1999NEWS
Public Works
Engineering
Code Enforcement
LETTER
Parks Report
The Parks Crew picked up
trash from the parks daily.
They also worked on flooding
rinks, which were opened on
Tuesday. The warm weather
has really made skating diffi-
cult, but some kids are using
the rinks. Boot hockey is what
most of them are doing. The
Parks Crew plowed the City
cul-de-sacs, pedways and
parking lots on Thursday of
last week and Monday this
week.
Utility Report
Rich checked the City's seven
sanitary lift stations daily. He
plowed snow on Thursday and
Monday —Rich does the north
end of the City. He ran all the
generators and checked all the
batteries to make sure they
were ready —if needed New
Year's Eve.
Streets Report
The Street Crew plowed snow
on Thursday and on Monday.
Tim does the south end
streets, Dave does the west or
(Industrial Park area). Tom
ordered 150 tons of sand and
25 tons of salt to replace what
has been used. They also
worked on repairing mail
boxes that they hit snowplow-
ing.
Code Enforcement Report
The Pipeline
December 30, 1999
constructed at the south east
corner of Northland Drive and
Mendota Heights Road across
from the Super America sta-
tion. The building is a 6,000
square foot office building. The
plans submitted do not account
for type III construction
(masonry) or equivalent which
is a requirement in our busi-
ness and industrial zoned dis-
tricts. They also have not pro-
vided for the needed sound at-
tenuation required for the air-
craft noise zone they are in
(noise zone 3). Paul is working
with the architect to revise the
plans to comply with these and
other City Zoning Code issues.
YEAR 2000 STREET PROJECT
The Engineering Department
has started working on the lay-
out and design of the plans and
specifications for the year 2000
street reconstruction and reha-
bilitation project. Lake Drive
will be reconstructed with Mu-
nicipal State Aid (MSA) funds in
accordance with MSA standards
under this project. Conse-
quently, Marc Mogan attended
the one -day seminar on MSA
construction projects conducted
by MnDOT recently. The timing
couldn't have been better to
learn about the latest develop-
ments in this process since it
has been some time since the
City has undertaken a MSA
construction project of this
scope and magnitude.
CENTRE POINTE BUSINESS
PARK
Tax Increment Financing re-
quest presented by Roseville
Properties to install storm
sewer improvements to serve
Building Number 4, which is in
the early stages of construc-
tion, and the remaining unde-
veloped portion of the Centre
Pointe Business Park. Roseville
Properties made good on their
commitment to Mendota
Heights to have these improve-
ments in place before the end
of the year when Nova Frost
completed the installation of
this storm sewer system last
week.
Y2K
Rich Burrows and Tim Oster will
be on duty starting 11:00 P.M.
Friday night through midnight
to make sure they are available
for any emergencies. They will
also both be carrying cell
phones all day Friday and Sat-
urday so that we can get them
quickly to respond to any Y2K
problems. All vehicles will be
topped off with fuel and spare
gas cans filled. Auxiliary gen-
erators have been checked over
and are ready for use. Three
vehicles will be moved outside
before midnight to be ready to
shuttle generators or anything
else that should be needed. If
it looks like snow or ice —they
will also move out some plow
trucks. (The vehicles are being
moved out because the heavy
garage doors can not be
opened without an electric ga-
rage door opener).
Plans have been submitted by
RI Ryan Construction for the Late this fall Council approved a Happy 2000!
Farris Incentive building to be
NEWS
Public WorksEngineering The Pipeline
Code Enforcement
LETTER December 23, 1999
Utility Report
Rich checked the City's seven
sanitary lift stations daily.
When the frost is going into
the ground and when it comes
out are the two most frequent
times for watermain breaks.
This year was no exception,
we had a break on Decorah
Lane. According to our con-
tract with St. Paul Water Util-
ity, they fix these breaks and
repair the street damage.
While the main on Decorah
was shut down for repair, we
operated the fire hydrant by
the Friendly Hills ice rinks —
and the supply line broke. St.
Paul Water Utility thinks be-
cause the feed was different to
that hydrant as a result of the
ongoing repairs, water ham-
mer occurred when our crew
shut the hydrant off. Water
hammer breaks water lines.
Because this line only feeds
the hydrant and does not
serve any residential custom-
ers, St. Paul Water Utility has
three other breaks that do
serve residents and is com-
pleting those repairs where
residents are affected first.
This prevents us from flooding
the rink —the rink that we were
closest to having open.
Parks Report
The Parks Crew picked up
trash from the parks daily.
They continue to work hard at
trying to establish skating
rinks by flooding the rinks
daily. They hope to have them
open by December 27th. They
are also still completing repairs
to the warming houses. They
plowed cul-de-sacs, trails and
parks parking lots on Monday.
St. Paul Water conducted train-
ing on Wednesday, after the
Friendly Hills fire hydrant lead
break, to show everyone who
floods how to operate the hy-
drants —they need to be opened
and closed slowly to avoid wa-
ter hammer.
Street Report
We finally received enough
snow to plow and sand. Three
employees came in Sunday to
do some plowing of main routes
and sand slippery spots. Eve-
ryone came in at 2:00 A.M. on
Monday to plow the entire City.
They were done plowing before
noon.
There were a large number of
mail boxes vandalized in the
City this week, and we got
blamed for hitting them. The
vandals used bats (?) and on
occasion their vehicle to break
the boxes. The ones we know
about occurred on Willow Lane,
Valley Curve, Faro Lane and Li-
lac Lane.
We ordered and received sand
and salt to replace the amount
we used —Tom tries to keep the
storage bin full in case we get a
"big one"
35E Bridge Design Meeting
Held
Patrice Bataglia, resident and
Dakota County Commissioner,
was appointed along with Art
Werthuaser, resident and for-
mer St. Paul Bridge Engineer,
by the City Council to serve as
the City's representatives on
MnDOT's 35E aesthetic design
committee. Patrice reported to
me this week that the first
meeting of the committee had
been held. She said that the
main elements the committee
were reviewing were: the color
of the support beams (they are
looking at different shades of
blue), having a pedestrian
overlook and having landmarks
at the ends of the bridge. She
was impressed with the input
from the St. Paul representa-
tive —who was probably made
very knowledgeable because of
his recent dealings with several
other bridges in St. Paul. Their
next meeting is January 12th.
Patrice said that she intends to
report back to the City Council
on the committee's progress
soon.
H-applu H-oLWL2l s
NEWS
Public WorksEngineering The Pipeline
Code Enforcement
LETTER December 17, 1999
Parks Report
The Parks Crew performed daily
trash pickups in the parks. They
had to clean up Kensington Park
of Christmas tree lights —
presumably stolen ones that kids
had scattered all over the park.
They began flooding ice skating
rinks —they hauled out their
flooding equipment to the warm-
ing houses, and met with the
new attendants to go over the
rules and train them on hydrant
and hose use for flooding.
They replaced a round globe
light fixture on a pathway that
was broken by vandals at Men-
dakota Park. They also replaced
a regulatory sign in Ivy Hills Park
that informs pet owners that
dogs must be on a leash and
that the dog's owner is responsi-
ble for the clean up and removal
of their dogs excrement from
any public or private property.
The 1999-2000 Ice Rink Atten-
dant staff met on Thursday, De-
cember 16th. Eight rink atten-
dants were in attendance. Staff
for this rink season consists of
eleven attendants, many of
which are either high school stu-
dents or college students back
on winter break. Ice rink hours
are as follows: Monday —Friday
3:30 to 8:30 p.m., Saturdays
11:00 a.m. to 8:30 p.m., and
Sundays noon to 6:00 p.m. Re-
served ice time for hockey prac-
tice has decreased this season
as many of the teams will be
practicing at the West St. Paul
Ice Arena due to the merger be-
tween Mendota Heights and
West St. Paul hockey programs.
The tentative opening date for
the ice rinks is set for Monday,
December 27th.
Flooding of the three hockey and
three causal skating rinks located
in Friendly Hills, Wentworth and
Marie Parks began on Thursday
by the three -member crew. Each
application of water requires two
hours per rink and can only be
done when freezing conditions
exist. The Parks Crew receives
assistance from some of the rink
attendants and local residents
who have children that skate in
the Mendota Heights Athletic As-
sociation programs.
Utility Report
Rich checked the City's seven
sanitary lift stations daily. Rich
fixed a "rattling" manhole cover
on Marie Avenue. Sometimes
manhole covers get damaged and
"rattle" or make a noise every
time a car drives over them —the
noise can be so loud that it dis-
turbs residents inside their
nearby homes.
Street Report
The City closed on the 11 plus
acre site at Resurrection Ceme-
tery last week. We now own the
site, so this week we located a
spot on the site to deposit our
street sweepings next spring.
The Street Crew began construc-
tion of a driveway access to the
site this week. They installed a
culvert to allow drainage to con-
tinue in the ditch under the drive-
way and used street sweepings
from the Mulvihill site by Acacia
Cemetery where the City has
been storing them for the past
few years to build up a driveway.
The Crew also performed street
sign maintenance such as
straightening skewed or fallen
signs, replacement of stolen or
damaged signs and replacement
of faded signs. Regulatory signs
such as parking restrictions are
on "Engineer Grade" materials.
These signs last up to four or five
years. For the past several years
the City has been using "High In-
tensity" grade materials for stop,
yield, and speed limit signs be-
cause of the increased reflectivity
of the material which can last up
to ten years.
Code Enforcement Report
This week permits were issued for
two new single-family homes to
be constructed by Bjorklund Con-
struction at 1854 Orchard Hill and
the other home to be constructed
by Heaver Construction at 1441
Clement Street.
Warnke House
The environmental clean up of
the Warnke house located next to
the Fire Hall was completed fol-
lowing air quality testing on
Wednesday. The well was filled
with grout/concrete as required
by the Dakota County Environ-
mental Department and final
demolition is scheduled for Fri-
day, December 17th. All building
materials including concrete foot-
ings and slabs will be removed
and the disturbed areas leveled
and top -dressed with black dirt.
Next spring the City Park Crew
will seed the area and transplant
several trees along the west and
north property lines adjacent to
the new Mendakota Country Club
maintenance facility.
£ sedgy fiiVS V1111M
NEWS
Public WorksEngineering The Pipeline
Code Enforcement
LETTER December 10, 1999
Parks Report
The Parks crews removed,
cleaned, and stored the pur-
ple martin houses for the
winter. They replaced some
damage to the corner boards
at the Wentworth Park
hockey rink. They installed
plow controls for the three
Park crew trucks that are
used for plowing cul-de-sacs
during the winter. They also
attended the annual Minne-
sota Turf and Grounds Foun-
dation Conference that were
held at the Minneapolis Con-
vention Center this week.
Utility Report
Rich checked the City's seven
sanitary sewer lift stations
daily. Rich also assisted
Braun Pump, a private pump
station supplier and Contrac-
tor, in repairing a malfunc-
tioning controller box at the
Centre Pointe lift station.
Rich cleaned some built-up
grease from the controller
floats at the Veronica Lane
lift station. He performed an
inspection for a storm sewer
connection to the City's sys-
tem for the new home under
construction at 990 Diego
Lane. This connection was
installed to comply with a
Council building permit con-
dition requiring that John
Mathern construct a drain
pipe to insure that surface
runoff can be drained from
the rear yard upon comple-
tion of this new home.
Street Report
The Street crew installed stop
and street signs on Glen Toro
Road in the newly completed
development in the northwest
quadrant of the Huber Drive
and Delaware Avenue inter-
section. They removed the
hoods covering the no parking
signs along Victoria Curve.
They cleaned storm sewer
grates in various locations
throughout the City. They
checked on street lights that
were not operating in the
Centre Pointe Business Park.
They picked up parts for the
grader, and started to update
the control panel for the hy-
draulic controllers in truck
308. They inventoried and
prepared a list of trees that
will be trimmed, and signs
that will be targeted for future
maintenance or replacement.
John Ambrose performed re-
pairs on the Parks broom and
snow blower equipment.
City Entrance Sign
Significant progress was made
this week on the construction
of the City entrance/
monument sign located in the
southeast corner of the Men-
dota Heights Road and Dodd
Road intersection. Installa-
tion of the cut stone wall was
completed last week, and on
Saturday the face stone was
mortared into place around
the sign base. The mortar
was washed with acid, and an
anti -graffiti sealer was applied
early Wednesday. The cap
stone and sign were then in-
stalled later Wednesday after-
noon. Landscape trees were
installed on Thursday around
the entrance/monument sign.
Two up -flood lights remain to
be installed to illuminate the
front of the sign after the
electrical connections are
made. Shrubs, ground cover
plantings and turf will not be
installed until next spring.
View of City Entrance/Monument Sign
NEWS
Public Work The Pipeline
Engineering
Code Enforcement
LETTER December 3, 1999
Parks Report Code Enforcement Report
The Parks Crew worked on
cleaning up the yard of the
house that the City recently ac-
quired and demolished on Lex-
ington Avenue. They installed
gutters over the doors on the
Friendly Hills warming house
and they installed berms around
the rinks to contain the water
used for flooding and making
the ice skating rinks.
Utility Report
Rich checked the City's seven
sanitary lift stations daily. Rich
replaced a hydrant marker that
was broken. He exercised the
backup generator at the Men-
dota Heights Road main sanitary
sewer lift station.
Street Report
The Street Crew filled low spots_
in the gravel alley between Fre-
mont and Hiawatha Avenues.
They removed a dead tree from
the boulevard at 513 Hiawatha
Avenue. They repaired a pot-
hole in the Crown Point
neighborhood.
Dave met with a resident at
Lower Colonial and Cherry Hill
Road to try and find an accept-
able location for a street name
sign that had been relocated to
improve sight distance. He also
worked with the Mayflower
Building contractor to determine
the location for a City street
light that needs to be relocated
from their driveway location.
The Crew continued to install
snow plow guide posts in un-
curbed areas at homeowners re-
quests.
Dick and Paul have been attend-
ing seminars put on by the State
of Minnesota presenting the re-
quirements of a new Energy
Code that will be implemented
April 2000. Although the
changes appear in the Energy
Code most of them relate to
"indoor air quality" and the ma-
jority of them are ventilation air
requirements. The changes will
be difficult for the contractors to
implement and the City to en-
force. A majority of the changes
affect residential construction
and will add significantly to the
cost of building a new home. For
example, it will be mandated that
all new homes have an air ex-
changer and that alone could in-
crease the cost of a new home
over$2,000.
There were two new single family
house permits issued this week.
