some missing street name signs and called for locations to install the new "No Parking" signs by the SuperAmerica sta- tion on Mendota Heights Road and TH55. They patched pot- holes on Ellen, Chippewa and Miriam Streets. North Urban Regional Trail Marc Mogan and Guy Kullander met on Wednesday with Mary Jackson from the Dakota County Physical Development Department to discuss the rout- ing and scheduling of the pro- posed NURT trail along Highway 110 from Dodd Road easterly to Delaware Avenue. The regional trail will be designed and built by the County with funding re- imbursement from Met Council or Federal funding sources. The project's current emphasis is directed on a bridge connection June 21, 2002 over Hwy 52 connecting the County trails in South St. Paul and West St. Paul. Another ef- fort is being directed at extend- ing a trail connection westerly from the soon to be completed Government Center in West St. Paul. This effort would extend the trail to our Town Center site then continue on through Valley Park to Lilydale and the Big Rivers Regional Trail. Design of the segment adjacent to Town Center is scheduled to begin in 2003 with construction in 2004 or 2005. The present Federal funding for this overall project expires in 2005 and must be reapplied for if work is not com- pleted in 2005. This meeting was arranged to determine if any conflicts exist between the County's plan and our Town Center and Freeway Road street reconstruction pro- ject. With no definitive County plan to review staff will proceed with these projects as previ- ously directed by Council. At press time, Friday,10:15 A.M. , the rain gauge at City Hall was about to reach 2" accumulation since 6:30 A.M. this morning NEWS Public Works Engineering Code Enforcement LETTER Parks Report The Parks Crew picked up trash daily from the parks. They also dragged and chalked fields and striped foul lines on an as needed basis. The Crew serviced their mowers this week, they hauled away the old concrete footings from the playground equipment at Friendly Hills Park. They cleaned up the Mendakota Park comfort sta- tion and began preparing the park grounds for a big AAU baseball tournament this weekend. Utility Report Rich checked the City's seven sanitary sewer lift stations daily. Rich responded to a sanitary sewer backup into the home at 653 Callahan Place this week. The backup was difficult to locate be- cause a manhole cover had been paved over by the slurry seal contractor. He discovered the backup was caused by a large comb and rags. He was called in at 11:00 PM on Monday night because of a power outage at the Centre Pointe lift station. Power was restored at 1:30 A.M. He cleaned the sewers with the jetter on Callahan Place and Oxford Court this week. Street Report The Street Crew replaced some burned out light bulbs for the traffic signal at TH55 and Mendota Heights Road. They patched potholes on the "Avenue" streets this week. They replaced some missing street name signs. Code Enforcement Report Paul issued a permit this week for Socon Construction to complete a MAC Part 150 noise mitigation remodeling upgrade for the home located at 2218 Lexington Avenue South. As a result of the hail damage from a storm in May, Paul has issued a large number of re- roofing permits in the Copper - field and Hampshire neighbor- hoods recently. Note: Some of these contractors are solic- iting more work from home- owners who may or may not have hail damage. (We have received several complaints from homeowners about over- aggressive contractors). Suburban Dakota County Greenway Project Suburban Dakota County Greenway Project staff has mailed invitations to specific property owners and munici- pal officials that own property within the identified Greenway Corridor between Lilydale and June 7, 2002 both Rosemount or Apple Val- ley to attend a landowner workshop (see attached). This workshop is scheduled for 7:00 pm on Wednesday, June 12, at the Dodge Nature Center at 365 Marie Avenue West, West St. Paul where the purpose and findings of this project will be presented to the public. Greenways are defined as privately or pub- licly owned corridors of open space which often follow natu- ral land or water features and which are managed to protect and enhance natural re- sources. The goal of this workshop will be to educate willing landowners in the benefits and positive impacts that can be achieved by pre- serving or restoring these greenway corridors. This vol- untary program will hopefully generate interest with willing landowners that would then lead to an implementation program that would fund natural resource preservation or restoration projects. Engineerino Summer Aide On Wednesday of this week, Brent Larson started work for the Engineering Department. Brent is a senior in the Civil Engineering undergraduate program at the University of Minnesota. With the heavy workload anticipated this summer we're glad to have Brent working here. Welcome aboard Brent! NEWS Public Works Engineering Code Enforcement LETTER Parks Report The Parks Crew picked up trash daily from the parks. They also mowed grass, dragged and chalked fields and striped foul lines on an as needed basis. They repaired the City Hall sprinkler system, removed and replaced some dead trees in Marie Park and some dead limbs in Friendly Hills Park. They planted flow- ers at Mendakota Park. Utility Report Rich checked the City's seven sanitary sewer lift stations daily. He sprayed broadleaf weeds at Mendakota Park, North and South Kensington Park, Hagstrom King Park, the vacant right-of-way located at Pontiac and Cheyenne Lane and the tot lot. He cleaned sewers on Victory Avenue, Furlong Avenue and Kendon Lane. He removed some trees that were impacting a sanitary sewer manhole on William Court. Street Report The Street Crew patched pot- holes this week, they ordered Gopher One -Call locations to install the "No Parking" signs on Warrior Drive. They re- moved two dead crab apple trees from the median on Lilac Lane. They trimmed over- hanging trees in the Friendly Hills neighborhood where school buses were hitting them. affm 0 , — — Valley Park Trail Paved On Tuesday of this week, Pine Bend Paving paved the bitumi- nous trail connecting the new pedestrian bridge to the exist- ing trails in the north end of Valley Park. The bridge was constructed late last summer to replace some under designed culverts that were continually washing out. The new bridge and trail are very attractive and we invite everyone to go there and see for yourself. Town Center Tree Removal Tuesday evening, the City Council awarded a purchase or- der to Precision Landscape and Tree to remove the trees from the Town Center site. Precision is a firm that has been in busi- ness for many years and comes highly recommended from the other cities they have worked for (Edina, New Brighton and Minneapolis). They tentatively plan on beginning work June 3rd. Their work hours are lim- ited from 7:00 AM to 8:00 PM Monday through Friday and 9:00 AM to 8:00 PM, if they have to work the weekend. New Play Equipment This week, new play equipment was installed at Friendly Hills and Valley Parks. The synthetic resilient rubberized surface will be installed in the next two weeks —after the concrete sur- face has a chance to cure. New pathways from the existing bi tuminous to the new rubberized surface will be excavated by Public Works. May 24, 2002 Suburban Dakota County Greenway Project Guy Kullander, Marc Mogan and John Tran attended the third meeting with the advisory group of the Suburban Dakota County Greenway Project on Wednesday at City Hall. This study has identified natural ar- eas in the suburban areas of Dakota County and greenway corridors that extend from Lily - dale south to Lebanon Hills, and southeast to areas in east- ern Rosemount. They will be mailing out invitations to 300 key landowners that have prop- erty within this greenway corri- dor inviting them to a attend a meeting scheduled for 7:00 pm on Wednesday, June 12, at the Dodge Nature Center at 365 Marie Avenue West, West St. Paul where the purpose and findings of this project will be presented. The goal of this meeting will be to educate will- ing landowners in the benefits and positive impacts that can realized by preserving and pro- tecting these greenway corri- dors, or restoring these areas with trees and vegetation suited to their property. This voluntary program will hope- fully generate interest and mo- mentum with willing landown- ers that would then lead to an implementation program that would fund natural resource preservation or restoration pro- jects. Enjoy the Memo- rial Day Weekend! Public Works Engineering Code Enforcement LETTER Parks Report The Parks Crew picked up trash daily from the parks. They also mowed grass, dragged and chalked fields and striped foul lines on an as needed basis. They replaced some dead pine trees in Marie Park. They repaired a broken toilet in the women's restroom at Kensington Park, and tilled the garden in Ivy Falls Park for the Ivy Falls Townhomes Gar- den Club to plant. They re- paired some broken lines and sprinkler heads for the lawn sprinkler system at the Fire Station. They continued to spray for dandelions as the weather allowed (wind and rain). They attended a spring work- shop for Turf Managers and learned more about lawn irri- gation, trouble shooting, in- stallation and maintenance techniques. Utility Report Rich checked the City's seven sanitary sewer lift stations daily. Rich's sum- mer helper started this Monday so he was able to begin cleaning sanitary sewers this week. Rich's helper this year is Luke Carlson who is a resident of the Curley neighbor- hood. They cleaned sew- ers in the Curley neighbor- hood; on Theresa Street, Timmy Street, William Court, Patricia Street, Mary M Ah An Fm =9 Adele Avenue and Cullen Street. He found and cleared a build up of roots from the lines on Theresa, Cullen and Timmy Streets. Street Report The Street Crew reviewed the sweeping bill this week. McPhillips used six machines over four days working about 12 hours per day for a total of 234 hours. They charged us $75/hour for a total cost of about $17,000 this year. The Crew was worked on patching pot holes this week. Foundation and Slope Repair at 739 Knollwood Lane Code Enforcement was asked to make a final inspection of the foundation underpinning and slope repair work this Friday that has been under construc- tion at 739 Knollwood Lane since last August. This proved to be one long, complicated, Foundation/slope repairs at 739 Knollwood Lane as of 5/10/02 May 17, 2002 and expensive repair project. The property owner will surely rest easier now that the work is completed. Code Enforcement Report Paul issued a sign permit this week to Sign Maintenance Lighting and Electric to install the new sign on the east side of Mendota Plaza for 'Royal Star Liquidators". (Approved by the City Council on May 7th). Paul Berg and Paul Kaiser met with architect Gary Ostberg this week to review his plans for two floors of new classrooms and a basement storage area at Visitation Convent. Visitation hopes to begin constructing the addition this summer for com- pletion and use this winter after Christmas break. Engineering Summer Aide The Engineering Department hired Peter Daniels as the summer engineering aide and he started work on Monday of this week. We are sad to report that Peter turned in his resig- nation and his last day is Friday of this week. He is leaving to pursue an- other employment op- portunity. The Engineer- ing Department and Emmy are scrambling to hire another engineering summer aide to help with this summer's heavy workload. NEWS Public Works Engineering Code Enforcement LETTER Parks Report The Parks Crew picked up trash daily from the parks. They also mowed grass, dragged and chalked fields and striped foul lines on an as needed basis. The Parks Crew also aerated the infield at the City Hall ballfield and fertilized it. They prepared the fields at Mendakota Park for the Cretin Durham Hall fast pitch softball