2000NEWS
Public Works
Engineering
Code Enforcement
LETTER
Parks Report
The Parks Crew picked up trash
daily from the parks and swept
and flooded rinks. They had to
repair the drive shaft on vehicle
#506 which is a Toro riding
mower with a broom mounted
on it to clear the ice rinks.
Utility Report
Rich checked the City's seven
sanitary sewer lift stations daily.
He also had to replace the
heater at the sanitary sewer lift
station located on Mendota
Heights Road near St. Thomas
Academy. Heaters are required
in the lift stations to keep the
electric controls dry.
Street Report
The new street name sign mak-
ing equipment arrived this week,
so the street crew worked on
setting it up. Council recently
approved the purchase of the
equipment to replace the exist-
ing equipment that was well
over 25 years old and repair
parts for it were no longer avail-
able.
They worked on mailbox repairs,
cleaning bridge decks and mix-
ing sand and salt.
" a 0 9 Ah Ah
December 29, 2000
Code Enforcement Report
Paul recently completed a written
survey and oral interview with a
representative from Insurance
Services Office (ISO). ISO is an
insurance supported organization
with the mission of providing ad-
visory insurance underwriting
and rating information to insur-
ers. We received written confir-
mation this week that Mendota
Heights has received a Building
Effectiveness Grading Classifica-
tion of 5 for both residential and
commercial industrial properties.
This is the same rating that the
City has received in the past and
one that most cities of our size
receive.
Ropers Lake Aerator
Earlier this week, the contractor
installing the permanent aerator
at Roger's Lake Park activated
the intake pump in preparation
for a final inspection/project ac-
ceptance by the DNR on Tues-
day, January 2nd. The City's Park
Crew removed the snow in the
area of the lift station and
opened the intake valve that al-
lows lake water to enter the lift
station where a 10 horsepower
pump will lift the water to the top
of a stairway chute that Public
Works will move into position
next Tuesday. The water can
then cascade down the stair and
spill super oxygenated water
Snow Events for the Week
Date: Amount: Response:
12/23 2" fluffy snow 4 workers scraped and sanded
12/28 6" ? Plowed all areas
back into the lake. DNR tests of
the oxygen level in the lake indi-
cated the pumping needs to be-
gin immediately. The City Park
Crew will install and maintain
"Thin Ice" warning signs around
the open water area, created by
the aerator operation, as they did
last winter.
Water Main System Repairs
At the end of November a water
main break occurred on the north
end of the City on a segment of a
12-inch cast iron water main in a
wooded easement area between
the west end of Woodbridge
Drive and State Trunk Highway
13. St. Paul Regional Water Ser-
vice crews successfully repaired
that water main break on De-
cember 8, but also discovered
during their repair efforts that a
valve on that segment of water
main was leaking and needed to
be repaired. St. Paul Regional
Water Service crews completed
the required repairs on that 12-
inch valve this past Wednesday.
Natural Gas System Alarm
The Police received a report from
a citizen concerned about a
warning siren near a green post
that they had observed just north
of I-494 at Pilot Knob Road. The
Engineering Department investi-
gated the situation and deter-
mined that this was an indication
that a natural gas regulator was
venting to the atmosphere. We
contacted Xcel Energy to inform
them of our findings. Xcel En-
ergy got back to us after they
checked it out, and informed us
that we did not need to be con-
cerned. The noise was caused by
an extraordinary large flow in the
line.
NEWS
Public Works
Engineering
Code Enforcement
LETTER
Parks Report
The Parks Crew picked up
trash daily from the parks.
They also plowed cul-de-sacs,
parking lots, pedways, and ice
rinks after each snow fall.
They flooded all ice rinks daily
and inspected warming
houses.
Street Report
Dave Sorby ordered the re-
placement signs for Decorah
Lane to be installed as re-
quired for additional traffic
calming.
The crew cleaned bridge decks
of snow, and plowed their nor-
mal routes for the snowfalls.
They also had to replace the
cutting edges on snow plows
#303 and #304. Cutting
edges are the strips of steel
bolted to the bottom edges of
the plow blades that make
contact with street, they wear
down and need to be replaced.
They also performed mailbox
repairs where needed.
The Pipeline
December 22, 2000
Utility Report
Rich checked the City's seven
sanitary sewer lift stations
daily. Besides checking lift sta-
tions this week, Rich also
plowed his normal route (north
end) and assisted the me-
chanic, Len Kanitz, by making
runs to stores to pick up repair
pa rts.
Water Main Break
Early Thursday morning a water
main break occurred on the 8
inch cast iron pipe on Apache
Lane just north of Decorah
Lane in the Friendly Hills
neighborhood. This section of
water main was part of the wa-
ter system that was originally
installed approximately 40
years ago by Friendly Hills
homeowners as a privately
owned and operated water util-
ity. St. Paul Regional Water
Service repair crews were on -
site at 7:00 am but did not shut
the water main off until about
8:30 so that customers had wa-
ter service through the morning
Weekly Snow Events
Date: Amount: Response:
12/16/00 6" Plow entire City
12/18/00 6" Plow entire City
Note: Last year our first snow plowing occurred as the result of a 2"
snowfall on 12/19/00.
peak usage period. St. Paul
Regional Water Service crews
took most of the day to finish
their repair work given the bit-
terly cold weather and the
amount of machinery and
equipment they had at their
disposal.
Engineering Staff Alumni
News
Shawn Sanders stopped by City
Hall on Thursday to announce
that he and his wife had be-
come the proud parents of
twins this past Tuesday. They
named the twins Anna and
Luke. The twins are approxi-
mately the same weight and
length, and their combined
weight was nearly 12 pounds.
Shawn and his wife are excited
and realize that their lives are
now changed forever, but he
feels they are up to the chal-
lenge of parenthood.
r-tpppiu Holibdaius
NEWS
Public Works Engineering The Pipeline
Code Enforcement
LETTER December 15, 2000
Parks Report
The Parks Crew picked up trash
daily from the parks. The Parks
Crew began flooding ice skating
rinks Monday morning this
week. (Residents were able to
begin skating on the Friendly
Hills and Marie Park rinks by
Wednesday evening). The crew
held a rink attendant orientation
meeting on Tuesday afternoon
and the attendants went to work
Tuesday evening. This weeks
very cold weather very much
facilitated getting the rinks
ready for use early this year
(the crew is able to flood twice a
day with the weather this cold).
The Parks Crew performed its
usual snow plowing duties (the
cul-de-sacs, parking lots and
pedways).
Street Report
The Street Crew worked on re-
pairs to their trucks, mixed sand
and salt and plowed and sanded
streets as needed.
tary sewer lines in the Public
Works shop area. This time of
year these lines often get
plugged with sand from the
trucks. He used the auger to
clean the lines this week and will
continue to do it on a routine ba
sis.
Code Enforcement Report
Both Shaw Lundquist, the Dakota
County CDA's contractor, and
Oakwood Builder, Tony Feffer's
contractor, started framing their
projects on Lexington Avenue
this week.
Both contractors have been
working on their foundations for
the last several weeks and were
slowed by the cold weather.
Engineering Department
Work
The Engineering Department is
currently in the process of filling
out a number of surveys from
different agencies and working
on a
jects.
Snow Events of the Week:
number of different pro -
The Engineering staff has
begun
work on
the Met-
12-10-00 Street Department was called in to sand all areas ropol ita n
Council
12-11-00 dusting Check all areas, sanded slippery areas as needed I Environ-
mental
12-12-00 Sanded streets as required Services
12-14-00 2" Plowed snow in all areas t U r V e y
t h a t
comes in
Decem-
Utility Report
Rich checked the City's seven
sanitary sewer lift stations daily.
Rich purchased a power auger
to be used for cleaning the sani-
ber requiring that metro area
communities compile and update
data relative to new sanitary
sewer connections, water usage,
records of individual sewage
treatment systems, and calcula-
tions of sewage flows for the past
year. The Engineering Depart-
ment will also begin updating and
certifying mileage for streets in
Mendota Heights through the
year 2000 to comply with Minne-
sota Municipal State Aid Street
reporting requirements. Engi-
neering staff is also working on
developing and preparing plans
for the bituminous trail from
Mendota Heights Road to the in-
tersection of Wagon Wheel Trail
and along Wagon Wheel Trail to
the bridge over I-35E. The Engi-
neering Department is also look-
ing at some conceptual plans and
estimating the cost of improve-
ments that would serve the Car-
ron site north of the Acacia
Cemetery property at the end of
Pilot Knob Road.
Florida Report
Curt Wimpee felt compelled to
call Marc Mogan this past week to
compare weather conditions in
Palm Coast, FL with the Twin Cit-
ies after seeing what the tem-
perature was this past week in
Minnesota. He never did admit
that he regrets missing out on
the opportunity to go ice fishing.
He said that he was working hard
at the new job and that it was
going well. He has learned a lot
already. He has put in extra time
at work adjusting to both the
workload and educating himself
with the peculiarities of engineer-
ing designs in Florida. He misses
the people at Mendota Heights
but doesn't miss the weather and
he wishes all a Happy Holidays.
NEWS
Public Works Engineering The Pipeline
Code Enforcement
LETTER December 8, 2000
Code Enforcement Report
Paul issued a permit to Hoff-
man Homes Construction this
week to construct their fourth
duplex unit. This permit was
for two Sterling model units,
which is their highest valued
unit.
Utility Report
Rich checked the City's seven
sanitary sewer lift stations
daily. Rich worked with Brian
LeMond of Barr Engineering to
help analyze Lilydale's sanitary
sewer lift station. Lilydale
hired Barr to analyze the ca-
pacity of the lift station to see
if it could handle the increased
flow from their new Stone -
bridge development.
Street Report
The Street Crew worked on in-
stalling new MTC signs as for-
mally agreed to by the City
within a contract with them.
All City costs will be reim-
bursed once the project is
completed.
Parks Report
The Parks Crew picked up trash
daily from the parks. The Parks
Crew repaired the furnace at
the Friendly Hills Park warming
house this week. They at-
tended the annual Minnesota
Turf and Ground Foundation
Conference and Trade Show
held at the Minneapolis Con-
vention Center.
Water Main Repaired
This week St. Paul Water Re-
gional Services repaired the 12"
water main break that had oc-
curred on November 25th. St.
Paul Water repair crews were
able to stop the water flow last
week by isolating this section of
water main through the instal-
lation of another gate valve and
closing valves on each side of
the break. The break was lo-
cated in the woods between
TH13 and Woodridge Drive.
Several trees had to be re-
moved to make room for equip-
ment before the work could be
done. This section of water
main was put back in service on
Friday.
Snow Events for this Week
12/6 Dusting sand and salt slippery areas
12/7 1" sand and scrape streets as necessary
Street Lights Installed
This week Xcel Energy installed
seven street lights within the
Hoffman Homes Augusta
Shores project. The developer
had the lights approved by
Council. They are the City
standard residential neighbor-
hood "lantern" type lights, the
same style as were used in
John Mathern's Mendota Mead-
ows project.
LMRWMO Watershed News
The Lower Mississippi River Wa-
tershed Management Organiza-
tion (LMRWMO) conducted a
public hearing at 4:00 PM on
Thursday November 301h at the
West St. Paul City Hall Council
Chambers to present informa-
tion and accept public comment
concerning the LMRWMO sec-
ond -generation draft watershed
management plan. The public
turnout was limited to a few in-
dividuals that had served ear-
lier on the Citizen Advisory
Committee and were interested
in how their input was incorpo-
rated in the draft plan. Clifford
Timm, benefactor and the indi-
vidual primarily responsible for
initiating the installation of the
Rogers Lake fishing pier and
aeration system, played a video
at the public hearing that he
produced in cooperation with
NDC4 that educates the public
on lawn fertilization, its affect
on metro area lakes and the
benefits of the application of no
phosphorus fertilizer.
NEWS
Public Works The Pipeline
Engineering
Code Enforcement
LETTER December 1, 2000
Parks Report
The Parks Crew picked up
trash daily from the parks.
They prepared the warming
houses to be opened for the
ice rinks. They worked on
maintenance and clean up in
the shop area this week.
Utility Report
Rich checked the City's seven
sanitary sewer lift stations
daily. He flushed the sanitary
sewer line clean on Sylvandale
Court this week. He flushes all
the sewers that are within the
street reconstruction jobs after
the work is completed to en-
sure that no debris is left in
them from the work.
He performed inspections for
new sewer service line connec-
tions for the following homes
this week: 2113 Augusta
Shores, 2107 Augusta Shores,
2219 Alice Lane and 1762
Dodd Road.
Street Report
The Street Crew worked on re-
pairs to the plow trucks (304
needed repairs to the sander).
They worked on installing
some signs for MTC and in-
stalled some guide posts
where required in non -curbed
neighborhoods for snow plow-
ing. There were no snow fall
events this week!
Code Enforcement Report
Paul issued a permit to Robert
Carr and Associates for a bath-
room remodeling at Ecolab.
Ecolab is adding a unisex
handicapped accessible bath-
room and remodeling an exist-
ing bathroom, locker room and
shower. Estimated valuation at
$52K.
Water Main Break
Last Saturday a water main
break occurred on the north
end of the City on a segment of
the 12-inch cast iron water
main in a wooded easement
area between the west end of
Woodbridge Drive and State
Trunk Highway 13. St. Paul
Water Utility repair crews were
not able to repair the water
main break directly, but did
stop the water flow by installing
another gate valve and closing
valves on each side of the
break that then isolated this
section of water main. The fi-
nal watermain break repair has
not been made yet and we
have not been told when this
repair will occur. Fortunately
for everyone affected, St. Paul
Water Utility can take time
making this repair given the
fact that residents in this area
have water service and the wa-
ter flow at the break has been
stopped. The vegetation and
steep topography in this area
will make repairing this water
main break a difficult and time
consuming proposition. Trees
will have to be removed before
the machinery they will need to
make the repair can get access
to the break site. Some grad-
ing will likely have to occur that
will allow the equipment to
travel safely to the location of
the break.
Augusta Shores Improve-
ment Proiect
The Engineering Department
received a Gopher State One
Call utility locate request this
week for the installation of
street lighting throughout the
Augusta Shores development.
We would expect to see street
light construction start any time
now in the development be-
cause these Gopher State utility
locate requests generally serve
as a reliable notice that con-
struction work is about to com-
mence on a particular task.
LMRWMO Watershed Public
Hearing
The Lower Mississippi River Wa-
tershed Management Organiza-
tion (LMRWMO) is in the proc-
ess of developing a second -
generation watershed manage-
ment plan as was mandated by
the Board of Water and Soil Re-
sources (BWSR) in Minnesota
Rules Chapter 8410. The
LMRWMO conducted a required
public hearing at 4:00 PM on
Thursday November 30th at the
West St. Paul City Hall Council
Chambers. The goals of the
public hearing were to present
information and accept public
comment related to the draft
copy of the LMRWMO second -
generation watershed manage-
ment plan.
NEWS
Public Works Engineering The Pipeline
Code Enforcement
LETTER November 22, 2000
Parks Report
The Parks Crew picked up trash
daily from the parks. The Crew
plowed the pedways and worked
on equipment maintenance.
John Boland and Terry Blum
have been off.
Utility Report
Rich checked the City's seven
sanitary sewer lift stations daily.
He plowed all the snow from the
lift station's driveways after
plowing his normal route (north
end) on Monday. He also came
in Friday night to sand some
slippery intersections.
Rich performed a sanitary sewer
connection inspection for the
new home being constructed at
916 Carmen Lane.
Street Report
Tom has already ordered some
replacement sand and salt (150
tons of sand and 50 tons of
salt). The Street Crew mixed
some for use this week (we mix
it at a 4:1 ratio right now).
They delivered the siren to the
Civic Center site for attachment
to AT&T's antenna tower. The
siren was delivered several
weeks ago and had been stored
at the Public Works Garage.
Code Enforcement Report
Paul issued the full building per-
mit this week to Kraus Anderson
Construction for 1230 Northland
Drive Building 4, Mendota
Heights Tech. Center. The foot-
ing/founding permit had been is-
sued previously and that work is
now completed. That building
contains 72K square feet and is
valued at $2.4 million. Lucent
Technology will be the occupant
of this building and they will be
applying for a permit for their in-
terior space finish at a future
date.
Paul also issued a permit to
United Properties Construction at
1201 Northland Drive Building 3
this week. The space will be oc-
cupied by McLeod, USA. The
work will finish 8,540 square feet
of this building at a valuation of
$120,787.00
The on -site underground utilities
are currently under construction
on the Dakota County HRA site
on Lexington Avenue.
Year 2000 Street Reonstruc-
tion
Valley Paving, Inc. worked on ad-
dressing some of the remaining
punch list items on the Year 2000
project this week. They collected
and disposed
Snow Events for this Week
of a
small
pile
of dirt
and sediment
11/19 <2 inches Three street workers came in—
that
had
scraped main roads and sanded all
been
stock -
areas.
piled
on the
grass
ease-
11/20 <2 inches Four street workers scraped main
ment
area
roads and sanded all areas.
after
remov-
ng the
accu-
mulated material from the storm
sewer sump manhole between
Rogers Lake and the end of Blue -
bill Drive. They brought in a
small milling machine to remove
some bituminous pavement
thickness from two driveway
aprons that abut Rogers Avenue
to provide additional clearance
between the pavement and the
undercarriage of vehicles using
the driveways. They also
brought in a small tracked skid
loader backhoe to do some ditch
excavation and cleaning that was
included in this contract at the
outfall of the storm sewer system
from Apache Lane in the Friendly
Hills Park pond.
Augusta Shores Improvement
Proiec
The entrance sign to the develop-
ment is complete now that the
letters spelling AUGUSTA
SHORES have been installed on
the face of the monument near
the intersection of Highway 13
and Acacia Drive. The first two
twinhome units are fully framed
and in various stages of comple-
tion, and the foundation for the
third twinhome unit is now cur-
rently under construction.
Happy
Thanksgiving
'NEWS
Public Works
Engineering
Code Enforcement
LETTER
Parks Report
The Parks Crew picked up trash
daily from the parks. The Parks
Crew met with representatives
of the DNR to review the instal-
lation of the pipe connections
between the recently con-
structed pump intake system to
the aeration apparatus. They
also cleaned up machine 580-D,
worked on changing it over from
summer to winter and hooked
up the snowblower. They
washed and waxed all parks
trucks. On Thursday morning,
they plowed the cul-de-sacs on
the north end, plowed the ped-
ways and City parking lots.
Utility Report
Rich checked the City's seven
sanitary sewer lift stations daily.
Rich responded to an alarm at a
Northland Drive lift station on
Saturday, November 11th that
resulted from a power surge at
the lift station. He also plowed
out all the lift station parking ar-
eas.
Street Report
The Street Crew installed cutting
edges on the snowplows, re-
placed hydraulic hoses on the
snowplow wing attachment and
replaced the broken centering
spring on the plow of truck
#308. They cleaned up the
back lot and hauled out brush
and miscellaneous debris to SMC
compost site in Eagan. They
changed out burned out traffic
signal lamps on the signals at
Mendota Heights Road and
Highway 55 and also notified
MnDOT Electrical Services for a
The Pipeline
November 17, 2000
repair to one signal head and a
tarnished reflector with burned
out socket. They sanded streets
on Tuesday, November 14th and
plowed all the City streets on
Thursday, November 16th after
the 2" snowfall.
Code Enforcement Report
Paul issued a permit this week to
United Properties Construction to
complete 5400 square feet of of-
fice space finish to be occupied
by Charter Communications at
1210 Northland Drive (Building
#3).
He also issued a permit to Hoff-
man Homes, Inc. for another new
double townhome to be con-
structed in their Augusta Shores
Development. Estimated value
for each unit is about $200K.
Hoffman is submitting to Paul
homeowner signoffs acknowledg-
ing that they are aware that their
construction is within an aircraft
noise zone.
The on -site underground utilities
have been constructed on the
Mendota Heights Business Center
development in the northeast
corner of Lexington Avenue and
Mendota Heights Road. A unique
aspect of the design of the storm
sewer system on this project was
the utilization of a large diameter
storm sewer pipe network to de-
tain on -site runoff instead of con-
structing a storm water detention
basin to serve the development.
Year 2000 Street Reconstruc-
tion
The Engineering Department met
with Ed Vivant of Valley Paving,
Inc. on Wednesday to review the
punch list items that remain to
be completed on the project.
There are some items on that
punch list that can be completed
yet this year, but the items that
involve bituminous surface re-
pairs will have to wait until next
spring to be completed. Valley
Paving has contacted many of
the property owners that have
expressed concerns about their
driveway work, and they have
reached an agreement with many
of these residents as to what will
be done to resolve the issues in
question. We have asked the
Contractor to provide us with
written confirmation about what
commitments they have agreed
to with these respective property
owners.
Darn Mosquitoes!
Metro Mosquito Control dropped
by City Offices to present an up-
date on last summers efforts.
Nineteen residents contacted the
agency last year requesting con-
trol efforts to reduce nuisance
causing mosquitoes in their
neighborhood or to declare their
lot "off limits" for spray pro-
grams. Mendota Heights is care-
fully watched by the agency due
to a reported incident of en-
cephalitis in Sunfish Lake several
years ago. Attached is a copy of
an information brochure prepared
by the MMCD, that should answer
any and all questions. The
MMCD is governed by a board of
17 elected county commission-
ers, each representing their re-
spective county boards. Com-
missioner Patrice Bataglia repre-
sents Dakota County.
