2000NEWS Public Works Engineering Code Enforcement LETTER Parks Report The Parks Crew picked up trash daily from the parks and swept and flooded rinks. They had to repair the drive shaft on vehicle #506 which is a Toro riding mower with a broom mounted on it to clear the ice rinks. Utility Report Rich checked the City's seven sanitary sewer lift stations daily. He also had to replace the heater at the sanitary sewer lift station located on Mendota Heights Road near St. Thomas Academy. Heaters are required in the lift stations to keep the electric controls dry. Street Report The new street name sign mak- ing equipment arrived this week, so the street crew worked on setting it up. Council recently approved the purchase of the equipment to replace the exist- ing equipment that was well over 25 years old and repair parts for it were no longer avail- able. They worked on mailbox repairs, cleaning bridge decks and mix- ing sand and salt. " a 0 9 Ah Ah December 29, 2000 Code Enforcement Report Paul recently completed a written survey and oral interview with a representative from Insurance Services Office (ISO). ISO is an insurance supported organization with the mission of providing ad- visory insurance underwriting and rating information to insur- ers. We received written confir- mation this week that Mendota Heights has received a Building Effectiveness Grading Classifica- tion of 5 for both residential and commercial industrial properties. This is the same rating that the City has received in the past and one that most cities of our size receive. Ropers Lake Aerator Earlier this week, the contractor installing the permanent aerator at Roger's Lake Park activated the intake pump in preparation for a final inspection/project ac- ceptance by the DNR on Tues- day, January 2nd. The City's Park Crew removed the snow in the area of the lift station and opened the intake valve that al- lows lake water to enter the lift station where a 10 horsepower pump will lift the water to the top of a stairway chute that Public Works will move into position next Tuesday. The water can then cascade down the stair and spill super oxygenated water Snow Events for the Week Date: Amount: Response: 12/23 2" fluffy snow 4 workers scraped and sanded 12/28 6" ? Plowed all areas back into the lake. DNR tests of the oxygen level in the lake indi- cated the pumping needs to be- gin immediately. The City Park Crew will install and maintain "Thin Ice" warning signs around the open water area, created by the aerator operation, as they did last winter. Water Main System Repairs At the end of November a water main break occurred on the north end of the City on a segment of a 12-inch cast iron water main in a wooded easement area between the west end of Woodbridge Drive and State Trunk Highway 13. St. Paul Regional Water Ser- vice crews successfully repaired that water main break on De- cember 8, but also discovered during their repair efforts that a valve on that segment of water main was leaking and needed to be repaired. St. Paul Regional Water Service crews completed the required repairs on that 12- inch valve this past Wednesday. Natural Gas System Alarm The Police received a report from a citizen concerned about a warning siren near a green post that they had observed just north of I-494 at Pilot Knob Road. The Engineering Department investi- gated the situation and deter- mined that this was an indication that a natural gas regulator was venting to the atmosphere. We contacted Xcel Energy to inform them of our findings. Xcel En- ergy got back to us after they checked it out, and informed us that we did not need to be con- cerned. The noise was caused by an extraordinary large flow in the line. NEWS Public Works Engineering Code Enforcement LETTER Parks Report The Parks Crew picked up trash daily from the parks. They also plowed cul-de-sacs, parking lots, pedways, and ice rinks after each snow fall. They flooded all ice rinks daily and inspected warming houses. Street Report Dave Sorby ordered the re- placement signs for Decorah Lane to be installed as re- quired for additional traffic calming. The crew cleaned bridge decks of snow, and plowed their nor- mal routes for the snowfalls. They also had to replace the cutting edges on snow plows #303 and #304. Cutting edges are the strips of steel bolted to the bottom edges of the plow blades that make contact with street, they wear down and need to be replaced. They also performed mailbox repairs where needed. The Pipeline December 22, 2000 Utility Report Rich checked the City's seven sanitary sewer lift stations daily. Besides checking lift sta- tions this week, Rich also plowed his normal route (north end) and assisted the me- chanic, Len Kanitz, by making runs to stores to pick up repair pa rts. Water Main Break Early Thursday morning a water main break occurred on the 8 inch cast iron pipe on Apache Lane just north of Decorah Lane in the Friendly Hills neighborhood. This section of water main was part of the wa- ter system that was originally installed approximately 40 years ago by Friendly Hills homeowners as a privately owned and operated water util- ity. St. Paul Regional Water Service repair crews were on - site at 7:00 am but did not shut the water main off until about 8:30 so that customers had wa- ter service through the morning Weekly Snow Events Date: Amount: Response: 12/16/00 6" Plow entire City 12/18/00 6" Plow entire City Note: Last year our first snow plowing occurred as the result of a 2" snowfall on 12/19/00. peak usage period. St. Paul Regional Water Service crews took most of the day to finish their repair work given the bit- terly cold weather and the amount of machinery and equipment they had at their disposal. Engineering Staff Alumni News Shawn Sanders stopped by City Hall on Thursday to announce that he and his wife had be- come the proud parents of twins this past Tuesday. They named the twins Anna and Luke. The twins are approxi- mately the same weight and length, and their combined weight was nearly 12 pounds. Shawn and his wife are excited and realize that their lives are now changed forever, but he feels they are up to the chal- lenge of parenthood. r-tpppiu Holibdaius NEWS Public Works Engineering The Pipeline Code Enforcement LETTER December 15, 2000 Parks Report The Parks Crew picked up trash daily from the parks. The Parks Crew began flooding ice skating rinks Monday morning this week. (Residents were able to begin skating on the Friendly Hills and Marie Park rinks by Wednesday evening). The crew held a rink attendant orientation meeting on Tuesday afternoon and the attendants went to work Tuesday evening. This weeks very cold weather very much facilitated getting the rinks ready for use early this year (the crew is able to flood twice a day with the weather this cold). The Parks Crew performed its usual snow plowing duties (the cul-de-sacs, parking lots and pedways). Street Report The Street Crew worked on re- pairs to their trucks, mixed sand and salt and plowed and sanded streets as needed. tary sewer lines in the Public Works shop area. This time of year these lines often get plugged with sand from the trucks. He used the auger to clean the lines this week and will continue to do it on a routine ba sis. Code Enforcement Report Both Shaw Lundquist, the Dakota County CDA's contractor, and Oakwood Builder, Tony Feffer's contractor, started framing their projects on Lexington Avenue this week. Both contractors have been working on their foundations for the last several weeks and were slowed by the cold weather. Engineering Department Work The Engineering Department is currently in the process of filling out a number of surveys from different agencies and working on a jects. Snow Events of the Week: number of different pro - The Engineering staff has begun work on the Met- 12-10-00 Street Department was called in to sand all areas ropol ita n Council 12-11-00 dusting Check all areas, sanded slippery areas as needed I Environ- mental 12-12-00 Sanded streets as required Services 12-14-00 2" Plowed snow in all areas t U r V e y t h a t comes in Decem- Utility Report Rich checked the City's seven sanitary sewer lift stations daily. Rich purchased a power auger to be used for cleaning the sani- ber requiring that metro area communities compile and update data relative to new sanitary sewer connections, water usage, records of individual sewage treatment systems, and calcula- tions of sewage flows for the past year. The Engineering Depart- ment will also begin updating and certifying mileage for streets in Mendota Heights through the year 2000 to comply with Minne- sota Municipal State Aid Street reporting requirements. Engi- neering staff is also working on developing and preparing plans for the bituminous trail from Mendota Heights Road to the in- tersection of Wagon Wheel Trail and along Wagon Wheel Trail to the bridge over I-35E. The Engi- neering Department is also look- ing at some conceptual plans and estimating the cost of improve- ments that would serve the Car- ron site north of the Acacia Cemetery property at the end of Pilot Knob Road. Florida Report Curt Wimpee felt compelled to call Marc Mogan this past week to compare weather conditions in Palm Coast, FL with the Twin Cit- ies after seeing what the tem- perature was this past week in Minnesota. He never did admit that he regrets missing out on the opportunity to go ice fishing. He said that he was working hard at the new job and that it was going well. He has learned a lot already. He has put in extra time at work adjusting to both the workload and educating himself with the peculiarities of engineer- ing designs in Florida. He misses the people at Mendota Heights but doesn't miss the weather and he wishes all a Happy Holidays. NEWS Public Works Engineering The Pipeline Code Enforcement LETTER December 8, 2000 Code Enforcement Report Paul issued a permit to Hoff- man Homes Construction this week to construct their fourth duplex unit. This permit was for two Sterling model units, which is their highest valued unit. Utility Report Rich checked the City's seven sanitary sewer lift stations daily. Rich worked with Brian LeMond of Barr Engineering to help analyze Lilydale's sanitary sewer lift station. Lilydale hired Barr to analyze the ca- pacity of the lift station to see if it could handle the increased flow from their new Stone - bridge development. Street Report The Street Crew worked on in- stalling new MTC signs as for- mally agreed to by the City within a contract with them. All City costs will be reim- bursed once the project is completed. Parks Report The Parks Crew picked up trash daily from the parks. The Parks Crew repaired the furnace at the Friendly Hills Park warming house this week. They at- tended the annual Minnesota Turf and Ground Foundation Conference and Trade Show held at the Minneapolis Con- vention Center. Water Main Repaired This week St. Paul Water Re- gional Services repaired the 12" water main break that had oc- curred on November 25th. St. Paul Water repair crews were able to stop the water flow last week by isolating this section of water main through the instal- lation of another gate valve and closing valves on each side of the break. The break was lo- cated in the woods between TH13 and Woodridge Drive. Several trees had to be re- moved to make room for equip- ment before the work could be done. This section of water main was put back in service on Friday. Snow Events for this Week 12/6 Dusting sand and salt slippery areas 12/7 1" sand and scrape streets as necessary Street Lights Installed This week Xcel Energy installed seven street lights within the Hoffman Homes Augusta Shores project. The developer had the lights approved by Council. They are the City standard residential neighbor- hood "lantern" type lights, the same style as were used in John Mathern's Mendota Mead- ows project. LMRWMO Watershed News The Lower Mississippi River Wa- tershed Management Organiza- tion (LMRWMO) conducted a public hearing at 4:00 PM on Thursday November 301h at the West St. Paul City Hall Council Chambers to present informa- tion and accept public comment concerning the LMRWMO sec- ond -generation draft watershed management plan. The public turnout was limited to a few in- dividuals that had served ear- lier on the Citizen Advisory Committee and were interested in how their input was incorpo- rated in the draft plan. Clifford Timm, benefactor and the indi- vidual primarily responsible for initiating the installation of the Rogers Lake fishing pier and aeration system, played a video at the public hearing that he produced in cooperation with NDC4 that educates the public on lawn fertilization, its affect on metro area lakes and the benefits of the application of no phosphorus fertilizer. NEWS Public Works The Pipeline Engineering Code Enforcement LETTER December 1, 2000 Parks Report The Parks Crew picked up trash daily from the parks. They prepared the warming houses to be opened for the ice rinks. They worked on maintenance and clean up in the shop area this week. Utility Report Rich checked the City's seven sanitary sewer lift stations daily. He flushed the sanitary sewer line clean on Sylvandale Court this week. He flushes all the sewers that are within the street reconstruction jobs after the work is completed to en- sure that no debris is left in them from the work. He performed inspections for new sewer service line connec- tions for the following homes this week: 2113 Augusta Shores, 2107 Augusta Shores, 2219 Alice Lane and 1762 Dodd Road. Street Report The Street Crew worked on re- pairs to the plow trucks (304 needed repairs to the sander). They worked on installing some signs for MTC and in- stalled some guide posts where required in non -curbed neighborhoods for snow plow- ing. There were no snow fall events this week! Code Enforcement Report Paul issued a permit to Robert Carr and Associates for a bath- room remodeling at Ecolab. Ecolab is adding a unisex handicapped accessible bath- room and remodeling an exist- ing bathroom, locker room and shower. Estimated valuation at $52K. Water Main Break Last Saturday a water main break occurred on the north end of the City on a segment of the 12-inch cast iron water main in a wooded easement area between the west end of Woodbridge Drive and State Trunk Highway 13. St. Paul Water Utility repair crews were not able to repair the water main break directly, but did stop the water flow by installing another gate valve and closing valves on each side of the break that then isolated this section of water main. The fi- nal watermain break repair has not been made yet and we have not been told when this repair will occur. Fortunately for everyone affected, St. Paul Water Utility can take time making this repair given the fact that residents in this area have water service and the wa- ter flow at the break has been stopped. The vegetation and steep topography in this area will make repairing this water main break a difficult and time consuming proposition. Trees will have to be removed before the machinery they will need to make the repair can get access to the break site. Some grad- ing will likely have to occur that will allow the equipment to travel safely to the location of the break. Augusta Shores Improve- ment Proiect The Engineering Department received a Gopher State One Call utility locate request this week for the installation of street lighting throughout the Augusta Shores development. We would expect to see street light construction start any time now in the development be- cause these Gopher State utility locate requests generally serve as a reliable notice that con- struction work is about to com- mence on a particular task. LMRWMO Watershed Public Hearing The Lower Mississippi River Wa- tershed Management Organiza- tion (LMRWMO) is in the proc- ess of developing a second - generation watershed manage- ment plan as was mandated by the Board of Water and Soil Re- sources (BWSR) in Minnesota Rules Chapter 8410. The LMRWMO conducted a required public hearing at 4:00 PM on Thursday November 30th at the West St. Paul City Hall Council Chambers. The goals of the public hearing were to present information and accept public comment related to the draft copy of the LMRWMO second - generation watershed manage- ment plan. NEWS Public Works Engineering The Pipeline Code Enforcement LETTER November 22, 2000 Parks Report The Parks Crew picked up trash daily from the parks. The Crew plowed the pedways and worked on equipment maintenance. John Boland and Terry Blum have been off. Utility Report Rich checked the City's seven sanitary sewer lift stations daily. He plowed all the snow from the lift station's driveways after plowing his normal route (north end) on Monday. He also came in Friday night to sand some slippery intersections. Rich performed a sanitary sewer connection inspection for the new home being constructed at 916 Carmen Lane. Street Report Tom has already ordered some replacement sand and salt (150 tons of sand and 50 tons of salt). The Street Crew mixed some for use this week (we mix it at a 4:1 ratio right now). They delivered the siren to the Civic Center site for attachment to AT&T's antenna tower. The siren was delivered several weeks ago and had been stored at the Public Works Garage. Code Enforcement Report Paul issued the full building per- mit this week to Kraus Anderson Construction for 1230 Northland Drive Building 4, Mendota Heights Tech. Center. The foot- ing/founding permit had been is- sued previously and that work is now completed. That building contains 72K square feet and is valued at $2.4 million. Lucent Technology will be the occupant of this building and they will be applying for a permit for their in- terior space finish at a future date. Paul also issued a permit to United Properties Construction at 1201 Northland Drive Building 3 this week. The space will be oc- cupied by McLeod, USA. The work will finish 8,540 square feet of this building at a valuation of $120,787.00 The on -site underground utilities are currently under construction on the Dakota County HRA site on Lexington Avenue. Year 2000 Street Reonstruc- tion Valley Paving, Inc. worked on ad- dressing some of the remaining punch list items on the Year 2000 project this week. They collected and disposed Snow Events for this Week of a small pile of dirt and sediment 11/19 <2 inches Three street workers came in— that had scraped main roads and sanded all been stock - areas. piled on the grass ease- 11/20 <2 inches Four street workers scraped main ment area roads and sanded all areas. after remov- ng the accu- mulated material from the storm sewer sump manhole between Rogers Lake and the end of Blue - bill Drive. They brought in a small milling machine to remove some bituminous pavement thickness from two driveway aprons that abut Rogers Avenue to provide additional clearance between the pavement and the undercarriage of vehicles using the driveways. They also brought in a small tracked skid loader backhoe to do some ditch excavation and cleaning that was included in this contract at the outfall of the storm sewer system from Apache Lane in the Friendly Hills Park pond. Augusta Shores Improvement Proiec The entrance sign to the develop- ment is complete now that the letters spelling AUGUSTA SHORES have been installed on the face of the monument near the intersection of Highway 13 and Acacia Drive. The first two twinhome units are fully framed and in various stages of comple- tion, and the foundation for the third twinhome unit is now cur- rently under construction. Happy Thanksgiving 'NEWS Public Works Engineering Code Enforcement LETTER Parks Report The Parks Crew picked up trash daily from the parks. The Parks Crew met with representatives of the DNR to review the instal- lation of the pipe connections between the recently con- structed pump intake system to the aeration apparatus. They also cleaned up machine 580-D, worked on changing it over from summer to winter and hooked up the snowblower. They washed and waxed all parks trucks. On Thursday morning, they plowed the cul-de-sacs on the north end, plowed the ped- ways and City parking lots. Utility Report Rich checked the City's seven sanitary sewer lift stations daily. Rich responded to an alarm at a Northland Drive lift station on Saturday, November 11th that resulted from a power surge at the lift station. He also plowed out all the lift station parking ar- eas. Street Report The Street Crew installed cutting edges on the snowplows, re- placed hydraulic hoses on the snowplow wing attachment and replaced the broken centering spring on the plow of truck #308. They cleaned up the back lot and hauled out brush and miscellaneous debris to SMC compost site in Eagan. They changed out burned out traffic signal lamps on the signals at Mendota Heights Road and Highway 55 and also notified MnDOT Electrical Services for a The Pipeline November 17, 2000 repair to one signal head and a tarnished reflector with burned out socket. They sanded streets on Tuesday, November 14th and plowed all the City streets on Thursday, November 16th after the 2" snowfall. Code Enforcement Report Paul issued a permit this week to United Properties Construction to complete 5400 square feet of of- fice space finish to be occupied by Charter Communications at 1210 Northland Drive (Building #3). He also issued a permit to Hoff- man Homes, Inc. for another new double townhome to be con- structed in their Augusta Shores Development. Estimated value for each unit is about $200K. Hoffman is submitting to Paul homeowner signoffs acknowledg- ing that they are aware that their construction is within an aircraft noise zone. The on -site underground utilities have been constructed on the Mendota Heights Business Center development in the northeast corner of Lexington Avenue and Mendota Heights Road. A unique aspect of the design of the storm sewer system on this project was the utilization of a large diameter storm sewer pipe network to de- tain on -site runoff instead of con- structing a storm water detention basin to serve the development. Year 2000 Street Reconstruc- tion The Engineering Department met with Ed Vivant of Valley Paving, Inc. on Wednesday to review the punch list items that remain to be completed on the project. There are some items on that punch list that can be completed yet this year, but the items that involve bituminous surface re- pairs will have to wait until next spring to be completed. Valley Paving has contacted many of the property owners that have expressed concerns about their driveway work, and they have reached an agreement with many of these residents as to what will be done to resolve the issues in question. We have asked the Contractor to provide us with written confirmation about what commitments they have agreed to with these respective property owners. Darn Mosquitoes! Metro Mosquito Control dropped by City Offices to present an up- date on last summers efforts. Nineteen residents contacted the agency last year requesting con- trol efforts to reduce nuisance causing mosquitoes in their neighborhood or to declare their lot "off limits" for spray pro- grams. Mendota Heights is care- fully watched by the agency due to a reported incident of en- cephalitis in Sunfish Lake several years ago. Attached is a copy of an information brochure prepared by the MMCD, that should answer any and all questions. The MMCD is governed by a board of 17 elected county commission- ers, each representing their re- spective county boards. Com- missioner Patrice Bataglia repre- sents Dakota County. Y V 2 ry cd O �n a N w U r Z O Ur ZE:_al U .0 CD _ U cr p C C _ U ^ p •G O O 0 O U^ C. to 3 r o > > 0 � c oo 00 7 h r J O c — r _ O �.E3 o= U 7 ^ n s �•N o� �r ° � 3 t^n U, c3 y r c3 U 3 '>1 U c � U r c1 6 U vi - y o ^w 7� O U ° r o •.�-� > U N O C11� O -�2 Tsai • Qi > ° Cv F N 00 U ct n 2 C:) U c o C OJ C U.• � N�u� i R Y N CCL > N c>3 ..U., O a O o � ' S 3 ob. e X w c3 U -� O r• U U O cq c �c o cU oo °> 0 0> > O �� r U a �>1to m° u to UM a 9 t H �0 LQ r 0 co LQ r a 0 s 0 ii i 24 co m aE o (� `o >— m 3 a� J E 60 m O) T O D a E �o v o a o m c Q o c N _0 O -0 S- o — r- -:� 0 E L (0 n = C Q > m o a U O O y M <0 d L C C � C 0O m� o� m L N N � ^ L 3 0 0 � 0 0 o E o > o- W m 3 N E 5 U' O r2 o O El o = b b w �.�= u =C] c a bl � �a � ^ r O O O 6 .� .^^ .� •y O> �.� r, ^ > � o �b 3 A � bp� o 60 y u CZ o ^n� a? tj) PU N Y'y�� LT-) °= "' > ca•� w p ~ O cG cC ca N . O tC �O cc3 O m 3 Cn ajr4•' N '�-' r OMO U M 'O O — bn-O CL c3 `d f-" .O a`�i 'C �, 00 .