tourna- ment that was held last weekend. They picked up and planted three trees that were do- nated by the Mendota Heights Garden Club — Friends of the Parks (trees have been donated by them for many years). They re- paired the drain for the sink in the women's restroom at Mendakota Park. Utility Report Rich checked the City's seven sanitary sewer lift sta- tions daily. He performed some maintenance on truck #404, (the sewer jetter) this week. He performed a sani- tary sewer service connec- tion inspection for a new connect at 2154 LeMay Lake Road. He installed the sprayer and tank on the Cushman so that he can be- gin spraying dandelions as The Pipeline soon as the wind slows down. He is working with Lilydale's contractor to up- grade their sanitary sewer lift station —they left the door open all weekend long. Street Report The Street Crew disposed of a dead deer, installed some new street signs, put new tires on the bobcat and worked on cleaning up the back lot located behind the Public Works Garage this week. They repaired a few mailboxes that had been damaged by snowplows and had been overlooked. Keen the Lakes and Ponds "Blue" Dakota County participated in a metro wide effort to pub- lish the attached brochure. They supplied us with 500 copies which we will have available on our rack located in the lobby of City Hall. Town Center Update Marc, Tom and I met with Ross Feffercorn and Kari Gill on Wednesday of this week to review Dan Hughes', Land - form Engineer, latest adjust- ments to the Town Center grading plan. His original grading plan resulted in a +50,000 cubic yard shortfall May 10, 2002 of dirt. Dan lowered the site approximately 3 feet and now the site is roughly at a cut/fill balance. Ross and Kari's architects will review the changes to make sure they fit with their building designs. I am currently working with Brian Watson of the Dakota County Soil and Water District to process the wetlands permits to fill part of three wetlands located on the site. We think the amount of filling that we are proposing will be "exempt", from needing a permit how- ever the City still needs to process a "Certificate of Ex- emption". Code Enforcement Resort The City received a complaint this week about a contrac- tor's trailer that was parked at 1938 Dodd Road. The trailer had advertising on the site of it and almost ap- peared like it was an adver- tising billboard. Paul con- tacted the owner and he re- moved it promptly. Paul issued a permit to Lu- loff, Inc. to construct a single family dwelling at 2165 Glen Toro Road. This was Dewy Thorbeck's third home, there are seven lots remaining. NEWS Public Works Engineering Code Enforcement LETTER Parks Report The Parks Crew picked up the trash daily from the parks and dragged and chalked ball fields. A homeowner (Ira Kipp) donated some roses for Roger's Lake Park and the Crew planted them this week. The Crew also started up the lawn sprinkler sys- tems this week at Kensington and Mendakota Parks, City Hall and the Fire Station (heads were repaired where needed). Utility Report Rich checked the City's seven sanitary sewer lift stations daily. Rich had to assist Xcel in sewer line clean up on Dodd Road. He investigated a sewer backup for a homeowner on North Freeway Road. The problem was roots in the homeowner's private service line not the City's main. He will have to flush our line out once the roots are routed out so that we do not get an- other backup in our line like we did recently on South Lane. Street Report The Street Crew worked with McPhillips, the City's street sweeping contractor, to sweep the streets this week. McPhillips used six sweepers and were finished in four 12 hour days. The Street Crew worked with the sweepers to dispose of the street sweep- ings. The Street Crew disposed of two loads of wood chips, a homeowner wanted them. They received their new pickup truck —the replacement for #302. SWPPP Coming I attended a workshop this week on Storm Water Man- agement Plans (SWMP) and Storm Water Pollution Preven- tion Plans (SWPPP). I was trained on, and given an one inch thick workbook and a CD on SWPPP. SWPPP is a feder- ally mandated program that requires cities to first submit a permit or plan, and then has a continuing annual duties and reporting requirement. The presenters estimate that SWPPP will cost cities $10/ year/household. The MPCA has known of this requirement for three years, however they have been dragging their feet on getting the requirements out to the cities. Now, they are going through their public process to establish the re- quirements, they have wa- tered them down as much as they can. During the com- ment period, some environ- mental "whackos" surfaced in - May 3, 2002 sisting that their regulations be tightened up. (It's being reviewed in the courts). If the MPCA plan survives un- changed it will be sent to the cities December 9th, then the cities have until March 9, 2003 to submit their plan back to the MPCA. (We do not know if we will be able to meet that deadline). Delaware Avenue & TH110 Intersection Sunfish Lake has requested that a MnDOT Traffic Engineer attend their June 4th meeting to discuss their traffic con- cerns about Delaware Avenue and TH110 (see attached let- ter from Mayor Tiffany). I re- cently discussed the intersec- tion with the Dakota County Transportation and Planning Departments and asked that they add the upgrade to their 5 year CIP. They told me that they would be unable to do any improvements in 2003 or 2004, but that they would consider putting it in for some future year. Enjoy Cinco de Mayo NEWS Public Works Engineering Code Enforcement Parks Report The Parks Crew picked up the trash daily from the parks and dragged and chalked ball fields. The Crew chipped up brush and downed limbs in the parks this week. They removed a limb from the pedway on Lexington Avenue at Marie Avenue. They started cutting grass this week! Utility Report Rich checked the City's seven sanitary sewer lift stations daily. He flushed sanitary sewer lines on Winston Court (a problem line with paper buildups) Diego Lane (paper and roots in the line from a homeowner's roto rooter ac- tivities), Knollwood Court and Spring Creek Court ease- ments (known slow flow lines). He also performed an inspection for a new connec- tion to the sanitary sewer at 2166 LeMay Lake Road. Street Report The Street Crew replaced some missing signs this week. They finished their mailbox repairs and patched some potholes. The sweep- ing contractor began sweep- ing streets this week (with six machines). They are pro- jected to be completed by the middle of next week. " I uft 9 Aft M Town Center Grading Plan City Staff met with Dan Hughes, Landform Engineer, on Monday to discuss final changes to the Town Center grading plan. Dan had in- formed us that there was a significant shortfall in the earth work quantities, so we met to discuss the possibility of lowering the site to make up the difference. Matching the project to the Freeway Road neighborhood and sani- tary sewer service elevations are some the limiting factors to lowering the site, however we were able to find some ar- eas to adjust. Dan promised to make these adjustments the highest priority in his work load. We need a final grading plan as soon as possi- ble so that we can apply for the needed permits (MnDOT, MPCA, Corps. Of Engineers) and prepare the Plans and Specifications to go out for bids. Lexington Bridge Update MnDOT informed us this week that they had finalized a change order with their con- tractor that will minimize the closure of the ramps to and from I-35E. They made these changes at Lilydale's insis- tence and the changes are ex- pensive ($500K). The new schedule calls for the northbound loop to I-35E to April 26, 2002 be closed for 3-4 weeks start- ing in mid -September this year and for 3 months in 2004, the southbound I-35E to TH13 ramp is to be closed in 2003 for the month of May and for 3 months in the fall in 2003. Dakota County CIP Meet- ing Marc and I met with members of the Dakota County Trans- portation and Planning De- partments this week to dis- cuss Dakota County's 2003- 2007 CIP. We informed them that Mendota Heights is plan- ning on constructing the Lex- ington Avenue Trail project this year along with the North Urban Regional Trail as it goes through our Town Center. We also asked them to add the Delaware/TH110 signal im- provements to their program in as early a year as they could. They informed us that they were working toward turning Delaware Avenue (CR 63) north of Dodd Road and Victoria Road (CR 45) back to Mendota Heights this year. They told us, that due to some overly aggressive spending the last few years, their spending would have to be greatly reduced for a few years to get them out of the hole. NEWS Public Work Engineering Code Enforcement LETTER Street Report The City's street sweep- ing contractor is pro- jected to be starting next week, so the street crew worked on repairs to the access drive at the Resur- rection Cemetery street sweeping disposal site this week. They began patching potholes this week, working on mail- box repairs and sod dam- aged by snow plow op- erations. They replaced some burned out light bulbs at the Dodd Road (TH149) and Mendota Heights Road traffic sig- nal. Utility Report Rich checked the City's seven sanitary sewer lift stations daily. He re- sponded to a power out- age last Sunday at the Culligan Lane and Veron- ica Lane lift stations — power was restored within 30 minutes and he did not have to bring out the portable generator to operate the stations. He lowered a water valve box on the pedway at The Pipeline Stratford Lane and Victo- ria Road that was pro truding above the surface by two inches ( a tripper). Rich checked Lilydale's storm sewer system as the City agreed to do for Lilydale in the spring and fall (at a cost). He per- formed inspections for new sanitary sewer con- nections at 2158 and 2162 Lemay Lake Road. Parks Report The Parks Crew picked up the trash daily from the parks. The Park Crew re- paired the drinking foun- tain at Rogers Lake Park. They dragged and chalked ballfields for a Visitation High School tournament this week. They prepared all the ballfields for use this week. They had to repair the as- phalt trail that leads to the fishing pier in Rogers Lake Park this week ( it was damaged by the pier this winter). They replaced basketball April 19, 2002 nets this week. They re- moved all the thirty year old wood timber play structures from Friendly Hills and Valley Parks. Council authorized re- placement equipment last December, and that equipment will be deliv- ered and installed late April or early May by Earl F. Anderson the equip- ment supplier. Terry supervised a tree removal contractor who was hired to remove the overhanging tree limbs that were shading the play areas. The Parks Crew will be ex- cavating for additional paved pathways to be ex- tended from existing paved areas to these new play structures and make the structures handi- capped accessible. Code Enforcement Report Paul issued three swim- ming pool permits this week— spring is definitely here! NEWS Public Works Engineering Code Enforcement LETTER Parks Report The Parks Crew picked up the trash daily from the parks. They finished sweeping all the pedways this week. They cleaned up the tennis courts, re- moved the leaves and branches and put up the nets. They hooked up the water meters at Men- dakota and Kensington Parks —cleaned and opened the restrooms for the season —spring is here FINALLY! Utility Report Rich checked the City's seven sanitary sewer lift stations daily. Rich as- sisted the Parks Crew with sweeping the trails by wetting down the trails for dust control. He had to work with Braun Pump to repair a pump switch at the Mendota Heights Road lift station. Rich worked on cleaning the sewer lines on May- field Heights Road and Douglas Road as a follow up action to the sewer back up we had last week. He found a large The Pipeline April 12, 2002 rootball and removed it. He is analyzing how to fix the bad