Y
V
2
ry
cd
O
�n
a
N
w
U
r
Z
O
Ur
ZE:_al
U
.0
CD _
U
cr
p C
C
_ U
^ p
•G O
O
0
O
U^
C. to
3
r
o
>
>
0
�
c oo
00
7
h r
J
O
c
— r
_
O
�.E3
o=
U
7
^
n s �•N
o�
�r
°
�
3
t^n
U, c3
y r
c3 U
3 '>1
U
c
�
U
r
c1 6
U vi
-
y
o ^w
7�
O
U °
r o
•.�-�
>
U N
O
C11�
O
-�2
Tsai
•
Qi >
°
Cv
F N
00 U
ct
n
2 C:)
U c o
C OJ
C U.•
�
N�u�
i
R Y
N
CCL
> N c>3 ..U.,
O
a
O
o
�
'
S
3 ob.
e
X w
c3 U
-�
O
r• U
U O
cq
c
�c
o
cU
oo
°>
0
0>
>
O
��
r
U
a
�>1to
m°
u
to
UM
a
9
t
H
�0
LQ
r
0
co
LQ
r
a
0
s
0
ii
i
24
co m
aE
o (�
`o
>—
m 3 a�
J E
60 m
O) T
O D
a
E
�o v
o a
o m c
Q o
c N
_0
O -0 S-
o
— r- -:�
0
E
L (0 n
= C
Q
>
m o
a U
O
O y
M <0
d L C
C �
C
0O
m�
o�
m
L N
N
� ^
L
3 0
0
�
0 0
o
E o
>
o-
W m
3
N E
5
U'
O
r2
o
O
El
o
=
b
b w
�.�=
u
=C] c
a
bl
� �a
�
^
r
O O
O 6 .� .^^
.�
•y O>
�.�
r,
^ >
� o
�b 3
A
� bp�
o 60
y
u
CZ
o ^n�
a?
tj)
PU
N
Y'y��
LT-)
°= "' > ca•� w p
~ O
cG cC ca N . O tC �O cc3 O
m 3 Cn ajr4•' N '�-' r OMO U
M 'O O —
bn-O CL
c3 `d f-" .O a`�i 'C �, 00 .� N 00 .�^. O. Y
bi)N ,0, F N O 0.0
c3CL
❑ in cC • • '.,,, bA to
O O > ° a w C . a>
ro _cz
bb
cb s ai o
o w o cp ono T a o' C o cs o
I
o
o
rs
C
EC
e U
p
p
O
O
N
C
rv.l
CJ
?
as
o
Q
U
C]
v�
"
O
�✓
Q
7D
r
U vU U
N
U
r 0
o 0
a+
bA
A
F s
m
O
cC -a
>'
CL
,G
Cd
�Qq
�
az3
Qoo
o
0
0
_to
vto
y
Q
to
U
-0 75 U
+N'
a)
oto
-p
p .+ C � by
�'dp
❑
U
'��'
U
-ry
?
O
0
3b bo
a o.
y
o
cd
/1
ai
td
:3
U O O U
t
tD.
>
ct
g ° '°
d ?
,t
.�
ti
a
bD
s
ti
V
N
C
y'
W
V
cCi
U ctl
y a ti
c3 U V U
U❑°
'in
P.
."
V
0
U
�..i.
tD
.T
r
—
�
�
O
U
T
U
V
N
a..
U
r
�
U
°
r U
T
N
a
R
m
v
a
0
d
1
U
R
O
`m
s
E
3
c
v
m
w
w
Q
L6
96
96
b6
£6
36
t6
06
6e
88
L8
98
s8
o b8
NEWS
Public WorksEngineering The Pipeline
Code Enforcement
LETTER November 9, 2000
Parks Report
The Parks Crew picked up
trash daily from the parks,
and mowed grass and picked
up leaves at several park lo-
cations. They worked on the
park machinery preparing it
winter use by removing the
summer equipment accesso-
ries and installing the winter
ones. The Parks Crew cleaned
up the water tower storage
area in order to create addi-
tional sheltered storage space
over the winter. The Parks
Crew also spent time picking
up trash and repositioning pic-
nic tables that were over-
turned by recent vandalism
that occurred in Rogers Lake
and Valley Park.
Utility Report
Rich checked the City's seven
sanitary sewer lift stations
daily. He also did a thorough
cleaning of the interior and
exterior of truck numbers 404
and 409. He flushed the
sanitary sewer mains on Syl-
vandale Court South and Syl-
vandale Road. Rich and Marc
Mogan met with a resident at
2526 Whitfield Drive to pro-
vide details of the sanitary
service line connection to their
property. The alarm at the
Northland Drive Lift Station
sounded at 1:30 pm last Fri-
day as a result of some main-
tenance being performed by
Qwest. Rich also helped Tom
Olund put up voting signs at
the voting precincts through-
out the City.
A contractor for Koch Pipeline
replaced and re-laid a section
of storm sewer pipe in the
southwest corner of the inter-
section of Mendota Heights
Road and Highway 55 when it
was discovered during some
routine testing that the storm
sewer pipe had settled and
come in contact with the pipe-
line that conveys jet fuel to the
airport.
Whether it was a sign that win-
ter has officially arrived, or
purely coincidental we proba-
bly won't know for sure, but in
any event a watermain break
occurred in the vicinity of 565
Marie Avenue late Thursday af-
ternoon. The break occurred
in close proximity to the water
service connection at that loca-
tion. The repair was made and
the watermain was back in ser-
vice relatively quickly.
Street Report
The Street Crew cleaned storm
sewer grates at various loca-
tions throughout the City.
They removed the asphalt pav-
ing equipment from truck
number 312. The Crew
worked on cleaning up the
back shop area. The Street
Crew installed the snowplow
wings and sanding attach-
ments on all of the trucks and
inspected the snowplowing and
sanding equipment for any
necessary repairs. Tim Oster
was called in around 10 pm on
election night to sand some of
the areas that had gotten slip-
pery from the precipitation
that occurred that afternoon
and evening.
Code Enforcement Report
Code Enforcement has seen an
increase in single-family home
construction during the 2000
calendar year. There have
been 21 single-family home
building permits issued
through October of this year as
compared to 11 during the
same period last year. This
additional construction activity
has led to a $2.8 million dollar
increase in valuation of single-
family home construction over
that of last year.
Augusta Shores
Erickson Construction per-
formed required mandrel tests
and flushed the sanitary sewer
system this week on the Au-
gusta Shores project. The
completion of these work items
permits the sanitary sewer
system to be put into service.
The Contractor has completed
work around the manholes in
the street pavement to protect
them from snowplow damage
over the winter. The perma-
nent monument sign for the
development is proceeding to-
wards completion in the north-
east corner of Acacia Drive at
Highway 13. Plans for a build-
ing permit for the third twin -
home unit were submitted to
the City this week.
NEWS
Public WorksEngineering The Pipeline
Code Enforcement
LETTER November 3, 2000
Parks Report
The Parks Crew picked up trash
daily from the parks, and
mowed the leaves at several
parks. They also removed the
martin houses from the parks
this week. They applied fall fer-
tilizer and aerated the fields at
all the neighborhood park ball -
fields and soccer fields.
Utility Report
Rich checked the City's seven
sanitary sewer lift stations daily.
Rich is the City's certified pesti-
cide applier. He attended an
annual class put on by the Min-
nesota Department of Agricul-
ture at the Dakota County Ex-
tension office in Farmington.
The class is a mandatory class
required for re -certification.
He flushed sanitary sewers in
Ocala Court, Ocala Lane, Nashua
Lane, Apache Lane, and Apache
Court. He performed two in-
spections for new connections to
the City's sanitary sewer lines
and inspected Lilydale's storm
sewer system (as agreed to by
City Council).
Street Report
The Street Crew continued to
babysit the bonfire pile this
week —they had to remove a to-
tal of 5 sofas, 3 chairs, railroad
ties, etc before the pile was
burned Tuesday night (this was
the worst year yet for residents
dumping illegal items). The fire
continued to smolder Wednes-
day morning and had to be ex-
tinguished after a concern was
raised by the dry cleaner that
their clothes might start to smell
smoky.
There has been a concern raised
about Brown Institute students
parking on the street too close to
other business' driveways and
preventing their delivery trucks
from entering. The Street Crew
painted the curbs yellow adjacent
to the driveways to keep student
parkers well away and driveways
open. The Crew worked on re-
pairing a large hole that had
formed in the ditch line along
Marie Avenue because of erosion.
Code Enforcement Report
Paul issued a permit this week to
Brigitte Enterprises, Inc. to re-
model the interior space of
McDonalds, 2020 Dodd Road.
The project will provide seating
arrangement for disabled cus-
tomers (valuation $30K). He
also issued a permit to United
Properties to complete 5,400
square feet of tenant space finish
at 1210 Northland Drive (building
3) for Charter Communications
(valuation $67K).
Paul also issued a permit to Glas-
sen Co. to replace the windows
for the home at 1011 Wagon
Wheel Trail (valuation $52K).
This project is to replace windows
for the second time that were
funded by the MAC (Part 150).
The first windows were upgraded
with acoustical panels installed
over casement windows. This
was similar to adding storm win-
dows. These panels were found
to be a maintenance problem and
unsuitable.
Quest began installing their an-
tenna pole in the outfield of the
ball field at City Hall Thursday
this week. Once completed the
pole will have a City storm warn-
ing siren mounted on the top of
it.
Site work continues on the Men-
dota Heights Business Center de-
velopment at the corner of Lex-
ington Avenue and Mendota
Heights Road. The Developer's
utility contractor made the sani-
tary sewer connection to the
City's trunk system on Thursday,
and continued with the construc-
tion of the internal sanitary
sewer system on the property.
Year 2000 Street Reconstruc-
tion
Punch list items that were
worked on over the past week in-
cluded the replacement of some
of the Covenant of the Visitation
fencing that had to be moved in
the vicinity of the curve on Lake
Drive to accommodate the wider
street section, and some sod res-
toration work. Charlie Noel of
1165 Sylvandale Road has filed
an appeal in District Court chal-
lenging the driveway portion of
the special assessment against
his property. The prepayment
assessment count the City has
received from property owners in
the Rogers Lake reconstruction
area now stands at 12 for street
improvements and 2 for driveway
work, and for the property own-
ers in the Delaware Crossing, Ivy
Falls, and Rogers Lake rehabilita-
tion areas the totals are 52 for
street improvements and 17 for
additional driveway construction.
NEWS
Public Works Engineering The Pipeline
Code Enforcement
LETTER October 20, 2000
Parks Report
The Parks Crew picked up trash
daily from the parks, mowed the
grass and striped soccer fields
on an as needed basis. The
Parks Crew continued working
on winterizing the lawn sprinkler
systems this week. They also
had to remove the water meters
from the non -winterized build-
ings and complete many repairs
to the heads and valves.
They worked on cleanup around
the Fire Hall to prepare it for the
open house held last Saturday,
and they attended an open
house and seminar at Toro
where they were able to look at
and demo new equipment.
Utility Report
Rich checked the City's seven
sanitary sewer lift stations daily.
He raked leaves at his lift sta-
tions. He performed two sani-
tary sewer connection inspec-
tions for the new townhomes
being constructed in Augusta
Shores.
Street Report
The Street Crew had to "baby-
sit" the Halloween bonfire brush
pile this week. In spite of the
fact that dumping was not sup-
posed to start until this Friday,
many people were already
dumping. Besides brush, resi-
dents were also dumping lots of
banned material. The Crew had
to remove a couch, railroad ties,
bags of leaves and construction
material. (Proper disposal of
this stuff costs the City dumping
fees).
Fire In Inver Grove Heights
The Public Works Firefighters
were called to a mutual aid fire in
Inver Grove Heights this
Wednesday at 11:00 AM and
were there until 4:30 P.M. The
fire totally destroyed one unit of
a 4-plex townhome.
Code Enforcement Report
Paul issued a permit to United
Properties Construction for a
7,180 square foot tenant space
finish at 1270 Northland Drive
(value of $50K). The occupant
will be Fidelity National Foreclo-
sure Solutions.
He issued a permit to Johnson
Engineering (Dale Johnson) to
construct a one story single fam-
ily dwelling with a walkout at
2219 Alice Lane ($200K valua-
tion).
Year 2000 Street Reconstruc-
tion
Work on punch list items pro-
ceeded at a snails pace through-
out the project this week by Val-
ley Paving, Inc. There is nothing
new to report on the progress
being made in resolving the
problems some property owners
have with the driveway work that
was completed in conjunction
with this improvement project.
The City has received prepay-
ments to cover 3 street and 1
driveway special assessment
from property owners in the
Rogers Lake reconstruction area,
and 20 street and 7 driveway
special assessments from prop-
erty owners in the Delaware
Crossing, Ivy Falls, and Rogers
Lake rehabilitation areas.
Alice Lane Improvement Pro-
iect
Foundation construction is under-
way for the construction of a new
home in the development.
Augusta Shores Improvement
Project
Hoffman Homes has now com-
pleted extensive landscaping im-
provements throughout the de-
velopment. Trees and shrubs
were planted, sod was laid, and
an irrigation system that covers
the entire development was in-
stalled to maintain the plantings.
The site looks good now and will
only improve as these plantings
mature. Building continues on
the first twin townhome unit,
which will serve as their model,
and now they have started con-
struction on a second twin town -
home unit.
Tilsen's Highland Heights and
Bunker Hills Sod Replacement
We are still waiting for some pre-
cipitation to break out of this
drought cycle we are in to help
the people out that had sod in-
stalled under this program. Rain
is desperately needed here and
throughout the entire City, as
there has been no precipitation of
any sort since September 2.
Residents have been good for the
most part about watering their
new boulevard sod. The center
island area on Lilac Lane was
top -dressed with topsoil and hy-
dro -seeded with a heat and
drought tolerant hardy seed mix-
ture.
NEWS
Public Works
Engineering
Code Enforcement
LETTER
Parks Report
The Parks Crew picked up
trash daily from the parks,
mowed the grass and striped
soccer fields on an as needed
basis. The Parks Crew contin-
ued preparations for winter by
cleaning up the parks and
blowing out the lawn sprinkler
systems at City Hall, Fire De-
partment, Public Works Ga-
rage, Mendakota and Kensing-
ton Parks.
Utility Report
Rich was on vacation this
week, so Tom checked the
City's seven sanitary sewer lift
stations daily.
Street Crew
The Street Crew hauled in and
spread fill in Rogers Lake Park
to prepare the land for instal-
lation of a new culvert that is
to be installed. The culvert
will get rid of a ditch and will
make mowing easier between
the small pond by the access
road and the lake. They con-
tinued installing replacement
street name signs in the year
2000 street reconstruction
neighborhoods.
Metricom to Start
Metricom informed me this
week that they will begin on
Friday installing their radio
boxes on light and utility poles
throughout the City. They
have 34 boxes to install and
October 13, 2000
will complete their work in one
day. Metricom is approximately
one half done installing their
boxes within the Metro area
and will begin marketing next
month.
Code Enforcement Report
Dave Regel Construction was
issued a permit this week to
begin construction of a one
story home at 915 Carmen
Court. Regel is the same con-
tractor who recently con-
structed a similar home on
Mary Adele Avenue. Estimated
valuation is $310K.
Paul also issued the second
permit to Hoffman Homes for a
twin home at Augusta Shores
this week. The permits for the
models were issued several
weeks ago and they are under
construction right now.
Year 2000 Street Recon-
struction
Valley Paving, Inc. continued
working on punch list items
throughout the project this
week and has had further dis-
cussions trying to rectify the
problems that some property
owners have with their drive-
ways.
Alice Lane Improvement
Proiect
Some minor landscaping resto-
ration work was completed this
week on the existing abutting
lots. A building permit was is -
sued and the basement was ex-
cavated to construct the foun-
dation for a new home in the
development.
Augusta Shores Improve-
ment Proiect
Hoffman Homes is in the proc-
ess of completing a very ambi-
tious and extensive landscaping
plan throughout the develop-
ment. The site will really look
impressive when they are fin-
ished. Building continues on
the first twin townhome unit in
the development.
Tilsen's Highland Heights
and Bunker Hills Sod Re-
placement
Wagner Sod Company of Inver
Grove Heights completed es-
sentially all of the sod replace-
ment work this week in the Til-
sen's Highland Heights and
Bunker Hills neighborhoods.
Residents have been good for
the most part about watering
their new boulevard sod. The
center island area on Lilac Lane
was top -dressed with topsoil
and hydro -seeded with a heat
and drought tolerant hardy
seed mixture. The City will
probably need to spray this
area for weeds next year, and
give it some tender loving care
for a while until it gets estab-
lished. We are hoping that we
can break out of this drought
cycle and get some precipita-
tion to help these people out as
well as the rest of the residents
throughout the City.
NEWS
Public Works The Polpefine
Engineering
Code Enforcement
LETTER September 22, 2000
Parks Report
The Parks Crew picked up trash
daily from the parks, mowed the
grass, and striped foul lines on
an as needed basis. The Parks
Crew assisted the DNR with in-
stalling the new fishing pier at
Rogers Lake Park. They began
respraying the parking lines in
the park's parking lots.
Utility Report
Rich checked the City's seven
sanitary sewer lift stations daily.
He cleaned sanitary sewer lines
on Mendakota Drive and Court
and on Swan Drive. He replaced
a hydrant marker flag on High-
way 13.
Street Report
The Street Crew has been
stockpiling some black dirt that
they got free from United Prop-
erties' latest building project.
Street Paint Markin
Street paint markings
(centerline, turn lanes, etc.)
were applied to approximately
seven miles of City streets. IN
1999, the City embarked on a
three year rotational program
of street striping where one
third of all striping is done once
every three years with high
wear section receiving additional
markings as necessary.
Fishing Dock at Roger's Lake
The fishing dock at Roger's Lake
was assembled and installed by
a Department of Natural Re-
sources crew of five on Tuesday
and Wednesday. The dock ex-
tends 108 feet into the lake with
a thirty foot wide "T" at the end.
The floating dock remains in the
lake year round. Water depth at
the end of the dock is reported to
be four and 1/2 feet deep. The
dock includes lower side rail ar-
eas intended for wheelchair
bound fisher persons. Lower
rails do not restrict casting and
land of fish.
The DNR also informed the City
that bids for the installation of a
permanent lake aerator have
been reviewed and a contract let.
The work will begin in early Octo-
ber.
City Hall Roof Repaired
The City Hall roof received minor
repairs last week. Ridge cap ce-
dar shingles along the east side
of the building were deteriorating
rapidly exhibiting extensive
cracking and splitting. No other
unusual wear areas were found.
The east side ridge caps were
replaced and other minor work,
such as nail or staples "popping"
were hammered in and flashing
areas were re -caulked as
needed.
Year 2000 Street Reconstruc-
tion
The Contractor is importing and
spreading more topsoil in the
Rogers Lake Area. We expect to
see a flurry of sod restoration
construction activity next week in
that area.
Augusta Shores Improvement
Pro "e
Gas, electric, telephone, and
television line installation work
continues. Building continues on
the first twin townhome
unit in the development.
The developer started
constructing landscaping
improvements in and
around the storm water
retention basin and in-
tends to install a fountain
in the basin to transform
-- �;
it into an aesthetic amen-
ity for the neighborhood.
Tilsen's Highland
Heights and Bunker
Hills Sod Replacement
""'"' Council awarded a con-
tract for the replacement of sod
in the Tilsen's Highland Heights
and Bunker Hills street recon-
struction project areas this week
to Wagner Sod Company, Inc. of
Inver Grove Heights, MN. The
Engineering Department met
with the Contractor on Thursday
and this work will likely start the
first week of October.
NEWS
Public WorksEngineering The Pipeline
Code Enforcement
LETTER September 15, 2000
Parks Report
The Parks Crew picked up trash
daily from the parks, mowed
the grass and striped foul lines
on an as needed basis. The
Crew worked on repairs to the
warning tracks for the ball
fields at Mendakota Park. They
repaired the retaining wall at
Rogers Lake Park that was
damaged as a result of the last
large rain storm. They
trimmed the low hanging
branches from the trail on
Wachtler Avenue. They an-
chored down all the soccer
goals in the neighborhood
parks (Ivy, Wentworth, Victoria
Highlands, Friendly Hills, Men-
dakota and Kensington).
The Crew also worked on re-
pairing the timbers around the
new playground equipment at
Marie Park, hauled in dirt and
seeded around the outside of
the timbers and trimmed up
overhanging tree branches.
Utility Report
Rich checked the City's seven
sanitary sewer lift stations
daily. He pulled all the pumps
from the sanitary sewer lift sta-
tions and checked them over
with Braun Pump. They found
and repaired a few minor prob-
lems. He jetted clean the sani-
tary sewer lines for Lexington
Avenue from Marie Avenue to
TH 13 and flushed the sewer
line clean on Chippewa Avenue.
A.M. on Monday. NSP arrived
and restored the power.
Street Report
Dave met with an MTC repre-
sentative to discuss their sign
replacement program that the
City is doing for them. The City
will be reimbursed for all its
costs once the project is com-
pleted. There are a number of
changes to the plan that will
need to be made.
Dave met with the 3M represen-
tative again about our sign
making machine. Our machine
needs repairs, but it is so old
that no replacement parts are
available. Dave repaired the
streets lights in the Industrial
Park, two control boxes had
tripped mains.
Code Enforcement Report
Paul issued the first permit to
Hoffman Homes allowing them
to begin construction on their
model homes. Hoffman Homes
has two unit designs, the
"Sterling" and the "Trenton".
The "Trenton" will have 3,670
square feet and the "Sterling"
will have 3,950 square feet.
They are both one story ram-
blers with a majority of their
basements finished. Dick will
perform the first footing inspec-
tions Friday.
Year 2000 Street Recon-
struction
He responded to a power out- The Contractor imported and
age at the main lift station on spread some more topsoil in an -
Mendota Heights Road at 11
ticipation of the start of sod res-
toration work in the Rogers Lake
Area. We expect to see some
serious construction activity
starting next week on sod resto-
ration in that area. Assessment
notices were in the process of
being mailed out for the project
as this publication was being
printed.
Augusta Shores Improve-
ment Proiect
Bituminous base course and
pathway construction was com-
pleted this past Tuesday on the
Augusta Shores project. The
long fill slopes in the develop-
ment were being hydro -seeded
by Jackson Landscape under a
private Contract with the devel-
oper. The utility companies
have now begun the task of in-
stalling underground gas, elec-
tric, telephone, and television
lines in the development. The
footings for the first twin town -
home unit have been dug and
we should see the building going
up soon.
Tilsen's Highland Heights
and Bunker Hills Sod Re-
placement
The Engineering Department ac-
cepted bids for the replacement
of sod in the Tilsen's Highland
Heights and Bunker Hills street
reconstruction project areas this
week. This item will be up for
Council award consideration this
week for fall construction.
NEWS
Public WorksEngineering The Pipeline
Code Enforcement
LETTER September 8, 2000
Parks Report
The Parks Crew picked up
trash daily from the parks,
mowed the grass, and
chalked fields on an as
needed basis.