With these latest two the total of
new homes constructed this year
is 13. The St. Thomas Academy
permit review was completed this
week and their full permit was is-
sued for their middle school ex-
pansion. A footing foundation
permit had been issued earlier
and that work is currently under-
way. There were a number of in-
spections at Lloyd's Barbeque
this week for their expansion
work (the expansion work has
Pretty much put them out of
business for awhile so they are
anxious to finish the work as
soon as possible).
Year 2000 Street Project
Public hearing notices were
mailed to 216 affected property
owners last week to alert them of
next Tuesday's public hearing on
the proposed Year 2000 Street
Reconstruction and Rehabilitation
Improvement Project. The no-
tices prompted a very limited
amount of telephone calls or
written comment. It will be in-
teresting to see if this limited re-
sponse correlates in any way to
the actual turnout at the upcom-
ing public hearing.
Watershed Joint Powers
Agreements
Dakota County's Board of Com-
missioners and staff recently no-
tified the Lower Mississippi River
Watershed Management Organi-
zation (LMRWMO) that they were
aware that the LMRWMO joint
powers agreement (JPA) was due
to expire on January Ist 2000
(see attached letter). They went
on to state that the County would
be obligated under state statute
to petition the Board of Soil and
Water Resources to establish a
watershed district if there is no
JPA in place. A watershed dis-
trict established by the County
under these circumstances would
also be granted taxing authority.
The County is encouraging the
member communities of the
LMRWMO to approve an exten-
sion to the existing JPA to pre-
vent this from happening. The
Engineering Department will pre-
sent an amendment for Council
approval to extend the existing
JPA for the LMRWMO, and possi-
bly the Gun Club Lake Watershed
Management Organization, at
Council's second meeting in De-
cember.
Office of the County
3card
Dakota County
Administrtion Center
1590 Highway 55
Hastings. MN 550333
651 a38.4418
Fax 651 438.4-405
www.co.dakom.mo.us
i�
C O U N T.
November 24, 1999
Mr. William Hankee, Chair
Lower Mississippi River'Natershed Management C ganization
1101 Sibley Memorial Highway #309
Lilydale, MN 55118
Dear Mr. Hankee:
Dakota Counfijs Board of Commissioners and staff are aware that the Lower.
Mississippi River Watershed Management Organization (L&iRWMO) joint powers
agreement (JPA) will expire on January 1, 2000. As you are aware, by statute, Dakota
and Ramsey Counties must petition the Minnesota Board of Water and Soil Resources
I or the establishment of a watershed district, if there is no JPA in place.
The question of future watershed management has became an important one in many
parts of the Metropolitan Area. Dakota County addressed surfacewater management in
its recantly approved 2020 Comprehensive Plan. The County's 2020 Comprehensive
Plan states that'Watershed Management Organizations (WMOs) will be the responsible
governmental units for surface water management'
Dakota County supports local control of surface water management decisions and
would prefer not to petition to establish. a watershed district The Vermillion River WMO
(VRWMO) is facing a situation similar to the LMRWMO with its JPA, and developed an
extension amendment for its members to sign that will extend its currant JPA until the
new JPA is developed and approved.
I anc!csed a copy of the proposed extension to the VRWId10 JPA as an example of an
amendment that, if signed by the LMRWMO members, would eliminate the need for
Dakota and Ramsey Counties to petition to establish a watershed district Please
consider developing a similar extension amendment to the LMRWMO JPA that will
cover the time during which the LMRWI4i0's sacond generation watershed management
plan and new JPA are developed and approved. Please encourage the member
communities of the LMRWMO to sign a JPA extension amendment as soon as possible.
I would appreciate it if you would discuss this issue at your December 2, 1999, meeting.
If you have any questions, please call Lisa Ring at (612) 891-7018.
Sincerely, ,
Michael E. Turner, Chair
Dakota County Scard of Commissioners
Dakota County Board of Commissioner. -
Brandt Richardson, Dakota County Administrator
Lynn'vlertzka, Diractor, Dakota County Office of Planning
Rafael Ortega, Chair, Ramsey County Board of Commissioner
LMRW;NO Member Community Mayors
Phi! 5elficri, Minnesota Board of Water and Soil Resources
Enc!
Approved by the Town Board
19
Approved by the Town Board
19
Approved by the Torun Board
19
Approved by the Town -Board
1Q
MARSHAN TOWNSHIP
BY:
Attest:
EUREKA TOWNSHIP
BY:
Attest:
CASTLE POCK 1 OWNSHTr
BY:
Attest:
®OUG"LAS TOWNSHIP
BY:
Attest:
Approved by the Town Board NININGER TOWNSHIP
19
BY:
Attest:
CTC . . . .
91197 01 2
RNX:10I15/99
1 HIRD AMENDMENT
TO JOINT POWERS AGREEMENT
ESTABLISHING A WATERSHED MANAGEMENT
COMMISSION FOB T HE
VERMILLION RIVER WATERSHED
THE PARTIES TO THIS -AGREEMENT are members of the Vermillion
River Water Management Commission. This amendment is made pursuant
to the authority conferred upon the parties by Minn. Stat. Sections 471.59
and 473.875, et sea.
1. EXISTING AGREEMENT. The existing Joint Powers Agreement
for the Vermillion River Water Management Commission, including the First
and Second Amendments thereto, are incorporated herein and shall remain
in full force and effect, except as specifically amended by this Agreement.
2. PARAGRAPH-1.11 SUBDIVISION 1 of the Joint Powers
Agreement is amended to provide:
Each member agrees to be bound by the terms of this
Agreement until August 1, 2000, and it may be continued
thereafter upon the agreement of all the parties.
3. EFFECTIVE ®ATE. This Agreement shall be in full force and
effect when all twenty-one (21) existing members approve and sign this
Agreement. All members need not sign the same copy.
IN WITNESS WHEREOF, the undersigned governmental units, by
action of their -governing bodies, have caused this Agreement to be executed
in accordance with the authority of Minn. Stat. § 471.59.
Approved by the Town Board EMPIRE TOWNSHIP
,19
W
Attest:
81797.01 1
RYK:10115l99
NEWS
Public Works Engineering The Pipeline
Code Enforcement
LETTER November 24, 1999
Parks Report
The Parks Crew picked up
trash from the Parks daily.
They cut up and removed a
large tree limb that had fallen
on the Valley Park pedway.
They repaired a light fixture
that had been damaged by
vandals in Mendakota Park.
They serviced and stored all
their small equipment that is
only used in the summer
(changed oil, etc. on the weed
whips and hand mowers).
Street Report
The Street Crew installed snow
plow guide posts in non -
curbed neighborhoods where
we are known to have prob-
lems locating the roadway
when plowing. They filled in a
wash out at Mendota Heights
Road and Lexington Avenue
where a street light conduit
was exposed. They reinstalled
some street name sings that
were stolen in the Kressin
neighborhood. They rebuilt a
wing cylinder on plow truck
#308. Len worked on servic-
ing plow truck #312 and then
after he was done, they in-
stalled the wing, plow and
sander on it for winter plow-
ing.
Utility Report
Rich checked the City's seven
sanitary sewer lift stations
daily. He continued to work
on flushing the Furlong
neighborhood sanitary sewer
lines. He installed replacement
hydrant markers at various lo-
cations in the City.
ArcView GIS Software Up-
date
The Engineering Department
has purchased and installed the
latest ArcView GIS software
program update on the Engi-
neering Department's GIS com-
puter station. The previous
version of the software did not
have the capability to import
geographic information survey
data into a format that could be
incorporated into a plan for de-
sign purposes. This software
limitation prevented the Engi-
neering Department from fully
utilizing the vast amount of
geographic information survey
data that was at the Engineer-
ing Department's disposal. This
software program update now
has this capability, and will
likely become an invaluable and
efficient source of geographic
survey data for design purposes
in the Engineering Department.
Warnke House (Next to Fire
Hall
Mendota Heights has ownership
rights to the existing property
next to the fire hall under a life
lease agreement with Mr.
Warnke. City Council has not
determined the future disposi-
tion of the existing house next
to the fire hall, but has directed
the Engineering Department to
solicit bid estimates for the
possible demolition and resto-
ration of the site. The first step
in this process will be to per-
form an environmental investi-
gation of the building materials
used to construct this 720
square foot home that was built
in 1930. On Saturday morning,
Excel Environmental was given
access to the house to collect
material samples for testing.
Preliminary results indicate that
there is an abundance of asbes-
tos building materials used in
the construction of this house.
Demolition contractors will be
asked to bid on the removal of
the house including a separate
bid to cover any environmental
cleanup costs. Bid results
should be available for the De-
cember 7th Council meeting.
Year 2000 Proiect Notices
Attached are copies of the no-
tices that were sent out to the
residents informing them of the
December 7th public hearing.
Happy
Thanksgiving
City of
Mendota Heights
November 24, 1999
Subject: Year 2000 Street Reconstruction Project
Public Hearing Notification
Job No. 200001, Improvement No. 2000, Project No. 1
Dear Resident:
Earlier this summer City Council identified potential neighborhoods for a year 2000
street reconstruction or rehabilitation project in Mendota Heights. Council directed staff to
poll property owners to determine the level of interest to be chosen as the City's street
reconstruction or rehabilitation project for the year 2000 in neighborhoods throughout the City
including the Delaware Crossing, Ivy Falls, Rogers Lake, and Somerset areas.
A letter describing street improvement projects, and a self-addressed postage paid
postcard was sent to property owners in these neighborhoods. Property owners were asked to
sign and mail these postcards back to City Hail no later than August 31, 1999 indicating their
support or opposition for a year 2000 street project. The information packet was mailed on
August l lth, 1999 to 75 affected property owners in Delaware Crossing, 55 property owners
in Ivy Falls, 78 property owners in Rogers Lake and 98 property owners in the Somerset area.
Property owners returned a high percentage of the postcards mailed out for this poll. The poll
responses returned in descending percentage order by area were Ivy Falls 78%, Delaware
Crossing 76%, Rogers Lake 76%, and Somerset 74%. Support for the initiation of a Year
2000 Street Improvement Project by residents responding to the poll in descending percentage
order by area were Ivy Falls 88%, Rogers Lake 71 %, Delaware Crossing 60%, and Somerset
44%. Council ordered the preparation of a feasibility report by resolution to consider a public
improvement project for a Year 2000 Street Improvement Project for the Delaware Crossing,
Ivy Falls and Rogers Lake area at the September 7, 1999 Council meeting based on this poll
and other input received.
The proposed improvement project would upgrade all streets to meet current City
Standard street criteria. City Standard streets have a 3.5". thick bituminous pavement surface
constructed over a 6" gravel base with concrete curb and gutter, and storm sewer where
appropriate. All streets are currently approximately 30 feet wide, except for the north/south
segment of Lake Drive, and the segment of Swan Drive between Wagon Wheel and Cheri
Lane, which are 27 and 24 feet wide respectively. All reconstructed streets, except the
segment of Swan Drive between Wagon Wheel and Cheri Lane, would consist of a 30-foot
width of bituminous pavement plus the addition of MnDot B618 concrete curb and gutter to
each side of the pavement. The total width of this City Standard street section measures 34.33
feet between the outside edges of the concrete curb and gutter. The Swan Drive segment
between Wagon Wheel and Cheri Lane would be reconstructed 26.33 feet wide between the
outside edges of the concrete curb and gutter.
(over)
1101 Victoria Curve • Mendota Heights, MN • 55118 (651) 452-1850 • FAX 452-8940
Residents November 24, 1999
Year 2000 Street Reconstruction Project Page 2
Residential property owners whose parcels currently have driveway access abutting one
of the proposed improved streets would be assessed up to fifty percent (50%) of the project
cost on a per lot basis for the street reconstruction improvements under this project. The
property owner's fifty percent (50%) share of the preliminary estimated project cost is
approximately $3,700 per lot. These special assessments could be paid up front without
interest, or added to the property owner's taxes at an estimated average cost of $28 per month
over a 19-year period at 7 % simple interest.
Residents will be offered the opportunity to replace their entire existing driveway under
this improvement project. This additional driveway replacement cost could be paid by the
resident out of pocket, or added to the base special assessment over a 10-year period at 7 %
simple interest.
Attached is a copy of the formal public hearing notice to consider a street
reconstruction improvement project to serve the Rogers Lake area neighborhood. A feasibility
report has been prepared which describes the project in greater detail, and is available for
review at City Hall. City Council invites you to attend and comment on this proposed
improvement project at a public hearing scheduled for December 7, 1999, at 8:00 P.M at City
Hall. If you so desire, you may also express your opinions or comments relative to this
improvement project to me, or Jim Danielson, by telephone (651-452-1850), or preferably in
writing, prior to this December 7, 1999 public hearing.
Sincerely,
Marc S. Mogan, P.E.
Civil Engineer
NvISM
Enclosure
City of
Mendota Heights
November 24, 1999
Subject: Year 2000 Street Rehabilitation Project
Public Hearing Notification
Job No. 200002, Improvement No. 2000, Project No. 1
Dear Resident:
Earlier this summer City Council identified potential neighborhoods for a year 2000
street reconstruction or rehabilitation project in Mendota Heights. Council directed staff to
poll property owners to determine the level of interest to be chosen as the City's street
reconstruction or rehabilitation project for the year 2000 in neighborhoods throughout the City
including the Delaware Crossing, Ivy Falls, Rogers Lake, and Somerset areas.
A letter describing street improvement projects, and a self-addressed postage paid .
postcard was sent to property owners in these neighborhoods. Property owners were asked to
sign and mail these postcards back to City Hall no later than August 31, 1999 indicating their
support or opposition for a year 2000 street project. The information packet was mailed on
August 11th, 1999 to 75 affected property owners in Delaware Crossing, 55 property owners
in Ivy Falls, 78 property owners in Rogers Lake and 98 property owners in the Somerset area.
Property owners returned a high percentage of the postcards mailed out for this poll. The poll
responses returned in descending percentage order by area were Ivy Falls 78%, Delaware
Crossing 76%, Rogers Lake 76%, and Somerset 74%. Support for the initiation of a Year
2000 Street Improvement Project by residents responding to the poll in descending percentage
order by area were Ivy Falls 88%, Rogers Lake 71 %, Delaware Crossing 60%, and Somerset
44%. Council ordered the preparation of a feasibility report by resolution to consider a public
improvement project for a Year 2000 Street Improvement Project for the Delaware Crossing,
Ivy Falls and Rogers Lake area at the September 7, 1999 Council meeting based on this poll
and other input received.
Streets rehabilitated under this project would be resurfaced with a simple mill and
bituminous overlay paving method where this design is appropriate and economically
beneficial. The City will determine which sections of concrete curb and gutter will be replaced
to repair damage or to insure proper drainage. Concrete gutter sections adjoining driveways
were typically installed at the property owner's expense in conjunction with driveway
construction after curb and gutter was placed on the abutting street. City policy has always
been that all expenses related to private driveways are the responsibility of the property owner.
