Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
2001
NEWS Public Works Engineering Code Enforcement LETTER Parks Report The Parks Crew attended a class this week put on by the Minnesota DNR to learn about the benefits of aerating lakes. It also informed them of how to safely operate the City's aerator at Roger's Lake. The contractor completed recon- structing the Marie Avenue hockey rink this week —the guys inspected the work and tested the lights. Utility Report Rich checked the City's seven sanitary lift stations daily. Rich uncovered and raised a sanitary sewer manhole that had been buried three feet by a resident when grading their back yard. He flushed the sanitary sewer line that ser- vices the Bloomington Lake Clinic. They had been doing some repair work and in- formed us that a piece of de- bris had gotten away from them and entered the City's line. Street Report Because of the mild winter weather, the Street Crew has been able to work on repairing snowplow damage (mailboxes and yards). They cleaned out a drainage ditch and chipped some trees that were downed in Roger's Lake Park and Wen- tworth Park. They put cold mix in some potholes. The Pipeline December 14, 2001 Code Enforcement Report Paul issued a permit this week to Dick Bjorklund Construction for a 2 story home to be con- structed at 1849 Orchard Hill. This is the last lot of Swanson's 2nd Addition to be developed. He issued a permit to Metro Sign Service to install a new sigh at Ecolab identifying their new entrance. Marie Avenue Project The thirty -day period for the prepayment of special assess- ments for the Marie Avenue Mill and Overlay project expired on December 6th. Ten property owners elected to pay off these special assessments with- out interest during this prepayment period. The City certified the remaining sixteen special assess- ments with Dakota County on Friday December 7th, and these special assess- ments will be added to the property owner's property taxes beginning in 2002. Storm Water Proiects Fischer's Landscaping, Inc. put the finishing touches on two small separate storm water projects. Both projects were located within the Copperfield de- velopment. The first pro- ject completed was at 562 Stone Road near the inter- section of Stone Road and Copperfield Drive. The storm drainage system was extended from this intersection and inlets were installed in the easement area to capture runoff from a rear yard drainage swale before it runs onto the sidewalk and freezes in this type of weather. Provisions were made for the resident whose property abuts this work to connect their sump pump discharge line to this sys- tem as well. The second pro- ject was completed at the inter- section of Bent Tree Lane and Huber Drive. The storm drain- age system was extended to add an inlet in the gutter line at this location in order to drain this intersection more effec- tively. Cofferdam for 35E bridge NEWS Public Works Engineering Code Enforcement LETTER Parks Report The Parks crew picked up the trash daily. They replaced lamps for the lights in hockey rinks at Friendly Hills and Wentworth parks, and repaired light fixtures at the Rogers Lake and Friendly Hills parks. The also attended the Minne- sota Turf and Grounds Founda- tion Conference and Trade - show. They attended workshop sessions on turf and sports turf management, safety in the workplace, and tree care. Utility Report Rich checked the City's seven sanitary sewer lift stations daily. Rich responded to a sanitary sewer station alarm at the Culligan lift station on Sat- urday morning at 9:30 AM. A power surge set off the alarm that he was able to clear quickly upon arrival. Monday morning he discovered that the operation times of the two lift station pumps were signifi- cantly different at the Lilydale lift station. Rich and Braun Pump removed the pump that was running longer and found that the pump was obstructed by a piece of wood and some rope. He was alerted of a lift station alarm at the Mendota Heights Road lift station on Wednesday at 9:45 AM when Xcel Energy lost power in that area. After the power was re- stored he discovered that the switch controlling the backup generator was not working. Ziegler was called out to inves- tigate the problem and they ordered a replacement switch. The Pipeline December 7, 2001 This switch will activate the backup power generator when it senses that Xcel Energy elec- tric service is out, and then shut the generator off when electric service has been re- stored. Rich also observed two sanitary sewer service connec- tion installations at 2219 and 2221 Lake Augusta Drive. Street Report The Street crew trimmed trees in Bunker Hills and other iso- lated locations. They cleaned off bridge decks on Mendota Heights Road and Wagon Wheel Trail and cleaned some catchbasins throughout the City. They worked with Total Electric replacing burned out lamps and ballasts on street- lights. They repaired a broken outrigger on a tractor. They removed the remains of the fifth deer killed by a car in the City since Thanksgiving from a location near Hilltop and Dodd Road. Code Enforcement Report Paul issued a permit to Rosewood Con- struction this week to do some interior re- modeling to the GNB Building (1110 Centre Pointe Curve). He is- sued a permit to Sign-Arama to con- struct a monument sign for TA) Technol- ogy at 1108 North- land Drive. He also issued the permits to LeRoy Signs for Brown Institute to change their name to Brown College. Hoffman Homes was issued a permit for one more building (2 units) 2154 and 2158 LeMay Lake Drive. Water Main Break Thursday afternoon a water main break occurred in the Freeway Road neighborhood on the 8-inch cast iron water main pipe in the vicinity of 667 South Freeway Road. St. Paul Re- gional Water Service repair crews were on -site late Thurs- day afternoon and apparently were able to finish the repairs before Friday morning. Valley Trail Bridge Veit and Company, Inc. placed the pedestrian bridge over Val- ley Creek last week (see photo) after first transporting it ap- proximately one-half mile from the location where the bridge manufacturer, Wheeler Consoli- dated, had delivered it previ- ously in the vicinity of the Val- ley Park Trail and Lilydale Road. Setting the Valley Trail Bridge NEWS Public Works Engineering Code Enforcement LETTER Parks Report The Parks Crew picked up trash daily from the parks. The Parks Crew also plowed their cul-de-sacs on Tuesday. They had to cut up and re- move two trees that had fallen down across pedways in Valley Park and Wentworth Park from the heavy, wet snow. They serviced the ice skating warming houses' fur- naces and lit the pilot lights to prepare them to be opened. They brought out the hoses and hydrant fit- tings to prepare for flooding the rinks. Utility Report Rich checked the City's seven sanitary lift stations daily. Rich plows the north end streets with one of the large main line trucks so he was busy sanding slippery spots up there on Monday and he plowed on Tuesday. He also plowed out all of his lift sta- tion site driveways and park- ing lots on Wednesday. He performed a sanitary sewer inspection for the line at 765 Creek Avenue on Wednes- day. (The homeowners' sewer line was packed with roots and Roto Rooter broke their equipment off in the line trying to remove them. They had to dig it up to re- trieve their equipment in the line). He flushed the City's main line to clean it after Roto Rooter was finished. The Polpefine November 30, 2001 SNOW EVENTS OF THE WEEK Date: Action: 11/26 Sand and scrape main roads 11/27 Plow all areas 11/28 Cleanup and sand slippery areas Street Report The deer are rutting now and therefore are running amuck —the Street Crew has had to dispose of four car killed deer this week. The Crew plowed streets for the first time this year —they only had one minor breakdown while they were plowing. They began plowing at mid- night on Monday and were ba- sically done by 9:00 A.M. on Tuesday morning. The first snowfall usually results in a large number of complaints, however there were very few this time (the majority of those, were people who got "all the snow in their drive- ways"). Amount: rain turning to snow Traffic Count Up- date The School 4"+ of the Visi- tation was having traf- fic problems associated with school opening this fall, and they contacted the City for help. We contacted MnDOT and they observed the Mendota Heights Road/Dodd Road intersection during rush hour and were able to make some adjustments to their traffic signals to help out. We installed some new warning signs on Mendota Heights Road, and the police were there during rush hour to help direct traffic when needed. We also had SEH recount the traffic to see what traffic in- creases occurred as a result of school opening: TRAFFIC COUNTS Summer Count Fall Count (ADT) (ADT) Mendota Heights Road West ofTH149 3611 5701 Mendota Heights Road West of Lake Drive 3244 3998 Visitation Drive 2265 Minnesota Department of Transportation Metropolitan Division Waters Edge 1500 West County Road 132 Roseville, MN 55113 November 26, 2001 Mr. Jim Danielson Mendota Heights City Engineer 1101 Victoria Curve Menodta Heights, MN 55118-4167 Subject: SP 8825-62 Paint Traffic Control Signal Systems Dear Mr. Danielson: Telephone No. 651.634.2395 Facsimile No. 651.634.2085 E-mail: jim.wiczek@dot.state.mn.us For your information, the Minnesota Department of Transportation has let a project to paint traffic control signal systems within the Metro Division. Included in this contract are the signal systems at the intersection of TH 55 and TH 13, at the intersection of TH 35E (East and West Ramps) and TH 110 and at the intersection of TH 494 (North Ramps) and TH 149/Dodd Road in Mendota Heights. The work will begin as soon as the weather permits, in the spring of 2002. If you have any questions please call me. Sincerely, Minnesota Department of Transportation ,James E. Wiczek Metro Division Signal Design Project Manager c: Bev Farraher - WE FY1 An equal opportunity employer NEWS Public Works Engineering Code Enforcement LETTER Parks Report The Parks Crew picked up trash daily from the parks. They cut grass and put dirt dams around the edges of the ice hockey rinks to pre- pare them for flooding this winter (the hockey rinks are located at Wentworth, Marie and Friendly Hills parks). They did some landscape work around the newly in- stalled handicapped acces- sible walkway to the Marie Park play equipment. They transported the lake aerator to Rogers Lake Park to be- gin setting it up for aerating the lake this winter. Utility Report Rich checked the City's seven sanitary sewer lift stations daily. He repainted several fire hydrants on Marie Avenue. He helped Lilydale repair a broken manhole casting on Lexing- ton Avenue (located a con- tractor to the work). Street Report The Street Crew was able to pick up the City's wood chipper that had to have a new diesel engine installed because the first one was ruined after it "ran away" November 23, 2001 last summer. The new en- gine was furnished free of charge because the chipper was still under warrantee. They worked on setting up the plow trucks for winter (hopefully they are not needed anytime soon). They replaced some missing and downed street signs. Stop Signs City staff continues to get stop sign requests all the time. Most of the requests are for slowing speeding traffic. Attached is a re- search report sent to me re- cently by MnDOT addressing stop and yield signs. Town Center Update MnDOT has issued Mendota Heights a permit for tempo- rary drilling and soil sam- pling activities on MnDOT right-of-way associated with the environmental investiga- tion of the fuel tanks on the Oasis Market site and the dry cleaning fluid from Tom Thumb Market that is being conducted by ProTec Envi- ronmental Consultants, Inc. on the Town Center Project. The first phase of soil sam- pling work will commence on Monday and soils samples will be sent to the lab for testing by Wednesday. The Analysis and results of these soil test samples should be completed by the end of the week. ProTec Environ- mental Consultants, Inc. plans to submit their find- ings to the Minnesota Pollu- tion Control Agency the week of December 3rd and if everything is acceptable Oa- sis plans on beginning tank removal later in the week. Valley Trail Bridge Update Delivery of the Wheeler Con- solidated manufactured pe- destrian bridge is expected to take place on Monday No- vember 26th. Veit and Company has the responsi- bility of transporting the 30 foot long manufactured pe- destrian bridge to its' loca- tion on the Valley Park Trail and securing it to the con- crete footings that they in- stalled last month. The pe- destrian trail over the creek should be open to the public again sometime early next week. „ * OESOT a° 4 or TAB TECHNOLOGY R E S E A R C H A N D KNOWLEDGE Traffic engineers introduced the yield sign because they felt a less restrictive sign would improve driver compliance with the remaining stop signs. News o©o0000 Number 22, June 2001 Do Stop Signs Work? Yes. No. May Be. It Depends Research results provide insight into options for traffic engineers who struggle with stop sign installation decsions When an accident occurs at an intersection, the solution of a stop sign often comes to mind. But does a stop sign offer the best,solution in every case? Traffic engineers struggle with the decision to install or not to install stop signs on a daily basis. They turn to traffic control manuals and other information for their decisions. The results of research also provide insight into options. This report presents findings from a literature review about studies on stop sign violations and the related safety of an intersection or roadway. Motorist behavior makes a difference Legal stop sign compliance requires the motorist to come to a complete stop. However, rolling stops are very common at intersections with stop signs. In some instances, complete disregard for the stop sign occurs. Studies from as far back as the 1930s indicate that more than 50 percent of motorists fail to voluntarily come to a complete stop at stop signs. Many drivers do not stop fully. Others do not slow down much if they see light traffic or do not see a police officer. The table on the next page summarizes eight studies of stop sign compliance from 1931 through 1981. Although studies used different methodologies, the conclusion of signficant non-compliance remains a consistent finding. Drivers obey or ignore traffic controls based on two perceptions: How they view the reasonable- ness of the traffic control and how they view the possibility of getting caught violating the traffic control. Because not stopping gives the motorist less time to determine the safety of the situation, theoretically non -compliant behavior could lead to an increased chance for accidents. Although certain personality traits may lead to non-compliance with traffic controls, driver groups with those characteristics do not necessarily have more crashes. Can the yield sign save the day? Traffic engineers introduced the yield sign because they felt a less restrictive sign would improve driver compliance with the remaining stop signs. Researchers conducted several studies throughout the United States to determine the impact of replacing stop signs with yield signs and found several common themes. Accidents • Annual crash rate experience decreased significantly after installing a yield sign --at least temporarily. For one to two years after installation, the crash rate rises to some level below that existing for the uncontrolled intersection. Mail Stop 330, John Ireland Boulevard, St. Paul, Minnesota 55155 • As mainline roadway volume increases, the total violations decrease. Full non-compliance statisti- cally relates to major roadway volume and follows the same trend as total violations. The partial non- compliance rate is twice the full non-compliance rate. • The most visible decline in violations occurred at the levels of 2,000 and 5,000 ADT. The total non- compliance rate stabilizes in the lower volume range at approximately 75 percent, which means 25 percent of drivers accept stop signs at face value, and drops below 50 percent in the higher volume range, which means 50 percent of drivers accept stop signs at face value. • Minor roadway sight distance impacted the total non-compliance rate significantly. Total violations were higher at intersections with unrestricted sight distance and lower at locations with restricted sight distance. • For both restricted and unrestricted sight distance, the total violation rate decreased as major road- way volume increased. At intersections with restricted sight distance and volumes near the 2,000 ADT level, the compliance rate increased by up to 20 percent and by 10 percent at intersections near the 5,000 ADT level. The study did not succeed in determining if an increased violation rate resulted in an increase in accidents for the intersections. But it did lend support to some interesting conclusions about driver behavior and safety. For example, on low -volume intersections with volumes near 2,000 ADT on the major roadway, drivers may tend to ignore the presence of stop signs with no detriment to safety. In the middle of the volume range (2,000-5,000 ADT), drivers need more information about the possibility of conflicting traffic, but again, the violation rate shows that not all roadway vehicles need the control of a stop sign. Accident experience at these volumes does not necessarily warrant stop control; yield signing may be a more meaningful and warranted control. Each situation requires a fresh look at options The problem of driver compliance with stop signs is not a new one. The yield sign was introduced to protect the integrity of the stop sign. Several studies indicate successful implementation of less traffic control in lieu of stop signs. But only a limited number of unwarrranted stop signs have been removed and replaced with no control or yield control, perhaps reflecting pressure to use stop signs as a NEWS Public Works Engineering The Pipeline Code Enforcement LETTER November 16, 2001 Parks Report The Parks Crew picked up trash daily and cut up leaves that were gathered from the City parks. The soccer fields at Kensington Park were top dressed with a mixture of sand, compost and soil. Top dressing fills in small depressions and maintains the crown of the field so that storm water drains off the fields. The ball fields at Hagstrom-King and Victoria Highland Parks were fine graded. The Parks Crew also worked on equipment maintenance. The groundmaster mower (capable of cutting up to a sixteen foot wide swath of grass) was fitted with a six foot wide snow thrower attachment for use on the trails and at the skating rinks. One of the smaller riding mowers was fitted with a broom attachment that is pri- marily used at the skating rinks. Plows were made ready to be attached to the pick-up and one ton trucks. These smaller plowing units are used to first clear the cul-de-sac ar- eas and then the trails and skating rink parking lots. Utility Renort Rich checks the City's seven sewer lift stations daily. He re- views the run logs of the pumps and performs periodic maintenance. Rich also main- tains the landscape materials (trees, shrubs, turf) around each lift station and clears snow so that access to each station is maintained. Each of the lift stations mechanical and electrical functions are moni- tored. When problems or power outages occur the monitoring alarm company notifies Rich or the Dispatch office in West St. Paul. Rich also had two new sewer in- spections at the Augusta Shores townhome development and used the jetter to clean the sewer lines on Marie Avenue from Dodd Road to Lexington Avenue. Street Report The Street Crew picked up and stockpiled asphalt "cold -mix" for patching potholes during the winter months. The potholes are then permanently repaired in the spring or early summer. The Street Crew was dispatched to Mendota Heights Road to pick up trash that had fallen out of a garbage/trash truck. Trees were trimmed in the area of Callahan Place, Kressin Avenue and Friendly Hills. They also straightened out several signs posts and replaced sign faces that were faded or damaged. Valley Bridge Update The bridge to replace the washed out culverts in Valley Park will be delivered on No- vember 26th and moved into place soon after. Concrete foot- ings are in place. Once the bridge is in place the trail will be temporarily repaired with gravel. Next summer perma- nent asphalt surfacing will be in stalled and the trail segment from the bridge up the hill to the Park Place development will receive an asphalt overlay. Town Center Update Soil borings have been sched- uled to begin next Wednesday to test the soil for grading and design purposes in the vicinity of the Senior Housing site of the Town Center Development. Also included is an exhibit showing the location of the petroleum transmission line on the site. Stone Bridge Update Curb and Gutter and pavement that will ultimately serve the re- tail area of the Stone Bridge De- velopment in Lilydale was con- structed this week and this area is close to Highway 13. 