The Crew had to paint the
walls of the pavilion in Valley
Park to cover up graffiti that
was placed there by vandals.
They removed the old
wooden playground equip-
ment from Marie Park this
week to make way for the
new equipment to be in-
stalled. The new equipment
was installed by Flannigan
Sales (Tiny Tikes equip-
ment). The tennis court at
Valley Park was power
washed and a new epoxy lev-
eling compound and color
coat was applied this week.
Replacement net support
poles were also installed.
The 2" rainstorm that fell last
weekend only caused some
minor washout damage along
the pedways which were re-
paired this week.
Utility Report
Rich checked the City's seven
sanitary sewer lift stations
daily. Rich along with his
helper, jetted sanitary sewer
pipes clean on Faro Lane,
Avanti Drive, Summit Lane,
West Circle Court, Twin Circle
Court, Bwana Court, Vail
Drive, Lexington Avenue
from City Hall to Marie Ave-
nue and on Marie Avenue
from Overlook west to Lexing-
ton Avenue this week.
Street Report
The Street Crew continued
painting crosswalks this week.
They patched potholes in the
Industrial Park areas. They
installed new street name
signs in the Kressin neighbor-
hood and replaced some
missing ones at various loca-
tions around the City.
Code Enforcement Report
Roseville Properties broke
ground this week for their
Centre Pointe Five building.
Ryan Construction has been
the contractor for all of their
previous buildings and is also
their contractor who will build
this building. The building is
a 27,170 square foot office
shell with a valuation of
$HOOK.
Paul issued a permit to
McDonald Construction to
build a new single family
home on Lot 2 of Pine Creek
Estates, 1762 Dodd Road.
This house will be a two story
home valued at $363K.
Check your home for ter-
mites! Paul received the at-
tached letter from the Minne-
sota Department of Agricul-
ture this week informing him
of the spread of termites to
Minnesota.
Year 2000 Street Recon-
struction
The final preparations for pav-
ing that were made last week
by the Contractor in the Ivy
Falls area paid off and led to
the completion of paving in
that neighborhood this week.
The Contractor also finished
paving in the Delaware Cross-
ing area as well. The Con-
tractor also imported more
topsoil in anticipation of sod
restoration in the Rogers Lake
Area. The major work items
that remain to be completed
on this project are in the
Rogers Lake Area.
Augusta Shores Improve-
ment Project
Street construction activities
resumed on the Augusta
Shores project after the utility
companies completed their
work relocating power lines
and removing an existing
power pole that was located
within the new street inter-
section of Acacia Drive at
State Trunk Highway 13. We
anticipate that the streets on
the project will be paved by
the end of next week, and
that townhome construction
will likely begin immediately
thereafter.
NEWS
Public Works Engineering The Pipeline
Code Enforcement
LETTER September 1, 2000
Parks Report
The Parks Crew picked up
trash daily from the parks,
mowed the grass, dragged and
chalked fields and striped foul
lines on an as needed basis.
The Parks Crew had to cut up
and remove a tree that had
fallen on the pavilion at Valley
Park. While they were doing
that, they also removed some
other trees that were in dan-
ger of falling on the pavilion.
The Crew worked with Street
Crew to remove and haul away
some weeds and trees from
Rogers Lake in preparation for
the new DNR fishing pier.
They pulled weeds from
around the parks signs and
they weed whipped around the
new City sign on Dodd Road.
Utility Report
Rich was on vacation this week
so his helper J.P. checked the
lift stations and mowed the
grass in his absence.
Street Report
The Street Crew worked with
the Parks Crew to clean up the
beach at Rogers Lake in prepa-
ration for installation of the
fishing pier. They worked on
installing the new bus stop
signs and replaced several
stop signs. They started re-
painting the crosswalks.
The responded to several pot-
hole complaints by patching
them. Dave met with a 3M
representative to discuss re-
pairs to our sign machine. The
machine is 28 years old and
needs some repairs. Because
of its age, the 3M rep was un-
sure if he could locate the
needed repair parts. The crew
had to pick up and dispose of
some tree and brush debris
that had been "donated" to the
City on Victory Avenue. (Dave
also provided the attached
Farmer's Almanac Report —I
hope it is right).
Rogers Lake Fishing Pier
The DNR has informed the City
that the fishing pier, which has
been fabricated by prison in-
mates, will be delivered and in-
stalled on September 19`h.
Public Works staff will assist
DNR employees in unloading
the delivered dock sections, as-
sembly and installation of the
dock into the lake. The location
of the dock will be directly
south of the gravel driveway/
cul-de-sac and will extend into
the lake 60 or more feet with
the objective being to reach a
water depth of at least four feet
at the end of the dock. The
dock will be "T" shaped with the
"T" 20 feet in width. The dock
is designed to remain in the
lake year round. The City will
construct an eight -foot wide
blacktop path connecting the
dock to the cul-de-sac parking
area. Next spring amenities,
such as benches, picnic tables,
etc. will be installed near the
dock. A donation of $4,000.00
from Mr. Clifford Timm will be
used to fund these improve-
ments.
Year 2000 Street Recon-
struction
The Contractor placed pave-
ment markings on Lake Drive
last Saturday thereby insuring
that the street would handle
the rush of traffic associated
with the start of school at St.
Thomas Academy. The new
right and left turn lanes on
Lake Drive at Mendota Heights
Road helps move traffic more
efficiently through this intersec-
tion. The Contractor devoted
most of their effort this week to
preparing the Ivy Falls area for
paving. We had hoped that this
neighborhood would get paved
this week, but now it appears
that this will occur next week.
Augusta Shores Improve-
ment Proiect
A new power pole was installed
south of the new intersection of
Acacia Drive at State Trunk
Highway 13 in order to relocate
power lines from an existing
power pole that is currently lo-
cated within the new street.
We are hoping that the utility
companies relocate their lines
to the new power pole next
week so that street construc-
tion activities can resume after
removal of the existing power
pole.
People
Farmers' Almanac
predicts another
moderate winter
The publishers of the Fanners' A►inanac,
using a formula known to only two people,
predict another moderate winter as a follow-
up to last year's warmest winter on record.
"The winter of 2000-01 should gel off to a
late start and turn out to be milder than
average, even less severe than this last one,"
forecaster Caleb Weatherbee writes in the al-
manac that hits newsstands today.
Weatherbee predicts a wet fall, to be fol-
lowed by two big Deceniber snowstorms.
More snow is predicted, but overall the season
will be mild.
!Editor Peter Geiger admitted that last year's
prediction — of a stormy November and De-
cember to be capped by more than a foot of
snow at year's end in the M idwest and North-
east — was way off the i i ark.
The National Weather Service contends
weather can't be predicted with any certainty
so far in advance. But the Farmers' Almanac,
published for 184 years in Lewistown, Maine,
says its long-term predictions are right about
80 percent of the time.
The almanac and the Old Farmer's Alma-
nac, 24 years older and published in neighhor-
I ing New Hampshire, are used by many people
to plan outdoor weddings, cookouts and va-
cations.
NEWS
Public Works Engineering The Polpeline
Code Enforcement
LETTER August 25, 2000
Parks Renort
The Parks Crew picked up
trash daily from the parks,
mowed the grass, dragged and
chalked fields and striped foul
lines on an as needed basis.
The Parks Crew set up the
small soccer goals and nets in
the neighborhood parks. They
also fertilized the grass at the
Kensington Park soccer fields.
They finished placing rec rock
along the fence lines at the
Mendakota Park ballfieds and
worked on trimming trees
along pedways.
Utility Report
Rich checked the City's seven
sanitary sewer lift stations
daily. Rich cleaned the follow-
ing sanitary sewer lines this
week: Victoria to Walsh, Sum-
mit to Mendota School and
Victoria Court, James Road
and Court, Douglas Road and
Court, Caren Court, Mayfield
Heights Road and Court,
Kingsley Circle North and
South. Rich also washed down
the pedway on Lexington Ave-
nue with the jet truck for the
Parks Crew. He also mowed
the grass at the Veronica Lane
lift station.
Street Report
The Street Crew finished in-
stalling new signs for the Dela-
ware Crossing Street Recon-
struction Project. They
dropped off barricades for a
resident having a block party
on Downing Street. They also
reinstalled the missing stop
sign at Mendota Heights Road
east of Medallion Drive. They
removed brush and trimmed
trees to improve sight distance
at Marie Avenue and Dodd
Road, Lexington Avenue and
Cullen, and Freeway Road at
Highway 110.
The Street Crew also removed
a dead boulevard tree on West -
view Terrace. They met with a
representative from Bargen Inc.
about the infrared heat patch-
ing on Marie Avenue between
Lexington and Victoria. They
also removed campaign signs
from the City's boulevard area
on Huber Drive.
Augusta Shores
Minnesota State Curb and Gut-
ter finished installing curb and
gutter at Augusta Shores on
Monday. We are waiting for
the placement of the remainder
the Class 5 gravel base to be
installed which would be fol-
lowed shortly thereafter by
blacktop paving operations.
Street Reconstruction
St. Thomas Academy starts
school next week, and so con-
sequently the Contractor dedi-
cated most of their work effort
this week to prepping Lake
Drive for the final lift of black-
top as this publication was be-
ing printed. The area resem-
bled an ant colony under attack
with the number of men and
equipment on -site between the
paving work that was being
done by the City and the school
expansion work that the Build-
ing Contractor was feverishly
trying to complete before the
start of school next week.
Slurry Seal Proiect
Struck and Irwin, Inc. arrived
this week to start this years
slurry seal project. They
started crackfilling on Monday
and were finished late Tuesday.
They began spreading slurry
seal late Wednesday afternoon
and were finished by noon on
Friday. They modified their
work plan somewhat to accom-
modate a couple of residents
that needed access while this
work was being done. Resi-
dents in the project area, and
office workers in the Centre
Pointe development were pa-
tient and understanding for the
duration of this work, and for-
tunately this work was com-
pleted before school started.
Resurfacing of the Valley
Park Double Tennis Courts
Dermco-LaVine Construction
has received the contract to re-
surface the Valley Park tennis
courts. The existing surfacing
is de -laminating and must be
repaired before conditions
worsen. Work is scheduled to
be completed by the end of the
month. Uneven cracks in the
tennis courts in Ivy Park have
made play difficult, and next
year the tennis courts will be
rebuilt by a mill and overlay
project similar to how some
City streets are rehabilitated in
Mendota Heights.
NEWS
Public WorksEngineering The Pipeline
Code Enforcement
LETTER August 18, 2000
Parks Report
The Parks Crew picked up
trash daily from the parks,
mowed the grass, dragged
and chalked fields and
striped foul lines on an as
needed basis. Fall soccer
leagues are just starting so
the Parks Crew set up and
striped the fields in the
neighborhood parks and in-
stalled the soccer goals.
They had to repair the sink
at Mendakota Park —the
drain pipe had to be re-
placed. They worked on
chipping the brush in the
back parking lot for dis-
posal.
Utility Report
Rich checked the City's
seven sanitary sewer lift
stations daily. Rich had to
come in Thursday at 9:00 P.
M.-12:00 A.M. because of
a power outage at the
Northland Drive lift station.
He worked on finishing
spraying the parks for
weeds.
Street Report
The Street Crew worked on
patching Centre Pointe
Boulevard and Drive and
Walsh Lane streets. They
installed replacement street
name signs in the street re
construction areas. John
Ambrose fabricated a stencil
for painting crosswalk bars.
The Crew had to pick up tree
limbs that fell in the street
at 759 Creek where lightning
struck a tree. They rented a
chipper to chip the branches
and the supply of branches
that had accumulated in the
back lot at the shop.
Code Enforcement Report
Paul is reviewing an applica-
tion from a resident to build
a new two story single fam-
ily home at 592 Sibley
Court. This is the second to
last vacant lot within the
Sibley Heights Subdivision.
Estimated valuation of the
home without the lot is
$300K.
A permit was issued to Eco-
lab to install a water reser-
voir to be used on a tempo-
rary basis for testing pool
chemicals and to Associated
Bureaus to install additional
signage at their facility on
1500 Commerce Drive.
Augusta Shores
Minnesota State Curb and
Gutter started installing curb
and gutter at Augusta
Shores on Monday and fin -
ished on Tuesday. The curb
needs some time to cure, af-
ter which the remainder of
the Class 5 gravel base will
be installed. Blacktop pav-
ing could occur as early as
next week.
Street Reconstruction
Driveway replacements and
driveway apron fill-ins were
installed this week, two side-
walk replacements were
made and curb repairs done
within the Rogers Lake
neighborhood. The street
contractor started rough
grading boulevards in prepa-
ration for black dirt and sod
installation by the landscape
contractor.
NSP's subcontractor, Mueller
Pipeline, finally finished their
lawn restoration work in the
Sylvandale Road area, now
our subcontractor can begin
our boulevard restoration
work in the area.
Cemstone Wetlands
Brush
On Tuesday of this week,
Cemstone's landscape con-
tractors removed the black
willows from in front of their
building. They did the work
without disturbing any soil
as approved by the City
Council.
NEWS
Public Works The Pipeline
Code Enforcement
LETTER August 4, 2000
Parks Report
The Parks Crew picked up trash daily
from the parks, mowed the grass,
dragged and chalked fields and
striped foul lines on an as needed
basis. They prepared the fields for
the Men's over thirty softball play-
offs. They aerated the soccer fields
and ballfields. They topdressed the
soccer fields and ballfields at Menda-
kota and Kensington Parks. They cut
out and removed diseased and dam-
aged sod at the soccer goals and
resodded and seeded the areas.
The crew cut up and removed
downed trees and dead trees from
Mendakota, Valley and Victoria High-
land Parks. They performed mainte-
nance on the landscaped berm at
North Kensington Park. Weeding
these berms is very labor intensive
and requires whipping, pulling and
applying chemicals to the weeds,
while at the same time avoiding do-
ing damage to the good plants. They
had to repair two broken sprinkler
heads at Kensington Park.
Utility Report
Rich checked the City's seven sani-
tary sewer lift stations daily. Rich in-
spected the sanitary sewer service
repair work that was being done at
1951 Victoria Curve. He worked with
the resident at 748 Pontiac Place to
determine the cause of a back-up --
it was roots in the private service.
He performed the annual inspection
of Lilydale's lift station with Braun
Pump's assistance. Rich's summer
helper is gone for the next 2 1/2
weeks, operating the sewer jetter is
a two person job so he will be unable
to clean sewer lines for a while.
Street Report
The Street Crew picked up some ex-
cess sandbags from the City of Eagan
and installed them at a storm water
runoff ditch adjacent to the Bloom-
ington Lake Clinic. The ditch has
been over -flowing and flooding the
Clinic during heavy rainfalls. They
cleaned out a ditch on Knob Road to
address a residents' complaint.
The crew worked on making up and
replacing some missing street name
signs, changed out a faded stop sign
and replaced some burned out traffic
signal lights at Highway 13 and Pilot
Knob Road and Lexington and TH110.
The City's agreement with the State
and County requires us to maintain
these lights. They worked on overlay-
ing a portion of 1st Avenue.
They removed the stop signs on
Decorah Lane at Ocala Lane.
Code Enforcement
United Properties has submitted plans
for a building permit to finish out of-
fice tenant space at their Mendota
Heights Office Center III building lo-
cated at 1210 Northland Drive. The
new tenant will be Paychex MPLS, who
will be occupying 29,150 sf or about
half the building. The permit was cal-
culated based on a valuation of
$550,000. Paychex is hoping to oc-
cupy their new space by October 15,
2000,
The City has just received another
MAC noise attenuation permit. Socon
Construction is the contractor doing
the work at 2311 Swan Drive, (Dick
and Dorothy Bjorklund). This is the
first noise attenuation permit the City
has received in a very long time and
is valued at $48,500.
Verizon Changes Antennas
Verizon formerly AirTouch formerly US
West New Vector was the first wire-
less communications company to in-
stall antennas on the City's water
tower (1991). Verizon began last
Thursday changing out some of their
antennas to new, more modern ones.
They also repositioned one bank of
antennas to improve its usefulness.
The foreman on the job told me Tues-
day that they would finish their work,
including repainting by the end of this
week.
APT is another wireless communica-
tions company with antennas on the
water tower and they have informed
the City that they will be changing
their antennas to these new, more
modern ones in the near future.
Safety Training
Safe Assure conducted safety training
for affected Public Works personnel on
confined space entry and overhead
crane operation this Thursday from
1:00 pm-3:OOpm.
Year 1000 Street Reconstruction
The Contractor finished concrete curb
and gutter construction on Kressin,
Roger, and Swan Drive last Saturday.
NSP completed gas main installation
work in the Ivy Falls area this week.
Sod replacement will follow immedi-
ately in the Ivy Falls neighborhood by
NSP. All sod replacement work re-
lated to the NSP gas main work will be
finished before the placement of any
bituminous overlay in the Ivy Falls
area. Driveway construction activities
resumed again at the end of the
week. The Contractor has begun to
shape and tolerance the streets in the
Rogers Lake neighborhood where con-
crete curb and gutter was recently
poured to prepare them for the place-
ment of the bituminous base. Bitumi-
nous base course construction in the
Rogers Lake area should be underway
soon.
Augusta Shores Improvement
Proiect
Erickson Construction has essentially
completed utility construction on the
Augusta Shores project. The Contrac-
tor has begun to shape and tolerance
the street subgrade in the Augusta
Shores development in anticipation of
the placement of some of the aggre-
gate base for concrete curb and gutter
construction.
NEWS
Public Works
Engineering
Code Enforcement
LETTER
Parks Report
The Parks Crew picked up
trash daily from the parks,
mowed the grass, dragged and
chalked fields and striped foul
lines on an as needed basis.
The crew replaced a broken
lawn sprinkler valve at City
Hall by the Police entrance.
The two summer time helpers
that were hired to work the
weekends at the ball tourna-
ments failed miserably last
weekend. Mike and another
reliable summer helper had to
come in and replace them.
Monday after the tournament,
the Crew had to clean up the
park and remove the pitchers
mounds at Mendakota Park.
The Crew hauled in and lev-
eled rec rock for fields at Hag-
strom-King and Victoria High-
lands neighborhood parks.
They also had to haul in Class
5 rock to repair a washout that
occurred in left field near the
Hagstrom-King pond as a re-
sult of Tuesday evenings 11/2"
rainfall. They picked up re-
placement boards for the
bridge at Valley Park. These
boards had to be special or-
dered —because the ones we
bought 'off the shelf' swelled
and warped to the extent they
caused a walker to stumble
and be injured.
Utility Report
Rich checked the City's seven
sanitary sewer lift stations
daily. Rich and his summer
helper cleaned sanitary sewers
on Lilac Lane, Vicki Lane and
The Pipeline
July 28, 2000
Douglas Road from James Road
to Lilac Lane. Rich investigated
a wet spot at 2331 Fieldstone
Drive, found it to be a leaking
water service box and reported
it to St. Paul Regional Water
Services (St. Paul Water Utili-
ties' new name).
Street Report
The Street Crew worked on
patching streets in the Copper -
field neighborhood this week.
They finished making up new
street name signs for the street
reconstruction areas— a total of
61 new signs were made. They
worked on improving some
sight distances: Wentworth
and Wachtler, Marie and Dodd
Road and Victoria and Celia.
They had to remove a tree that
was blown down as a result of
Tuesday nights' storm. The
tree was located at the end of
4ch Avenue and was blocking
the street.
Wetlands Health Team Leader
Resigns
Mara May who was a naturalist
for Dodge Nature Center, was
also Mendota Heights' Citizen
Wetlands Health Evaluation
Team Leader. Mara recently
left the Nature Center and will
no longer be able to serve as
our team leader (see attached).
Mara was an excellent team
leader and will be missed. It
will be most difficult to replace
her.
Code Enforcement Report
To date there have been more
new house starts in 2000 than
in 1999 (12 vs. 9). This repre-
sents $3M in valuation. The to-
tal permit valuation for 2000 is
$13.8M which is up $8M over
1999. Paul also received a per-
mit application from Tharoldson
Development Company this
week to remodel their dining
room at the Heritage Inn.
Year 2000 Street Reconstruc-
tion
Valley Paving, Inc. placed the
bituminous overlay in most of
the Delaware Crossing
neighborhood this week. The
Contractor is preparing to con-
struct concrete curb and gutter
on Kressin Avenue, Roger Ave-
nue, and Swan Drive in the
Rogers Lake area this Friday
and Saturday. NSP gas main
work should be completed in
the Ivy Falls area within a few
days.
Augusta Shores Improvement
Proiect
Erickson Construction com-
pleted water main construction
on the Augusta Shores project.
They completed some of the re-
quired sanitary sewer testing
on the project. They started
working on the installation of
water services this week.
Some storm sewer was con-
structed this week and more is
planned for next week on the
project.
Dakota County
Wetland Health
Evaluation Project
;nnsored by:
c Dakom County
>:nmental Education Program
_'0i0 Sheet West, Suite 101
F:, ;ton, Minnesota 55024
(6_-S0-7734
FA:. 612) 463-g002
Emaii: ahover@exmnsion.umn.edu
1999 Cooperating Partners:
City of Apple Valley
City of Bumsville
City of Eagan
City of Farmington
City. of Hastings
City of Inver Grove Heights
City of Lakeville
City of Mendom Heights
City of Rosemount
City of South St. Paul
City of West St. Paul
Black Hawk Middle School
Burnsville High School
Dodge Nature Center
Eastview High School
Hastings High School
Kenwood Trail Jr. High School
McGuire Junior High School
School of Environmental Studies
Minnesota Pollution Control
Agency
Suburban Hennepin Regional
Park District
Team leaders and
volunteers from Dakota
County communities
Consultants:
BR W, Inc.
An educational program
vaing citizen monitoring to
eva6mte +,aland health.
Mara May
Dodge Nature Center
365 West Mane Avenue
West St. Paul, Minnesota 55113
Dear Mara:
Thank you again for the outstanding job you have done as team
leader for the Mendota Heights Wetland Health Evaluation Project
team. Your professionalism, enthusiasm, and dedication are
appreciated by all; and your team is an excellent example of an
effective, productive volunteer monitoring team.
I have appreciated the relationship forged between Dakota County
and Dodge Nature Center as a result of this project, and I hope the
nature center will continue to be involved in the Wetland Health
Evaluation Project in the future.