joint to prevent a root blockage again. He attended a sanitary sewer collection system operators seminar this week. The seminar up- dated him on the new rules that are to be imple- mented by the USEPA. Street Report The Street Crew worked this week on repairing sod damaged by snowplows. They removed marker guide posts from the boulevard areas, and they dismantled the plows and wings from the trucks. They also installed the as- phalt "hot box" to truck #312. The asphalt plants are open now, so we can begin making permanent pothole repairs. Code Enforcement Re- port Dick attended a confer- ence Wednesday, and Paul goes April 24th. This conference is put on by the State of Minnesota in- troducing the new Inter- national Residential Code to Building Inspectors. The IRC is a new code that is being adopted to standardize construction worldwide. The State is still looking at the legal ramifications of adopting this new code and subject to the State not finding any legal problems, they will require that all Cities adopt this new code in July 2002. There are no major changes in this new code from the existing code but there are numer- ous changes throughout the entire code. Attachment: Gun Club Lake WMO 2002 Newsletter April Showers Brings May's Flowers NEWS Public Works Engineering Code Enforcement LETTER Parks Report The Parks Crew picked up the trash daily from the parks. They ordered placement of the porta potties in the parks this week. We normally have them placed starting in April (this is the first time there has been this much snow on the ground this late since April 1983). Softball practices start next week —believe it or not! The Parks Crew attended a Turf Seminar this week covering: spe- cies of grass, blends and mixtures, and how to minimize winter damage to lawns in order to maximize spring usage of fields. Utility Report Rich checked the City's seven sani- tary sewer lift stations daily. He and John Boland helped Tom Olund rearrange his office so that it can accommodate Tom's new computer. Rich also helped Tom Knuth with some Gopher State One call locates for sewer cleanouts. Rich responded to a sanitary sewer backup at 1151 Douglas Road this Thursday night (between the second and third period of the Gopher hockey game). This has been a problem line for us. We are plan- ning to televise the line this summer to see if we can locate what is caus- ing the problems. Street Report Dave Sorby gathered information this week for making a claim in Small Claims Court to recover the City's costs from a sodding contrac- tor who cut the underground wires for our street lights on Centre Pointe Blvd and then refused to pay the costs for repairing them. The Crew worked on repairing mailboxes that were damaged from snowplowing. They stripped one snowplow down and prepared it for summer use. The Plpeline April 5, 2002 On Monday, they were out plowing and sanding all day, however they started plowing the entire City after lunch and were totally finished by 9:00 PM. On Tuesday, they just plowed during normal work hours. Spring Road Restrictions The State of Minnesota has adopted a new law that now applies road re- strictions to all roads in the State. Now, unless local governments take separate action to the to the con- trary, road restrictions are imposed by the State every spring on all roads including City and County roads. De- pending on weather and frost condi- tions, the State establishes a begin- ning and ending date that these re- strictions apply. This year load re- strictions were put in effect beginning February 18th. The ending date will be established based on weather and ground conditions in the future (see attached MnDot bulletin). The load limit on all affected roads during this time is 5 tons per axel. Snow Events: Date: Amount: Respons 4-1-02 5"* Plow sn 4-2-02 3" Plow sn *attached see Dave Dahl's forecast from Sunday, March 31 Street Project Poll Result Notices The Engineering Department mailed letters to roughly 300 residents in 8 different areas this week that de- scribed the results of the street pro- ject poll that was conducted this March soliciting property owners' views relative to the need and timing of potential future street construction projects throughout the City (see at- tached). Those areas surveyed in- cluded the Somerset and Avenues neighborhoods, and residents abut- ting Walsh Avenue and Kay Avenue, Ivy Falls Avenue, Spring Street, Sun- set Lane, Callahan Place, and Dodge Lane. Staff has updated the project poll with a few additional responses that have arrived at City Hall since the issue was first considered at the March 19th Council meeting. These additional responses did not change the results in any of the areas polled except for the Ivy Falls Avenue area. Property owners on Ivy Falls Avenue initially favored a street improvement project by a narrow majority, but af- ter including the additional votes re- ceived, those results now show that residents are evenly split between their support and opposition for a street improvement project. Tom Thumb —Demolition On Tuesday evening, the City Council selected Minnesota Petroleum Ser- vices to perform demolition and clean up of hazardous materials of the Tom Thumb "mini -mall" at 1944-48 Dodd Road. The contractor picked e: up keys to the building on Wednesday morn- ing ow -all areas g and informed me that they would begin ow -all areas removal of the asbes- tos -containing building materials next week. Following removal of hazardous materials from the site, the Fire - Department will conduct training drills using their infared cameras, ventilation of a commercial structure by cutting holes through the roof and search and res- cue of downed firefighter. The train- ing exercises could begin as early as April 15. Following the Fire Depart- ments training drills the building will be demolished. A May 1st target date has been set for completion of this project. % LID + Spring Thaw Monitoring and Load Restrictions, Spring Load Restrictions Page t of �R Spring Thaw Monitoring and Load Restrictions Office of Materials and Road Research Search I E-mail Minnesota Road Research Spring Load Restrictions Special Notes Placement Dates Zone Boundaries 2002 SLR Map Text of SLR Map (long) Text of SLR Map (short) Map Contacts SLR Probability North MN Central MN Metro MN South MN Southeast MN Introduction SLR Policy SLR Statute Weight Statute Forecasts Forecast Research R/WIS Intro Historical Dates Fact Sheet Definitions Questions AASHTO SDDOT SLR VvsDOT SLL NEW LOCAL NUMBER: The local number has CHANGED to (651) 747-2253. 2002 Spring Load Restriction Starting/Ending Dates' Frost Zone Starting Date Ending Date 2 North March 27, 2002 (12:01 AM) N/A Central February 19, 2002 (12:01 NIA AM) Metro February 18, 2002 (12:01 N/A AM) South February 18, 2002 (12:01 N/A AM) Southeast I February 18, 2002 (12:01 N/A AM) ' The Starting/Ending dates of spring load restrictions are preceded by at least a 3-day advance notice. Advance notice is available on this website and via recorded messages at (651) 747-2253 or toll free at 1-800-723-6543. 2 The END of the spring load restriction period is no longer fixed at 8 weeks. > Special_Not_es - Updated April 1, 2002 Current_ Estimated/Actual Placement Dates - Updated March 22, 2002 Zone Boundary_ Descriptions 200.2 Spring _Load _Restrictions Map 2002 Text Description of SLR Map_(with 10 ton roads) 2002 Text Description..of SLR Map without 10 ton roads) > Contacts, Paper. Copy of 2002-Spring Load Restriction Map Visit the SL_R_Prob_ability_Chart to view the percentage likelihood that spring load restrictions (SLR) will be placed for the North or South Zones on any given day this spring. Mn/DOT Home in general, spring load restrictions on local roads (county, city, and township roads) FAQ follow the same dates as the State Trunk Highways, however any local road can be Site Map restricted at any time during the year so long as the restricted load limit is posted. Search Mn/DOT This depends on the condition of the road. The local road authority can keep spring Info@DOT restrictions on longer if they deem them necessary. It is always a good idea to City 1 Mendota He1 April 4, 2002 Subject: Mendota Heights Street Project Poll Results Dear Mendota Heights Resident: The Engineering Department is mailing this letter to residents of the Somerset neighborhood to inform them of the results of the street improvement project poll survey that was mailed out this March. The March correspondence that was mailed to 104 property owners abutting streets in the Somerset neighborhood by the Engineering Department included a letter describing street improvement projects, and a self addressed postage paid postcard that residents were asked to fill out and to mail back to City Hall indicating their support or opposition for a street improvement project for properties in the area. These project survey responses were compiled, and a summary of this data is shown on the back of this letter. Council has decided not to proceed with a street construction project in your area at the present time based on the results of the project poll survey that was conducted this March. Council might be inclined to reconsider this decision if a majority of the affected property owners in a particular area took it upon themselves to circulate, sign, and submit a petition to the City requesting a street improvement project. In the meantime, Public Works and Engineering will be monitoring street conditions in the area, and the issue concerning any future street improvement project will be re-evaluated if circumstances change. If you have any questions or comments relative to the above project information, please contact Jim Danielson or myself either by telephone (651-452-1850), in writing, or by email at marcm@mendota-heights.com. Sincerely, Marc S. Mogan, P.E. Civil Engineer 1101 Victoria Curve o Mendota Heights, MN 55118 (651) 452-1850 • FAX (651) 452.8940 Street Project Poll Results 58% Somerset Neighborhood ® Support ❑ Do Not Support Surveyed Support Do Not Support Percent Reporting Somerset 104 31 43 71.2% Support This Year N N 0 Support Next Year s v Support 2004 or Beyond 0 n' Don't Support Any Time Soon Poll Data Details 0 10 20 30 40 50 Number of Responses 4/3/2002 City of ,Fvlendota April 4, 2002 Subject: Mendota Heights Street Project Poll Results Dear Mendota Heights Resident: The Engineering Department is mailing this letter to residents of the Avenues neighborhood to inform them of the results of the street improvement project poll survey that was mailed out this March. The March correspondence that was mailed to 95 property owners abutting streets in the Avenues neighborhood by the Engineering Department included a letter describing street improvement projects, and a self addressed postage paid postcard that residents were asked to fill out and to mail back to City Hall indicating their support or opposition for a street improvement project for properties in the area. These project survey responses were compiled, and a summary of this data is shown on the back of this letter. Council has decided not to proceed with a street construction project in your area at the present time based on the results of the project poll survey that was conducted this March. Council might be inclined to reconsider this decision if a majority of the affected property owners in a particular area took it upon themselves to circulate, sign, and submit a petition to the City requesting a street improvement project. In the meantime, Public Works and Engineering will be monitoring street conditions in the area, and the issue concerning any future street improvement project will be re-evaluated if circumstances change. If you have any questions or comments relative to the above project information, please contact Jim Danielson or myself either by telephone (651-452-1850), in writing, or by email at marcm@mendota-heights.com. Sincerely, Marc S. Mogan, P.E. Civil Engineer 1101 Victoria Curve- Mendota Reights, MN 55118 (651) 452.1850 • FAX (651) 452�8940 Street