� N 00 .�^. O. Y bi)N ,0, F N O 0.0 c3CL ❑ in cC • • '.,,, bA to O O > ° a w C . a> ro _cz bb cb s ai o o w o cp ono T a o' C o cs o I o o rs C EC e U p p O O N C rv.l CJ ? as o Q U C] v� " O �✓ Q 7D r U vU U N U r 0 o 0 a+ bA A F s m O cC -a >' CL ,G Cd �Qq � az3 Qoo o 0 0 _to vto y Q to U -0 75 U +N' a) oto -p p .+ C � by �'dp ❑ U '��' U -ry ? O 0 3b bo a o. y o cd /1 ai td :3 U O O U t tD. > ct g ° '° d ? ,t .� ti a bD s ti V N C y' W V cCi U ctl y a ti c3 U V U U❑° 'in P. ." V 0 U �..i. tD .T r — � � O U T U V N a.. U r � U ° r U T N a R m v a 0 d 1 U R O `m s E 3 c v m w w Q L6 96 96 b6 £6 36 t6 06 6e 88 L8 98 s8 o b8 NEWS Public WorksEngineering The Pipeline Code Enforcement LETTER November 9, 2000 Parks Report The Parks Crew picked up trash daily from the parks, and mowed grass and picked up leaves at several park lo- cations. They worked on the park machinery preparing it winter use by removing the summer equipment accesso- ries and installing the winter ones. The Parks Crew cleaned up the water tower storage area in order to create addi- tional sheltered storage space over the winter. The Parks Crew also spent time picking up trash and repositioning pic- nic tables that were over- turned by recent vandalism that occurred in Rogers Lake and Valley Park. Utility Report Rich checked the City's seven sanitary sewer lift stations daily. He also did a thorough cleaning of the interior and exterior of truck numbers 404 and 409. He flushed the sanitary sewer mains on Syl- vandale Court South and Syl- vandale Road. Rich and Marc Mogan met with a resident at 2526 Whitfield Drive to pro- vide details of the sanitary service line connection to their property. The alarm at the Northland Drive Lift Station sounded at 1:30 pm last Fri- day as a result of some main- tenance being performed by Qwest. Rich also helped Tom Olund put up voting signs at the voting precincts through- out the City. A contractor for Koch Pipeline replaced and re-laid a section of storm sewer pipe in the southwest corner of the inter- section of Mendota Heights Road and Highway 55 when it was discovered during some routine testing that the storm sewer pipe had settled and come in contact with the pipe- line that conveys jet fuel to the airport. Whether it was a sign that win- ter has officially arrived, or purely coincidental we proba- bly won't know for sure, but in any event a watermain break occurred in the vicinity of 565 Marie Avenue late Thursday af- ternoon. The break occurred in close proximity to the water service connection at that loca- tion. The repair was made and the watermain was back in ser- vice relatively quickly. Street Report The Street Crew cleaned storm sewer grates at various loca- tions throughout the City. They removed the asphalt pav- ing equipment from truck number 312. The Crew worked on cleaning up the back shop area. The Street Crew installed the snowplow wings and sanding attach- ments on all of the trucks and inspected the snowplowing and sanding equipment for any necessary repairs. Tim Oster was called in around 10 pm on election night to sand some of the areas that had gotten slip- pery from the precipitation that occurred that afternoon and evening. Code Enforcement Report Code Enforcement has seen an increase in single-family home construction during the 2000 calendar year. There have been 21 single-family home building permits issued through October of this year as compared to 11 during the same period last year. This additional construction activity has led to a $2.8 million dollar increase in valuation of single- family home construction over that of last year. Augusta Shores Erickson Construction per- formed required mandrel tests and flushed the sanitary sewer system this week on the Au- gusta Shores project. The completion of these work items permits the sanitary sewer system to be put into service. The Contractor has completed work around the manholes in the street pavement to protect them from snowplow damage over the winter. The perma- nent monument sign for the development is proceeding to- wards completion in the north- east corner of Acacia Drive at Highway 13. Plans for a build- ing permit for the third twin - home unit were submitted to the City this week. NEWS Public WorksEngineering The Pipeline Code Enforcement LETTER November 3, 2000 Parks Report The Parks Crew picked up trash daily from the parks, and mowed the leaves at several parks. They also removed the martin houses from the parks this week. They applied fall fer- tilizer and aerated the fields at all the neighborhood park ball - fields and soccer fields. Utility Report Rich checked the City's seven sanitary sewer lift stations daily. Rich is the City's certified pesti- cide applier. He attended an annual class put on by the Min- nesota Department of Agricul- ture at the Dakota County Ex- tension office in Farmington. The class is a mandatory class required for re -certification. He flushed sanitary sewers in Ocala Court, Ocala Lane, Nashua Lane, Apache Lane, and Apache Court. He performed two in- spections for new connections to the City's sanitary sewer lines and inspected Lilydale's storm sewer system (as agreed to by City Council). Street Report The Street Crew continued to babysit the bonfire pile this week —they had to remove a to- tal of 5 sofas, 3 chairs, railroad ties, etc before the pile was burned Tuesday night (this was the worst year yet for residents dumping illegal items). The fire continued to smolder Wednes- day morning and had to be ex- tinguished after a concern was raised by the dry cleaner that their clothes might start to smell smoky. There has been a concern raised about Brown Institute students parking on the street too close to other business' driveways and preventing their delivery trucks from entering. The Street Crew painted the curbs yellow adjacent to the driveways to keep student parkers well away and driveways open. The Crew worked on re- pairing a large hole that had formed in the ditch line along Marie Avenue because of erosion. Code Enforcement Report Paul issued a permit this week to Brigitte Enterprises, Inc. to re- model the interior space of McDonalds, 2020 Dodd Road. The project will provide seating arrangement for disabled cus- tomers (valuation $30K). He also issued a permit to United Properties to complete 5,400 square feet of tenant space finish at 1210 Northland Drive (building 3) for Charter Communications (valuation $67K). Paul also issued a permit to Glas- sen Co. to replace the windows for the home at 1011 Wagon Wheel Trail (valuation $52K). This project is to replace windows for the second time that were funded by the MAC (Part 150). The first windows were upgraded with acoustical panels installed over casement windows. This was similar to adding storm win- dows. These panels were found to be a maintenance problem and unsuitable. Quest began installing their an- tenna pole in the outfield of the ball field at City Hall Thursday this week. Once completed the pole will have a City storm warn- ing siren mounted on the top of it. Site work continues on the Men- dota Heights Business Center de- velopment at the corner of Lex- ington Avenue and Mendota Heights Road. The Developer's utility contractor made the sani- tary sewer connection to the City's trunk system on Thursday, and continued with the construc- tion of the internal sanitary sewer system on the property. Year 2000 Street Reconstruc- tion Punch list items that were worked on over the past week in- cluded the replacement of some of the Covenant of the Visitation fencing that had to be moved in the vicinity of the curve on Lake Drive to accommodate the wider street section, and some sod res- toration work. Charlie Noel of 1165 Sylvandale Road has filed an appeal in District Court chal- lenging the driveway portion of the special assessment against his property. The prepayment assessment count the City has received from property owners in the Rogers Lake reconstruction area now stands at 12 for street improvements and 2 for driveway work, and for the property own- ers in the Delaware Crossing, Ivy Falls, and Rogers Lake rehabilita- tion areas the totals are 52 for street improvements and 17 for additional driveway construction. NEWS Public Works Engineering The Pipeline Code Enforcement LETTER October 20, 2000 Parks Report The Parks Crew picked up trash daily from the parks, mowed the grass and striped soccer fields on an as needed basis. The Parks Crew continued working on winterizing the lawn sprinkler systems this week. They also had to remove the water meters from the non -winterized build- ings and complete many repairs to the heads and valves. They worked on cleanup around the Fire Hall to prepare it for the open house held last Saturday, and they attended an open house and seminar at Toro where they were able to look at and demo new equipment. Utility Report Rich checked the City's seven sanitary sewer lift stations daily. He raked leaves at his lift sta- tions. He performed two sani- tary sewer connection inspec- tions for the new townhomes being constructed in Augusta Shores. Street Report The Street Crew had to "baby- sit" the Halloween bonfire brush pile this week. In spite of the fact that dumping was not sup- posed to start until this Friday, many people were already dumping. Besides brush, resi- dents were also dumping lots of banned material. The Crew had to remove a couch, railroad ties, bags of leaves and construction material. (Proper disposal of this stuff costs the City dumping fees). Fire In Inver Grove Heights The Public Works Firefighters were called to a mutual aid fire in Inver Grove Heights this Wednesday at 11:00 AM and were there until 4:30 P.M. The fire totally destroyed one unit of a 4-plex townhome. Code Enforcement Report Paul issued a permit to United Properties Construction for a 7,180 square foot tenant space finish at 1270 Northland Drive (value of $50K). The occupant will be Fidelity National Foreclo- sure Solutions. He issued a permit to Johnson Engineering (Dale Johnson) to construct a one story single fam- ily dwelling with a walkout at 2219 Alice Lane ($200K valua- tion). Year 2000 Street Reconstruc- tion Work on punch list items pro- ceeded at a snails pace through- out the project this week by Val- ley Paving, Inc. There is nothing new to report on the progress being made in resolving the problems some property owners have with the driveway work that was completed in conjunction with this improvement project. The City has received prepay- ments to cover 3 street and 1 driveway special assessment from property owners in the Rogers Lake reconstruction area, and 20 street and 7 driveway special assessments from prop- erty owners in the Delaware Crossing, Ivy Falls, and Rogers Lake rehabilitation areas. Alice Lane Improvement Pro- iect Foundation construction is under- way for the construction of a new home in the development. Augusta Shores Improvement Project Hoffman Homes has now com- pleted extensive landscaping im- provements throughout the de- velopment. Trees and shrubs were planted, sod was laid, and an irrigation system that covers the entire development was in- stalled to maintain the plantings. The site looks good now and will only improve as these plantings mature. Building continues on the first twin townhome unit, which will serve as their model, and now they have started con- struction on a second twin town - home unit. Tilsen's Highland Heights and Bunker Hills Sod Replacement We are still waiting for some pre- cipitation to break out of this drought cycle we are in to help the people out that had sod in- stalled under this program. Rain is desperately needed here and throughout the entire City, as there has been no precipitation of any sort since September 2. Residents have been good for the most part about watering their new boulevard sod. The center island area on Lilac Lane was top -dressed with topsoil and hy- dro -seeded with a heat and drought tolerant hardy seed mix- ture. NEWS Public Works Engineering Code Enforcement LETTER Parks Report The Parks Crew picked up trash daily from the parks, mowed the grass and striped soccer fields on an as needed basis. The Parks Crew contin- ued preparations for winter by cleaning up the parks and blowing out the lawn sprinkler systems at City Hall, Fire De- partment, Public Works Ga- rage, Mendakota and Kensing- ton Parks. Utility Report Rich was on vacation this week, so Tom checked the City's seven sanitary sewer lift stations daily. Street Crew The Street Crew hauled in and spread fill in Rogers Lake Park to prepare the land for instal- lation of a new culvert that is to be installed. The culvert will get rid of a ditch and will make mowing easier between the small pond by the access road and the lake. They con- tinued installing replacement street name signs in the year 2000 street reconstruction neighborhoods. Metricom to Start Metricom informed me this week that they will begin on Friday installing their radio boxes on light and utility poles throughout the City. They have 34 boxes to install and October 13, 2000 will complete their work in one day. Metricom is approximately one half done installing their boxes within the Metro area and will begin marketing next month. Code Enforcement Report Dave Regel Construction was issued a permit this week to begin construction of a one story home at 915 Carmen Court. Regel is the same con- tractor who recently con- structed a similar home on Mary Adele Avenue. Estimated valuation is $310K. Paul also issued the second permit to Hoffman Homes for a twin home at Augusta Shores this week. The permits for the models were issued several weeks ago and they are under construction right now. Year 2000 Street Recon- struction Valley Paving, Inc. continued working on punch list items throughout the project this week and has had further dis- cussions trying to rectify the problems that some property owners have with their drive- ways. Alice Lane Improvement Proiect Some minor landscaping resto- ration work was completed this week on the existing abutting lots. A building permit was is - sued and the basement was ex- cavated to construct the foun- dation for a new home in the development. Augusta Shores Improve- ment Proiect Hoffman Homes is in the proc- ess of completing a very ambi- tious and extensive landscaping plan throughout the develop- ment. The site will really look impressive when they are fin- ished. Building continues on the first twin townhome unit in the development. Tilsen's Highland Heights and Bunker Hills Sod Re- placement Wagner Sod Company of Inver Grove Heights completed es- sentially all of the sod replace- ment work this week in the Til- sen's Highland Heights and Bunker Hills neighborhoods. Residents have been good for the most part about watering their new boulevard sod. The center island area on Lilac Lane was top -dressed with topsoil and hydro -seeded with a heat and drought tolerant hardy seed mixture. The City will probably need to spray this area for weeds next year, and give it some tender loving care for a while until it gets estab- lished. We are hoping that we can break out of this drought cycle and get some precipita- tion to help these people out as well as the rest of the residents throughout the City. NEWS Public Works The Polpefine Engineering Code Enforcement LETTER September 22, 2000 Parks Report The Parks Crew picked up trash daily from the parks, mowed the grass, and striped foul lines on an as needed basis. The Parks Crew assisted the DNR with in- stalling the new fishing pier at Rogers Lake Park. They began respraying the parking lines in the park's parking lots. Utility Report Rich checked the City's seven sanitary sewer lift stations daily. He cleaned sanitary sewer lines on Mendakota Drive and Court and on Swan Drive. He replaced a hydrant marker flag on High- way 13. Street Report The Street Crew has been stockpiling some black dirt that they got free from United Prop- erties' latest building project. Street Paint Markin Street paint markings (centerline, turn lanes, etc.) were applied to approximately seven miles of City streets. IN 1999, the City embarked on a three year rotational program of street striping where one third of all striping is done once every three years with high wear section receiving additional markings as necessary. Fishing Dock at Roger's Lake The fishing dock at Roger's Lake was assembled and installed by a Department of Natural Re- sources crew of five on Tuesday and Wednesday. The dock ex- tends 108 feet into the lake with a thirty foot wide "T" at the end. The floating dock remains in the lake year round. Water depth at the end of the dock is reported to be four and 1/2 feet deep. The dock includes lower side rail ar- eas intended for wheelchair bound fisher persons. Lower rails do not restrict casting and land of fish. The DNR also informed the City that bids for the installation of a permanent lake aerator have been reviewed and a contract let. The work will begin in early Octo- ber. City Hall Roof Repaired The City Hall roof received minor repairs last week. Ridge cap ce- dar shingles along the east side of the building were deteriorating rapidly exhibiting extensive cracking and splitting. No other unusual wear areas were found. The east side ridge caps were replaced and other minor work, such as nail or staples "popping" were hammered in and flashing areas were re -caulked as needed. Year 2000 Street Reconstruc- tion The Contractor is importing and spreading more topsoil in the Rogers Lake Area. We expect to see a flurry of sod restoration construction activity next week in that area. Augusta Shores Improvement Pro "e Gas, electric, telephone, and television line installation work continues. Building continues on the first twin townhome unit in the development. The developer started constructing landscaping improvements in and around the storm water retention basin and in- tends to install a fountain in the basin to transform -- �; it into an aesthetic amen- ity for the neighborhood. Tilsen's Highland Heights and Bunker Hills Sod Replacement ""'"' Council awarded a con- tract for the replacement of sod in the Tilsen's Highland Heights and Bunker Hills street recon- struction project areas this week to Wagner Sod Company, Inc. of Inver Grove Heights, MN. The Engineering Department met with the Contractor on Thursday and this work will likely start the first week of October. NEWS Public WorksEngineering The Pipeline Code Enforcement LETTER September 15, 2000 Parks Report The Parks Crew picked up trash daily from the parks, mowed the grass and striped foul lines on an as needed basis. The Crew worked on repairs to the warning tracks for the ball fields at Mendakota Park. They repaired the retaining wall at Rogers Lake Park that was damaged as a result of the last large rain storm. They trimmed the low hanging branches from the trail on Wachtler Avenue. They an- chored down all the soccer goals in the neighborhood parks (Ivy, Wentworth, Victoria Highlands, Friendly Hills, Men- dakota and Kensington). The Crew also worked on re- pairing the timbers around the new playground equipment at Marie Park, hauled in dirt and seeded around the outside of the timbers and trimmed up overhanging tree branches. Utility Report Rich checked the City's seven sanitary sewer lift stations daily. He pulled all the pumps from the sanitary sewer lift sta- tions and checked them over with Braun Pump. They found and repaired a few minor prob- lems. He jetted clean the sani- tary sewer lines for Lexington Avenue from Marie Avenue to TH 13 and flushed the sewer line clean on Chippewa Avenue. A.M. on Monday. NSP arrived and restored the power. Street Report Dave met with an MTC repre- sentative to discuss their sign replacement program that the City is doing for them. The City will be reimbursed for all its costs once the project is com- pleted. There are a number of changes to the plan that will need to be made. Dave met with the 3M represen- tative again about our sign making machine. Our machine needs repairs, but it is so old that no replacement parts are available. Dave repaired the streets lights in the Industrial Park, two control boxes had tripped mains. Code Enforcement Report Paul issued the first permit to Hoffman Homes allowing them to begin construction on their model homes. Hoffman Homes has two unit designs, the "Sterling" and the "Trenton". The "Trenton" will have 3,670 square feet and the "Sterling" will have 3,950 square feet. They are both one story ram- blers with a majority of their basements finished. Dick will perform the first footing inspec- tions Friday. Year 2000 Street Recon- struction He responded to a power out- The Contractor imported and age at the main lift station on spread some more topsoil in an - Mendota Heights Road at 11 ticipation of the start of sod res- toration work in the Rogers Lake Area. We expect to see some serious construction activity starting next week on sod resto- ration in that area. Assessment notices were in the process of being mailed out for the project as this publication was being printed. Augusta Shores Improve- ment Proiect Bituminous base course and pathway construction was com- pleted this past Tuesday on the Augusta Shores project. The long fill slopes in the develop- ment were being hydro -seeded by Jackson Landscape under a private Contract with the devel- oper. The utility companies have now begun the task of in- stalling underground gas, elec- tric, telephone, and television lines in the development. The footings for the first twin town - home unit have been dug and we should see the building going up soon. Tilsen's Highland Heights and Bunker Hills Sod Re- placement The Engineering Department ac- cepted bids for the replacement of sod in the Tilsen's Highland Heights and Bunker Hills street reconstruction project areas this week. This item will be up for Council award consideration this week for fall construction. NEWS Public WorksEngineering The Pipeline Code Enforcement LETTER September 8, 2000 Parks Report The Parks Crew picked up trash daily from the parks, mowed the grass, and chalked fields on an as needed basis. The Crew had to paint the walls of the pavilion in Valley Park to cover up graffiti that was placed there by vandals. They removed the old wooden playground equip- ment from Marie Park this week to make way for the new equipment to be in- stalled. The new equipment was installed by Flannigan Sales (Tiny Tikes equip- ment). The tennis court at Valley Park was power washed and a new epoxy lev- eling compound and color coat was applied this week. Replacement net support poles were also installed. The 2" rainstorm that fell last weekend only caused some minor washout damage along the pedways which were re- paired this week. Utility Report Rich checked the City's seven sanitary sewer lift stations daily. Rich along with his helper, jetted sanitary sewer pipes clean on Faro Lane, Avanti Drive, Summit Lane, West Circle Court, Twin Circle Court, Bwana Court, Vail Drive, Lexington Avenue from City Hall to Marie Ave- nue and on Marie Avenue from Overlook west to Lexing- ton Avenue this week. Street Report The Street Crew continued painting crosswalks this week. They patched potholes in the Industrial Park areas. They installed new street name signs in the Kressin neighbor- hood and replaced some missing ones at various loca- tions around the City. Code Enforcement Report Roseville Properties broke ground this week for their Centre Pointe Five building. Ryan Construction has been the contractor for all of their previous buildings and is also their contractor who will build this building. The building is a 27,170 square foot office shell with a valuation of $HOOK. Paul issued a permit to McDonald Construction to build a new single family home on Lot 2 of Pine Creek Estates, 1762 Dodd Road. This house will be a two story home valued at $363K. Check your home for ter- mites! Paul received the at- tached letter from the Minne- sota Department of Agricul- ture this week informing him of the spread of termites to Minnesota. Year 2000 Street Recon- struction The final preparations for pav- ing that were made last week by the Contractor in the Ivy Falls area paid off and led to the completion of paving in that neighborhood this week. The Contractor also finished paving in the Delaware Cross- ing area as well. The