Best wishes for a wonderful next step in your life. I know you will
continue to make meaningful contributions and have fun in
whatever you chose to do.
Thank you again for the contributions you have made to citizen
monitoring in Dakota County as well as the friendship you have
shown to me.
Sincerely,
Charlotte Shover, Coordinator
Dakota County Environmental Education Program
cc: Jim Danielson, City of Mendota Heights
Administrator, Dodge Nature Center
Funding for this project approved by the Ntinnesota Legislature, 1999 N'linnesom Law, Ch.231,
Sec. 16, Subd. 21d as recommended by the Legislative Commission on Minnesota Resources from the Minnesota Environment and
NEWS
Public Works
Engineering
Code Enforcement
LETTER
Parks Report
The Parks Crew picked up trash
daily from the parks, mowed the
grass, dragged and chalked fields
and striped foul lines on an as
needed basis. This week they
are preparing four softball fields
in Mendakota Park for the State
AAU Baseball Tournament being
held there this weekend. They
had to build pitchers mounds on
all the fields. They trimmed
trees along pedways and behind
the outfield fence at City Hall.
They painted foul ball poles at
Mendakota Park and City Hall.
They had to paint over graffiti at
the Friendly Hills warming house
(working with cops to try and
catch the vandal who did the
work). They also had to repair a
park bench at Mendakota Park
that was damaged by vandals.
Finally, they planted two orna-
mental crab trees at City Hall this
week. The trees were donated
by the Mendota Heights Garden
Club, as they have done annually
over the past nine years.
Utility Report
Rich checked the City's seven
sanitary sewer lift stations daily.
Rich and his summer helper jet-
ted the sanitary sewer lines clean
on Walsh Lane to Marie Avenue,
Rolling Green Curve and the
easement area nearby and on
Windwood Court this week. He
assisted a resident at 1951 Victo-
ria Road locate their sanitary
sewer service. The line was
plugged, so the resident hired
Roto Rooter to televise the line.
The line was broken and needed
to be dug up and repaired. He
discovered another buried man
hole cover —this one near Rolling
July 21, 2000
Green Curve. It was under a resi-
dents flower garden, so Rich
worked with the resident to raise
the cover to the surface and he
relocated the affected flowers.
He performed a new sanitary
sewer connection inspection for
the new Ryan Construction Head-
quarters building. Ryan had to
raise one manhole 8 feet and an-
other 5 feet to accommodate their
new grades. He performed the fi-
nal inspection of the sanitary
sewer system with Tom Knuth for
the Glen Toro Addition.
Street Report
The Street Crew worked mainly
on patching streets this week.
They patched potholes in the
Freeway Road Addition. The
Freeway Road streets are in very
bad shape, but we tried not to go
overboard with patching because
the streets will need to be totally
reconstructed in the very nearfu-
ture. We have received several
letters of request from the resi-
dents asking that their streets be
redone soon. It would be most
efficient to redo the streets in
conjunction with the Town Center
Development.
The Crew also worked on making
replacement street name signs for
the street reconstruction
neighborhoods.
DNR to Install Aeration Pump
Guy, Marc and I met with Jerry
Johnson from the DNR this week
to locate the permanent pumping
station at Roger's Lake Park. The
DNR feels that the temporary
portable aerator that they in-
stalled at Roger's Lake this winter
was a success and have budgeted
$30,000 to install a permanent fa -
cility this year. This plan will be
brought to the City Council for fi-
nal approval at their August 1st
meeting.
Code Enforcement Report
Paul issued a building permit to
Heaver Design and Construction
for a new single family home in
Ivy Falls South subdivision on
Knollwood Lane. The home is a
multi -level walkout home that has
up to three levels exposed at one
point in the rear. The home abuts
the existing Cherry Hill neighbor-
hood and the immediate neighbor
to the rear called to express her
concern over the size of the home
and the drainage. There was no
extraordinary restriction on this
lot when approved by Council and
the drainage appears to work cor-
rectly —we will watch that it stays
that way.
Year 2000 Street Reconstruc-
tion
The Contractor
constructed con-
crete curb and
gutter on Lake
Drive this week.
Some replace-
ment of sod was
done in the over-
lay area of the
Rogers Lake
neighborhood.
NSP gas main
work continues
in the Ivy Falls
area. Driveway
construction re-
sumed again at
the end of the
week.
Augusta Shores Improvement
Project
Erickson Construction continues
with water main construction on
the Augusta Shores project.
Some storm sewer was con-
structed this week and more is
planned for next week on the pro-
ject.
NEWS
Public Works
Engineering
Code Enforcement
LETTER
Parks Report
The Parks Crew picked up trash
daily from the parks, mowed the
grass, dragged and chalked fields
and striped foul lines on an as
needed basis. City League soft-
ball and baseball is winding down
and the final tournaments for
girls softball and boys baseball
are this weekend. The fields will
be prepared on Friday with sum-
mer helpers doing the touchups
and clean up over the weekend.
I am unaware of any major dam-
age anywhere in the City due to
last weekend's storms, but there
were a lot of limbs down in the
parks and the Parks Crew spent
the better part of the beginning
of the week cleaning them up.
There were two larger limbs that
fell, one in Ivy Park and one by
the pedway near Delta Dental
that required the rest of the tree
to be removed.
Utility Report
Rich checked the City's seven
sanitary sewer lift stations daily.
Rich had to use the City's sewer
jet cleaner to open a culvert at
St. Thomas Academy that was
blocked by erosion from the Mid-
dle School construction that oc-
curred as a result of last week-
end's storm. Rich and his sum-
mer helper finished cleaning the
City's sanitary sewer within the
Eagle Ridge townhome and con-
dominiums development and on
Stratford and Coventry Court.
John Boland was called in at 4:00
A.M. on Sunday for a high water
alarm that occurred at a sanitary
sewer lift station. The alarm had
cleared and John found no prob-
lem by the time he got there.
Ah
iffi=9 An
July 14, 2000
Street Report
The Street Crew had to install a
temporary 4-way stop at North-
land Drive and Pilot Knob road on
Friday because a power line was
knocked down. They had to re-
move a patch of marijuana that
was growing wild on a lot at the
end of Waters Drive.
They had to reinstall the stop sign
on east bound Decorah Lane at
Ocala (for the sixth time). The
sign had even been installed in
concrete the last time, so the per-
son who removed it had to really
be determined. They patched
potholes in the Park Place
neighborhood, Freeway neighbor-
hood by Par 3 and on Marie Ave-
nue this week.
Lilvdale Watermain Analysis
Because of the upcoming I-35E
bridge construction, the City of
Lilydale hired Barr Engineering to
analyze whether it would be pru-
dent to work with MnDOT to elimi-
nate a deadend waterline on TH13
and to serve the Nursery, Ryan,
and Tennis Club with water. See
attached report —the cost would
be too high to consider doing the
work.
Year 2000 Street Reconstruc-
tion
The Contractor continued working
on Lake Drive grading and shap-
ing the aggregate base section to
the appropriate street and gutter
elevations. This week they con-
centrated on the north/south seg-
ment of Lake Drive and the area
west of Swan Drive. NSP gas
main work continues in the Ivy
Falls area. Bituminous driveway
construction and patching be -
tween existing driveways and re-
placed concrete gutter continued
again this week. Bituminous
driveway construction resumed on
Thursday. Sod replacement will
commence next week in the Dela-
ware Crossing neighborhood
where sod was disturbed during
concrete curb and gutter replace-
ment work.
Augusta Shores Improvement
Project
Erickson Construction continues
with utility construction on the
Augusta Shores project. The
mainline sanitary sewer and most
of the sanitary sewer services
have now been installed. Con-
struction started Thursday on the
deeper segments of the storm
sewer system that outlets the ex-
cess runoff from the internal
storm water retention basin for
this development. Watermain
construction is scheduled to begin
on Tuesday.
Personnel News
Curt Wimpee returned this
Wednesday from the Jacksonville
Florida area where he intends to
relocate after interviewing with a
number of prospective employers.
Curt's training and experience
have served him well based on
the six job offers that were ex-
tended to him after these inter-
views. These offers were all
made before Curt learned on
Thursday that he had passed his
Professional Engineer's exam.
Congratulations to Curt on these
recent developments.
Attachment:
• 35E Water main crossing re-
port
Barr Engineering Company
4700 West 77th Street • Minneapolis, MN 55435-4803
Phone: 952-832-2600•Fax: 952-832-2601
m
Minneapolis, MN • Hibbing, MN • Duluth, MN • Ann Arbor, MI • Jefferson City, MO
July 6, 2000
Honorable Mayor Ed Mullarky
City of Lilydale
1101 Sibley Memorial Hwy #310
Lilydale, MN 55118
Dear Mr. Mullarky:
The purpose of this letter is to present to the city of Lilydale a brief discussion of the issues and
costs related to the 35E water main crossing. The letter will include project background, a
discussion of the need for the project and its goals, three alternative alignments, preliminary costs
for one of the alignments and a summary.
Project Background
Due to recent development within the City of Lilydale the existing water system was analyzed to
verify that it could supply adequate fire protection to the Stonebridge of Lilydale development in
the west quadrant of Interstate 35E (35E) and Highway 13. Analysis indicated that the system
can meet projected fire demands but that a few areas have other issues the city may wish to
address in the future. One of those issues is the dead end that currently exists on Highway 13 just
east of 35E in the vicinity of the bridge over Lilydale Road shown on Figure 1. The Lilydale
Comprehensive Plan Public Facilities discussion identifies the elimination of this dead-end. In
addition to this there are several developed properties between Lilydale road and 35E that do not
have City water and are currently on wells.
At the same time the Minnesota Department of Transportation (MuDot) has been in the process
of designing significant modification to the 35E bridge over the Mississippi River. The project
will involve rerouting traffic from one side of the freeway to the other so that at some point
during construction each direction of the road will be without traffic. This is important because it
provides the Cities of Lilydale and Mendota Heights with a rare opportunity to construct utility
crossings of the freeway with open cut methods potentially reducing costs. Because of this the
city of Lilydale has instructed Barr Engineering to look into the possibility of constructing a
watermain across 35E and connecting the dead end discussed above into a portion of the water
system west of 35E and coordinating the construction with MnDot work to gain efficiency and
potentially reduce cost.
Project Need and Goals
The primary reason this project is being considered is to eliminate the dead end mentioned above
at this opportune time when Lilydale can take advantage of the 35E construction. A secondary
benefit is the potential to serve the developed properties between 35E and Lilydale road if one of
the proposed alignments is constructed. There are several reasons dead ends are undesirable on
water systems. One is that dead ends limit water circulation. If use is low on the dead end,
degraded quality and poor taste often results. To our knowledge neither Mendota Heights nor
Lilydale has received any quality complaints from this area to date
Another benefit of eliminating dead ends is that water users along dead ends are at a greater risk
for interruption of service than those in looped service areas should a water main break occur.
Those in looped areas can receive service from the portion of the loop away from the break.
Obviously when a break occurs on a dead end those on the wrong side of the break have no other
options. This remains an issue for the properties along the dead end on Highway 13.
Finally, probably the most important benefit of looping the system is that it will improve fire flow
to the area by providing a second path for water to travel to hydrants that are currently at the end
of the line on Highway 13. It should be noted that fire flows to the hydrants on the dead end were
not modeled in the earlier work done for the Rancone development. Additional modeling would
be needed to quantify the benefit to the area.
Another point of project need worth noting is that eliminating this dead end is recommended in a
document titled "Mendota Heights Water Study" prepared in 1991 by HNTB.
Alternative Alignments
The main alignment looked at is shown on Figure 1 as Alignment 1. Two other alignments are
shown on the figure for comparison. They were developed to reduce rock excavation or eliminate
the bridge crossing over Lilydale road. Due to the limited scope of this study neither of the other
alignments were reviewed in depth and no costs estimates were prepared for them, however each
has some benefits as compared to Alignment 1. Of the alignments only Alignment 2 could be
described as conventional watermain construction and all will likely have some rock excavation.
Each has significant drawbacks that are discussed below. None of the drawbacks make any of the
alignments impossible but they do make them more costly.
Alignment 1
Alignment 1 is the original proposed route and essentially is the shortest distance between the
original proposed connection points on the system. Running north east from the comer of
Highway 13 and Victoria Road it crosses 35E perpendicular to the lanes of traffic and would jog
to the east to avoid a proposed bike trail and then head across Lilydale Road on the Highway 13
bridge to connect to the dead end. There are a number of significant drawbacks to this alignment,
which are as follows:
1. Virtually all of the alignment is constructed in rock to some depth, and almost all
rock near 35E and Lilydale Road is at the surface. Some of this rock is sand stone
and will be relatively easy to excavate, however, some is limestone and will be
difficult.
2. NSP has a natural gas facility on the east side of 35E that will require significant
consideration during design and may result in further alignment adjustments.. The
facility appears as four small white buildings on Figure 2 south of Highway 13
between the 35 E ramp and Lilydale road.
3. The bridge over Lilydale road will be very difficult to work on. There may not be
enough room to connect an insulated water main to the bridge and clear the cross
braces that exist at regular intervals between each of the bridge beams. MnDot does
not allow utilities to be strapped to the outside of the bridge and hanging the main
under the cross braces results in conflicts with the pier caps. Construction of the
main in the valley under the bridge rather than on it would be no easier since rock is
at the surface at many points along the steep wooded banks and there is a creek in the
middle that would require other special construction.
Alignment 2
This alignment eliminates most of the problems with Alignment I by avoiding the known rock
outcrops and avoiding the bridge area entirely. Some rock will still be encountered but it should
be less than in the other alignments. The draw backs of this alignment are as follows:
1. The developed property between Lilydale road and 35E remains unserved.
2. Almost the entire alignment is believed to be on, or immediately adjacent to, the
NSP gas site. Because of this there will likely be significant route modifications
to make it through or around the tank field. The tank field can be seen on
Figure 2.
3. The alignment provides very limited benefit to the west side of 35E, though it
should be pointed out that earlier modeling indicated no significant deficiencies
in that location.
Alignment 3
This alignment would actually pass under the 35E bridge and require a little less coordination
with MnDot's 35E project. It could potentially serve the property between Lilydale Road and
35E, and potentially even the Yacht Club could receive a service under this alignment. As with
the other alignments this one also has its drawbacks, which are as follows:
1. Lilydale would have to coordinate with Stonebridge of Lilydale developers or
one of the other developments along the bluff to get a water main down to the
area below the 35E bridge.
2. Rock will likely be a significant factor along this alignment again.
3. Some of the construction would be difficult, as it would occur along steep
wooded slopes.
4. There may be some environmental issues due to the route along the river.
5. The services to the properties between Lilydale road and 35E are not simple
connections by any means and would have to run up steep slopes and probably be
built in rock again.
None of the alignments represents easy construction with the possible exception of Alignment 2,
which ends up not providing service to the property between 35E and Lilydale Road. All require
some rock excavation. It is undeniable the 35E project represents an opportunity to cross the
freeway with much less complication than normal, however it is also clear that any utility work in
this area will be expensive and involve significant rock excavation.
Costs
A preliminary planning level cost estimate was prepared for Alignment 1 and includes only a
general breakdown of quantities. In order to address the uncertainty of a project such as this, a
cost range is provided. As shown on Figure I Alignment i is estimate to cost between $477,000
and $730,000 to construct. The two most significant contributing factors to the high cost are rock
excavation and attaching the main to the bridge, which account for about 40% of the total project
cost.
Note the costs shown here do not include administrative costs, engineering design, soils
investigations, easement acquisition, legal issues, or permit procurement. These items could
easily approach $100,000 for a project of this difficulty.
Summary
In summary the city should expect to spend no less than $477,000 to construct Alignment 1, and
should be prepared to pay as much as $730,000. Other alignments may be more cost-effective in
eliminating this dead end but none allows service to be brought to the properties between Lilydale
road and 35E without significant expense. Barr recommends that the Cities of Lilydale and
Mendota Heights contact the businesses along Highway 13 in the vicinity of the dead end and
verify that they are satisfied with their water quality. In addition to this fire flow to the dead end
should be looked into further to quantify the benefit of the project. If the fire flow is inadequate
or if the customers complain of poor water quality then the project becomes a more significant
issue.
Even if fire flow and water quality appear to be adequate eliminating dead ends is always good
practice. Because of this Barr recommends that both Lilydale and Mendota Heights continue to
pursue eliminating this dead end and then plan the work accordingly. Before making a final
decision it would be wise to further investigate Alignment 2.
Sincerely,
Brian K. LeMon
BKL/mis
C: Joey Lundquist, MuDOT
Bernard Weitzman, City of Lilydale
James Danielson, City of Mendota Heights
::ODMA\PCDOCS\DOCS\218026\I
NEWS
Public Works Engineering The Pipeline
Code Enforcement
LETTER June 23, 2000
Parks Report
The Parks Crew picked up trash
daily from the parks. The Crew
dragged and chalked fields and
striped foul lines on an as
needed basis. They prepared
the fields at Mendakota Park for
the Women's Sibley Area fast
pitch softball tournament that
was held last weekend. They
aerated all the soccer fields.
They began fertilizing the lawn
areas and applying a second ap-
plication of crab grass preven-
tion. They repaired a broken
swing set at Rogers Lake Park.
The Crew had to clean up fire
damage at the Kensington Park
men's bathroom that was done
by vandals. Vandals have
started fires in the men's bath-
room three nights this week.
We are working with the Police
Department to try and catch
these delinquents. Somehow
we either have to catch them or
find a way to stop them.
Utility Report
Rich checked the City's seven
sanitary sewer lift stations daily.
Rich repaired the door lock to
the Northland lift station, and
he responded to a power outage
at the lift station that occurred
Monday morning. He jetted the
sanitary sewer lines clean on
Willow Lane, Ridge Place and
Wachtler Avenue. He replaced a
broken manhole cover at Dodd
Road and Wagon Wheel Trail.
Street Report
The Street Crew worked on
patching streets in the north end
of the City (Maple Park Drive
and Spring Street). They in-
stalled "No Dumping" signs at the
City's storm sewer holding pond
lot at Caren Road. These signs
were installed at the request of
several of the residents who are
trying to get their neighborhood
to quit using the site as a grass
clipping and brush disposal area.
The Crew also began making re-
placement street name signs for
this years street reconstruction
project. They patched the drive-
way apron at the entrance to
Wentworth Park.
Alice Lane Subdivision Two
Improvement Proiect
The first lift of bituminous paving
for the Alice Lane Subdivision
Two Project was placed on Thurs-
day of this week.
Year 2000 Street Reconstruc-
tion
Bituminous driveway construction
work started Wednesday of this
week in the Ivy Falls area. The
Contractor scheduled the place-
ment of the first layer of bitumi-
nous paving on Cheyenne Lane
and the major bituminous patch-
ing work on Apache Lane this Fri-
day weather permitting. NSP
Gas main work in the Rogers
Lake neighborhood was finished
this week, and now will com-
mence in the Ivy Falls area to re-
place the gas main system in this
neighborhood. Bituminous over-
lay work in the Ivy Falls area will
not begin until the gas main work
is finished. Storm sewer con-
struction continues in the Rogers
Lake area this week. The Con-
tractor is planning to reclaim the
remaining bituminous pavement
on the streets where new con-
crete curb and gutter will be con-
structed in the Rogers Lake area
next Monday. There has been
measurable precipitation re-
corded on 22 of the 33 working
days since this project began.
The combination of this weather
pattern, and the high volume of
residential driveway replacement
contracts (55) have contributed
to the slower than expected pro-
gress on the project.
Glen Toro Second Addition
improvement Project
The second and final lift of bitu-
minous paving that was planned
for construction last Friday for
the Glen Toro Second Addition
Project was postponed for a pe-
riod of time to accommodate a
period of busy and congested
home building construction activ-
ity in the development.
Augusta Shores Improvement
Project
G. L. Contracting has completed
the structural grading this week
on the Augusta Shores project.
Now the grading Contractor will
concentrate on placing non-
structural fill throughout the pro-
ject, and on the re -spreading of
topsoil. All grading should be
completed in about a week with
favorable weather. A pre -
construction meeting was held
Monday for utility and street con-
struction on the project. Erick-
son Construction is the General
Contractor for utility and street
construction under the City's
contract and plans to begin some
minor utility construction starting
next week.
NEWS
Public WorksEngineering The Pipeline
Code Enforcement
LETTER June 16, 2000
Parks Report
The Parks Crew picked up trash
daily from the parks. The Crew
mowed grass, dragged and
chalked fields and striped foul
lines on an as needed basis.
They also worked on trimming
brush along the pedways and
around the tennis courts. They
hauled black dirt to Rogers
Lake Park to fill in and repair
the stump holes from the dead
elm trees that were recently re-
moved. They planted roses at
Rogers Lake Park that were do-
nated by a neighbor.
Utility Report
Rich checked the City's seven
sanitary lift stations daily. Rich
responded to a residents call
for help at 1910 Knob Road.
Their sanitary sewer service
line was blocked with tree roots
very close to its connection
with the City's main and they
requested that Rich clean the
City's lines to remove any roots
that may have gone into it.
Rich also cleaned the sewer
lines in Mager Court, Dodd
Road and in the Hilltop Road
area. He cleaned Dodd Road
from Ivy Hill Drive to the Som-
merset easement.
Street Report
The Street Crew finished patch-
ing potholes within the Som-
merset neighborhood. They
cleaned up and removed stump
grindings from a boulevard tree
removed at 572 Hiawatha Ave-
nue. They filled the hole with
black dirt and seeded it. They
replaced the light bulbs in the
traffic signal at Mendota Heights
Road and TH 55 (per MnDOT's
order —see attached). They
trimmed bushes to improve traf-
fic sight distance at several in-
tersections. They replaced sev-
eral street name signs that were
missing.
Year 2000 Street Recon-
struction
Concrete gutter replacement
work has now been essentially
completed throughout the entire
project. On Thursday, the Con-
tractor began preparation work
on Cheyenne Lane in prepara-
tion for bituminous paving. The
Contractor is going to concen-
trate on completing driveway
replacement work in the Ivy
Falls area starting next Tuesday.
NSP Gas main work in the
Rogers Lake neighborhood was
finished this week. Storm sewer
construction commenced in the
Rogers Lake area this week and
will continue next week.