Project Poll Results 53% Avenues Neighborhood ®Support ❑ Do Not Support Surveyed Support Do Not Support Percent Reporting Avenues 95 27 31 61.1% a Support This Year m o Support Next Year r U Support 2004 or Beyond 0 Q. Don't Support Any Time Soon Poll Data Details 0 5 10 15 20 25 30 35 Number of Responses 4/3/2002 City 1 Mendota April 4, 2002 Subject: Mendota Heights Street Project Poll Results Dear Mendota Heights Resident: The Engineering Department is mailing this letter to residents of Walsh Lane and Kay Avenue to inform them of the results of the street improvement project poll survey that was mailed out this March. The March correspondence that was mailed to 20 property owners abutting Walsh Lane and Kay Avenue by the Engineering Department included a letter describing street improvement projects, and a self addressed postage paid postcard that residents were asked to fill out and to mail back to City Hall indicating their support or opposition for a street improvement project for properties abutting Walsh Lane and Kay Avenue. These project survey responses were compiled, and a summary of this data is shown on the back of this letter. Council has decided not to proceed with a street construction project in your area at the present time based on the results of the project poll survey that was conducted this March. Council might be inclined to reconsider this decision if a majority of the affected property owners in a particular area took it upon themselves to circulate, sign, and submit a petition to the City requesting a street improvement project. In the meantime, Public Works and Engineering will be monitoring street conditions in the area, and the issue concerning any future street improvement project will be re-evaluated if circumstances change. If you have any questions or comments relative to the above project information, please contact Jim Danielson or myself either by telephone (651-452-1850), in writing, or by email at marcm@mendota-heights. com. Sincerely, Marc S. Mogan, P.E. Civil Engineer 1101 Victoria Curve ^ Mendota heights, MN 55118 (651) 452.1850 • FAX (651) 452-8940 Street Project Poll Results Support This Year N 0 Support Next Year t U Support 2004 or Beyond 0 M Don't Support Any Time Soon Poll Data Details 0 2 4 6 8 10 Number of Responses 4/3/2002 • Mendota 1 April 4, 2002 Subject: Mendota Heights Street Project Poll Results Dear Mendota Heights Resident: The Engineering Department is mailing this letter to residents of Ivy Falls Avenue to inform them of the results of the street improvement project poll survey that was mailed out this March. The March correspondence that was mailed to 19 property owners abutting Ivy Falls Avenue by the Engineering Department included a letter describing street improvement projects, and a self addressed postage paid postcard that residents were asked to fill out and to mail back to City Hall indicating their support or opposition for a street improvement project for properties abutting Ivy Falls Avenue. These project survey responses were compiled, and a summary of this data is shown on the back of this letter. Council initiated the process for a street construction project under the statutory provisions for public improvements by ordering the preparation of a feasibility report on March 19th based on the results of this project poll survey. The Engineering Department will be collecting preliminary survey data in the neighborhood, preparing the feasibility report, conducting the public hearing, and developing final design plans and specifications for the project over a period of time. The next correspondence you will receive will be a notice of a public hearing for the proposed street improvement project. The street improvement project, estimated costs, and schedule will be discussed in greater detail at that public hearing. If you have any questions or comments relative to the above project information, please contact Jim Danielson or myself either by telephone (651-452-1850), in writing, or by email at marcm@mendota-heights.com. Sincerely, Marc S. Mogan, P.E. Civil Engineer 1101 Victoria Curve • Mendota Heights, MN 55118 (651) 452-1850 • FAX (651) 452.8940 Street Project Poll Results 50% Ivy Fails Avenue 50% a Support ❑ Do Not Support Surveyed Support Do Not Support Percent Reporting Falls Ave. 19 8 8 84.2% m Support This Year v Support Next Year a r v Support 2004 or Beyond 0 IL Don't Support Any Time Soon Poll Data Details 0 1 2 3 4 5 6 7 8 9 Number of Responses 4/4/2002 ,AAA2AA JA April 4, 2002 Subject: Mendota Heights Street Project Poll Results Dear Mendota Heights Resident: The Engineering Department is mailing this letter to residents of Spring Street to inform them of the results of the street improvement project poll survey that was mailed out this March. The March correspondence that was mailed to 9 property owners abutting Spring Street by the Engineering Department included a letter describing street improvement projects, and a self addressed postage paid postcard that residents were asked to fill out and to mail back to City Hall indicating their support or opposition for a street improvement project for properties abutting Spring Street. These project survey responses were compiled, and a summary of this data is shown on the back of this letter. Council has decided not to proceed with a street construction project in your area at the present time based on the results of the project poll survey that was conducted this March. Council might be inclined to reconsider this decision if a majority of the affected property owners in a particular area took it upon themselves to circulate, sign, and submit a petition to the City requesting a street improvement project. In the meantime, Public Works and Engineering will be monitoring street conditions in the area, and the issue concerning any future street improvement project will be re-evaluated if circumstances change. If you have any questions or comments relative to the above project information, please contact Jim Danielson or myself either by telephone (651-452-1850), in writing, or by email at marcm@mendota-heights.com. Sincerely, Marc S. Mogan, P.E. Civil Engineer 1101 Victoria Curve • Mendota Heights, MN 55118 (651) 452-1850 • FAX (651) 452.8940 Street Project Poll Results M 71 Spring Street ®Support ❑ Do Not Support Surveyed Support Do Not Support Percent Reporting Street 9 2 5 77.8% N Support This Year d 'o Support Next Year s v Support 2004 or Beyond 0 a Don't Support Any Time Soon Poll Data Details 0 1 2 3 4 5 6 Number of Responses 4/3/2002 ®®a,kl®® April 4, 2002 A Mendota tA g Subject: Mendota Heights Street Project Poll Results Dear Mendota Heights Resident: The Engineering Department is mailing this letter to residents of Sunset Lane to inform them of the results of the street improvement project poll survey that was mailed out this March. The March correspondence that was mailed to 14 property owners abutting Sunset Lane by the Engineering Department included a letter describing street improvement projects, and a self addressed postage paid postcard that residents were asked to fill out and to mail back to City Hall indicating their support or opposition for a street improvement project for properties abutting Sunset Lane. These project survey responses were compiled, and a summary of this data is shown on the back of this letter. Council has decided not to proceed with a street construction project in your area at the present time based on the results of the project poll survey that was conducted this March. Council might be inclined to reconsider this decision if a majority of the affected property owners in a particular area took it upon themselves to circulate, sign, and submit a petition to the City requesting a street improvement project. In the meantime, Public Works and Engineering will be monitoring street conditions in the area, and the issue concerning any future street improvement project will be re-evaluated if circumstances change. If you have any questions or comments relative to the above project information, please contact Jim Danielson or myself either by telephone (651-452-1850), in writing, or by email at marcm@mendota-heights . com. Sincerely, Marc S. Mogan, P.E. Civil Engineer 1111 01 Victoria Curve • Mendota Heights, MN 55118 (651) 452.1850 • FAX (651) 452-8940 Street Project Poll Results 50% Sunset Lane =Not50% Surveyed Support Do Not Support Percent Reporting Sunset Lane 14 6 6 85.7% W Support This Year d Support Next Year 0 s U Support 2004 or Beyond 0 a. Don't Support Any Time Soon Poll Data Details 0 1 2 3 4 5 6 Number of Responses 4/3/2002 ciety of Mendota - g April 4, 2002 Subject: Mendota Heights Street Project Poll Results Dear Mendota Heights Resident: The Engineering Department is mailing this letter to residents of Callahan Place to inform them of the results of the street improvement project poll survey that was mailed out this March. The March correspondence that was mailed to 30 property owners abutting Callahan Place by the Engineering Department included a letter describing street improvement projects, and a self addressed postage paid postcard that residents were asked to fill out and to mail back to City Hall indicating their support or opposition for a street improvement project for properties abutting Callahan Place. These project survey responses were compiled,, and a summary of this data is shown on the back of this letter. Council has decided not to proceed with a street construction project in your area at the present time based on the results of the project poll survey that was conducted this March. Council might be inclined to reconsider this decision if a majority of the affected property owners in a particular area took it upon themselves to circulate, sign, and submit a petition to the City requesting a street improvement project. In the meantime, Public Works and Engineering will be monitoring street conditions in the area, and the issue concerning any future street improvement project will be re-evaluated if circumstances change. If you have any questions or comments relative to the above project information, please contact Jim Danielson or myself either by telephone (651-452-1850), in writing, or by email at marcm@mendota-heights.com. Sincerely, Marc S. Mogan, P.E. Civil Engineer (651) 452.89 1101 Victoria Curve • Mendota Heights, MN 55118 (651) 452-1850 • FAX Street Project Poll Results Support This Year N N Support Next Year 0 s U Support 2004 or Beyond 0 IL Don't Support Any Time Soon Poll Data Details 0 2 4 6 8 10 12 14 16 Number of Responses 4/312002 City o.: Mendota April 4, 2002 Subject: Mendota Heights Street Project Poll Results Dear Mendota Heights Resident: The Engineering Department is mailing this letter to residents of Dodge Lane to inform them of the results of the street improvement project poll survey that was mailed out this March. The March correspondence that was mailed to 4 property owners abutting Dodge Lane by the Engineering Department included a letter describing street improvement projects, and a self addressed postage paid postcard that residents were asked to fill out and to mail back to City Hall indicating their support or opposition for a street improvement project for properties abutting Dodge Lane. These project survey responses were compiled, and a summary of this data is shown on the back of this letter. Council initiated the process for a street construction project under the statutory provisions for public improvements by ordering the preparation of a feasibility report on March 19th based on the results of this project poll survey. The Engineering Department will be collecting preliminary survey data in the neighborhood, preparing the feasibility report, conducting the public hearing, and developing final design plans and specifications for the project over a period of time. The next correspondence you will receive will be a notice of a public hearing for the proposed street improvement project. The street improvement project, estimated costs, and schedule