10 Point Buck Spotted A big 10 point buck was spotted on the Public Works grounds earlier this week as it trotted across the front of the Public Works Garage and then headed towards the new townhomes and made its way down Lexing- ton Avenue towards the R.J. Ryan building. Personnel News Jim returned this week from a week long vacation to Las Vegas and is gone again for two days (Thursday and Friday) for a Mu- nicipal Public Works Association conference at the Earl Brown Center in Brooklyn Center. Tom Knuth leaves next week for a long vacation with other fam- ily members on Maui in Hawaii. k—) NEWS Public Works Engineering Code Enforcement LETTER Parks Report The Parks Crew picked up trash daily and cut up leaves that were gathered from the City parks. They performed service maintenance on the small engines. With the help of the Street Crew they re- moved dead shrubs at Ken- sington Park and restored the areas where the plants were removed with topsoil and seed. Some time back the Parks Crew hauled in and placed rec rock on the Hag- strom-King and Victoria High- lands ballpark infields from St. Thomas Academy. They re- turned to the parks to level these surfaces after giving the aggregate some time to settle. Utility Relzort Rich checked the City's seven sanitary lift stations daily. Over the weekend Blooming- ton Lake Clinic had problems with some rags obstructing their sanitary sewer service line. Rich jetted the sanitary sewer line in front of the clinic to remove this obstruction. Rich performed sewer inspec- tions for two new houses at 913 Carmen Lane, 1085 Mary Adele Avenue. He also in- spected the Marie Avenue sew- ers with Ace Blacktop who has the responsibility to insure that the sanitary sewer line was clear upon completion of the Marie Avenue Mill and Overlay Project. Some sand and con- crete was discovered in this sanitary sewer line during this il i t! Ah F =9 inspection that was subsequently removed by the Contractor. He jetted the sani- tary sewer line in the sanitary easement area between Mary Adele Avenue and William Court in the Curley Ad- dition neighbor- hood. Street Report The Street Crew disposed of ashes and debris remaining from the Halloween Bonfire at the Men- dota Plaza. They installed identification posts at locations of key street catch basins for the purpose of making them easier to locate in the event they do not drain and require maintenance to clear them to prevent street flooding during the winter months. They cleaned out storm drain outlets that discharge to open water along Huber Drive and Rogers Lake. They removed a dead boulevard tree at 717 Na- vajo Lane and backfilled it with dirt and seed. They also swept up glass in the street on Mendota Heights Road and Whitfield Drive that proba- bly fell off of one of garbage re- cycling trucks. They brought seasonal equipment to the wa- ter tower for winter storage. November 8, 2001 Rogers Lake Fisherman on Open Water on 11-7-01 FYI: You could have fished on Rogers Lake under similar con- ditions last year on this date, but by November 14 Public Works had sanded the streets for the first time and on No- vember 16 they plowed snow on all City streets. Code Enforcement Code enforcement has issued a building permit for construction of another twin -unit townhouse building at 2131 and 2137 Lake Augusta Drive in the Augusta Shores development. This per- mit will bring the total number of units that are either occupied or under construction to 26. It won't be long until the remain- ing 20 units are built at this current pace. Code enforcement also issued a permit for interior alterations estimated at $75K at the Go- pher State One Call offices at 2020 Centre Point Boulevard. NEWS Public Works The Pipeline Engineering Code Enforcement LETTER November 2, 2001 Parks Report The Parks Crew picked up trash daily from the parks, cut grass and removed leaves where needed. They contin- ued to apply a fall application of fertilizer in the parks. They removed and brought in for storage, all the tennis nets and locked the gates to the courts. They began attaching plows to their trucks for winter snow plowing (they do the cul-de- sacs, trails and parking lots). They removed large rocks at the Marie Park hockey rink — the ones unearthed by the fence contractor when the holes for the posts were being augured. Utility Report Rich checked the City's seven sanitary sewer lift stations daily. He performed an in- spection at 710 Evergreen Knolls for a new connection to the sanitary sewer. He worked with Pipe Services (a private contractor) to vacuum out all the sand from the sanitary sewer lines near the Su- perAmerica on Lexington Ave- nue. The vacuum removed 7 CU. yards of sand (1-1/2 dump truck loads). We will work with SuperAmerica to try to prevent all this sand from entering the sanitary sewer in the future. He and George Noack worked together to un- cover a buried manhole in the Curley Addition. Street Report The Street Crew continued pre- paring for winter by removing the "hot box" from one of the plow trucks. (The hot box is used to keep pothole patching material hot during patching operations). They then mounted the sanders and wings on three of the plow trucks. They cut up two trees that were downed as a result of last weeks wind storm. They re- placed some missing signs and fixed the street lights that were out in the Industrial Park. The Crew responded to some pothole complaints on Mayfield Heights Road and the Kay and Walsh Streets areas. They pushed up the brush pile for the Halloween bonfire and extinguished it the af- ternoon the next day. They will let the pile cool down over the weekend and then dispose of it on Monday. Marie Avenue Hockey Rink This week Mid -Northern Electric completed install- ing the poles and lights for the relocated hockey rink. Six twenty-five foot poles (same height as the old wood poles) were installed with eight light heads (two illuminate the free skating rinks and six the hockey rink). All of the electrical wiring was placed under- ground which makes the site look clean and open. Also, on Wednesday, Keller Residential Fencing began installation of new hockey boards and posts. A majority of the posts were in- stalled (8 ft. on center) and the boards will follow within the next week or two. The raw boards will be painted white by our Public Works Crew next summer or this fall, weather permitting. Watermain Break On Thursday afternoon, St. Paul Water Utility repaired a 6" cast iron watermain at 667 First Avenue. This area has some of the oldest watermain in the City. St. Paul Water Utility will patch the street next week. Valley Park Pedestrian Bridge Abutment NEWS Public WorksEngineering The Pipeline Code Enforcement LETTER October 26, 2001 Parks Report The Parks Crew picked up trash daily from the parks and cut grass in the parks and along the ped- ways this week. They brought in the soccer goals from the parks for winter storage. Several of the goals are damaged and require repairs. They finished trimming the shrubs around all the park signs. They began fall fertilizing, cleaned up and put away summer use equipment in the base of the water tower for storage. They cleaned out the storage rooms at the Kensington and Mendakota comfort stations all in preparation for winter. Utility Report Rich checked the City's seven sanitary sewer lift stations daily. He performed an inspection for a new sanitary sewer connection for a home being constructed on Sibley Court. He met with Delta Environmental to determine how to shut off a venting fan that they have installed on one of our sani- tary sewer manholes by the Su- perAmerica station located on Lexington Avenue. The fan was put in place because the manhole needs to be vented of gas fumes. The entire area around Su- perAmerica was contaminated by leaking tanks from S.O.S. (the previous station), and Delta is still working to clean it up. Rich needs to shut the fan off and enter the manhole to clean the line. Street Report The Street Crew pushed up the Halloween bonfire pile on an as needed basis —the residents have been very cooperative this year and not put in alot of logs too large to burn or trash. The Crew worked on patching around man- hole covers that were protruding too high and could be hit by the plows this winter. They cleaned up the leftover dirt and debris that re- mained from last weekends land- scaping work at the Fire Station. They hauled some street sweeping sand to be used for backfill at the new pedestrian bridge being in- stalled in Valley Park. Code Enforcement Report Paul issued a building permit this week to United Properties Con- struction Company for a tenant to expand their space at 2520 Pilot Knob Road. The tenant, Anacomp Company, is preparing to occupy an additional 12,000 square feet of space. Hoffman Homes was issued a per- mit to start construction on one more of their two unit townhouse buildings (2138 and 2142) Lake Augusta Drive. They have now been issued permits for 24 units which leaves 22 more units re- maining to be constructed. Paul also issued a permit to Law- rence Sign Company to construct two replacement monument along Lexington Avenue for the GNB building. Marie Avenue Mill and Overlay Pro- ject This week the con- tractor was able to complete the paving of a small area of Marie Avenue near Dodd Road and the small area of bitumi- nous overlay on a signs segment of the pedestrian trail ad- jacent to the Marie Avenue bridge. Still needed to be completed is the pavement striping. Hohenstein Residence-1898 Dodd Road Demolition of the house and ga- rage began at 7:30 A.M. on Tues- day and both were reduced to a pile of rubble by 8:00 A.M. It took the remainder of the day to re- move the rubble and concrete foundations. Serious demolition of the large, well constructed con- crete storage building began on Wednesday morning with the final debris and concrete footings hauled from the site by noon Thursday. Two "surprises" occurred during the removal operations. A tractor backhoe had to be brought on site to remove the seven foot by seven foot by thirteen foot deep concrete well pit and a buried one thousand gallon fuel oil tank was unearthed on the north side of the house. Tests of the sludge in the tank and surrounding soil were taken by Pro Tec Environmental prior to removal of the tank, which was then trans- ported to a disposal yard. Demolition of the Hohenstein Residence Public Works Engineering Code Enforcement LETTER Parks Report The Parks Crew picked up trash daily from the parks. They also dragged and chalked fields and striped soccer lines on an as needed basis. The Parks Crew finished aerating the neighbor- hood parks ballfields and soccer fields this week. St. Thomas Academy has a stu- dent whose father owns Bryant Rock Products —they produce and sell rec rock so he donated all new rec rock to the school. (Bryant rec rock is red colored). The school volunteered to donate all their existing rec rock to the City if we would remove it. We re- moved it this week and used it to improve the ballfields at Hastrom King and Victoria Highlands Parks. The Crew started blowing out the lawn sprinkler systems at Menda- kota and Kensington Parks this week. Street Report The Street Crew relocated the Overlook and Lexington Avenue street sign this week to improve its visibility. They installed the Halloween Bonfire dumping signs. They hauled street sweeping sand to Marie Park to be used for back - fill at the hockey rink improve- ments that are currently under- way and assisted the Parks Crew in removing the rec rock that was given to the City by St. Thomas Academy. They patched potholes in the Industrial Park. Utility Report Rich checked the City's seven sanitary sewer lift stations daily. Rich and his helper jetted the fol- lowing sanitary sewer lines clean . Ah • October 12, 2001 this week: Mary Adele Avenue, Patricia Street, Theresa Street, Tom Thumb Boulevard and Lexing- ton Avenue near the SuperAmerica Station. He found the line from SuperAmerica to be 1/2 full of sand (probably from the car wash). He scheduled a private company to come in and vacuum out that line. Rich is going to pursue with Met Council Environmental Services and SuperAmerica a solution to try and prevent all this sand from en- tering our sewer lines. Lighting Up In Marie Park, installation of con- crete light pole bases began on Wednesday. Six new metal poles, mounted on concrete bases are to be installed that will replace the six lights, mounted on telephone poles that were removed when improve- ments to the hockey rink began early this summer. The rink has been re -graded, by the Public Works Department, so that its new location will be fifteen feet east and north of its original position. This will allow additional room outside the rink boards for snow storage and easier sum- mer mainte- nance. Code Enforce- ment Report Paul issued a building permit this week to John B. Mahoney Construction for a new single family one-story walkout home to be built at 1085 Mary Adele Ave- nue. Marie Avenue Mill and Overlay Proiect This week PCI, a subcontractor of Ace Blacktop, Inc., worked on the north side of the bridge centerline to remove and replace the expan- sion joint assemblies in the west- bound lane of Marie Avenue be- tween Trail Road and Sutton Lane. Slurry Seal Struck and Irwin Paving, Inc. re- turned to the City this week to make repairs to the area damaged by a garbage truck. The truck drove on Wesley Court after it was reopened to traffic the day after the contractor applied the slurry seal and caused damage by turning his wheels sharply. Valley Trail Bridge This week Veit & Company, Inc. started working on the foundations to support the new bridge to be in- stalled for Valley Trail (see picture below). Valley Trail Bridge Foundation NEWS Public Works Engineering Code Enforcement LETTER Parks Report The Parks Crew picked up trash daily from the parks, dragged and chalked fields and striped foul lines on an as needed basis. The Crew aerated all the soccer fields and ballfields at Mendakota Park this week and repaired lawn sprin- kler heads at Kensington Park. Utility Report Rich checked the City's seven sanitary sewer lift stations daily. Rich cleaned sanitary sewer lines by Lloyd's Meats, South Plaza Drive, and the easement area by South Plaza Drive all this week. He performed sewer inspections for sanitary sewer connections at Augusta Shores, Orchard Hill Court and the new Resurrection Cemetery administration offices. Street Report The Street Crew worked on patch- ing some holes this week, hauled some street sweepings to Marie Park to be used for fill and —oh no, started working on converting the trucks for winter snow plowing (see attached almanac warning about a snowy winter). Happy Trails Bituminous trails/pathways were installed on Thursday in Roger's Lake Park and Marie Park. The Roger's Lake path connected the fishing pier, installed by the DNR, to the existing path that leads to the picnic shelter. As part of the cooperative agreement with the DNR, the City agreed to install an accessible path connecting the fishing pier to a parking area. An existing path led from the parking lot/cul-de-sac to the picnic shel- ter. The new path extends from itm October 5, 2001 the pier to this existing pathway. In Marie Park, a bituminous path was installed from the parking lot to the doors of the warming house. A second path was installed along the west side of the play area tim- ber edging. This new segment will lead to a future rubberized accessi- ble surface material, to be installed inside the timber board, to an ac- cessible transfer point platform that is part of the new play compo- nents installed last summer. Slurry Seal The Engineering Department has made arrangements to have Struck and Irwin Paving, Inc. return to Mendota Heights to make repairs to the areas damaged by a gar- bage hauler that drove on Wesley Court after the cul-de-sac was re- opened to traffic the day after the Contractor applied the slurry seal. Struck and Irwin Paving, Inc. has tentatively planned to complete this work on Monday October 8th weather permitting. Suburban Dakota County Greenway Project Guy Kullander and Marc Mogan at- tended a meeting on Wednesday at City Hall with the advisory group of the Suburban Dakota County Greenway Project (see attached handout). This is a grant -funded study that will identify natural ar- eas and prioritize restoration ef- forts in greenway corridors in the suburban areas of Dakota County. This study will offer information and education to landowners rela- tive to the impact they can have in preserving, protecting, and restor- ing natural areas in these green - way corridors. The results of this project will hopefully develop into an implementation program that will fund natural resource preser- vation or restoration projects with willing landowners. Marie Avenue Mill and Overlay Project PCI, a subcontractor on the Marie Avenue paving project to Ace Blacktop, Inc., began work this week removing and replacing two expansion joint assemblies (see photo) south of centerline on the bridge structure located on Marie Avenue between Trail Road and Sutton Lane. They placed concrete around the two new expansion joints assemblies on Wednesday that were installed to replace the original expansion joints on the bridge that had deteriorated over the years. Next week PCI will switch over to work on the north side of the bridge centerline to re- move and replace the expansion joint assemblies in the westbound lane. Marie Avenue Bridge Expansion Joint T [� tES Vl m�uco a`>�m�� o w o m `noyN O �,� _`O, cc fn 25 o o o�-o O a c N (� 3mm 300 0Wo LL. CL Z cc5 00 N X `�' fiEmCN)�3�jNLd N: LLd 93mS ,-i of ai4 A'A A Boa N F ro K ti W ry ca e� w c� S .0 , C M. or n 7 oCU ^.0 :Q C� W ca q `�j H • .n c� U'O cn a.o o•o pq .., Gu'�,�i ��Q.r Zy�°'.n -E-!,y •aa•�•�y.�"�i m a>i��o��a�i 676m3..o . a a o o3u 2aC 8 -2 V C O, U W ro O u J 5 Co �_ o� doV iOo���roo+'�ooym o- h m .7 'Sno � "gz ti o o �v o•o c5� N.a o o;.'? o bn $ c .a � .?, >, `° •� now w ro �.; a•°i c�. a�i .. ,r�l- p,.'• U �, w , TJ iso«: for.. aiA OU s... NE"a�a o>ro�vn, o s ro c G s> mov�.0 ¢ 22 E3000Y aa� o -o•� Dakota Suburban Restoring the 6reen Corridor The Suburban Dakota County Greenway Project will identify quality natural areas, prioritize restoration efforts, and empower landowners to create and enhance a viable suburban greenway corridor in northern Dakota County. Why is this area important? Detailed natural resource inventories recently identified multiple potential green corridors that can provide a natural, ecological connection between Lilydale Regional Park, Eagan's Lebanon Hills, Dodge Nature Center in Sunfish Lake and West Saint Paul, Marcott Lakes in Inver Grove Heights, and the Pine Bend Bluffs on the Mississippi River. Once protected and enhanced, these green corridors can provide tremendous wildlife habitat and create a continuous green pathway across the county. What are the project objectives? • Focus on an ecologically -based corridor. • Work with local units of government to protect and enhance the greenway. • Partner with landowners • Enhance and focus ongoing greenway and open space planning efforts. How will we meet these objectives? • Use recently completed land cover data to analyze the greenway. • Gain input from a citizen advisory committee. • Identify and rank existing natural areas, potential restoration areas, and corridor barriers. • Develop a corridor barrier circumvention options plan. • Determine optimal natural community types for high-ranking restoration areas. • Conduct greenway design workshops. • Work with landowners to design and implement preservation plans. Who are the project partners? Landowners • Cities of Lilydale, Mendota Hts, W. St. Paul, Sunfish Lake, Inver Grove Heights, Eagan, and Rosemount • South Robert Trail Neighborhood Association • Dakota County Soil and Water Conservation District • Dakota County • Friends of the Mississippi River • Critical Connections • DNR Questions? Call Jay Riggs, Dakota SWCD's Urban Conservationist, at 651.480.7779 • Funded in Part by a DNR Greenway Grant NEWS Public Works Engineering Code Enforcement WIFEW4 ohm Parks Reoort The Parks Crew picked up trash daily from the parks. They also worked with the MNDNR to remove weeds from the new plantings along Rogers Lake in the Park. They had to replace some boards that were vandalized on the Rogers Lake dock. They trimmed some trees at Mendakota Park and while chipping them the diesel engine on the new chipper went out of con- trol and destroyed the engine. The chipper is still under warranty and the engine will be replaced at no cost to the City. They hauled fill to level some low areas in Friendly Hill Park, leveled and seeded it. Street Report The Street Crew continued to do repairs to the Public Works Garage parking lot. They patched potholes on Mendota Heights Road and at the City Hall parking lot. They contacted salt suppliers to make arrangements for street salt this winter and discovered the price of salt has almost doubled, it was $26 a ton last winter and is $50 a ton this year. Utility Report Rich checked the City's seven sani- tary sewer lift stations daily. He worked with Braun Pump to per- form a thorough annual service check on all the City's lift stations this week. LMCIT asks that we do this and document its completion for insurance purposes (if a pump malfunctions it will not be as a re- sult of oversight). He cleaned sanitary sewer lines this week where we have known root prob- lems: Dodd Road and 4th Avenue, Callahan Place, Walsh Lane, Victo- ria Road and the easement be- tween Cheri Lane and Wagon Wheel Trail. He also applied a root killer in the lines at the same time. The Pipeline September 28, 2001 Code Enforcement Report Paul issued a permit this week to Hoffman Homes Construction to start construction on their next set of townhomes at 2119 and 2125 Lake Augusta Drive. He also issued a permit this week to Mike Laughlin to begin remodeling the home lo- cated at 2535 Condon Court for the Haven Chemical Health Systems to operate a treatment facility for chemically dependent females. He issued a permit to Builders, Inc. to begin construction of their new of- fice headquarters for Catholic Cemeteries to be located by the main entrance on Resurrection Cemetery property. He issued a permit to William Huttner Construc- tion, Inc. to reconstruct the Dennis Brown residence on Diane Road, that home was destroyed by fire this summer. He issued a permit to Dick Bjorklund Construction to con- struct a pool house for the lessens who recently received a Conditional Use Permit from the City Council to construct one in their back yard at 869 Bluff Circle. Marie Avenue Mill and Overlap Proiect Last Friday Ace Blacktop, Inc. placed much of the bituminous planned for the Marie Avenue pro- ject between Lexington Avenue and the I-35 Bridge. They finished pav- ing the section of Marie Avenue from the I-35 Bridge to Wachtler Avenue on Wednesday. The Con- tractor will finish the segment be- tween Wachtler Avenue and Dodd Road after the concrete and joint seal repair work is completed on the Marie Avenue Bridge section. This bridge repair work should be start- ing shortly. Slurry Seal Struck and Irwin Paving, Inc. ar- rived in Mendota Heights on Monday and began slurry seal application work on the streets and pedestrian trails that were planned for this bi- tuminous surface maintenance treatment. They finished work on all of the streets but ran out of the material needed to finish all of the planned bituminous trail work when they left Mendota Heights Tuesday afternoon. The wheel tracks of a garbage truck that drove on Wesley Court damaged the slurry seal ma- terial that was applied to the street surface after the street was opened up for traffic again. Valley Trail Bridge Project The Engineering Department re- ceived bids on Thursday for site preparation, completion of the con- crete foundation, and placement of the bridge in Valley Park that is cur- rently being manufactured by Wheeler Bridge in St. Louis Park. Veit, Inc. of Rogers, MN submitted the low bid for the project. The low bid was higher than anticipated in actual dollars and on this small pro- ject increased the project cost on a percentage basis significantly. The bids will be presented to Council for bid award consideration at the next Council meeting. Rogers Lake Shoreline Restora- tion Guy Kullander helped Minnesota DNR staff remove weeds that were competing with the native and aquatic plants that were planted in conjunction with the Rogers Lake Shoreline Restoration Project in Rogers Lake Park on Wednesday. The Minnesota DNR thinks that geese have eaten some of the aquatic vegetation, but overall they are pleased with the plant growth that they are seeing within the pro- ject area. NEWS Public Works Engineering Code Enforcement LETTER Parks Report The Parks Crew picked up trash daily from the parks, dragged and chalked fields and striped foul lines on an as needed basis. The Parks Crew continued trim- ming overhanging, over- grown trees in the parks this week and chipped them to dispose of them. They pre- pared the fields at Mendakota Park for the Sibley Area Women's Fast Pitch Softball tournament that was held last weekend. They also over seeded areas where the grass had died this year and they replaced sev- eral lawn sprinkler heads that were damaged by vandals (kids? tried to break the heads off). Utility Report Rich checked the City's seven sanitary sewer lift stations daily. Rich and his summer helper cleaned sanitary sew- ers this week in Fox Place, Creek Avenue, behind the old fire station, Mendakota Park and Dodd Road in this area. He replaced hydrant flag markers and raised a buried manhole cover that was lo- cated along the trail adjacent to Huber Drive. September 21, 2001 Street Report The Street Crew worked on patching potholes this week on Mendota Heights Road and Copperfield Drive. They also worked on patching the Public Works Garage parking lot in preparation for an overlay and removed brush to improve sight distance at an intersec- tion at the request of a resi- dent. Code Enforcement Report Paul issued a permit this week to Parkos Construction to con- struct an addition to the Con- vent of the Visitation School. Parkos is to complete some ADA upgrades to bathrooms and a freezer addition for the kitchen. Marie Avenue Mill and overlay Proiect Ace Blacktop, Inc. of Inver Grove Heights continued work on the Marie Avenue Mill and Overlay Paving Project this week. The Con- tractor raised gate valve boxes to the proper elevation for the placement of the bitu- minous overlay. The Contractor also milled the bituminous pave- ment in narrow strips in isolated areas that exhibited significant cracking to provide wide and deep enough area to place a bituminous patch in the surface of the pave- ment. Placement of the bi- tuminous overlay on Marie Avenue began on the west end of the project at Lexing- ton Avenue on Friday morn- ing and was to continue throughout the day. Slurry Seal Last week the City mailed residents a notice that Slurry Seal work could begin as early as Thursday, Septem- ber 20th (see attached let- ters). We have now learned that the Contractor expects to begin work on Monday September 24th, weather permitting. Struck and Irwin Paving, Inc. posted notices on the residents front doors beginning Thursday on streets where they plan to start work on Monday. a This turtle was seen wandering around the grounds of City Hall City of Mendota Heights September 13, 2001 Dear Resident: City Council has dedicated funds in the city street maintenance budget for the past several years to apply slurry seal to particular streets in Mendota Heights. Slurry seal is applied to the street surface to extend and maximize the service life of an existing structurally sound street. Public streets in the Kensington area were chosen to receive this slurry seal application under this year's maintenance program. This work could begin as early September 20th. This date may be delayed if the Contractor encounters inclement weather that postpones the completion of work on other projects. Below is a list of important details about slurry seal maintenance. Please take time to read the following points about this work. • The starting date listed above is only tentative and may be delayed. • The day before slurry seal is applied to your street you will be notified by means of a notice posted at your door. • Slurry seal operations may occur between the hours of 7:00am and 8:00pm. • Slurry seal is extremely wet when it is initially applied. It is your responsibility not to drive on this slurry seal before the street is opened for traffic: • Your street will be closed to all traffic after the slurry seal is applied, and the street will remain closed until the surface has been deemed ready for traffic. (Drying time can be up to 8 hours long or could extend overnight) • If you need to use your car during this drying period, please park it in an area of the project that is open to traffic. • Please do not turn Your vehicle's steering wheel while the vehicle is stopped, as this can cause damage to this new surface for some time after this work is finished. (FYI: This request also applies to new blacktop surfaces you encounter in the City) Your cooperation during and after this street maintenance activity is appreciated, and will help contribute to extending the service life of your street as well as improve its surface appearance. Please feel free to contact the Engineering Department if you have any questions or comments about this street maintenance activity at 651-452-1850 (M-F 8:00 am to 4:30 pm). If you have questions or comments concerning traffic access after the Contractor starts work in the City, please contact the Contractor's Superintendent RJ directly at 1-608-575-5450. Sincerely, Marc S. Mogan Civil Engineer 1101 Victoria Curve • Mendota Heights, MIN 55118 (651) 452-1850 • FAX (651) 452-8940 ffirrA&4q ilhh V GKoo I. a o�. 