Alice Lane Subdivision Two
Improvement Project
Curb and gutter construction for
the new street and cul-de-sac to
serve the Alice Lane Subdivision
Two development was sched-
uled for Friday. We anticipate
that the first lift of bituminous
paving will follow within a cou-
ple of weeks.
Glen Toro Second Addition
Improvement Project
The second and final lift of bitu
minous paving for the Glen Toro
Second Addition Project was
planned for construction on Fri-
day.
Augusta Shores Improve-
ment Project
G. L. Contracting continued
rough grading operations this
week on the Augusta Shores
project. A pre -construction
meeting has been scheduled for
next Monday for utility and
street construction on the pro-
ject. Erickson Construction is
the General Contractor for utility
and street construction under
the City's contract and is anx-
ious to begin utility construction
as soon as the grading is fin-
ished. Grading on the project
continues and should be com-
pleted in about a week with fa-
vorable weather.
Code Enforcement Report
The City and Minnesota Pollution
Control Agency had received
complaints from employees of
Specialty Equipment Company
(northwest corner of Mendota
Heights Road and Pilot Knob
Road) that their cars were being
impacted by paint powder that
was being put in the air by their
neighbor, Applied Coating Tech-
nology. Dick Gill and Bob Berg,
MPCA, met with Applied Coating
Technology's plant manager this
week to discuss the problem.
Applied Coating is in the process
of amending their operation to
eliminate the emissions, they
are currently paying owners of
the impacted cars to have their
cars buffed clean.
, HESO,
e
ot
Minnesota Department of Transportation
Metropolitan Division
Waters Edge
1500 West County Road B2
Roseville, MN 55113
TRAFFIC OFFICE
June 14, 2000
Mr. Jim Danielson
City of Mendota Heights
1101 Victoria Curve
Mendota Heights, MN 55118
Dear Mr. Danielson:
SUBJECT: Traffic Signal Maintenance
This spring, Mn/DOT personnel conducted signal maintenance checks of all State operated signals.
These maintenance checks included a general diagnostic of all traffic signal components including
cabinet equipment, pedestrian pushbuttons, signal heads and lamps, detection and luminaires.
During our semi-annual signal operation check, the following signal and or streetlights were found in
need of relamping. This requires immediate attention for which you are responsible as per agreement
between your agency and the State of Minnesota.
T.H.
INTERSECTION
LUMINAIRES
DON'T WALK
WALK
55
Mendota Heights Rd.
OK
Numerous
Numerous
149
Mendota Heights Rd.
OK
OK
OK
It should be noted that the above items were found at the time of the signal maintenance check.
Other items may have failed since then, and the entire intersection should be checked when you
perform your maintenance.
It is important that signal lenses and reflectors are cleaned when lamps are replaced. If lenses or
reflectors are stained, burned, broken or will not clean, contact Mn/DOT Electrical Services at 612-
725-2310 for replacement.
According to agreements between the city and Mn/DOT, it is the responsibility of the city to relamp.
If you have any questions, please contact Dan Lowe at 651-634-2132.
Sincerely,
Steve Mrsgen' -
Signal Operations Engineer
An equal opportunity employer
Jim Danelson
1101 Victoria Curve
Mendota Heights, MN 55118
Dear Jim Danelson,
Just a note to thank one of your associates Dave Sorby for his great job in
regards to a fallen tree in our neighborhood. Dave was very thorough,
courteous, and helpful. Please give Dave a Big Thanks from me and our
neighborhood.
Sincerely,
/-3
'4
��
Bill Doody
18 Hingham Circle
Mendota Heights, MN 55118
June 10, 2000
Mr. Jim Danielson
City of Mendota Heights
1101 Victoria Curve
Mendota Heights, MN 55118
Dear Mr. Danielson,
Just a quick note to let you know how impressed I was with the helpful and professional attitude of Rich
Burrows.
On June 7t^, I had a main drain plugged. I had a sewer cleaner coming and I called City hall to see if the
city had a sewer camera. Some cities have them, for example, Fridley.
I had always thought the drain went out the back (South) and headed to Dodd Road (East). Mr. Burrows
stopped by and checked manholes on Dodd Road and on Sunset Lane. Then he went back to check prints
and he let me know where my main pipe is located.
Thank you for having a quality, professional employee on your staff
Best Regards,
PJamesLake/
630 Sunset Lane
Mendota Heights, MN 55118
NEWS
Public Works
Engineering
Code Enforcement
LETTER
Parks Report
The Parks Crew picked up trash
daily from the parks, they
dragged and chalked fields and
striped foul lines on an as
needed basis. The Parks Crew
worked last weekend to help
make the Celebrate Mendota
Heights Parks a success. They
hauled out stump grindings that
were left at Rogers Lake Park
and Wentworth Park where
some trees had been removed.
They performed repairs to the
Friendly Hills warming house
(furnace exhaust pipe).
The Crew hauled in and spread
more rec-rock to fields #2 and 3
at Mendakota Park where some
depressions had formed and
were holding water. They over -
seeded the hockey goal mouth
areas at Mendakota Park and at
City Hall by the Police Station
entrance. They had to replace
light bulbs in the pavilions at
Mendakota Park.
Utility Report
Rich checked the City's seven
sanitary lift stations daily. Rich
had to replace the battery for
the alarm system at the St. Tho-
mas Academy lift station. J.P.
Lipton, his summer helper,
started this week. This is
J.P.'s third summer and he has
done a good job. Now that
J.P. has started, Rich will be
able to begin jetting the sanitary
sewers clean, jetting the sewers
is a two -worker job.
They began by cleaning Wesley
Lane, Wesley Court, South Lane
and Mager Court. Rich per-
formed a sewer inspection for a
The Pipeline
June 9, 2000
new home at 2210 Rogers Court.
Rich was called out Wednesday
to 630 Sunset Lane for a sanitary
sewer backup. This time the
problem was in the homeowners
private service lead, not the
City's main. He located a buried
manhole cover at Mager Court
and he coordinated with the
homeowner to raise the manhole
to grade. He also worked with
Paul Dreelan, who does the
maintenance work for Country
Day Childcare Center, to locate
several other "missing?" manhole
covers. One is buried three feet
and will have to be raised or oth-
erwise uncovered next week.
Street Report
The Street Crew had to repair a
catch basin inlet in Copperfield
that was installed off center and
had caused a hole to form in the
street. They worked on repairing
potholes in Copperfield and Kay -
Walsh neighborhoods. They in-
stalled a stop sign at the exit to
Kensington Park's parking lot.
Year 2000 Street Reconstruc-
tion
Concrete gutter replacement
work continues throughout the
project. The Contractor has
commenced driveway replace-
ment work for property owners
that had requested replacement
of their driveways in conjunction
with the project. NSP Gas main
work continues in the Rogers
Lake neighborhood and could be
finished by Tuesday. Residents
will be without gas service for a
short period of time when the
property owner's gas services are
connected to the new main.
Storm sewer construction in the
Rogers Lake area is scheduled to
begin next Monday.
Alice Lane Subdivision Two
Improvement Proiect
The Engineering Department has
staked the curb and gutter for
the new street and cul-de-sac to
serve the development. We an-
ticipate that street construction
on the project will commence
soon.
Augusta Shores Improvement
Project
G. L. Contracting has resumed
rough grading operations on the
Augusta Shores project this
week. The Contractor has in-
formed us that they have about a
week and a half worth of work
left to complete the grading on
the project with favorable
weather.
Sod Replacement Program
Marc Mogan met with Dave
Gamez a turf grass specialist with
Northstar Turf on Wednesday to
observe and make specific rec-
ommendations with respect to
the problems with the grass in
the Tilsen's Highland Heights
neighborhood. His initial reac-
tions were that problems and so-
lutions were not as complicated
as some have suggested. Marc
Mogan summarizes Dave's com-
ments in the attached memoran-
dum, and his recommendations
will be incorporated into the re-
pair work undertaken by the City.
Attachment:
0 Turf Memo
Memorandum
To: Kevin Batchelder, Mayor and City Council Members
From: Marc
Date: June 7, 2000
Re: Tilsens's Turf Inspection on 6/7/00 with Dave Gamez, NorthStar Turf
1. Dave inspected the topsoil in the center island on Lilac Lane and found it acceptable in
composition and depth. He recommended that the weeds in the center island be killed with
Roundup. After the weeds had been dead for a period of time. He recommended that the area be
tilled using a rear tine tiller to a depth of approximately 2 to 3 inches. A rear tine tiller creates a
very suitable surface for seed application. Then he recommended seeding the area with their
Tough Turf seed mix. Kentucky Bluegrass sod is neither salt nor heat tolerant, and probably will
never do well at that location under the current conditions.
2. He believes that the problem on Anita Stockton's boulevard at 969 Caren Road is caused by a
high acid soil related to the large cottonwood tree that was there for years. It was his opinion that
nothing would grow there until this condition was corrected. Again he recommends killing the
weeds, followed by rear tilling and incorporating probably 150 pounds of lime into the soil.
Then the area could be re -sodded or seeded.
3. A lot of problems he sees with the sod adjacent to the curb is from the effect of salt and sand
from snowplowing. He recommends that property owners sweep the sand and grit that has
accumulated on the boulevard into the gutter before the City sweeps the streets in the spring of
the year. The high Kentucky bluegrass content of the sod that is installed in the boulevard
typically will always be susceptible to the effects of heat, salt and sand from snowplowing.
4. The root structure of the grass will grow to a depth of no greater than four inches. Residents
claim that the reason the sod has not established is due to the debris that is buried underneath the
sod. Any debris deeper than six inches below the surface will have no effect on the health of the
sod. The underlying soil beneath the sod will be excavated, roto-tilled, or subcut to a depth of
six inches below the surface to look for evidence of debris. Where debris is found it will be
removed. Soil tests will betaken randomly to determine the pH level and fertilizer requirements
for these areas. If the soil tests determine that the soil should be conditioned, the City will add
the necessary chemicals. If the topsoil is found to be deficient it will be removed and replaced.
The City property on the north end of Tilsen's between James Road and Lilac Lane is in good
condition for an area that is not maintained, but could be treated with Trimec and fertilized to
improve the turf in that area.
(over)
6. He made general recommendations that the City specify four inches of topsoil and mineral sod as
opposed to peat sod on future projects. Mineral sod seems to root more effectively in a new
location when it's laid. He also recommends that the City specify Medalist seed as opposed to
Scotts for the sod. He is of the opinion that the Scotts seed is not as advanced in the areas of
disease resistance, hardiness, etc.
7. He is a believer in aeration, Trimec, and slow release non-ag fertilizer.
NEWS
Public WorksEngineering The Pipeline
Code Enforcement
LETTER June 2, 2000
Parks Report
The Parks Crew picked up trash
daily from the parks, dragged
and chalked fields and striped
foul lines on an as needed basis.
They also cut up and removed
several dead Elm trees from
Rogers Lake Park. They
planted some shrubs at the But-
ler Avenue entrance to Ivy Park
to screen a new home from the
parking lot. They also replaced
several dead shrubs around park
signs. They attended a grounds
keeping clinic at Woodbury on
infield renovations and mainte-
nance. They worked on prepar-
ing Mendakota Park for
"Celebrate Mendota Heights
Parks" which is to be held this
weekend.
Utility Report
Rich checked the City's seven
sanitary lift stations daily. The
Northland Drive lift station was
"bugged" this week. Ants en-
tered the inside of the control
panel and caused the pump me-
ter to short out. Rich had to re-
place the meter and put out
some ant poison to kill the ants
and solve the problem. Rich
visited 666 2nd Avenue to re-
view a settlement in the front
yard. The resident was con-
cerned that the settlement
might be as a result of a sani-
tary sewer failure. Rich could
find no evidence that supported
that concern.
Street Report
George and Tim worked with the
Parks Crew to remove some
trees from Rogers Lake Park.
George operated the City's bob-
cat with the grapple attachment
to load the trees for removal.
The Crew worked on pothole re-
pairs in the Sommerset neighbor-
hood and the Kay -Walsh area.
Code Enforcement Report
United Properties has submitted
their plans for a permit for the
building shell at 1210 Northland
Drive, Phase III Mendota Tech-
nology Center. They had previ-
ously been issued a footing and
foundation permit. The building
has 61,320 square feet of area
and is valued at $2.4 million.
R.J. Ryan has submitted their
plans for a new office at 1120
Mendota Heights Road (right
where Lexington Avenue inter-
sects with Mendota Heights
Road). The new building will
serve as their office headquar-
ters. It is 9,344 square feet of
office space and 1,456 of garage
space with an estimated valua-
tion of $600K. R.J. Ryan will be
at next Tuesday's City Council
meeting requesting a zoning
change to comply with the City's
Comprehensive Plan.
There was a new single family
home permit issued for 1851 Or-
chard Hill. The contractor will be
Minnesota Custom Homes and
the home is valued at $600K.
Year 2000 Street Reconstruc-
tion
Concrete curb and gutter remov-
als have been completed
throughout the overlay project
area and the concrete gutter re-
placement work will continue
through the early part of next
week. The Contractor has begun
to remove some of the bitumi-
nous driveways for property own-
ers that had requested replace-
ment of their driveways in con-
junction with the project. NSP
Gas main work continues in the
Rogers Lake neighborhood.
Alice Lane Subdivision Two
Improvement Proiect
Ryan Contracting Company com-
pleted construction of the sani-
tary sewer, water main, and
house services for the new lots
this week. The Contractor re-
quested that the Engineering De-
partment stake the curb and gut-
ter for the new street and cul-de-
sac to serve the development.
We anticipate that street con-
struction on the project will com-
mence soon.
Augusta Shores Improvement
Proiect
The wet weather prevented G. L.
Contracting from making any
progress on the rough grading
operations on the Augusta
Shores project this week. The
site will have to dry out before
the Contractor can resume grad-
ing on the project.
Sod Replacement Program
Last week notices were sent out
to all residents in the Tilsen's
Highland Heights and Bunker
Hill's project neighborhoods out-
lining the conditions of a program
for the replacement of sod that
failed to survive in conjunction
with those street projects com-
pleted in 1997 and 1998 respec-
tively.
Attachments:
• Sod letters
City of
Mendota Heights
May 26, 2000
TO: Tilsen's Highland Heights Street Reconstruction Project Area Property Owners
FROM: Marc S. Mogan, P.E.,
Civil Engineer
SUBJECT: Boulevard Sod Replacement Program - Tilsen's Highland Heights Neighborhood
DISCUSSION:
Starting last fall a number of Tilsen's Highland Heights residents contacted staff to request that
the City replace sod that failed to become re-established after it was installed in the summer and fall of
1997 in conjunction with the Tilsen's Highland Heights Street Reconstruction project.
There are several locations throughout the project where it is obvious that the sod has not
survived during this 3-year period for whatever reason. The situation is not universal, and many times
it varies between adjacent properties. Over this period of time the level of care (watering, etc.) given
the sod replaced in conjunction with this project varied between properties. Given the number of
variables that come into play in this sod replacement work, it is difficult to establish which factors may
be responsible for either the success or failure in the establishment of the sod at one location and not
another after this period of time. Council's primary focus at this point is to offer a reasonable and
practical solution to this situation rather than dwell on the possible causes at this point.
Council directed staff to research the extent of this problem and administer a program that would
rectify the situation. The whole issue of establishing which areas should be repaired, and where this
work should terminate could be somewhat subjective. In many instances it is apparent where the sod
was originally replaced. The size of these areas varies considerably. The minimum lot width in
Mendota Heights is 100 feet. If the original area disturbed behind the curb in the boulevard was 12 feet
wide, the sod area replaced would be approximately 140 square yards. We have estimated that the cost
to replace an area of this size would be approximately $600. There are some properties where the
lawns outside of the boulevard areas restored under the street project are also in bad condition, and
Council understandably has reservations about replacing any sod on properties under these
circumstances. Council does not want to initiate sod replacement at considerable expense only to
experience a similar outcome. Under these circumstances, Council has determined that it would be
reasonable and appropriate to require the property owner to assume a certain level of responsibility for
any sod repair work undertaken by the City at this time.
(over)
1101 Victoria Curve • Mendota Heights, MN • 55118 (651) 452-1850 • FAX 452-8940
Adequate watering of any sod replaced is probably the most important aspect in this sod
replacement program. It is not practical, or feasible for a Contractor in this industry to water the small
or scattered areas of sod which could conceivably be replaced throughout this neighborhood.
Consequently, Council has decided that it shall be the property owner's responsibility to water any
boulevard sod that the City might replace. It would not be prudent for the City to begin a program such
as this without some assurance that the property owner would uphold their responsibility in this matter.
As a gesture of good faith by the Property Owner, Council will require that the homeowner submit a
$100 check payable to the City prior to initiating any work on a particular property. This money would
be placed in escrow, and refunded to the property owner prior to Thanksgiving in the Year 2001 if the
sod is established and growing. The property owner will forfeit the $100 escrow if an inspection
determines that the sod has not survived over this time period.
Property owners interested in having boulevard sod replaced by the City are being asked to
accept the following conditions relative to boulevard sod replacement under this program:
1. Sod replacement would not occur outside of the limits of the original work.
2. Existing boulevard grades would not be changed or adjusted.
3. The match line where new sod meets established sod would be constructed with equipment
and methods standard to the industry.
4. No topsoil would be brought in, on which new sod would be placed.
(Any existing soil that can retain moisture is suitable)
5. Soil preparation prior to the placement of replaced sod would be performed in conformance
with typical industry practice.
6. It shall be the homeowners responsibility to water replaced sod.
7. Fill out and return the enclosed form to the City, and submit $100 check payable to the City
to initiate this boulevard sod repair work (Repairs would commence as soon as possible).
8. The $100 escrow will be refunded to the property owner prior to Thanksgiving in the Year
2001 if the sod is established and growing.
9. This will be the last time this issue is considered by the City.
Council hopes that you find this proposal to be a reasonable and acceptable solution to address
any boulevard sod problems you may be experiencing. Please feel free to contact me, or the
Engineering Department, 651-452-1850, if you have any questions regarding the information presented.
Sincerely,
Marc S. Mogan, P.E.
Civil Engineer
MSM
City Of
Mendota Heights
May 26, 2000
TO: Bunker Hills Street Reconstruction Project Area Property Owners
FROM: Marc S. Mogan, P.E.,
Civil Engineer
SUBJECT: Boulevard Sod Replacement Program — Bunker Hills Neighborhood
DISCUSSION:
A few Bunker Hills residents contacted staff to request that the City replace sod that failed to
become re-established after it was installed in the summer and fall of 1998 in conjunction with the
Bunker Hills Street Reconstruction project.
There are several locations throughout the project where it is obvious that the sod has not
survived during this 2-year period for whatever reason. The situation is not universal, and many times
it varies between adjacent properties. Over this period of time the level of care (watering, etc.) given
the sod replaced in conjunction with this project varied between properties. Given the number of
variables that come into play in this sod replacement work, it is difficult to establish which factors may
be responsible for either the success or failure in the establishment of the sod at one location and not
another after this period of time. Council's primary focus at this point is to offer,a reasonable and
practical solution to this situation rather than dwell on the possible causes at this point.
Council directed staff to research the extent of this problem and administer a program that would
rectify the situation. The whole issue of establishing which areas should be repaired, and where this
work should terminate could be somewhat subjective. In many instances it is apparent where the sod
was originally replaced. The size of these areas varies considerably. The minimum lot width in
Mendota Heights is 100 feet. If the original area disturbed behind the curb in the boulevard was 12 feet
wide, the sod area replaced would be approximately 140 square yards. We have estimated that the cost
to replace an area of this size would be approximately $600. There are some properties where the
lawns outside of the boulevard areas restored under the street project are also in bad condition, and
Council understandably has reservations about replacing any sod on properties under these
circumstances. Council does not want to initiate sod replacement at considerable expense only to
experience a similar outcome. Under these circumstances, Council has determined that it would be
reasonable and appropriate to require the property owner to assume a certain level of responsibility for
any sod repair work undertaken by the City at this time.
(over)
1101 Victoria Curve • Mendota Heights, MN • 55118 (651) 452-1850 • FAX 452-8940
Adequate watering of any sod replaced is probably the most important aspect in this sod
replacement program. It is not practical, or feasible for a Contractor in this industry to water the small
or scattered areas of sod which could conceivably be replaced throughout this neighborhood.
Consequently, Council has decided that it shall be the property owner's responsibility to water any
boulevard sod that the City might replace. It would not be prudent for the City to begin a program such
as this without some assurance that the property owner would uphold their responsibility in this matter.
As a gesture of good faith by the Property Owner, Council will require that the homeowner submit a
$100 check payable to the City prior to initiating any work on a particular property. This money would
be placed in escrow, and refunded to the property owner prior to Thanksgiving in the Year 2001 if the
sod is established and growing. The property owner will forfeit the $100 escrow if an inspection
determines that the sod has not survived over this time period.
Property owners interested in having boulevard sod replaced by the City are being asked to
accept the following conditions relative to boulevard sod replacement under this program:
1. Sod replacement would not occur outside of the limits of the original work.
2. Existing boulevard grades would not be changed or adjusted.
3. The match line where new sod meets established sod would be constructed with equipment
and methods standard to the industry.
4. No topsoil would be brought in, on which new sod would be placed.
(Any existing soil that can retain moisture is suitable)
5. Soil preparation prior to the placement of replaced sod would be performed in conformance
with typical industry practice.
6. It shall be the homeowners responsibility to water replaced sod.
7. Fill out and return the enclosed form to the City, and submit $100 check payable to the City
to initiate this boulevard sod repair work (Repairs would commence as soon as possible).
8. The $100 escrow will be refunded to the property owner prior to Thanksgiving in the Year
2001 if the sod is established and growing.
9. This will be the last time this issue is considered by the City.
Council hopes that you find this proposal to be a reasonable and acceptable solution to address
any boulevard sod problems you may be experiencing. Please feel free to contact me, or the
Engineering Department, 651-452-1850, if you have any questions regarding the information presented.
Sincerely, Sc,
. /% 0
Marc S. Mogan, P.E.
Civil Engineer
Iu1CN► I
CONDITIONS OF BOULEVARD SOD REPLACEMENT
Property owners interested in having boulevard sod replaced by the City are being asked to accept the
following conditions relative to boulevard sod replacement under this program:
1. Sod replacement would not occur outside of the limits of the original work.
2. Existing boulevard grades would not be changed or adjusted.
3. The match line where new sod meets established sod would be constructed with equipment
and methods standard to the industry.