For this reason I propose that the property owner make the decision regarding replacement of
this concrete gutter section through driveways, and that the additional cost of this work be split
between the property owner and City based on this items contract unit price cost (residents'
est. share = $10/ft.) so that this work is not funded by other residents within the project area.
(over)
1101 Victoria Curve • Nlendota Heights, NIN • 55118 (651) 452-1850 • FAX 452-8940
Residents
November 24, 1999
Year 2000 Street Rehabilitation Project Page 2
Property owners whose parcels currently have driveway access abutting one of the
proposed improved streets would be assessed up to fifty percent (50%) of the project cost on a
per lot basis for the street rehabilitation improvements under this project. The property
owner's fifty percent (50%) share of the preliminary estimated project cost is approximately
$1,300 per lot. These special assessments could be paid up front without interest, or added to
the property owner's taxes at an estimated average cost of $16 per month over a 10-year period
at 7 % simple interest.
Residents will be offered the opportunity to replace their entire existing driveway under
this improvement project. This additional driveway replacement cost could be paid by the
resident out of pocket, or added to the base special assessment over a 10-year term of the
assessment at 7% simple interest.
Attached is a copy of the formal public hearing notice to consider a street rehabilitation
improvement project to serve the above referenced neighborhoods. A feasibility report has
been prepared which describes the project in greater detail, and is available for review at City
Hall. City Council invites you to attend and comment on this proposed improvement project at
a public hearing scheduled for December 7, 1999, at 8:00 P.M at City Hail. If you so desire,
you may also express your opinions or comments relative to this improvement project to me,
or Jim Danielson, preferably in writing, or by telephone (651-452-1850), prior to this
December 7, 1999 public hearing.
Sincerely,
Marc S. Mogan, P.E.
Civil Engineer
MSM
Enclosure
NEWS
Public WorksEngineering The Pipeline
Code Enforcement
LETTER November 19, 1999
Parks Report
The Parks Crew picked up
trash from the Parks daily.
They cut up and removed a
downed tree that was on the
pedway between Friendly
Hills and the shopping cen-
ter. They replaced a light
that was broken by vandals
in Mendakota Park.
Utility Re ort
Rich checked the City's
seven sanitary lift stations
daily. He inspected Lily -
dale's storm sewer system
as Council agreed to do for
them. He checks their sys-
tem twice a year, in the
spring and in the fall and we
bill Lilydale for his time. He
installed a replacement hy-
drant marker in Valley
Curve. Rich flushed the
sanitary sewer mains in the
Furlong neighborhood (there
had been a new house addi-
tion that caused some sand
to be in the line).
Street Report
The Street Crew installed
the plow, wing and sander
and removed the radio from
Truck #303. They then de-
livered it to Lakeland Ford
because it was to be traded
in for the new year 2000
plow truck that has now
come in. The new truck is
at "Falls Equipment" having
its new plow, wing and
sander installed.
Mendota Meadows
Last Friday Marc Mogan was
subpoenaed by the attorney
representing Cynthia
Schanno to testify at the ar-
bitration hearing in the case
of Cynthia Schanno versus
Mendota Meadows. The at-
torney's line of questioning
towards Marc was focused
primarily about his observa-
tions on the subject of the
stability of the slope on the
Schanno property on the east
end of the development. The
arbitrator was hoping that
testimony from the individu-
als remaining on the witness
list would be concluded by
this Monday.
CAC Meeting of the Lower
Mississippi WMO
The watershed's Citizen Advi-
sory Committee (CAC) meet-
ing that had been scheduled
for November 22nd, 1999 has
tentatively been rescheduled
to meet on January 24th
2000.
Boulevard Tree Program
Planting of the 30 boulevard
trees requested by residents
began on Wednesday and will
be completed late this week
or early next week, weather
permitting.
House Demolition
Demolition of the house lo-
cated at 2401 Lexington Ave-
nue, just east of the water
tower is scheduled to begin
on Friday, November 19th or
next Monday. Work was de-
layed until the environmental
clean-up required by the
MPCA was completed on
Thursday. Excel Environ-
mental, hired by the City,
collected samples of building
materials that were sus-
pected of containing asbestos
at the site and submitted
them for analysis. Samplers
were collected of the follow-
ing materials: wall plaster,
furnace insulation, tar paper,
electrical wire wrap, shingles,
window caulking, 9x9 floor
tile, sink undercoating, chim-
ney brick, etc. Asbestos was
detected in the window glaz-
ing, heat shield behind an
electrical wall heater and in
the sink undercoating. The
demolition and site restora-
tion should be completed
next week with only the clo-
sure of the well, permit
pending from the County, re-
maining. The City Park Crew
will seed and the disturbed
areas and maintain the site
until future use is determined
for this one acre site.
NEWS
Public WorksEngineering The Pipeline
Code Enforcement
LETTER November 12, 1999
Parks Report
The Parks Crew picked up
trash from the Parks
daily. They made repairs
to the soccer nets and
goals. They removed the
rest of the soccer nets
from Kensington. They
hauled dirt and filled
some settlement areas
around the various parks
and the Public Works Ga-
rage. They installed dirt
around the hockey rinks
so that water will not leak
out when they are
flooded.
Utility Report
Rich checked the City's
seven sanitary lift sta-
tions daily. Rich per-
formed sanitary sewer in-
spections for new resi-
dential connections at
2376 LeMay Lake Road
and on Knollwood Court.
He also installed a hy-
drant marker on a hy-
drant on Valley Curve.
Street Report
John Ambrose welded
new side plates on the
tail gate of the dump
trucks to keep material
from falling out of the
sides when being dumped.
Dave, Tim and John gave
tours of the shop to three
classes of preschoolers
from Somerset Elemen-
tary Monday, Tuesday and
Wednesday of this week.
Kids and their parents
toured one class a day for
three days. Tom told me
that when one child was
allowed to honk the horn
on one of the large trucks
he scared half the class to
tears — live and learn.
Dave replaced the light
bulbs at the Mendota
Heights Road and TH 55
traffic signal this week
(replacing lights is our re-
sponsibility at this signal).
They performed sign
maintenance at various lo-
cations (replaced faded
signs and straightened
posts). They removed a
brush pile left by MnDOT
at Ivy Falls Avenue and
Dodd Road.
Code Enforcement Re-
port
A building permit was is-
sued this week to Dewy
Thorbeck to construct the
first home in the Glen
Toro Addition at Delaware
Avenue and Huber Drive.
The footings were dug and
formed. A permit was is-
sued to United Properties
to finish off 8,580 square
feet of office in their new
three story building lo-
cated at 1270 Northland
Drive fronting on I 494.
The name of the company
to occupy the space is
Page Net. A smaller com-
pany called New Century
Mortgage also received a
permit to finish 1,260
square feet of office space
in the same building.
Eco Lab submitted a re-
quest for a permit for a
building modification to
install a new elevator.
Because the work also in-
volves exterior work, the
request was put on the
November 16th City Coun-
cil agenda for review and
authorization to issue the
permit. Kinko's who are
currently located at 1395
Northland Drive (Mendota
Heights Business Center)
received a permit to ex-
pand their business.
NEWS
Public WorksEngineering The Pipeline
Code Enforcement
LETTER October 22, 1999
Parks Report
The Parks Crew completed
general maintenance in the
parks this week including daily
trash pick up, grass cutting,
mulching leaves and striping
soccer fields. They striped the
soccer fields for the last time
this week. They cleaned the
restrooms for the final time
(they will be removing water
meters, winterizing, and lock-
ing up the restrooms for the
season). They aerated some
of the soccer fields and re-
moved the soccer goals from
the neighborhood parks. They
started putting down the fall
application of fertilizer.
Utility Report
Rich checked the City's seven
sanitary lift stations daily.
John Ambrose repaired the
lock latch at the St. Thomas
Academy lift station by welding
it back together. Rich re-
placed several hydrant mark-
ers throughout the City. They
get broken by kids (it's been a
real problem by the Friendly
Hills Middle School).
Street Report
John Ambrose finished fabri-
cating and installing a safety
device for the catch basin at
Vail Drive and Lexington Ave-
nue to calm the fears of the
day care supervisor at Royal
Redeemer Lutheran Church.
They worked on straightening
signs on Mendakota Drive and
also fabricated and installed
new street name signs at Aca-
cia Boulevard, Valencour Circle,
Glen Toro Drive and Huber
Drive. They continued to pre-
pare the trucks for plowing
snow, #308 is totally ready to
go, the others are almost ready
but are being used to haul
brush so they still need to have
the plows, wings and sanders
mounted. They also hauled
brush to the Halloween Bonfire
site and pushed it together in a
pile. Dave worked with Total
Electric, a private contractor, to
replace burned out street lights
in the Industrial Park and at
City Hail.
City Sian Construction
On Wednesday, Total Construc-
tion began work on the Monu-
ment/City Entrance sign. Fol-
lowing site preparation, the
concrete footing for the sign
base will be poured on Thurs-
day. Work on the sign is
scheduled to be completed in
late November.
Lexington Avenue House
Demolition
Demolition contractors have
been contacted requesting bid
proposals for the demolition
and site restoration of the
house located on Lexington
Avenue east of the City Water
Tower which was acquired by
using TIF funds. The City takes
possession of the house on No-
vember 10th which then allows
only three to four weeks for all
necessary work items to be
completed. The house will be
demolished, concrete footings,
slabs, walls as well as two sep-
tic tanks will be removed. The
well will be closed, many of the
undesirable trees and shrubs
will be removed, and the base-
ment will be filled and top
dressed with black dirt. The
driveway will also be removed
and the ditch line re-
established along Lexington
Avenue. In the spring, City
Parks Crew will seed the site
and begin routing mowing and
maintenance.
Code Enforcement Report
The new Mayflower building
had its footings poured this
week —which is the first inspec-
tion. The footing and founda-
tion permit was issued for the
Middle School Addition to St.
Thomas Academy. Heaver
Construction was issued a sin-
gle family home permit for his
new development on the end of
Knollwood Lane, he still has five
empty lots available. Code En-
forcement received the building
plans from Ryan Construction
this week to build Centre Pointe
IV. This is a 27,170 square
foot building shell for an office
structure on Centre Pointe
Drive.
NEWS
Public WorksEngineering The Pipeline
Code Enforcement
LETTER October 15, 1999
Parks Report
The Parks Crew completed
general maintenance in the
parks this week including
daily trash pick up, grass cut-
ting, and striping soccer
fields. The Parks Crew per-
formed the final round of
grass cutting adjacent to the
trails this week. They re-
moved tree suckers that
were growing up around the
tennis courts fence lines.
They trimmed and removed
brush from along the Curley's
neighborhood pedestrian
trail. They removed a tree
hazard from Kensington Park
that was reported by a resi-
dent (behind the US West
building).
Utility Report
Rich was on a hunting vaca-
tion this week, so Tom Olund
performed his lift station du-
ties. Tom had to call in a pri-
vate contractor to replace the
"alternator" at the Veronica
Lane lift station. Each lift
station has two pumps which
alternate pumping and they
were not alternating.
Street Report
The Street Crew fabricated a
storm grate attachment for a
storm inlet across from City
Hall. (The new Royal Re-
deemer day care supervisor
was concerned that the
openings were too large).
They continued to prepare
the trucks to plow snow.
They worked on straightening
and replacing signs.
GlenToro Second Edition
Municipal Contracting Ser-
vices, Inc. is putting the fin-
ishing touches on Glen Toro
Road this week. All utilities
have been installed and top-
soil is being spread along the
boulevards and disturbed ar-
eas. The final lift of bitumi-
nous will be added next spring
so we can monitor any settle-
ment that may occur during
the next 6 months.
ISTS
Following Council direction,
letters were sent out last
week to notify possible own-
ers of septic systems in the
City that we are starting a
maintenance program. Also
sent was a copy of the pro-
posed ordinance for the regu-
lation of these systems. Re-
sponse has been limited to
several property owners who
wished to have their names
removed from the list or those
asking direction for mainte-
nance. In a couple cases we
have found additional systems
unbeknownst to the City.
Y2k Proiects
Engineering has been gather-
ing information for proposed
projects for the year 2000.
Surveying has been taking
place in the Rogers Lake area
and along Lake Drive. Marc
has been assimilating the in-
formation for the feasibility
report that will be presented
soon.
Code Enforcement Report
St. Thomas Academy plans to
construct a new middle school
addition and plans for the ad-
dition have been reviewed
and approved for a footing
and foundation permit. STA is
currently working on licensing
requirements for their sub-
contractors.
Paul noticed that Resurrection
Cemetery was doing some ex-
cavating and called to see
what was going on. He was
informed that they were pre-
paring a base to install a
statue. Statues are an al-
lowed use within the Residen-
tial District as decorative
landscape features. Resurrec-
tion has also submitted plans
to construct a second mauso-
leum. This construction will
need to have a CUP issued
prior to the construction.
St Paul Water Report
We received copies of St. Paul
Water Utility's 1999 Water
Quality Report this week. I
thought it was an interesting,
informative report and or-
dered copies to include with
the Pipeline.
NEWS
Public Works
Engineering
Code Enforcement
LETTER
Parks Report
The Parks Crew completed gen-
eral maintenance in the parks
this week including daily trash
pick up, grass cutting, and strip-
ing soccer fields. The Parks
Crew finished blowing out the
lawn sprinkler systems and re-
paired broken sprinkler heads.
They repaired a toilet a Kensing-
ton that was broken by vandals.
They repaired and replaced bro-
ken and damaged signs in
Rogers Lake Park.
Utility Repot
Rich checked the City's seven
sanitary lift stations daily. Rich
performed preventative mainte-
nance at the Mendota Heights
Road and Lilydale lift stations by
greasing the pumps and valves.
He exercised the standby gen-
erator at the Mendota Heights
Road station. He replaced bro-
ken hydrant markers on Winston
Court, Concord Way and High-
way 13 and Mendota Heights
Road.
Park Maintenance
Several maintenance projects
within the parks have been com-
pleted or are ongoing by private
contractors. Picnic shelters in
Rogers Lake and Valley Park
were re -roofed on Wednesday.
When constructed in the early
70s the roofs were constructed
of cedar shakes. Replacing
them would have cost approxi-
mately $14,000. The
"Timberline" type asphalt shin-
gles resemble cedar shakes,
have a 40-year warranty, and
are approximately one-third of
the cost of cedar shakes.
October 8, 1999
Prairie Restorations, Inc. is re-
moving unwanted volunteer trees
and weeds from the Ivy Park na-
tive planting areas around the
holding pond. They may also do
a controlled burn this fall of the
wildflower prairie grasses to bet-
ter control invasive weed growth.