3 U t o - N Q I r O o ti U C-1111 C m September 13, 2001 Dear Resident: City of Mendota Heights City Council has dedicated funds in the city street maintenance budget for the past several years to apply slurry seal to particular streets in Mendota Heights. Slurry seal is applied to the street surface to extend and maximize the service life of an existing structurally sound street. Your street was chosen as one of the streets to receive this slurry seal application under this year's maintenance program. This work could begin as early September 20th. This date may be delayed if the Contractor encounters inclement weather that postpones the completion of work on other projects. Below is a list of important details about slurry seal maintenance. Please take time to read the following points about this work. • The starting date listed above is only tentative and may be delayed. • The day before slurry seal is applied to your street you will be notified by means of a notice posted at your door. • Slurry seal operations may occur between the hours of 7:00am and 8:00pm. • Slurry seal is extremely we when it is initially applied. It is your responsibility not to drive on this slurry seal before the street is opened for traffic. • Your street will be closed to all traffic after the slurry seal is applied, and the street will remain closed until the surface has been deemed ready for traffic. (Drying time can be up to 8 hours long or could extend overnight) • If you need to use your car during this drying period, please park it in an area of the project that is open to traffic. (See project area on reverse side of this notice) • Please do not turn Your vehicle's steering wheel while the vehicle is stopped, as this can cause damage to this new surface for some time after this work is finished. (FYI: This request also applies to new blacktop surfaces you encounter in the City) Your cooperation during and after this street maintenance activity is appreciated, and will help contribute to extending the service life of your street as well as improve its surface appearance. Please feel free to contact the Engineering Department if you have any questions or comments about this street maintenance activity at 651-452-1850 (M-F 8:00 am to 4:30 pm). If you have questions or comments concerning traffic access after the Contractor starts work in the City, please contact the Contractor's Superintendent RJ directly at 1-608-575-5450. Sincerely, S. 'f7%� Marc S. Mogan Civil Engineer 1101 Victoria Curve • Mendota Heights, MN 55118 (651) 452-1850 • FAX (651) 452-8940 1,2 NEWS Public Works Engineering Code Enforcement LETTER Parks Report The Parks Crew picked up trash daily from the parks, dragged and chalked fields and striped foul lines on an as needed basis. The Crew delivered extra picnic tables and trash barrels to the Friendly Hills Park for a very large block party. They trimmed trees and brush away from the pedways on Victoria Road and in Victoria Highlands Park and chipped the brush to dispose of it. Utility Report Rich checked the City's seven sanitary lift stations daily. This week he also cleaned sanitary sewers in High Pointe Road and Court, Stone Road, Glen Toro Road, Huber Drive (Delaware Avenue to Cheyenne), Hokah Avenue and Aztec Lane. Rich was called in Tuesday evening for a power outage at the Veronica Lane lift sta- tion. Power was restored to the area before he had to bring in the City's mobile generator. He installed a hy- drant marker flag and he continues to spray weeds in the parks in the early morn- ing hours (to avoid wind and park users). September 14, 2001 Street Report The Street Crew removed blacktop that was buried in the boulevard at 772 Ridge Place (by the contractor doing the street reconstruction pro- ject). The resident had complained that the street contractor had buried a large amount of blacktop and was proven right. We brought in clean black dirt to restore her yard. They ground a stump in the boulevard at 2236 Apache Street. They also patched the Public Works Garage parking lot. Code Enforcement Report Paul issued a permit this week to Dick Bjorklund Construction Company to construct a one story home with a walk out basement at 1850 Orchard Hill. There is now only one lot re- maining in this de- velopment. Marie Avenue Mill and Overlay Pro- iect Ace Blacktop, Inc. of Inver Grove Heights continued work on the Marie Avenue Mill and Over- lay Project this week. The Contractor raised manholes to the proper elevation to accom- modate the placement of the additional layer of bitu- minous pavement planned for the street, and then placed bituminous patches around these manholes. Hohenstein Property A Well Contractor sealed an abandoned well on the Hohenstein parcel on the Town Center site this Thursday in accordance with Minnesota Department of Health regulations. The steel well casing was split and then lean grout was pumped in to the well to fill the voids in the surround- ing soil to create an imper- vious barrier above the groundwater level. Preparing for the well sealing TMW Public Works Engineering Code Enforcement LETTER Parks Report The Parks Crew picked up trash daily from the parks. They also dragged and chalked fields and striped foul lines on an as needed basis. The Crew also sprayed the warning tracks and skinned areas at Wentworth and Ivy Parks with Round Up to kill the weeds. They trimmed trees and brush from along pedways and chipped the branches. They used milled bituminous from the Marie Avenue Street Overlay project to improve the driveway access and parking lot area at Rogers Lake Park. Street Report The Street Crew hauled in and spread Class 5 gravel to repair the cul-de-sac at the end of Pi- lot Knob Road. While they were there they had to remove a large tree stump that some- one had "donated" to the City. (See photo below right). They trimmed trees and bushes to improve some sight distances, they removed a stump on Apache. They worked on making replace- ment street name signs. Utility Report Rich checked the City's seven sanitary lift stations daily. Rich had to work with the alarm company, Electro Watchman, this week to solve an alarm malfunction problem at the Mendota Heights Road The Polpelmine September 7, 2001 lift station. The problem was located within the alarm com- pany's equipment. He cleaned sanitary sewers in Watersedge Terrace, Pond View Terrace, Fieldstone Drive and Court and on Copperfield Drive (found some gravel in the line and in- filtration in one manhole). Code Enforcement Report Paul issued a permit to Hoffman Homes this week to construct another pair of townhomes at 2130 and 2134 Lake Augusta Drive. He also issued a permit to Russ Hanson who is a home- owner who will be acting as his own general contractor to con- struct a new one story walkout home located at 600 Sibley Court. Finally, he issued a per- mit to R.A. Kot Homes to con- struct a two story single family home at 710 Evergreen Knoll. A permit was also issued to Arntzon and Co. Construction to complete a MAC Part 150 resi- dential air noise mitigation im- provement at 950 Lake Drive (St. Thomas Academy staff residence). Marie Avenue Mill and Overlay Pro- ject Ace Blacktop, Inc. of Inver Grove Heights continued work on the Marie Avenue Mill and Overlay Pro- ject this week. The removal and repair of the concrete curb and the gutter was completed last Friday. The Contractor milled the bitumi- nous surface along the edge of pavement adjacent to the con- crete curb and gutter this Thursday. This bituminous edge milling operation is per- formed to provide the depth necessary for the placement of the additional bituminous layer near the curb when the existing street surface is paved. The next task on the project will be to patch those areas in need of repair and to fill wider cracks in the pavement. Valley Trail Bridge The Engineering Department recently completed foundation plans necessary for the support and placement of the bridge in Valley Park that is currently be- ing manufactured by Wheeler Bridge in St. Louis Park. Staff has started contacting Contrac- tors that are interested in sub- mitting bids for the construction of the foundation and the placement of the bridge on this foundation. NEWS Public Works Engineering Npeline Code Enforcement LETTER August 31, 2001 Parks Report The Parks Crew picked up trash daily from the parks. They also dragged and chalked fields and striped foul lines on an as needed basis. The Parks Crew had to re- place the door knobs on the Wen- tworth Park warming house (damaged by vandals). They power washed the hockey boards and painted them. They also painted the hockey rink at Friendly Hills Park and the warm- ing houses at Friendly Hills and Marie Parks. (I hope this does not mean that winter is close.) They repaired a valve on the lawn sprinkler system at Mendakota Park. Utility Report Rich checked the City's seven sanitary lift stations daily. Rich and his summer helper cleaned sanitary sewer lines in Pond Circle East and West, Canton Court, Ab- bey Way and Court. Rich was called in Sunday after- noon to restore power at the Northland Drive lift station. Street Report The Street Crew patched the streets in the neighborhoods where the slurry seal is to be ap- plied this year. They began patching and repairing the Public Works garage parking lot area in preparation for a overlay to be completed by a private contractor. John Ambrose worked with the Parks Crew to perform some weld- ing repairs to the soccer goals. Marie Avenue Mill and Overlay Proiect Ace Blacktop, Inc. of Inver Grove Heights presented their plans and construction timetable during a pre -construction meeting that was held on Tuesday morning at 10 AM at City Hall for the upcoming Marie Avenue Mill and Overlay Project. Concrete curb and the gutter re- moval and repair was planned to begin on Friday. The concrete curb and gutter repair is expected to be completed in a matter of days. The Contractor may com- plete the bituminous re -paving work on the bridge segment be- tween Wachtler and Sutton after finishing the majority of the paving work on the rest of the project be- cause of the extra time required to complete the bridgework. The Contractor is planning on finishing the project before the October 19th contract completion date. 2001 Slurry Seal Crack filling operations were completed on Mon- day and Tuesday on streets designated for the application of slurry seal under this years' street pavement main- tenance program. Some residents called to complain that some crack filling material stuck to their tires cre- ating driveability prob- lems with their vehicles. The Contractor has made contact with these residents to rectify these issues. Foundation Repair at 739 Knollwood Lane Mark Mogan and Jim Danielson observed foundation repair work being performed at 739 Knollwood Lane on Thursday by Judy, Inc. of Kansas City. The project involves supporting the structure with temporary cribbing until a new foundation can be in- stalled to replace the failed founda- tion. A small track driven drilling machine was brought in to bore a number of vertical holes with a 4" inch diameter auger to a depth 20' below the existing grade where ep- oxy coated reinforcing bars will be lowered into place and filled with grout to form friction piles that will support the weight of the structure (see photo). The procedure is a simple but is performed with a very specialized piece of equipment. This work is expensive but effective and much cheaper than any other alternative. Judy hopes to be a subcontractor on the tunnel boring work commencing at the Airport. Foundation Underpinning at 739 Knollwood Lane NEWS Public WorksEngineering The Pipeline Code Enforcement LETTER August 24, 2001 Parks Report The Parks Crew picked up trash daily from the parks. They also dragged and chalked fields and striped foul lines on an as needed basis. The Crew re- placed dead shrubs in Victoria Highlands Park and at the park signs for Friendly Hills, Ivy and Rogers Lake neighborhood parks. They repaired lawn sprinkler heads at City Hall. They began the fall application of weed kill- ers. They power washed the hockey boards at Friendly Hills and Wen- tworth Park to prepare them to be repainted. They cleaned up after a fire that was started in the wooded area west of the ten- nis courts in Valley Park, Wednesday of this week. One of the trees caught on fire, a picnic table and some trash. The Police and Fire Departments responded, but no one was caught. The Parks Crew cleaned up the mess on Thursday. Up until now, this has been a relatively vandalism free year (lets keep our fingers crossed). Utility Report Rich checked the City's seven sanitary lift stations daily. Rich and his summer helper cleaned sanitary sewer lines this week on Whitfield Drive, Stockbridge (removed a t-shirt), Morson Court and Winthrop Court. Rich performed inspections for new connections to the sanitary sewer line at 1634 Butler Avenue and 2190 Augusta Lake Drive this week. On Monday, Rich met with the bidders for Lilydale's lift station upgrade project. Street Report The Street Crew replaced a miss- ing stop sign on Commerce Drive at Pilot Knob Road. They re- placed the missing and broken barricade boards at the end of Summit Lane. They worked on repainting pedestrian cross walks and weed whipped around various signs throughout the City. They began making bituminous repairs on the streets that are to be slurry sealed this year. 35E Bridge Update At their last meeting, the City Council inquired about the status of the I-35E bridge reconstruction project. I called Leslie Vermillion, Mendota Heights' representative at MnDOT. Leslie reported that MnDOT held the bid opening for the project last week and Edward Kraemer submitted the low bid of $32.5M, this bid is slightly lower than their estimate of $35M. They plan on beginning construc- tion around September loth, however this year's construction will consist mainly of clearing and grubbing in Crosby Park to make room for a staging area. We probably will not be able to see the start of actual bridge con- struction until next year. Year 2000 Street Proiect Last week Valley Paving, Inc. worked on resolving issues with property owners on driveways constructed under last years street project. This recent work effort leaves just three more property owners with driveway is- sues that are still unresolved. We have encouraged Valley Paving, Inc. to satisfy these last three re- maining property owners as soon as possible. Marie Avenue Mill and Overlay Project Council awarded the contract for the Marie Avenue Mill and Overlay Paving Project at their meeting on Tuesday to Ace Blacktop, Inc of Inver Grove Heights. The Con- tractor has scheduled a pre - construction meeting for Tuesday morning at 10 AM at City Hall to discuss their plans for the upcom- ing project. 2001 Slurry Seal Crack filling operations will proba- bly begin next Monday in Mendota Heights on the streets designated under this years' pavement main- tenance program. This crack fill- ing operation precedes the appli- cation of slurry seal. The applica- tion of the slurry seal material on the pavement on these streets will occur at a later date. Valley Park Bridge Replace- ment The Engineering Department re- ceived shop drawings for review to cover the fabrication of the 30' long pedestrian bridge designed by Wheeler Bridge in St. Louis Park that will span the creek channel in Valley Park. Staff ex- pressed their comments on the plans and authorized the manu- facturer to proceed with fabrica- tion of the bridge. It will take ap- proximately eight to ten weeks for the manufacturer to fabricate and deliver the bridge to the City. 0$RaR NEWS Public WorksEngineering The Pipeline Code Enforcement LETTER August 17, 2001 Parks Report The Parks Crew picked up trash daily from the parks. They also dragged and chalked fields and striped foul lines on an as needed basis. The Crew set up the Kensington soccer fields for fall use by sweeping and striping them. They weed whipped at the overlook on Mendota Heights Road, cleaned out weeds from cracks on basketball courts and removed all the cotton- wood trees that were starting to grow around the pond in Ivy Park. They started trim- ming trees in the parks. Utility Report Rich checked the City's seven sanitary sewer lift stations daily. He and his summer helper cleaned sanitary sewer lines on Brookfield Lane, Heritage Drive, Con- cord Way, Bedford Court, Lockwood Drive, Claremont Drive, Mendota Heights Road in front of Friendly Hills Mid- dle School (lots of grease) and Huber Drive. He performed a sewer in- spection at 1634 Diane Road where the sewer line was plugged before the home was demolished. He was called in at 1:30 A.M. Thursday morn- ing to respond to a high water alarm at the Mendota Heights Road lift station. He purged some bubbles and the station returned to normal operation. Street Report The Street Crew patched pot- holes on Eagle Ridge, Glen Hill Road and Walsh Lane this week. They repaired a wash- out to a "drop structure" on Ivy Falls Creek. The creek was going through and around the structure and causing erosion. They in- stalled some new "school warning" signs near the en- trance to Visitation School. Visitation and St. Thomas Academy start and end at the same time and traffic conges- tion is a problem —it is difficult to enter Mendota Heights Road from Visitation Drive. They removed and disposed of a pile of brush from the en- trance to the Police Depart- ment. 2001 Traffic Counts Municipal State Aid (MSA) re- quires that cities count traffic on their MSA streets every two years. The City hires Short, Elliot and Hendrickson (SEH) as our traffic engineers to do counting. SEH has completed their work for 2001 and submitted their counts to the State with a copy to us. I have tabulated the results and attached a copy. I have also attached a copy of the sheet they prepare for each count location as a sample. These sheets show the hour by hour traffic count. Marie Avenue Mill and overlay Proiect Four bids were opened at City Hall on Thursday for the Marie Avenue Mill and Overlay Pav- ing Project that extends from Lexington Avenue to Dodd Road. The low bidder was Ace Blacktop, Inc. of Inver Grove Heights. The project would probably commence following Labor Day, assum- ing that Council awards the contract at their meeting on Tuesday, and that paving would be completed by Octo- ber 19th. We anticipate that Marie Avenue will remain open to traffic throughout the duration of the project. Code Enforcement Report Paul issued a permit this week to Keith Heaver, Heaver De- sign and Construction, Inc. to begin construction of his (11/2 story) home located at 1417 Knollwood Lane (estimated valuation = $350K). He also issued a permit to Carl Bolander and Sons to demol- ish the home that was dam- aged by fire this summer lo- cated at 1634 Diane Road. MENDOTA HEIGHTS TRAFFIC COUNTS ON MSA ROUTES Road Location 2001 ADT 1999 ADT 1997 ADT 1995 ADT 1993 ADT I991 ADT Acacia Blvd/Pilot Knob Rd West of TH 55 1168 Not in System North of 1 494 5818 Not in System Chippewa Avenue North of TH 149 706 331 566 463 523 473 South of TH 149 923 828 776 768 779 461 Decorah Lane East of TH 149 (Dodd Road) 1954 2126 2210 Not on system Not on system Not on system West of Huber Drive No Counts 2428 1359 Not on system Not on system Not on system Emerson Avenue East of TH 149 (Dodd Road) 832 833 778 Not on system Not on system Not on system Huber Drive West of Delaware Ave. 1470 1612 1474 1691 1393 1363 North of Mendota Heights Road 1103 1215 1141 1233 729 764 North of Decorah No Counts No Counts No Counts 1083 1382 1433 Lake Drive West of TH 149 (Dodd Road) 296 639 618 Not on system Not on system Not on system Lexington Avenue North of Wagon Wheel Trail 3497 3393 3323 3273 3584 2444 South of TH 110 7543 7019 5650 5562 4893 4126 North of TH 110 5008 4912 4848 6414 3938 4360 South of Marie Avenue 3333 2985 3141 3036 2437 2558 North of Mendota Heights Road 2349 2334 No Counts 3101 2805 1659 South of TH 113 2248 No Counts Marie Avenue West of County Road 63 (Delaware Ave.) No Counts 2838 4455 2907 2802 3310 East of TH 149 (Dodd Road) 2901 2693 4653 3035 2576 2834 West of TH 149 (Dodd Road) 3288 3302 3959 3433 2966 4137 East of Victoria Road No Counts 3519 3952 3409 3066 3689 West of Victoria Road 1825 1716 1964 1758 1778 2139 East of Lexington Avenue 1267 1104 1201 827 821 937 Mendota Heights Road West of Delaware Avenue 1582 1952 1418 1501 1466 713 East of TH 149 (Dodd Road) 3781 3678 3739 3304 3105 1694 West of TH 149 (Dodd Road) No Counts 3951 2605 2940 2223 1835 East of Lexington Avenue 3294 3507 3549 2541 1983 2599 East of TH 55 6964 7519 6827 3282 3345 2565 West of TH 55 3956 3510 4246 2788 2107 2384 East of Pilot Knob Road No Counts 4241 3885 3661 2962 2609 East of TH 13 3309 3270 2804 2504 3441 3412 West of Visitation Drive 3611 Northland Drive West of TH 55 No Counts 1241 1177 Not on system Not on system Not on system East of Pilot Knob Road (Cry Rd 31) 4543 3777 1620 Not on system Not on system Not on system South Plaza Drive East of TH 149 (Dodd Road) 1049 904 1855 1925 1364 Not on system South of Marie Avenue 1157 Victoria Road North of Marie Avenue No Counts 3099 3412 3762 3343 2763 Cty Rd 45 South of TH 13 4114 3453 4005 4442 4122 5035 East of Lexington Avenue 1167 Wagon Wheel Trail West of TH 149 (Dodd Road) 1008 802 937 993 1022 352 East of Lexington Avenue 782 749 693 482 728 538 08/09/2001 Weather