Con- tractor also imported more topsoil in anticipation of sod restoration in the Rogers Lake Area. The major work items that remain to be completed on this project are in the Rogers Lake Area. Augusta Shores Improve- ment Project Street construction activities resumed on the Augusta Shores project after the utility companies completed their work relocating power lines and removing an existing power pole that was located within the new street inter- section of Acacia Drive at State Trunk Highway 13. We anticipate that the streets on the project will be paved by the end of next week, and that townhome construction will likely begin immediately thereafter. NEWS Public Works Engineering The Pipeline Code Enforcement LETTER September 1, 2000 Parks Report The Parks Crew picked up trash daily from the parks, mowed the grass, dragged and chalked fields and striped foul lines on an as needed basis. The Parks Crew had to cut up and remove a tree that had fallen on the pavilion at Valley Park. While they were doing that, they also removed some other trees that were in dan- ger of falling on the pavilion. The Crew worked with Street Crew to remove and haul away some weeds and trees from Rogers Lake in preparation for the new DNR fishing pier. They pulled weeds from around the parks signs and they weed whipped around the new City sign on Dodd Road. Utility Report Rich was on vacation this week so his helper J.P. checked the lift stations and mowed the grass in his absence. Street Report The Street Crew worked with the Parks Crew to clean up the beach at Rogers Lake in prepa- ration for installation of the fishing pier. They worked on installing the new bus stop signs and replaced several stop signs. They started re- painting the crosswalks. The responded to several pot- hole complaints by patching them. Dave met with a 3M representative to discuss re- pairs to our sign machine. The machine is 28 years old and needs some repairs. Because of its age, the 3M rep was un- sure if he could locate the needed repair parts. The crew had to pick up and dispose of some tree and brush debris that had been "donated" to the City on Victory Avenue. (Dave also provided the attached Farmer's Almanac Report —I hope it is right). Rogers Lake Fishing Pier The DNR has informed the City that the fishing pier, which has been fabricated by prison in- mates, will be delivered and in- stalled on September 19`h. Public Works staff will assist DNR employees in unloading the delivered dock sections, as- sembly and installation of the dock into the lake. The location of the dock will be directly south of the gravel driveway/ cul-de-sac and will extend into the lake 60 or more feet with the objective being to reach a water depth of at least four feet at the end of the dock. The dock will be "T" shaped with the "T" 20 feet in width. The dock is designed to remain in the lake year round. The City will construct an eight -foot wide blacktop path connecting the dock to the cul-de-sac parking area. Next spring amenities, such as benches, picnic tables, etc. will be installed near the dock. A donation of $4,000.00 from Mr. Clifford Timm will be used to fund these improve- ments. Year 2000 Street Recon- struction The Contractor placed pave- ment markings on Lake Drive last Saturday thereby insuring that the street would handle the rush of traffic associated with the start of school at St. Thomas Academy. The new right and left turn lanes on Lake Drive at Mendota Heights Road helps move traffic more efficiently through this intersec- tion. The Contractor devoted most of their effort this week to preparing the Ivy Falls area for paving. We had hoped that this neighborhood would get paved this week, but now it appears that this will occur next week. Augusta Shores Improve- ment Proiect A new power pole was installed south of the new intersection of Acacia Drive at State Trunk Highway 13 in order to relocate power lines from an existing power pole that is currently lo- cated within the new street. We are hoping that the utility companies relocate their lines to the new power pole next week so that street construc- tion activities can resume after removal of the existing power pole. People Farmers' Almanac predicts another moderate winter The publishers of the Fanners' A►inanac, using a formula known to only two people, predict another moderate winter as a follow- up to last year's warmest winter on record. "The winter of 2000-01 should gel off to a late start and turn out to be milder than average, even less severe than this last one," forecaster Caleb Weatherbee writes in the al- manac that hits newsstands today. Weatherbee predicts a wet fall, to be fol- lowed by two big Deceniber snowstorms. More snow is predicted, but overall the season will be mild. !Editor Peter Geiger admitted that last year's prediction — of a stormy November and De- cember to be capped by more than a foot of snow at year's end in the M idwest and North- east — was way off the i i ark. The National Weather Service contends weather can't be predicted with any certainty so far in advance. But the Farmers' Almanac, published for 184 years in Lewistown, Maine, says its long-term predictions are right about 80 percent of the time. The almanac and the Old Farmer's Alma- nac, 24 years older and published in neighhor- I ing New Hampshire, are used by many people to plan outdoor weddings, cookouts and va- cations. NEWS Public Works Engineering The Polpeline Code Enforcement LETTER August 25, 2000 Parks Renort The Parks Crew picked up trash daily from the parks, mowed the grass, dragged and chalked fields and striped foul lines on an as needed basis. The Parks Crew set up the small soccer goals and nets in the neighborhood parks. They also fertilized the grass at the Kensington Park soccer fields. They finished placing rec rock along the fence lines at the Mendakota Park ballfieds and worked on trimming trees along pedways. Utility Report Rich checked the City's seven sanitary sewer lift stations daily. Rich cleaned the follow- ing sanitary sewer lines this week: Victoria to Walsh, Sum- mit to Mendota School and Victoria Court, James Road and Court, Douglas Road and Court, Caren Court, Mayfield Heights Road and Court, Kingsley Circle North and South. Rich also washed down the pedway on Lexington Ave- nue with the jet truck for the Parks Crew. He also mowed the grass at the Veronica Lane lift station. Street Report The Street Crew finished in- stalling new signs for the Dela- ware Crossing Street Recon- struction Project. They dropped off barricades for a resident having a block party on Downing Street. They also reinstalled the missing stop sign at Mendota Heights Road east of Medallion Drive. They removed brush and trimmed trees to improve sight distance at Marie Avenue and Dodd Road, Lexington Avenue and Cullen, and Freeway Road at Highway 110. The Street Crew also removed a dead boulevard tree on West - view Terrace. They met with a representative from Bargen Inc. about the infrared heat patch- ing on Marie Avenue between Lexington and Victoria. They also removed campaign signs from the City's boulevard area on Huber Drive. Augusta Shores Minnesota State Curb and Gut- ter finished installing curb and gutter at Augusta Shores on Monday. We are waiting for the placement of the remainder the Class 5 gravel base to be installed which would be fol- lowed shortly thereafter by blacktop paving operations. Street Reconstruction St. Thomas Academy starts school next week, and so con- sequently the Contractor dedi- cated most of their work effort this week to prepping Lake Drive for the final lift of black- top as this publication was be- ing printed. The area resem- bled an ant colony under attack with the number of men and equipment on -site between the paving work that was being done by the City and the school expansion work that the Build- ing Contractor was feverishly trying to complete before the start of school next week. Slurry Seal Proiect Struck and Irwin, Inc. arrived this week to start this years slurry seal project. They started crackfilling on Monday and were finished late Tuesday. They began spreading slurry seal late Wednesday afternoon and were finished by noon on Friday. They modified their work plan somewhat to accom- modate a couple of residents that needed access while this work was being done. Resi- dents in the project area, and office workers in the Centre Pointe development were pa- tient and understanding for the duration of this work, and for- tunately this work was com- pleted before school started. Resurfacing of the Valley Park Double Tennis Courts Dermco-LaVine Construction has received the contract to re- surface the Valley Park tennis courts. The existing surfacing is de -laminating and must be repaired before conditions worsen. Work is scheduled to be completed by the end of the month. Uneven cracks in the tennis courts in Ivy Park have made play difficult, and next year the tennis courts will be rebuilt by a mill and overlay project similar to how some City streets are rehabilitated in Mendota Heights. NEWS Public WorksEngineering The Pipeline Code Enforcement LETTER August 18, 2000 Parks Report The Parks Crew picked up trash daily from the parks, mowed the grass, dragged and chalked fields and striped foul lines on an as needed basis. Fall soccer leagues are just starting so the Parks Crew set up and striped the fields in the neighborhood parks and in- stalled the soccer goals. They had to repair the sink at Mendakota Park —the drain pipe had to be re- placed. They worked on chipping the brush in the back parking lot for dis- posal. Utility Report Rich checked the City's seven sanitary sewer lift stations daily. Rich had to come in Thursday at 9:00 P. M.-12:00 A.M. because of a power outage at the Northland Drive lift station. He worked on finishing spraying the parks for weeds. Street Report The Street Crew worked on patching Centre Pointe Boulevard and Drive and Walsh Lane streets. They installed replacement street name signs in the street re construction areas. John Ambrose fabricated a stencil for painting crosswalk bars. The Crew had to pick up tree limbs that fell in the street at 759 Creek where lightning struck a tree. They rented a chipper to chip the branches and the supply of branches that had accumulated in the back lot at the shop. Code Enforcement Report Paul is reviewing an applica- tion from a resident to build a new two story single fam- ily home at 592 Sibley Court. This is the second to last vacant lot within the Sibley Heights Subdivision. Estimated valuation of the home without the lot is $300K. A permit was issued to Eco- lab to install a water reser- voir to be used on a tempo- rary basis for testing pool chemicals and to Associated Bureaus to install additional signage at their facility on 1500 Commerce Drive. Augusta Shores Minnesota State Curb and Gutter started installing curb and gutter at Augusta Shores on Monday and fin - ished on Tuesday. The curb needs some time to cure, af- ter which the remainder of the Class 5 gravel base will be installed. Blacktop pav- ing could occur as early as next week. Street Reconstruction Driveway replacements and driveway apron fill-ins were installed this week, two side- walk replacements were made and curb repairs done within the Rogers Lake neighborhood. The street contractor started rough grading boulevards in prepa- ration for black dirt and sod installation by the landscape contractor. NSP's subcontractor, Mueller Pipeline, finally finished their lawn restoration work in the Sylvandale Road area, now our subcontractor can begin our boulevard restoration work in the area. Cemstone Wetlands Brush On Tuesday of this week, Cemstone's landscape con- tractors removed the black willows from in front of their building. They did the work without disturbing any soil as approved by the City Council. NEWS Public Works The Pipeline Code Enforcement LETTER August 4, 2000 Parks Report The Parks Crew picked up trash daily from the parks, mowed the grass, dragged and chalked fields and striped foul lines on an as needed basis. They prepared the fields for the Men's over thirty softball play- offs. They aerated the soccer fields and ballfields. They topdressed the soccer fields and ballfields at Menda- kota and Kensington Parks. They cut out and removed diseased and dam- aged sod at the soccer goals and resodded and seeded the areas. The crew cut up and removed downed trees and dead trees from Mendakota, Valley and Victoria High- land Parks. They performed mainte- nance on the landscaped berm at North Kensington Park. Weeding these berms is very labor intensive and requires whipping, pulling and applying chemicals to the weeds, while at the same time avoiding do- ing damage to the good plants. They had to repair two broken sprinkler heads at Kensington Park. Utility Report Rich checked the City's seven sani- tary sewer lift stations daily. Rich in- spected the sanitary sewer service repair work that was being done at 1951 Victoria Curve. He worked with the resident at 748 Pontiac Place to determine the cause of a back-up -- it was roots in the private service. He performed the annual inspection of Lilydale's lift station with Braun Pump's assistance. Rich's summer helper is gone for the next 2 1/2 weeks, operating the sewer jetter is a two person job so he will be unable to clean sewer lines for a while. Street Report The Street Crew picked up some ex- cess sandbags from the City of Eagan and installed them at a storm water runoff ditch adjacent to the Bloom- ington Lake Clinic. The ditch has been over -flowing and flooding the Clinic during heavy rainfalls. They cleaned out a ditch on Knob Road to address a residents' complaint. The crew worked on making up and replacing some missing street name signs, changed out a faded stop sign and replaced some burned out traffic signal lights at Highway 13 and Pilot Knob Road and Lexington and TH110. The City's agreement with the State and County requires us to maintain these lights. They worked on overlay- ing a portion of 1st Avenue. They removed the stop signs on Decorah Lane at Ocala Lane. Code Enforcement United Properties has submitted plans for a building permit to finish out of- fice tenant space at their Mendota Heights Office Center III building lo- cated at 1210 Northland Drive. The new tenant will be Paychex MPLS, who will be occupying 29,150 sf or about half the building. The permit was cal- culated based on a valuation of $550,000. Paychex is hoping to oc- cupy their new space by October 15, 2000, The City has just received another MAC noise attenuation permit. Socon Construction is the contractor doing the work at 2311 Swan Drive, (Dick and Dorothy Bjorklund). This is the first noise attenuation permit the City has received in a very long time and is valued at $48,500. Verizon Changes Antennas Verizon formerly AirTouch formerly US West New Vector was the first wire- less communications company to in- stall antennas on the City's water tower (1991). Verizon began last Thursday changing out some of their antennas to new, more modern ones. They also repositioned one bank of antennas to improve its usefulness. The foreman on the job told me Tues- day that they would finish their work, including repainting by the end of this week. APT is another wireless communica- tions company with antennas on the water tower and they have informed the City that they will be changing their antennas to these new, more modern ones in the near future. Safety Training Safe Assure conducted safety training for affected Public Works personnel on confined space entry and overhead crane operation this Thursday from 1:00 pm-3:OOpm. Year 1000 Street Reconstruction The Contractor finished concrete curb and gutter construction on Kressin, Roger, and Swan Drive last Saturday. NSP completed gas main installation work in the Ivy Falls area this week. Sod replacement will follow immedi- ately in the Ivy Falls neighborhood by NSP. All sod replacement work re- lated to the NSP gas main work will be finished before the placement of any bituminous overlay in the Ivy Falls area. Driveway construction activities resumed again at the end of the week. The Contractor has begun to shape and tolerance the streets in the Rogers Lake neighborhood where con- crete curb and gutter was recently poured to prepare them for the place- ment of the bituminous base. Bitumi- nous base course construction in the Rogers Lake area should be underway soon. Augusta Shores Improvement Proiect Erickson Construction has essentially completed utility construction on the Augusta Shores project. The Contrac- tor has begun to shape and tolerance the street subgrade in the Augusta Shores development in anticipation of the placement of some of the aggre- gate base for concrete curb and gutter construction. NEWS Public Works Engineering Code Enforcement LETTER Parks Report The Parks Crew picked up trash daily from the parks, mowed the grass, dragged and chalked fields and striped foul lines on an as needed basis. The crew replaced a broken lawn sprinkler valve at City Hall by the Police entrance. The two summer time helpers that were hired to work the weekends at the ball tourna- ments failed miserably last weekend. Mike and another reliable summer helper had to come in and replace them. Monday after the tournament, the Crew had to clean up the park and remove the pitchers mounds at Mendakota Park. The Crew hauled in and lev- eled rec rock for fields at Hag- strom-King and Victoria High- lands neighborhood parks. They also had to haul in Class 5 rock to repair a washout that occurred in left field near the Hagstrom-King pond as a re- sult of Tuesday evenings 11/2" rainfall. They picked up re- placement boards for the bridge at Valley Park. These boards had to be special or- dered —because the ones we bought 'off the shelf' swelled and warped to the extent they caused a walker to stumble and be injured. Utility Report Rich checked the City's seven sanitary sewer lift stations daily. Rich and his summer helper cleaned sanitary sewers on Lilac Lane, Vicki Lane and The Pipeline July 28, 2000 Douglas Road from James Road to Lilac Lane. Rich investigated a wet spot at 2331 Fieldstone Drive, found it to be a leaking water service box and reported it to St. Paul Regional Water Services (St. Paul Water Utili- ties' new name). Street Report The Street Crew worked on patching streets in the Copper - field neighborhood this week. They finished making up new street name signs for the street reconstruction areas— a total of 61 new signs were made. They worked on improving some sight distances: Wentworth and Wachtler, Marie and Dodd Road and Victoria and Celia. They had to remove a tree that was blown down as a result of Tuesday nights' storm. The tree was located at the end of 4ch Avenue and was blocking the street. Wetlands Health Team Leader Resigns Mara May who was a naturalist for Dodge Nature Center, was also Mendota Heights' Citizen Wetlands Health Evaluation Team Leader. Mara recently left the Nature Center and will no longer be able to serve as our team leader (see attached). Mara was an excellent team leader and will be missed. It will be most difficult to replace her. Code Enforcement Report To date there have been more new house starts in 2000 than in 1999 (12 vs. 9). This repre- sents $3M in valuation. The to- tal permit valuation for 2000 is $13.8M which is up $8M over 1999. Paul also received a per- mit application from Tharoldson Development Company this week to remodel their dining room at the Heritage Inn. Year 2000 Street Reconstruc- tion Valley Paving, Inc. placed the bituminous overlay in most of the Delaware Crossing neighborhood this week. The Contractor is preparing to con- struct concrete curb and gutter on Kressin Avenue, Roger Ave- nue, and Swan Drive in the Rogers Lake area this Friday and Saturday. NSP gas main work should be completed in the Ivy Falls area within a few days. Augusta Shores Improvement Proiect Erickson Construction com- pleted water main construction on the Augusta Shores project. They completed some of the re- quired sanitary sewer testing on the project. They started working on the installation of water services this week. Some storm sewer was con- structed this week and more is planned for next week on the project. Dakota County Wetland Health Evaluation Project ;nnsored by: c Dakom County >:nmental Education Program _'0i0 Sheet West, Suite 101 F:, ;ton, Minnesota 55024 (6_-S0-7734 FA:. 612) 463-g002 Emaii: ahover@exmnsion.umn.edu 1999 Cooperating Partners: City of Apple Valley City of Bumsville City of Eagan City of Farmington City. of Hastings City of Inver Grove Heights City of Lakeville City of Mendom Heights City of Rosemount City of South St. Paul City of West St. Paul Black Hawk Middle School Burnsville High School Dodge Nature Center Eastview High School Hastings High School Kenwood Trail Jr. High School McGuire Junior High School School of Environmental Studies Minnesota Pollution Control Agency Suburban Hennepin Regional Park District Team leaders and volunteers from Dakota County communities Consultants: BR W, Inc. An educational program vaing citizen monitoring to eva6mte +,aland health. Mara May Dodge Nature Center 365 West Mane Avenue West St. Paul, Minnesota 55113 Dear Mara: Thank you again for the outstanding job you have done as team leader for the Mendota Heights Wetland Health Evaluation Project team. Your professionalism, enthusiasm, and dedication are appreciated by all; and your team is an excellent example of an effective, productive volunteer monitoring team. I have appreciated the relationship forged between Dakota County and Dodge Nature Center as a result of this project, and I hope the nature center will continue to be involved in the Wetland Health Evaluation Project in the future. Best wishes for a wonderful next step in your life. I know you will continue to make meaningful contributions and have fun in whatever you chose to do. Thank you again for the contributions you have made to citizen monitoring in Dakota County as well as the friendship you have shown to me. Sincerely, Charlotte Shover, Coordinator Dakota County Environmental Education Program cc: Jim Danielson, City of Mendota Heights Administrator, Dodge Nature Center Funding for this project approved by the Ntinnesota Legislature, 1999 N'linnesom Law, Ch.231, Sec. 16, Subd. 21d as recommended by the Legislative Commission on Minnesota Resources from the Minnesota Environment and NEWS Public Works Engineering Code Enforcement LETTER Parks Report The Parks Crew picked up trash daily from the parks, mowed the grass, dragged and chalked fields and striped foul lines on an as needed basis. This week they are preparing four softball fields in Mendakota Park for the State AAU Baseball Tournament being held there this weekend. They had to build pitchers mounds on all the fields. They trimmed trees along pedways and behind the outfield fence at City Hall. They painted foul ball poles at Mendakota Park and City Hall. They had to paint over graffiti at the Friendly Hills warming house (working with cops to try and catch the vandal who did the work). They also had to repair a park bench at Mendakota Park that was damaged by vandals. Finally, they planted two orna- mental crab trees at City Hall this week. The trees were donated by the Mendota Heights Garden Club, as they have done annually over the past nine years. Utility Report Rich checked the City's seven sanitary sewer lift stations daily. Rich and his summer helper jet- ted the sanitary sewer lines clean on Walsh Lane to Marie Avenue, Rolling Green Curve and the easement area nearby and on Windwood Court this week. He assisted a resident at 1951 Victo- ria Road locate their sanitary sewer service. The line was plugged, so the resident hired Roto Rooter to televise the line. The line was broken and needed to be dug up and repaired. He discovered another buried man hole cover —this one near Rolling July 21, 2000 Green Curve. It was under a resi- dents flower garden, so Rich worked with the resident to raise the cover to the surface and he relocated the affected flowers. He performed a new sanitary sewer connection inspection for the new Ryan Construction Head- quarters building. Ryan had to raise one manhole 8 feet and an- other 5 feet to accommodate their new grades. He performed the fi- nal inspection of the sanitary sewer system with Tom Knuth for the Glen Toro Addition. Street Report The