will be discussed in greater detail at that public hearing. If you have any questions or comments relative to the above project information, please contact Jim Danielson or myself either by telephone (651-452-1850), in writing, or by email at marcm@mendota-heights. com. Sincerely, '-�eaze' S, r-2 � Marc S. Mogan, P.E. Civil Engineer 1101 victoria Curve • Mendota Heights, MN 55118 (651) 452-1850 • FAX (651) 452-8940 Street Project Poli Results 3301 7% Dodge Lane ❑Suppo DoN Surveyed Support Do Not Support Percent Reporting Lane 4 2 1 76.0% a Support This Year Support Next Year 0 s v Support 2004 or Beyond 0 Q. Don't Support Any Time Soon Poll Data Details 0 1 2 3 Number of Responses 4/3/2002 NEWS Public WorksEngineering The Pmpel i n e Code Enforcement LETTER March 29, 2002 Parks Report The Parks Crew picked up the trash daily from the parks. They worked on get- ting ready for summer this week —hauled more trash barrels to the parks, pur- chased fertilizer and crab grass preventor. Mice have taken up resi- dence at the Public Works Garage and Tom has been at war with them all week — so far the mice are winning. Utility Report Rich checked the City's seven sanitary sewer lift stations daily. Rich was called in at 6:30 P.M. on Tuesday evening to respond to a sanitary sewer backup at 697 South Freeway Road. The sewer was backed up in the City's main and Rich jetted it open. The problem was found to be a tree rootball. The Freeway Road neighborhood is an older neighborhood and homeowners have been having problems with tree roots in their private ser- vices. We think that what may have happened in this case is that a resident up- stream had Roto Rooter or some other cleaner out to clear the roots from their line and that this rootball was pushed into our main where it got hung up and blocked our line. The resi- dent that had the back up told us that he currently has to have Roto Rooter out two times a year to clean his service of roots. We are planning on putting a notice in the next Heights Highlites asking residents who have their service cleaned to call City Hall and report it so that we can come in and clear their rootball from our line. Rich also performed mainte- nance on his sewer jetter this week. Street Report The Street Crew patched pot holes with cold mix this week. They replaced some missing street name signs. They disposed of a road killed deer. They removed the sand and salt from the plow trucks and cleaned them out —hopefully for the last time. The bids are back for this spring's street sweeping and McPhillips was the low bidder again (they've had the bid for 10 out of the last 11 years and they always do a good job). They plan on beginning sweeping the middle of April and, because they are going to use six sweepers, will be done in three or four days. Code Enforcement Report Paul issued a permit this week to United Properties Construction for an 8,516 square foot office tenant space finish to be occupied by Digital Data Voice at 1210 Northland Drive (Mendota Heights Office Complex III). He also issued a permit to Socon Construction for a MAC Part 150 noise abate- ment remodeling job to be completed at 2164 Trunk Highway 13 (Robert Larson residence owner/operator of Larson's Greenhouse). Per- mit valuation was $38,000. NEWS Public Works EngineeringThe Pipel i n e Code Enfforcorc ement LETTER March 15, 2002 Parks Report The Parks Crew picked up the trash daily from the parks. The Parks Crew plowed cul-de-sacs and ped- ways from the March 9th storm. They also removed tree limbs downed from the March 9th ice storms in the parks and on the pedways. They attended a seminar to learn about new techniques for safely applying pesticides in the parks. Utility Report Rich checked the City's seven sanitary lift stations daily. The resident living at 1051 Marie Avenue called the City to inform us that they had had trouble with their sewer line and that we should clean our line of their mess. Rich cleaned the line in front of their home (good work resident)! Rich had to use the sewer jetter to open up frozen catch basins and lines on Winston Court, Ivy Falls Court and Overlook Road this week. Street Report The Street Crew worked on maintenance to the vehicles this week (replaced a hy- draulic line on #310 etc.) They worked on mail box re- pairs, pothole complaints and opened frozen catch basins and culverts. Down By the Oasis... Bolander and Sons, Inc. be- gan the demolition of the for- mer Oasis Station at 1960 Dodd Road on Monday morn- ing at 7:05 a.m. At 7:15 a. m. the 1,600 square foot building and steel canopy had been transformed into a pile of rubble. Planning Commissioner Friel captured all the "action" on film and video. The pile of rubble was pushed, piled, and twisted to compress the rubble and dis- member the steel connec- tions. The loader operator separated the steel from the piles, which was loaded into trucks and hauled away to be recycled. The remaining rub- ble and concrete was also hauled away to be recycled or land filled. Concrete foun- dations were removed except for the light pole and sign Date: Event: base located adjacent to the bituminous bike path. Re- moving them now, with the frost still in the ground, could damage the adjacent bike path. The only "hitch" oc- curred when an uncapped well was discovered in the northeast corner of the site. We surmise that it is a moni- toring well that did not show up on previous site surveys. Keys Well Drilling is re- searching this matter for the City and will seal the well ac- cording to Dakota County regulations. o— C�C�� C� Snow Events 3/9 1-1/2" snow & ice Response: Sanded streets in morning — plowed all areas during day NEWS Public Works Pipeline Engineering The Code Enforcement LETTER March 8, 2002 Parks Report The Parks Crew picked up the trash daily from the parks. The Crew returned more trash cans to parks in anticipation of spring weather. They removed the Minnesota DNR lake aerator from Rogers Lake this week. They needed to remove it be- fore the frost was out of the ground. The aerator is stored during the summer at the Pub- lic Works Garage back lot. They plowed the pedways after the snow fell on March 3rd. Utility Report Rich checked the City's seven sanitary lift stations daily. He had to replace the plumbing vent for the Northland Drive lift station (in Brown College parking lot). A car had slid off the driveway and broken the existing one. Rich inspected both of the Su- perAmerica Station's car wash sand traps and found them to be cleaned out as directed. Street Report The Street Crew attended a "Work Zone Traffic Control" workshop and were updated on the following topics: New OSHA standards on high visi- bility garments, correct work zone signing and flagging, proper safety in work zones and an overview on traffic con- trol. They made some fire safety improvements to the Public Works Garage as re- quested by Fire Marshal Paul Kaiser. They performed some maintenance to truck #303 and replaced a burned out light bulb to the traffic signal at TH55 and Mendota Heights Road. Snow Event excavation was backfilled and now awaits a blacktop patch. Wetlands Education Series Attached are two notices from the Dakota County Environ- Date: Amount: Response: 2/5/02 3/4" Scraped main roads and sanded slippery spots (4:00 A.M. start) Construction Proiect Update I attended a meeting this Thursday sponsored by MnDOT and Dakota County to update the communities on the con- struction projects that they have going on this summer that may impact the Cities (MnDOT map attached). There were no Dakota County projects planned that will affect Mendota Heights this summer, and the Lexington Avenue Bridge project will be the only MnDOT project affect- ing us. Water main Break In what seems to be a weekly occurrence, St. Paul Regional Water Services had a crew re- spond to another 6" water main break, this time on Creek Ave- nue next to Dodd Road. The break occurred before sunrise Wednesday and the main was repaired and back in service by 1:00 P.M. the same day. The mental Education Program an- nouncing upcoming free pro- grams. I attended the one on frogs and toads last year and it was great! The one on Ecology of the Mississippi will be con- venient for us because it's to be held at City Hall on March 20th. Street Proiect Poll Notices This week the Engineering De- partment sent out street pro- ject poll questionnaires to 298 residents in 8 different areas to solicit their views relative to the need and timing of potential fu- ture street construction pro- jects throughout the City. Those areas included the Som- erset and Avenues neighbor- hoods, and residents abutting Walsh Avenue and Kay Avenue, Ivy Falls Avenue, Spring Street, Sunset Lane, Callahan Place, and Dodge Lane. A separate notice is being drafted for the Freeway Road area and will be mailed out shortly. • • • 1SS1SS1 Presentation by: Tom Lewanski Conservation Director Friends of the Mississippi River Wednesday, March 20, 2002 — 7:00 p.m. — 9:00 p.. Mendota Heights City Hall, Council Chambers 1101 Victoria Curve, Mendota Heights Also: Learn more about the 2002 Wetland Health Evaluation Project and sign up for the summer monitoring season! All programs are free and open to the public Sponsored by: The Dakota County Environmental Education Program 4100 220th Street West, Farmington, MN 55024 (651) 480-7734 The Hennepin Conservation District 6900 Wedgwood Rd., Maple Grove, MN 55311 (763) 420-2157 I -"7!Frogs and Toads of Minnesota Presentation by: John Morriarity Natural Resource Specialist, Ramsey County Parks Monday, March 11, 2002 - 7:00 p.m. - 9:00 p.m. Minnesota Valley National Wildlife Refuge 3815 E. 80th St., Bloomington Also: Learn more about the 2002 Wetland Health Evaluation Project and sign up for the summer monitoring season! All programs are free and open to the puhlic Sponsored hy: The Dakota County Environmental Education Program 4100 220th Street West, Farmington, MN 55024 (651) 430-7734 The Hennepin Conservation District 6900 Wedgwood Rd., Maple Grove, MN 55311 (763) 420-2157 2002 Construction Project Descriptions 1 «y]On iX J4om'Ad". PP: A.., m LP.6 M:Gady.aurlacng, d of s�.�Fm�a�anllzxP.6alszmx 'Alf, Ad, IAra'WaPe rv6513aE 1]62 re 411.11 CIEr I.I. z NAYS ..'AdIddA m. I,I-Amd, .A.1 Suxnsge 61anArare W012W2-WOIRO]J i.a ne l.ryact f emor'Id- Ili A. ' cosr Exl:la3 ] Hry 5 Hal lv LSAN 1I aairq.aunanrq.e¢vl San Iti 6YU1. OlA 12Wz Ill".1-All M.mc Mai em 651.1Hn1 ]62 Cvxl ESllaSlz]ttNJVaM1 wor Nw AorxuY.SM rncen ex9n, eegxe Ervlge d eNr SarvF.nNn aR6'2mE� Iv01RW2 iM al w�TN 5 bat rxgoeOCwaN � Oerov Casl EMnaS]0.U%COVa ker 651.562�1]62 sIM.EN;, rove 11.1 Ogsolrzmx Trallc req .., NovI., tA. �T. A -.A Coal Ea111ara �XreaxeB 6. H»y Bea, PA. 601. snWu;al in LNeece Gh Svon: Pec'ay.un avd wbav TH S sran-Flmrn aNbE W 2 � @012pAJ 'mr, Me+.lainaw wed A-Aln I=All. Ilwr✓e and 651.51t1]N Lwl Extl 5I . ar i. nrvy to IAd.. Ave N Ali 1. IIAI It filan 1m1.1l)" za10o"Ad, i AlI AdAlA Darc keoA(Iff-w fil"Al �dflll. All. d. my 21 iH 191e C5AN ]] in New Prayve Sran Fid-II.lAdd-�03'IS2- T'All d acl. F4no.. Po. LbsM DAdA ,a518B2Wrry n: LoI ryI'd' C SI ErII- 9 YIfveadawt/md Ll re A It »I.,- '' M 6:ar rmnnor ar sanAmmoslol�i6oi-mmrzn6z Trams At Lervr. rker It' It" Coel EslIf"i'T 'i 10. a]z 185rn, Lt:o C5AH a61n lane..l;e 6dmeina.sa 9]R2'2 W 2. 0& 1 C2 W z Tulle lrryx Mvnr. Enw'.der a:an cwuree ' .Fer 65TSex-tJ6x ' Casl EzeraSaSMV�nV a 11 a]SOver Uae Alar.ov 1.11 1. Sran FlA. -l. M:P}3501]OiNE z w5P ems l:0lane Ill ,Fer fill+.px-I 6z Cosl Ill 1.'d0.Xt]IXI d 12 r ]SE TH 77 m Eaian 10 Ill- All m 61law vory Symng.romcemau T.,M1A ImoA mmazmE a,aA«mad„_r aFArd61-51-1]6x e ,r�E.ilasd X�. r,. rl t]5E Ensoa•A nsz W.er B me sr;.1,Av I,�a�rrvl2x,.wgrzcv- TNnelmaxl. anw.. drro.d. zD]zaav aIII' ....... ... odr CEll 1]50C. 14. : W9We $[bH 11"A"Addlov IIAieragy..tl°an .aau,.nbveb ,.d7 Wr=fA.,d-.1. Tladf lrgdddt a n.'I.. a We[bfuras Snge Ww... ArIweek PWICAXyrxratl.-A 611d62�1965 LwI EM:$1W1V 15. 