JAMAR Techerlogieso Inc. Counted by: TAS for Windows Site Code : 000000036257 Eoard % Copyright 1999 Start Date: 07/16/2001 Other Mendota Heights Road East of TH 55 File I.D. : MENDOTA HTS R Time 07/16 07/17 07/18 07/19 07/20 Av 07/21 07/22 Avg Each " E 12:00 an 50 67 * ` 58 * " 58 *" 01:00 ` 42 22 ` * 32 ` " 32 ` 02:00 * 33 33 ` * 33 ` " 33 ` 03:00 28 30 ` " 29 ` " 29 * 04: 00 " 56 60 * * 58 ` * 5B "* 05:00 " 176 179 * 178 ` 178 xxx.x*x 06:00 * 361 370 " * 366 ` * 366 "xxw xww 07: 00 592 609 * 600 * 600 08:00 486 * * 486 ` * 486 09: 00 334 ` * 334 * * 334 "xxxxxxx 10:00 326 302 ` 314 * ` 314 "* xxxww 11:00 458 522 * " " 490 ` * 490 *"xxxw.x 12:00 Pm 596 519 ` * 558 ` 558 01:00 445 398 422 * 422 02:00 384 386 * * 385 * 385 03:00 450 490 * * 470 ` 470 04:00 549 585 567 ` 567 05:00 560 536 " 548 ` 541 06:00 308 273 ` * 290 x * 290 07:00 217 157 ` * 187 ` 187 08: 00 179 199 189 ` 1" 09:00 137 172 154 154 10:00 110 130 120 " 120 11.00 101 92 96 96 Totals 4820 6919 1370 0 0 6964 0 0 6964 8 Avg. WkDa 69.28 99.3% 19.6% .0% .0% 8 Avg. Day 69.2% 99.3% 19.6% .0% .0% .0% .0% AM Peak 11: 00 07:00 07:00 07:00 07:00 Volume 458 592 609 600 600 PH Peak 12:00 04:00 04:00 04:00 Volume 596 585 567 567 ADTs NEWS Public Works Engineering Code Enforcement LETTER Parks Re ort The Parks Crew picked up trash daily from the parks. They also dragged and chalked fields and striped foul lines on an as needed basis. Fall soccer starts this week so the Parks Crew striped the neighborhood Parks (Ivy, Friendly Hills, Wentworth and Victoria Highlands). They watered the new trees and plantings at Rogers Lake, City Hall and the entrance monu- ment on Dodd Road. They hauled in topsoil to repair the old warming house site in Ivy Park. They spread the soil and seeded it. They hauled away the pea gravel from the Rogers Lake playground to make way for the new equipment. Utility Report Rich checked the City's seven sanitary lift stations daily. He and his summer helper jetted the sanitary sewer lines clean on Apache Court and Lane, West - view Terrace and Court, Pond - haven Lane and Court, Monet Court and Lane, Mendota Heights Circle and Arbor Court. Rich was called in at 8:00 PM on Wednesday to reset the electric breakers at the Northland Drive lift station —they had been tripped by a power surge, how- ever once reset, the station op- erated fine. Street Report The Street Crew replaced some shrubs at 1056 Douglas Road that were killed as a result of last winter's snowplowing opera - August 10, 2001 tions. We waited until now to re- place them, because in most in- stances where shrubs are dam- aged, they grow back. The Crew continued to work on raising the crown in the street on Maple Park Drive to redirect drainage away from Mrs. O'Brien's home. They also patched miscellaneous potholes throughout the City. Dave bor- rowed a street milling machine from the City of Eagan and worked with Marc to analyze the surface of the at -grade bridge on Marie Avenue. Development of Ridder Prop- ertv The firm of Loucks/McLagen, rep- resenting Bill and Diana Makens, who recently purchased the 34 acre Ridder property, held three neighborhood informational meetings in the City Council chambers. The first meeting was attended by 45 people, the sec- ond meeting six people and the final meeting, held on Tuesday morning was attended by four residents, plus Merrily Helgeson from the Sun Current. The con- cept plan discussed included 19 or 20 lots ranging in size from 38,000 square feet to 2-1/2 acres (100,000 square feet). The development is be served by standard city streets which will access the area from Dodd Road and Marie Avenue. Lot prices are expected to range from $200K to $350K. The presenters stated that a planning application would be submitted as soon as possible in the future with the hope to be able to present the plan to the City Council by October or No- vember. City Hall —Erosion Repair Along West End of city Hall Work was completed this week repairing the erosion damage caused by the runoff of storm water from the roof along the west end of City Hall. Concrete support pads for two of the City Hall air conditioning compressors had begun to settle unevenly ne- cessitating immediate repairs. Council also authorized the in- stallation of rain gutters along the west end of the building. Low retaining walls were installed "stepping" the slope, from the upper to the lower level of City Hall. Following these landscape repairs, the gutters that have been ordered, will be installed within several weeks. Code Enforcement Officer Paul issued three new single fam- ily home permits in the month of July. He has now issued a total of 16 single family home permits for this year (4 more than last year at this time). He issued a permit to United Properties Construction Company to finish a 7,000 square foot tenant space at 1270 Northland Drive for Fidelity Na- tional Foreclosure Solutions, and at 1210 Northland Drive 3,600 square feet for Corporate Express and 1,500 square feet for Victory Sales. McGough Construction was issued a permit to complete some remodeling at St. Thomas Academy, changing a library to office, conference and classroom space (for the new headmaster). Hoffman Homes was issued a permit to complete another two unit townhouse at 2058 and 2062 Acacia Drive. NEWS Public Works Engineering Code Enforcement LETTER Parks Report The Parks Crew picked up trash daily from the parks. They also dragged and chalked fields and striped foul lines on an as needed basis. The Crew pre- pared the fields at Menakota Park for the 30 and over softball league tournament held last Saturday. They removed weeds from the landscaped berms lo- cated in North Kensington Park and trimmed the bushes adja- cent to the homes and pedways at South Kensington Park. Utility Report Rich checked the City's seven sanitary lift stations daily. Rich and his summer helper jetted the sanitary sewer lines clean on Cheyenne Lane (had bituminous in line) and Nashua Lane. He had to work with Roto Rooter to clean the line at the end of Knob Road. The homeowner had a HUGE root ball in his line that extended into the City's line in the street. We had to hire Roto Rooter to cut the root ball free in our line and then Rich jetted it out. He also replaced a "bee hive" type grate located in a resident's yard with a flat one (at the resi- dents request). Street Report The Street Crew finished patch- ing the potholes on Maple Park Drive this week. They also built up the crown (middle of the street) on Maple park Drive at its intersection with Cascade Lane and Falls View Court to correct a drainage problem. The Pipefine August 3, 2001 During heavy rainfall events wa- ter spills out of the curb line at these locations and flows to the wrong side of Falls View Court. The homeowner at that location has a very flat driveway and is concerned that this extra water could flood her driveway and ga- rage. The Crew also removed some overhanging tree limbs from the roadway. Fishing Derby Mary Hapka held the City's 1st Annual Roger's Lake Fishing Derby on Saturday, July 28th. There were eighteen children ages 2-15 that participated along with their parents and grandpar- ents. There were several prizes and trophies awarded for the big- gest fish (11"), most fish caught (12), a casting contest, ugliest fish (lots of catfish & bullheads) and more. It was apparent from the smiles on everyone's face (including Fisherman Cliff Timm) that everyone had a wonderful time. Mr. Clifford Timm donated tackle boxes for each participant and Mr. Ira Kipp, a resident of Roger's Lake, donated trophies and gift certificates for Ziggy's Deli. A special thank you goes to Mr. Cliff Timm for initiating efforts to provide the City of Mendota Heights with a fishing dock at Roger's Lake. The fishing dock has been getting a lot of use and is a wonderful addition to our park system and to the commu- nity of Mendota Heights. Roger's Lake —New Play Equipment On Wednesday, installation of new play equipment manufac- tured by Landscape Structures located in Delano, began in the westerly play area in Roger's Lake Park. The Parks and Rec- reation Commission cose play components with a modest nauti- cal theme that could fit within the limited size of the area and within the budget available. This park has a larger second play area installed in 1990 following passage of the Park Bond Refer- endum in 1989. I Cliff Timm and Ira Kipp at the City's 1st Annual Fishing Derby NEWS PublEngineering ngic Works Eng— The Pipeline ineering Code Enforcement LETTER July 27, 2001 Parks Report The Parks Crew picked up trash daily from the parks. They also dragged and chalked fields and striped foul lines on an as needed basis. The crew pulled weeds from around the park's signs. They worked on repairs to Marie Hockey Rink (dragged, leveled and picked rocks). They top - dressed the soccer fields and softball fields at Kensington and Mendakota Parks and over seeded where topdress- ing was applied. Utility Revort Rich checked the City's seven sanitary lift stations daily. Rich worked with his summer helper to jet the sanitary sewer lines clean on Decorah Lane, Ocala Lane and Court and Pontiac Place. He found a large amount of grease in the line on Ocala Lane. He worked with Tom Knuth to inspect the lines on Marie Avenue before the overlay project begins. They found one manhole that was leak- ing badly, it will be sealed with the road project. Street Reigort The Street Crew patched the streets on Maple Park Drive this week. They picked up trash "donated" along the City's roads at several loca- tions. They repaired/replaced several signs, and removed dead/diseased trees from the right-of-way on Trail Road and Sylvandale Road. Code Enforcement Revort Paul issued a permit this week for Tharaldson Development Company to have Aladdin Pools install an indoor pool at 1330 Northland Drive (Fairfield Inn and Suites Ho- tel). Council authorized, and Paul issued a permit to Getty Con- struction this week to com- plete foundation repair for a failing porch construction sys- tem and install erosion control protection for the slope along Ivy Falls Creek to protect a home and prevent further soil erosion at 729 Knollwood Court. He issued permits to Nordquist Signs to install three signs at 1230 Northland Drive to identify Agere Sys- tems as the occupant of that building. CSC has begun footing/ foundation construction this week for their office head- quarters at 1155 Northland Drive (immediately south of SuperAmerica on TH55). Dick is performing final in- spections for the south three-4 unit CDA structures this week. If they pass, resi- dents will begin to occupy the buildings this Saturday. Delaware Avenue Turnback Delaware Avenue is a County Road, however where it exists north of Dodd Road, it does not have the traffic or other characteristics of a County Road and is a very low priority for maintenance by the County. The road is in terrible condition and needs major re- pairs, however the County is only interested in completing major repairs to the road at this location if the Cities, (West St. Paul and Mendota Heights) are interested in re- ceiving it as a turnback. Be- cause the east half of the road is in West St. Paul and the west half of the road is in Mendota Heights, turnback would be complicated. Don Theisen the Dakota County Engineer called a meeting this week with me and Skip Stephanic, West St. Paul Di- rector of Public Works, to dis- cuss the feasibility of turning this portion of Delaware Ave- nue back to Mendota Heights and West St. Paul. As a result of the meeting, Don is doing some homework on whether Delaware Avenue could be added to the City's Municipal State Aid mileage with no penalty and on how much the County would be willing to pay the Cities toward upgrad- ing the road. We will meet again once Don has com- pleted his homework. NEWS Public Works Engineering Code Enforcement LETTER Parks Report The Parks Crew picked up trash daily from the parks and dragged and chalked fields and striped foul lines on an as needed basis. They also re- placed old sprinkling valves to the sodded areas in the Men- dakota Park ballfields and re- moved downed trees on a ped- way in the vicinity of 4th Ave- nue and Wentworth Park. They removed old light poles at Marie Park, repaired sprin- kler valves at the Fire Hall and planted the new crab apple tree at City Hall. They wa- tered the DNR plantings in the Rogers Lake Shoreland Resto- ration area and the new trees. They had to repair the trap door to the Mendakota Park overlook on the concession building because of vandalism. They also graded the hockey rink at Marie Park to level out high areas. Utility Report Rich checked the City's seven sanitary lift stations daily. He also sprayed for poison ivy on the pedway in Valley Park, thistle on Huber Drive and Marie Avenue, and the fence lines on Marie Avenue and Freeway Road. He did two new sewer connection inspec- tions in the Augusta Shores development at 2290 and 2094 Acacia Drive. Rich dis- covered that one of the two pumps at the Northland Drive sanitary sewer lift station was running three times more than The Pipeline July 20, 2001 the other pump. Rich sus- pected that there was a prob- lem with this pump because these two pumps are supposed to run on an alternating basis for approximately the same amount of time. Rich raised the offending pump and found that the impellor was plugged with socks and latex which he then removed. He also re- placed the lifting chains on both pumps that were badly cor- roded. The chains are con- nected to the pumps from the access level of the lift station and are used to lift the pumps out of the wet well. Rich jetted the sanitary sewer main on Na- vajo, Pontiac, and Keokuk with his summer helper in the Friendly Hills neighborhood. They found many roots in the sanitary sewer main on Pontiac and Keokuk and used some root killing chemicals in the line to delay root growth intrusion in the future. Street Report The Street Crew reinstalled MTC signs that were knocked down at Kay and Victoria. They swept up nails in the roadway at the southeast corner of Lex- ington and Mendota Heights Road, and sand in front of 749 Decorah Lane. The street crew filled in the sink hole behind the curb with black dirt at Nashua and Cheyenne Lane. They also patched Maple Park Drive which is starting to look like a candi- date for street resurfacing. They had to bring the chipper back to the dealer for repairs because it was making a bang- ing sound. The dealer found a piece of metal that got caught in the chipper brush. Code Enforcement Report This week Code Enforcement is- sued a permit to R.J. Ryan Con- struction for a tenant finish val- ued at $330,000 at 1160 Cen- ter Pointe Drive, Suite 100. The tenant is Tri-Advantage and will occupy 18,700 square feet at this address. Paul also issued a building per- mit for two more units in the Augusta Shores Development. The permits were issued for 2120 and 2126 Lake Augusta Drive, and brings the total number of units either occupied or under construction to 14. Year 2000 Street Proiect Valley Paving, Inc. returned Fri- day to commence repair work on driveways constructed in conjunction with last years street project. This driveway work is essentially all the work that remains to be completed on the Contractor's punch list. Sprinkling Restriction Status St. Paul Regional Water Ser- vices and the City have both been closely monitoring our water tower levels to determine if Mendota Heights needs to im- pose any watering restrictions. City staff does not feel any lawn sprinkling restrictions need to be imposed now. NEWS Public WorksEngineering The Pipeline Code Enforcement LETTER July 13, 2001 Parks Report The Parks Crew picked up trash daily from the parks. They also dragged and chalked fields and striped foul lines on an as needed basis. T h e C r e w trimmed some overhanging limbs from the pedways, chipped them and placed the chips in Wentworth Park. They also removed and chipped some overgrown shrubbery from Rogers Lake Park. They re- moved some dirt from around the tennis courts in order to im- prove drainage. The Parks Crew removed the thirty year old timber play struc- tures from the east side of Rogers Lake Park. The new metal/pvc play structures should be installed before the end of the month. They repainted the pavilions at Rogers Lake and Valley Parks. Utility Report Rich checked the City's seven sanitary lift stations daily. Rich tamped the sanitary sewer lines located near the at -grade bridge on Marie Avenue. The sewer line at this location is a "drop" structure that we have had trou- ble with before and wanted to insure that it was ok before we resurface Marie Avenue. There were some rags and grease in the line but the line itself was ok. Rich was called in on Saturday at 3:00 pm and 5:00 pm to re- store the power at the Culligan lift station (power surges?). He and his helper jetted the lines clean on Mohican Lane and Court, Havenview Court, Apache Street, Pueblo Drive and Lane and on Keokuk Lane. (they re- moved a substantial amount of roots from the line on Keokuk). They flushed the lines clean on 1st Avenue after a resident had trouble with his private sewer and cleaned it —dumping the de- bris from his service into our line. Street Report The Street Crew patched streets at the manhole by the Overlook Condos, in the Somerset neighborhood and Concord Way. They did some street sign re- pairs/replacements and trimmed some sight obstructions from around signs. Code Enforcement Report Dick, who is the City's weed in- spector was notified by the County's weed inspector this week that he needed to "step up" his enforcement of Canada This- tle removal before it goes to seed. The City had several loca- tions that were heavily infested and Rich Burrows was going to come in early (5:00 am) on Fri- day to spray them while the air was still calm. No Sprinkling Bans Required Due to the recent lack of rainfall, many cities are having to impose lawn sprinkling restrictions. We, along with St. Paul Regional Wa- ter have been closely monitoring our water tower levels to see if Mendota Heights needs to im- pose restrictions. Although we had one day where the level dipped "fairly" low it re- covered very nicely the next day. No restrictions have been needed and none are foreseen. St. Paul has also experienced some greater than normal water quality problems this year - swamp water smell. They think that they now have that problem under control. They are investi- gating some possible plant im- provements that would help them avoid these quality prob- lems in the future. Highway 13 Mudslide Update The property owner at 711 Woodridge Drive, their Engineer- ing Consultant, and representa- tives of MNDOT, and City staff have scheduled a second meeting on Monday morning to review the details and construction logistics associated with the different de- sign options for stabilizing the slope in their rear yard. We're expecting that the Consultant will be presenting preliminary plans for review and comment at this meeting. Tree Donated to City Hall An ornamental flowering Red Splender Crab Tree has been do- nated by the Mendota Heights Garden Club to enhance the City Hall grounds. This will be the twelfth tree the club has donated since 1990 when several mem- bers of the Club and Mayor Mertensotto held a "ground breaking" ceremony on a cold misty day in May. The Public Works Department will pick up and install the tree at City Hall next week. NEWS Public Works Engineering Code Enforcement LETTER Parks Report The Parks Crew picked up trash daily from the parks. They also dragged and chalked fields and striped foul lines on an as needed basis. They watered the DNR plantings along Roger's Lake in the Park. They stained picnic tables throughout all the parks. The Crew repaired broken sprinkler lines in Mendakota and Kensington Parks. They cleaned up Mendakota Park in preparation for the July 4th celebration. Utility Report Rich checked the City's seven sanitary lift stations daily. Rich and his summer helper jetted clean the sani- tary sewer lines on Hazel Court and Pagel Road. Street Report The Street Crew worked on patching streets this week on Simard Street, Lockwood Drive, Concord Way and in the Somerset neighbor- hood. They also worked on repairing pedways by the Tom Thumb and on Huber Drive by High Pointe Road. Boulevard Tree Planting Program On Monday and Tuesday, residents that subscribed to this annual program, re- ceived their new tree. Mid- west Landscapers installed fifty-nine trees, throughout the City, which are guaran- teed for one year from loss due to natural causes or de- fect. To help lower the cost of this program, homeown- ers have been asked to wa- ter and care for their tree during this period. City Entrance Sign Re -grading of the site and extension of the loose - stacked stonewall has been completed. Topsoil, seed and mulch was added to the areas that will receive regu- lar routine mowing by Public Works. Shredded bark mulch was spread under the trees and shrubs around the sign. Following the next rainfall, the contractor is required to water the site on three occa- sions, several days apart, to fulfill his project obligations. Public Works has installed a 500 gallon water tank on one of their one -ton trucks, July 6, 2001 which will be used to water the turf when necessary. Replacement of I-35E Bridge MnDOT has requested the use of the City Council Chambers in late July or early August for a public in- formation meeting on this project. The exact date has not been set, but the "open house" event will run from 4:00 P.M. to 7:00 P.M. The contract for this project has been scheduled for award in mid -September. Valley Park Pond Councilmember Vitelli re- cently received a request from a neighbor living adja- cent to the Valley Park Pond to raise its elevation. Upon an inspection of the site by Tom Knuth, Guy and me, it was determined that a dam located at the outlet to the pond had failed. Access to the dam is difficult and needs to be done during a dry time or after the ground has frozen. Tom Knuth will solicit bids from contractors to repair the dam and re- store the pond to its previ- ous elevations. NEWS Public Works Engineering Code Enforcement LETTER Parks Report The Parks Crew picked up trash daily from the parks. They also dragged and chalked fields and striped foul lines on an as needed basis. The Park Crew re- moved the baseball mounds that they had installed at Mendakota Park for last weekend's AAU State Tournament. They hauled the extra rec rock to Friendly Hills, Hagstrom King and Marie neighborhood parks where they spread it on those ballfield's in- fields. They repaired the sprin- kler systems at Mendakota and Kensington Parks, and at City Hall. They put down a second application of crabgrass pre - venter in the parks and fertilized the irrigated areas at Kensington and Mendakota Parks and City Hall. They watered the DNR shore land plantings at Rogers Lake Park. Utility Report Rich is on vacation, so Tom OI- und checked the lift stations for him and Tom Knuth did his sewer inspections. Street Report The Street Crew fixed a storm sewer inlet at 1155 Centre Pointe Drive. They worked on patching streets, mostly on Callahan Place. They removed a dead tree by the pedway on Victoria Road. Code Enforcement Report Paul issued a permit this week to Riverview Construction Company to begin construction on CSC Publishing's new office building to be constructed at 1155 North- land Drive (located just south of The Pipeline June 28, 2001 the SuperAmerica gas station on TH55). The building will have 6800 square feet of area and is valued at $740K. Paul this week also issued the largest reroof per- mit he's ever issued to Dalco Roofing (the work is valued at $750K). Dalco is to reroof the building located at 2360 Pilot Knob Road formally the RL John- son Warehouse building (which is approximately 10 acres of build- ing). City Monument Sign Work began this week on the landscape improvements to the area around the City Entrance/ Monument Sign at Dodd Road and Mendota Heights Road. Last week Public Works mowed the area and sprayed "Round -Up" to kill the grass and weeds in preparation for the re -grading of the site. The