R. L. Reynolds Landscape will
be performing maintenance work
on the landscape berms in North
Kensington Park. Trees will be
straightened, weeds removed,
and shrubs replaced as neces-
sary. With adequate weed con-
trol, shrub growth will eventually
spread to cover the entire berm,
and thereby eliminate much of
the future weed growth.
Street Report
The Street Crew patched pot-
holes on Kay Avenue and Walsh
Lane. They installed new signs in
the Cherry Hills neighborhood.
(We replace the signs in
neighborhoods when their streets
are redone.) They cleaned up
some slurry seal complaints on
Hampshire. They began outfit-
ting some of the plow trucks for
this winters snow plowing duties.
(Oh no, it can't be that time al-
ready, can it?)
Augusta Shores Development
Representatives of Hoffman
Homes, Minnesota Department of
Transportation, and City staff
met on Wednesday to resolve
site access issues associated with
the proposed Augusta Shores de-
velopment. After much discus-
sion it was decided that the ac-
cess road serving the develop-
ment would be moved southerly
to a location immediately north
of Larsen's Greenhouse that
would line up with the intersec-
tion of Acacia Boulevard and
Trunk Highway 13.
1999 Improvement Projects
Assessment notices for the
Cherry Hill Addition and Glen
Toro Second Addition improve-
ment projects were mailed out
this week informing residents
about the final dollar amounts
and payment terms for the spe-
cial assessments levied against
their properties for the refer-
enced projects.
ISTS Program
Notices were mailed out this
week to residents of Mendota
Heights that current data indi-
cates have individual sewage
treatment systems (ISTS). The
notice informs residents that the
City will soon be adopting a pro-
posed ISTS ordinance as man-
dated by State Statute, and re-
quests that residents comment or
ask any questions they might
have about the ordinance as pro-
posed.
Year 2000 Street Proiect
The Engineering Department
continued gathering preliminary
survey data in the Rogers Lake
area that will be used in the
preparation of the feasibility re-
port for the year 2000 Street
Project.
Personnel News
Nancy Bauer was on vacation this
week enjoying some rest and re-
laxation and the fall colors in
Door County Wisconsin with her
husband. Nancy will be back to
work on Monday.
MEWS
Public Works =1� h e loft mi wpft e I m n
Engineering
Code Enforcement
LETTER October 1, 1999
Parks Report
The Parks Crew completed gen-
eral maintenance in the parks
this week including daily trash
pick up, grass cutting and strip-
ing soccer fields. The Parks
Crew is now beginning to pre-
pare for winter. They are work-
ing on completing repairs to the
warming houses at Friendly Hills
and Wentworth Park. They are
shutting down and blowing out
the lawn sprinkler systems at
Kensington Park, Mendakota
Park, City Hall, Fire Department
and Public Works Garage. They
purchased paint and began re-
painting the hockey rink boards.
They attended a Toro seminar
which highlighted Toro's new
equipment.
Utility Report
Rich checked the City's seven
sanitary lift stations daily. He
also exercised the back up
power generator at the Mendota
Heights Road lift station and
performed an inspection for a
new residential sanitary sewer
connection at 990 Diego Lane.
Street Report
The Street Crew had to repair
the catch basin located at the
corner of Medallion Drive and
Lexington Avenue. Often times
our catch basins have been a
maintenance problem —often
times failing on either the street
side or lawn side and causing
the street to settle near them.
They graded the gravel alley lo-
cated off from Fremont Avenue
(the only constructed alley the
City has). They painted pedes-
trian crosswalk bars on Menda-
kota Drive at Dodd Road and on
Dakota Drive at Lexington Ave-
nue. They patched potholes in
the Ivy Falls and Sylvandale
Road neighborhoods. They at-
tended the Minnesota Fall Expo,
which is a winter roadway main-
tenance conference put on by
MnDOT each fall for City, County
and State workers.
Dodd Road Update
MnDOT's contractor who over-
layed Dodd Road this summer
has returned to do the corrective
repairs to remove the 'bird
baths". We are not convinced
that what they did will work —we
will see after the next rain storm
if more work needs to be done.
Code Enforcement Report
Mayflower Distributing Company
has now submitted their plans to
construct a 71,423 square foot
office warehouse (9,029 office,
62,394 warehouse) at 1155 Me-
dallion Drive. The estimated
building construction cost is $2.1
million. Council reviewed and
approved plans at their August
17, 1999 meeting for this build-
ing and authorized the Code En-
forcement to issue a building
permit. Mayflower's owner is
Martin Abelvitz, who is also a
resident of Mendota Heights. His
business is warehousing and dis-
tributing party favors. This
building needs to get off to a fast
start because their projected
move -in date is for March 2000.
Mendota Meadows Update
City staff toured Mendota Mead-
ows with representatives of Men-
dota Homes and residents on
Monday to perform an interim in-
spection on the landscaping
punch list items remaining to be
completed in the development.
Many items that appeared on this
landscaping punch list have now
been finished satisfactorily, and
the number of items left to com-
plete is relatively small.
Glen Toro Second Addition
Project
The utility companies began in-
stallation of the natural gas, tele-
phone, electric, and cable televi-
sion lines on the Glen Toro Sec-
ond Addition on Tuesday.
Personnel News
Guy Kullander returned to work
for a portion of the day on Tues-
day. Guy was diagnosed and is
being treated for an intestinal in-
fection with antibiotics. Guy is
improving but has been able to
work for any extended period
during the week. In other news,
congratulations to Jim Danielson
who became a grandfather for
the second time on Monday,
when daughter Theresa gave
birth to his second grandson
Sam. This is Theresa's and her
husband's first child. Sam was
19 inches long and weighed in at
six pounds 12 ounces. Theresa
and Sam are both doing fine.
NEWS
Public WorksEngineering The Pipeline
Code Enforcement
LETTER September 23, 1999
Parks Report
The Parks Crew completed
general maintenance in the
parks this week including
daily trash pick up, grass cut-
ting, and striping soccer
fields. They repaired a dam-
aged lawn sprinkler line at the
Fire Department. They also
picked up and removed brush
from the Fire Department.
They repaired the sprinkler
system at City Hall. They re-
placed a broken infant swing
at Mendakota Park. They ser-
viced their mowers (cleaned
and sharpened their blades).
They removed the sandstone
blocks from Kensington Park.
They cut the grass in the
right-of-way at the north end
of Pontiac Place. (The adjoin-
ing neighbors have quit cut-
ting their grass).
Utilities
Rich checked the City's seven
sanitary sewer lift stations
daily. He installed a marker
on the hydrant at 867 Blue -
bill. These markers are on all
of our hydrants throughout
the City and they are there so
that the Fire Department can
readily locate them in the
winter when they may be
covered with snow. He hired
a private contractor to clean
the grease from the wet wells
(where the sewage builds up
before it is pumped out) at
the Mendota Heights Road
and St. Thomas lift station.
He reinstalled a backup pump
from the Veronica lift station.
It had been removed for main-
tenance (rebuilt the motor and
replaced the seals and bear-
ings).
Street Report
They made up and installed
new street name signs within
the Somerset neighborhood.
They trimmed trees at the Kay
and Walsh intersection at the
request of a school bus driver.
They removed the dead elm
trees at 1160 Dodd Road and
a dead elm tree within Miriam
Street right-of-way. They met
with MTC about replacing their
bus stop signs in the City —We
will replace their signs and
they will pay us for the work.
They repaired a catch basin lo-
cated at Medallion Drive and
Lexington Avenue. They
hauled clay to repair a storm
water wash out area on Marie
Avenue by Valley Park.
MSA Traffic Counts
Attached is a table showing
MSA traffic counts that have
been updated for 1999. The
only unusual change was that
Marie Avenue near Henry
Sibley's count was back to
normal. There must have
been a large school event go-
ing on in 1997 when the count
was taken.
Mendota Meadows Update
Landscaping work continued
this week on the Mendota
Meadows townhome develop-
ment. Trees have been re-
placed and some areas have
been re -sodded. Mendota
Homes has requested and
scheduled another walk-
through inspection for next
Monday with City staff.
Glen Toro Second Addition
Proiect
The utility companies have in-
formed us that they plan to
start the installation of the
natural gas, telephone, elec-
tric, and cable television lines
on the Glen Toro Second Addi-
tion development next week.
Ivy Keep North
Penn Contracting, Inc. in-
stalled a catch basin and a
short segment of smaller di-
ameter storm sewer in a rear
yard between Butler Avenue
and London Road to promote
better rear yard drainage in
this area.
Personnel News
Guy Kullander has been off
sick this week. He went home
early last Friday with abdomi-
nal pains and a fever. By 5
pm last Friday he was admit-
ted to the hospital. He was in
the hospital until Tuesday.
Doctors have been conducting
additional tests throughout the
week after his release from
the hospital and so far have
been unable to determine the
cause of his condition.
MENDOTA HEIGHTS TRAFFIC COUNTS ON MSA ROUTES
Road
Location
Chippewa Avenue
North of TH 149
South of TH 149
Decorah Lane
East of TH 149 (Dodd Road)
West of Huber Drive
Emerson Avenue
East of TH 149 (Dodd Road)
Huber Drive
West of Delaware Ave.
North of Mendota Heights Road
North of Decorah
Lake Drive
West of TH 149 (Dodd Road)
Lexington Avenue
North of Wagon Wheel Trail
South of TH 110
North of TH 110
South of Marie Avenue
North of Mendota Heights Road
Marie Avenue
West of County Road 63 (Delaware Ave.)
East of TH 149 (Dodd Road)
West of TH 149 (Dodd Road)
East of Victoria Road
West of Victoria Road
East of Lexington Avenue
Mendota Heights Road
West of Delaware Avenue
East of TH 149 (Dodd Road)
West of TH 149 (Dodd Road)
East of Lexington Avenue
East of TH 55
West of TH 55
East of Pilot Knob Road
East of TH 13
Northland Drive
West of TH 55
East of Pilot Knob Road (Cty Rd 31)
South Plaza Drive
East of TH 149 (Dodd Road)
Victoria Road
North of Marie Avenue
Cty Rd 45
South of TH 13
Wagon Wheel Trail
West of TH 149 (Dodd Road)
East of Lexington Avenue
1999 ADT
1997 ADT
1995 ADT
1993 ADT
1991 ADT
331
566
463
523
473
828
776
768
779
461
2126
2210
Not on system
Not on system
Not on system
2428
1359
Not on system
Not on system
Not on system
833
778
Not on system
Not on system
Not on system
1612
1474
1691
1393
1363
1215
1141
1233
729
764
No Counts
No Counts
1083
1382
1433
639
618
Not on system
Not on system
Not on system
3393
3323
3273
3584
2444
7019
5650
5562
4883
4126
4912
4848
6414
3938
4360
2985
3141
3036
2437
2558
2334
No Counts
3101
2805
1659
2838
4455
2907
2802
3310
2693
4653
3035
2576
2834
3302
3959
3433
2966
4137
3519
3952
3409
3066
3689
1716
1964
1758
1778
2139
1104
1201
827
821
937
1952
1418
1501
1466
713
3678
3739
3304
3105
1694
3951
2605
2940
2223
1835
3507
3549
2541
1983
2599
7519
6827
3282
3345
2565
3510
4246
2788
2107
2384
4241
3885
3661
2862
2609
3270
2804
2504
3441
3412
1241
1177
Not on system
Not on system
Not on system
3777
1620
Not on system
Not on system
Not on system
904
1855
1925
1364
Not on system
3099
3412
3762
3343
2763
3453
4005
4442
4122
5035
802
937
993
1022
352
749
693
482
728
538
9-23-99
NEWS IN
Public WorksEngineering The Pipeline
Code Enforcement
LETTER September 17, 1999
Parks Report
The Parks Crew completed
general maintenance in the
parks this week including daily
trash pick up, grass cutting
and striping soccer fields. The
Parks Crew also cleaned and
hauled brush from off the ped-
ways in South Valley Park.
They repaired some of the soc-
cer nets that have been dam-
aged from use. They hauled
extra picnic tables to Friendly
Hills Park for a large party.
Street Report
The Street Crew hooded the
"no parking" signs on Victoria
Curve to allow for extra park-
ing for Rosh Hashanah. They
dropped of street barricades
for a Sommerset neighborhood
block party held last weekend.
They are fabricating and in-
stalling all new street name
and regulatory signs within the
Cherry Hills neighborhood.
They received their new Ford
plow truck this week and deliv-
ered it to ]-Craft to have the
dump body and hydraulics in-
stalled. They worked on re-
pairs to the overhead doors on
the salt storage room. That
salt is "EXTREMELY" corrosive,
and any metal quickly rusts to
dust that's in or near the
room. They performed pot
hole patching in the Hunter
and Orchard area. They also
completed several patches on
the trails.
Utility Report
Rich checked the City's seven
sanitary lift stations daily. This
week Rich pulled, checked and
maintained all the pumps from
the sanitary sewer lift stations
(see findings).
Lift Station;
Results;
Centre Pointe
Needs new electrical
controller
(lightning damage —
turned into insurance)
Culligan
O.K.
Veronica
Lower seals leaking
in one pump —sent
in for repair
Northland
O.K.
(By Brown
Institute)
St. Thomas
O.K.
Mendota Heights
O.K.
Road
Marie Park
Storm Sewer O.K.
Lilydale
O.K. (New pumps in-
stalled last year)
Mendota Meadows Update
At the request of Mendota
Homes, Marc and I performed
an early inspection of John
Mathern's progress with his
landscaping corrections. For
the first time there is GOOD
NEWS to report. Mr. Mathern
has hired a very competent
contractor this time who is do-
ing a very good job and pro-
gress is being made. Even
more work would have been
completed had certain areas
been dry enough to work on.
We were able to check off many
items from the list as being
done and many others were
well underway to being done —
correctly.
Glen Toro Second Addition
Proiect
Municipal Construction Services
(MCS) placed the first layer of
bituminous pavement on the
streets in the development and
the finished bituminous patches
on Huber Drive late last Friday.
Placement of the bituminous
base course last week con-
cludes work activities on the
Glen Toro Second Addition Pro-
ject for this construction season
under the City's contract with
MCS. The installation of natural
gas, telephone, electric, and
cable television in the develop-
ment should be commencing
soon. The developer has the
responsibility of contracting di-
rectly with the utility companies
for this work. Work activities
under the City's contract with
MSC will resume again next
construction season with the
placement of the second layer
of bituminous pavement on the
new Glen Toro Road.