Street Crew worked mainly on patching streets this week. They patched potholes in the Freeway Road Addition. The Freeway Road streets are in very bad shape, but we tried not to go overboard with patching because the streets will need to be totally reconstructed in the very nearfu- ture. We have received several letters of request from the resi- dents asking that their streets be redone soon. It would be most efficient to redo the streets in conjunction with the Town Center Development. The Crew also worked on making replacement street name signs for the street reconstruction neighborhoods. DNR to Install Aeration Pump Guy, Marc and I met with Jerry Johnson from the DNR this week to locate the permanent pumping station at Roger's Lake Park. The DNR feels that the temporary portable aerator that they in- stalled at Roger's Lake this winter was a success and have budgeted $30,000 to install a permanent fa - cility this year. This plan will be brought to the City Council for fi- nal approval at their August 1st meeting. Code Enforcement Report Paul issued a building permit to Heaver Design and Construction for a new single family home in Ivy Falls South subdivision on Knollwood Lane. The home is a multi -level walkout home that has up to three levels exposed at one point in the rear. The home abuts the existing Cherry Hill neighbor- hood and the immediate neighbor to the rear called to express her concern over the size of the home and the drainage. There was no extraordinary restriction on this lot when approved by Council and the drainage appears to work cor- rectly —we will watch that it stays that way. Year 2000 Street Reconstruc- tion The Contractor constructed con- crete curb and gutter on Lake Drive this week. Some replace- ment of sod was done in the over- lay area of the Rogers Lake neighborhood. NSP gas main work continues in the Ivy Falls area. Driveway construction re- sumed again at the end of the week. Augusta Shores Improvement Project Erickson Construction continues with water main construction on the Augusta Shores project. Some storm sewer was con- structed this week and more is planned for next week on the pro- ject. NEWS Public Works Engineering Code Enforcement LETTER Parks Report The Parks Crew picked up trash daily from the parks, mowed the grass, dragged and chalked fields and striped foul lines on an as needed basis. City League soft- ball and baseball is winding down and the final tournaments for girls softball and boys baseball are this weekend. The fields will be prepared on Friday with sum- mer helpers doing the touchups and clean up over the weekend. I am unaware of any major dam- age anywhere in the City due to last weekend's storms, but there were a lot of limbs down in the parks and the Parks Crew spent the better part of the beginning of the week cleaning them up. There were two larger limbs that fell, one in Ivy Park and one by the pedway near Delta Dental that required the rest of the tree to be removed. Utility Report Rich checked the City's seven sanitary sewer lift stations daily. Rich had to use the City's sewer jet cleaner to open a culvert at St. Thomas Academy that was blocked by erosion from the Mid- dle School construction that oc- curred as a result of last week- end's storm. Rich and his sum- mer helper finished cleaning the City's sanitary sewer within the Eagle Ridge townhome and con- dominiums development and on Stratford and Coventry Court. John Boland was called in at 4:00 A.M. on Sunday for a high water alarm that occurred at a sanitary sewer lift station. The alarm had cleared and John found no prob- lem by the time he got there. Ah iffi=9 An July 14, 2000 Street Report The Street Crew had to install a temporary 4-way stop at North- land Drive and Pilot Knob road on Friday because a power line was knocked down. They had to re- move a patch of marijuana that was growing wild on a lot at the end of Waters Drive. They had to reinstall the stop sign on east bound Decorah Lane at Ocala (for the sixth time). The sign had even been installed in concrete the last time, so the per- son who removed it had to really be determined. They patched potholes in the Park Place neighborhood, Freeway neighbor- hood by Par 3 and on Marie Ave- nue this week. Lilvdale Watermain Analysis Because of the upcoming I-35E bridge construction, the City of Lilydale hired Barr Engineering to analyze whether it would be pru- dent to work with MnDOT to elimi- nate a deadend waterline on TH13 and to serve the Nursery, Ryan, and Tennis Club with water. See attached report —the cost would be too high to consider doing the work. Year 2000 Street Reconstruc- tion The Contractor continued working on Lake Drive grading and shap- ing the aggregate base section to the appropriate street and gutter elevations. This week they con- centrated on the north/south seg- ment of Lake Drive and the area west of Swan Drive. NSP gas main work continues in the Ivy Falls area. Bituminous driveway construction and patching be - tween existing driveways and re- placed concrete gutter continued again this week. Bituminous driveway construction resumed on Thursday. Sod replacement will commence next week in the Dela- ware Crossing neighborhood where sod was disturbed during concrete curb and gutter replace- ment work. Augusta Shores Improvement Project Erickson Construction continues with utility construction on the Augusta Shores project. The mainline sanitary sewer and most of the sanitary sewer services have now been installed. Con- struction started Thursday on the deeper segments of the storm sewer system that outlets the ex- cess runoff from the internal storm water retention basin for this development. Watermain construction is scheduled to begin on Tuesday. Personnel News Curt Wimpee returned this Wednesday from the Jacksonville Florida area where he intends to relocate after interviewing with a number of prospective employers. Curt's training and experience have served him well based on the six job offers that were ex- tended to him after these inter- views. These offers were all made before Curt learned on Thursday that he had passed his Professional Engineer's exam. Congratulations to Curt on these recent developments. Attachment: • 35E Water main crossing re- port Barr Engineering Company 4700 West 77th Street • Minneapolis, MN 55435-4803 Phone: 952-832-2600•Fax: 952-832-2601 m Minneapolis, MN • Hibbing, MN • Duluth, MN • Ann Arbor, MI • Jefferson City, MO July 6, 2000 Honorable Mayor Ed Mullarky City of Lilydale 1101 Sibley Memorial Hwy #310 Lilydale, MN 55118 Dear Mr. Mullarky: The purpose of this letter is to present to the city of Lilydale a brief discussion of the issues and costs related to the 35E water main crossing. The letter will include project background, a discussion of the need for the project and its goals, three alternative alignments, preliminary costs for one of the alignments and a summary. Project Background Due to recent development within the City of Lilydale the existing water system was analyzed to verify that it could supply adequate fire protection to the Stonebridge of Lilydale development in the west quadrant of Interstate 35E (35E) and Highway 13. Analysis indicated that the system can meet projected fire demands but that a few areas have other issues the city may wish to address in the future. One of those issues is the dead end that currently exists on Highway 13 just east of 35E in the vicinity of the bridge over Lilydale Road shown on Figure 1. The Lilydale Comprehensive Plan Public Facilities discussion identifies the elimination of this dead-end. In addition to this there are several developed properties between Lilydale road and 35E that do not have City water and are currently on wells. At the same time the Minnesota Department of Transportation (MuDot) has been in the process of designing significant modification to the 35E bridge over the Mississippi River. The project will involve rerouting traffic from one side of the freeway to the other so that at some point during construction each direction of the road will be without traffic. This is important because it provides the Cities of Lilydale and Mendota Heights with a rare opportunity to construct utility crossings of the freeway with open cut methods potentially reducing costs. Because of this the city of Lilydale has instructed Barr Engineering to look into the possibility of constructing a watermain across 35E and connecting the dead end discussed above into a portion of the water system west of 35E and coordinating the construction with MnDot work to gain efficiency and potentially reduce cost. Project Need and Goals The primary reason this project is being considered is to eliminate the dead end mentioned above at this opportune time when Lilydale can take advantage of the 35E construction. A secondary benefit is the potential to serve the developed properties between 35E and Lilydale road if one of the proposed alignments is constructed. There are several reasons dead ends are undesirable on water systems. One is that dead ends limit water circulation. If use is low on the dead end, degraded quality and poor taste often results. To our knowledge neither Mendota Heights nor Lilydale has received any quality complaints from this area to date Another benefit of eliminating dead ends is that water users along dead ends are at a greater risk for interruption of service than those in looped service areas should a water main break occur. Those in looped areas can receive service from the portion of the loop away from the break. Obviously when a break occurs on a dead end those on the wrong side of the break have no other options. This remains an issue for the properties along the dead end on Highway 13. Finally, probably the most important benefit of looping the system is that it will improve fire flow to the area by providing a second path for water to travel to hydrants that are currently at the end of the line on Highway 13. It should be noted that fire flows to the hydrants on the dead end were not modeled in the earlier work done for the Rancone development. Additional modeling would be needed to quantify the benefit to the area. Another point of project need worth noting is that eliminating this dead end is recommended in a document titled "Mendota Heights Water Study" prepared in 1991 by HNTB. Alternative Alignments The main alignment looked at is shown on Figure 1 as Alignment 1. Two other alignments are shown on the figure for comparison. They were developed to reduce rock excavation or eliminate the bridge crossing over Lilydale road. Due to the limited scope of this study neither of the other alignments were reviewed in depth and no costs estimates were prepared for them, however each has some benefits as compared to Alignment 1. Of the alignments only Alignment 2 could be described as conventional watermain construction and all will likely have some rock excavation. Each has significant drawbacks that are discussed below. None of the drawbacks make any of the alignments impossible but they do make them more costly. Alignment 1 Alignment 1 is the original proposed route and essentially is the shortest distance between the original proposed connection points on the system. Running north east from the comer of Highway 13 and Victoria Road it crosses 35E perpendicular to the lanes of traffic and would jog to the east to avoid a proposed bike trail and then head across Lilydale Road on the Highway 13 bridge to connect to the dead end. There are a number of significant drawbacks to this alignment, which are as follows: 1. Virtually all of the alignment is constructed in rock to some depth, and almost all rock near 35E and Lilydale Road is at the surface. Some of this rock is sand stone and will be relatively easy to excavate, however, some is limestone and will be difficult. 2. NSP has a natural gas facility on the east side of 35E that will require significant consideration during design and may result in further alignment adjustments.. The facility appears as four small white buildings on Figure 2 south of Highway 13 between the 35 E ramp and Lilydale road. 3. The bridge over Lilydale road will be very difficult to work on. There may not be enough room to connect an insulated water main to the bridge and clear the cross braces that exist at regular intervals between each of the bridge beams. MnDot does not allow utilities to be strapped to the outside of the bridge and hanging the main under the cross braces results in conflicts with the pier caps. Construction of the main in the valley under the bridge rather than on it would be no easier since rock is at the surface at many points along the steep wooded banks and there is a creek in the middle that would require other special construction. Alignment 2 This alignment eliminates most of the problems with Alignment I by avoiding the known rock outcrops and avoiding the bridge area entirely. Some rock will still be encountered but it should be less than in the other alignments. The draw backs of this alignment are as follows: 1. The developed property between Lilydale road and 35E remains unserved. 2. Almost the entire alignment is believed to be on, or immediately adjacent to, the NSP gas site. Because of this there will likely be significant route modifications to make it through or around the tank field. The tank field can be seen on Figure 2. 3. The alignment provides very limited benefit to the west side of 35E, though it should be pointed out that earlier modeling indicated no significant deficiencies in that location. Alignment 3 This alignment would actually pass under the 35E bridge and require a little less coordination with MnDot's 35E project. It could potentially serve the property between Lilydale Road and 35E, and potentially even the Yacht Club could receive a service under this alignment. As with the other alignments this one also has its drawbacks, which are as follows: 1. Lilydale would have to coordinate with Stonebridge of Lilydale developers or one of the other developments along the bluff to get a water main down to the area below the 35E bridge. 2. Rock will likely be a significant factor along this alignment again. 3. Some of the construction would be difficult, as it would occur along steep wooded slopes. 4. There may be some environmental issues due to the route along the river. 5. The services to the properties between Lilydale road and 35E are not simple connections by any means and would have to run up steep slopes and probably be built in rock again. None of the alignments represents easy construction with the possible exception of Alignment 2, which ends up not providing service to the property between 35E and Lilydale Road. All require some rock excavation. It is undeniable the 35E project represents an opportunity to cross the freeway with much less complication than normal, however it is also clear that any utility work in this area will be expensive and involve significant rock excavation. Costs A preliminary planning level cost estimate was prepared for Alignment 1 and includes only a general breakdown of quantities. In order to address the uncertainty of a project such as this, a cost range is provided. As shown on Figure I Alignment i is estimate to cost between $477,000 and $730,000 to construct. The two most significant contributing factors to the high cost are rock excavation and attaching the main to the bridge, which account for about 40% of the total project cost. Note the costs shown here do not include administrative costs, engineering design, soils investigations, easement acquisition, legal issues, or permit procurement. These items could easily approach $100,000 for a project of this difficulty. Summary In summary the city should expect to spend no less than $477,000 to construct Alignment 1, and should be prepared to pay as much as $730,000. Other alignments may be more cost-effective in eliminating this dead end but none allows service to be brought to the properties between Lilydale road and 35E without significant expense. Barr recommends that the Cities of Lilydale and Mendota Heights contact the businesses along Highway 13 in the vicinity of the dead end and verify that they are satisfied with their water quality. In addition to this fire flow to the dead end should be looked into further to quantify the benefit of the project. If the fire flow is inadequate or if the customers complain of poor water quality then the project becomes a more significant issue. Even if fire flow and water quality appear to be adequate eliminating dead ends is always good practice. Because of this Barr recommends that both Lilydale and Mendota Heights continue to pursue eliminating this dead end and then plan the work accordingly. Before making a final decision it would be wise to further investigate Alignment 2. Sincerely, Brian K. LeMon BKL/mis C: Joey Lundquist, MuDOT Bernard Weitzman, City of Lilydale James Danielson, City of Mendota Heights ::ODMA\PCDOCS\DOCS\218026\I NEWS Public Works Engineering The Pipeline Code Enforcement LETTER June 23, 2000 Parks Report The Parks Crew picked up trash daily from the parks. The Crew dragged and chalked fields and striped foul lines on an as needed basis. They prepared the fields at Mendakota Park for the Women's Sibley Area fast pitch softball tournament that was held last weekend. They aerated all the soccer fields. They began fertilizing the lawn areas and applying a second ap- plication of crab grass preven- tion. They repaired a broken swing set at Rogers Lake Park. The Crew had to clean up fire damage at the Kensington Park men's bathroom that was done by vandals. Vandals have started fires in the men's bath- room three nights this week. We are working with the Police Department to try and catch these delinquents. Somehow we either have to catch them or find a way to stop them. Utility Report Rich checked the City's seven sanitary sewer lift stations daily. Rich repaired the door lock to the Northland lift station, and he responded to a power outage at the lift station that occurred Monday morning. He jetted the sanitary sewer lines clean on Willow Lane, Ridge Place and Wachtler Avenue. He replaced a broken manhole cover at Dodd Road and Wagon Wheel Trail. Street Report The Street Crew worked on patching streets in the north end of the City (Maple Park Drive and Spring Street). They in- stalled "No Dumping" signs at the City's storm sewer holding pond lot at Caren Road. These signs were installed at the request of several of the residents who are trying to get their neighborhood to quit using the site as a grass clipping and brush disposal area. The Crew also began making re- placement street name signs for this years street reconstruction project. They patched the drive- way apron at the entrance to Wentworth Park. Alice Lane Subdivision Two Improvement Proiect The first lift of bituminous paving for the Alice Lane Subdivision Two Project was placed on Thurs- day of this week. Year 2000 Street Reconstruc- tion Bituminous driveway construction work started Wednesday of this week in the Ivy Falls area. The Contractor scheduled the place- ment of the first layer of bitumi- nous paving on Cheyenne Lane and the major bituminous patch- ing work on Apache Lane this Fri- day weather permitting. NSP Gas main work in the Rogers Lake neighborhood was finished this week, and now will com- mence in the Ivy Falls area to re- place the gas main system in this neighborhood. Bituminous over- lay work in the Ivy Falls area will not begin until the gas main work is finished. Storm sewer con- struction continues in the Rogers Lake area this week. The Con- tractor is planning to reclaim the remaining bituminous pavement on the streets where new con- crete curb and gutter will be con- structed in the Rogers Lake area next Monday. There has been measurable precipitation re- corded on 22 of the 33 working days since this project began. The combination of this weather pattern, and the high volume of residential driveway replacement contracts (55) have contributed to the slower than expected pro- gress on the project. Glen Toro Second Addition improvement Project The second and final lift of bitu- minous paving that was planned for construction last Friday for the Glen Toro Second Addition Project was postponed for a pe- riod of time to accommodate a period of busy and congested home building construction activ- ity in the development. Augusta Shores Improvement Project G. L. Contracting has completed the structural grading this week on the Augusta Shores project. Now the grading Contractor will concentrate on placing non- structural fill throughout the pro- ject, and on the re -spreading of topsoil. All grading should be completed in about a week with favorable weather. A pre - construction meeting was held Monday for utility and street con- struction on the project. Erick- son Construction is the General Contractor for utility and street construction under the City's contract and plans to begin some minor utility construction starting next week. NEWS Public WorksEngineering The Pipeline Code Enforcement LETTER June 16, 2000 Parks Report The Parks Crew picked up trash daily from the parks. The Crew mowed grass, dragged and chalked fields and striped foul lines on an as needed basis. They also worked on trimming brush along the pedways and around the tennis courts. They hauled black dirt to Rogers Lake Park to fill in and repair the stump holes from the dead elm trees that were recently re- moved. They planted roses at Rogers Lake Park that were do- nated by a neighbor. Utility Report Rich checked the City's seven sanitary lift stations daily. Rich responded to a residents call for help at 1910 Knob Road. Their sanitary sewer service line was blocked with tree roots very close to its connection with the City's main and they requested that Rich clean the City's lines to remove any roots that may have gone into it. Rich also cleaned the sewer lines in Mager Court, Dodd Road and in the Hilltop Road area. He cleaned Dodd Road from Ivy Hill Drive to the Som- merset easement. Street Report The Street Crew finished patch- ing potholes within the Som- merset neighborhood. They cleaned up and removed stump grindings from a boulevard tree removed at 572 Hiawatha Ave- nue. They filled the hole with black dirt and seeded it. They replaced the light bulbs in the traffic signal at Mendota Heights Road and TH 55 (per MnDOT's order —see attached). They trimmed bushes to improve traf- fic sight distance at several in- tersections. They replaced sev- eral street name signs that were missing. Year 2000 Street Recon- struction Concrete gutter replacement work has now been essentially completed throughout the entire project. On Thursday, the Con- tractor began preparation work on Cheyenne Lane in prepara- tion for bituminous paving. The Contractor is going to concen- trate on completing driveway replacement work in the Ivy Falls area starting next Tuesday. NSP Gas main work in the Rogers Lake neighborhood was finished this week. Storm sewer construction commenced in the Rogers Lake area this week and will continue next week. Alice Lane Subdivision Two Improvement Project Curb and gutter construction for the new street and cul-de-sac to serve the Alice Lane Subdivision Two development was sched- uled for Friday. We anticipate that the first lift of bituminous paving will follow within a cou- ple of weeks. Glen Toro Second Addition Improvement Project The second and final lift of bitu minous paving for the Glen Toro Second Addition Project was planned for construction on Fri- day. Augusta Shores Improve- ment Project G. L. Contracting continued rough grading operations this week on the Augusta Shores project. A pre -construction meeting has been scheduled for next Monday for utility and street construction on the pro- ject. Erickson Construction is the General Contractor for utility and street construction under the City's contract and is anx- ious to begin utility construction as soon as the grading is fin- ished. Grading on the project continues and should be com- pleted in about a week with fa- vorable weather. Code Enforcement Report The City and Minnesota Pollution Control Agency had received complaints from employees of Specialty Equipment Company (northwest corner of Mendota Heights Road and Pilot Knob Road) that their cars were being impacted by paint powder that was being put in the air by their neighbor, Applied Coating Tech- nology. Dick