wall will be extended, bark mulch added under the trees and four inches of topsoil added followed by seed and mulch. Once the turf is established the site will receive weekly mowing and maintenance by Public Works. Boulevard Tree Planting The Boulevard Tree Planting pro- gram began on Thursday when utility companies met at City Hall to pick up location maps where the trees will be installed. Staff put in the wood laths for each tree location on Thursday. Plant- ing will begin on Monday and should last 2 to 3 days. A total of 59 trees will be planted at 39 lo- cations. Several residents will re- ceive more than one tree and eight trees were requested to ful- fill requests from other City pro- jects, which will be charged the full cost of the tree. Residents were required to pay $50.00 to - wards the cost of the installed tree, which is guaranteed for one year by the contractor. Rogers Lake Pavilion A private contractor will begin work next week to repair the pa- vilion roof at Rogers Lake Park that was damaged when a large cottonwood tree blew down in mid -June. The tree was disposed of by Public Works. Tennis Court Resurfacing Resurfacing of the double tennis courts at Rogers Lake and Friendly Hills Park will begin next week. Repair of the surface, ap- plication of color coats and re - striping will take from five to ten days. Highway 13 Mudslide The property owner at 711 Wood- ridge Drive, their attorney, Engi- neering Consultant, and represen- tatives of MNDOT, DNR, National Park Service/Mississippi National River and Recreation Area, and City staff met on Tuesday morn- ing to discuss details of the slope failure, and review the land - owner's concepts for stabilizing their rear yard slope. The meet- ing was productive, and the prop- erty owner left with a good idea about what issues the various ju- risdictions will view as important when they review the proposal as required under a City Critical Area Permit application for this type of work in the vicinity of the bluff. Because of the concern about continuing slope failures, we agreed to submit their Critical Area Permit application directly to Council for consideration without appearing before the Planning Commission first. NEWS Public Works The Pipeline Engineering Code Enforcement LETTER June 22, 2001 Parks Report The Parks Crew picked up trash from the parks daily. They also striped foul lines and chalked the ball fields, and dragged infields and warning tracks on an as needed basis. The Parks Crew also prepared the ball fields at Mendakota Park and installed temporary pitchers mounds for the AAU state baseball tourna- ment that begins this Friday evening. The baseball tourna- ment will continue through this Sunday. The roadway and parking area in Rogers Lake Park was graded as well. The Parks Crew cut up and removed a large cottonwood tree that fell onto the Rogers Lake Park shel- ter last week. This Tuesday the DNR installed the aquatic plants that were planned in conjunction with the Rogers Lake Shoreline Restoration Project. The Parks Crews delivered aggregate to Rogers Lake Park that the DNR then used to anchor the aquatic vegetation they planted in the lake. The Parks Crew were also out killing weeds and improving the drainage in the vicinity of the City Entrance monument at Dodd and Mendota Heights Road in anticipation of the upcoming landscaping project that Council authorized this past week. Utility Report Rich Burrows checked the City's seven sanitary lift stations daily. He also mowed the grass at the Veronica Lane lift station. Rich jetted and cleaned the sanitary sewer main on Dodd Road be- tween Lake Drive and Wagon Wheel Trail. Rich discovered and removed a significant mass of tree roots that had migrated into the pipe joints of the sewer main along Dodd Road between Cheri Lane and Wagon Wheel Trail. Rich also jetted the sewer main on Lake Drive, Cheri Lane, and Swan Drive in the Rogers Lake neighborhood. Rich also per- formed an inspection for the in- stallation of two new sanitary sewer service connections in the Augusta Shores development. Street Report The Street Crew repaired wash- outs along Ashley Lane and Or- chard Place after receiving com- plaints from residents. They cleared vegetation and brush to improve the sight distance at the Freeway/Dodd Road, South Lane/ Highway 110, and the Marie/ Wachtler Avenue intersections. They installed a large bituminous patch on Callahan Place, replaced some broken bituminous curb at 655 North Freeway Road, and re- paired potholes on Emerson Ave- nue between Dodd and Delaware. They replaced "Crime Watch" signs throughout the City that had faded, and returned surplus Metropolitan Transit Bus Route signs that were not mounted when the signs were last in- stalled. They picked up and re- moved brush from the public right of way on William Court and Norma Lane. They also removed a number of "Work at Home" and other miscellaneous advertising signs that have been posted on utility poles throughout the City. Code Enforcement Code Enforcement reports that there was a building permit is- sued to Mittelstaedt Brothers Construction for a two story sin- gle family house at 689 Ever- green Knott. This is the third new single family home building permit issued in June, and the 13th single family building permit that has been issued this year. Trucks and Travelin' Machines Night Lenny Kanitz and the City's road grader was one of many opera- tors and equipment represented in the "Trucks and Travelin' Ma- chines Night" display sponsored by ISO 197 Early Childhood Fam- ily Education (ECFE) program at Sibley High School Wednesday night. ECFE is a state -sponsored educational program for parents and their preschool children. Mendota Heights was one of many entities represented. The children and their chaperoning adults got a chance to sit in the vehicles and equipment and see them up close. Lenny and the other operators were there to de- scribe what the machines do, how they operate, and answer any questions from the public. Highway 13 Mudslide The property owner at 711 Wood- ridge Drive and their attorney met with City Staff on Monday af- ternoon to review what has tran- spired since the June 13th mud- slide. We were informed that a consulting engineer has been contacted to make recommenda- tions on potential options on how best to stabilize the rear yard slope abutting Trunk Highway 13. They also requested the city to facilitate a meeting with all the jurisdictions (MNDOT, DNR, Dept. of Interior, City, etc.) that will have any permitting or comment authority for this work under any required MNDOT, or City Critical Area permit. This meeting has been scheduled for next Tuesday morning at City Hall. NEWS Public eying gWorks The Pipeline Code Enforcement LETTER June 15, 2001 Parks Report The Parks Crew picked up trash daily from the parks. They also dragged and chalked fields and striped foul lines on an as needed basis. The Parks Crew also weed -whipped the berms at Kensington Park and sprayed them with Roundup weed killer. They painted lines for the bas- ketball courts in the parks and prepared fields for a tourna- ment at Mendakota. They also removed all the young cotton- wood sucker trees around Ivy Falls Pond. Believe it or not the Parks Crew had to water the plants that the DNR in- stalled under the Rogers Lake Shoreline Restoration Project. Utility Report Rich Burrows checked the City's seven sanitary lift stations daily. He also mowed the grass at the Veronica Lane lift station. Rich and John Ambrose jetted and lamped a section of the North Freeway Road sani- tary sewer main at the request of one of the residents. They found that the City's sewer main was flowing without any obstruction. Rich and his sum- mer helper, J.P. Lipton, jetted the sewer main on Alice Lane and the adjacent easement area, in addition to Kressin Avenue, Rogers Avenue and Bluebill Avenue. The Police alerted Public Works personnel that little baby mal- lard ducklings were stuck in a storm sewer. Rich rescued the the ducklings and released them to a happy mother hen at the Marie Park pond. Rich viewed this as his most reward- ing task of the week. Street Report The Street Crew patched pot- holes on Ivy Falls Avenue and on streets where they had re- ceived complaints from resi- dents. They reinstalled speed signs on Mendota Heights Road at Lake Drive, and Mendota Heights Road at Dodd Road. The numerous recent storms prompted the street crew to check and remove blockages from the storm sewer inlet grates throughout the City. A tree that had fallen at Valley Curve and Willow Lane was cut up and chipped. They had to push a downed tree off of Wachtler Avenue south of High- way 13. They also tested street lights on Centre Pointe Boulevard at Tom Knuth's re- quest because of suspected damage from the installation of a sprinkler sys- tem by an irri- gation com- pany. The street lights showed no ap- parent damage at this time. Dave Sorby and Marc Mogan met with an asphalt paving representative to discus pave- ment repair op- tions on the bridge segment of the Marie Avenue project. Code Enforcement A permit was pulled this week for another twin -unit building in the Augusta Shores project. Completion of this building will bring the number of units com- pleted in the development to a total of twelve. Highway 13 Mudslide A mudslide from the rear yard bluff area at 711 Woodbridge Drive closed Highway 13 for most of the day on Wednesday. This news item was a featured story in both major metro news- papers, and was a featured re- port on most of the local TV news broadcasts. The slope that was left standing after the mudslide is very steep and will be susceptible to further dam- age. Staff has learned that the property owner has contacted Consulting Engineers to develop some conceptual design options for them to address the situa- tion and present to the City. Mudslide Clean-up on Highway 13 NEWS Public WorksEngineering ...-The he Pipeline Code Enforcement LETTER June s, 2001 Parks Report The Parks Crew picked up trash daily from the parks, mowed the grass, dragged and chalked fields and striped foul lines on an as needed basis. The Parks Crew worked on improving the drainage around several of the tennis courts. They installed crime watch signs in the parks and trimmed low hang- ing limbs in the parks. Utility Report Rich checked the City's seven sanitary sewer lift stations daily. Rich fin- ished spraying weeds in all the Parks and other City property this week. He worked with Tom Knuth to analyze the sanitary sewer connec- tion from Friendly Hills into the main at Men- dota Plaza (where there have been several stop- pages). They discov- ered that a joint has set- tled near the manhole and is a point where de- bris is the line has been getting hung up and causing backups. We will monitor the problem closely this year and budget to dig the line and repair it next year. He worked with the Street Crew to patch around some manholes in order to improve the drainage and eliminate stormwater inflow. Finally, he worked with Tom Knuth on Thursday to try and help solve a homeowner's problem at 1395 Dodd Road with a sanitary sewage backup. The homeowner appears to have a sewage ejector system that was mal- functioning (it was not the City's fault). Street Crew The Street Crew worked on repairing some lawn damaged from snow- plows that was missed the first time. They worked on replacing the traffic signal lights at TH55 and Mendota Heights Road as is re- quired by the City's con- tract with MnDCT. They installed the yield sign on Ivy Lane at Cherry Hill Road. They improved sight distances at some intersections. They worked on pothole patching (Somerset neighborhood). Code Enforcement Re- port This week Paul issued a building permit to Thar- aldson Development Company to remodel the lobby area of their Heri- tage Inn Hotel located at 1330 Northland Drive. The hotel is being con- verted from a Heritage Inn contract hotel used exclusively by Northwest Airlines to be a Fairfield Inn and Suites Hotel open to the public. Council also authorized Tharaldson to construct a new pylon sign along I- 494 and to change the message on their en- trance monument sign. NEWS Public WorksEngineering The Pipeline Code Enforcement LETTER June 1, 2001 Parks Report The Parks Crew picked up trash daily from the parks, mowed the grass, dragged and chalked fields and striped foul lines on an as needed basis. They also worked this week on pre- paring Mendakota Park for "Celebrate Mendota Heights Parks" which is scheduled for this weekend. They worked on clearing brush away from pedways, they started on Mendota Heights Road. Utility Report Rich checked the City's seven sanitary sewer lift stations daily. He trimmed the trees and bushes at the Culligan Lane lift station. He met with a resident liv- ing along Wentworth Ave- nue to assist him with ana- lyzing what was causing a sanitary sewer blockage. The problem turned out to be in the resident's line, not the City main. Rich did the second spray- ing for weeds within the parks and at other City property this week. A good share of the first spraying was made ineffective by rain storms. Street Report The Street Crew cleaned the ditch at Garden Lane and Sibley Memorial High- way. This is a ditch that frequently fills up with sedi- ment and has to be cleaned out. The Crew used the chipper to dispose of some brush and the old hockey boards from Marie Avenue Park by chipping them. They worked on patching potholes this week — responding to complaints. Code Enforcement Re- port Paul reports that through May he has issued 10 new residen- tial home permits with a total valuation of $1.8 million (this does not include the value of the lots). Roger's Lake Shoreline Project The Shoreline Habitat Resto- ration Project in Roger's Lake Park that the Minnesota Department of Natural Re- sources had scheduled to rth begin on Friday, May 2.) was postponed as a result of inclement weather. They in- dicated their current plans would be to start work on this project on June 6tn by spreading mulch for the up- land plantings. This work would be followed with the installation of the upland plants over the next couple of days. The DNR is now planning to install the aquatic plants beginning in mid June. The wood ducks are hatching this week —the nest behind Becky Pentel's produced 15 ducklings. NEWS Public Works Engineering Code Enforcement LETTER Parks Report The Parks Crew picked up trash daily from the parks, mowed the grass, dragged and chalked fields and striped foul lines on an as needed basis. They pre- pared the soccer fields at Ken- sington and Mendakota Parks for the major area -wide soccer tournament held last weekend. They prepared the softball fields at Mendakota Park for the Catholic Athletic Associations Tournament also held last week- end. They repaired a broken water line on the City Hall lawn irrigation system. Three summertime employees have now begun working in the Park Department. Steve Squire, Justin and Tom Deeg are the employees. They are all Men- dota Heights residents and for- mer ice rink attendants. The Parks Crew removed the hockey boards and posts at Marie Park this week. The boards were in terrible shape and are budgeted for replace- ment this year. Utility Report Rich checked the City's seven sanitary sewer lift stations daily. Rich, with John Ambrose's help jetted clean the sanitary sewer line that serves Lloyds Meats this week. This line needs to be cleaned at least twice a year be- cause of all the grease that is generated by Lloyds. Rich also hired Pipe Services to clean all the lift stations. He does this twice a year at the main lift sta- The Pipeline May 25, 2001 tion and once a year at all the others. He performed new sanitary sewer connection inspections for the new home now under construc- tion on Evergreen Knolls. Street Report The Street Crew worked on patching potholes, worked on equipment maintenance and pre- pared to install the crime watch signs in the parks. Roger's Lake The Minnesota State Department of Natural Resources will begin the Shoreline Habitat Restoration Project in Roger's Lake Park on Friday, May 251h (weather per- mitting). They will first spray the project area to remove unwanted vegetation and begin installing the aquatic plants on Monday/ Tuesday June 41h & 51h to be fol- lowed on Monday/Tuesday June 111h & 121h with upland plantings. The project objectives are to cre- ate a buffer zone of native plants to stabilize and control erosion, reduce runoff, enhance fish and wildlife habitat and provide an aesthetically pleasing area for visitors to the park. A side bene- fit of this type of project is that thicker/higher vegetation dis- courages nuisance geese from loitering in the area. The DNR crews, in addition to the plant- ings, will install a ten foot wide biodegradable erosion blanket along the shore, install wave breaks to protect aquatic plants, and spread 2 inch thick mulch over the upland area to maintain soil moisture and minimize ger- mination of weedy species. Buckthorn Removal A local Scout Troop, under the di- rection of Sally McNamara (a resident in the Roger's Lake area) volunteered to remove Buckthorn from a City park. Common Buckthorn is an inva- sive small tree that reproduces readily from seeds. It can quickly take over and dominate wood- land understories. Buckthorn is a serious problem in the Midwest, where is has severely degraded many woodlands and wildlife habitat. Following cutting, the rootstock is sprayed to prohibit regeneration of the tree. Sally and the Scouts have been cutting in the area east of the City's Entrance/Monument sign located on the southeast corner of Dodd Road and Mendota Heights Road and plan one addi- tional removal operation. The cuttings are piled on site and re- moved by the Public Works De- partment. Year 2000 Street Reconstruc- tion Tom Knuth and Marc Mogan met with representatives of Valley Paving, Inc. this past week to re- view the shrinking number of punch list items that remain to be completed on last years street project. Most of the work that remains involves rectifying issues with nine property owners on driveway work Valley Paving completed under the project. NEWS Public Works Engineering The Pipeline Code Enforcement LETTER May 11, 2001 Parks Report The Parks Crew picked up trash daily from the parks, mowed the grass, dragged and chalked fields and striped foul lines on an as needed basis. They also worked on repairs to the lawn sprinkler system at City Hall this week, they re- placed several bad valves and sprinkler heads. They repaired a washout at Roger's Lake Park near the parking lot and aerated the lawns at the 'old Fire Hall" lot and the new Fire Hall site. They prepared the fields at Mendakota Park for the Cretin girls fast pitch soft- ball tournament being held this weekend. They attended a workshop put on by the Sports Turf Man- ager's Association on effective use of nitrogen in fertilizer and treatment of winter kill on cer- tain turf areas. Utility Report Rich checked the City's seven sanitary sewer lift stations daily. He flushed the sanitary sewer line on Winston Court and Diego Lane (this is a trou- blesome line that needs to be watched and flushed several times a year). He mowed the lift station lots. He repaired the alternator at the Veronica lift station and cleaned the grease off the floats. Rich performed sewer inspec- tions for four new connections at the Community Develop- ment Agency's new homes be- ing constructed on Lexington Avenue across from the Public Works Garage. Rich is the City's OSHA and State licensed chemical applicator, he began spraying the parks and other City property this week for weed control (dandelions). His progress was slowed due to windy and rainy conditions. Street Report Dave finished installing the new MTC bus route signs this week. The City completed this work at MTC's request and MTC will re- imburse the City for the ex- penses involved with doing the work. The Crew used spring clean up as an opportunity to dispose of all our old, used tires. We put them in the tire container on Monday morning before it was removed. Many tires are "donated" to the City along the roadways. The Crew worked on mailbox repairs and on sod damaged by snow plow operators this win- ter. Code Enforcement Report Paul issued a permit this week to True North Services to install four new wireless antennas for Sprint on Henry Sibley High School. Paul completed a final inspections at 1230 Northland Drive for the building shell this week. The building is to be oc- cupied by Agere Systems, a subsidiary of Lucent Technolo- gies. The contractor is cur- rently working on their tenant space improvements. Town Center Deed Found Dakota County requires owner- ship research to be done by the landowners, so Larry, Guy & I went to Hastings for lunch on Thursday and stopped by Da- kota County offices to do the research. While there, we found the deed for the City owned Town Center property (the City actually purchased the property in 1971, it was not acquired as a tax forfeited property as we had feared). 