4. No topsoil would be brought in, on which new sod would be placed.
(Any existing soil that can retain moisture is suitable)
5. Soil preparation prior to the placement of replaced sod would be performed in conformance
with typical industry practice.
6. It shall be the homeowners responsibility to water replaced sod.
7. Fill out and return the enclosed form to the City, and submit $100 check payable to the City
to initiate this boulevard sod repair work (Repairs would commence as soon as possible).
8. The $100 escrow will be refunded to the property owner prior to Thanksgiving in the Year
2001 if the sod is established and growing.
9. This will be the last time this issue is considered by the City.
Property owners interested in having the City initiate boulevard sod repairs are being asked to accept
the above conditions, fill out this form, and return it to the City with a check for $100 payable to the
City of Mendota Heights by June 12, 2000.
ADDRESS:
PHONE NUMBER: (H) (W)
NEWS
Public Works
Engineering
Code Enforcement
LETTER
Parks Report
The Parks Crew picked up trash
daily from the parks. They
also dragged and chalked fields
and striped foul lines on an as
needed basis. The crew pre-
pared the soccer fields for a big
Sting soccer tournament last
weekend. They planted flow-
ers at Mendakota Park. They
attended the annual spring
MSTMA Spring Workshop on
Wednesday to learn the latest
about athletic field mainte-
nance.
Utility Report
Rich checked the City's seven
sanitary lift stations daily. Rich
hired a private contractor (Pipe
Services) and coordinated their
efforts to clean all the City's lift
station's wet wells, the sand
traps at the Fire Station, Public
Works Garage and one plugged
catch basin on Victoria Road.
The wet well at the Mendota
Heights Road lift station was
caked with grease from Lloyds
and it took almost eight hours
to clean. We will talk to MCES
about what they can do to help
work with Lloyds to reduce
their grease waste. The power
went out at the Veronica and
Culligan Lane lift station at
5:15 P.M., Wednesday as a re-
sult of the winds and John
Boland responded with the
portable generator. John had
to pump each station once be-
fore power was restored.
Street Report
The Street Crew cleaned the
The Pipeline
May 26, 2000
drainage ditch at Garden Lane
and TH 13. They installed a bi-
tuminous swale at Mendota
Heights Road and Lexington
Avenue to handle the stormwa-
ter runoff. They repaired the
trail at both ends of the pedes-
trian bridge in Valley Park and
patched potholes on Summit
Lane at the entrance to Mendota
Elementary and at the entrance
to Crown Point.
County CIP Road Projects
Reviewed
Marc and I met with Dakota
County Highway and Planning
Staff this week to discuss their 5
year Capital Improvement Plan.
We informed the County that
Mendota Heights is intending to
complete the Lexington Avenue
trail as a two phased project,
from Mendota Heights Road to
Wagon Wheel Trail this year and
Wagon Wheel Trail to Tom
Thumb Blvd later. We discussed
the safety problems that have
occurred with constructing a
right turn lane at Delaware Ave-
nue and THE 110 and that the
County would need to add fund-
ing to be able to cost share with
MnDOT in adding a left turn lane
(after MnDOT completes its
right-of-way acquisition). We
discussed the turn back of Victo-
ria Road. The County intends to
arrange a meeting between Lily -
dale and Mendota Heights to
discuss maintenance and other
issues associated with the north
end of that road which is in Lily -
dale. We discussed the possibil-
ity of Dakota County's participa-
tion in funding trails associated
with Town Center (NURT).
Year 2000 Street Recon-
struction
Bituminous base was placed on
the segment of Decorah Lane
from Pueblo Lane to Huber Drive
late last Friday. The removal
and replacement of concrete
curb and gutter, and the adjust-
ment of manholes and gate
valves continue throughout the
overlay area. Some of the resi-
dents that requested replace-
ment of concrete gutter abutting
driveways soon after the project
began, and have since been re-
placed, have been backfilled
thereby allowing access to their
garages. Engineering continues
to hear requests for quotes from
residents to replace private
driveways and concrete gutter
abutting driveways. NSP Gas
main work continues in the
Rogers Lake neighborhood.
Alice Lane Subdivision Two
Improvement Proiect
Ryan Contracting Company
commenced construction of the
Alice Lane Subdivision Two site
improvements this Thursday.
The installation of sanitary
sewer and water main facilities
should be completed by early
next week.
Augusta Shores Improve-
ment Proiect
G. L. Contracting continues
rough grading operations on the
Augusta Shores project under a
separate private contract with
the Developer. It will probably
take G. L. Contracting a few
more weeks to complete the
grading on the site.
NEWS
Public Works
Engineering
Code Enforcement
LETTER
Parks Report
The Parks Crew picked up trash,
mowed grass, striped foul and
soccer lines, dragged and chalked
fields daily in the parks. They
also did a thorough cleaning of the
tennis courts this week which re-
sulted in many bags of leaves.
They treated the Ivy Park pond for
algae, duck weed, etc. We have
received numerous complaints
about the presence of too much
duck weed that occurs when we
do not treat this pond. The drink-
ing fountain located in Mendakota
Park was vandalized this week
and had to be repaired (at least
there were not any bills pushed
over yet this week).
Utility Report
Rich checked the City's seven
sanitary lift stations daily. Rich
with John Ambrose's help jetted
clean the sanitary sewer line from
Lloyd's Meats to the lift station —
this line often gets overly greasy
from the effluent from Lloyds. He
performed a sanitary sewer con-
nection inspection for a new home
being constructed at 615 Butler
Avenue. Thursday the starter coil
went out in the control panel at
the Culligan Lane lift station, Rich
had to call in Braun Pump to fix
the coil.
Street Report
The Street Crew worked on patch-
ing pothole complaints this week —
mostly in the north end and Som-
erset neighborhoods. They pur-
chased materials and fabricated
signs and barricades to be used
for the Police Department bike ro-
deo this weekend. John fabri-
cated some equipment racks to be
installed on the Parks Crew's new
trailer.
The Pipeline
Code Enforcement Report
Code Enforcement has been receiv-
ing complaint calls lately about
dandelions. Residents who call are
always surprised when they learn
that dandelions are a "vegetable"
not a "weed". Dick has been in-
formed of this fact by Todd Matzke,
Dakota County Agricultural Inspec-
tor during his annual weed inspec-
tor training sessions. We always
refer residents who want to learn
more about dandelions and their
status as a "vegetable" to Todd.
Patterson Dental finally paid for
and picked up their permit to ex-
pand their facility located next to
St. Thomas Academy along I-35E.
The plans were submitted weeks
ago, approved by Council and Code
Enforcement and then never picked
up. Their expansion is a 9,600
square foot building expansion to-
gether with a 7,200 square foot in-
terior remodeling to add a second
floor over their warehouse area.
The expansion is valued at $1.8
million and CF Haglund and Sons is
the contractor.
County to do Overiays
Jim Danielson attended a pre -
construction conference on Thurs-
day at Dakota County where they
were discussing various overlay
projects scheduled for this sum -
May 19, 2000
mer. In Mendota Heights the
County will overlay Lexington Ave-
nue from Mendota Heights Road
north to Centre Pointe Boulevard
and Victoria Road from Lexington
to Celia. Victoria Road is sched-
uled to be turned back to the City
after the overlay. The overlay
work is scheduled to be completed
in Mendota Heights the first part of
July.
Year 2000 Street Reconstruc-
tion
The removal and replacement of
concrete curb and gutter, and the
adjustment of manholes and gate
valves continue throughout the
overlay area. NSP Gas main work
is underway in the Rogers Lake
neighborhood. Engineering has
been deluged with requests for
quotes to replace private driveways
and concrete gutter abutting drive-
ways.
Alice Lane Subdivision Two Im-
provement Project
Council awarded the construction
contract for site improvements for
Alice Lane Subdivision Two project
to Ryan Contracting Company at
the Council meeting last Tuesday.
A pre -construction meeting is
scheduled for 10:00 A.M. on Mon-
day, May 22nd. The Contractor
indicated that they intend to start
construction on Wednesday, May
24th.
Augusta Shores Imorovement
Proiect
Erickson Construction was awarded
the construction contract for site
improvements at the Council meet-
ing last Tuesday for the Augusta
Shores project. Rough grading op-
erations continue on site by G. L.
Contracting under a separate pri-
vate contract with the Developer.
NEWS
Public Works Engineering The Pipeline
Code Enforcement
LETTER May 5, 2000
Parks Report
The Parks Crew picked up
trash daily from the parks.
The Parks Crew applied pre -
emergent crab grass pre-
vention in all the parks at lo-
cations where it was
needed. They striped the
foul lines at the ball fields
and started up the irrigation
systems at City Hall and the
Fire Hall. They had to repair
sprinkler heads at Kensing-
ton Park, City Hall and the
Fire Hall. They also started
spraying for weeds on City
property —those little yellow
flowers are showing up eve-
rywhere.
Finally, they finished putting
up the Martin houses (the
Martins are birds that come
back late).
Utility Report
Rich checked the City's
seven sanitary lift stations
daily. Because Rich is
trained and fitted to use a
respirator, he helped the
Parks Crew by spraying dan-
delions. He also performed
a new sanitary sewer in-
spection for a connection for
the home being constructed
at 1656 Mayfield Heights
Road.
Street Report
The Street Crew began
pre-
paring for summer patching
by servicing their roller
and
trailer and organizing
and
cleaning up the rest of
their
tools. They installed the
hot
box, asphalt tray and
tool
rack on truck #312.
They
reinstalled a street
name
sign across the street
at a
residents request and
rein-
stalled one that was
dam-
aged by a car accident.
Dave attended the League of
Minnesota Cities Safety and
Loss seminar where he
learned about innovative so-
lutions to safety problems,
pathway maintenance and
repair, confined space entry
rules and proper work zone
traffic control measures.
Augusta Shores
Clearing has continued at the
Augusta Shores development
site this week. It was slowed
because the drum chipper
being used by the contractor
caught on fire and is under
repair. If you have not seen
the site in the last week, it is
worth the trip. Fills in excess
of thirty feet will occur for
some of the street sections.
Grading and fill is expected
to start sometime next week.
Y2K Street Work
Letters were mailed this
week informing residents of
the upcoming 2000 street
projects in the Roger's Lake,
Ivy Falls and Delaware
Crossing neighborhoods. The
City hopes that by informing
residents on what to expect
for the construction season,
we might eliminate some of
the inevitable headaches as-
sociated with road construc-
tion.
A pre -construction meeting
has been scheduled for Mon-
day morning with Valley Pav-
ing, Inc. at which time
schedules will be laid out and
coordination with utility com-
panies will be arranged. NSP
gas will be replacing or modi-
fying gas distribution sys-
tems in all of the neighbor-
hoods. This work should
start in the next two weeks.
Valley Paving, Inc. is anxious
to begin work and could start
within a week.
Code Enforcement Report
Inspections have begun for
United Properties' third build-
ing in their Mendota Office
Center Planned Unit Develop-
ment (1210 Northland
Drive). Kraus Anderson who
is United Properties contrac-
tor is starting installing foot-
ings, foundations and column
pads.
NEWS
Public Works
Engineering
Code Enforcement
LETTER
Parks Report
The Parks Crew picked up
trash daily from the parks.
The Crew dragged and
chalked fields and striped
foul lines on an as needed
basis. This was the first
week that they had to cut
grass this spring. The Crew
started up the lawn sprinkler
system at Kensington Park
this week and had to perform
some repairs to it. They had
to relamp the lights at the
Kensington comfort station.
They finished dragging the
Fire Hall site and the Public
Works site and seeded and
fertilized both areas.
Utility Report
Rich checked the City's seven
sanitary lift stations daily.
The telephone line went out
to the Centre Pointe lift sta-
tion last Thursday and did
not get repaired until Friday.
We had to perform additional
checks of the station while it
was not being electronically
monitored. The alarm went
off at the Veronica lift station
at 4:45 P.M. Thursday, Rich
came back in but the alarm
had cleared by the time he
got there.
Street Crew
The Street Crew worked on
clean up at the shop lot and
hauled brush, logs, etc to
The Pipeline
April 28, 2000
SMC and SKB recycling cen-
ters in Eagan. They repaired
another drop structure in the
Ivy Falls Creek Bed.
They marked locations and
called Gopher State One Call
to install "No Parking" signs
on the south side of Wagon
Wheel Trail where it travels
between Rogers Lake.
They reinstalled several signs
that were falling over —out of
plumb around Copperfield.
They replaced some missing
street name signs. They be-
gan making up replacement
street name signs for the
street reconstruction areas.
Year 2000 Street Recon-
struction/Rehabilitation
Four bids were received on
April 27th for the Year 2000
Reconstruction/Rehabilitation
Project. Valley Paving, Inc.
was the low bidder on the
project: The bids are as fol-
lows:
Valley Paving, Inc. $ 91
Hardrives, Inc. $ 94
Midwest Asphalt $1,05
Bituminous Roadways $1,16
Valley Paving, Inc. bid was
less than the Engineer's esti-
mate of $958,074.00. They
completed the Friendly Hills
and Curley Addition street re-
construction projects and
their work was viewed favora-
bly.
Code Enforcement Report
Paul met with Ms. Cher Sven-
ningsen, ISO field representa-
tive, on Monday to review the
completed Building Code Ef-
fectiveness Grading Schedule
form. The form is 25 pages
long. Once the review is fin-
ished Mendota Heights will re-
ceive a grading that will be
sold to insurance companies
who provide coverage in Men-
dota Heights. She will also
return sometime in the future
to go out with Dick to observe
a field inspection first hand.
ISO is the same organization
that rates cities for fire ser-
vice (they are funded by the
insurance industry). She told
us that they rate cities on a
five year cycle.
Paul issued a permit for a new
home to be located on one of
Dakota Banks lots along Mary
Adele. The
1
3,360.05 home is a six
9,365.50 bedroom
5,978.35 home being
,902.75 constructed
by Dakota
Community's
Incorporated
for physically and mentally
challenged adults.
NEWS
Public Works
Engineering
Code Enforcement
LETTER
Parks Report
The Parks Crews picked up
trash daily from the parks.
The Crew dragged and
chalked fields and striped
foul lines on an as needed
basis. They finished up the
clean up work at the new
public works garage site
near the water tower. They
worked on cleaning up the
fire hall site where Herb
Warnke's house was re-
moved.
The Crew did some repairs
to the irrigation system at
Kensington Park, and
hauled in Class 5 gravel to
the Roger's Lake parking lot
and used it to repair pot-
holes and ruts.
Utility Report
Rich checked the City's
seven sanitary sewer lift
stations daily. Rich worked
on installing marker posts
by manholes in easement
areas. He installs the posts
to aid in finding the man-
holes. He bolted down the
manhole cover located at
the rear of the tot lot to
help prevent a reoccurrence
of having debris thrown in
it.
Street Report
McPhillips finished sweeping
the streets on Monday
April 21, 2000
morning before noon. John
Ambrose worked on install-
ing the "hot box" to the back
of Truck #312. The hot box
keeps the asphalt hot during
street patching operations.
The Crew worked on install-
ing signs (MTC and others).
They worked on repairs to a
drop structure in Ivy Falls
Creek. The repairs were
needed to restore the creek
back in the center of the
structure instead of running
around it. The drop struc-
tures are energy dissipaters
used for slowing erosion to
the creek bed.
They removed downed trees
and brush from the City
owned lot located at the end
of Spring Street. One of the
neighbors had been
"bugging" us to get it
cleaned up. Of course, while
we were doing the work an-
other neighbor called to
complain that our work was
taking away from the
"natural feel" of the
neighborhood and asked us
to stop.
Dave worked with an electri-
cal contractor to complete
some repairs to the street
lights on Centre Pointe
Boulevard and Medallion
Drive.
Code Enforcement Report
Code Enforcement received
an official notice from the
State of Minnesota this week
informing them that the new
energy code had been
passed into law this session
and went into effect April
14th (see attached notice).
The new rules give the con-
tractors two options, either
build under certain, more
strict rules of the old code
or, follow a new code that
was adopted. Either option
will be more expensive for
homeowners to build, but
will provide better indoor air
quality.
There are ten contractors/
homeowners who have failed
to meet the new Zoning Or-
dinance requirement to have
a passing final inspection
within a one year time pe-
riod. There are a variety of
reasons for these failures
and we are attempting to re-
solve all of them now, but
we are unsure of what the
next steps should be, if we
are unable to resolve them
in a reasonable time frame.
Attachment:
• Minnesota Residential En-
ergy Code Update
MINNESOTA DEPARTMENT OF COMMERCE
MINNESOTA DEPARTMENT OF ADMINISTRATION
Minnesota Residential Enemy Code Update
Summary of New Code Requirements
A new energy code goes into effect for building permit
applications submitted after April 14, 2000
For detached one- and two-family, R-3 occupancy residential buildings, the following
requirements apply:
Option (a):
• A contractor or owner must comply with the provisions of Minnesota Rules Chapter
7670 that apply to Category 1 buildings.
• Buildings that have fuel -burning equipment using non -solid fuels for spacer, beating,
service water heating, or hearth products must instalt direct vent, power vent, or
seated combustion equipment.
• Buildings must have a mechanical ventilation system which replaces, by direct or
indirect means, air from habitable rooms with outdoor air.
• If any single exhaust device over 300 cubic feet per minute (cfm) is installed, seated
combustion space heating equipment or an alternative make-up air source must be
used.
Option (b):
• A contractor or owner must comply with Minnesota Rules, Chapter 7672.
Other Requirements:
• Alterations and additions must comply either with Minnesota Rules, Chapter 7670 or
with Minnesota Rules, Chapter 7672.
• Three or more attached dwelling units, three stories and less in height, must comply
either vnth Minnesota Rules, Chapter 7670 or with Minnesota Rules, Chapter 7674.
For additional information, or to receive Request for Interpretation fof i',s, con,_-c _
the Energy Information Center at 651-296-5175 (toll free at 1-800-657 s7 or
the Buiidmg Codes and Standards Division at 651-205-4707.
Request for Interpretation forms may also be downloaded at
Yp,vw.commerce.state.mn.us. Responses to current interpretations on '.ne
Ainnesota Enemy Code may also be obtained at that site.
4i UU
Pa,'V!jr�nconu?�101-214a�•(bi1)296-7107-(6iI)297-19�9 TiY
An equal opporu:.it.: emplocc,-
NEWS
Public Works
Engineering
Code Enforcement
LETTER
Parks Report
The Parks Crew picked up
trash daily from the parks.
The Crew began dragging
ball fields, chalking lines
and finish grading all ball
fields this week. They
worked on repairs to the ir-
rigation system at Kensing-
ton Park. Terry met with
the summer helpers to dis-
cuss their work hours and
work duties. All the helpers
are former park workers, so
we know that we have a
good crew. One of the
summer workers was spe-
cifically hired to only work
weekends when there are
ball tournaments. Another
summer worker will arrange
his week day hours when
needed to help out on the
weekends (so that he only
works 40 hours).
They started up the irriga-
tion system for Mendakota
Park on Thursday this week.
They also worked on clean-
ing up the new area of land
that was added to the Public
Works site last fall (where
the old house was re-
moved).
Utility Report
Rich checked the City's
seven sanitary sewer lift
The Pipeline
April 14, 2000
stations daily. Rich had to
jet the sanitary sewer line
clean on Orchard Circle be-
cause Baldinger's contractor
had hit a manhole cover
knocking it off and putting
dirt in the line. He installed
a hydrant locator flag at
Knollwood Court.
Vandals had removed a sani-
tary sewer manhole cover
located at the rear of the
Curley Tot Lot and filled the
manhole with logs, wood
and other construction de-
bris. This debris was caus-
ing sewage to backup, but
fortunately not into anyone's
basement. Rich with Tom's
help removed the debris
piece by piece for the most
part of a day. When Rich is
completed, he will bolt the
cover down to help prevent
this from happening again.
Rich also jetted a line clean
on Wagon Wheel Trail that
was clogged with roots.
Street Report
McPhillips, the City's street
sweeping contractor, started
sweeping streets this week.
Wednesday McPhillips
brought in six machines.
Two machines started in the
north end, two in the middle
(Marie Avenue) and two in
the south. They are working
twelve hours a day
6:00 a.m. to 6:00 p.m. If
all goes well, they will be
completed on Monday of
next week.
The Street Crew went to the
Annual Spring Maintenance
Expo put on by the Univer-
sity of Minnesota. The con-
ference covered such topics
as Lyme's disease preven-
tion, pot hole patching,
equipment maintenance and
OSHA compliance.
Drug Test Conducted
All workers who operate
trucks or heavy equipment
over a certain size need to
be tested periodically on a
random basis for drug or al-
cohol use. This week four
Public Works employee's
numbers came up and they
were tested on Monday. As
usual —no problem all of
them passed the test.
Code Enforcement Report
United properties began
grading this week for their
new Phase III, Mendota
Technology Center building.
If you're out on Northland
Drive on TH 55—take a look
at the site —sure looks differ-
ent with all those poplar
trees gone.
NEWS
Public Works
Engineering
Code Enforcement
19WN-64 ME
Parks Report
The Parks Crew picked up
trash daily from the parks.
They cleaned the tennis court
surfaces from leaves and trash
that accumulated over the
winter. They cleaned up the
dirt and mess created by the
watermain break at Marie
Park. They started grading
and dragging the ball fields
and located and installed the
bases at Mendakota Park.
They worked with St. Paul Wa-
ter Utility to reinstall water
meters at Mendakota and Ken-
sington Parks comfort stations,
and after they were installed,
opened the restrooms for the
season.
They picked up the downed
limbs in all the parks that fell
as a result of the strong wind
storm on Wednesday evening.
They installed new base an-
chors at the Civic Center site
(which were needed because
this field is being converted to
a baseball field).
Street Report
The Street Crew repaired some
potholes on Lake Drive with
cold mix bituminous. These
repairs were done in response
to a complaint that was re-
ceived (if anyone has a favor-
ite pothole, please call it in
and we will repair it). They
finished installing the new gate
at the Resurrection site —the
April 7, 2000
site has now been secured from
indiscriminate dumping (we
hope).