Gill and Bob Berg, MPCA, met with Applied Coating Technology's plant manager this week to discuss the problem. Applied Coating is in the process of amending their operation to eliminate the emissions, they are currently paying owners of the impacted cars to have their cars buffed clean. , HESO, e ot Minnesota Department of Transportation Metropolitan Division Waters Edge 1500 West County Road B2 Roseville, MN 55113 TRAFFIC OFFICE June 14, 2000 Mr. Jim Danielson City of Mendota Heights 1101 Victoria Curve Mendota Heights, MN 55118 Dear Mr. Danielson: SUBJECT: Traffic Signal Maintenance This spring, Mn/DOT personnel conducted signal maintenance checks of all State operated signals. These maintenance checks included a general diagnostic of all traffic signal components including cabinet equipment, pedestrian pushbuttons, signal heads and lamps, detection and luminaires. During our semi-annual signal operation check, the following signal and or streetlights were found in need of relamping. This requires immediate attention for which you are responsible as per agreement between your agency and the State of Minnesota. T.H. INTERSECTION LUMINAIRES DON'T WALK WALK 55 Mendota Heights Rd. OK Numerous Numerous 149 Mendota Heights Rd. OK OK OK It should be noted that the above items were found at the time of the signal maintenance check. Other items may have failed since then, and the entire intersection should be checked when you perform your maintenance. It is important that signal lenses and reflectors are cleaned when lamps are replaced. If lenses or reflectors are stained, burned, broken or will not clean, contact Mn/DOT Electrical Services at 612- 725-2310 for replacement. According to agreements between the city and Mn/DOT, it is the responsibility of the city to relamp. If you have any questions, please contact Dan Lowe at 651-634-2132. Sincerely, Steve Mrsgen' - Signal Operations Engineer An equal opportunity employer Jim Danelson 1101 Victoria Curve Mendota Heights, MN 55118 Dear Jim Danelson, Just a note to thank one of your associates Dave Sorby for his great job in regards to a fallen tree in our neighborhood. Dave was very thorough, courteous, and helpful. Please give Dave a Big Thanks from me and our neighborhood. Sincerely, /-3 '4 �� Bill Doody 18 Hingham Circle Mendota Heights, MN 55118 June 10, 2000 Mr. Jim Danielson City of Mendota Heights 1101 Victoria Curve Mendota Heights, MN 55118 Dear Mr. Danielson, Just a quick note to let you know how impressed I was with the helpful and professional attitude of Rich Burrows. On June 7t^, I had a main drain plugged. I had a sewer cleaner coming and I called City hall to see if the city had a sewer camera. Some cities have them, for example, Fridley. I had always thought the drain went out the back (South) and headed to Dodd Road (East). Mr. Burrows stopped by and checked manholes on Dodd Road and on Sunset Lane. Then he went back to check prints and he let me know where my main pipe is located. Thank you for having a quality, professional employee on your staff Best Regards, PJamesLake/ 630 Sunset Lane Mendota Heights, MN 55118 NEWS Public Works Engineering Code Enforcement LETTER Parks Report The Parks Crew picked up trash daily from the parks, they dragged and chalked fields and striped foul lines on an as needed basis. The Parks Crew worked last weekend to help make the Celebrate Mendota Heights Parks a success. They hauled out stump grindings that were left at Rogers Lake Park and Wentworth Park where some trees had been removed. They performed repairs to the Friendly Hills warming house (furnace exhaust pipe). The Crew hauled in and spread more rec-rock to fields #2 and 3 at Mendakota Park where some depressions had formed and were holding water. They over - seeded the hockey goal mouth areas at Mendakota Park and at City Hall by the Police Station entrance. They had to replace light bulbs in the pavilions at Mendakota Park. Utility Report Rich checked the City's seven sanitary lift stations daily. Rich had to replace the battery for the alarm system at the St. Tho- mas Academy lift station. J.P. Lipton, his summer helper, started this week. This is J.P.'s third summer and he has done a good job. Now that J.P. has started, Rich will be able to begin jetting the sanitary sewers clean, jetting the sewers is a two -worker job. They began by cleaning Wesley Lane, Wesley Court, South Lane and Mager Court. Rich per- formed a sewer inspection for a The Pipeline June 9, 2000 new home at 2210 Rogers Court. Rich was called out Wednesday to 630 Sunset Lane for a sanitary sewer backup. This time the problem was in the homeowners private service lead, not the City's main. He located a buried manhole cover at Mager Court and he coordinated with the homeowner to raise the manhole to grade. He also worked with Paul Dreelan, who does the maintenance work for Country Day Childcare Center, to locate several other "missing?" manhole covers. One is buried three feet and will have to be raised or oth- erwise uncovered next week. Street Report The Street Crew had to repair a catch basin inlet in Copperfield that was installed off center and had caused a hole to form in the street. They worked on repairing potholes in Copperfield and Kay - Walsh neighborhoods. They in- stalled a stop sign at the exit to Kensington Park's parking lot. Year 2000 Street Reconstruc- tion Concrete gutter replacement work continues throughout the project. The Contractor has commenced driveway replace- ment work for property owners that had requested replacement of their driveways in conjunction with the project. NSP Gas main work continues in the Rogers Lake neighborhood and could be finished by Tuesday. Residents will be without gas service for a short period of time when the property owner's gas services are connected to the new main. Storm sewer construction in the Rogers Lake area is scheduled to begin next Monday. Alice Lane Subdivision Two Improvement Proiect The Engineering Department has staked the curb and gutter for the new street and cul-de-sac to serve the development. We an- ticipate that street construction on the project will commence soon. Augusta Shores Improvement Project G. L. Contracting has resumed rough grading operations on the Augusta Shores project this week. The Contractor has in- formed us that they have about a week and a half worth of work left to complete the grading on the project with favorable weather. Sod Replacement Program Marc Mogan met with Dave Gamez a turf grass specialist with Northstar Turf on Wednesday to observe and make specific rec- ommendations with respect to the problems with the grass in the Tilsen's Highland Heights neighborhood. His initial reac- tions were that problems and so- lutions were not as complicated as some have suggested. Marc Mogan summarizes Dave's com- ments in the attached memoran- dum, and his recommendations will be incorporated into the re- pair work undertaken by the City. Attachment: 0 Turf Memo Memorandum To: Kevin Batchelder, Mayor and City Council Members From: Marc Date: June 7, 2000 Re: Tilsens's Turf Inspection on 6/7/00 with Dave Gamez, NorthStar Turf 1. Dave inspected the topsoil in the center island on Lilac Lane and found it acceptable in composition and depth. He recommended that the weeds in the center island be killed with Roundup. After the weeds had been dead for a period of time. He recommended that the area be tilled using a rear tine tiller to a depth of approximately 2 to 3 inches. A rear tine tiller creates a very suitable surface for seed application. Then he recommended seeding the area with their Tough Turf seed mix. Kentucky Bluegrass sod is neither salt nor heat tolerant, and probably will never do well at that location under the current conditions. 2. He believes that the problem on Anita Stockton's boulevard at 969 Caren Road is caused by a high acid soil related to the large cottonwood tree that was there for years. It was his opinion that nothing would grow there until this condition was corrected. Again he recommends killing the weeds, followed by rear tilling and incorporating probably 150 pounds of lime into the soil. Then the area could be re -sodded or seeded. 3. A lot of problems he sees with the sod adjacent to the curb is from the effect of salt and sand from snowplowing. He recommends that property owners sweep the sand and grit that has accumulated on the boulevard into the gutter before the City sweeps the streets in the spring of the year. The high Kentucky bluegrass content of the sod that is installed in the boulevard typically will always be susceptible to the effects of heat, salt and sand from snowplowing. 4. The root structure of the grass will grow to a depth of no greater than four inches. Residents claim that the reason the sod has not established is due to the debris that is buried underneath the sod. Any debris deeper than six inches below the surface will have no effect on the health of the sod. The underlying soil beneath the sod will be excavated, roto-tilled, or subcut to a depth of six inches below the surface to look for evidence of debris. Where debris is found it will be removed. Soil tests will betaken randomly to determine the pH level and fertilizer requirements for these areas. If the soil tests determine that the soil should be conditioned, the City will add the necessary chemicals. If the topsoil is found to be deficient it will be removed and replaced. The City property on the north end of Tilsen's between James Road and Lilac Lane is in good condition for an area that is not maintained, but could be treated with Trimec and fertilized to improve the turf in that area. (over) 6. He made general recommendations that the City specify four inches of topsoil and mineral sod as opposed to peat sod on future projects. Mineral sod seems to root more effectively in a new location when it's laid. He also recommends that the City specify Medalist seed as opposed to Scotts for the sod. He is of the opinion that the Scotts seed is not as advanced in the areas of disease resistance, hardiness, etc. 7. He is a believer in aeration, Trimec, and slow release non-ag fertilizer. NEWS Public WorksEngineering The Pipeline Code Enforcement LETTER June 2, 2000 Parks Report The Parks Crew picked up trash daily from the parks, dragged and chalked fields and striped foul lines on an as needed basis. They also cut up and removed several dead Elm trees from Rogers Lake Park. They planted some shrubs at the But- ler Avenue entrance to Ivy Park to screen a new home from the parking lot. They also replaced several dead shrubs around park signs. They attended a grounds keeping clinic at Woodbury on infield renovations and mainte- nance. They worked on prepar- ing Mendakota Park for "Celebrate Mendota Heights Parks" which is to be held this weekend. Utility Report Rich checked the City's seven sanitary lift stations daily. The Northland Drive lift station was "bugged" this week. Ants en- tered the inside of the control panel and caused the pump me- ter to short out. Rich had to re- place the meter and put out some ant poison to kill the ants and solve the problem. Rich visited 666 2nd Avenue to re- view a settlement in the front yard. The resident was con- cerned that the settlement might be as a result of a sani- tary sewer failure. Rich could find no evidence that supported that concern. Street Report George and Tim worked with the Parks Crew to remove some trees from Rogers Lake Park. George operated the City's bob- cat with the grapple attachment to load the trees for removal. The Crew worked on pothole re- pairs in the Sommerset neighbor- hood and the Kay -Walsh area. Code Enforcement Report United Properties has submitted their plans for a permit for the building shell at 1210 Northland Drive, Phase III Mendota Tech- nology Center. They had previ- ously been issued a footing and foundation permit. The building has 61,320 square feet of area and is valued at $2.4 million. R.J. Ryan has submitted their plans for a new office at 1120 Mendota Heights Road (right where Lexington Avenue inter- sects with Mendota Heights Road). The new building will serve as their office headquar- ters. It is 9,344 square feet of office space and 1,456 of garage space with an estimated valua- tion of $600K. R.J. Ryan will be at next Tuesday's City Council meeting requesting a zoning change to comply with the City's Comprehensive Plan. There was a new single family home permit issued for 1851 Or- chard Hill. The contractor will be Minnesota Custom Homes and the home is valued at $600K. Year 2000 Street Reconstruc- tion Concrete curb and gutter remov- als have been completed throughout the overlay project area and the concrete gutter re- placement work will continue through the early part of next week. The Contractor has begun to remove some of the bitumi- nous driveways for property own- ers that had requested replace- ment of their driveways in con- junction with the project. NSP Gas main work continues in the Rogers Lake neighborhood. Alice Lane Subdivision Two Improvement Proiect Ryan Contracting Company com- pleted construction of the sani- tary sewer, water main, and house services for the new lots this week. The Contractor re- quested that the Engineering De- partment stake the curb and gut- ter for the new street and cul-de- sac to serve the development. We anticipate that street con- struction on the project will com- mence soon. Augusta Shores Improvement Proiect The wet weather prevented G. L. Contracting from making any progress on the rough grading operations on the Augusta Shores project this week. The site will have to dry out before the Contractor can resume grad- ing on the project. Sod Replacement Program Last week notices were sent out to all residents in the Tilsen's Highland Heights and Bunker Hill's project neighborhoods out- lining the conditions of a program for the replacement of sod that failed to survive in conjunction with those street projects com- pleted in 1997 and 1998 respec- tively. Attachments: • Sod letters City of Mendota Heights May 26, 2000 TO: Tilsen's Highland Heights Street Reconstruction Project Area Property Owners FROM: Marc S. Mogan, P.E., Civil Engineer SUBJECT: Boulevard Sod Replacement Program - Tilsen's Highland Heights Neighborhood DISCUSSION: Starting last fall a number of Tilsen's Highland Heights residents contacted staff to request that the City replace sod that failed to become re-established after it was installed in the summer and fall of 1997 in conjunction with the Tilsen's Highland Heights Street Reconstruction project. There are several locations throughout the project where it is obvious that the sod has not survived during this 3-year period for whatever reason. The situation is not universal, and many times it varies between adjacent properties. Over this period of time the level of care (watering, etc.) given the sod replaced in conjunction with this project varied between properties. Given the number of variables that come into play in this sod replacement work, it is difficult to establish which factors may be responsible for either the success or failure in the establishment of the sod at one location and not another after this period of time. Council's primary focus at this point is to offer a reasonable and practical solution to this situation rather than dwell on the possible causes at this point. Council directed staff to research the extent of this problem and administer a program that would rectify the situation. The whole issue of establishing which areas should be repaired, and where this work should terminate could be somewhat subjective. In many instances it is apparent where the sod was originally replaced. The size of these areas varies considerably. The minimum lot width in Mendota Heights is 100 feet. If the original area disturbed behind the curb in the boulevard was 12 feet wide, the sod area replaced would be approximately 140 square yards. We have estimated that the cost to replace an area of this size would be approximately $600. There are some properties where the lawns outside of the boulevard areas restored under the street project are also in bad condition, and Council understandably has reservations about replacing any sod on properties under these circumstances. Council does not want to initiate sod replacement at considerable expense only to experience a similar outcome. Under these circumstances, Council has determined that it would be reasonable and appropriate to require the property owner to assume a certain level of responsibility for any sod repair work undertaken by the City at this time. (over) 1101 Victoria Curve • Mendota Heights, MN • 55118 (651) 452-1850 • FAX 452-8940 Adequate watering of any sod replaced is probably the most important aspect in this sod replacement program. It is not practical, or feasible for a Contractor in this industry to water the small or scattered areas of sod which could conceivably be replaced throughout this neighborhood. Consequently, Council has decided that it shall be the property owner's responsibility to water any boulevard sod that the City might replace. It would not be prudent for the City to begin a program such as this without some assurance that the property owner would uphold their responsibility in this matter. As a gesture of good faith by the Property Owner, Council will require that the homeowner submit a $100 check payable to the City prior to initiating any work on a particular property. This money would be placed in escrow, and refunded to the property owner prior to Thanksgiving in the Year 2001 if the sod is established and growing. The property owner will forfeit the $100 escrow if an inspection determines that the sod has not survived over this time period. Property owners interested in having boulevard sod replaced by the City are being asked to accept the following conditions relative to boulevard sod replacement under this program: 1. Sod replacement would not occur outside of the limits of the original work. 2. Existing boulevard grades would not be changed or adjusted. 3. The match line where new sod meets established sod would be constructed with equipment and methods standard to the industry. 4. No topsoil would be brought in, on which new sod would be placed. (Any existing soil that can retain moisture is suitable) 5. Soil preparation prior to the placement of replaced sod would be performed in conformance with typical industry practice. 6. It shall be the homeowners responsibility to water replaced sod. 7. Fill out and return the enclosed form to the City, and submit $100 check payable to the City to initiate this boulevard sod repair work (Repairs would commence as soon as possible). 8. The $100 escrow will be refunded to the property owner prior to Thanksgiving in the Year 2001 if the sod is established and growing. 9. This will be the last time this issue is considered by the City. Council hopes that you find this proposal to be a reasonable and acceptable solution to address any boulevard sod problems you may be experiencing. Please feel free to contact me, or the Engineering Department, 651-452-1850, if you have any questions regarding the information presented. Sincerely, Marc S. Mogan, P.E. Civil Engineer MSM City Of Mendota Heights May 26, 2000 TO: Bunker Hills Street Reconstruction Project Area Property Owners FROM: Marc S. Mogan, P.E., Civil Engineer SUBJECT: Boulevard Sod Replacement Program — Bunker Hills Neighborhood DISCUSSION: A few Bunker Hills residents contacted staff to request that the City replace sod that failed to become re-established after it was installed in the summer and fall of 1998 in conjunction with the Bunker Hills Street Reconstruction project. There are several locations throughout the project where it is obvious that the sod has not survived during this 2-year period for whatever reason. The situation is not universal, and many times it varies between adjacent properties. Over this period of time the level of care (watering, etc.) given the sod replaced in conjunction with this project varied between properties. Given the number of variables that come into play in this sod replacement work, it is difficult to establish which factors may be responsible for either the success or failure in the establishment of the sod at one location and not another after this period of time. Council's primary focus at this point is to offer,a reasonable and practical solution to this situation rather than dwell on the possible causes at this point. Council directed staff to research the extent of this problem and administer a program that would rectify the situation. The whole issue of establishing which areas should be repaired, and where this work should terminate could be somewhat subjective. In many instances it is apparent where the sod was originally replaced. The size of these areas varies considerably. The minimum lot width in Mendota Heights is 100 feet. If the original area disturbed behind the curb in the boulevard was 12 feet wide, the sod area replaced would be approximately 140 square yards. We have estimated that the cost to replace an area of this size would be approximately $600. There are some properties where the lawns outside of the boulevard areas restored under the street project are also in bad condition, and Council understandably has reservations about replacing any sod on properties under these circumstances. Council does not want to initiate sod replacement at considerable expense only to experience a similar outcome. Under these circumstances, Council has determined that it would be reasonable and appropriate to require the property owner to assume a certain level of responsibility for any sod repair work undertaken by the City at this time. (over) 1101 Victoria Curve • Mendota Heights, MN • 55118 (651) 452-1850 • FAX 452-8940 Adequate watering of any sod replaced is probably the most important aspect in this sod replacement program. It is not practical, or feasible for a Contractor in this industry to water the small or scattered areas of sod which could conceivably be replaced throughout this neighborhood. Consequently, Council has decided that it shall be the property owner's responsibility to water any boulevard sod that the City might replace. It would not be prudent for the City to begin a program such as this without some assurance that the property owner would uphold their responsibility in this matter. As a gesture of good faith by the Property Owner, Council will require that the homeowner submit a $100 check payable to the City prior to initiating any work on a particular property. This money would be placed in escrow, and refunded to the property owner prior to Thanksgiving in the Year 2001 if the sod is established and growing. The property owner will forfeit the $100 escrow if an inspection determines that the sod has not survived over this time period. Property owners interested in having boulevard sod replaced by the City are being asked to accept the following conditions relative to boulevard sod replacement under this program: 1. Sod replacement would not occur outside of the limits of the original work. 2. Existing boulevard grades would not be changed or adjusted. 3. The match line where new sod meets established sod would be constructed with equipment and methods standard to the industry. 4. No topsoil would be brought in, on which new sod would be placed. (Any existing soil that can retain moisture is suitable) 5. Soil preparation prior to the placement of replaced sod would be performed in conformance with typical industry practice. 6. It shall be the homeowners responsibility to water replaced sod. 7. Fill out and return the enclosed form to the City, and submit $100 check payable to the City to initiate this boulevard sod repair work (Repairs would commence as soon as possible). 8. The $100 escrow will be refunded to the property owner prior to Thanksgiving in the Year 2001 if the sod is established and growing. 9. This will be the last time this issue is considered by the City. Council hopes that you find this proposal to be a reasonable and acceptable solution to address any boulevard sod problems you may be experiencing. Please feel free to contact me, or the Engineering Department, 651-452-1850, if you have any questions regarding the information presented. Sincerely, Sc, . /% 0 Marc S. Mogan, P.E. Civil Engineer Iu1CN► I CONDITIONS OF BOULEVARD SOD REPLACEMENT Property owners interested in having boulevard sod replaced by the City are being asked to accept the following conditions relative to boulevard sod replacement under this program: 1. Sod replacement would not occur outside of the limits of the original work. 2. Existing boulevard grades would not be changed or adjusted. 