3]Sly Ia ¢tivl S1 N Bbawr9lan Wan:69yesaum:llon Zll.o].V1Rm211/1. ,AIi 11 All Liwe w.e lave el4]Avla. I. t-,Arum, y-}M1Xlamaeci651.5021e65 ,.A III 11Y! W 1&IJSW wewvp A.CwmYPwe 52 N Avoka vlaM lma<Xvy recurMluclbn eve A . . s W 1FukN N•t5'M¢ ..11W ] It.,, Np6 At Llofursol NaertNvga WC Ad-DaveeN At (Al 65160x�1i15 Loll . ¢AYAb 1I, H..yM RAAA ,l. it lne it, C:vc III Wart&tlya r.1 Aid veul'rAd 6umFlrvN WIS2mZ�t62SQWx n.ttA At Mw,. AIIxA.ey nna. I.w ar,rmq .vre.M Aav Pu6YAIWm Xenl Bamern fl14Y2�1]G Con Eae. f#.DW IB. HW e1 Enper 11Ub LH 5 Add: aem+rr[.r. mu a "All -11 sun Nx0401RS2'OTpIrZM2 "Ali All did d. Ill di I. der'.... Alt""t P.A., I.. XeN W elver Sd2 Coil E,l 11UKN 1q. NW wrx ss1diH xDm D.kwe cmrmv ,At St. e Il6 Ali SunFmN O]AYEO]E. W.r1YEx1 me eNSPW NeAdd alweJ lolrvovyn lrellC I11 XwN Wahar 651�SA2�1J@ MI,]RPU EO Mry 5x3aq[Ie1N 551n must Greve Mmgnla eUa.-A ml6avMsy rggrryyy 6apwamenu sIM{.:a movmm-paoa26oz TmttA Mex-1.-A"d nwr I.. rwv[d.e e1651�1ex�1%R Lu1 EH. al0E0AJ We x1. H.ry'3Mo+sual Or to PNb Dr In M1led.na W -And A p.ka.azvm.WMnfdx/ Sun{'nN I'd 1. 1.".}raX<, Addi Mainlein Ilene ea PAzvur Ad -.-II C.I l]W�SI51561 Lm1 Ert3 H 1E. Wry SS E Y.A 1. TH d28 An 631r.]b A. iff 55 'cl, f✓Maq.vdxlrq Al A.. s ecewrzwo�xl nmc mvxt uapr. M.d.d z mnw re d-dl- -Ild ®di[y.ee a rX 6z XnmA,ce fill �5621 a65 Cw1Eat SIEFAOTJ 2>. 1, 61 NHazupa mMel Alf J161e lit , relay .µ®dry NCf�o nmentn Sr M.FMvdlMC61D]x. W152mz }rat A1arrclm 11 III. Waker Al"AI.... xa. It, 61 AidAli H:va to rH 10 rlealleHin9e I.AFOAUAn�r«rmdl d -,III illd- A,s pe .PA1]6a lddlyd 651.S L6n Ell Sd 35.IIry 61 aA9n10 51. Parrl A-1 Boen m l d-. w F:N.+q.aWaCn9d Arw9aa II.ff Ccmfurel.q.r sl<mxnrpw san.f:.. wrmxDz. lam2xa rA n- :.Ia i� ......... e, .....A. d'.- .nlP.rnnd 6ssxznx[ C,ad�En: v . M.Hry61 H9a lACavu Ave.Ae 11" .1.1 eruu[IA "Loge, Hare rA[«AlA aIA�zn f -A Air mrre <wrr,lw c��EIf.- A.Illilli iAmwnm E i.1, 61 Id. lu. A, to Posemwe Ave. WAF:.1-d-s m06 overlay sramFNHa mmszeoz � raro266z Tranc lnpxl: Mnor. Wmbb I.A. II..... py4 pllava: DaneeFa M�ueMv 651�50EIPS Cwl Esl: ENPWA x8.Ill 61 Ar[aoeovm.,f, Py rA Sl Paw Wank: fil AAdge d Avca.[xef 6un4`wf1..11W2- IIr.-I i. We Irryx1: lAepr, Poan Cbf en . Debvr qye pllava:0eneeka M.CWen. 6515BDit]5 Lm1ESI: SaW]W] 29. I"ill f.JAE WM li reXa..dAA S.,.di lax/I.Wx-.IRWx TlAddd plrl: Mepr. Madam..... ea dreclbn P+nA^s � SFOmueea P2Mp11a.e. Xann Wahae 651.S6E�1]62 Lwlffc SIO20.1tl 'A, Nay II Onr Mvmeada Prve, ,di :&JypaAf SwANA W I..-.., 'Al. 'At Mlew, I.. [Iwwe+ avU aA.IOfA [Awes All Allisre. 1. x,aeea['c 65158E. C1[81 wI EM: YOLW] If, "17..--A Bner &qge mNdemtion maee�pnsb 1 son Fw o]ral2wx12w2 TN]c Inyx.I: Mlmr. Manf.A No lanes ea dmaro PAk Allaln: TMx Xeemexi 851361 Ia65 Cwl Efl: 3156W] J2. 1, rl Af-i l6vn1.m 6z Wpk &Nmmwa mlCaavenq. 1Mttrcnla relreM;talan $umGnlsA 01A4'20J3-0.W2)Rm2 Imll,d Inyx[.1.Snouaarb we tlmorva pv'se AllYr.e:iwW Wurosce e5TG8t1a65 Cw161'. 821WN Sl 4w Lmx Hluar to wal ryrcum al l ABa Ww.a: Pru[IMe MMneW swFm;enowlamz.loolrzmz NAIIUH: Oanee4MOpuenaa 651382f 1711 1. Eel: S19'J'.10 ][. 4M AI Cs.WBllHerrAacklnllauaweAAA- At I rAlartna,. id i'eeNOBCNAm1'IW01RWz Hette lrKSl: Malor. Nan maAAowlana<Iwurea pverc Alldn: Den AAA a MLquenW Al I5.- 1115 Ill $'It YA JS. SM TH "I A. Earle Ave, Work. Pxmarrvct Add All I'd Mne sraNEWaA6591Rmz 0l. Aff TmI[Impal'. u.id.. vomrusnnwrlan. [Nrww . Om2eAl.1-ido65T56z 1115 tdsi En!reu S2d"A ]6.FMAI L6AH B18 al6raaU«ay k: 1"..A 1". er'bgw [u 6ramFrvaX O]�Wtml �GVIa2WJ inllc lrryx.Nalo., umlam lrolareawd.ecw (Ia n: Daeeedra- Ivuen.61t�562-1])5 n1E nIt. J1. 69[ Fbm M9a to fit Lmra Pner Stan FlSnxnvrvl e^lacemenl Henc Irpar rl.rcr. Aev.mum Av Ic rdi Earle55: am Al -'A 61...... Lwl ]]. L9a ln»ex/XAl iunnela P.:-, Ave tunas. urn Erman Illrv�Ja z � larzzmz Han[In'vocx. M.mr, N:gm.ne [Ndwex u.i Ell n �awroAm a-, 111.56aw65 J9. n»Y Iw Gennmd Ar. b Dadev v9mv XU n: Gra61tg1d a<iny,drgges ro 61. Fle'H�C6ro1rzOx "Idldi 1A�en1'ra.pr. namrw narrnarre<Iwww. ^e Aff I caanrrIam Mf 1" -1 L"1"Lon a . l. I IfAf A Preliminary Draft -- Feb-25-2002 W Hwy 1 W DwvlA sl:o 291a. Ave N k:OraalnA. q.ru cmg UrNges Slerol-".I,r.,ii x a; I.,f. ] I,.". Alvrlane cb AwesAli. WM 5 PIIar pM Pv[1651.6W65 z- Col.ES: 119MCOMram 11. HA, diffli ve 10 RMAve work: aaaAm.Ar,nazmq.e.wgw la s., „y:rmer.rg A`dff late E;n. fill"fill".� aro 1Rmx IA LA Aapr.N .bne<wswas, 6.,'.I-I'MIAe LoY All M TOXnma 651Sex�1aG5 l Est SzAI. ax. Hwy JNXAre IONOI Trvm lakeadve C54H 61 n: Gmdy.Sr.ncmg.Mvlges la I 6 i+ne rUry.rnler[narye al6t I S.mFlrvaxoWo4rzW1�4 12VA elrpxl:..Al. Nev.-IAll, rdA.... A.- }N 1 WW ..A -.,Cos. c Iurs: T..'-All 651hdz-la65 Losl Erl: SSGN"N a1 Nrvy I., Ne ovei A4ax Hrver near Elt if I, A .,.-A llU - 6 aopmacves Sun Frnrsn 0]MERW I � WRW2Wx Halle lmpxl: Mnp..sa Ax (A.A. ov 58 di" llaonee P.. Ars'. DI1-0yeevN 861�562�1]]5 I.,..: SJ91IXil] a. xwy Iw.ml.w n:Gudvy,. dA. Ad or xvouwo mn diA,, 1-Id all srzcoz - oimMzooz I.". "All: Mvw,Norv.uxlr nwrlay.Coined pWue Adana TAl XlA,u Ill.58P 11. Lw1 Ed, . Ill. AS. ,, 169lMxlidAil rPrver b TN An -A k:..dv9au xm9.egvalxer< Of M SIan""Iff1/I"'A" INISRWx aUk di Mwr. fr Iram Mam ll, A Tx 10 ANernaIael...... all Sgz.lii5 CowIarn:Oaneeu M1l�Cvuenao661� Est 56565W] e6. x«/Ill P.mml]bd to Vaua/Vie+r Onve SbrvFu.15A0T21Y2WE o03g120R nMm"Al.Luaor. Add Nan Aaw All. [Iworea sea fill III.1.65 Losl EnI:151J0]m}Xbm AI. xwy xa2 Loon Ck SAv I. Panvnye id, I. -Nap IdIA Covsrr.el A. Ali one apw Sun Ermar.,..I.I dAl Tra1M f1.1 All Full di In 200] Cosl EAIIIIA2 fid va 11 Cvuenao d"di .... A61Y9e AI P.nn Ave n P¢A161b®amnuglan Wan Heaxe avwexAerlld,dt�l 1-di Illf Hall[ ve CalJ.Pesvuuanr on ,.,,A',A, mmne+wuon 21 ioel Xramnsa 651.562-Ia65 CmI ESI: Sz10CW.tl 19. 1411 TN.:o v esl prclbn If FY Won. &Iuminevr mzldove ay sumfmun 05'1SEW2-ION12x3 I.d elmpae ap. SmA weekend mne c.ozueer Pli AdAr'cT11 Xramad<i 651 N2 Iasi T 50 La9a vale, Iff., PaAd 1. l-9a rn"Ad d-, d. Wrge. Sue F rv,I C6ovtxl` claotz6Z Lw1E3LAll illffI rd 6515A' 51. n.v/ 610 A1rsizd.cN Pwer:o Goan Pao.ar Biva Wan dm4 r[nacn9 moemn9 soovUgertorru�UnAec mFrmxn anszxl.gn162xz ar. va Aror«n. rnr rrda �4neaorvrexe. ., waexa al.aweAll, 6sl-mz-vs codsl Ea�asllEcu'A.G Ez. 1.,If Fla-rH V).aI'll Y.l Jsv wAli All qunrlUraJ I'd .memzAd, E m:r"A"Id6CO2me-ogr26RLd] .r. care I.6sa a�a mr .n, rare 'l If':,,�e:a wcdrrenm As:.56z. f }5 A, Ill s2VIdAiro S}.1.1 .1, fit ..It I«amr BrvU., .. n: WldSn relax and pame 1 12 Illl W,dgar SmrtArmA d, 151.1-Od01.].1 :lsperd� P ova d 6515P2vn Ed A NO 1A c n 11 1,.ar NEWS Public WorksEngineering The Pipeline Code Enforcement LETTER March 1, 2002 Parks Report The Parks Crew picked up the trash daily from the parks. They attended the Annual Min- nesota Toro Conference in Brooklyn Center this week. At the conference, they attended classes on lawn irrigation, chemical application, turf and landscape maintenance, pond and lake management and turf equipment applications and use. The class on turf diseases was particularly interesting and should be very useful in keep- ing the City's lawns healthy. Utility Report Rich checked the City's seven sanitary sewer lift stations daily. He purchased some "grease eating" bacteria this week and put it in the wet wells at four sanitary sewer lift sta- tions (Mendota Heights Road, Northland Drive, Veronica and St. Thomas). He learned about this type of treatment at his re- cent Wastewater Operator's Conference held in Blooming- ton. We have been having trouble with grease build up at all of these stations and have had to vacuum them out on a regular basis. Another city told Rich that this bacteria was an effective treatment, and that they used it —so Rich thought he would buy some and give it a try. Rich responded this week to a complaint on Ridge Place. A resident complained that he could smell "sewer". Rich could find no problem, but he plugged the "pick hole" and caulked around the rim of a nearby sanitary sewer manhole. Street Report The Street Crew patched pot- holes with "cold mix" asphalt this week, and trimmed trees in the Bunker Hills neighborhood. They worked on repairs to truck #312 (one of the snow plowing trucks). Marc Mogan spent some time this week with Street Crew per- sonnel at the Public Works Ga- rage resolving some problems that they were having with the software program and hardware that the City uses to create street signs. The hardware set- tings that the cutting device uses to generate the actual street signs and the software program settings that are used to create the text lettering had to be changed to produce the signs in the desired format. Those issues seem to be re- solved, and the Street Crew personnel should now be able to produce street signs relatively quickly. Water Main and Utility Re- pairs Repair crews for Xcel Energy were called out to repair gas line leaks in the Ivy Hill Town - home development on Monday and another one at the corner of Chippewa Avenue and Junction Lane on Tuesday. The water main repair work that St. Paul Regional Water Services per- formed last week was merely a warm up for what took place this week. St. Paul Regional Water Services started work on Tuesday morning to repair a water main break on the 6-inch cast iron water main on the north end of Knob Road in the Freeway Road neighborhood. They were just finishing up that repair early Tuesday afternoon when they were called to repair another broken 6-inch cast iron water at the intersection of Sec- ond Avenue and Vandall Street in the Avenues neighborhood. The repair work on that break continued into the evening. Code Enforcement Report Paul issued sign permits to Law- rence Sign to install the Su- perAmerica logo signs at 2060 Centre Pointe Boulevard. This is the new corporate headquarters location for SuperAmerica in Minnesota. He also issued a building permit to Mr. Cliff Kirchner to replace his canopy located at 2156 Dodd Road that was damaged as a result of a vehicle striking it. (Note: Cliff insisted that he needed the permit im- mediately back in Au- gust.)j Did March come in like a lion or a lamb? NEWS Public Works Pipeline Engineering Code Enforcement LETTER February 22, 2002 Parks Report The Parks Crew picked up the trash daily from the parks. They removed the "thin ice" signs from Roger's Lake this week. The signs were installed to warn the public about the possibility of thin ice near the lake aerator. The aerator was furnished to the City in 1999 by the Minnesota DNR. The aerator is turned on when the oxygen levels get to a point in the lake that it will not support fish life. The DNR monitors the oxygen level on a weekly basis and notifies the City when operation of the aerator is required. The oxygen did not reach the low levels this year and we never had to op- erate the aerator which saved the City money. When the ice and snow cover blocks the sunlight penetration, it causes the vegetation to die and the decaying process uses up all the oxygen in the lake. The Crew continued to work on repairs to the picnic tables. They plowed all the pedways and park parking lots this week. Utility Report Rich checked the City's seven sanitary lift stations daily. He was called in at 11:40 PM Monday evening to respond to a high water alarm at the Ve- ronica sanitary sewer lift sta- tion. He received two more alarms on Tuesday. Rich dis- covered that the problem was with Electro Watchman's equip- ment (the alarm company). They came in Tuesday after- noon and repaired their equip- ment. He finished walking and check- ing the sanitary sewer trunk main this week, he did not find any problems. Street Report The Street Crew patched some potholes with "cold mix" this week. The asphalt plants are not open so "cold mix" is used as a temporary patch until spring arrives and the plants reopen. Dave attended the Minnesota Street Superinten- dents Association (MSSA) meeting this week. The topic this month was street sweeping policies. Snow Events: Date: Amount: Respon day thereby minimizing the in convenience to the affected residents. Suburban Dakota County Greenway Proiect 2/20 1" Sand an 2121 Trace Sand an needed. Water Main Break A water main break occurred on the 6-inch cast iron water main on Theresa Street in the Curley neighborhood on Monday, Presidents' Day. St. Paul