Street Striping
On Tuesday, the paint striping
crew from Century Fence out of
Forest Lake spent the day strip-
ing the following streets:
South Plaza Drive, Mendakota
Drive, Dakota Drive, Glen Hill
Road, Victoria Curve, Mendota
Heights Road, Decorah Lane,
and Huber Drive. These street
constitute approximately 37%
of the total street striping re-
quired. Next year similar mile-
age of streets will be restriped.
The epoxy paint used is re-
ported to have a "wear life" of
from two to three years.
NEWS �
Public Works ThePi*peline
Engineering
Code Enforcement
LETTER September 10, 1999
Parks Report
The Parks Crew completed
general maintenance in the
parks this week including daily
trash pick up, grass cutting,
and striping soccer fields.
They also began getting ready
for winter (too soon I hope) by
servicing all the mowers and
ordering and receiving their
fall application of fertilizer.
The porta potty vandals struck
again on Saturday when they
burned the porta potty located
in Victoria Highlands Parks.
Now that we have the con-
crete pads in place so that the
porta potties can not be easily
tipped over, all that left is burn-
ing them - I guess we will have
to install fire sprinklers next.
Utility Report
Rich checked the City's seven
sanitary sewer lift stations
daily. Rich also jetted sanitary
sewer lines on Mendota
Heights Road from Lloyd's
Barbecue to the lift station and
from Patterson's Dental to the
lift station. He also cleaned
North and South Freeway
Roads where he found lots of
roots in the lines.
Street Report
The Street Crew continued
patching streets in the north
end of the City this week.
They installed posts around
the radius of the center island
at Douglas Road and Lilac
Lane, where it remains un-
curbed, the cars have been
cutting across the grass. They
cleaned some catch basins in
Bunker Hills and they dropped
off barricades for a neighbor-
hood block party on Apache.
Glen Toro Second Addition
Project
Work activities continue on
the Glen Toro Second Addi-
tion project by Municipal Con-
struction Services (MSC).
MSC brought in, placed, and
compacted the balance of the
Class 5 aggregate base this
week. They also placed and
adjusted the elevation of cast-
ings on the sanitary sewer
manholes to prepare for the
placement of the first layer of
bituminous pavement on the
new Glen Toro Road. The
pavement cuts in Huber Drive
associated with sewer and
water extensions to serve the
development were also
prepped for finished bitumi-
nous patches. MSC was
planning on placing the first
layer of bituminous pavement
on the streets in the develop-
ment and the finished bitumi-
nous patches on Huber Drive
on Friday.
Slurry Seal Project Update
Struck and Irwin, Inc. began
slurry seal application opera-
tions on Wednesday and
were finished by Thursday.
All the concerns and angst
that the residents expressed
to staff leading up to the start
of the work somehow never
seems to materialize once the
work begins.
Mendota Meadows Update
Either the stars in the sky are
coming into alignment or Men-
dota Homes is serious about
rectifying the concerns in the
Mendota Meadows townhome
development because there
seemed to be a significant
amount of construction activity
starting on Wednesday. Engi-
neering Department staff met
with the Contractor that Men-
dota Homes hired to complete
the punch list items to review
and verify some drainage
grade issues in the develop-
ment and give some direction
as to what is to be done. The
Contractor seems to have the
experience and qualifications
necessary to meet the expec-
tations that residents have for
the remaining landscaping
and drainage work that needs
to be completed in this devel-
opment.
NEWS
Public Works 1 e lne
Engineering The
Code Enforcement
LETTER September 3, 1999
Parks Report
The Parks Crew completed gen-
eral maintenance in the parks this
week including daily trash pick up,
grass cutting, and striping soccer
fields. The Parks crew worked on
finishing up the conversion of the
Civic Center softball field to a
baseball field. They installed irri-
gation lines and set sprinkler
heads. They also hauled in and
spread more rec rock and top -
dressed the outfield. The field is
now completed. We have to keep
a watchful eye and hope that the
public stays off the field until the
grass has had a chance to root.
The crew also had to clean up the
Valley Park Pavilion area from
some vandalism that occurred this
week.
Utility Report
Rich is on a fishing vacation in
Canada this week so JP, his sum-
mer helper, has been checking the
lift stations daily. When JP was
done checking the lift stations he
helped mow grass in the Parks be-
cause all of their summer helpers
have already left to go back to
school.
Street Report
The Street Crew cleaned dirt and
weeds from around a catch basin
at Lexington Avenue and Vail next
to the pedway and added a bitumi-
nous flume around it. They contin-
ued to repaint cross walks.
They hauled roadside debris to
hazardous waste disposal sites in
Eagan - tires to BFI, debris to SKB
and appliances to JR's. They per-
formed blacktop patching on Diego
Lane, Simard Street, Miriam
Street, John Street, Junction Lane,
Kirchner Avenue and Butler Av-
enue. They installed new stop
signs with orange accessory plates
above them at Mears and Dorset to
try and improve compliance with
those stop signs.
Delaware Avenue
Valley Paving, Dakota County's
contractor, who is to construct the
right turn lane and separated trail
to south bound Delaware Avenue
at TH110 began work this week -
just in time for school. They were
delayed for one and one half
months because Cable TV did not
move their line from an overhead
pole.
Glen Toro Second Addition Project
-
Work activities continue on the
Glen Toro Second Addition project
by Municipal Construction Ser-
vices (MSC). MSC completed the
grading, preparation, and toleranc-
ing of the street subgrade last
Monday. MSC completed the
placement and compaction of a
portion of the aggregate base
Wednesday, which was followed
by the placement of concrete curb
and gutter on the streets in the de-
velopment.
Year 2000 Street Proiect Poll
Residents that were polled in
neighborhoods under considera-
tion for next year's street improve-
ment project have now returned
more than 70% of the postcards
that were mailed out. The neigh-
borhood's rank in descending or-
der of support is as follows: Ivy
Falls, Rogers Lake, Delaware
Crossing, and Somerset (see at-
tached).
Slurry Seal Proiect Update
Struck and Irwin, Inc. began deliv-
ering material at the end of week
in preparation of the start of the
application of slurry seal to Men-
dota Height's streets. Struck and
Irwin, Inc. informed us that they
expect to start work on Tuesday.
Personnel News
Curt Wimpee' returned from his
two week Florida vacation on
Thursday. He had a great time
surfing, snorkeling, and visiting
theme parks, friends, and rela-
tives. Also on Thursday Ross
Bintner finished his last day of
work for a second summer as
Temporary Engineering Aide in
Mendota Heights. Ross did an-
other outstanding job in the posi-
tion. He was instrumental in up-
dating and developing a great deal
of data and information for the
City's MSDS and AWAIR pro-
grams that are required by OSHA.
He begins his sophomore year in
Civil Engineering at Michigan
Tech. next Tuesday.
Attachments:
• 2000 Street Reconstruction Poll
Results
Star Tribune Article reprinted
from Farmer's Almanac predict-
ing 1999 Snowfall
PAGE Al2 • STAR TRIBUNE * NATION MONDAY, AUGUST 30. 1999
Farmers' Almanac: Snowy end to'99 in Midwest
Associated Press
LEWISPON, MAi N B — Parts of
the country have another Y2K
problem to worry about: a power-
ful storm in the last days of 1999.
So says the Farmers' Almanac,
which predicts a stormy Novem-
ber and December, capped by
more than a foot of snow in the
last week of the year for the Mid-
west and Northeast.
But the clouds should part by
the time champagne corks pop,
said Sondra Duncan, the alma-
nac's managing editor. This year's
edition is due out Tuesday.
For the North Central United
States, which is one of the Alma-
nac's seven regions and includes
Minnesota, Duncan said we
should expect snow at (lie begin-
ning of November and in the
middle of (lie mouth.
"The good news is that it will
be fair for Thanksgiving," she said
Sunday. however, the region
should expect an "intense storm"
at the end of November, more
snow in time for a white Christ-
mas, and then clear and cold
weather in the days leading up to
the next millennium. After that,
January and February don't look
too stormy, she said.
The National Weather Service
harrumphs that the weather can't
be predicted with any certainty
so far in advance. But the 183-
year-old Farmers' Almanac says
its weather predictions are right
110 percent of the time.
"We're older than the National
Weather Service, and we affec-
tionately call the National Weath-
er Service anon -prophet," edi-
tor Peter Geiger said.
The Farmers' Almanac, not to
be confused with the Old Farm-
er's Almanac in New Hampshire,
which is 24 years older, bases its
weather forecast on a secret for-
mula that involves sunspots, po-
sition of the planets and tidal
action caused by the moon.
— Staff writer Paul Walsh
contributed to this report.
2000 Street Reconstruction Poll Results
13% Ivy Falls Area
® Support
❑ Do Not Support
87%
Surveyed Support Do Not Support Percent Reporting
Falls 55 35 5 72.7%
Rogers Lake
me
®Support
O Do Not Support
Surveyed Support Do Not Support Percent Reporting
Lake 78 40 17 73.1%
Delaware Crossing
® Support
❑ Do Not Support
Surveyed Support Do Not Support Percent Reporting
Delaware Crossing 75 33 23 74.7%
57%
Somerset
® Support
❑ Do Not Support
Surveyed Support Do Not Support Percent Reporting
Somerset 98 30 40 71.4%
NEWS
Public Works
Engineering
Code Enforcement
LETTER
Parks Report
The Parks Crew completed general
maintenance in the parks this week in-
cluding daily trash pick up, grass cut-
ting, and striping soccer fields.
For the past two weeks the Parks Crew,
has been removing rec-rock, spreading
a blended topsoil mix (70% sand, 30%
peat) and installing irrigation lines in the
infield area of the ballfield. The Parks
Crew "Team" also enlisted the help of
Len Kenitz, our mechanic at Public
Works, to assist on the street motor -
grader which was used to reshape the
work area so that there will be proper
drainage once the turf infield is com-
pleted.
On Thursday, the fine of Maury Braun
Landscaping began the fine grading
and final prep work. This firm special-
ized in athletic fields and will be in-
stalling a sod product specifically grown
for aggressive play. The Parks Crew
will install irrigation heads following the
sod operations. With normal weather
conditions this winter the field should be
in excellent playing condition for the
spring baseball startup.
They began trimming trees and brush
overhanging the trails along Mendota
Heights Road, Marie Avenue and Victo-
ria Trail. The Crew also worked on Fri-
day and overtime on Saturday to pre-
pare for and staff the "Celebrate Men-
dota Heights Parks" event last weekend.
Utility Report
Rich checked the City's seven sanitary
sewer lift stations daily. Rich removed
and cleaned the grease from the floats
at the Veronica liftstation. The floats are
mercury switches that operate the sta-
tion. When the sewage reaches the
highest level, the top float activates a
high water alarm, the next float down
turns on both pumps, the next one down,
one pump and finally the lowest float
The Pipeline
turns the pumps off. Rich and his helper
JP cleaned sanitary sewers on Warrior
Drive, High Ridge Circle, Sibley Court,
TH 110 Frontage Road (lots of sand and
rocks), South Lane and Knob Road (lots
of roots). He was called back last week-
end when the railroad reported a
blocked sanitary sewer (it fumed out to
be a blocked MnDOT storm sewer). He
was also called upon this week to rescue
a woman who had dropped her car keys
down a storm drain inlet at Lilac Lane
and Douglas.
Street Report
The Street Crew graded Dodge Lane
this week (one of our two remaining
gravel roads). Dave worked on obtain-
ing some Y2K compliance letters for our
trucks. They trimmed bushes to improve
the sight distance for traffic entering onto
Dodd Road from Roundhill Road and
removed a broken limb from near the
trail on Lexington Avenue, both in re-
sponse to resident complaints. They re-
painted crosswalks. They worked onim-
proving the stop signs at Mears and
Dorset (straightened posts and replaced
signs). They also did potholes and
street repair patching on 4th Avenue and
on Laura Street. They dropped off barri-
cades for a street block party on James
Road. Dave was called back on Tues-
day evening to remove a large tree limb
that had broken off, fallen across Dou-
glas Road and was blocking traffic. The
limb was from a very large tree that had
a fancy tree house in it (the tree house
was severely damaged).
Dodd Road "Bird Baths"
Tom Knuth and I met this week with Tom
Ravn and Charles Graff from MnDOT to
review "on the ground" our concerns with
MnDOT's new mill and overlay project of
Dodd Road. In reviewing all the plate
beam guardrails, MnDOT could not find
any that they felt were a problem and
told us that they do not intend to make
August 27, 1999
any changes. The same goes for the
bituminous curbing. We did look at
seven areas that were ponding water
(bird baths) and discussed ways to re-
move them. MnDOT promised to at-
tempt to correct every one we looked at.
They also promised to paint cross walks
at South Plaza Drive and at Marie Av-
enue.
Glen Toro Second Addition Project
Work activities continue on the Glen
Toro Second Addition project by Munici-
pal Construction Services (MSC). All
underground utilities have been in-
stalled and passed the required installa-
tion testing procedures. MSC is now
concentrating their efforts on grading,
preparing, and lolerancing the street
subgrade prior to the placement of ag-
gregate base. This work will hopefully
be followed early next week by the
placement of concrete curb and gutter
on the streets in this development.
Year 2000 Street Project Poll
Residents that were polled in neighbor-
hoods under consideration for next
year's street improvement project have
now returned slightly more than 60% of
the postcards that were mailed out. The
neighborhood's rank in descending or-
der of support is as follows: Ivy Falls,
Rogers Lake, Delaware Crossing, and
Somerset (see attached).
Personnel News
Marc Mogan received a voice mail mes-
sage at the office on Thursday evening
from Curt Wimpee' calling from the
Jacksonville Jaguar versus Kansas City
Chief football game. He said the game
was great. He was looking forward to
going surfing on the big surf spawned
by the hurricanes in Florida and under
the circumstances wasn't sure when he
would make it back to the office.
NEWS
Public Works
Engineering
Code Enforcement
LETTER
Parks Report
The Parks Crew completed general
maintenance in the parks this week
including trash pick up, grass cutting,
and striping soccer fields. The Parks
Crew delivered extra picnic tables to
Rogers Lake Park for a large company
picnic. They delivered soccer goals to
the neighborhood parks (fall soccer
practices started this week). The
main work for the week was beginning
reconstruction of the ball Feld at City
Hall converting it from a softball field to
a baseball field. The first order of work
was hauling out all of the unneeded
rec rock. It was hauled to neighbor-
hood parks, where it was leveled out
on existing infields by Len, who is the
City's expert operator of the road
grader. After this was completed, the
Parks Crew hauled in and spread
black dirt to replace the rec rock so
that a grass infield can be established.