711 woodridoe Drive Slope instability The City of Mendota Heights re- ceived a complaint in July of 1999 regarding construction ac- tivity in the rear yard at 711 Woodridge Drive. The City in- vestigated the matter and de- termined that the property was in the Critical Area and that the Contractor did not have the re- quired permits. City staff was not willing to accept the work that was already completed or proposed, and therefore a Geo- technical Engineer was called in to review the matter. The Geo- technical Engineer indicated that the slope construction that was planned may or may not be effective. Slope construc- tion was eventually completed to the extent the homeowner felt was necessary. We learned last week that the slope is now indeed failing, and that stabili- zation of this rear yard slope will be complicated. Cnri n a Cl Pan T In 1�rrnn Ronk NEWS • PEngineering ublic Works The Pulpeline Code Enforcement LETTER May 4, 2001 Parks Report The Parks Crew picked up trash daily from the parks, mowed the grass, dragged and chalked fields and striped foul lines on an as needed basis. They aer- ated soccer fields at Kensington and Mendakota Parks, applied weed and crab grass preventor at City Hall, Fire Station, Public Works Garage and Mendakota Park. They applied fertilizer to the soccer fields at Kensington Park. They cleaned up and prepared Mendakota Park for Sibley High School Girls Fast Pitch Softball Tournament that was held last weekend. Terry and John worked Saturday morning too. Utility Report Rich checked the City's seven sanitary sewer lift stations daily. Rich flushed the sewer lines on Spring Creek Court and easement and marked the manholes located within the easement with a post. He worked with the homeowner at 620 Callahan Place to analyze a sewer blockage —the blockage was totally within the home- owner's service line, not the City's fault or problem. He in- stalled a hydrant marker flag on Creek Avenue at Dodd Road. He assisted in aerating soccer fields in the parks. Street Report George Noack assisted in the parks by digging holes in Ken- sington Park for the West St. Paul/Mendota Heights Rotary Club to plant some spruce trees that were donated by Parks Commissioner Dave Libra. Dave attended the annual loss semi- nar put on by our insurance company (LMCIT). The Crew started repairing sod damage and finished mailbox repairs this week. Code Enforcement Report Paul issued a permit this week to Vogue Homes to construct a new single family home at 706 Evergreen Knoll. The home will have poured concrete founda- tions and exterior walls and is designed to be more energy ef- ficient (see attached news arti- cle). This home is intended to be completed and used as a model home for the fall Parade of Homes. The home is valued at $315K without the lot. A permit was also issued this week to Cell Com Services/AT&T Wireless to extend the height of their antenna tower located on City property at TH55 and Northland Drive. The tower will be raised 30 feet from its exist- ing height of 95 feet to 120 feet. Ultimately, Nextel plans to co - locate a second ar- ray of antennas to this tower at a lower height. Personnel News Dick Gill had an an- gioplasty and a stint installed on one of the arteries serving his heart on Thurs- day this week. Dick will be released from the hospital on Fri- day, after which he will have a 2 week recovery period before re- turning to work. Kensington Park Freeway Buffer Landscaping This Wednesday, 10 members of the Mendota Heights -West St. Paul Rotary Club donated the time and labor necessary to plant 16 potted evergreen trees between the MNDot right-of-way fence and the south side of the Kensington Park soccer fields. City Public Works personnel au- gured holes that Rotary Club members used to plant these trees. Money to purchase the evergreen trees and mulch was donated by one of the Mendota Heights Parks Commission members. Rotary Club endeav- ors like this is their way of showing appreciation to those outside of their organization who have volunteered time to past Rotary Club activities. A landscape buffer of mature ev- ergreens along the south side of the soccer fields will become a great asset to Kensington Park in the future. as concrete 1. Local firm t - solution �'building more energy -efficient homes by Chris Smith Jason Fritz, had a problem. He had a product that he believed would meet many of the changing needs of the con- struction industry and would be a big hit with consumers: concrete homes. But he couldn't seem to change the minds of home builders or overcome the negative perceptions of the public. So Mendota Heights -based Cenr- stone, Fritz's employer, and John Vogstrom of Vogue Homes Inc.decided to take a big step. They built a 1,500- square-foot concrete home inside the Minneapolis Convention Center forlast montlis Home and Garden Show. "The biggest problem is that people think of a concrete home as being like a bunker —cold, damp and dark:' Fritz said. The home show proved otherwise. "It looked just like any other home on the block, onlybetter; he said. Getter in that it is more energy -effi- cient, longer -lasting, quieter and stronger than traditional "Stick frame" homes, Fritz said."1 don't think a single one of the 60,000 people who walked through the model wouldn't want a concrete honic:' he said, noting that he has been overwhelmed with requests for follow-up information."We've cre- ated a good problem for ourselves:' he said. What Fritz is selling is not the homes themselves —that's Vogstrom's job —but the insulated concrete forms (ICF) and the concrete that are used to create the exterior and dividing walls. The forms are essentially an insulating Styrofoam shell that can be stacked and combined in any configuration. Concrete is poured into the ICFs. The forms are manufactured with hard plas- tic strips at regular intervals to which drywall or siding can be directly at- tached. They can also come with con- duits for electrical, plumbing and heating elements. Since concrete exterior walls are solid, the loss of heat is minimized.And since construction requires air ex- changers, indoor air quality is main- tained. Smaller heating and cooling units are used so air is exchanged more often, since the units need to work less Concrete ['iorneS/frompreviouspage foundations have been around for more than two decades in Minnesota; ICF home sys- tems were not far behind. However, in the last five years, the business has taken off nationally, with the number of firms making the forms more than doubling. "Its ready to take off here, too:' Fritz said. "The No. I problem we have is the resistance oflon,- time builders to do something new" Still, Fritz is pushing ahead into new areas. He has seen the growth in concrete dividing galls for townhomes and other common - wall dwellings."It's great for both the fire-rat- in- and the sound-cleadening:' he said. Although concrete is typically used in new construction, some remodeling contractors are also beginning to use concrete walls, both for their efficiency and their ease of installa- tion. Vogstrom agreed that the forms are simple to workwith."A trained crew can do it in the same time or less than with wood -frame con- struction, he said."Anything you can build with regular construction, you can build with these For those who missed the Home and Gar- den Show, Vogue Homes is building two con- crete homes in Mendota Heights for the Fall Parade of Homes."We're doing a rambler and an upper -end two-story:' Vogstrom said. often than in wood -frame homes. Although concrete homes have been more expensive to build than wood - frame hotnesVogstrom said newbuild- ing codes that require more tightly insulated homes are bringing the costs quite close. "The new requirements make a wood -frame house almost as expensive now:' he said. "Plus, the heating effi- ciency is so much greater that you can live in a concrete home for the same monthly cost or even less:' Concrete homes are also built to last. Those who live in them do not have to worry about wood rot, termites or high winds."Right now, (in more established concrete home markets), a concrete home will resell for 3 to 5 percent more than a stick -frame home:' Fritz said."I think that'll go up as more people learn about the advantages and see how durable they are:' Those more established markets in- clude hot -weather states like Florida, Texas and Arizona. Poured concrete Concrete/see next page A worker sets up insulated forms for a wall that will be filled with concrete. "We're going to keep close track of how much it costs to build and how much it costs to heat and coot so we can show that it really is com- parable:' Fritz agreed with Vogstrom that the longer people live in a concrete home, the more they appreciate them."With the cost of heating oil so high and the new building requirements, there are a lot of things coming together at once, he said. -It's an exciting product to be selling right now" NEWS Public Works Engineering The Pipeline Code Enforcement LETTER April 27, 2001 Parks Report The Parks Crew picked up trash daily from the parks, dragged the ball fields, infields and chalked and painted foul lines and soccer field out -of -bound lines The Crew finished sweep- ing the grass on the soccer fields and in the parks. Where there was snow mold the sweeping seems to have saved the grass, it is growing well. They re- moved a fallen tree from the pedway in Valley Park. They used the new chipper to dispose of the tree. They removed and stored the trailer and hose used for the Rogers Lake aerator. They started up the lawn sprin- kler systems at Mendakota and Kensington Parks to find out where repairs need to be made. Utility Report Rich checked the City's seven sanitary sewer lift stations daily. Because he had done some work adjusting a manhole cover on TH 13, and because Roto Rooter had cleaned a homeowner's0 sewer service on Dorset Road, Rich flushed the mains at both loca- tions this week to ensure that they were clean. Rich had to call In and work with Braun Pump on repairs to Lily - dale's lift station. They discov- ered that a chunk of wood was lodged in the impellor and rags and dental floss were caught on them. Street Report The Street Crew installed a "Dead End" sign on Orchard Hill and removed a "Dead End" sign from Knollwood Lane. They con- tinue to have to remove illegal "work at home" signs that are ap- pearing on utility poles around the City. They finished installing the "No Parking" signs on Northland Drive near Brown Institute. They worked on mailbox repairs and pothole patching this week. Last week they finished street sweeping. The six sweepers took 263 hours to sweep the City and they finally pleased Mrs. O'Brien (see attached). Code Enforcement Report This week Paul issued two permits for new homes to be constructed along the north side of Mary Adele within the Curley Addition plat. These lots had been vacant for many years and had a concrete wall and mature spruce trees on them that were planted and in- stalled during the development of the original plat as a screen to the commercial development along TH110. During the approval of the Dakota Bank and Su- perAmerica motor fuel station, Council approved a replat of these lots that increased their size to conform to today's standards. As a condition of approval of the new lots, they were not to be sold for development until after the Bank and SuperAmerica were built and a replacement screening berm, plantings and fence were in place. The contractor began constructing homes this week by removing the concrete wall and some of the spruce trees. One of the neighbors that lives across the street from these homes con- tacted me and complained about removal of the pine trees —it was her recollection that, during the approval process, Dakota Bank agreed to construct a solid fence all along their south property line as a screen. My research of the Developers Agreement does not show this resident to be correct. She currently has an unobstructed view of the bank (the replacement landscaping is only a few years old). After the homes are in - place her view of the bank will be obscured by them. Rogers Lake Shoreland Resto- ration The Minnesota DNR has notified City staff of their intent to land- scape and restore the beach and shoreline with native and aquatic plants in the vicinity of Rogers Lake Park. Last Friday a contin- gent of Minnesota DNR personnel came to City Hall to present a concept plan and discuss the benefits to fish and wildlife habitat and water quality that these prac- tices provide in a lake's ecosys- tem. This type of project has been installed in a number of lo- cations in lakes throughout the metro area. They serve as educa- tional and demonstration sites to the general public for these lakescaping concepts. These ar- eas are ecologically diverse and aesthetically pleasing. The DNR has observed that geese are wary of these areas and tend to avoid them, which many also be viewed as beneficial. The cost of the plantings and labor to install them would be funded by the DNR. The only involvement that the DNR is requesting from the City is their approval and some limited weed- ing and watering effort as may be necessary until the area becomes established. Request for approval will appear on an upcoming Parks & Recreation and City Council agendas. Message W�te 9711 rim e___ . e: �--j {10, ADAMS BUSINESS FORMS NEWS Public Works TheEngineering Pipeline Code Enforcement LETTER April 20, 2001 Parks Report The Parks Crew picked up trash daily from the parks. Believe it or not? - softball season began this week. The Parks Crew had to ready the ballfields by installing the base and foul lines, dragging the in- fields and installing the bases. They had to install the water meters in the restrooms at Kensington and Mendakota Parks in order to open them. They also started sweeping the fields in order to repair the turf damaged by snow mold. They removed downed tree limbs from the parks and removed a downed tree from the pedway behind the Friendly Hills Middle School. Utility Report Rich checked the City's seven sanitary sewer lift stations daily. He lowered a sanitary sewer manhole cover located on TH13 between London Road and Downing Street that was hit by a MnDOT plow. Street Report The Street Crew worked on patching pot holes last Friday. Starting this Monday morning, they worked with McPhilips, the City's sweeping contractor, to clean all of the City's streets. Our Crew provided the trucks for the sweepers to empty their sweepings into and then they dispose of the sweepings at the City's new site recently acquired from Res- urrection Cemetery. McPhilips uses six sweepers, so that they are able to completely sweep the City in about three days. They worked three twelve hour days and had no serious break- downs. This year the amount of sand that had to be swept up was significantly higher than past years because of our un- usually long winter with lots of snow and ice. Delaware Ave. Turn Lanes At their April 17th meeting, Council discussed MnDOT's re- sponse to the their request for left turn lanes on Delaware Avenue at TH110. MnDOT had denied the City's request but had left the door open to their cooperating with some funding, if the City and County still wanted to do a project. Brenda Machacek, a resident who lives nearby and a frequent user of the intersection, was at the meeting and informed the Council of her many unpleasant experiences using the intersec- tion. Council asked me to write a letter to the County asking for their help in improving the safety of the intersection (letter attached). Marie Avenue Resurfacino Proiect A public hearing was held at the last Council meeting to con- sider resurfacing Marie Avenue from Lexington to Dodd Road. There were about a half a dozen property owners in at- tendance at the public hearing. Council accepted the feasibility report and directed the Engi- neering Department to proceed with the preparation of plans and specifications for the pro- ject. Development News Dick Braun, of RHB, Inc. stopped by City Hall to gather all the background information we could provide concerning all the parcels owned by the Bid- der's in the Superblock area. The Ridders own approximately 32 acres of property south cen- trally located between Marie and Wentworth east of Dodd Road. He is representing the Ridder family in the marketing and possible sale of the prop- erty. He has scheduled a meeting with the City Planner next Monday to discuss all of the relevant issues that may be pertinent in the development of this property. Ridder Parcels Highlighted Attachment 4 [A A nl�', '6, JA April 19, 2001 Don Theisen, Dakota County Engineer Dakota County 14955 Galaxie Avenue Apple Valley, MN 55124-8579 Dear Mr. Theisen: V 1 1; a I'� Mendota Heights recently received the attached letter from Mr. Bruce Kastner, MnDOT Traffic Engineer, responding to the City's 1999 request that MnDOT install left turn lanes on Delaware Avenue (CSAH 63) at TH 110. In his letter, Mr. Kastner informs the City that he has estimated the costs for completing a major reconstruction of the intersection and finds the costs for such a project to be very high. He reports that these high costs, when compared to the accident history at the intersection, do not justify MnDOT's completion of a project at this time. He suggests that if Mendota Heights and Dakota County still wish to pursue a project, MnDOT may be willing to participate in a share of the costs. The Mendota Heights City Council reviewed Mr. Kastner's letter at their April 17, 2001 meeting and directed me to send you a letter requesting Dakota County's assistance in improving the safety of the intersection. The City continues to receive complaints from users of the intersection that it is unsafe. The intersection is also adjacent to Henry Sibley High School and has many juvenile drivers using it. One of the vehicles involved in a 1999 accident was being operated by a Henry Sibley student. Also, all other intersections along TH 110 currently have been upgraded to include left turn signals. The City requests that Dakota County investigate the possibility of completing a less expensive, shorter term fix solution, possibly by adding left turn lanes without right turn lanes. The status of possible improvements to this intersection are of a major concern to the City Council, so please keep me informed of your progress in analyzing our request. Thank you. Sincerely, p in es E. Danielson ((( blic Works Director Attachments cc: Mayor and Councilmembers Patrice Pataglia, Dakota County Bruce Kastner, MnDOT Peter Sorenson, Dakota County Brenda Machacek I1o1 victoria Curve - Mendota Heights, MN 55118 (651) 452.1850 ^ FAX (651) 452.8940 NEWS Public WorksEngineering The Pipeline Code Enforcement LETTER April 13, 2001 Parks Report The Parks Crew picked up trash daily from the parks. The ice went out on Roger's Lake either Wednesday night or early Thursday this week, so there is no longer any need to run the DNR aerator. The Crew installed all the tennis court nets and re- paired the old picnic tables in the parks. Where the walking trail crosses the Creek in Valley Park over two 36" culverts, it washed out. The Parks Crew barri- caded the trail. Tom Knuth is analyzing how we should repair the crossing. The other two locations where the trail crosses the creek are by bridges, so Tom is also estimating what it would cost to install a bridge at this location too. (A bridge would then pro- vide the safest, most long term solution). Utility Report Rich checked the City's seven sanitary sewer lift stations daily. (As of Thurs- day, checking the Lilydale station became much more difficult when the Mississippi River flooded the access road and trail). Rich placed a water box cover on Copperfield Drive that was damaged during snowplow- ing. He had to locate and open the storm water inlet located on the Xcel Energy tank farm (by Ecolab). The inlet had plugged and had created a huge lake. He continued to inspect the City's sanitary sewer main line this week. He inspected Lilydale's stormwater main line, as agreed to by the City Council. Street Report The Street Crew installed the "No Parking" signs at the driveways by Brown Insti- tute (students were parking too close to the driveway en- trances making it very diffi- cult for cars to enter some of them and impossible for trucks). They continued to patch pot- holes —Freeway Road, First Avenue, etc. based on com- plaints. They removed the plow wings and sanders from the trucks to make them ready to haul street sweeping sand on Monday. McPhillips, the City's sweep- ing contractor, has notified us that they will be starting sweeping streets then. McPhillips will be using six sweepers in order to finish the job rapidly (last year they were done in three days). Roger's Lake Stocking Guy Kullander was informed by a resident that lives on Wagon Wheel Trail that he had a conversation with the DNR Department of Fisheries and they informed him that last fall 100,000 walleye fry and 34 adult northern pike were placed in Roger's Lake. The DNR is enthusiastic that the fish stock placed in the lake will eat lots of the bull- head minnows in the lake, thereby helping to "clean up" the lake. Code Enforcement Report Paul issued a permit this week to Hoffman Homes for a new, two unit townhouse structure to be constructed in Augusta Shores. It must also finally be spring, because Paul issued a permit to Valley Pools to install an inground pool at 870 Mendakota Court. Paul issued a permit this week to R.C. Burns, Inc. (no pun in- tended) to repair the fire damage done at the Gene and Marlene Schiff residence located at 2196 Aztec Lane ($46k valuation). This was the garage damage caused by the recent garage fire. �N E W S Public Works - The Polpel s e Engineering eering Code Enforcement LETTER April 6, 2001 Parks Report The Parks Crew picked up trash daily from the parks and checked the DNR aerator on Roger's Lake. The Parks Crew cleaned out the wood duck homes located in ponds at various sites in the parks. They started sweeping the trails and changing their equipment over from winter use to summer use. Utility Report Rich checked the City's seven sanitary sewer lift stations daily. Rich installed the hy- drant markers on all the new hydrants in the Augusta Shores project this week. He also walked the sanitary sewer main trunk line, removed the manhole covers to check that everything was working prop- erly. Street Report The Street Crew worked on mailbox repairs this week. They installed the curve warn- ing signs on Decorah Lane at the curve near Ocala Lane. They received the "no parking" signs for installation near the driveways on Northland Drive where Brown Institute stu- dents are parking too close to driveways causing difficulty for the nearby businesses. They worked on patching potholes at various locations in the City. Code Enforcement Report Paul issued a permit to Tharald- son Development Company this week to remodel fourteen rooms to suite rooms in their Heritage Inn Hotel. Delaware Left Turn Lane This week I received the at- tached letter from Bruce Kast- ner, MnDOT Traffic Engineer, concerning MnDOT's analysis of the intersection at Delaware Avenue and TH110. The City Council had requested that MnDOT install left turn signals at the intersection after a near fatal accident that occurred in 1999. After MnDOT received the request, Bruce contacted me and told me that he agreed that adding left turn signals at this intersection would be MnDOT's responsibility and that it would be a very good idea. Now, after his analysis has been completed, he still agrees that adding left turn signals would be a good idea, and MnDOT's responsibility, but the cost -benefit of doing the pro- ject is not there. The project is estimated to cost over 1/2 mil- lion dollars, not including right- of-way acquisition, and a study of the accident history shows that only the one, 1999 acci- dent may have been eliminated by left turn signals. This pro- ject does not compare well with other, more dangerous inter- sections when competing for scarce MnDOT funds. Bruce tells me that if the Cities involved and the County were willing to share in the costs of a cooperative agreement project, the State would also contribute its cost share. Of course, Men- dota Heights, West St. Paul, Sunfish Lake and Dakota County would all need to coop- erate in this application, which would also be in competition with other similar state-wide projects for funding. This letter will be placed on the next City Council meeting agenda for dis- cussion about a next course of action. Sink Hole Mystery Solved Tuesday evening before the City Council meeting, Scott Johnson and I were called to 916 Chippewa Avenue to inves- tigate a large sink hole that had formed in the backyard (in the garden). We were puzzled as to the reason for the sinkhole — there were no City utilities nearby and no other clues as to what cased the hole (8-10' di- ameter and 12-13' deep). For- tunately on Wednesday, an- other chunk of soil fell in the hole exposing a pipe heading in the direction of a nearby home, the old farmhouse structure that was the first home in the area. The hole was caused by the total collapse of a rusted old metal septic tank. The fill- ing of the hole is not covered by homeowners insurance, so the homeowner requested that the City let her use street sweeping sand to fill the hole. to Minnesota Department of Transportation Metropolitan Division Waters Edge 1500 West County Road B2 Roseville, MN 55113 March 29, 2001 Mr. James E. Danielson Public Works Director City of Mendota Heights Mendota Heights, Minnesota 55118 Dear Mr. Danielson: SUBJECT: C.S.1918 T.H. 110 at C.S.A.H. 63 (Delaware Avenue) Intersection Review In Metro Division Engineer Richard A. Stehr's, November 29, 1999 letter to you, he stated that we would investigate the possibility of providing left turn lanes on Delaware Avenue and/ or split phasing the Delaware Avenue signal operation. Your concerns were generated by a crash that occurred on October 9, 1998 in which a driver passed a southbound left turning vehicle on its (eft and collided with a vehicle going southbound through the intersection continuing to follow Delaware Avenue. We have reviewed the crash history of this intersection for the four years 1997 through 2000 and evaluated different scenarios that would install left turn lanes on C.S.A.H. 63 (Delaware Avenue). Based upon the low number of correctable crashes and the relatively high estimated construction costs, we believe that the expenditure of State funds is not justified. We delayed responding until all of the 2000 crash information was available. We reviewed the crash reports of all of the crashes coded to this intersection from January 1, 1997 through December 31, 2000. There were 16 crashes reported during this four-year period. Seven in 1997, none in 1998 six in 1999, and three in 2000. The October 9's, 1998 crash was the only one - involving a driver turning "inside" an opposing left turning vehicle. Of the 15 other crashes, only the November 21, 1999 crash may have been eliminated if left turn lanes had been in place. Collision diagrams showing these crashes are attached for your information. The proximity of the frontage roads, north and south of T.H. 110, makes the installation of left turn lanes on Delaware Avenue very difficult. None of the scenarios provided reasonable tapers to move the through lanes over to introduce the full width left turn lanes, between the frontage roads and T.H. 110, The resulting turn lanes are very short and do not provide adequate storage. The widening of Delaware Avenue, even to accommodate this substandard An equal 0000rtunity employer Mr. James E. Danielson March 29, 2001 Page 2 improvement, would require replacing the existing traffic signal system. The lowest road construction cost scenario, which provided left turn, through, and right turn lanes, was estimated at S 175,000. An additional 5200,000 would be needed for new traffic signals. To do the "right" improvements, would mean moving the north frontage road approximately 600 feet north. This would impact the homes in the northeast quadrant of the frontage road and Delaware Avenue intersection and is not feasible. Similar changes would be needed for the frontage road on the south side of T.H. 110. We have not attempted to estimate the construction cost or right of way acquisition cost for this option. Changing the operation of the existing traffic signal system to split phase is not possible at this time. If this option were pursued, considerable delay would be added to all approaches to this intersection and the overall operation of the other signals along T.H. 110 would be adversely affected. Our traffic signal operations section will be studying the operation of all of the signals on T.H. 110 this summer with the intent of developing new timing plans. They will be exploring the possibility of revising the operation of the T.H. 110 and Delaware Avenue signal system as part of this effort. Steven Misgen, Traffic Signal Operations Engineer, is heading this effort. He will be in contact with you as they conduct this study. If Dakota County or the City of Mendota Heights wishes to pursue this work, I am sure that Mn/DOT, assuming funds are available, would be willing to participate according to our cost sharing policies. Please feel free to call me at 651.634.2145 if you have any questions or comments regarding this issue. Sincerely, &A - Bruce C. Kastner Division Traffic Studies Supervisor CC' Mr. Donald Theisen — Dakota County Engineer Mr. Donald Sterna — Sunfish Lake City Engineer Mn/OOT 2942 (rev 9-11-92) Collision Diagram Minnesota Department of Transportation Location: TH 110 Q DELA'WARE AVE R.P. 002-00.965 Time Period: 1/1/97 - 12/31/97 Date: 1/19/01 Prepared By: K SOMMERS w a North ¢ ¢ J W O MNTH 110 6/04/97 (15) L-C-D N 9/05/ 7 (16) L-C-(3) 24/97 (16) L-�m No. of Accidents Fato1= 0 A Injury= 0 B Injury= 0 C Injury= 2 Injury Total= 2 Property Domage= 5 Total Accidents= 7 3/24/97 (18) DI-S-S (4)� C�000004� ram/ 10/06/97 (14) L-C-D MNTH 110 KEY NOTES (11 AUI ((EFL Motor Vehicle Backing Up Details (2) AR = -ou>3-) Motor Vehicle Out of Control Unclear (31 SR = Motor Vehicle Ahead 9 Pedestrian L ightm Weather: Surface: g L= Daylight (1)C= Clear or Cloudy ( I or 2) D• Dry (1) Fixed Object c i Bicycle/Moped ON= Dawn ( 2 ) R= Rain (3) W' Wet l21 M MOtorayc le Du - Dusk 13) S= Snow or Sleet 1 4 or 5 ) S= Snow or Ice ( 3 or 4 l ® Fatal Acc Yb qJ F= F Son Smoke (6) M. Muddy (5) 0 A Injury Acc. 06 B Injury Acc. © C Injury Acc. o Property Damge Acc D1= Dark. Lighted 1 og. g. Rear End Dom Dark. Lights Off (5) B= Blowing Sond/Dust (7) Ob= Debris (6) Property Damage D= Dark. Unlighted (6) W= Severe Crosswinds (8) 0= Oily (7) %= Unknown (99) %= Other or Unknown (99) %= Other Or Unknown 6 Right Angle o*oer B Injury wen i<Ic inJ ury LlOa:el—[i Irn �tvS�J-0.