Re- gional Water Services repair crews were able to repair the water main break that same Guy Kullander and Marc Mogan attended a second meeting with the advisory group of the Sub- urban Dakota County Greenway Project on Wednesday at City Hall. This study will identify natural areas and prioritize res- toration efforts in greenway corridors in the suburban areas of Dakota County. The data being compiled in this study identifies soil types, grade and slope aspect, and historical and existing vegetative cover down to a 10 by 10 meter grid within the developed suburban areas of Dakota County. This infor- mation will be made available to landowners to educate them in the benefits and posi- tive impacts that can be realized by d scrape preserving and pro- tecting these green- d scrape as way corridors or re- storing these areas with trees and vegetation suited to their site. This work will com- pliment the Natural Resource Inventory and Management Project being developed for Mendota Heights by Barr Engi- neering. The results of this project will hopefully lead to an implementation program that will fund natural resource pres- ervation or restoration projects with willing landowners. NEWS Public Works Engineering Code Enforcement LETTER Parks Report The Parks Crew picked up the trash daily from the parks. The ice rinks were closed for the sea- son on Monday, February 11. This was one of, if not the, worst years for maintaining the ice skating rinks. It was also one of, if not the, shortest ice skating seasons on record. The Crew was continu- ally having to fight the warm weather's damage to the ice. They worked this week on closing up the rinks for the season. They cleaned up inside the warming houses, brought the flooding hoses, hydrant wrenches and fit- tings in for storage. They also be- gan repairs to the old picnic tables this week, for placement in the parks. Utility Report Rich checked the City's seven sanitary sewer lift stations daily. He cleaned the sanitary sewer lift station located near St. Thomas Academy and worked on repairs to the ventilation louvers at the main lift station on Mendota Heights Road. He began his annual inspection of the trunk sanitary sewer this week. Every spring, Rich walks the lines, opens and checks every manhole to make sure they are all ok. Street Report The Street Crew continued trim- ming overhanging trees along the streets this week. They also worked on other miscellaneous duties such as disposing of road killed deer, welding repairs to equipment and clean up to snow plows. The Pipeline February 15, 2002 City Hall Generator Serviced Public Works Mechanic, Lenny Kanitz, completed servicing the emergency backup generator at City Hall this week. Len replaced the radiator, fuel and heater hoses, belts, anti -freeze, fuel filters and load tested the batteries. Although Len checks the generator periodi- cally, this was the first replacement of all the belts and hoses since the equipment was installed in 1988. When activated, the generator runs essential equipment and lights at the City Hall, primarily in the Police Department. CAD Software Most Engineering firms use some type of computer aided drafting (CAD) design software that saves information in an AutoCAD drawing file format. The City purchased a CAD software program in late 1998 that was considerably cheaper than AutoCAD, but was able to open and save drawings in an AutoCAD file format. AutoCAD has been up- graded three times since the City purchased its software package in 1998. The Engineering Depart- ment recently requested the latest versions of all of the CAD files that Westwood Professional Services, Inc. developed in conjunction with the title and survey work they completed on the Town Center pro- ject to date. Westwood Profes- sional Services, Inc. sent these CAD files to the Engineering De- partment by email, but we discov- ered that we could not open their AutoCAD compatible format files with the version of the CAD soft- ware that the City had been using. Fortunately, the company that de- veloped the CAD program that we purchased it from back in 1998 has released a new and affordable ver- sion of the software that is com- patible with the latest AutoCAD file format. In order to use the CAD information supplied by Westwood Professional Services, Inc. for this project, and CAD data for other projects that we may get in the fu- ture from other Engineering and surveying firms we decided to pur- chase the latest version of the soft- ware that we acquired back in 1998. The software arrived this week and we installed it on the En- gineering Department computer. We encountered some problems in- stalling the software initially, but we believe that we now have them resolved and now the software ap- pears to be working correctly. Attachments: Wetlands Exploration Presenta- tion Flyer • Thank you letter from the Men- dota Heights MOMS Club Happy Presidents Day l N'ef�lo, �ftlu�i�. --- I Wetland Birds Presentation by Steve Weston Minnesota Ornithological Union Tuesday, February 19, 2002 — 7:00 p.m. — 9,00 p.m. Apple Valley Municipal Center, City Council Chamber 7100 West 147th Street, Apple Valley Also: Learn more about the 2002 Wetland Health Evaluation Project, a citizen volunteer wetland monitoring program and sign up for summer monitoring season! All programs are free and open to the public Sponsored by: The Dakota County Environmental Education Program 4100 220'h Street West, Farmington, MN 55024 (651) 480-7734 The Hennepin Conservation District 6900 Wedgwood Rd., Maple Grove, MN 55311 (763) 420-2157 NEWS Public Works Engineering The Pipeline Code Enforcement LETTER February s, 2002 Parks Report The Parks Crew picked up the trash from the parks and checked the ice skating rinks and warming houses daily. They are continuing to flood, sweep and otherwise maintain the ice skating rinks. They also worked on repairs to the snow blower this week and a ice rink flooding valve at Marie Park. The Crew cleaned and repaired all the wood duck houses this week. There are twelve houses and all twelve had been used. Utility Report Rich checked the City's seven sanitary sewer lift stations daily. He replaced the heaters at the Centre Pointe and St. Thomas Academy sanitary sewer lift stations. When ex- ercising the Mendota Heights Road emergency generator he noticed that the exhaust lou- vers were not working. He contacted Total Electric to ar- range to have them repaired. Street Report The Street Crew trimmed overhanging tree branches in the Bunker Hills and Friendly Hills neighborhoods this week. They repaired some potholes with cold mix bituminous patching material (temporary potholes). Dave conducted a tour of the Public Works Garage for the "Mom's Club of Mendota Heights". There were seven moms and 12 children. Four dump trucks plowed snow last Friday morning. We felt that if the streets were plowed they would melt and dry off quicker. Code Enforcement Report Paul issued a building permit this week to Deily Construction to remodel the building located at 2422 Enterprise Drive. The building is owned and occupied by Pioneer Engineering. Town Center Guy sent out bids this week to seven contractors requesting bids for removal of hazardous materials and demolition of the Oasis Market. The environ- mental survey found no asbes- tos that required removal be- fore demolition. There is very little hazardous removal re- quired —just "run of the mill" items like smoke detectors, ballasts, fluorescent bulbs, cleaning products, etc. Protec Environmental began their hazardous material survey of the Tom Thumb building on Thursday and will be taking samples to be tested for asbes- tos. Test results and a final re- port are expected in early March, after which we can pro- ceed with the cleanup and demolition of that building. New Traffic Signal I was contacted this week by Mark Lindeberg, MnDOT Traffic Engineer. Mark informed me that MnDOT was preparing the plans to install a traffic signal at the intersection of Mendota Heights Road and TH13. He said that MnDOT was intending to take bids on the project this fall, the successful low bidder would then likely order the equipment this winter and in- stall it beginning next spring. Old Traffic Signal Last Friday morning, there was an accident with a fatality that occurred at the Delaware Ave- nue and TH110 intersection. City officials received several calls from concerned residents as a result of the accident. The accident occurred on TH110, not Delaware Avenue, however the City Council remembered a similarly bad accident that oc- curred on Delaware Avenue in 1999. After that accident, the Council had requested MnDOT to upgrade the intersection's traffic signals. MnDOT then determined that the upgrade was not justified at that time. The Council directed me Tues- day evening to forward another letter to MnDOT asking them to revisit that decision. U M NEWS Public Works Engineering Code Enforcement LETTER Parks Report The Parks Crew picked up the trash from the parks and checked the skating rinks and warming houses daily. The Parks Crew plowed the cul de sacs on Monday morning (115 cul de sacs) and cleaned snow from the trails, skating rinks and parking lots when they were done. They flooded the skating rinks every morning. They performed maintenance to the electrical breakers at the Friendly Hills warming house and the power take off on 505 (the snowblower). Utility Report Rich checked the City's seven sanitary sewer lift stations daily. Rich also plowed the north end streets (his normal route) Monday morning. Then he plowed all his lift station driveways and parking lots when he was done. Watermain Break A resident notified the City Wednesday morning of a wa- termain break on Valley Lane. St Paul Regional Water Service responded quickly to repair the break and by early afternoon restored water service to the residents in the area. Tom Knuth was at the site and ob- served that the frost depth in the street was about 1/2 the depth of what it would nor- mally be this time of year. (1- 2 feet deep versus 3-4 feet) Street Report The Street Crew changed the traffic signal light bulbs at Men- dota Heights Road and TH55 because they were notified by MnDoT to do it. We are re - January 18, 2002 its condition. Tom Olund, Rich Burrows and I met with Brian LeMond and Ann Ferris of Barr Engineering on Tuesday to show them our station so that they could give us a proposal to complete the study. They Weekly Snow Event Amount: 5" snow 1/15/02 light snow 1/16/02 1/2" snow quired by agreement that this is the City's responsibility. They repaired mailboxes dam- aged during snow plow opera- tions. Code Enforcement Paul issued a permit this week to United Properties Construc- tion to alter a space for a new tenant at 2425 Enterprise Drive. The permit was for 14,000 square feet of office and 28,000 square feet of ware- house space to be occupied by IKON (a sales and service office products company). Lift Station Study The City's main sanitary sewer lift station located on Mendota Heights Road is over 30 years old now, and the life of a lift station is thought to be about 50 years. Because of that, we budgeted money within the Utility Fund this year to have the station studied to analyze Response: Plow and Sand all areas Sand slippery areas Scrape as Required Sand and Scrape found that the building itself is in very good condition, however many of its components are original equipment that will probably need replacing/ updating in the near future. We asked to have them plan for completing their report in time for consideration during 2003 budget preparation. Photo taken inside Mendota Heiahts Road Lift Station NEWS Public Works Engineering Code Enforcement LETTER Parks Report The Parks Crew picked up the trash daily from the parks. They worked with the help of the rink attendants and started flooding the out- door skating rinks begin- ning this Tuesday. Resi- dents are already skat- ing on the rink in Friendly Hills Park (because it has a bitumi- nous base, this rink is the first