3. The match line where new sod meets established sod would be constructed with equipment and methods standard to the industry. 4. No topsoil would be brought in, on which new sod would be placed. (Any existing soil that can retain moisture is suitable) 5. Soil preparation prior to the placement of replaced sod would be performed in conformance with typical industry practice. 6. It shall be the homeowners responsibility to water replaced sod. 7. Fill out and return the enclosed form to the City, and submit $100 check payable to the City to initiate this boulevard sod repair work (Repairs would commence as soon as possible). 8. The $100 escrow will be refunded to the property owner prior to Thanksgiving in the Year 2001 if the sod is established and growing. 9. This will be the last time this issue is considered by the City. Property owners interested in having the City initiate boulevard sod repairs are being asked to accept the above conditions, fill out this form, and return it to the City with a check for $100 payable to the City of Mendota Heights by June 12, 2000. ADDRESS: PHONE NUMBER: (H) (W) NEWS Public Works Engineering Code Enforcement LETTER Parks Report The Parks Crew picked up trash daily from the parks. They also dragged and chalked fields and striped foul lines on an as needed basis. The crew pre- pared the soccer fields for a big Sting soccer tournament last weekend. They planted flow- ers at Mendakota Park. They attended the annual spring MSTMA Spring Workshop on Wednesday to learn the latest about athletic field mainte- nance. Utility Report Rich checked the City's seven sanitary lift stations daily. Rich hired a private contractor (Pipe Services) and coordinated their efforts to clean all the City's lift station's wet wells, the sand traps at the Fire Station, Public Works Garage and one plugged catch basin on Victoria Road. The wet well at the Mendota Heights Road lift station was caked with grease from Lloyds and it took almost eight hours to clean. We will talk to MCES about what they can do to help work with Lloyds to reduce their grease waste. The power went out at the Veronica and Culligan Lane lift station at 5:15 P.M., Wednesday as a re- sult of the winds and John Boland responded with the portable generator. John had to pump each station once be- fore power was restored. Street Report The Street Crew cleaned the The Pipeline May 26, 2000 drainage ditch at Garden Lane and TH 13. They installed a bi- tuminous swale at Mendota Heights Road and Lexington Avenue to handle the stormwa- ter runoff. They repaired the trail at both ends of the pedes- trian bridge in Valley Park and patched potholes on Summit Lane at the entrance to Mendota Elementary and at the entrance to Crown Point. County CIP Road Projects Reviewed Marc and I met with Dakota County Highway and Planning Staff this week to discuss their 5 year Capital Improvement Plan. We informed the County that Mendota Heights is intending to complete the Lexington Avenue trail as a two phased project, from Mendota Heights Road to Wagon Wheel Trail this year and Wagon Wheel Trail to Tom Thumb Blvd later. We discussed the safety problems that have occurred with constructing a right turn lane at Delaware Ave- nue and THE 110 and that the County would need to add fund- ing to be able to cost share with MnDOT in adding a left turn lane (after MnDOT completes its right-of-way acquisition). We discussed the turn back of Victo- ria Road. The County intends to arrange a meeting between Lily - dale and Mendota Heights to discuss maintenance and other issues associated with the north end of that road which is in Lily - dale. We discussed the possibil- ity of Dakota County's participa- tion in funding trails associated with Town Center (NURT). Year 2000 Street Recon- struction Bituminous base was placed on the segment of Decorah Lane from Pueblo Lane to Huber Drive late last Friday. The removal and replacement of concrete curb and gutter, and the adjust- ment of manholes and gate valves continue throughout the overlay area. Some of the resi- dents that requested replace- ment of concrete gutter abutting driveways soon after the project began, and have since been re- placed, have been backfilled thereby allowing access to their garages. Engineering continues to hear requests for quotes from residents to replace private driveways and concrete gutter abutting driveways. NSP Gas main work continues in the Rogers Lake neighborhood. Alice Lane Subdivision Two Improvement Proiect Ryan Contracting Company commenced construction of the Alice Lane Subdivision Two site improvements this Thursday. The installation of sanitary sewer and water main facilities should be completed by early next week. Augusta Shores Improve- ment Proiect G. L. Contracting continues rough grading operations on the Augusta Shores project under a separate private contract with the Developer. It will probably take G. L. Contracting a few more weeks to complete the grading on the site. NEWS Public Works Engineering Code Enforcement LETTER Parks Report The Parks Crew picked up trash, mowed grass, striped foul and soccer lines, dragged and chalked fields daily in the parks. They also did a thorough cleaning of the tennis courts this week which re- sulted in many bags of leaves. They treated the Ivy Park pond for algae, duck weed, etc. We have received numerous complaints about the presence of too much duck weed that occurs when we do not treat this pond. The drink- ing fountain located in Mendakota Park was vandalized this week and had to be repaired (at least there were not any bills pushed over yet this week). Utility Report Rich checked the City's seven sanitary lift stations daily. Rich with John Ambrose's help jetted clean the sanitary sewer line from Lloyd's Meats to the lift station — this line often gets overly greasy from the effluent from Lloyds. He performed a sanitary sewer con- nection inspection for a new home being constructed at 615 Butler Avenue. Thursday the starter coil went out in the control panel at the Culligan Lane lift station, Rich had to call in Braun Pump to fix the coil. Street Report The Street Crew worked on patch- ing pothole complaints this week — mostly in the north end and Som- erset neighborhoods. They pur- chased materials and fabricated signs and barricades to be used for the Police Department bike ro- deo this weekend. John fabri- cated some equipment racks to be installed on the Parks Crew's new trailer. The Pipeline Code Enforcement Report Code Enforcement has been receiv- ing complaint calls lately about dandelions. Residents who call are always surprised when they learn that dandelions are a "vegetable" not a "weed". Dick has been in- formed of this fact by Todd Matzke, Dakota County Agricultural Inspec- tor during his annual weed inspec- tor training sessions. We always refer residents who want to learn more about dandelions and their status as a "vegetable" to Todd. Patterson Dental finally paid for and picked up their permit to ex- pand their facility located next to St. Thomas Academy along I-35E. The plans were submitted weeks ago, approved by Council and Code Enforcement and then never picked up. Their expansion is a 9,600 square foot building expansion to- gether with a 7,200 square foot in- terior remodeling to add a second floor over their warehouse area. The expansion is valued at $1.8 million and CF Haglund and Sons is the contractor. County to do Overiays Jim Danielson attended a pre - construction conference on Thurs- day at Dakota County where they were discussing various overlay projects scheduled for this sum - May 19, 2000 mer. In Mendota Heights the County will overlay Lexington Ave- nue from Mendota Heights Road north to Centre Pointe Boulevard and Victoria Road from Lexington to Celia. Victoria Road is sched- uled to be turned back to the City after the overlay. The overlay work is scheduled to be completed in Mendota Heights the first part of July. Year 2000 Street Reconstruc- tion The removal and replacement of concrete curb and gutter, and the adjustment of manholes and gate valves continue throughout the overlay area. NSP Gas main work is underway in the Rogers Lake neighborhood. Engineering has been deluged with requests for quotes to replace private driveways and concrete gutter abutting drive- ways. Alice Lane Subdivision Two Im- provement Project Council awarded the construction contract for site improvements for Alice Lane Subdivision Two project to Ryan Contracting Company at the Council meeting last Tuesday. A pre -construction meeting is scheduled for 10:00 A.M. on Mon- day, May 22nd. The Contractor indicated that they intend to start construction on Wednesday, May 24th. Augusta Shores Imorovement Proiect Erickson Construction was awarded the construction contract for site improvements at the Council meet- ing last Tuesday for the Augusta Shores project. Rough grading op- erations continue on site by G. L. Contracting under a separate pri- vate contract with the Developer. NEWS Public Works Engineering The Pipeline Code Enforcement LETTER May 5, 2000 Parks Report The Parks Crew picked up trash daily from the parks. The Parks Crew applied pre - emergent crab grass pre- vention in all the parks at lo- cations where it was needed. They striped the foul lines at the ball fields and started up the irrigation systems at City Hall and the Fire Hall. They had to repair sprinkler heads at Kensing- ton Park, City Hall and the Fire Hall. They also started spraying for weeds on City property —those little yellow flowers are showing up eve- rywhere. Finally, they finished putting up the Martin houses (the Martins are birds that come back late). Utility Report Rich checked the City's seven sanitary lift stations daily. Because Rich is trained and fitted to use a respirator, he helped the Parks Crew by spraying dan- delions. He also performed a new sanitary sewer in- spection for a connection for the home being constructed at 1656 Mayfield Heights Road. Street Report The Street Crew began pre- paring for summer patching by servicing their roller and trailer and organizing and cleaning up the rest of their tools. They installed the hot box, asphalt tray and tool rack on truck #312. They reinstalled a street name sign across the street at a residents request and rein- stalled one that was dam- aged by a car accident. Dave attended the League of Minnesota Cities Safety and Loss seminar where he learned about innovative so- lutions to safety problems, pathway maintenance and repair, confined space entry rules and proper work zone traffic control measures. Augusta Shores Clearing has continued at the Augusta Shores development site this week. It was slowed because the drum chipper being used by the contractor caught on fire and is under repair. If you have not seen the site in the last week, it is worth the trip. Fills in excess of thirty feet will occur for some of the street sections. Grading and fill is expected to start sometime next week. Y2K Street Work Letters were mailed this week informing residents of the upcoming 2000 street projects in the Roger's Lake, Ivy Falls and Delaware Crossing neighborhoods. The City hopes that by informing residents on what to expect for the construction season, we might eliminate some of the inevitable headaches as- sociated with road construc- tion. A pre -construction meeting has been scheduled for Mon- day morning with Valley Pav- ing, Inc. at which time schedules will be laid out and coordination with utility com- panies will be arranged. NSP gas will be replacing or modi- fying gas distribution sys- tems in all of the neighbor- hoods. This work should start in the next two weeks. Valley Paving, Inc. is anxious to begin work and could start within a week. Code Enforcement Report Inspections have begun for United Properties' third build- ing in their Mendota Office Center Planned Unit Develop- ment (1210 Northland Drive). Kraus Anderson who is United Properties contrac- tor is starting installing foot- ings, foundations and column pads. NEWS Public Works Engineering Code Enforcement LETTER Parks Report The Parks Crew picked up trash daily from the parks. The Crew dragged and chalked fields and striped foul lines on an as needed basis. This was the first week that they had to cut grass this spring. The Crew started up the lawn sprinkler system at Kensington Park this week and had to perform some repairs to it. They had to relamp the lights at the Kensington comfort station. They finished dragging the Fire Hall site and the Public Works site and seeded and fertilized both areas. Utility Report Rich checked the City's seven sanitary lift stations daily. The telephone line went out to the Centre Pointe lift sta- tion last Thursday and did not get repaired until Friday. We had to perform additional checks of the station while it was not being electronically monitored. The alarm went off at the Veronica lift station at 4:45 P.M. Thursday, Rich came back in but the alarm had cleared by the time he got there. Street Crew The Street Crew worked on clean up at the shop lot and hauled brush, logs, etc to The Pipeline April 28, 2000 SMC and SKB recycling cen- ters in Eagan. They repaired another drop structure in the Ivy Falls Creek Bed. They marked locations and called Gopher State One Call to install "No Parking" signs on the south side of Wagon Wheel Trail where it travels between Rogers Lake. They reinstalled several signs that were falling over —out of plumb around Copperfield. They replaced some missing street name signs. They be- gan making up replacement street name signs for the street reconstruction areas. Year 2000 Street Recon- struction/Rehabilitation Four bids were received on April 27th for the Year 2000 Reconstruction/Rehabilitation Project. Valley Paving, Inc. was the low bidder on the project: The bids are as fol- lows: Valley Paving, Inc. $ 91 Hardrives, Inc. $ 94 Midwest Asphalt $1,05 Bituminous Roadways $1,16 Valley Paving, Inc. bid was less than the Engineer's esti- mate of $958,074.00. They completed the Friendly Hills and Curley Addition street re- construction projects and their work was viewed favora- bly. Code Enforcement Report Paul met with Ms. Cher Sven- ningsen, ISO field representa- tive, on Monday to review the completed Building Code Ef- fectiveness Grading Schedule form. The form is 25 pages long. Once the review is fin- ished Mendota Heights will re- ceive a grading that will be sold to insurance companies who provide coverage in Men- dota Heights. She will also return sometime in the future to go out with Dick to observe a field inspection first hand. ISO is the same organization that rates cities for fire ser- vice (they are funded by the insurance industry). She told us that they rate cities on a five year cycle. Paul issued a permit for a new home to be located on one of Dakota Banks lots along Mary Adele. The 1 3,360.05 home is a six 9,365.50 bedroom 5,978.35 home being ,902.75 constructed by Dakota Community's Incorporated for physically and mentally challenged adults. NEWS Public Works Engineering Code Enforcement LETTER Parks Report The Parks Crews picked up trash daily from the parks. The Crew dragged and chalked fields and striped foul lines on an as needed basis. They finished up the clean up work at the new public works garage site near the water tower. They worked on cleaning up the fire hall site where Herb Warnke's house was re- moved. The Crew did some repairs to the irrigation system at Kensington Park, and hauled in Class 5 gravel to the Roger's Lake parking lot and used it to repair pot- holes and ruts. Utility Report Rich checked the City's seven sanitary sewer lift stations daily. Rich worked on installing marker posts by manholes in easement areas. He installs the posts to aid in finding the man- holes. He bolted down the manhole cover located at the rear of the tot lot to help prevent a reoccurrence of having debris thrown in it. Street Report McPhillips finished sweeping the streets on Monday April 21, 2000 morning before noon. John Ambrose worked on install- ing the "hot box" to the back of Truck #312. The hot box keeps the asphalt hot during street patching operations. The Crew worked on install- ing signs (MTC and others). They worked on repairs to a drop structure in Ivy Falls Creek. The repairs were needed to restore the creek back in the center of the structure instead of running around it. The drop struc- tures are energy dissipaters used for slowing erosion to the creek bed. They removed downed trees and brush from the City owned lot located at the end of Spring Street. One of the neighbors had been "bugging" us to get it cleaned up. Of course, while we were doing the work an- other neighbor called to complain that our work was taking away from the "natural feel" of the neighborhood and asked us to stop. Dave worked with an electri- cal contractor to complete some repairs to the street lights on Centre Pointe Boulevard and Medallion Drive. Code Enforcement Report Code Enforcement received an official notice from the State of Minnesota this week informing them that the new energy code had been passed into law this session and went into effect April 14th (see attached notice). The new rules give the con- tractors two options, either build under certain, more strict rules of the old code or, follow a new code that was adopted. Either option will be more expensive for homeowners to build, but will provide better indoor air quality. There are ten contractors/ homeowners who have failed to meet the new Zoning Or- dinance requirement to have a passing final inspection within a one year time pe- riod. There are a variety of reasons for these failures and we are attempting to re- solve all of them now, but we are unsure of what the next steps should be, if we are unable to resolve them in a reasonable time frame. Attachment: • Minnesota Residential En- ergy Code Update MINNESOTA DEPARTMENT OF COMMERCE MINNESOTA DEPARTMENT OF ADMINISTRATION Minnesota Residential Enemy Code Update Summary of New Code Requirements A new energy code goes into effect for building permit applications submitted after April 14, 2000 For detached one- and two-family, R-3 occupancy residential buildings, the following requirements apply: Option (a): • A contractor or owner must comply with the provisions of Minnesota Rules Chapter 7670 that apply to Category 1 buildings. • Buildings that have fuel -burning equipment using non -solid fuels for spacer, beating, service water heating, or hearth products must instalt direct vent, power vent, or seated combustion equipment. • Buildings must have a mechanical ventilation system which replaces, by direct or indirect means, air from habitable rooms with outdoor air. • If any single exhaust device over 300 cubic feet per minute (cfm) is installed, seated combustion space heating equipment or an alternative make-up air source must be used. Option (b): • A contractor or owner must comply with Minnesota Rules, Chapter 7672. Other Requirements: • Alterations and additions must comply either with Minnesota Rules, Chapter 7670 or with Minnesota Rules, Chapter 7672. • Three or more attached dwelling units, three stories and less in height, must comply either vnth Minnesota Rules, Chapter 7670 or with Minnesota Rules, Chapter 7674. For additional information, or to receive Request for Interpretation fof i',s, con,_-c _ the Energy Information Center at 651-296-5175 (toll free at 1-800-657 s7 or the Buiidmg Codes and Standards Division at 651-205-4707. Request for Interpretation forms may also be downloaded at Yp,vw.commerce.state.mn.us. Responses to current interpretations on '.ne Ainnesota Enemy Code may also be obtained at that site. 4i UU Pa,'V!jr�nconu?�101-214a�•(bi1)296-7107-(6iI)297-19�9 TiY An equal opporu:.it.: emplocc,- NEWS Public Works Engineering Code Enforcement LETTER Parks Report The Parks Crew picked up trash daily from the parks. The Crew began dragging ball fields, chalking lines and finish grading all ball fields this week. They worked on repairs to the ir- rigation system at Kensing- ton Park. Terry met with the summer helpers to dis- cuss their work hours and work duties. All the helpers are former park workers, so we know that we have a good crew. One of the summer workers was spe- cifically hired to only work weekends when there are ball tournaments. Another summer worker will arrange his week day hours when needed to help out on the weekends (so that he only works 40 hours). They started up the irriga- tion system for Mendakota Park on Thursday this week. They also worked on clean- ing up the new area of land that was added to the Public Works site last fall (where the old house was re- moved). Utility Report Rich checked the City's seven sanitary sewer lift The Pipeline April 14, 2000 stations daily. Rich had to jet the sanitary sewer line clean on Orchard Circle be- cause Baldinger's contractor had hit a manhole cover knocking it off and putting dirt in the line. He installed a hydrant locator flag at Knollwood Court. Vandals had removed a sani- tary sewer manhole cover located at the rear of the Curley Tot Lot and filled the manhole with logs, wood and other construction de- bris. This debris was caus- ing sewage to backup, but fortunately not into anyone's basement. Rich with Tom's help removed the debris piece by piece for the most part of a day. When Rich is completed, he will bolt the cover down to help prevent this from happening again. Rich also jetted a line clean on Wagon Wheel Trail that was clogged with roots. Street Report McPhillips, the City's street sweeping contractor, started sweeping streets this week. Wednesday McPhillips brought in six machines. Two machines started in the north end, two in the middle (Marie Avenue) and two in the south. They are working twelve hours a day 6:00 a.m. to 6:00 p.m. If all goes well, they will be completed on Monday of next week. The Street Crew went to the Annual Spring Maintenance Expo put on by the Univer- sity of Minnesota. The con- ference covered such topics as Lyme's disease preven- tion, pot hole patching, equipment maintenance and OSHA compliance. Drug Test Conducted All workers who operate trucks or heavy equipment over a certain size need to be tested periodically on a random basis for drug or al- cohol use. This week four Public Works employee's numbers came up and they were tested on Monday. As usual —no problem all of them passed the test. Code Enforcement Report United properties began grading this week for their new Phase III, Mendota Technology Center building. If you're out on Northland Drive on TH 55—take a look at the site —sure looks differ- ent with all those poplar trees gone. NEWS Public Works Engineering Code Enforcement 19WN-64 ME Parks Report The Parks Crew picked up trash daily from the parks. They cleaned the tennis court surfaces from leaves and trash that accumulated over the winter. They cleaned up the dirt and mess created by the watermain break at Marie Park. They started grading and dragging the ball fields and located and installed the bases at Mendakota Park. They worked with St. Paul Wa- ter Utility to reinstall water meters at Mendakota and Ken- sington Parks comfort stations, and after they were installed, opened the restrooms for the season. They picked up the downed limbs in all the parks that fell as a result of the strong wind storm on Wednesday evening. They installed new base an- chors at the Civic Center site (which were needed because this field is being converted to a baseball field). Street Report The Street Crew repaired some potholes on Lake Drive with cold mix bituminous. These repairs were done in response to a complaint that was re- ceived (if anyone has a favor- ite pothole, please call it in and we will repair it). They finished installing the new gate at the Resurrection site —the April 7, 2000 site has now been secured from indiscriminate dumping (we hope). The Crew removed part of a tree that blew down across Walsh Lane as a result of Wednesday night's storm. The rest of the tree is impacted by an electrical power line so we need to work with NSP to have it removed. They reinstalled a dead end sign on Pagel Road to replace one that was hit by