The Crew removed part of a
tree that blew down across
Walsh Lane as a result of
Wednesday night's storm. The
rest of the tree is impacted by
an electrical power line so we
need to work with NSP to have
it removed. They reinstalled a
dead end sign on Pagel Road to
replace one that was hit by a
vehicle.
Utility Report
Rich checked the City's seven
sanitary sewer lift stations
daily. He performed a new
sanitary sewer connection in-
spection for a home being con-
structed at 1441 Clement.
Rich was assisted by George
Noack who used the City's
backhoe to dig out a sanitary
sewer manhole that had been
buried at 1812 Valley Curve.
He installed a replacement hy-
drant flag at Knollwood Court.
He responded to a power out-
age alarm at the Veronica lift
station at 9:30 P.M. Wednesday
evening (probably caused as a
result of the wind storm).
Safety Training
Chad Peterson, SafeAssure in-
structor, conducted classes for
the Public Works Crew on
Thursday afternoon. He cov-
ered how and when hearing
protection should be used. He
will return at a later date with a
decibel meter to measure noise
levels with all our equipment.
He also covered lock out/tag
out requirements which are
used when electric power
equipment is being worked on.
Finally, he began instruction on
the proper use of personal pro-
tection equipment.
Code Enforcement Report
United Properties were ap-
proved by City Council this
week for the third addition to
their Mendota Technology Cen-
ter. This building is a one story
61,336 square foot office struc-
ture with architecture to match
their first two buildings. Paul
has reviewed their plans for a
footing and foundation permit
and is ready to issue it. Signal
Bank has found a tenant in
their building on Commerce
Drive and Paul has issued an
interior remodeling permit to
Unitech for 3215 square feet of
space. Unitech is a computer
business and the space has all
raised floors. Two single family
homes were started in March;
1646 Mayfield Heights Road is
being built by Schafer Brothers
Construction and 615 Butler
Avenue is being built by ]arvi
Construction.
NEWS
Public WorksEngineering The Pipeline
Code Enforcement
LETTER March 31, 2000
Parks Report
The Parks Crew picked up
trash daily from the parks.
The Fire Department when
responding to a report that
there was a grass fire in Val-
ley Park drove across the
foot bridge with their grass
rig and broke several boards.
The boards in the bridge
were original (over twenty
years old). The Parks Crew
purchased new replacement
boards for the bridge and in-
stalled them this week. They
also installed the tennis nets
in the parks this week
(twenty courts).
Utility Report
Rich checked the City's seven
sanitary sewer lift stations
daily. Rich responded to a
complaint at 544 Fremont
Avenue where the resident
smelled "sewer odor". The
City's line was flowing
freely —but theirs was not.
He advised them to contact a
contractor such as Roto
Rooter to open their line. He
performed a new sanitary
sewer connection inspection
for the new home being con-
structed at 1147 Orchard
Place.
He flushed the sanitary sewer
line at Winston Court be-
cause he knows that the
City's line flows slowly and is
subject to blockages at that
location. He finished checking
the sanitary sewer manholes
located in easement areas this
week and found no further
problems. Rich, Tom and I
met with the homeowner on
Valley Curve where a manhole
has been buried. The home-
owner is willing to cooperate
and will allow us to cross his
property with our backhoe to
try and uncover the manhole.
Street Report
The Street Crew reinstalled
some missing street signs this
week. They also were digging
some holes to install posts for
the new gate at the Resurrec-
tion site. While digging the
holes they encountered a util-
ity cable. They had called Go-
pher State One Call before
digging but nothing was
marked, upon rechecking with
Gopher State they discovered
that it was a US West line that
was not marked (not our
fault) - and the planes are
still flying.
The Street Crew attended a
traffic work zone safety work-
shop. They learned some
new information about new
types of safety vests to use,
that safety cones are not to
be used at night any more
etc.
John Ambrose worked with
Len Kanitz to fabricate a
"headache rack" for our new
plow truck #409.
Johnson Grading
Dale Johsnon hired Scherff In-
corporated to complete the
site grading for his five lot
subdivision which recently had
its final plat approval. On
Saturday about noon, the
loader operator jumped off his
vehicle to check something
without setting the hand
brake. The vehicle rolled all
the way down Alice Lane and
crashed into a pickup truck
and a garage doing major
damage to both. Mr. Scherff,
the owner of the company
came to the scene and gave
the name of his insurance
company to the affected land-
owners. Dick Gill visited the
damaged home on Monday to
review the situation with the
homeowner —he suggested
that a structural expert be
brought in to check out the
garage.
Code Enforcement Report
Dick Gill and Paul Kaiser per-
formed their final inspections
on the Mayflower building and
gave them the go ahead to
begin moving in this weekend.
NEWS
Public Works Engineering The Pipeline
Code Enforcement
LETTER March 24, 2000
Parks Report
The Parks
Crew picked up
trash daily
from the parks.
They also
purchased and
picked up
some new trash
barrels from
Twin City Con-
tainer and
placed them in the
parks.
There have been several com-
plaints about dog waste being
a problem in Mendakota Park.
In response to the complaints
the Parks Crew installed a
number of our standard
"doggy do" signs in the park.
They purchased and picked
up field striping supplies this
week. They interviewed ap-
plicants for summer helper
positions this week. John
Boland applies the liquid
weed killer in the parks and
wears a respirator while doing
so. John was fit tested for his
mask this week as required
by OSHA.
Utility Re ort
Rich checked the City's seven
sanitary sewer lift stations
daily. He finished walking the
easement sewer lines. There
is one manhole that he is still
unable to locate (it must be
covered by landscaping). He
will return with the metal de-
tector to see if that helps find
it. He checked Lilydale's
storm sewer system as
agreed to last year. He found
the system to be in perfect
working order.
The alternator went out at the
Veronica lift station, the devise
that makes the two pumps al-
ternate pumping. Rich or-
dered a replacement one from
Braun Pump.
Rich got fit tested by Conti-
nental Safety this week for his
breathing apparatus mask.
Rich wears a breathing appa-
ratus if he has to enter some
manholes with hazardous gas
present. It is a requirement of
OSHA that masks be fit tested
annually.
Street Report
The Street Crew worked on
improvements to the new ac-
cess driveway at the City's
new Resurrection Cemetery
site. Recycled con-
crete was installed
and the gate was
worked on.
They reinstalled
some signs hit by
motorists: Con-
cord Way, LeMay
Lake Road, Bent
Tree Lane (reinstall
stop sign and stop
ahead signs at
Decorah Lane).
They had to bring
truck 301 into
Belzers to fix a
rear pinion seal
that was leaking.
They repaired a wire and reset
the main breaker for the street
lights east of TH 55.
Code Enforcement Report
Paul Berg is gone on a two
week vacation to Hawaii, so
Dick has been doing double
duty this week. Dick, along
with his double duty, has had
to deal with an unsafe building
complaint. The resident at
954 Wagon Wheel Trail was
caught tearing down and burn-
ing an old barn (Paul Kaiser is-
sued a ticket for an illegal
fire). Two men were half way
done with the project when
the Police Department caught
and stopped them. Dick gave
the resident one week to le-
gally remove the rest of the
barn and bring it into a safe
condition. (See picture be-
low).
NEWS
Public Works Pipeline
Engineering The Code Enforcement
LETTER March 17, 1999
New Mallard Home
At Marie Park
Mallard Homes
Terry Blum, Mike Maczko, and
John Boland have fabricated ten
nesting structures for Mallard
Ducks. The nesting structures
are constructed of two wire
mesh tubes, one inside the
other, with three inches of straw
in between them. The tubes are
three feet long and mounted
about one foot above the high
water level of the ponds (to pre-
vent predators such as raccoons
from attacking the nest). They
are mounted by a wood and
metal bracket to a metal post
driven into the pond bottom.
The straw is replaced every two
or three years. Len Kanitz, our
mechanic at the Public Works fa-
cility, assisted in the fabrication
of the wood and metal mounting
brackets. Installation of these
homes began prior to the ice
melting so that the mounting
posts could be driven down
through the ice away from the
pond edge.
Reliable sources report that sev-
eral of the nesting sites are al-
ready occupied and new broods
of residents are expected soon.
Parks Revort
The Parks Crew picked up trash
daily from the parks. They had
to take the back hoe onto the
Nature Center on Monday to ex-
cavate out a peat fire that was
started as a result of the grass
fire last week. The peat was still
smoldering and had to be dug up
and extinguished.
They had to dismantle and re-
move a fort that was built by kids
along the north shore of Rogers
Lake. They removed the aerator
pump from Rogers Lake and took
it to Public Works Garage for
storage. DNR has informed us
that this was a temporary pump
that they will take back when
they install a permanent pump
and aerator. They did tell us that
they do intend to stock the lake
with Northerns, Bass and Pan
Fish. Depending on the funding,
this permanent aerator may be
installed as early as this summer.
The crew worked on servicing all
their small engines that will be
used this summer.
Street Report
The Street Crew finished mailbox
repairs this week. They filled in
a sink hole that showed up on
Diego Lane with cold mix bitumi-
nous, and will have to do a more
permanent repair of this patch
this summer.
They emptied the sand and salt
from the dump trucks and
cleaned them. John Ambrose be-
gan fabricating a gate to be in-
stalled to control access to the
new Resurrection site that will be
used to store our street sweep-
ings.
They worked on installing MTC
bus route signs, and repaired a
bad photo cell that operates the
Centre Pointe street lights. They
began working on the replace-
ment street name signs for the
road reconstruction project ar-
eas.
Utility Report
Rich checked the City's seven
sanitary lift stations daily. Rich
was called in at 11:00 A.M. on
Sunday to respond to a power
outage at the Northland Drive lift
station. NSP was on the scene
working on restoring their power
but Rich had to run the City's
portable generator to power the
station until 2:00 P.M. Rich con-
tinued to walk and check the
sanitary sewers running through
easements this week. He found
another tree that was growing
right next to and interfering with
a manhole. He had to cut and
remove the tree. He also
trimmed trees at the Veronica lift
station.
Happy St. Patrick's Day!
NEWS
Public Works
Engineering
Code Enforcement
LETTER
Parks Report
The Parks Crew picked up
trash daily from the parks.
They removed the snow
blower from the large Toro
and installed the mower
decks. They finished in-
stalling the Mallard Duck
houses and shut down the
aerator at Rogers Lake. Af-
ter shutting down the aera-
tor they hauled it to the
shop and put it in storage
for the summer. The Parks
Crew attended Minnesota
Toro Institutes Turf Man-
agement course where they
learned the latest about
maintaining sports fields,
tree management, trouble
shooting sprinkler heads
and many other turf indus-
try innovations.
Utility Report
Rich checked the City's
seven sanitary lift stations
daily. Rich continued walk-
ing, locating and inspecting
manholes within the City's
easement areas this week.
These easement lines are
the ones that are not lo-
cated within the street
right-of-way. Tom Olund
had to respond at 3:00am
Thursday morning to an
alarm at Veronica lift sta-
tion. There was no problem
found, all he had to do was
reset the pump.
Street Reyort
The Street Crew worked on
mailbox repair and sod dam-
age clean up that occurred
as a result of snowplowing.
They also worked on install-
ing Metro Transit bus stop
signs and began making up
the replacement signs for
this years street reconstruc-
tion project. The street
name signs are replaced
along with every street re-
construction project. They
cleaned out some clogged
catch basins. They sanded
slippery areas and plowed
main line streets for the
Thursday morning snow
storm.
Code Enforcement Report
The City received and Paul
filled out a building code ef-
fectiveness grading schedule
form this week. This was
the same form he had to do
two years ago. The form is
from Insurance Services Of-
fices Inc. and will be used to
grade the City's building
9 - Ah
March 10, 2000
code enforcement. We will
receive a number grade
which can be used by insur-
ance companies when calcu-
lating rates for the City's
residents and businesses.
Dick Gill, who acts as the
Mayor's Assistant Weed In-
spector attended the annual,
mandatory weed inspectors
class held Wednesday March
8th at the Soil and Water
Conservation offices in
Farmington. There are
eleven noxious weeds desig-
nated by the State (with the
addition of garlic mustard
weed this year). Dakota
County adds three more to
the States list for a total of
fourteen. (They add Cockle-
bur, Wild Sunflower and Vel-
vet Leaf.) The class updated
Dick on his duties and bio
control programs. They
asked, and Dick confirmed
with them that Mendota
Heights intends to continue
with its Purple Loosestrife
bio control program this year
(growing and placing Loose -
strife eating bugs). Euro-
pean Buckthorn is listed as a
"restricted" noxious weed.
Which means you can have
it on your property, but you
can not plant it, or do any-
thing to promote its spread.
NEWS
Public Works
Engineering
Code Enforcement
LETTER
Parks Report
The Parks Crew picked up
trash daily from the parks
and checked the aerator at
Roger's Lake for any prob-
lems. They also worked on
equipment maintenance
(Toro #505 the snow
blower and Truck #501 had
an anti freeze leak). The
Crew purchased the materi-
als and began constructing
and installing the Mallard
Duck nests. They cleaned
out the Wood Duck houses
and installed new sawdust
in them for nesting material
(spring must be coming).
They continued to work on
cleaning up and closing
down the ice skating rinks.
Utility Report
Rich checked the City's
seven sanitary sewer lift
stations daily. Rich began
walking the sanitary sewer
line located within an ease-
ment near Farmdale Road
to locate and mark the
manholes. He found one
manhole that was covered
by a downed tree. He cut
up and removed the
downed tree.
Street Report
The Street Crew worked on
street sign repairs and in-
stallation this week —some
The Pipeline
March 3, 2000
new street name signs were
installed. Some old cross-
walk signs were replaced
with new yellow -green ones
provided by the Federal
Government, and some new
Metro Transit Bus Route
signs were installed. Metro
Transit is funding our work
and the materials for replac-
ing their old signs with new
ones.
The Crew repaired a street
light and picked up some
brush on Marie Avenue near
our trail that had been
"donated" by someone.
They installed the perma-
nent stop signs at the
Decorah Lane/Ocala Lane lo-
cation. They also emptied
the sand and salt from the
plow trucks and cleaned
them out to avoid corrosion.
Code Enforcement Report
The first swimming pool per-
mit (18' x 36' in -ground)
was applied for this week by
Paragon Pools for 1454
Cherry Hill Road (another
sign of spring). ECI applied
for a 3,500 square foot office
finish for the second floor of
the Dakota Bank Building
across from City Hall. This
will be for John Siedel's new
office and will finish off all
the space in the building.
This week Dave Regel Con -
struction applied for a build-
ing permit to construct a six
bedroom, 3,000 square foot,
one story residence for dis-
abled occupants for Dakota
Communities, Inc. The pro-
posed site is on Mary Adele
Avenue on one of the single
family lots located within the
Dakota Bank/SuperAmerica
redevelopment plat. The
proposed building was found
not to have a basement as
required by the City's Zoning
Ordinance. The builder is
consulting with the owner to
determine what their desires
are. There are already three
of these type of facilities in
Mendota Heights, one in
South Ridge on Diane Road
and two in Friendly Hills
(remodelings) on Cheyenne
Lane and on Pontiac Place.
Storm Sewer Going In
There is an old storm sewer
outlet at Mendota Heights
Road and Northland Drive
that had caused severe ero-
sion downstream. Farris In-
dustries agreed to repair and
extend the pipe as part of
their TIF agreement. They
began working on complet-
ing that work this week.
Robins Are Back
Lambert saw the first Robin
this Tuesday —spring is here.
Uti/it�oort.
Rich checked the City's seven
sanitary lift stations daily. Rich
also performed an inspection at
1150 Northland Drive for a new
connection to the sanitary sewer
main. He had to clean the Lily -
dale lift station from graffiti.
Street Report
The Street Crew did not have
any snowfalls to plow this week,
NEWS
I
En ineerin
Code Enforcement
LETTER
Parks�r_t
The Parks Crew picked up trash
daily from the parks. They also
checked daily the aerator at Roger's Lake for any problems.
Well, the time has come to close
the ice rinks. This Tuesday,
February 22 Was as long as we
could stretch the ice this year
and we closed the Wentworth
and Friendly Hills Park rinks.
(The Marie Park rink had been
closed earlier because of dam-
age from a watermain break).
Mary told me that she felt that this was a good year —the
weather was cold enough to
flood and make ice, but it was
warm enough so that skaters
could very comfortably skate.
Use was down this year because
the Mendota Heights Athletic As-
sociation merged with West St. Paul Athletic Association and to-
gether they used more indoor
ice. The high school kids who
were rink attendants did rea-
sonably good jobs this year,
with only a few exceptions. The
Parks Crew cleaned out the warming houses and brou Hoffman Homes Start Soon
the hockey9ht in
nets for storage. I received a call from Pat
Hoff-
man this week informing
he is close to closing me that
w
Resur-
rection Cemeteryotheir ith land
they would have closedalready
but there is a State recording of
cemetery land that has to be
voided. This will take a week or
two to complete before the final
closing occurs. After they close
they will begin removing trees
and grading —probably at the end
Of March. G.L. Contracting is
their contractor.
The Popeline
February 25, 2000
but because of the mild weather
and rain they had to unthaw and
open catch basins and culverts.
They also worked on mailbox and
equipment repairs.
Code Enforcement Report
There were three new house per-
mits issued this month; 1147
Orchard Circle (Baldingers)
Heaver is the contractor and
started removing trees, 2150
Glen Toro—Hagstrom Builders is
the contractor, and 1117 Orchard
Place—M. W. Johnson is the con-
tractor. The Farris I
The final plat is being reviewed
by Dakota County and as soon as
that review is completed they will
submit it to the City for approval.
Pat said that before they ever
even advertised they had to lot
holds in place. The response has
been terrific with prospective
buyers driving all they way to
Eden Prairie to look at the model
there which is a similar product.
They are now starting to adver-
tise.
Ro er's Lake Fis6int7pier
contractor is ncentives The Departmen
Northland t of
NaturRe-
walls at putting up block I sources has informed us that he
Drive and
application for installation of a
Mendota Heights Road. The re-
suits of our one fishing pier in Roger's lake has
for residential onstru�ton completion
been approved. The pier is pro -
February is as follows: vided and installed by the D
Permits Final
Issued: Lett
Inspections Noti
Completed: Non
18 14
4
and installation will probablyNR
y
cur in Jul oc-
ty
ersSent will enter into ha Cc'o-
fying of operative agreement
Compliance: with the DNR and the
City will be responsi-
ble for future mainte-
nance of the pier,
construction of an
eighty foot long by
eight foot wide bituminous path
from the gravel cul-de-sac to the
lake shore for access to the pier,
and for installation of informa-
tional signage. Additional ameni-
ties such as benches, tables, etc,
Will also be provided and are to
be funded from the $4,000 Mr.
Clifford Timm presented to the
City Council last December.
Road Restrictions
Road restrictions go on today,
Friday, February 25th. See at-
tached map showing affected
roads.
>artmen
NEWS
Public Works Engineering The Pipeline
Code Enforcement
LETTER February 18, 1999
Parks Report
The Parks Crew picked up
trash daily from the parks.
They also checked the warm-
ing houses daily and the aera-
tor at Roger's Lake for any
problems. The Parks Crew,
besides plowing the City's cul-
de-sacs, which is their assign-
ment during snowfalls, also
cleaned the snow from the ice
rinks and pedways. They had
to take truck 501 in for repair.
501 was damaged during
plowing activities, the cylin-
ders, which control the direc-
tion of the plow need to be re-
built and the estimated cost is
$1,000.00.
The skating rinks are still open
and operating, so the Parks
Crew continues to flood them.
They had to replace a broken
board on the hockey rink at
Friendly Hills Park.
Utility Report
Rich checked the City's seven
sanitary lift stations daily.
Rich plowed the north end
streets which is his normal
area to plow. He also plowed
his lift station lots and drive-
ways.
Code Enforcement Report
Paul received a call from the
State Building Code Division
this week informing him that
they were set to issue a build-
ing permit to MnDot for the
construction of a 56' x 152'
pole building at their mainte-
nance facility, 2229 Pilot Knob
Road. The Attorney General's
Office had informed us that
State owned buildings are ex-
empt from local Ordinances and
codes.
Patterson Dental has submitted
their plans for a building permit
to construct a two story 4,800
sf/floor addition. There are sig-
nificant interior building modifi-
cations occurring throughout
the rest of the facility. The to-
tal estimated remodeling costs
are $1.8 million.
Last year, Council adopted an
Ordinance amendment that re-
quires completion of residential
construction within one year of
issuance. The one year anni-
versary of that Ordinance is ap-
proaching and the Code En-
forcement Staff is reviewing
permits to ensure completion
within that one year.
Year 2000 Street Proiect
The Engineering Department
submitted construction plans
and specifications and other de-
sign information to MnDOT this
Wednesday for State Aid review
for the Lake Drive segment of
the year 2000 Street recon-
struction and rehabilitation pro-
ject. MnDOT changed their
rules recently, and now require
that all State Aid projects be of-
ficially approved before bids are
opened. We are hoping that
MnDOT is able to complete this
review as quickly as possible so
that there is no delay in the
schedule of construction for this
project.
Personnel News
Tom Knuth was the envy of the
office this week. Tom and his
wife Marsha were on vacation
this past week in the Florida
Keys. Tom will be back to work
on Monday. Also Guy Kullander
was in Tucson, Arizona this
past Tuesday through Thiirs-
day. This was not a pleasure
trip as Guy was helping his
mother attend to family affairs
associated with the recent
death of Guy's uncle.
Street Report
The Street Crew had to do
some electrical repairs to Truck
304 this week. They also
trimmed trees on Ridge Place
and Callahan Place where
branches were extending out
over the street and hitting the
plow trucks. They worked on
mailbox repairs where the
boxes were damaged during
plowing operations.
Snow Events for the Week
Date:
Amount:
2/10
1/2"
2/12
3"
2/15
1/2"
2/17
2"
Activity:
Sanded slippery areas
Plowed (6:00 P.M.-5:00 A.M.)
Sanded
Sanded and Plowed
NEWS
Public Works
Engineering
Code Enforcement
LETTER
Parks Report
The Parks Crew picked up
trash daily from the parks.
They also checked the warm-
ing houses daily and the
aerator at Roger's Lake for
any problems. They had to
relocate several of the "thin
ice" signs that are on Roger's
Lake for the fish aerator be-
cause the area of open water
had changed.