Utility Report
Rich checked the City's seven sani-
tary sewer lift stations daily. Rich
had to purchase and install a new
hose for his jetter this week. His
existing hose had been damaged to
the point that it was a hazard as a
result of freeing it from being hung up
on the Callahan Willow tree roots last
week. Upon installing his new hose,
Rich jetted sanitary sewer lines on
Callahan Place, Warrior Drive, Marie
Avenue (Dodd to Sutton Lane),
Spring Creek and all of Crown Point.
He inspected new sanitary sewer
connections at 623 Butler, 1948
Glenhill and 907 Carmen Lane.
Street Report
The Street Crew cleaned up some
areas where street sand was build-
ing up (end of Furlong and on Hunter
The Pipeline
Lane). They trimmed bushes at
some intersection where sight dis-
tance was a problem. They worked
on patching streets in the north end
of the City and patched near some
replacement curbs on Pondview
Drive.
They began repainting crosswalks,
they have 10 of them that need to be
done this year. They had some trou-
ble with vandalism when the bars
were still wet, some kids drove right
through the cones and over the wet
paint.
Dave surveyed a broken limb in an
alley at 678 2nd Avenue and found it
to be the City's. The limb was hang-
ing directly over and threatening a
home, so Dave arranged for a tree
service to remove it.
Glen Toro Second Addition Project
Work activities continue on the Glen
Toro Second Addition project by Mu-
nicipal Construction Services
(MCS). With the completion of wa-
ter services and storm sewer within
the new road right of way this week,
MCS has finished all underground
utility construction. They also com-
pleted the bituminous patching on
Huber Drive that was required as a
result of connecting to the existing
sanitary sewer and watermain.
Slurry Seal Project Update
Struck and Irwin, Inc. was in town
this week performing crack filling on
the streets that have been chosen
for the application of slurry seal this
year. The latest information from
Struck and Irwin, Inc. is that they will
August 19, 1999
arrive no sooner than the week of
August 30 to apply the slurry seal to
Mendota Heights' streets.
Year 2000 Street Project Poll
Residents that were polled in neigh-
borhoods under consideration for
next year's street improvement pro-
ject have returned approximately
45% of the postcards that were
mailed out. Early results in this poll
show that there is support for street
projects in the Ivy Falls and Rogers
Lake neighborhoods, and opposition
to street improvement projects in the
Somerset and Delaware Crossing
neighborhoods.
GIS Software Update
Kent Tupper, Senior GIS Specialist
with Dakota County's Survey and
Land Information Department met
with Engineering Department staff
on Tuesday to demonstrate and in-
stall a user friendly GIS software
module on the Engineering Depart-
ment's GIS computer station. This
software module's ability to effi-
ciently identify adjacent properties
within a specified distance to a par-
ticular property will reduce the time
and effort necessary to generate
public hearing notification data on
planning cases and engineering pro-
jects.
Personnel News
Curt Wimpee' and the family left
Thursday morning for a two week
vacation in the new minivan to visit
friends, relatives, and theme parks
in Florida. Curt apparently couldn't
find enough hot and humid weather
here in Minnesota.
NEWS
Public Works
Engineering
Code Enforcement
LETTER
Parks Report
The Parks Crew completed general
maintenance in the parks this week
including trash pick up, grass cutting,
dragging, striping and chalking ball
fields and soccer fields. The men's
league softball playoffs are under-
way. They aerated the soccer and
ball fields at Kensington Park, the
soccer fields at Mendakota Park, the
neighborhood parks and at City Hall.
They top dressed the soccer and ball
fields and repaired worn areas on
soccer fields with sod (mainly in front
of the goals).
They borrowed West St. Paul's
power seeder for over seeding worn
areas at Mendakota and Kensington
Parks and they also fertilized the
fields, all in an attempt to bring them
into good condition for fall soccer.
They striped all the neighborhood
soccer fields with paint (Friendly
Hills, Ivy, Wentworth, Victoria High-
lands and the small field at Kensing-
ton).
Utility Report
Rich checked the City's seven sani-
tary sewer lift stations daily. Rich
jetted the sanitary sewer lines on
Delaware Avenue, Marie Avenue to
Ridgewood Lane, Ridgewood Lane,
and on Callahan Place. When jetting
the sanitary sewer lines on Callahan
Place, Rich encountered roots from
a very large Willow tree and almost
lost the nozzle on his jetting hose.
He was finally able to free it (without
having to dig up the street). He had
to call in Infratech, a private sewer
cleaning contractor, to have the
roots cut out and removed from the
line. While they were here, he also
The Pipeline
had them cut out some Willow tree
roots from the line on Dodd Road at
4th Avenue. (Those Willow tree
roots can be a real problem). Rich
had to use his sewer jetter to open up
a clogged storm sewer line on Huber
Drive.
Street Report
The Street Crew is patching streets
in the north end. They also repaired
a dip in the Bridgeview Shores Addi-
tion neighborhood. They rented a
blacktop milling attachment for the
bobcat to repair some larger cracks
on Fremont, Hiawatha and Garden
Lane.
Code Enforcement Report
Martin Costello, the City's Prosecut-
ing Attorney, visited on Friday morn-
ing to meet with the Code Enforce-
ment Officers and Fire Marshal to
plot strategy on several on -going
code violators. This was a good
meeting, with a lot of progress being
made. We agreed to continue to
meet on a regular basis until the
backlot of cases is brought down.
Glen Toro Second Addition Proiect
Construction continues on the Glen
Toro Second Addition project by Mu-
nicipal Construction Services
(MCS). The installation of water -
main has been completed. Initial
bacteria testing for the new water -
main failed, therefore, the watermain
was flushed and it is being tested
once again. Water must remain
stagnant in the new main for a mini-
mum of 16 hours before a test sam-
ple can be drawn. This testing has
delayed the installation of water ser-
August 13, 1999
vices for individual lots. Storm
sewer should be completed this
week clearing the way for final grad-
ing of the street section upon com-
pletion of the water services.
Y2k (Street Proiects)
Letters and return postcards were
mailed out Wednesday this week to
four neighborhoods in the city to de-
termine interest in street rehabilita-
tion projects for the 2000 construc-
tion season. Two neighborhoods
are being asked if they would like to
have their streets reconstructed, in-
cluding the addition of curb and gut-
ter and storm sewer. The other two
neighborhoods are being asked
about a mill and overlay of their
streets since they are currently con-
structed urban.
The neighborhoods being consid-
ered are as follows: Rogers Lake
area, Ivy Falls 2nd Addition, Somer-
set View, and Delaware Crossing.
The engineering department has al-
ready received several calls in favor
of all of the projects so far and the
postcards are starting to trickle in.
The deadline for responses is Au-
gust 31 st.
A. W.O.L.
No, were not referring to any Viking
personnel. Marc Mogan has been
on vacation this week getting some
much deserved R&R at Cass Lake.
We'll find out how big the one that
got away was on Monday.
NEWS
Public Works ePipeline
Engineering
Code Enforcement
LETTER August 6, 1999
Parks Report
The Parks Crew completed gen-
eral maintenance in the parks this
week including trash pick up, grass
cutting, dragging,striping and
chalking ball fields and soccer
fields. They also installed a con-
crete pad at Friendly Hills Park to
serve as a base to attach the porta
potty to. These bases have
worked well so far - no porta pot-
ties have been tipped over re-
cently. They installed new grills at
Friendly Hills and Rogers Lake
Parks. They attended a confer-
ence on Wednesday put on by the
MN Sports Turf Managers Associ-
ation.
Utility Report
Rich checked the City's seven
sanitary sewer lift stations daily.
Rich checked Lilydale's storm
sewer system according to the
agreement we have with them. He
and his partner JP "jetted" sanitary
sewers on Dodd Road from Went-
worth to Marie Avenues, on Stan-
wich Lane and Roundhill Road.
(They finished the Somerset Park
neighborhood). He had to locate
and raise a manhole cover that
had been buried on Dodd Road
north of Stanwich Lane.
Street Report
The Street Crew patched streets
on Fremont Avenue. They made
up some replacement street signs.
They trimmed back the brush and
weeds on Freeway Road to im-
prove the sight distance. They in-
stalled black dirt and repaired the
yards where sunken curbs had
been replaced.
Cherry Hill Addition Street Re-
construction
Jirik Sod returned to the Cherry
Hill Addition street reconstruction
project to replace sod that had not
survived the 30 day warrantee pe-
riod that is the Contractor's re-
sponsibility. Sod that was obvi-
ously dead, or yellow and had not
rooted was replaced. Sod that
looked to be under stress, but was
well rooted was left in place with
the expectation that it will recover
as the weather becomes more fa-
vorable for the growth and estab-
lishment of sod.
Glen Toro Second Addition Pro-
ecct
Work activities continue on the
Glen Toro Second Addition project
by Municipal Construction Ser-
vices (MSC). MCS has completed
the construction of sanitary sewer
services within the new road right
of way, and is in the process of in-
stalling mainline watermain. MCS
will commence storm sewer instal-
lation after the watermain is fin-
ished. NSP Electric began re-
laying a buried electric cable that
had to be lowered as a result of
grading and street construction for
the new Glen Toro Road.
Delaware Avenue
The Dakota County Highway De-
partment completed paving a seg-
ment of the southbound aggregate
shoulder on Tuesday on Delaware
Avenue between Copperfield
Drive and Salem Church Road.
This work was undertaken to pre-
vent aggregate material from
eroding along the edge of pave-
ment and being deposited on the
pavement at the inter-
section of Copperfield Drive and
Delaware Avenue after a heavy
rainfall event. This shoulder
paving should help to eliminate
the unsafe driving condition that
occurs when aggregate gets be-
tween a vehicle's tires and the
pavement causing a vehicle to
slide if the driver breaks suddenly,
turns sharply, or is traveling too
fast.
Code Enforcement Report
We have found that prosecuting
Zoning Ordinance violators is a
slow, difficult process and there
are currently several of them out-
standing. We have come to an
agreement with Martin Costello,
the City's Prosecuting Attorney, to
begin weekly face to face meetings
until we are able to get these under
control. Our first meeting is sched-
uled for next Wednesday.
Lloyd's Meats was issued a permit
this week for their 12,157 sf expan-
sion and interior remodeling pro-
ject. Mendakota Country Club was
also issued a demolition permit this
week to remove their old mainte-
nance facility and their under-
ground fuel tank.
NEWS s
Public Works 1 e lne
Engineering The
Code Enforcement
LETTER July29,1999
Parks Report
The Parks Crew completed gen-
eral maintenance in the parks this
week including trash pick up, grass
cutting, dragging, striping and
chalking ball fields and soccer
fields. The Parks Crew replaced
two inoperable sprinkler heads at
City Hall and a valve at Men-
dakota Park. They repaired the
damaged lawn at Kensington Park
where a landscaping water line
had been repaired. They removed
brush and limbs from Parks and
the Fire Hall that were downed as
a result of Sunday nights' wind
storm. They repaired a broken
window on 504 (the big mower)
with plexi glass. They painted the
foul poles at the ballfields.
Utility Report
Rich checked the City's seven
sanitary sewer lift stations daily.
Rich had to remove a broken alu-
minum cover from the Marie Park
Storm Sewer lift station. He had to
take it to a speciality shop that
welds aluminum for repairs. He
continued to work on building a
retaining wall at the Mendota
Heights Road lift station. He per-
formed a new sanitary sewer con-
nection inspection at 1046 London
Road. He installed location posts
at manholes in Valley Park. He
flushed the sanitary sewer line at
Winston Court where there is a
rough spot in the line that catches
material and can cause a problem.
Street Report
The Street Crew finished patching
potholes in the Freeway Road and
Wesley Lane areas. They patched
the parking lot driveway where it
was cut to install the new screen-
ing fence at the Public Works
Garage. They cleaned storm
grates after Sundays' storm. They
also cleaned up downed limbs and
branches from the storm. They
began patching streets in the
neighborhoods to be seal coated:
Fremont Avenue, Hiawatha Av-
enue, Bridgeview Shores neigh-
borhood, Mendakota Court and
Park Place.
Glen Toro Second Addition Project
-
The material fabrication and deliv-
ery problems that curtailed con-
struction at the end of the week
were resolved, and Municipal
Construction Services (MSC) re-
sumed work activities Tuesday on
the Glen Toro Second Addition
project. The installation of main-
line sanitary sewer is now com-
pleted, and sanitary sewer service
construction started late Friday.
Delaware Avenue
The Engineering Department re-
ceived a complaint this week
about unsafe driving conditions
that occur occasionally at the in-
tersection of Copperfield Drive
and Delaware Avenue. It was
pointed out that aggregate shoul-
der material erodes from along the
edge of pavement on Delaware
Avenue between Copperfield
Drive and Salem Church Road
and ends up being deposited on
the Copperfield Drive pavement
after a heavy rainfall event. This
aggregate acts like ball bearings
between a vehicle's tires and the
pavement, and can cause a vehi-
cle to slide if the driver breaks
suddenly, turns sharply, or is trav-
eling too fast. The Engineering
Department contacted the Dakota
County Highway Department and
requested that they investigate
this situation. Dakota County
looked into this matter and deter-
mined that the best way to resolve
this condition would be to pave a
segment of the southbound shoul-
der on Delaware Avenue. The
Dakota County Highway Depart-
ment scheduled this shoulder
paving work for completion next
week.
OSHA Update
Ross Bintner, Engineering Sum-
mer Intern, has begun working on
updating or creating the required
OSHA safety training, data infor-
mation and record documentation
programs that were lacking when
the OSHA inspection was per-
formed in late May. Ross has
completed the task of compiling
the Material Safety Data Sheets
(MSDS) and is now developing an
Employee Right to Know Training
Program for the City's Public
Works, Engineering, and Adminis-
tration Departments.
NEWS
Public Works ThePi*peline
Engineering
Code Enforcement
LETTER July 23, 1999
Parks Report
The Parks Crew completed general
maintenance in the parks this week
including trash pick up, grass cutting,
dragging,striping and chalking ball
fields and soccer fields.
The Parks Crew installed home
plates in the new batting cage at
Mendakota Park. Terry and Mike
worked overtime last weekend to
staff the AAU thirteen -year -old State
Baseball Tournament. As far as we
know, everything went well. After the
tournament was over the Parks
Crew removed the baseball mounds
and used the material to repair the
warning tracks. They repaired a bro-
ken lawn sprinkler at Kensington
Park. John Boland planted the pur-
ple loosestrife (beetle laden) plants
at several wetlands throughout the
City. John has been growing these
bugs in his "nursery" at the Public
Works Garage since early this
spring.