a vehicle. Utility Report Rich checked the City's seven sanitary sewer lift stations daily. He performed a new sanitary sewer connection in- spection for a home being con- structed at 1441 Clement. Rich was assisted by George Noack who used the City's backhoe to dig out a sanitary sewer manhole that had been buried at 1812 Valley Curve. He installed a replacement hy- drant flag at Knollwood Court. He responded to a power out- age alarm at the Veronica lift station at 9:30 P.M. Wednesday evening (probably caused as a result of the wind storm). Safety Training Chad Peterson, SafeAssure in- structor, conducted classes for the Public Works Crew on Thursday afternoon. He cov- ered how and when hearing protection should be used. He will return at a later date with a decibel meter to measure noise levels with all our equipment. He also covered lock out/tag out requirements which are used when electric power equipment is being worked on. Finally, he began instruction on the proper use of personal pro- tection equipment. Code Enforcement Report United Properties were ap- proved by City Council this week for the third addition to their Mendota Technology Cen- ter. This building is a one story 61,336 square foot office struc- ture with architecture to match their first two buildings. Paul has reviewed their plans for a footing and foundation permit and is ready to issue it. Signal Bank has found a tenant in their building on Commerce Drive and Paul has issued an interior remodeling permit to Unitech for 3215 square feet of space. Unitech is a computer business and the space has all raised floors. Two single family homes were started in March; 1646 Mayfield Heights Road is being built by Schafer Brothers Construction and 615 Butler Avenue is being built by ]arvi Construction. NEWS Public WorksEngineering The Pipeline Code Enforcement LETTER March 31, 2000 Parks Report The Parks Crew picked up trash daily from the parks. The Fire Department when responding to a report that there was a grass fire in Val- ley Park drove across the foot bridge with their grass rig and broke several boards. The boards in the bridge were original (over twenty years old). The Parks Crew purchased new replacement boards for the bridge and in- stalled them this week. They also installed the tennis nets in the parks this week (twenty courts). Utility Report Rich checked the City's seven sanitary sewer lift stations daily. Rich responded to a complaint at 544 Fremont Avenue where the resident smelled "sewer odor". The City's line was flowing freely —but theirs was not. He advised them to contact a contractor such as Roto Rooter to open their line. He performed a new sanitary sewer connection inspection for the new home being con- structed at 1147 Orchard Place. He flushed the sanitary sewer line at Winston Court be- cause he knows that the City's line flows slowly and is subject to blockages at that location. He finished checking the sanitary sewer manholes located in easement areas this week and found no further problems. Rich, Tom and I met with the homeowner on Valley Curve where a manhole has been buried. The home- owner is willing to cooperate and will allow us to cross his property with our backhoe to try and uncover the manhole. Street Report The Street Crew reinstalled some missing street signs this week. They also were digging some holes to install posts for the new gate at the Resurrec- tion site. While digging the holes they encountered a util- ity cable. They had called Go- pher State One Call before digging but nothing was marked, upon rechecking with Gopher State they discovered that it was a US West line that was not marked (not our fault) - and the planes are still flying. The Street Crew attended a traffic work zone safety work- shop. They learned some new information about new types of safety vests to use, that safety cones are not to be used at night any more etc. John Ambrose worked with Len Kanitz to fabricate a "headache rack" for our new plow truck #409. Johnson Grading Dale Johsnon hired Scherff In- corporated to complete the site grading for his five lot subdivision which recently had its final plat approval. On Saturday about noon, the loader operator jumped off his vehicle to check something without setting the hand brake. The vehicle rolled all the way down Alice Lane and crashed into a pickup truck and a garage doing major damage to both. Mr. Scherff, the owner of the company came to the scene and gave the name of his insurance company to the affected land- owners. Dick Gill visited the damaged home on Monday to review the situation with the homeowner —he suggested that a structural expert be brought in to check out the garage. Code Enforcement Report Dick Gill and Paul Kaiser per- formed their final inspections on the Mayflower building and gave them the go ahead to begin moving in this weekend. NEWS Public Works Engineering The Pipeline Code Enforcement LETTER March 24, 2000 Parks Report The Parks Crew picked up trash daily from the parks. They also purchased and picked up some new trash barrels from Twin City Con- tainer and placed them in the parks. There have been several com- plaints about dog waste being a problem in Mendakota Park. In response to the complaints the Parks Crew installed a number of our standard "doggy do" signs in the park. They purchased and picked up field striping supplies this week. They interviewed ap- plicants for summer helper positions this week. John Boland applies the liquid weed killer in the parks and wears a respirator while doing so. John was fit tested for his mask this week as required by OSHA. Utility Re ort Rich checked the City's seven sanitary sewer lift stations daily. He finished walking the easement sewer lines. There is one manhole that he is still unable to locate (it must be covered by landscaping). He will return with the metal de- tector to see if that helps find it. He checked Lilydale's storm sewer system as agreed to last year. He found the system to be in perfect working order. The alternator went out at the Veronica lift station, the devise that makes the two pumps al- ternate pumping. Rich or- dered a replacement one from Braun Pump. Rich got fit tested by Conti- nental Safety this week for his breathing apparatus mask. Rich wears a breathing appa- ratus if he has to enter some manholes with hazardous gas present. It is a requirement of OSHA that masks be fit tested annually. Street Report The Street Crew worked on improvements to the new ac- cess driveway at the City's new Resurrection Cemetery site. Recycled con- crete was installed and the gate was worked on. They reinstalled some signs hit by motorists: Con- cord Way, LeMay Lake Road, Bent Tree Lane (reinstall stop sign and stop ahead signs at Decorah Lane). They had to bring truck 301 into Belzers to fix a rear pinion seal that was leaking. They repaired a wire and reset the main breaker for the street lights east of TH 55. Code Enforcement Report Paul Berg is gone on a two week vacation to Hawaii, so Dick has been doing double duty this week. Dick, along with his double duty, has had to deal with an unsafe building complaint. The resident at 954 Wagon Wheel Trail was caught tearing down and burn- ing an old barn (Paul Kaiser is- sued a ticket for an illegal fire). Two men were half way done with the project when the Police Department caught and stopped them. Dick gave the resident one week to le- gally remove the rest of the barn and bring it into a safe condition. (See picture be- low). NEWS Public Works Pipeline Engineering The Code Enforcement LETTER March 17, 1999 New Mallard Home At Marie Park Mallard Homes Terry Blum, Mike Maczko, and John Boland have fabricated ten nesting structures for Mallard Ducks. The nesting structures are constructed of two wire mesh tubes, one inside the other, with three inches of straw in between them. The tubes are three feet long and mounted about one foot above the high water level of the ponds (to pre- vent predators such as raccoons from attacking the nest). They are mounted by a wood and metal bracket to a metal post driven into the pond bottom. The straw is replaced every two or three years. Len Kanitz, our mechanic at the Public Works fa- cility, assisted in the fabrication of the wood and metal mounting brackets. Installation of these homes began prior to the ice melting so that the mounting posts could be driven down through the ice away from the pond edge. Reliable sources report that sev- eral of the nesting sites are al- ready occupied and new broods of residents are expected soon. Parks Revort The Parks Crew picked up trash daily from the parks. They had to take the back hoe onto the Nature Center on Monday to ex- cavate out a peat fire that was started as a result of the grass fire last week. The peat was still smoldering and had to be dug up and extinguished. They had to dismantle and re- move a fort that was built by kids along the north shore of Rogers Lake. They removed the aerator pump from Rogers Lake and took it to Public Works Garage for storage. DNR has informed us that this was a temporary pump that they will take back when they install a permanent pump and aerator. They did tell us that they do intend to stock the lake with Northerns, Bass and Pan Fish. Depending on the funding, this permanent aerator may be installed as early as this summer. The crew worked on servicing all their small engines that will be used this summer. Street Report The Street Crew finished mailbox repairs this week. They filled in a sink hole that showed up on Diego Lane with cold mix bitumi- nous, and will have to do a more permanent repair of this patch this summer. They emptied the sand and salt from the dump trucks and cleaned them. John Ambrose be- gan fabricating a gate to be in- stalled to control access to the new Resurrection site that will be used to store our street sweep- ings. They worked on installing MTC bus route signs, and repaired a bad photo cell that operates the Centre Pointe street lights. They began working on the replace- ment street name signs for the road reconstruction project ar- eas. Utility Report Rich checked the City's seven sanitary lift stations daily. Rich was called in at 11:00 A.M. on Sunday to respond to a power outage at the Northland Drive lift station. NSP was on the scene working on restoring their power but Rich had to run the City's portable generator to power the station until 2:00 P.M. Rich con- tinued to walk and check the sanitary sewers running through easements this week. He found another tree that was growing right next to and interfering with a manhole. He had to cut and remove the tree. He also trimmed trees at the Veronica lift station. Happy St. Patrick's Day! NEWS Public Works Engineering Code Enforcement LETTER Parks Report The Parks Crew picked up trash daily from the parks. They removed the snow blower from the large Toro and installed the mower decks. They finished in- stalling the Mallard Duck houses and shut down the aerator at Rogers Lake. Af- ter shutting down the aera- tor they hauled it to the shop and put it in storage for the summer. The Parks Crew attended Minnesota Toro Institutes Turf Man- agement course where they learned the latest about maintaining sports fields, tree management, trouble shooting sprinkler heads and many other turf indus- try innovations. Utility Report Rich checked the City's seven sanitary lift stations daily. Rich continued walk- ing, locating and inspecting manholes within the City's easement areas this week. These easement lines are the ones that are not lo- cated within the street right-of-way. Tom Olund had to respond at 3:00am Thursday morning to an alarm at Veronica lift sta- tion. There was no problem found, all he had to do was reset the pump. Street Reyort The Street Crew worked on mailbox repair and sod dam- age clean up that occurred as a result of snowplowing. They also worked on install- ing Metro Transit bus stop signs and began making up the replacement signs for this years street reconstruc- tion project. The street name signs are replaced along with every street re- construction project. They cleaned out some clogged catch basins. They sanded slippery areas and plowed main line streets for the Thursday morning snow storm. Code Enforcement Report The City received and Paul filled out a building code ef- fectiveness grading schedule form this week. This was the same form he had to do two years ago. The form is from Insurance Services Of- fices Inc. and will be used to grade the City's building 9 - Ah March 10, 2000 code enforcement. We will receive a number grade which can be used by insur- ance companies when calcu- lating rates for the City's residents and businesses. Dick Gill, who acts as the Mayor's Assistant Weed In- spector attended the annual, mandatory weed inspectors class held Wednesday March 8th at the Soil and Water Conservation offices in Farmington. There are eleven noxious weeds desig- nated by the State (with the addition of garlic mustard weed this year). Dakota County adds three more to the States list for a total of fourteen. (They add Cockle- bur, Wild Sunflower and Vel- vet Leaf.) The class updated Dick on his duties and bio control programs. They asked, and Dick confirmed with them that Mendota Heights intends to continue with its Purple Loosestrife bio control program this year (growing and placing Loose - strife eating bugs). Euro- pean Buckthorn is listed as a "restricted" noxious weed. Which means you can have it on your property, but you can not plant it, or do any- thing to promote its spread. NEWS Public Works Engineering Code Enforcement LETTER Parks Report The Parks Crew picked up trash daily from the parks and checked the aerator at Roger's Lake for any prob- lems. They also worked on equipment maintenance (Toro #505 the snow blower and Truck #501 had an anti freeze leak). The Crew purchased the materi- als and began constructing and installing the Mallard Duck nests. They cleaned out the Wood Duck houses and installed new sawdust in them for nesting material (spring must be coming). They continued to work on cleaning up and closing down the ice skating rinks. Utility Report Rich checked the City's seven sanitary sewer lift stations daily. Rich began walking the sanitary sewer line located within an ease- ment near Farmdale Road to locate and mark the manholes. He found one manhole that was covered by a downed tree. He cut up and removed the downed tree. Street Report The Street Crew worked on street sign repairs and in- stallation this week —some The Pipeline March 3, 2000 new street name signs were installed. Some old cross- walk signs were replaced with new yellow -green ones provided by the Federal Government, and some new Metro Transit Bus Route signs were installed. Metro Transit is funding our work and the materials for replac- ing their old signs with new ones. The Crew repaired a street light and picked up some brush on Marie Avenue near our trail that had been "donated" by someone. They installed the perma- nent stop signs at the Decorah Lane/Ocala Lane lo- cation. They also emptied the sand and salt from the plow trucks and cleaned them out to avoid corrosion. Code Enforcement Report The first swimming pool per- mit (18' x 36' in -ground) was applied for this week by Paragon Pools for 1454 Cherry Hill Road (another sign of spring). ECI applied for a 3,500 square foot office finish for the second floor of the Dakota Bank Building across from City Hall. This will be for John Siedel's new office and will finish off all the space in the building. This week Dave Regel Con - struction applied for a build- ing permit to construct a six bedroom, 3,000 square foot, one story residence for dis- abled occupants for Dakota Communities, Inc. The pro- posed site is on Mary Adele Avenue on one of the single family lots located within the Dakota Bank/SuperAmerica redevelopment plat. The proposed building was found not to have a basement as required by the City's Zoning Ordinance. The builder is consulting with the owner to determine what their desires are. There are already three of these type of facilities in Mendota Heights, one in South Ridge on Diane Road and two in Friendly Hills (remodelings) on Cheyenne Lane and on Pontiac Place. Storm Sewer Going In There is an old storm sewer outlet at Mendota Heights Road and Northland Drive that had caused severe ero- sion downstream. Farris In- dustries agreed to repair and extend the pipe as part of their TIF agreement. They began working on complet- ing that work this week. Robins Are Back Lambert saw the first Robin this Tuesday —spring is here. Uti/it�oort. Rich checked the City's seven sanitary lift stations daily. Rich also performed an inspection at 1150 Northland Drive for a new connection to the sanitary sewer main. He had to clean the Lily - dale lift station from graffiti. Street Report The Street Crew did not have any snowfalls to plow this week, NEWS I En ineerin Code Enforcement LETTER Parks�r_t The Parks Crew picked up trash daily from the parks. They also checked daily the aerator at Roger's Lake for any problems. Well, the time has come to close the ice rinks. This Tuesday, February 22 Was as long as we could stretch the ice this year and we closed the Wentworth and Friendly Hills Park rinks. (The Marie Park rink had been closed earlier because of dam- age from a watermain break). Mary told me that she felt that this was a good year —the weather was cold enough to flood and make ice, but it was warm enough so that skaters could very comfortably skate. Use was down this year because the Mendota Heights Athletic As- sociation merged with West St. Paul Athletic Association and to- gether they used more indoor ice. The high school kids who were rink attendants did rea- sonably good jobs this year, with only a few exceptions. The Parks Crew cleaned out the warming houses and brou Hoffman Homes Start Soon the hockey9ht in nets for storage. I received a call from Pat Hoff- man this week informing he is close to closing me that w Resur- rection Cemeteryotheir ith land they would have closedalready but there is a State recording of cemetery land that has to be voided. This will take a week or two to complete before the final closing occurs. After they close they will begin removing trees and grading —probably at the end Of March. G.L. Contracting is their contractor. The Popeline February 25, 2000 but because of the mild weather and rain they had to unthaw and open catch basins and culverts. They also worked on mailbox and equipment repairs. Code Enforcement Report There were three new house per- mits issued this month; 1147 Orchard Circle (Baldingers) Heaver is the contractor and started removing trees, 2150 Glen Toro—Hagstrom Builders is the contractor, and 1117 Orchard Place—M. W. Johnson is the con- tractor. The Farris I The final plat is being reviewed by Dakota County and as soon as that review is completed they will submit it to the City for approval. Pat said that before they ever even advertised they had to lot holds in place. The response has been terrific with prospective buyers driving all they way to Eden Prairie to look at the model there which is a similar product. They are now starting to adver- tise. Ro er's Lake Fis6int7pier contractor is ncentives The Departmen Northland t of NaturRe- walls at putting up block I sources has informed us that he Drive and application for installation of a Mendota Heights Road. The re- suits of our one fishing pier in Roger's lake has for residential onstru�ton completion been approved. The pier is pro - February is as follows: vided and installed by the D Permits Final Issued: Lett Inspections Noti Completed: Non 18 14 4 and installation will probablyNR y cur in Jul oc- ty ersSent will enter into ha Cc'o- fying of operative agreement Compliance: with the DNR and the City will be responsi- ble for future mainte- nance of the pier, construction of an eighty foot long by eight foot wide bituminous path from the gravel cul-de-sac to the lake shore for access to the pier, and for installation of informa- tional signage. Additional ameni- ties such as benches, tables, etc, Will also be provided and are to be funded from the $4,000 Mr. Clifford Timm presented to the City Council last December. Road Restrictions Road restrictions go on today, Friday, February 25th. See at- tached map showing affected roads. >artmen NEWS Public Works Engineering The Pipeline Code Enforcement LETTER February 18, 1999 Parks Report The Parks Crew picked up trash daily from the parks. They also checked the warm- ing houses daily and the aera- tor at Roger's Lake for any problems. The Parks Crew, besides plowing the City's cul- de-sacs, which is their assign- ment during snowfalls, also cleaned the snow from the ice rinks and pedways. They had to take truck 501 in for repair. 501 was damaged during plowing activities, the cylin- ders, which control the direc- tion of the plow need to be re- built and the estimated cost is $1,000.00. The skating rinks are still open and operating, so the Parks Crew continues to flood them. They had to replace a broken board on the hockey rink at Friendly Hills Park. Utility Report Rich checked the City's seven sanitary lift stations daily. Rich plowed the north end streets which is his normal area to plow. He also plowed his lift station lots and drive- ways. Code Enforcement Report Paul received a call from the State Building Code Division this week informing him that they were set to issue a build- ing permit to MnDot for the construction of a 56' x 152' pole building at their mainte- nance facility, 2229 Pilot Knob Road. The Attorney General's Office had informed us that State owned buildings are ex- empt from local Ordinances and codes. Patterson Dental has submitted their plans for a building permit to construct a two story 4,800 sf/floor addition. There are sig- nificant interior building modifi- cations occurring throughout the rest of the facility. The to- tal estimated remodeling costs are $1.8 million. Last year, Council adopted an Ordinance amendment that re- quires completion of residential construction within one year of issuance. The one year anni- versary of that Ordinance is ap- proaching and the Code En- forcement Staff is reviewing permits to ensure completion within that one year. Year 2000 Street Proiect The Engineering Department submitted construction plans and specifications and other de- sign information to MnDOT this Wednesday for State Aid review for the Lake Drive segment of the year 2000 Street recon- struction and rehabilitation pro- ject. MnDOT changed their rules recently, and now require that all State Aid projects be of- ficially approved before bids are opened. We are hoping that MnDOT is able to complete this review as quickly as possible so that there is no delay in the schedule of construction for this project. Personnel News Tom Knuth was the envy of the office this week. Tom and his wife Marsha were on vacation this past week in the Florida Keys. Tom will be back to work on Monday. Also Guy Kullander was in Tucson, Arizona this past Tuesday through Thiirs- day. This was not a pleasure trip as Guy was helping his mother attend to family affairs associated with the recent death of Guy's uncle. Street Report The Street Crew had to do some electrical repairs to Truck 304 this week. They also trimmed trees on Ridge Place and Callahan Place where branches were extending out over the street and hitting the plow trucks. They worked on mailbox repairs where the boxes were damaged during plowing operations. Snow Events for the Week Date: Amount: 2/10 1/2" 2/12 3" 2/15 1/2" 2/17 2" Activity: Sanded slippery areas Plowed (6:00 P.M.