one to be ready for skating). The ice on this rink is still not the best, but it will be very soon. The other two rinks (Wentworth Park and Marie Park) will be ready for use this week- end (hopefully) or if not, early next week. The Parks Crew plowed snow from the cul-de- sacs on Sunday. They plowed the pedways (where needed) on Mon- day. Street Report The Street Crew sanded on Saturday and plowed The Pipeline December 28, 2001 on Sunday. (They began plowing at 10:00 am and were finished by 7:00 pm). They worked on mail box repairs and changed the cutting edge on plow #312 on Mon- day. Weekly Snow Event Date: Amount: 12/22/01 rain/ice 12/23/01 2" snow Utility Report Rich checked the City's seven sanitary lift sta- tions daily. He sanded slippery spots on Satur- day, and plowed the north end streets on Sunday. He plowed out his lift stations on Mon- day. Watermain Break The frost going into the ground always results in watermain breaks. Early Thursday morning we re- ceived a call from a resi- dent reporting water run- ning down a gutter. We investigated, and discov- ered that a watermain break had occurred south of Miriam Street on Diego Lane. We reported the break to St. Paul Regional W a t e r Utility and they Response: informed Sand where needed us that they will Plow all areas repair it Thursday night. Someone (Santa?) decorated this tree in Valley Park for Christmas NEWS Public Works Engineering Code Enforcement LETTER Parks Report The Parks Crew picked up the trash daily from the parks. They also had to install markings by the recently installed DNR plantings along Rogers Lake to prevent peo- ple from driving over them. We officially opened the ice rinks on Saturday, January 5th, we then had to close them Tuesday through Thursday. We will try to reopen them on Friday. (This is turning out to be the shortest skating season on record). The crew worked on trimming trees in Friendly Hills Park. Utility Report Rich checked the City's seven sanitary lift stations daily. He cleaned built up grease from the floats at the Veronica and Centre Pointe sanitary sewer lift stations. The floats are switches that oper- ate the lift station pumps based on the level of the liquid in the wet well. He also worked with the Parks Crew this week to chip branches trimmed in Friendly Hills Park. Street Report The Street Crew worked on trim- ming trees this week. They also worked on equipment repair to the chipper, backhoe/tractor and bobcat. They were able to work on some sod damage repairs too. John Ambrose used his welding skills to complete some repairs to the soccer goals. Code Enforcement Report Paul issued a permit this week to Thompson Homes, Inc. to com- plete a MAC Part 150 aircraft noise attenuation project at 1062 Cullen Avenue. This work is paid The Pipeline for by the MAC to mitigate aircraft noise. The mitigation is accom- plished by changing the windows or by adding storm doors and storm windows, increasing attic in- sulation, sealing attic by-passes, baffling roof vents and replacing the furnace and installing a com- plete air conditioning system. County Surveyor Ouits Gary Stevenson, who has been the Dakota County Surveyor for the past 15 years has quit to accept a job with Westwood Engineering. Gary will be relocating to West - wood's St. Cloud office, which is his hometown area. I attended Gary's farewell reception on Tuesday, January 8th to thank him for all his help and wish him well in his new job. Brian Birch Drainage Issue Last week Brian Birch submitted an estimate from Southview Design to stabilize stream bank erosion in the natural drainage channel that flows through his rear yard at 755 Willow Lane. The estimate submitted by Brian Birch from Southview Design came in higher than expected, and so the Engineering Department asked Fischer's Contracting, Inc. to submit a quote of their own to ad- dress this situation. There is a sig- nificant difference in cost between the two estimates quoted for this work. Given the fact that City Council had offered to reimburse Brian Birch for the cost of this work last fall, now the issue left to be worked out is the resolution of the differences between these two esti- mates or Brian Birch's acceptance of this alternate quote from Fischer's Contracting, Inc. January 11, 2002 Survey Equipment JP Letourneau of Sokkia Measuring Systems met with Marc Mogan, Tom Knuth, and John Tran to dem- onstrate the use and operation of their current survey equipment line in the Freeway Road neighborhood this week. This survey equipment measures horizontal and vertical angles like the Engineering Depart- ment's existing equipment, but measures distances electronically with a reflecting prism as opposed to using a measuring tape to deter- mine distances like we do cur- rently. All this information is stored in the equipments memory that is then downloaded directly to the office computer or vice versa. Another advantage offered by this survey equipment is that this field- work can be performed with two people as opposed to the three - person crew that is often necessary using our existing survey equip- ment. Robins Fooled Councilmember Schneeman, Pat and I saw a large flock of robins out of the large conference room windows this week. They were feeding on the crabapple trees. These guys must have either known winter was going to be mild this year and never left, or were fooled into venturing back too soon. Let's hope they are right! NEWS Public Works Engineering Code Enforcement LETTER Parks Report The Parks Crew picked up the trash daily from the parks. They have also been working hard flooding the ice skating rinks to prepare them for their official open- ing this weekend. Although the rinks are not yet offi- cially open, the ice has been very good since last week- end and residents have al- ready been using them. They installed the hockey nets, trash barrels and phones in the warming houses this Thursday. Utility Report Rich checked the City's seven sanitary lift stations daily. He worked this week on completing documenta- tion forms provided to the City by LMCIT (the City's in- surance carrier). These forms are used to document which sanitary sewer mains were cleaned during the year, so that the City can prove that preventative maintenance is occurring should there be a lawsuit. He installed a new hour me- ter on the pump panel for the lake aerator at Rogers Lake Park. He also installed the "thin ice" signs by where there will be open water. The DNR monitors The Pipeline January 5, 2002 the dissolved oxygen levels in the lake and informs us when to turn on the aerator. So far this year, because of the mild winter, the dis- solved oxygen is still high and we have not been di- rected to turn on the aera- tor. Street Report Several of the Street Crew took advantage of the lack of snow and ice and took some time off this week. The remaining workers have mainly worked on mainte- nance to the chipper and trucks. Code Enforcement Report Paul issued a permit to Hoff- man Homes this week for construction of another two unit townhome (2162 and 2166 LeMay Lake Road). Town Center Demolition Plans ProTec Environmental Con- sultants have been directed to begin an asbestos and hazardous materials survey of the Oasis gas station. They will be sampling and completing an analysis of suspected asbestos contain- ing materials along with a complete survey of hazard- ous materials at the site. All hazardous materials that are required by the Minnesota Pollution Control Agency to be removed prior to demoli- tion activities, will be com- pleted within three weeks. Contract documents will then be sent out for bids from demolition contractors and be presented to City Council for review in February. Demolition and site restora- tion could be completed by early April. Brian Birch Drainage Ts - sue Surface runoff drains through a natural drainage channel through Brian Birch's rear yard at 755 Wil- low Lane. The flow in this natural drainage channel is causing some stream bank erosion that needs to be sta- bilized. This fall, City Coun- cil offered to reimburse Brian Birch for the costs necessary to stabilize this stream bank erosion. He submitted an estimate for this work from Southview Design. We are expecting a second estimate from Fischer's Landscaping, Inc. for comparable work sometime next week. A comparison of the materials and methods identified in these estimates hopefully will help determine what is ultimately constructed to ad- dress this situation. NEWS Public Works Engineering Code Enforcement LETTER Parks Report The Parks crew picked up the trash daily from the parks. The Crew picked up materials and made signs warning about "thin ice" for placement on Rogers Lake, if and when, there is any ice and the lake aerator is turned on. They performed maintenance and repair work on their equip- ment. Utility Report Rich checked the City's seven sanitary sewer lift stations daily. He obtained bids from contractors to repair the trans- fer switch at the City's main lift station located on Mendota Heights Road. The station cur- rently will not automatically transfer from Xcel power to the on -site generator when there are power outages. He in- spected the new sanitary sewer connection for the new office building currently under construction at Resurrection Cemetery. He inspected the sanitary sewer that was capped at 1250 Dodd Road where the home is being moved to accommodate for the development of the Ridder site. He also checked the City's sanitary sewer line at 1065 Highway 110 (Hugo Blackfel- ner's house) because he was having trouble with his service. The problems was found not to be as a result of the City's line. Street Report The Street Crew removed the sand/salt from the trucks and The Pipeline -J December 21, 2001 washed out the boxes in order to avoid having them being corroded. They trimmed trees in the Curley neighborhood where branches are striking the trucks when they are plowing. They repaired the broken "trip spring" on the plow blade for truck number 312. Code Enforcement Report Paul issued a permit this week to Crossroad Construction, Inc. to complete MAC Part 150 noise mitigation project at 1053 Wagon Wheel Trail (Palme resi- dence). He issued a permit to Parkos Construction to do some interior remodeling at 2455 Visitation Drive (Visitation School). He issued two permits to Deily Construction, Inc. for 1110 Centre Pointe Curve (the old GNB building) for interior and exterior remodeling pro- jects. Engineering Department The Engineering Department is currently in the process of filling out a number of surveys from different agencies and working on a number of different pro- jects. The Engineering staff has begun work on the Metropolitan Council Environmental Services survey that comes in December requiring that metro area com- munities compile and update data relative to new sanitary sewer connections, water us- age, records of individual sew- age treatment systems, and calculations of sewage flows for the past year. The Engineering Department will also begin up- dating and certifying mileage for streets in Mendota Heights at the end of the current year to comply with Minnesota Munici- pal State Aid Street reporting requirements. Engineering staff is also begun work on gathering preliminary survey data infor- mation for the Freeway Road neighborhood. Survey Equipment Lee Thompson of Contactors and Surveyors Supply (CSS) of Eagan met with Marc Mogan, Tom Knuth, and John Tran to demonstrate the operation and use of some survey equipment that the Engineering Depart- ment might be interested in us- ing for design and construction purposes on the Town Center project. The survey equipment that the Engineering Depart- ment currently uses is 1970's technology, and this new survey equipment promises to provide better accuracy in a fraction of the time. CSS will let the Engi- neering Department use the equipment on a trial basis to see if it is everything as adver- tised, and whether or not it would be something the Engi- neering Department would be interested in owning.