Utility Report
Rich checked the City's seven
sanitary lift stations daily.
Rich completed a sanitary
sewer inspection for a new
connection for a home being
constructed at 613 Kirchner
Avenue. He had to repair the
inside of a manhole that was
damaged as a result of the
watermain break that oc-
curred last week on Lilac
Lane. There was another
watermain break this week at
620 Callahan.
Street Report
The Street Crew installed the
stop signs at Decorah Lane
and Ocala this week. Instal-
lation was delayed pending
receipt of some special tem-
porary sign posts (the per-
manent signs will be installed
when the ground thaws in
the spring). After the signs
were installed the City re-
ceived calls from several
February 11, 2000
angry residents who were op-
posed to the new signs. The
Crew repaired some potholes
with "cold mix". Cold mix
patches are temporary repairs
that will be replaced when
warm weather returns.
Plow Events:
Date:
Amount: Res o
2/4/00
1" sanded
slippe
Right -of -Way Ordinance
Many of the cities of Dakota
County are working together
to prepare a standardized or-
dinance to better control un-
derground utility construction
within the right-of-ways.
Eagan has taken the lead in
this effort and, using a model
from the League of Minnesota
Cities, has prepared a draft
ordinance. They have submit-
ted the ordinance to all the
utility companies who would
be involved. They held a
workshop with the utility com-
panies and interested cities on
Thursday to receive their
comments. The workshop
went well, and with a few mi-
nor corrections the ordinance
will be ready soon to bring to
Council for consideration. It
was made very clear at the
workshop that this ordinance
was not intended to address
telecommunications equip-
ment.
ry
That type of equipment will
continue to be addressed by
City's antenna ordinances.
The Eagan representative told
me that he feels that telecom-
munication equipment
mounted
on poles
within the
v nse: right -of-
and scraped way is ex -
spots empt from
and scraped any city
processes
but a right-of-way permit.
(Seems inconsistent if this
right-of-way ordinance is for
underground only). The City
Attorney is currently review-
ing that question for us.
Code Enforcement Report
Langer Construction is the
contractor for Signal Bank
who is remodeling the old
Prime Source building into of-
fice space. Langer submitted
their construction plans to
Paul Berg this week for a
building permit. They told
Paul that Signal Bank needs
the remodeling completed in
time for a March move in (fast
track!!).
MNRRA Lectures
Attached is a notice from the
Mississippi National Rivers and
Recreation Area (MNRRA) in-
forming interested residents
of some upcoming free lec-
tures.
Stewardship Lecture Series
NATION ARK
SERVICE for Mississippi River Communities
V
A series of forums sponsored by the
National Park Service,
Mississippi National River and Recreation Area
for Metro Area Residents and Landowners
February -April 2000
A Natural Approach to Designing Residential Landscapes
Create natural settings or redesign your yard to attract wildlife and benefit the river. This
forum will explore landscape design principles, ecological benefits, and native plant materials
that will enhance any yard.
Speakers:
Susan Overson - Landscape Architect/Planner, National Park Service
Tom Lewanski - Conservation Director, Friends of the Mississippi River
Tom Tennant - Owner, Outback Nursery and Tennant Landscaping /
February 24, 2000, 7-9 p.m.
Earle Brown Center, Tack Room, 6155 Earle Brown Dr., Brooklyn Center
March 2, 2000, 7-9 p.m. r `v
Best Western - Drover's Inn, Wakoto Room, 701 S. Concord St., South St. Paul
Resident's Guide to Historic Home Restoration
Discover tips and what steps to take in plannina restoration of
your older or historic home. Speakers will discuss the historic
context of river communities, present examples ofcompleted
restorations, and recommend local resources for historic
restoration along the river corridor.
Speakers
Charles Nelson - MN State Historical Architect, MN Historical Society
Dick Thorsen in Hastings - Chair, Hastings Historic Preservation
Commission
Carolyn Braun in Anoka - Director, Anoka Community Development
March 16, 2000, 7-9 p.m.
Hastings City Hall Community Room, 101 East 4th St., Hastings
March 30, 2000, 7-9 p.m.
Anoka City Hall Community Room, 20151st Ave. N., Anoka
Birds of the Mississippi
Follow eagle nesting cycles and waterfowl migrations, plus learn about colonic
water birds along the Mississippi River. Identify Minnesota songbirds, focus
on the colorful spring migrants present in the Mississippi River Valley.
Speakers:
Eric Nelson - Refuge Biologist, Upper Mississippi National Wildlife & Fish Re
Chase Davies - Experienced birder, National Audubon Society
April 13, 2000, 7-9 p.m.
American Legion Post # 600, 12450 Business Park Blvd., Champlin
April 27, 2000, 7-9 p.m.
Mississippi Dunes Golf Course, 10351 Grey Cloud Trail, Cottage Grove
Join area experts and neighbors in forums that explore the preservation, use, and history of the rationally
significant Mississippi River corridor in the Twin Cities Metropolitan Area.
Sessions are free and open to the public. Coffee and cookies will be provided. To help us determine refreshment
needs, please RSVP to the National Park Service, 651-290-4160, x221, The series is sponsored by the
Mississippi National River and Recreation Area, National Park Service, St. Paul, MN,
Visit our web site at http://tvtvw.nps.gov/miss.
NEWS
Public Works
Engineering
Code Enforcement
LETTER
Parks Report
The Parks Crew picked up trash
daily from the Parks. They also
checked the warming houses
and the aerator at Roger's Lake
for any problems, daily. There
was a serious watermain break
on Lilac Lane on Tuesday eve-
ning adjacent to Marie Park.
The water from the break
flooded areas of the park and
closed the park from ice skaters.
The water filled the staking ar-
eas and warming house with
sand and water —we will not be
able to reopen the rinks for use
again this season. The remain-
ing rinks are probably surviving
on "borrowed time". We nor-
mally have to close in the mid-
dle of February anyway. De-
pending on the weather, there
are probably only two to three
weeks left.
Utility Report
Rich checked the City's seven
sanitary lift stations daily.
Braun finished repairs to the Ve-
ronica Lift Station pump and re-
installed it on Wednesday. This
was the same pump that they
had previously rebuilt in Sep-
tember 1999. The pump was
still under warrantee, so their
repairs were done at no cost to
the City.
Rich worked on updating his re-
cords keeping this week by up-
dating all his records to show
what sewer lines he cleaned last
summer.
Street Report
The Street Crew emptied and
cleaned the plow truck boxes
The Pipeline
February 4, 2000
from sand and salt. That salt is
extremely corrosive when it
comes in contact with metal, so
we do this frequently during the
sanding and salting season. (It
does not take long to reload
them when needed). They
worked on repairs to the trucks,
in particular, the wing on truck
304 is bent.
Code Enforcement Update
The City recently received a let-
ter from the State Building Codes
and Standards Division informing
us that requiring Type III con-
struction in our Zoning Ordinance
was not legal. Ferris Incentives
which is intending to build a new
office for themselves at the inter-
section of Northland Drive and
Mendota Heights Road across
from the Super America gas sta-
tion was trying to wait until we
amended our ordinances remov-
ing that requirement. Ferris was
unable to wait for the process to
be concluded, because they have
to vacate their existing building
in June. This week they submit-
ted plans with Type III construc-
tion. Paul has reviewed and ap-
proved them, and subject to their
subcontractors being licensed,
they will begin construction next
week.
The Salmen's, 1694 Dodd Road,
who received a Conditional Use
Permit and variance to construct
a large, handicapped accessible
garage submitted their drawings
for a permit this week —they
have complied with the condi-
tions of their Conditional Use Per-
mit including filing the conditions
with their property title at Dakota
County, and can begin construc-
tion as soon as they desire.
The second home on Glen Toro
Road received a permit this week
and construction will begin next
week. This was the second home
to start in this neighborhood.
The permit valuation on these
homes exceed $300,000.
County Culvert Frozen
The City received several calls
from motorists concerned about
ice build up on Victoria Road near
the Amoco Station. The problem
was on a County road in Lily -
dale —but we needed to help the
County to get the problem
solved --some thought it was the
car wash, some a spring. Tom
Knuth helped the County mainte-
nance crew to show them where
a storm sewer was frozen shut.
Once they were shown how, they
then did an excellent job of open-
ing it and clearing the road from
ice.
Safety Training
"SafeAssure" conducted its sec-
ond in a series of safety training
classes this week. This time
their classes were for Administra-
tion and Public Works and cov-
ered an Emergency Actions Plan
and Bloodbourne Pathogens.
Emergency action trained em-
ployees on what to do in case of
a fire, a tornado or a bomb
threat. It was a very informative
class with lots of good instruc-
tion. The second class on Blood -
bourne Pathogens was for Public
Works employees who operate
chain saws or work on sewers.
NEWS
Public Works
Engineering
Code Enforcement
LETTER
Utility Report
Rich checked the City's seven
sanitary sewer lift stations
daily. Rich re -jetted and
cleaned the line on Victoria
Road where it was plugged last
week to ensure that it was
completely clean and flowing
freely. He attended his annual
"Collection Systems Mainte-
nance" seminar at the Thun-
derbird Hotel three days this
week. (He had to leave the
seminar early on Wednesday
to come back and plow snow).
They worked on cleaning up
after the snowfall doing such
things as cleaning bridge
decks, ordering sand and salt,
mixing sand and salt and mail
box repair.
Parks Report
The Parks Crew picked up
trash from the parks daily.
They also checked the warm-
ing houses and the aerator at
Roger's Lake for any problems
daily. They plowed cul-de-
sacs, pedways, and parking
lots as a result of Wednesday's
snow storm. They broomed
the ice skating rinks and
flooded them daily.
Roger's Lake Aeration Up-
date:
Guy has received a number of
calls inquiring about the new
Roger's Lake aerator. All call-
ers, once they were informed
The Pipeline
January 21, 2000
of what the aerator was for,
were pleased that the City was
doing something to improve the
lake's condition. The aerator
has created an area of open
water of approximately 80' x
40'.
Code Enforcement Report
Code Enforcement has received
three applications for new
homes: 613 Kirchner Avenue,
1117 Orchard Place (received a
Critical Area Review approval
by Council), and 1147 Orchard
Circle (which also received a
Critical Area Review and permit
at the last City Council meet-
ing).
Ferris Incentives architect has
contacted the State regarding
the City's requirement for type
III construction within the Busi-
ness and
Industrial So
zones. The
State then Date: Event:
called Paul
and re- 1/19/00 6" sno
quested a
copy of the
City's Zon-
ing Ordi-
nance to confirm that we do in
fact have that requirement.
The State is investigating
whether that City requirement
is legal. They feel that this
zoning requirement may be
construed as illegally amending
the Uniform Building Code.
(They are investigating and will
get back to us).
Street Report
The Street Crew took delivery
of their new plow truck last Fri-
day. The truck was ordered al-
most a year ago. We pur-
chased the truck from Lakeland
Ford and they let us continue to
use our old truck for the time
we were waiting for delivery.
They kept their trade-in price
the same. John Ambrose used
the truck for the first time this
last snowfall.
Cutting edges are 8" x 3/4"
steel plates that are bolted to
the bottom of the plow blades
where they come into contact
with the street. These plates
wear down and need to be re-
placed periodically. The Street
Crew replaced their cutting
edges this week.
ow Event for the Week:
Activity:
wfall Sanded and salted slippery areas
during snowfall —plowing
started 3:00 P.M. and finished
11:00 P.M.
NEWS
Public Works
Engineering
Code Enforcement
LETTER
Utility Report
Rich checked the City's seven
sanitary lift stations daily. Rich
plowed his normal route (the
north end) on Wednesday and
Thursday and plowed out all his
lift stations after he was done with
the streets. He also had to repair
the sump pump at the Mendota
Heights Road lift station.
Street Report
The Street Crew had to pick up
trash along Decorah Lane (per Po-
lice Department's request). They
installed some snow plow guide
posts at the request of some resi-
dents. They ordered, received
and mixed 50 tons of sand and 50
tons of salt. They plowed the fol-
lowing snow events:
Date: Amount: Action:
1/11/00 Trace Sand streets
The Pipeline
January 14, 2000
Parks Report
The Parks Crew picked up trash
from the Parks daily. The Parks
Crew plowed out the City's cul-de-
sacs, ice skating rinks and trails
from the Wednesday/Thursday
snowfall. They also had to give
depositions to the opposing attor-
ney in an ongoing lawsuit against
the City for a cycling accident on
the Valley Park trail. They worked
with the DNR to install the lake
aerator at Rogers Lake Park. They
checked warming houses daily.
Rogers Lake Gets Oxvpen
John Boland and Mike Maczko as-
sisted two representatives from the
Minnesota Department of Natural
Resources to install a lake aerator
1/12 & 13/00 9" Plowed Wednesday
through Thursday
Code Enforcement Report
Paul and Dick attended their an-
nual conference put on by the In-
stitute for Building Officials this
Monday through Wednesday.
Russ Wahl was kind enough to fill
in for them while they were gone.
One of the main topics addressed
at the conference was continued
training on the new energy code
that is to be implemented this
April (see attached news article).
Senator Deanna Weiner, who is
also a licensed realtor, was the
featured speaker at the confer-
ence. She talked about things
that are going on in the legislature
this year that would affect build-
ing codes.
at Rogers Lake Park on
Thursday morning. The
equipment was provided
by the DNR and consists
of a pump mounted on
two floatation tanks
about
o n e
hundred
feet from shore.
This pump sends
water through an
eight -inch diame-
ter hose to a
trailer mounted
stair unit on
shore. Lake water
is pumped to the
top of the stair
and as it cascades
down the stairs
picks up oxygen.
The highly oxy-
genated water is
then returned to
the lake thereby
increasing the
oxygen in the wa-
ter.
That allows fish to survive the
winter months when the lake is ice
covered and the normal oxygen
absorption of wave action can not
occur. This pump will operate until
the ice breaks up in the spring.
The equipment will then be re-
moved from the lake and stored at
the Public Works Facility. If this
operation is successful and fish
populations increase, the DNR may
request permission from the City
Council to install a permanent un-
derground aeration facility with
only a manhole cover to mark its
location along the shore.
The DNR requires that "Thin Ice"
warning signs be posted every one
hundred feet around the affected
discharge area in the lake. John
and Mike accomplished this task by
mounting the "Thin Ice" warning
signs on wood posts frozen into au-
gured holes in the ice. When
spring arrives and the ice melts
they will recover the signs for re-
use by collecting the floating posts.
Attachment:
News Article
By Jim Buchta
Star Tribune Staff Writer
On April 15, a new state energy code
takes effect that will dramatically change
the way most houses in Minnesota are
built. At the center of the issue is Kathie
Pugaczewski, executive vice president of
the Builders Association of Minnesota.
Building scientists and state officials
say the code will make houses safer, more
energy efficient and more durable. It will
require that houses have adequate ventila-
tion, safer combustion appliances (water
treaters and furnaces) and more energy
efficient windows. The code will also re-
quire builders to pay more attention to
construction details such as vapor barriers
and insulation that affect house energy
efficiency and durability.
The code is the result of a legislative
requirement that houses in Minnesota be
die most energy efficient in the nation.
QThe building industry is
Y evolving. What will be its
biggest challenge in the first
decade of this new millennium?
AThere are a variety of chal-
lenges including [dealing
with] a labor shortage, maintain-
ing housing affordability and
planning for the projected
392,940 new households in Min-
nesota in the next 20 years. We
must plan for growth by allowgng
a wide range of housing choices
and using land more efficiently as
well as investing in Minnesota's
infrastructure. For example, the
association will start playing a
bigger role in transportation is-
sues, which ties together with
housing needs. As we develop
and redevelop the core in the first
and second ring suburbs, we
need to make sure that we're
maximizing the infrastructure
that already exists there.
As implementation of the
new energy code nears,
what's the association's biggest
challenge?
AOur biggest challenge has
been developing the training
on the new code requirements.
The association and industry
partners have invested almost
$100,000 in comprehensive
hands-on training on the new
code. Builders, subcontractors
and mechanical contractors need
to get training on the code. While
the builders have a yearly seven -
hour continuing education re-
quirement, the mechanical con-
tractors and other subcontractors
are not licensed by the state and
have no continuing education re-
quirements. In addition to train-
ing, another critical challenge is
the potential misinterpretation of
the code by both builders and
building officials.
QImplementation has already
been delayed twice, primari-
ly because of concerns that the
new code will make houses un-
affordable and that builders, in-
spectors and manufacturers
wouldn't be ready. Are they
ready now, and if not, when will
they be?
AlAn estimated 30 to 40 percent
of the builders are ready to
build to the new code.
Builders are in the process of
getting ready now, but it's going
to take time. We're providing
training to get them ready, but
it's going to be an ongoing effort.
There are 9,000licensed contrac-
tors in the state and the Builders
Association of Minnesota repre-
sents 3,200 members, of which
1,200 are general contractors or
remodelers. While housing af-
fordability is an important con-
cern, the code was delayed to
develop and provide comprehen-
sive training on the requirements
of the new code.
QDoes the association sup-
port a revision or another
delay in implementation of the
new code? Are you aware of any-
one other than builders who
nigh t seek a delay or change to
the code?
AWhile we still have serious
concerns about the complex-
ity of the code, the Builders Asso-
ciation of Minnesota will not re-
quest a delay. After the code is
implemented, we will workto
clarify code requirements that
will improve the code. I'm not
aware of any other group re-
questing a delay.
During the 2000 legislative ses-
sion, all building codes will be
discussed as a result of the Con-
struction Codes Advisory Council
report to the Legislature that was
required after the release of the
Legislative Auditor's report last
session. Key issues include the
statewide building code, local
building official interpretation
and enforcement, conflicting
codes and code coordination.
Most states have only one or two
code -administering agencies,
while Minnesota has five.
There is still opposition to
the new code. Can you sum
up the objections? Is the associ-
ation helping builders with the
cost factor by suggesting ways
they can cut costs, without sac-
rificing quality, in order to pay
for the comfort that the new
code will bring?
The opposition to the code
comes from the complexity of
the code requirements, the in-
creased costs and maintenance
issues for homeowners and code
enforcement issues.
The association's primary fo-
cus has been developing training
and identifying areas of the code
that need clarification. Our next
focus tell be to assist the industry
in communicating the new code
requirements and maintenance
issues to consumers. After the
code is implemented and we can
identify any innovative tech-
niques that can cut costs while
still meeting the code, the associ-
ation will offer ongoing training
on the code.
VMany builders have com-
plained that the new energy
code makes homes unafford-
able. Will it? Are there any loner
term savings for the homeowner
or the builder?
A[� The new energy code will add
estimated $3,000 to
s10,000 to all new homes. The
combination of the energy code,
rising land costs due to lack of
supply, government fees, increas-
ing building material costs, and
the labor shortage will make
homes less affordable. The long-
term savings of the new code, if
any, can only be accurately meas-
ured after the code goes into
effect.
NEWS
Public Works Engineering The Pipeline
Code Enforcement
LETTER January 7, 2000
Parks Report
The Parks Crew picked up
trash from the parks daily.
They also cleaned and flooded
the skating rinks daily. They
had to repair the door knobs at
Friendly Hills and Marie Parks
(vandalism). They repaired an
electrical breaker in the warm-
ing house at Marie Park. The
Parks Crew assisted in plowing
(they plow the cul-de-sacs,
trails, parking lots and skating
rinks).
Utility Report
Rich checked the City's seven
sanitary lift stations daily.
Rich was called in at 8:00 P.M.
on Thursday to clear a sewer
blockage on Victoria Road near
Stratford Road. (One of the
townhomes had sewage back-
ing up into its basement). The
downstream manhole was in a
yard area and Rich could not
find it, he had to use a metal
detector. After he located the
manhole, he cleared the line of
roots, grease and rags. Rich
was also called in on Friday
(holiday) at 2:30 P.M. to clear
an alarm at the Veronica lift
station and at 3:30 P.M. on
Saturday, because of a power
outage at the Northland Drive
lift station. He and Tim Oster
came in over midnight on New
Years Eve to check all the lift
stations for any Y2K glitches —
none were found.
Rich performed a sanitary
sewer inspection for a connec-
tion for a new home being
constructed at 1854 Orchard
Hill.
Street Report
The Street Crew called "Gopher
State One Call" for locations for
the new stop signs at Decorah
Lane and Ocala and for a re-
placement sign at Bent Tree
Lane and Huber Drive. The
ground is too hard for the com-
pressor to drive posts for the
signs, so temporary ones will
be placed until spring.
The Street Crew responded to
the following snow events this
week:
Date: Amount:
1-4-00 Dusting
1-5-00 1"
1-6-00 17'
Activity:
Sanded Streets
Sanded Streets
(some plowing)
Plowed curb to curb
beginning at 2:00 A.M.
Gopher State One Call
The close of the millennium has
brought the following interest-
ing statistics to our attention.
First, some background infor-
mation: Mendota Heights Engi-
neering Department has the re-
sponsibility to respond to
"Gopher State One Call" locate
requests. Gopher State One
Call (651-454-0002) is a notifi-
cation system established by
Minnesota law to inform under-
ground facility operators of in-
tended excavation in the vicin-
ity of their underground utility.
We locate buried electric cable
for our street lights, sanitary
sewer and storm sewer pipes
and manholes. St. Paul Water
locates buried water mains and
services. Other utilities doing
locates are NSP Gas and Elec-
tric, US West, Media One, Mobil
Oil and Williams Pipeline. Each
utility has its own color for the
type of pipeline it operates.
Our colors are red for electric
and green for sewers.
In the past year of 1999, there
were 683,000 locate requests
in the metro area. Mendota
Heights received 2,300 locate
requests and Lilydale (we do
their locates re-
quests also) received
about 300 locate re-
quests. Each year
the number is rising
which indicates the
number of excava-
tions and amount of
underground pipes
are also increasing.
During the peak part of con-
struction season it would not be
unusual for the Engineering De-
partment to receive 90 utility
locate requests per week.
Even in the dead of winter En-
gineering gets a fair number of
notifications for everything
from "For Sale" sign installa-
tions from realtors to cable
television installations, or wa-
ter main break repairs. This
past week the Engineering De-
partment went an entire week
without getting any locate re-
quests. Nobody can ever re-
member going an entire week
without any such activity. Is it
merely coincidence or could it
by Y2K preparedness or para-
noia??