�gn:-Wea mer-S u'iacel �yoe Mn/DOT 2942 (rev 9-I1-92) Collision Diagram Minnesota Depart(rPnt of Transportation Location: TH 110 9 DELAWARE AVE. R.P. 002.00.965 Time Period: 1/1/98 - 12/31/98 Dote: 1/22/01 Prepared By: K SOMMERS i T W a North MNTH 110 KEY OF, ) Motor Vehicle Backing Up Details Unci ear -00o-3 Motor Vehicle Out of Control (I) AQ_ (2l AR = (31 SR= No. of Accidents Fatal= 0 A Injury= 0 B Injury= 0 C Injury- 0 Injury Total= 0 Property Damage= 0 Total Accidents= 0 MNTH 110 —) Motor Vehicle Ahead Pedestrian L ight: Weather Surf OcleT B L= Daylight (1) C= Clear or Cloudy ( I or 2) 0= Dry ( U ❑ Fixed Object � Bicycle/Moped DN• Dawn 12) R= Rain (3) W= Wet (2) 4 M MotorcyCle Du• Dusk (3) S= Snow Or Sleet (4 or 5) S= Snow or ICe 13 Or 411 Fatal Acc d (41 F• Fog Snag Smoke (6) M• Muddy (5) oa A Injury Acc. a B Injury Acc. © C Injury Acc. a Property Damage Acc DI= Dark, Ltghte Rear End Dow Dark. Lights Off (5) 8= Blowing Sand/Dust (7) OD= Debris (6) Property Domage 0= Dark, Unlighted (6) W= Severe Crosswinds (6) 0= Oily (7) X= Unknown (99) X= Other or Unknown (99) X= Other or Unknown (9 — Right Angle B Injury Greer [aorel—(Ttm.- rt,re�l—(Lbn<-wea mer-S �riccel ven�ci� �^I=;rr --- T yDd ,U/DOT 2942 We,, 9-I1-92) Collision Diagram Minnesota Department of Transportation Location: TH 110 0 DELAWARE AVE R P 002=00.c;5 Time Period: 1/1/99 - 12/31/99 Dote: 1/23/01 Prepared By: K SOMI,-ERS T w w North 3 ¢ J W O MNTH 110 KEY No. of Accidents Fatal= 0 A Injury= I 8 Injury= I C Injury= 2 Injury Total= 4 Property Dcrwge= 2 iotol Accidents= 6 / 1/ 0/99 (14) L-S-5 (3)C 3/01/99 (07) L-C-D JA 3) Et 7/ 8/99 (11) C-D 0, � MNTH I10 l - (17 ADT = 23026 W, Motor Vehicle Backing Up Details (z) AR R = 2.1 Unclear �D Motor Vehicle Out of Control hts Weatherr Surface, Motor Vehicle Ahead 9 Pedestrion 6 rL.Daylight11)C= Clear or Cloudy 11 or 2) D= Dry (UBicycle/MopedFixed Object �b mm (2) R. Rain (3) w= wet (2) 4 M Motorcycle usk (3) S= Snow or Sleet (4 or 5) S= Snow or Ice l3 or Fatal Acc 7b 4) - FFo Smo Sanke (6) M= Middy (5) Q A Injury Acc. 08 B Injury Acc. Q C Injury Acc. 0 Property Damage Acc D1= Dark, Lighted 9. 9• Rear End Do= Dark. Lights Off (5) 8• Blowing Sond/Oust (7) Db= Debris (6) ' Property Dortnge D= Dark. Unlighted (6) w= Severe Crosswinds (6) 0= oily (7) � � %• Unknown (99) X= Other or Unkno', (99) X• Other or Unknown (5 'R Right Angle 0*ner ven icie inl vey� [oatel—((Irt: �:vs�l—f: �pne-rearner-Sv'Iece) B Injury - � 7yoa Mn/DOT 2942 (rev 9-II-92) Collision Diagram Minnesota Department of Transportation Loco IiOn+ TH I10 0 DELAWARE AVE R P 002 inn a-5 Time Period: 1/I/00 - 12/31/00 Date: 3/28/01 Prepared By: K SOMMERS i T W a North w MNTH 110 E ) Motor Vehicle Backing Up Details Unclear -aoo-) Motor Vehicle Out of Control (I) ADT = 23026 1z)AR =04 (31 SIR 0 4 n No. of Accidents Fatal= 0 A Injury= 0 B Injury= 0 C Injury= 0 Injury Total= 0 Property Damoge= 3 Total Accidents= 3 MNTH I10 --) Motor Vehicle Ahead Pedestrian Light, Weather 1 Surface, 6 L• Daylight (1) C= Clear or Cloudy ( 1 or 2) D= Dry I rl Fixed Object b Bicycle/Moped ON Dorm 12) R= Rain (3) W= wet (2) M Motorcycle Du• Dusk (3) S. Snow or Sleet ( q or 5 ) S= Snow or Ice ( 3 or < I Fatal Acc YIE; A Injury Acc. © 6 Injury Acc. © C Injury Acc. O Property Dornage Acc (1 - DI. Dark. Lighted og. 9. Rear End Do. Dark, Lights Off (5) B% Blowing Sand/Dust (7) Db= Debris (6) Property Dormge 0= Dark, Unlighted (6) W. Severe Crosswinds (8) 0= oily (7) X= Unknown (99) X= Other or Unknown (99) X. Other or Unknown (99 —)Q Right Angle o,ner B Injury v<m cie inlury Itowel-[n� ,nrnl—atG�.*-weo+ner -5,.-focal Tycc NEWS Public WorksEngineering The Pipeline Code Enforcement LETTER March 30, 2001 Parks Report The Parks Crew picked up trash daily from the parks and checked the DNR aera- tor on Roger's Lake. They also purchased and assem- bled several handicapped accessible picnic tables for placement in the parks this summer. They attended a seminar put on by North Star Turf where new prod- ucts were presented. Utility Report Rich checked the City's seven sanitary sewer lift stations daily. Rich was called in about noon on Sunday to open a sanitary sewer main blockage. The homeowner at 1051 Doug- las Road had noticed sew- age coming up through his floor drain —called Roto Rooter and they discovered that the problem was in the City's main. Rich discov- ered that roots and grease in the line were the cause of the problem and used the City's sewer jetter to open the line. Rich helped Len, the City's Mechanic, by run- ning for parts. Street Report The Street Crew disposed of two road —killed deer, worked on mailbox repairs and removed some advertis- ing signs that had appeared on telephone poles along Dodd Road. The Crew worked on patching potholes on Marie Avenue, Mendota Heights Road and Northland Drive this week. Code Enforcement Report Paul issued a permit this week to United Properties Construction Company for 72K square feet of office and lab space finish work in their Tech Center 4 building lo- cated at 1230 Northland Drive (the "Y" building). The permit valuation was for $750K. During building permit ap- proval by the City Council, Council was informed that Lucent Technology (a spin off company of AT & T) would occupy the space. The space will now be occu- pied by Agere Systems (a spin off company of Lucent). Agere, formerly the most profitable division of Lucent, this week was approved for a $3.5 billion IPO. Agere tests semiconductor prod- ucts used in phones. United Properties will own the build- ing and has a ten year lease with Agere to occupy the space. (See attached Wall Street Journal Article). Water Main Break The number of cold weather related water main breaks continue to increase in Men- dota Heights. Monday morning a water main break took place on a hydrant lead on North Freeway Road in the Jefferson Heights neighborhood (see photo). St. Paul Regional Water Ser- vice repair crews were able to complete the necessary repairs in a matter of hours. St. Paul Regional Water repaired this water line break on North Freeway Road Monday morning. NEWS Public Works — EngineeringThe Pipeline Code Enforcement LETTER March 23, 2001 Parks Report The Parks Crew picked up trash daily from the parks and checked the DNR aerator on Roger's Lake. The Parks Crew repaired the hockey nets this week. They attended a Turf Seminar to learn how to de- tect, treat and prevent turf grass diseases on the athletic fields. Utility Report Rich checked the City's seven sanitary sewer lift stations daily. Rich replaced the indi- cator lights located on the in- strument panels for the Veron- ica and Culligan Lane sanitary sewer lift stations this week. He performed a sanitary sewer connection inspection for the repair of an existing connec- tion at 2335 Dodd Road. Rich and Tom Knuth inspected the sanitary sewer manhole lo- cated at Mendota Plaza that caused a backup last month and resulted in sewage flowing into the basements of two homes on Aztec Lane. They found that the line was back- ing up again. They flushed it open and used a lamp and mirror to look up the line. They saw that a metal window frame was stuck in the line and was what was causing it to backup. They were able to re- move the frame, hopefully this will solve the problem. (Rich will monitor it regularly for the next few months). Street Report The Street Crew was still open- ing some frozen storm water catch basins this week. They installed some advance warning signs along Mendota Heights Road and Huber Drive at Friendly Hills Middle School. The signs were obtained by the Police Department through a 50-50 matching grant with the State and are used to warn mo- torists to stop for pedestrians in the crosswalks. The removed the plow, wing and sander from truck #312 and installed the hotbox for patching streets. The St. Paul asphalt plant opened for busi- ness on Thursday. The guys reported that there was a very long line of trucks waiting to buy patching material on Thursday morning - when it first opened. IIIE Watermain Break crew from St. Paul Regional Water Service indicated that this was their third watermain break notice they received that morning in their suburban ser- vice area. Marie Avenue Resurfacing Info Council directed staff to call a public hearing at their last meeting to consider resurfacing Marie Avenue from Lexington to Dodd Road. A check of project records indicates that the seg- ment between Victoria and Dodd Road received a mill and overlay in 1992/1993. This section is in relatively good condition except for the 420- foot long at -grade bridge sur- face segment east of Wachtler that abut properties extending from 766 to 786 Marie Avenue. There was a water - main break on Thursday morning at 701 Roundhill" Road. Watermain breaks most com- monly occur in the fall or in the spring when the frost is — either going in or This wild turkey is a frequent visitor to Becky coming out of the Pentel's deck —it even eats from her bird feeder ground. Spring and is amorous with a female decoy she has in her must be here be- cause the repair sliding glass window! NEWS Public WorksEngineering The Pipel i n e Code Enforcement LETTER f4 March 16, 2001 Parks Report The Parks Crew picked up trash daily from the parks and checked the DNR aerator on Roger's Lake. The Parks Crew plowed their cul-de-sacs, parks parking lots, and trails as a re- sult of Monday's storm. They had to repair truck 501's transmission which was dam- aged as a result of plowing trails. Utility Report Rich checked the City's seven sanitary sewer lift stations daily. Rich also plowed all his lift station driveways and park- ing lots this week and worked on repairing his "fetter" which has been used to open frozen catch basins. Street Report The Street Crew worked on opening frozen catch basins this week and many other clean up type duties after Monday's storm. They also had to replace a broken trip edge spring for the wing plow on plow truck #304. They also met with a software company to discuss their software pro- gram that could be used to m- ventory and manage the main- tenance of the City's signs. Tom ordered another 25 tons of more salt this week for the City's storage shed (capacity = approximately 100 ton). He has kept the shed as close to being full as he can all winter long —just in case. It has been reported at his Street Superin- tendents meeting that all Cities, the State and Counties are short of salt this winter, but Morton Salt, our salt supplier, has kept us well supplied all winter long. The State is so low on salt that they have be- gun using a sand/salt mixture instead of their usual straight salt. Low Impact Development Conference Marc Mogan attended a work- shop on Wednesday and Thurs- day titled "Protecting Water Re- sources Through Low Impact Development'. The Dakota County Soil and Water Conser- vation District, Minnesota Land Trust, Minnesota Erosion Con- trol Association and the McKnight Foundation jointly sponsored the conference. Low impact development (LID) in- tegrates ecological and environ- Snow Events for Week Date: Amount: Response: 3/12/01 6.5"* Plow all areas *This brings the total for the year to 72"! mental considerations into all phases of urban planning, de- sign, and construction. The goal of LID is to minimize the impacts of urbanization on the water resources. LID incorpo- rates the philosophy of smart growth and conservation site design principles into site de- velopment to the fullest extent possible. LID storm water management practices strive to decrease runoff volume from a site by increasing infiltration and maximizing evaporation and evapotranspiration. Biore- tention areas (rain gardens) are an LID design facility that can be installed in a small area and is very effective in removing pollutants from storm water runoff. These concepts and features can result in a more economical design than a con- ventional storm water system in certain cases, and they can be readily retrofitted into exist- ing developed areas as well as incorporated into the design of new and redevelopment pro- jects. Happy St. Patrick's Day! NEWS Public Works eering The Pipeline Code Enforcement LETTER March 9, 2001 Parks Report The Parks Crew picked up trash daily from the parks and checked the DNR aerator on Roger Is Lake. They also cleaned out the warming houses this week and removed the flooding hoses. They recon- verted the Toro snow- blower used for clean- ing rinks back to being a lawn mower for sum- mer use. Street Report The Street Crew had no snowfall events this week, but they opened frozen catch basins during melting days and worked on mailbox repairs. The steel framing that surrounded the hoist in the City's maintenance bay began to settle as a result of corrosion. We felt that this posed a safety hazard and called in a hoist repair service to investigate the problem. The ser- vice found that, due to the fact that there is corrosive soil, all of the underground compo- nents of the hoist are seriously damaged by rust. The hoist is a much needed piece of equipment (for repairing all of our trucks, we need this hoist), so we authorized the repair service to complete emergency repair work immediately on the hoist. The Street Crew at- tended a traffic control seminar this week to be updated on work zone safety procedures. Utility Report Rich checked the City's seven sanitary sewer lift stations daily. Rich also assisted the Street Crew with opening catch ba- sins and assisted Len Kanitz, the City's me- chanic, by running for repair parts that he needed. Code Enforcement Report Paul issued a permit to McDonald Construction Company to construct a two story, single family home at 619 Butler Ave- nue. This is the last va- cant lot and will finish out development of the Ivy Keep North plat. The home's valuation is estimated at $224K not including the cost of the lot. Paul also issued a per- mit this week to United Properties Construction for tenant space finish at 1355 Mendota Heights Road (South Ridge PUD). The re- modeling project is to complete 6175 square feet of office space and 1600 square feet of storage space to be oc- cupied by "Accelerated Payments, Inc." NEWS Public WorksEngineering The Pipeline Code Enforcement L E T TE R March 2, 2001 The Parks Crew picked; up trash daily from the parks, checked the warming houses and checked the DNR aerator, on Roger's Lake.The Parks Crew ,attended Toro Univer sity this week to be updated on turf care, sprinkler system repair and ' general athletic field management. The hockey rinks were closed- for the season after last week- end's heavy, wet snow. The forecast is for above freezing temperatures. This is one of the latest times that the rinks have remained opened. Utility Report Rich checked the City's seven sanitary sewer lift stations daily. Rich "saved" the Pay- checks Building from being flooded this week. The catch basin that their roof drains empty into was frozen shut and water was backing up into the building (he jetted the fro- zen basin open). The entire Public Works Crew is working hard all over town this week to open catch basins and relieve the street flooding. Rich worked with Safe As- sure —the City's safety consult- ant this week to make sure he purchases an OSHA approved gas monitor (his old one no longer works and it was too expensive to repair). He only had a 3-gas monitor and OSHA now requires cities to have a a-s the moni- sewer man- mce of nox- enters them and H2S. The Street Crews have been working 'daily on mailbox re- pairs —many ,,boxes have been damaged due to the extra heavy, deep snow. They also have been working on improv- ing site distances at intersec- tions' where we have been re- ceiving complaints: They have been working on clearing off bridge decks (Mendota Heights Road and Wagon Wheel Trail at 35E). Bridge deck snow re- moval is a job made difficult because all of the snow has to be removed from the bridge — none can be pushed over onto I-35E and possibly onto cars. They have also been putting "cold mix" asphalt into potholes as temporary patches until spring. Last Saturday plowing began at 7:00 A.M. and was finished by 5:00 P.M. The Crew returned Sunday morning at 4:30 A.M. and had to plow until 5:00 P.M. Snow Events again. The Crew was plagued on Sunday by breakdowns be- cause of the heavy, wet snow. The breakdowns made plow- ing go very slowly. Once a breakdown occurs it takes several employees to help move the immobile vehicle to the shop for repair and then the mechanic usually needs a helper in the shop to help make the repairs. Date: Amount: Response: March came in like a lamb —let's hope it doesn't go out with a roar! 2/24/01 3" + Plowed entire City 2/25/01 5" + Plowed entire City (and opened catch basins for drainage) NEWS Public WorksEngineering The Pipeline Code Enforcement LETTER February 23, 2001 Parks Report The Parks Crew picked up trash daily from the parks, checked the warming houses, checked the DNR aerator on Roger's Lake and cleaned and flooded the ice rinks as needed. The Parks Crew worked on equipment main- tenance this week. Utility Report Rich checked the City's seven sanitary sewer lift stations daily. Rich met this week with Brian LeMond, Lilydale's engineer, to assist him with designing an upgrade to their sanitary sewer lift station. The station is extremely old, out of date and its upgrading was made as one of the ob- jectives of their TIF for their Stone Bridge project. He performed a sanitary sewer inspection for a new home being constructed at 611 Butler Avenue. On Thursday of this week, a homeowner at 2112 Aztec Lane noticed sewage in his basement and called Public Works. Rich and Tom inves- tigated, they discovered a blockage in a pipe near a manhole located in the park- ing lot of the Mendota Plaza Shopping Center. This block- age was backing up sewage all the way to Aztec Lane. The owner at 2112 noticed the sewage first, but the home at 2106 where no one was home (owner in hospital) was more greatly impacted. Fortunately, the homeowner at 2112 had a key to that home and we were able to work with him to make sure the sewage drained out and that a cleaning contractor was hired to clean up the mess. This is the second backup at that location (the other one was three years ago) so we will be televising the line as soon as we can to see if there is some problem with it that needs to be dug up and re- paired. Street Report Members of Inver Grove Heights' Public Works sign making department were good enough to come over and work to train the Street Crew on our new sign making machine. While training, they discovered a problem with the plotter and our crew is at- tempting to get the supplier of the equipment to come and repair it. Code Enforcement Report Paul issued a permit to R.J. Ryan Construction Company this week to construct a show room within the building lo- cated at 1450 Northland Drive (just north of Brown Institute) for displaying their party products. Water Main Break News A water main break occurred Sunday afternoon on the north end of the City on a segment of water main in an easement area in the Ivy Falls townhome development. The water main break occurred between garages in a paved area. Water entered some garages but didn't cause any damage of a significant na- ture. St. Paul Regional Water Service repair crews were called out Sunday to make the necessary repairs. Final pavement repairs will have to wait until spring to be com- pleted. Year 2001 Street Proiect Poll Eight residents that would be assessed for improvements under current City policy were polled to determine their sup- port or opposition to a mill and overlay type of street re- surfacing project on the sec- tion of Marie Avenue between Lexington Avenue and Victoria Road. Five of the eight resi- dents returned postcards as requested expressing their views on the proposed pro- ject. Four of the residents that returned postcards indi- cated that they opposed a street resurfacing project in 2001 on this segment of Marie Avenue as proposed. NEWS Public WorksEngineering T h e P i p e l i n e Code Enforcement LETTER February 16, 2001 Parks Report The Parks Crew picked up trash daily from the parks, checked the warming houses, checked the DNR aerator on Roger's Lake and cleaned and flooded the ice rinks as needed. The Crew had to replace the plow undercarriage on Truck #501 (the repair took one day to complete). Utility Report Rich checked the City's seven sanitary sewer lift stations daily. Rich had to replace a sanitary sewer manhole cover on Marie Avenue near Callahan Place —the old one had broken and was rattling. Street Report Last Friday about noon, there was a serious watermain break that occurred at the intersec- tion of Arcadia Drive and Syl- vandale Road. There is very little storm sewer in that neighborhood, so the water from the break backed up in Falls View Court and Maple Snow Events Date: Response: Park Court. The Street Crew had to open several frozen cul- verts in order to allow the wa- ter to drain away. One of the home's garage on Maple Park Drive was threatened with be- ing flooded. The Street Crew helped that homeowner divert the water away from the ga- rage until St. Paul Regional Wa- ter Services could shut down their leaking line (there were seven valves that had to be closed). The Street Crew had to work quite some time to clear the slush from roadways before it froze, and sanded/salted slip- pery areas. I believe that there were not any residents flooded and that they were all happy with our fast actions to keep them safe. The mechanical problems con- tinued: The serpentine belt broke on plow truck #308 and had to be replaced. In order to replace the belt, the plow, wing and many engine components have to be removed. The whole process required an en- tire days work. The Crew cleaned some hy- drants buried —I by snow. 2/9/01 Replowed and cleaned up after Thursday's storm. 