-5:00 A.M.) Sanded Sanded and Plowed NEWS Public Works Engineering Code Enforcement LETTER Parks Report The Parks Crew picked up trash daily from the parks. They also checked the warm- ing houses daily and the aerator at Roger's Lake for any problems. They had to relocate several of the "thin ice" signs that are on Roger's Lake for the fish aerator be- cause the area of open water had changed. Utility Report Rich checked the City's seven sanitary lift stations daily. Rich completed a sanitary sewer inspection for a new connection for a home being constructed at 613 Kirchner Avenue. He had to repair the inside of a manhole that was damaged as a result of the watermain break that oc- curred last week on Lilac Lane. There was another watermain break this week at 620 Callahan. Street Report The Street Crew installed the stop signs at Decorah Lane and Ocala this week. Instal- lation was delayed pending receipt of some special tem- porary sign posts (the per- manent signs will be installed when the ground thaws in the spring). After the signs were installed the City re- ceived calls from several February 11, 2000 angry residents who were op- posed to the new signs. The Crew repaired some potholes with "cold mix". Cold mix patches are temporary repairs that will be replaced when warm weather returns. Plow Events: Date: Amount: Res o 2/4/00 1" sanded slippe Right -of -Way Ordinance Many of the cities of Dakota County are working together to prepare a standardized or- dinance to better control un- derground utility construction within the right-of-ways. Eagan has taken the lead in this effort and, using a model from the League of Minnesota Cities, has prepared a draft ordinance. They have submit- ted the ordinance to all the utility companies who would be involved. They held a workshop with the utility com- panies and interested cities on Thursday to receive their comments. The workshop went well, and with a few mi- nor corrections the ordinance will be ready soon to bring to Council for consideration. It was made very clear at the workshop that this ordinance was not intended to address telecommunications equip- ment. ry That type of equipment will continue to be addressed by City's antenna ordinances. The Eagan representative told me that he feels that telecom- munication equipment mounted on poles within the v nse: right -of- and scraped way is ex - spots empt from and scraped any city processes but a right-of-way permit. (Seems inconsistent if this right-of-way ordinance is for underground only). The City Attorney is currently review- ing that question for us. Code Enforcement Report Langer Construction is the contractor for Signal Bank who is remodeling the old Prime Source building into of- fice space. Langer submitted their construction plans to Paul Berg this week for a building permit. They told Paul that Signal Bank needs the remodeling completed in time for a March move in (fast track!!). MNRRA Lectures Attached is a notice from the Mississippi National Rivers and Recreation Area (MNRRA) in- forming interested residents of some upcoming free lec- tures. Stewardship Lecture Series NATION ARK SERVICE for Mississippi River Communities V A series of forums sponsored by the National Park Service, Mississippi National River and Recreation Area for Metro Area Residents and Landowners February -April 2000 A Natural Approach to Designing Residential Landscapes Create natural settings or redesign your yard to attract wildlife and benefit the river. This forum will explore landscape design principles, ecological benefits, and native plant materials that will enhance any yard. Speakers: Susan Overson - Landscape Architect/Planner, National Park Service Tom Lewanski - Conservation Director, Friends of the Mississippi River Tom Tennant - Owner, Outback Nursery and Tennant Landscaping / February 24, 2000, 7-9 p.m. Earle Brown Center, Tack Room, 6155 Earle Brown Dr., Brooklyn Center March 2, 2000, 7-9 p.m. r `v Best Western - Drover's Inn, Wakoto Room, 701 S. Concord St., South St. Paul Resident's Guide to Historic Home Restoration Discover tips and what steps to take in plannina restoration of your older or historic home. Speakers will discuss the historic context of river communities, present examples ofcompleted restorations, and recommend local resources for historic restoration along the river corridor. Speakers Charles Nelson - MN State Historical Architect, MN Historical Society Dick Thorsen in Hastings - Chair, Hastings Historic Preservation Commission Carolyn Braun in Anoka - Director, Anoka Community Development March 16, 2000, 7-9 p.m. Hastings City Hall Community Room, 101 East 4th St., Hastings March 30, 2000, 7-9 p.m. Anoka City Hall Community Room, 20151st Ave. N., Anoka Birds of the Mississippi Follow eagle nesting cycles and waterfowl migrations, plus learn about colonic water birds along the Mississippi River. Identify Minnesota songbirds, focus on the colorful spring migrants present in the Mississippi River Valley. Speakers: Eric Nelson - Refuge Biologist, Upper Mississippi National Wildlife & Fish Re Chase Davies - Experienced birder, National Audubon Society April 13, 2000, 7-9 p.m. American Legion Post # 600, 12450 Business Park Blvd., Champlin April 27, 2000, 7-9 p.m. Mississippi Dunes Golf Course, 10351 Grey Cloud Trail, Cottage Grove Join area experts and neighbors in forums that explore the preservation, use, and history of the rationally significant Mississippi River corridor in the Twin Cities Metropolitan Area. Sessions are free and open to the public. Coffee and cookies will be provided. To help us determine refreshment needs, please RSVP to the National Park Service, 651-290-4160, x221, The series is sponsored by the Mississippi National River and Recreation Area, National Park Service, St. Paul, MN, Visit our web site at http://tvtvw.nps.gov/miss. NEWS Public Works Engineering Code Enforcement LETTER Parks Report The Parks Crew picked up trash daily from the Parks. They also checked the warming houses and the aerator at Roger's Lake for any problems, daily. There was a serious watermain break on Lilac Lane on Tuesday eve- ning adjacent to Marie Park. The water from the break flooded areas of the park and closed the park from ice skaters. The water filled the staking ar- eas and warming house with sand and water —we will not be able to reopen the rinks for use again this season. The remain- ing rinks are probably surviving on "borrowed time". We nor- mally have to close in the mid- dle of February anyway. De- pending on the weather, there are probably only two to three weeks left. Utility Report Rich checked the City's seven sanitary lift stations daily. Braun finished repairs to the Ve- ronica Lift Station pump and re- installed it on Wednesday. This was the same pump that they had previously rebuilt in Sep- tember 1999. The pump was still under warrantee, so their repairs were done at no cost to the City. Rich worked on updating his re- cords keeping this week by up- dating all his records to show what sewer lines he cleaned last summer. Street Report The Street Crew emptied and cleaned the plow truck boxes The Pipeline February 4, 2000 from sand and salt. That salt is extremely corrosive when it comes in contact with metal, so we do this frequently during the sanding and salting season. (It does not take long to reload them when needed). They worked on repairs to the trucks, in particular, the wing on truck 304 is bent. Code Enforcement Update The City recently received a let- ter from the State Building Codes and Standards Division informing us that requiring Type III con- struction in our Zoning Ordinance was not legal. Ferris Incentives which is intending to build a new office for themselves at the inter- section of Northland Drive and Mendota Heights Road across from the Super America gas sta- tion was trying to wait until we amended our ordinances remov- ing that requirement. Ferris was unable to wait for the process to be concluded, because they have to vacate their existing building in June. This week they submit- ted plans with Type III construc- tion. Paul has reviewed and ap- proved them, and subject to their subcontractors being licensed, they will begin construction next week. The Salmen's, 1694 Dodd Road, who received a Conditional Use Permit and variance to construct a large, handicapped accessible garage submitted their drawings for a permit this week —they have complied with the condi- tions of their Conditional Use Per- mit including filing the conditions with their property title at Dakota County, and can begin construc- tion as soon as they desire. The second home on Glen Toro Road received a permit this week and construction will begin next week. This was the second home to start in this neighborhood. The permit valuation on these homes exceed $300,000. County Culvert Frozen The City received several calls from motorists concerned about ice build up on Victoria Road near the Amoco Station. The problem was on a County road in Lily - dale —but we needed to help the County to get the problem solved --some thought it was the car wash, some a spring. Tom Knuth helped the County mainte- nance crew to show them where a storm sewer was frozen shut. Once they were shown how, they then did an excellent job of open- ing it and clearing the road from ice. Safety Training "SafeAssure" conducted its sec- ond in a series of safety training classes this week. This time their classes were for Administra- tion and Public Works and cov- ered an Emergency Actions Plan and Bloodbourne Pathogens. Emergency action trained em- ployees on what to do in case of a fire, a tornado or a bomb threat. It was a very informative class with lots of good instruc- tion. The second class on Blood - bourne Pathogens was for Public Works employees who operate chain saws or work on sewers. NEWS Public Works Engineering Code Enforcement LETTER Utility Report Rich checked the City's seven sanitary sewer lift stations daily. Rich re -jetted and cleaned the line on Victoria Road where it was plugged last week to ensure that it was completely clean and flowing freely. He attended his annual "Collection Systems Mainte- nance" seminar at the Thun- derbird Hotel three days this week. (He had to leave the seminar early on Wednesday to come back and plow snow). They worked on cleaning up after the snowfall doing such things as cleaning bridge decks, ordering sand and salt, mixing sand and salt and mail box repair. Parks Report The Parks Crew picked up trash from the parks daily. They also checked the warm- ing houses and the aerator at Roger's Lake for any problems daily. They plowed cul-de- sacs, pedways, and parking lots as a result of Wednesday's snow storm. They broomed the ice skating rinks and flooded them daily. Roger's Lake Aeration Up- date: Guy has received a number of calls inquiring about the new Roger's Lake aerator. All call- ers, once they were informed The Pipeline January 21, 2000 of what the aerator was for, were pleased that the City was doing something to improve the lake's condition. The aerator has created an area of open water of approximately 80' x 40'. Code Enforcement Report Code Enforcement has received three applications for new homes: 613 Kirchner Avenue, 1117 Orchard Place (received a Critical Area Review approval by Council), and 1147 Orchard Circle (which also received a Critical Area Review and permit at the last City Council meet- ing). Ferris Incentives architect has contacted the State regarding the City's requirement for type III construction within the Busi- ness and Industrial So zones. The State then Date: Event: called Paul and re- 1/19/00 6" sno quested a copy of the City's Zon- ing Ordi- nance to confirm that we do in fact have that requirement. The State is investigating whether that City requirement is legal. They feel that this zoning requirement may be construed as illegally amending the Uniform Building Code. (They are investigating and will get back to us). Street Report The Street Crew took delivery of their new plow truck last Fri- day. The truck was ordered al- most a year ago. We pur- chased the truck from Lakeland Ford and they let us continue to use our old truck for the time we were waiting for delivery. They kept their trade-in price the same. John Ambrose used the truck for the first time this last snowfall. Cutting edges are 8" x 3/4" steel plates that are bolted to the bottom of the plow blades where they come into contact with the street. These plates wear down and need to be re- placed periodically. The Street Crew replaced their cutting edges this week. ow Event for the Week: Activity: wfall Sanded and salted slippery areas during snowfall —plowing started 3:00 P.M. and finished 11:00 P.M. NEWS Public Works Engineering Code Enforcement LETTER Utility Report Rich checked the City's seven sanitary lift stations daily. Rich plowed his normal route (the north end) on Wednesday and Thursday and plowed out all his lift stations after he was done with the streets. He also had to repair the sump pump at the Mendota Heights Road lift station. Street Report The Street Crew had to pick up trash along Decorah Lane (per Po- lice Department's request). They installed some snow plow guide posts at the request of some resi- dents. They ordered, received and mixed 50 tons of sand and 50 tons of salt. They plowed the fol- lowing snow events: Date: Amount: Action: 1/11/00 Trace Sand streets The Pipeline January 14, 2000 Parks Report The Parks Crew picked up trash from the Parks daily. The Parks Crew plowed out the City's cul-de- sacs, ice skating rinks and trails from the Wednesday/Thursday snowfall. They also had to give depositions to the opposing attor- ney in an ongoing lawsuit against the City for a cycling accident on the Valley Park trail. They worked with the DNR to install the lake aerator at Rogers Lake Park. They checked warming houses daily. Rogers Lake Gets Oxvpen John Boland and Mike Maczko as- sisted two representatives from the Minnesota Department of Natural Resources to install a lake aerator 1/12 & 13/00 9" Plowed Wednesday through Thursday Code Enforcement Report Paul and Dick attended their an- nual conference put on by the In- stitute for Building Officials this Monday through Wednesday. Russ Wahl was kind enough to fill in for them while they were gone. One of the main topics addressed at the conference was continued training on the new energy code that is to be implemented this April (see attached news article). Senator Deanna Weiner, who is also a licensed realtor, was the featured speaker at the confer- ence. She talked about things that are going on in the legislature this year that would affect build- ing codes. at Rogers Lake Park on Thursday morning. The equipment was provided by the DNR and consists of a pump mounted on two floatation tanks about o n e hundred feet from shore. This pump sends water through an eight -inch diame- ter hose to a trailer mounted stair unit on shore. Lake water is pumped to the top of the stair and as it cascades down the stairs picks up oxygen. The highly oxy- genated water is then returned to the lake thereby increasing the oxygen in the wa- ter. That allows fish to survive the winter months when the lake is ice covered and the normal oxygen absorption of wave action can not occur. This pump will operate until the ice breaks up in the spring. The equipment will then be re- moved from the lake and stored at the Public Works Facility. If this operation is successful and fish populations increase, the DNR may request permission from the City Council to install a permanent un- derground aeration facility with only a manhole cover to mark its location along the shore. The DNR requires that "Thin Ice" warning signs be posted every one hundred feet around the affected discharge area in the lake. John and Mike accomplished this task by mounting the "Thin Ice" warning signs on wood posts frozen into au- gured holes in the ice. When spring arrives and the ice melts they will recover the signs for re- use by collecting the floating posts. Attachment: News Article By Jim Buchta Star Tribune Staff Writer On April 15, a new state energy code takes effect that will dramatically change the way most houses in Minnesota are built. At the center of the issue is Kathie Pugaczewski, executive vice president of the Builders Association of Minnesota. Building scientists and state officials say the code will make houses safer, more energy efficient and more durable. It will require that houses have adequate ventila- tion, safer combustion appliances (water treaters and furnaces) and more energy efficient windows. The code will also re- quire builders to pay more attention to construction details such as vapor barriers and insulation that affect house energy efficiency and durability. The code is the result of a legislative requirement that houses in Minnesota be die most energy efficient in the nation. QThe building industry is Y evolving. What will be its biggest challenge in the first decade of this new millennium? AThere are a variety of chal- lenges including [dealing with] a labor shortage, maintain- ing housing affordability and planning for the projected 392,940 new households in Min- nesota in the next 20 years. We must plan for growth by allowgng a wide range of housing choices and using land more efficiently as well as investing in Minnesota's infrastructure. For example, the association will start playing a bigger role in transportation is- sues, which ties together with housing needs. As we develop and redevelop the core in the first and second ring suburbs, we need to make sure that we're maximizing the infrastructure that already exists there. As implementation of the new energy code nears, what's the association's biggest challenge? AOur biggest challenge has been developing the training on the new code requirements. The association and industry partners have invested almost $100,000 in comprehensive hands-on training on the new code. Builders, subcontractors and mechanical contractors need to get training on the code. While the builders have a yearly seven - hour continuing education re- quirement, the mechanical con- tractors and other subcontractors are not licensed by the state and have no continuing education re- quirements. In addition to train- ing, another critical challenge is the potential misinterpretation of the code by both builders and building officials. QImplementation has already been delayed twice, primari- ly because of concerns that the new code will make houses un- affordable and that builders, in- spectors and manufacturers wouldn't be ready. Are they ready now, and if not, when will they be? AlAn estimated 30 to 40 percent of the builders are ready to build to the new code. Builders are in the process of getting ready now, but it's going to take time. We're providing training to get them ready, but it's going to be an ongoing effort. There are 9,000licensed contrac- tors in the state and the Builders Association of Minnesota repre- sents 3,200 members, of which 1,200 are general contractors or remodelers. While housing af- fordability is an important con- cern, the code was delayed to develop and provide comprehen- sive training on the requirements of the new code. QDoes the association sup- port a revision or another delay in implementation of the new code? Are you aware of any- one other than builders who nigh t seek a delay or change to the code? AWhile we still have serious concerns about the complex- ity of the code, the Builders Asso- ciation of Minnesota will not re- quest a delay. After the code is implemented, we will workto clarify code requirements that will improve the code. I'm not aware of any other group re- questing a delay. During the 2000 legislative ses- sion, all building codes will be discussed as a result of the Con- struction Codes Advisory Council report to the Legislature that was required after the release of the Legislative Auditor's report last session. Key issues include the statewide building code, local building official interpretation and enforcement, conflicting codes and code coordination. Most states have only one or two code -administering agencies, while Minnesota has five. There is still opposition to the new code. Can you sum up the objections? Is the associ- ation helping builders with the cost factor by suggesting ways they can cut costs, without sac- rificing quality, in order to pay for the comfort that the new code will bring? The opposition to the code comes from the complexity of the code requirements, the in- creased costs and maintenance issues for homeowners and code enforcement issues. The association's primary fo- cus has been developing training and identifying areas of the code that need clarification. Our next focus tell be to assist the industry in communicating the new code requirements and maintenance issues to consumers. After the code is implemented and we can identify any innovative tech- niques that can cut costs while still meeting the code, the associ- ation will offer ongoing training on the code. VMany builders have com- plained that the new energy code makes homes unafford- able. Will it? Are there any loner term savings for the homeowner or the builder? A[� The new energy code will add estimated $3,000 to s10,000 to all new homes. The combination of the energy code, rising land costs due to lack of supply, government fees, increas- ing building material costs, and the labor shortage will make homes less affordable. The long- term savings of the new code, if any, can only be accurately meas- ured after the code goes into effect. NEWS Public Works Engineering The Pipeline Code Enforcement LETTER January 7, 2000 Parks Report The Parks Crew picked up trash from the parks daily. They also cleaned and flooded the skating rinks daily. They had to repair the door knobs at Friendly Hills and Marie Parks (vandalism). They repaired an electrical breaker in the warm- ing house at Marie Park. The Parks Crew assisted in plowing (they plow the cul-de-sacs, trails, parking lots and skating rinks). Utility Report Rich checked the City's seven sanitary lift stations daily. Rich was called in at 8:00 P.M. on Thursday to clear a sewer blockage on Victoria Road near Stratford Road. (One of the townhomes had sewage back- ing up into its basement). The downstream manhole was in a yard area and Rich could not find it, he had to use a metal detector. After he located the manhole, he cleared the line of roots, grease and rags. Rich was also called in on Friday (holiday) at 2:30 P.M. to clear an alarm at the Veronica lift station and at 3:30 P.M. on Saturday, because of a power outage at the Northland Drive lift station. He and Tim Oster came in over midnight on New Years Eve to check all the lift stations for any Y2K glitches — none were found. Rich performed a sanitary sewer inspection for a connec- tion for a new home being constructed at 1854 Orchard Hill. Street Report The Street Crew called "Gopher State One Call" for locations for the new stop signs at Decorah Lane and Ocala and for a re- placement sign at Bent Tree Lane and Huber Drive. The ground is too hard for the com- pressor to drive posts for the signs, so temporary ones will be placed until spring. The Street Crew responded to the following snow events this week: Date: Amount: 1-4-00 Dusting 1-5-00 1" 1-6-00 17' Activity: Sanded Streets Sanded Streets (some plowing) Plowed curb to curb beginning at 2:00 A.M. Gopher State One Call The close of the millennium has brought the following interest- ing statistics to our attention. First, some background infor- mation: Mendota Heights Engi- neering Department has the re- sponsibility to respond to "Gopher State One Call" locate requests. Gopher State One Call (651-454-0002) is a notifi- cation system established by Minnesota law to inform under- ground facility operators of in- tended excavation in the vicin- ity of their underground utility. We locate buried electric cable for our street lights, sanitary sewer and storm sewer pipes and manholes. St. Paul Water locates buried water mains and services. Other utilities doing locates are NSP Gas and Elec- tric, US West, Media One, Mobil Oil and Williams Pipeline. Each utility has its own color for the type of pipeline it operates. Our colors are red for electric and green for sewers. In the past year of 1999, there were 683,000 locate requests in the metro area. Mendota Heights received 2,300 locate requests and Lilydale (we do their locates re- quests also) received about 300 locate re- quests. Each year the number is rising which indicates the number of excava- tions and amount of underground pipes are also increasing. During the peak part of con- struction season it would not be unusual for the Engineering De- partment to receive 90 utility locate requests per week. Even in the dead of winter En- gineering gets a fair number of notifications for everything from "For Sale" sign installa- tions from realtors to cable television installations, or wa- ter main break repairs. This past week the Engineering De- partment went an entire week without getting any locate re- quests. Nobody can ever re- member going an entire week without any such activity. Is it merely coincidence or could it by Y2K preparedness or para- noia??