Utility Report
Rich checked the City's seven sani-
tary sewer lift stations daily. Rich
performed maintenance to the land-
scape in the island at the end of Cul-
ligan Lane (trimmed the shrubs and
sprayed the weeds). This island con-
tains a sanitary sewer lift station. He
cleaned the sanitary sewers on Deer
Trail Court, part of Wachtler Avenue
with the City's sewer jetter. He per-
formed a sewer inspection at 1455
Mendota Heights Road (Lloyds
Meats) where they installed two new
cleanouts at angle points where they
are relocating their line for their new
building addition.
He started installing a retaining wall
at the Mendota Heights Road lift sta-
tion to provide for easier access dur-
ing cleaning operations.
Street Report
The Street Crew worked on repairs
to the street lights within the Centre
Pointe Business Park Area. They
replaced bulbs and ballasts at sev-
eral locations. George worked with
Rich to assist him with the bobcat at
the Mendota Heights Road lift station
retaining wall project. The crew cut
down and removed a dead tree in the
right-of-way at 651 TH 110
Frontage Road. They cleaned up
some sight obstructions at Knob
Road and TH 110 Frontage Road,
South Lane and at Summit and
Marie Avenue. They worked on
patching pot holes within the Free-
way Road Addition.
Glen Toro Second Addition Project
-
Municipal Construction Services
(MSC) continued work activities this
week on the Glen Toro Second Ad-
dition project by constructing con-
nections to the existing utilities in
Huber Drive. Sanitary sewer and
water main were extended from the
respective mains to a point just north
of the NSP overhead transmission
line. Material fabrication and deliv-
ery problems curtailed construction
at the end of the week. We expect
that these material issues will be re-
solved and that construction will re-
sume early next week.
Code Enforcement
Upon receiving a complaint from a
neighbor, Paul investigated a project
on Woodridge Drive. He found that
a homeowner was completing a
backyard landscaping project to re-
move a pool, regrade their backyard
and install slope protection mea-
sures of questionable design to sta-
bilize the very steep slope. The pro-
ject did not have a critical area permit
nor was the contractor licensed.
Paul stopped the work. Engineering
is investigating what measures need
to be taken to protect the backyard
and slope from erosion while the
homeowner prepares a plan and pro-
cesses a permit. The backyard looks
like a war zone (see pictures).
View of Backyard
NEWS
Public Works ePipeline
Engineering
Code Enforcement
LETTER July 16,1999
Parks Report
The Parks Crew completed general
maintenance in the parks this week
including trash pick up, grass cutting,
dragging ball fields and striping and
chalking ball fields and soccer fields.
The parks crew continued to work on
finishing the batting cage at Men-
dakota Park. They replaced a lawn
sprinkling valve at the City Hall's base-
ball field. They prepared Mendakota
Park for the State AAU Baseball Tour-
nament, built mounds, washed down
concrete, brought in more trash barrels
and set up posts for installing marker
tape to control access (they charge ad-
mission). The fields look GREAT! The
tournament starts Friday morning and
runs through Sunday. Terry and Mike
will be working overtime this weekend
to staff this tournament. They installed
some sprinkler heads at the old fire
hall site to improve lawn maintenance.
Utility Report
Rich checked the City's seven sani-
tary sewer lift stations daily. Rich
worked on cleaning the sanitary
sewer lines in Evergreen Knolls this
week (Evergreen Knoll, Gryc Court,
Pamela Lane and Deer Trail Point).
Rich was called back on Friday after-
noon to replace a broken manhole
cover at the intersection of Emerson
and Wachtler, the old one had bro-
ken in half and was at the bottom of
the manhole. Rich responded to a
call from 2530 Arbor Point about
sewer problems. He found a 20
pound sand bag in a manhole which
was slowing flow. He removed the
sand bag and flushed the line clean.
Street Report
The Street Crew provided barricades
to the Police Department for use at
Mendota Days. They trimmed some
brush obscuring signs. They in-
stalled the "No Standing or Stopping'
signs on Mendota Heights Road as
we agreed to do last winter for
Friendly Hills Middle School. They
installed a cross walk sign at the ped-
way on Maple Park Drive at the re-
quest of a resident. They patched
potholes in the Freeway Road Addi-
tion. They worked with a resident
living at Kay and Walsh to try and
solve a problem where cars were
cutting the corner across her yard.
(They installed posts to prevent cars
from cutting the corner and those
posts were pulled out).
Cherry Hill Addition Street Recon-
struction
The small quantity of concrete curb
and gutter and concrete driveway
pavement that needed to be re-
moved and replaced in isolated ar-
eas throughout the project was com-
pleted late last Friday. The private
bituminous driveway reconstruction
that was requested by some resi-
dents of Cherry Hill Addition neigh-
borhood was completed this
Wednesday by Ace Blacktop as
well. Ace Blacktop has requested
that these property owners not drive
over these bituminous driveways for
a week to give the pavement a
chance to cure. Hardrives, Inc.
wisely decided to wait until these
two work items were completed be-
fore proceeding with the placement
of the second and final layer of bitu-
minous pavement. Hardrives, Inc.
has for all intents and purposes
completed this project when they fin-
ished placing the second and final
layer of bituminous pavement late
Thursday.
Dodd Road Mill and Overlay
Construction activity on the MnDOT
Dodd Road mill and overlay project
in Mendota Heights continued this
week with restoration and landscap-
ing activities. We received com-
plaints about the installation of
guardrails, and some potential ad-
verse sight distance concerns asso-
ciated with their placement.
Glen Toro Second Addition Project
Municipal Construction Services
(MSC) began construction activities
this week by stripping topsoil within
the right of way areas, and rough
grading operations near the pro-
posed Glen Toro Road and Huber
Drive intersection. Connections to
the existing sanitary sewer and wa-
termain laterals in Huber Drive
should occur early next week.
Code Enforcement Report
Mr. John Jacobs applied for and re-
ceived a permit to modify his shed to
be a 144 square foot shed at a com-
plying location on his property. Paul
and Dick have met twice with archi-
tects designing a middle school addi-
tion for St. Thomas Academy. They
were doing code compliance reviews
and were notified during these re-
views that this addition will trigger the
requirement for them to comply with
MN SBC Code 1306 which does re-
quire installing fire protection
throughout the entire building (fire
sprinklers).
NEWS 0
Public eyng TheP*pel1ine
Engineering
Code Enforcement
LETTER JUIV9.1999
Parks Report
The Parks Crew completed general
maintenance in the parks this week
including trash pick up, grass cutting,
dragging ball fields, striping and
chalking ball fields and soccer fields
and trimming shrubs around park
signs. They repaired some broken
lawn sprinkler heads at Mendakota
Park and at the City Hall ballfield.
They repaired some broken swings
at Mendakota Park. They planted an
Ash tree on Watersedge Terrace
(replacement boulevard tree). They
worked on constructing the new bat-
ting cage at Mendakota Park (they
installed the pitcher's protection
fences, home plates and hung the
netting). They trimmed over -hanging
branches along trails. Mendota
Heights Athletic Association has
their softball and baseball tourna-
ments scheduled for this weekend,
Terry and Mike will work overtime to
staff these tournaments.
Utility Report
Rich checked the City's seven sani-
tary sewer lift stations daily. Rich
and his summer helper cleaned sani-
tary sewer mains with the City's fet-
ter this week on Bachelor Avenue,
Lansford Lane, Sutton Lane, and
Trail Road. Rich performed a new
sewer connection inspection at 2376
LeMay Lake Road. Rich was called
in Saturday at 6:30 A.M. to clear a
power outage at the Veronica lift sta-
tion.
Street Report
The Street Crew removed downed
trees from Valley Curve, Marie Av-
enue, Summit Lane and 2270 Cop-
perlield. They hauled debris from
various projects to SKB Landfill in
Rosemount. They patched potholes
on the "Avenues" and on Highway
110 Frontage Road. They repaired a
washout by a culvert near Orchard
Circle and Orchard Place. They
cleaned storm grates. They installed
some replacement signs where
some had been stolen. They re-
moved the stones from the overlook
at Kensington Park (we have re-
ceived numerous complaints about
them).
Cherry Hill Addition Street Recon-
struction
There is a small amount of concrete
curb and gutter, and concrete drive-
way pavement that needs to be re-
moved and replaced in isolated ar-
eas throughout the project. We
want to see that these repairs are
completed before the Contractor
proceeds with the placement of the
second and final layer of bituminous
pavement. Also, paving should be-
gin shortly by Ace Blacktop on the
private bituminous driveways or-
dered at additional expense by
some residents in the Cherry Hill Ad-
dition neighborhood.
Dodd Road Mill and Overlay
Construction activity on the MnDOT
Dodd Road mill and overlay project
in Mendota Heights continued this
week with the placement of bitumi-
nous pavement in driveway aprons
and side street intersections. Some
of this work was completed without
enough consideration given to
drainage, and we anticipate that it
will need to be redone based on our
observations after Thursday's rain-
fall.
Glen Toro Second Addition Proiect
Municipal Construction Services
(MSC) requested locates of under-
ground utilities in the project area
this week signifying that the start of
construction activity on this project is
imminent. Hopefully rough grading
will begin early next week.
Lower Mississippi WMO Meeting
The third meeting of the watershed's
Citizen Advisory Committee (CAC)
was held on Monday, June 28th.
The meeting consisted of a staff
guided bus tour of important facilities
and interesting sites within the
Lower Mississippi watershed. The 9
members of the CAC that attended
the tour representing almost all of
the communities in the Lower Mis-
sissippi Watershed found it to be in-
teresting and educational.
Mendota Homes Landscaping In-
spection
Marc and Jim along with Jack Barber
and a contingent of Mendota Homes
residents performed a landscaping
and grading inspection of the project
on Wednesday of this week. As
usual, progress has been made, but
more remains to be done. We hope
to perform a final inspection in time to
bring the results back to Council for
their first meeting in August.
NEWS
Public Works
Engineering
Code Enforcement
LETTER
Parks Report
The Parks Crew completed general
maintenance in the parks this week in-
cluding trash pick up, grass cutting,
dragging ball fields and striping and
chalking ball fields and soccer fields.
The Parks Crew applied weed killer for
a second time in parks where it was
needed and also at the Fire Department
and at City Hall. They restained the pic-
nic tables and moved a number of them
to Wentworth Park to accommodate use
by a large group. They also moved them
later to Friendly Hills for a large group
there. (This is a service we provide
upon request). They removed and
cleaned up a large Willow tree from
Rogers Lake Park that had been dam-
aged by a summer storm.
Utility Report
Rich checked the City's seven sanitary
sewer lift stations daily. Rich, along with
his summer helper jetted the following
sanitary sewer lines clean this week;
Park Place Drive, Boardwalk Court, Bluff
Circle, Park Circle and easement, Farm -
dale Road, Cherry Hills Road (all of Park
Place and Cherry Hills II subdivisions).
He discovered a large amount of grease
in the Farmdale Road line. He replaced
a hydrant marker on Somerset Road
and painted a hydrant on Valley Curve.
Street Report
The Street Crew made up several street
name signs and installed them. They
loaded and hauled six loads of debris
that was left on Dodd Road by a contrac-
tor. They cleaned storm grates. They
spread black dirt and seeded where a
storm damaged a tree which had to be
removed on Staples. They performed
pot hole repairs on the Avenue Streets.
They replaced light bulbs on the traffic
signal at Mendota Heights Road and TH
55. They performed maintenance on the
bobcat.
The Pipeline
Forty gallons of diesel fuel were spilled
at 2415 Northland Drive in a truck acci-
dent. The fuel entered our storm sewer
system and Public Works had to assist
in the clean up.
The fuel ended up
in the outlet at a
Brown Institute.
The Dakota
County Environ-
mental Office and
the Minnesota
PGA were notified
and the MPCA su-
pervised the --
clean-up (see
photo).Y°"
Cherry Hill Addi-
tion Street Re-
construction
Hardrives' sub-
contractor respon
sible for boulevard
restoration, Jirik
Sod, has com-
pleted placing sod
in the disturbed
areas throughout
the Cherry Hill
neighborhood.
Ace Blacktop has placed Class 5 aggre-
gate in all of the private bituminous
driveways that are being totally recon-
structed at the property owners' addi-
tional cost. Ace Blacktop informed us
that they plan to start paving these
driveways next week.
Dodd Road Mill and Overlay
Construction activity on MnDOT'S Dodd
Road mill and overlay project in Men-
dota Heights was in full force again this
week with pavement milling and paving
operations. Traffic delays were com-
mon because of the traffic control mea-
sures imposed around the equipment
and labor in the construction work zone.
We received complaints from motorists
July 2, 1999
about inadequate traffic control warn-
ings for local cross street traffic in the
area, and from people that drove
through the construction zone and got
tack coat or asphalt on their vehicles.
Brown Institute Stormwater Outfall
fitted to absorb spilled diesel fuel.
Glen Toro Sec-
ond Addition
Proiect
Municipal Con-
struction Services
(MSC) completed
chipping trees
and brush that
were cleared from
areas that are to
be graded for
street construc-
tion within the
proposed right of
way, or where
utilities are to be
installed. Hope-
fully rough grad-
ing will begin next
week and signify
the start of inten-
sified construction
activity on this pro-
ject.
Mathern Townhome Inspection
Mr. John Mathern, Developer of the
Mendota Heights Townhomes located at
the intersection of Dodd Road and Men-
dota Heights Road has completed his
final townhome and is working with the
City and his residents to finalize his land-
scaping so that his letter of credit can be
released. He had a deadline at the end
of June to complete the work. Marc and
I along with Jack Barber, one of his resi-
dents performed a preliminary inspection
of the work without the Developer. We
found that, once again, although
progress has been made, there were still
many shortcomings. We will be contact-
ing Mr. Mathern for an inspection with
him included next week, but - we are
frustrated.
NEWS '
Public Works The Pi*peline
Engineering
Code Enforcement
LETTER June 25,1999
Parks Report
The Parks Crew completed general main-
tenance in the parks this week including
trash pick up, grass cutting, dragging ball
fields and striping and chalking ball fields
and soccer fields. They also spread dirt
around the batting cages and repaired
sprinkler lines. They installed a drain on the
warning track of field #1. Five crewmem-
bers worked eight hours at Mendakota
Park building pitching mounds, washing
down cement areas, installing 75 foot
baselines, hauling rec rock onto warning
tracks, dragging fields, and hauling in more
picnic tables and trash containers to pre-
pare for the upcoming baseball tourna-
ment. They also leveled all mounds and
graded around all infields at Mendakota
Park. They also installed sprinkler heads
at City Hall along the curb at Victoria
Curve. They started cutting grass along
pedways and weed whipped around sign
posts along pedways. They worked on the
John Deere tractor changing and repairing
nozzles that apply water to control the dust
that is generated when dragging infields.