2/11/01 Sand slippery areas. State Aid Training Marc Mogan and John Tran attended a three hour training session hosted by MnDOT for over 100 County and City representa- tives in the Metro area. MnDOT state aid personnel and soft- ware developers trained those attending on the application software's operation and an- swered questions. The purpose of this needs study application software is to provide informa- tion for the apportionment of state aid funds. Each year County and City Engineers must submit the necessary in- formation explaining their road structure and railroad crossing funding needs to the Commis- sioner of Transportation. This needs data must now be en- tered directly into a database over the internet to a server on MnDOT's website. Year 2001 Street Proiect Letters and return postcards were mailed out on Tuesday this week to eight homeowners on the segment of Marie Ave- nue from Lexington Avenue to Victoria Road. The purpose of this letter is to determine if there is any interest in a street rehabilitation project for the year 2001 construction season. This street section would be re- surfaced with a simple mill and bituminous overlay paving method. The most recent bitu- minous construction project oc- curred nearly 20 years ago, and the street conditions have been deteriorating. The deadline for responses to be returned is February 23, 2001. A copy of the letter sent is attached. NEWS Public Works Engineering Code Enforcement Street Report After a relatively maintenance free season of snowplowing so far, this snowfall resulted in numerous breakdowns and re- pairs: 1. Plow #308 spring on t the wing. 2. Replace the cutting edg( on plows #308 and #310. 3. Fix broken wing spring on cutting edge for truck # 304. UN1111119,f� S. Two cul-de-sac plow trucks had snow plow frame breaks. An Aspen Equipment employee trained the entire shop on the proper use of the new brush chipper this week. The trainer covered the operation, mainte- nance and the safety features for operating the new ma- chine. Date: Snow Amount: 2nloi Start of 6" 2/8/01 6" The Polpefine Parks Report The Parks Q daily from''t the warming the DNR a Lake and cl the ice rinks Park this February 9, 2001 Utility Company News up trash Xcel Energy gas repair person - checked nel were called out on Wednes- checked day to investigate a suspected Roger's natural gas main leak along I flooded Dodd Road in the vicinity of Sunset Lane.Xcel Energy did- n't view this to be a safety haz- had re- and and appeared to be in com- ad to re-- plete control of the situation. for the Xcel Energy, was still working to ne'of the try and locate this leak Friday )wed the "when this report was written. king lots Atofthe Water Main Break News A water main break occurred early Friday morning on the north end of the City' on a seg- -h had to clean the from the floats at the lift station. These !nd into the wet well suppressor ror the ouLrau rrorn the Roger's Lake aerator. The outfall water was eroding the shore line and the aerator was rolling into the lake. He plowed the north end streets (his nor- mal route) on Thursday.. Response sand and salt slippery plow main roads plowed entire City starting at midnight main on Sylvandale'Road near the 'intersection of Arcadia Drive. The water main break released a significant volume of water before it was shut off. This water flowed down Arcadia Drive to Cascade Lane and then to Maple Park Drive and Ivy Falls Court >'where it caused some minor street flooding until City crews were able to clear storm sewer culverts and catch basins. St. Paul Regional Water Service repair 'crews appeared on site early Friday morning to begin their repair work. St. Paul Regional Water Service Crews were working on finish- ing this repair work under diffi- cult winter working conditions when this article was being printed. NEWS Public Works The Pipeline Code Enforcement LETTER February 2, 2001 Utility Report Rich checked the City's seven sanitary sewer lift stations daily and plowed their driveways. Rich plowed the north end streets on Tuesday (his nor- mal route). Rich was called out to the Bloomington Lake Medical Clinic located on the frontage road across from City Hall to investigate a sewer backup. The City's line was clear and the prob- lem was found to be caused by rags within their sewer service line. Street Report Due to the mild weather and Monday's rain fall there was water ponding at sev- eral locations on the streets. The Street Crew had to locate and open many storm sewer catch basins in order to allow this water to drain away. They worked on mailbox re - Snow Events Date: Amount: 1-29-01 freezingrain/snow 1-30-01 2-1/2" very heavy snow (slush) pair this week (several mail- boxes were damaged as a result of plowing opera- tions). The Street Crew took delivery of a new brush chip- per this week. The dealer will return at a later date to provide a training session on safe operation and proper maintenance of the chipper. Parks Report The Parks Crew picked up trash daily from the parks, checked the warming houses, checked the DNR aerator on Roger's Lake and cleaned and flooded the ice rinks as needed. The Parks Crew plowed the City's 100± cul-de-sacs, trails, ice rinks and parking lots as a result of Monday's rain and snow storm. The ice rinks had to be closed Wednesday be- cause of warm weather melting the ice and kids walking on the melting ice causing foot print damage. The Crew had to repair the foot prints and re -flood the ice rinks on Thursday (damage to Marie a n d Response: Friendly Hills ice Sand slippery areas rinks was more ex - Plow entire City t e n s i v e than Wen- tworth). Code Enforcement Report Paul issued a permit to H & B Construction to remodel 5100 square feet of tenant space at 2401 Pilot Knob Road (Dakota Business Cen- ter) to be occupied by Ver- gason Technology, Inc. He also issued the first new single family home permit in 2001 to Bonfe Home Build- ers, Inc. to construct a two story home at 611 Butler Avenue (estimated valuation $200K). After this home, there is only one remaining vacant lot to be constructed in this subdivision. Happy Groundhog Day!! Punxsutawney Phil supposedly saw it's shadow in Punxsutaw- ney, Pennsylvania today. But, Clover, the Minnesota Groundhog, from the Minne- sota Zoo did not see her shadow, so can we expect an early spring? NEWS Public WorksEngineering The Pipeline Code Enforcement LETTER January 26, 2001 Parks Report The Parks Crew picked up trash daily from the parks, checked the warming houses, and cleaned and flooded the ice rinks as needed. The Parks Crew had to repair the door at the Friendly Hills warming house this week. They also posted signs in Valley Park alerting users that Mendota Heights has, and enforces a leash law. Several residents have been frightened when they were approached by unleashed dogs and the Police Depart- ment requested that the signs be installed. Utility Report Tom Olund checked the lift stations this week while Rich was on vacation. Brown In- stitute students are parking in such a way as to block ac- cess to the lift station located on their property. Rich is working with the Police De- partment to try and remedy the problem. A water service break that occurred this past weekend and a recently discovered leaking gate valve served as a reminder of what we have to deal with living here in Minnesota. We can probably point to 'Mother Nature" again for being subjected to these wintertime repair pro- jects. Adding insult to injury, these watermain repairs oc- curred in the Cherry Hills and Rogers Lake neighborhoods where the streets had re- cently been reconstructed. Street Report The Street Crew completed several bituminous patches this week (with cold mix). They had to clean up after the St. Paul Water Department who performed repairs on a water line break that occurred on Lower Colonial Drive this week. They used the grader to scrape the ice from the streets in several neighbor- hoods. Code Enforcement Report Paul issued a sign permit to Nordquist Sign Company to install a new sign at 1031 Mendota Heights Road, Pat- terson Dental. The new sign is required as a result of their recent building expansion along 35E. Paul issued a permit to United Properties Construction to re- model 4K square feet of office space in South Ridge Business Center, 1355 Mendota Heights Road. The new space is being remodeled to accommodate Risk Enterprise, Management Ltd. He issued a second per- mit to United Properties Con- struction to remodel 2400 square feet of office and 6K square feet of warehouse to accommodate Capital Com- puter Inc. at 2425 Enterprise Drive. Staff News Tom Knuth left Wednesday for a vacation of sun and fun in the U.S. Virgin Islands. Tom will be back to work on Febru- ary 5th. Jim Danielson and Marc Mogan attended the an- nual City Engineers Associa- tion of Minnesota conference held this week at the Earl Brown Heritage Center in Brooklyn Center. Some of the topics presented included; Media Relations, Strategic Planning for the City Engi- neers Association of Minne- sota, City Perspective on GIS, Innovations in Stormwater Quality and Treatment, NPDES Phase II Update, and Internet and Computer pri- vacy. Enjoy the Super Bowl! NEWS Public WorksEngineering The Polpeline Code Enforcement LETTER January 19, 2001 Parks Report The Parks Crew picked up trash daily from the parks, checked the warming houses, and cleaned and flooded the ice rinks as needed. The Parks Crew rented a bucket truck this week in order to replace all the burned out light bulbs at the hockey rinks. They plowed all pedways, rinks and parking lots. They also worked with the DNR to try and determine why the Rogers Lake aerator has not been functioning as expected since it was put into service earlier this month. The Contractor and DNR checked a number of items associated with the sys- tems operation and design to try and determine what might be responsible for the pump's frequent shutdowns and lower than anticipated discharge rate. After going through their checklist and failing to dis- cover any obvious problems they decided to hire a diver to check the intake line of the system. The mystery was solved when they discovered they had to clear the screens of the intake pipes because, be- lieve it or not, fish and vegeta- tion had plugged the intake line thereby restricting the supply of water and reducing the dis- charge rate of the aerator pump sufficiently to cause the open water to freeze closed. Utility Report Rich checked the City's seven sanitary sewer lift stations daily. Rich plowed and sanded his areas on the north end of the City on Sunday. He and Tom Olund attended the annual three day Sanitary Sewer Col- lection System School this week held at the Thunderbird Hotel in Bloomington. This an- nual class is sponsored by the Minnesota Pollution Control Agency and attendance is re- quired in order to maintain their licenses. Street Report The Street Crew worked on mailbox repairs this week. They also continued to work on setting up the sign room to make it ready for the new sign machine. Snow Events Date: Amount: Response: 1-14-01 2" Scrape main streets and sand neighborhoods 1-18-01 dusting Sand streets as needed Code Enforcement Report Dick issued a certificate of oc- cupancy allowing the Baldingers to occupy their new home being constructed at 1147 Orchard Circle. The Baldingers had many hours of time dedicated to the process of acquiring a Critical Area permit from the City and the MN DNR before they were able to start con- struction of their home and I'm sure they are happy to finally be able to occupy it. Buried Utility Markings Anyone performing any type of excavation with power equip- ment in Minnesota must call Gopher State One Call at least 48 hours before digging. Go- pher State One Call notifies utility operators to locate all buried utilities in the vicinity of a particular project within this 48-hour time frame. The un- derground utility owners will mark the location of the under- ground service with flags or paint. Recently the city re- ceived a letter from a property owner expressing displeasure about the prospect of viewing these painted markings over a long period of time. The mark- ings the property owner was referring to were painted by St. Paul Regional Water Services to mark water line locations for a project this summer. Attached are copies of the property owner's letter and a response by Jerry Krenner of St. Paul Re- gional Water Services. Public Works Garage City of Mendota Heights 2431 Lexington Ave Mendota Heights, MN 55120 To whom it may concern, I am not sure who is responsible, but I wanted to bring a matter to your attention. It is the unsightly and totally unnecessary graffiti that public employees do to "make their mark" on our city. I have enclosed a few pictures of such "marks" in front of my house. This is not all of it, just a sampling. These are "marks" that I will have to live with for many years. As you walk around the area, you will find 12 inch sized letter "marks" that date from shortly after we moved into the area 15 years ago. I am confident that the workers are as bright as anyone is and can find things without "marks" that can be seen 100 yards away. I am also confident that they can be creative and find another way to meet the need. The big blue "mark" across the street was needed for less than a week. I will live with it for many years. I would appreciate your attention to this issue. If this is not being done by city employees, I would appreciate your advice on how we can stop it. Th^yowu�, Jerry Fra ck 2317 Nashua Lane Mendota Heights, MN 55120 �Y m,ev +y fS FY' 1 Yr � December 19, 2000 Mr. Bernie Bullert, General Manager St. Paul Regional Water Service 8 East 4' Street St. Paul, MN 55101-1007 Dear Bernie: o Mendota .daHeights 1i..9 The City received the attached complaint concerning Gopher One marks that are being made on concrete curbing. The marks are ones made by St. Paul Regional Water Service. Would you please analyze the complaint and call me with your advice on any actions that could be taken to address the problem. Thank you. Sincerely, J es E. Danielson ternn City Administrator cc: Jerry Franck- 1101 Victoria Curve • Dlendota Heights, MN • 55118 (651) 452-1850 • FAX 452-8940 coff BOARD OF WATER COMbIISSIONERS % iter, President . Stephen Haselmann, Vice President ._. James Rer P Commissioners: Michael Arcand . Robert Cardinal . Pat Harris Mr. Jerry Franck 2317 Nashua Lane Mendota Heights, Mn The St. Paul Regional Water Services has received from The City of Mendota Heights, a copy of the undated letter you sent to their Public Works Garage. The SPRWS acknowledges responsibility for the blue marks mentioned in your letter. State law requires all Utility Companies to clearly mark their facilities when requested through the Gopher State One Call System. In the past we have tried several brands of paint to determine which brand has a minimum life expectancy and yet be durable enough to meet requirements for GSOC. The brand we use is called Aervoe Marking Paint and is used by most Utility Companies. It has been our experience, when using this brand, that most marks have faded within a year. We share your concerns and will require our locators to keep future markings to a minimum, both in size and quantity. If you have any questions please call me at 651-917-4733. erely, j L erry er , Engm ng Unit Supervisor cc: James E. Danielson Interim City Admiistrator City of Mendota Heights SAINT PAUL REGIONAL WATER SERVICES Bernie R. Bullert, General Nlanager 8 4`' St E, Saint Paul MN 55101-1007 0 TTY: 651-266-6299 Saint And Regional Rater Sen'ices provides quality water sen ices to the failotoing cities: Arden Hills•Falcon Heights- Lauderdale -Lade Canada• Mapl euood• A lendota•\iendota H�i_hts•Rosecille•Sair,t Paul -Wes' St. Paul 0 NEWS Engineering Work The Pipeline Code Enforcement LETTER January 12, 2001 Parks Report The Parks Crew picked up trash daily from the parks, checked the warming houses, and cleaned and flooded the ice rinks as needed. The Parks Crew worked this week with the Minnesota DNR employees and their contractor, Eagan McKay Electrical, to try and solve a problem with the aera- tor on Rogers Lake. The aera- tor pumps kept shutting down and the lake would freeze over. It is suspected that the inlet to the aerator pump located out in the lake must be partially plugged. As of Thursday, the Crew had not been able to lo- cate the inlet and open it. Utility Report Rich checked the City's seven sanitary sewer lift stations daily. Rich updated his mainte- nance cards this week, docu- menting all the areas that he had cleaned this past year. Proper documentation is an im- portant ingredient in defending any lawsuits that may arise as a result of plugged sewer lines. Rich replaced a missing hy- drant flag on Third Avenue. Rich and Dave were selected this week to receive their quar- terly drug test as is required for all operators who hold a commercial drivers license. Street Report The Street Crew removed snow from around some fire hydrants this week and knocked down some high snow banks at inter sections to improve sight dis- tance. They worked on reor- ganizing the sign room and worked on equipment set up for the new sign making equipment that is arriving. They replaced the cutting edges on plow trucks #312 and #304. They brought plow truck #303 to Lakeland Ford for a recall. Code Enforcement Report Both Paul and Dick attended the 45th Building Institute Confer- ence for Building Officials held at Earl Brown Continuing Educa- tion Center this week. This is a mandatory class for Building Of- ficials. The course was ex- panded from 3 to 5 days this year to allow time to cover is- sues concerning a new code that is currently being reviewed for adoption. Russ Wahl was once again willing to perform the needed inspections. He worked in the morning covering for Mendota Heights and in the af- ternoon for South St. Paul. Sunfish Lake Cellular Antenna Tower Proposal On Tuesday January 2nd the Sunfish Lake City Council referred the cellular antenna tower proposal sub- mitted by APT Min- neapolis of Voic- eStream Wireless back to the Planning Commis- sion for further consideration af- ter receiving additional informa- tion on cellular area coverage for the two proposed sites. One cellular tower location is on the Bethel Baptist church property in the southeast corner of High- way 110 and Delaware Avenue. This antenna tower would be constructed 130 feet tall ap- proximately 500 feet east of Delaware Avenue and 400 feet south of Highway 110 behind the church. The second an- tenna tower location is approxi- mately 900 feet north of Cop- perfield Drive on the east side of the road near 2250 Delaware Avenue and would be con- structed 43 feet tall. The differ- ence in antenna tower height at these two locations is a function of the cellular coverage area they seek and the relative ele- vation variation between these two sites. The Sunfish Lake Planning Commission will hold a public hearing on January 171h to consider the planning applica- tion of APT Minneapolis with this additional cellular coverage area information. NEWS Public WorksEngineering The Pipeline Code Enforcement LETTER January 4, 2001 Parks Report The Parks Crew picked up trash daily from the parks, checked the warming houses, cleaned the ice rinks as needed, flooded rinks, and removed snow from the warming house roofs. They also plowed the trails and parking lots as needed. Utility Report Rich checked the City's seven sanitary sewer lift stations daily. He plowed his north end routes for last Thursday's storm and plowed out all his lift station driveways and parking areas. He assisted a resident on Lexington Avenue with investigating a sani- tary sewer backup, the problem was found to be within the pri- vate sewer line and not the City's main. Street Report The Street Crew had to repair the wing on truck number 303 which was broken during snow plow clean up operations after last Thursday's storm. The Crew also had to repair a number of mailboxes that were damaged as a result of snow removal opera- tions. struct 12,300 square feet of office tenant space finish for Suite 7 at 1120 Centre Pointe Drive. The tenant to occupy the space will be Search 401K.com. The permit valuation was for $250K. He also issued a permit to McGough Con- struction to remodel suite 300 of the Cemstone building, this work was valued at $126K. Broten De- sign and Build were issued a per- mit to reconstruct the mainte- nance building for the Par 3 Golf Course. Rogers Lake Aerator The electrical control panel, wir- ing, and pump operation testing was successfully completed last week on the Rogers Lake aeration system. Minnesota DNR staff came out to Rogers Lake on Wednesday and put the lake aera- tion system into service for the season. The DNR staff had found that the dissolved oxygen levels had dropped to marginal levels, and therefore the activation of the aeration system came at a good time. Natural Resources Inventory and Management Plan Pro- posal The Parks Commission has ac- tively dis- Snow Event for the Week cussed the need for a Date: Amount: 12/28-29 9" snow Code Enforcement Report Paul issued a permit this week to R.J. Ryan Construction to con- Response: natural re- sources in- ventory Plow all areas and man - I agement plan for the City's parks and trails. The Parks Commission is hoping that the City can receive some matching grant money to help fund this type of study. Marc Mogan and Guy Kullander met with Fred Rozumalski and Diane Hellekson of Barr Engineering to see what they might be able to do in this regard for Mendota Heights. Barr Engineering has done similar work for the City's of Eden Prairie and Maple Grove and comes highly recommended by the Minnesota Department of Natural Resources. It was also in- teresting to note that Fred Rozu- malski did his masters thesis on suburban landscaping and how it effects and interacts with the natural area surrounding the Cop- perfield Pond. Barr Engineering will make a presentation to the Parks Commission at their next meeting to discuss a proposal to prepare a Natural Resources In- ventory and Management Plan for the Mendota Heights. Engineering Department Work Engineering staff continued work- ing on the Metropolitan Council Environmental Services (MCES) survey. This MCES survey re- quires that metro area communi- ties compile and update data rela- tive to new sanitary sewer con- nections, water usage, records of individual sewage treatment sys- tems, and calculations of sewage flows for the past year. Engi- neering staff is also working on developing and preparing plans for the bituminous trail from Men- dota Heights Road to the intersec- tion of Wagon Wheel Trail and along Wagon Wheel Trail to the bridge over I-35E. The Engineer- ing Department also developed some drainage design data and ponding requirements for a poten- tial long-range office expansion plan on the Ecolab property in the southwest corner of Wachtler Avenue and Highway 13.