Utility Report
Rich checked the City's seven sanitary
sewer lift stations daily. He jetted sanitary
sewer lines on Sylvandale and Sylvandale
Court North, Sylvandale Court South, and
Ivy Falls Court (which had lots of sand). He
also mowed the grass at the Veronica Lane
lift station.
Street Report
The Street Crew hauled out debris from the
Public Works backlot and took it to SKB
Landfill. They cleaned up stump grindings,
filled it with black dirt and seeded for a tree
that fell during one of our storms thissea-
son in the Somerset neighborhood. They
installed dirt around the outside radius of
Kay and Walsh Lane where vehicles were
cutting the corner causing ruts and in-
stalled snow posts. The Street Crew also
did pothole patching in the Kressin and
Lake Drive area. They made up various
street name signs and cleaned storm
grates. They also pulled out the barricades
at Marie and Callahan.
Cherry Hill Addition Street Reconstruc-
tion
Hardrives, Inc. has finished reinstalling all
the mailboxes that were removed when the
project began, and the Postal Service has
now resumed the usual mail deliveries to
residents in the neighborhood. Hardrives
has completed the placement of castings
on manholes and the adjustments to gate
valves that lie within the newly paved
street section to prepare for the placement
of the second and final layer of bituminous.
Hardrives has completed backfilling the
boulevards, and subcontractor responsible
for boulevard restoration (Jirik Sod) has
begun placing sod. The private bituminous
driveway reconstruction that was re-
quested by some residents of Cherry Hill
Addition neighborhood started Wednesday
when Ace Blacktop began removing bitu-
minous driveway surfaces and started
prepping driveways for paving.
Dodd Road Mill and Overlay
Construction activity on MnDOT'S Dodd
Road mill and overlay project intensified in
Mendota Heights this week with the start
of pavement milling and paving operations
on the northbound lane. Traffic delays
were common because of the traffic con-
trol measures imposed around the equip-
ment and labor in the construction work
zone. MnDOT recommended that mo-
torists use alternate routes, and it ap-
peared that the traveling public heeded
that advice based on the reduction in the
number of complaints received at City Hall
as the week progressed.
1999 Slurry Seal
It is time again to decide which streets
should be slurry sealed in the City this
construction season. Mendota Heights has
been dedicating funds in the City's budget
since 1988 to perform slurry seal street
maintenance during the summer months in
Mendota Heights. Bituminous street pave-
ments that are structurally sound and are
expected to last five years or more are
candidates for the application of this slurry
seal to the bituminous surface. Slurry seal
is applied to asphalt surfaces to improve
the moisture resistance of the street sec-
tion, retard the inevitable oxidation of the
asphalt mix, and improve the friction prop-
erties of the driving surface. Streets that
are being recommended for this years
work include Fremont Avenue, Garden
Lane, Hiawatha Avenue, Mendakota Drive,
Mendakota Court, Mendota Heights Circle,
Bridgeview Court, Pondhaven Circle,
Pondhaven Lane, Westview Circle, West -
view Terrace, Hampshire Dr., Hampshire
Court, and Park Lane.
Wetland News
The Engineering Department submitted a
grant funding application recently that has
been made available for certain educa-
tional activities that promote water quality
and wildlife protection measures by the
Dakota County Environmental Education
Program. This application was submitted
to secure funding to purchase storm water
information medallions that St. Thomas
Academy (STA) Environmental Science
Class students have agreed to affix to
storm water inlets. These medallions are
intended to remind and educate people
about the direct link that debris and runoff
entering these catch basin inlets can have
on the quality of receiving waters. The
Dakota County Environmental Education
Program approved a $1,000 funding grant
to purchase these medallions. This grant
program requires a 25% local match that
will be fulfilled by a provision of the pro-
gram that places a dollar value on each
hour of donated time spent installing these
medallions by STA staff and students.
Lower Mississippi WMO Meeting
The third meeting of the watershed's Citi-
zen Advisory Committee (CAC) will be
held at 6:30 P.M. on Monday, June 28th.
This next meeting will originate from the
Mendota Heights parking lot and consist of
a staff guided bus tour of important facili-
ties and interesting sites within the Lower
Mississippi watershed.
Attachments:
• CAC Meeting Minutes
• CAC Preliminary Bus Tour Agenda
LOWER MISSISSIPPI RIVER
WATERSHED MANAGEMENT
ORGANIZATION
CITIZEN ADVISORY COMMITTEE
MEETING MINUTES
Monday May 24, 1999
7:00 — 9:00 P.M.
Mendota Heights City Hall
Members in Attendance: Jim Burkowski - St Paul.
Aethan Hart- West St. Paul
John Barthe - Lilydale
Mike Dwyer - Mendota Heights
Tim Bruckmueller -Mendota Heights
Jim Helseth - South St. Paul
Mark Linafelter - South St. Paul
John Ertel - West St. Paul
Others in Attendance: Karen Chandler- Barr Engineering
Marc Mogan - City of Mendota Heights
Laura Jester- Dakota County SWCD
Phil Belfiori - Board of Water and Soil Resources
Pat Lynch - Minnesota Department of Natural Resources
Judy Sventek - Metropolitan Council-__- - ---
Lower Mississippi River WMO
5124199 CAC Meeting Minutes
Phil also mentioned that infiltration technologies do not work in every case. The soil
permeability needs to be fairly good.
Gene Soderbeck discussed the need for pre -settlement treatment of runoff before
infiltration in some cases. This is due to clays in the water, which settle out last,
creating a barrier layer that won't allow infiltration in the future. Additionally, some
infiltrated water has the potential to contaminate groundwater.
There was some discussion among the group regarding the use of infiltration
technologies. One comment was made that these ideas must be brought to the citizens
and developers. A question was raised regarding the current city ordinances and the
amount of impervious surfaces they allowed, etc.
IV. LMRWMO Vision and Purpose Statement— Karen Chandler
Due to the lack of time, it was decided to discuss the vision and purpose statement at a
future meeting.
The next meeting is scheduled for Monday June 28t'. This meeting will include a tour of the
watershed and sites of interest to the CAC. A meeting time and place will be announced with
the agenda.
Preliminary Tour Agenda
1.
Mendota Heights City Hall
— Begin tour from parking lot
2.
Ivy Falls Creek, Mendota Heights
— Detention pond with staged outlet
• effect on flow rate
• water quality
— View creek channel from road
3.
Lower Lilydale, Lilydale (St. Paul
— Former housing tract —frequent flooding
Parks)
4.
Harriet Island, St. Paul
— No longer an island (story?)
5.
Holman Field, St. Paul
— Flood control levees
— Frequency and depth of flooding
6.
Simon's Ravine at Concord, South
— Houses and businesses removed for safety
St. Paul
7.
Simon's Ravine at 19'', South St. Paul
— Kaposia Dam (high hazard)
• Water level July 1987
• Washout August 1977
— View construction
8.
Simon's Ravine at Emerson Pond,
— Detention pond with water quality outlet
West St. Paul
• Effect on flow rate
• Water quality
• Control on downstream flow rate
— View "wilderness area"
9.
Simon's Ravine at Wentworth Ponds,
— Detention pond
West St. Paul
• Effect on flow rate
• Water quality
• Valve
— 1987 Storm comments
10.
Babcock Trai, Inver Grove Heights
— Stormwater management planning in the 110-494
corridor (possibly visit Schmitt Lake)
11.
Schmitt Lake, Inver Grove Heights
— 110-494 corridor system of ponds
12.
Siedel's Pond, South St. Paul and Inver
— Landlocked
Grove Heights
— Water quality (WMO study)
13.
Mississippi River at 494, South St. Paul
— Boat launch
— Levees
14.
Landlocked Pond with Outlet, Inver
— DP-29B Pumped Outlet, controlled water levels
Grove Heights
15.
Landlocked Pond without Outlet, Inver
— City Offices Pond: Expected vs. actual level
Grove Heights
16.
Marcott Lakes, Inver Grove Heights
— Valued water bodies, landlocked. Effort to
minimize urban impacts
17.
Mud Lake, West St. Paul
— Citizen involvement in lake improvements
207002.doc
W.
I
\V
'
r
!
i
'
rc.
1
31
Ll
�4..
LOWER MISSISSIPPI RIVER
WATERSHED MANAGEMENT
ORGANIZATION
CITIZEN ADVISORY COMMITTEE
YOU'RE INVITED ON A
WATERSHED TOUR
MONDAY DUNE 28'
6:30 — 9:30 P.M.
Starting at the Mendota Heights City Hall
In lieu of a meeting, we will be touring various sites
throughout the watershed to get better acquainted with
issues facing water management in -the area and past
projects implemented to address these issues..
The bus will leave the Mendota Heights City Hall
promptly at 6:30 p.m. and will return around 9:30 p.m.
Please R.S.V.P. with Laura Jester 651/480-7784 as
soon as possible.
The City Hall is located at 1101 Victoria Curve in the northwest comer of the
intersection of Lexington Ave. and Hwy 110, just west of 35E.
NEWS
Public Works
Engineering
Code Enforcement
LETTER
Street Report
The Street Crew delivered and
picked up barricades at 2219
Apache street that were used for a
block party. They furnished tempo-
rary "No Parking" signs on wood
laths to Linda Kieffer who lives on
Nina Court that she will use to re-
strict parking in the vicinity of Sibley
High School during an upcoming
band concert. They hooded the "No
Parking" signs on Victoria Curve for
a barmitzvah at Beth Jacob Syna-
gogue. They also reinstalled the
post and street name sign at Eagle
Ridge and Marie Avenue. They
worked on pothole patching in the
Kressin Avenue area. They hauled
debris from the back of the Public
Works Garage to the SKB landfill.
Utility Report
Rich checked the City's seven sani-
tary sewer lift stations daily. Rich
jetted the sanitary sewer lines start-
ing on Sylvandale and then jetted
Medora, Emerson, Knollwood Lane,
and Knollwood Court. He also
mowed the grass at the Veronica lift
station. He performed a sewer in-
spection at 1128 Highway 13 and
1256 Wachtler Avenue.
Parks Report
The Parks Crew completed general
maintenance in the parks this week
including trash pick up, grass cut-
ting, dragging ball fields, striping,
and chalking ball fields and soccer
fields. John Boland began raising
beetles at the Public Works bug
nursery that will then be introduced
into some of the City's wetlands in
an attempt to control or eliminate the
Purple Loosestrife growth. The
Parks Crew also formed and placed
The Pipeline
cement pads that will enable the
porta-potties to be anchored to the
ground and locked in Marie, Valley,
and Wentworth Parks to prevent
them from being tipped over.
They formed and installed cement
pad footings for the installation of
barbecue grills at Kensington and
Wentworth Parks. They sharpened
mower blades, washed trucks and
serviced some of the parks equip-
ment. They cleaned up bathrooms
and contacted a plumber to replace
bathroom fixtures that were de-
stroyed as a result of the vandalism
last weekend at Kensington and
Mendakota Park. They pulled sprin-
kler lines at Mendakota Park around
the baseball batting cages, set
heads, and backfilled around the
sprinkler heads, batting cages and
the blacktop pedway.
Cherry Hill Addition Street Recon-
struction
Hardrives, Inc. is continuing to back -
fill and grade the boulevards.
Hardrives continues to reinstall mail-
boxes that were removed when the
project began. Hardrives has begun
to place castings on manholes and
adjust gate valves that lie within the
newly paved street section to pre-
pare for the placement of the second
and final layer of bituminous.
Glen Toro Second Addition Project
Work began this week on the Glen
Toro Second Addition Project. Mu-
nicipal Construction Services (MSC)
started clearing trees and brush
from areas that are to be graded for
street construction within the pro-
posed right of way, or where utilities
are to be installed. Rough grading
will hopefully begin next week.
June 18, 1999
Dodd Road Mill and Overlay
MnDot's Dodd Road mill and overlay
construction project began this
week. NSP Gas started performing
repairs and installing anode protec-
tion on some of their gas lines.
Pavement construction activities will
follow after NSP Gas has completed
this work. Traffic will be restricted
by an on duty flagperson on those
highway segments where pavement
milling and asphalt paving opera-
tions are in progress. The project is
scheduled for completion in early
August. MnDot recommends that
motorists use alternate routes.
Mendakota Park Batting Cages
The gravel was placed inside the
concrete maintenance strip and the
trail paved on Wednesday by Ace
Blacktop. Fenc-Co. Inc., began
placing the fence fabric and gates to
complete the double batting cage on
Thursday.
Public Works Screen/Privacy
Fence
Fenc-Co, Inc., began installing the
posts for the privacy fence at the
Public Works Facility. The fence is
intended to screen the storage area
area behind the maintenance
garage from view. Work should be
completed next week.
Staff News
Jim Danielson loaded up the family
minivan and left early Monday morn-
ing for a two -week summer vacation
to Disney World and Florida's Gulf
Coast. We expect Jim to return to
work on Monday, June 28th.
NEWS
Public Works 1 e In e
Engineering The
Code Enforcement
LETTER June11.1999
Street Report
The Street Crew cleaned all of the
storm grates that were plugged be-
cause of the storms. The mowing
contractor's grass from the boulevards
had floated on to them. John Ambrose
had to be called in Sunday to clear
several trees that had been blown
down during the storm and were im-
peding traffic. The entire crew worked
on removing downed trees and limbs
from the boulevard areas on Monday
(Overlook, Staples, Mears and
Dorset). Greenleaf, a private contrac-
tor, had to be hired to remove a tree
from the boulevard at #6 Staples be-
cause a large branch was broken and
hanging precariously over a home.
Ex -Mayor Lockwood had called in this
request because the home involved
was next to his and the residents were
gone on vacation. The Street Crew
borrowed a bituminous paver from the
City of Eagan this week for use in
patching our streets.
Mark Olson was contracted this week
to mow the boulevard areas that have
high weeds.
Parks Report
The Parks Crew completed general
maintenance in the parks this week
including trash pick up, grass cutting,
dragging ball fields and striping and
chalking ball fields and soccer fields.
The Parks Crew repaired the sprinkler
lines at Mendakota Park where they
were damaged due to the batting cage
construction. They installed base an-
chors at 60 feet at the four fields at
Mendakota Park. They fertilized the
lawns at Mendakota and Kensington
Parks, City Hall and the Fire Station.
They picked up numerous downed
limbs in the parks and along the ped-
ways on Monday that were there as a
result of Sundays storm and they be-
gan installing concrete bases in Marie,
Valley, and Wentworth Parks to be
used as anchors for the porta potties.
One full-time and one part-time em-
ployee will be working overtime this
weekend at Mendakota Park to pre-
pare the fields for Mendota Heights
Athletic Association's in-house 8-13
year old baseball tournaments.
Utility Report
Rich checked the City's seven sanitary
sewer lift stations daily. The power
went out at 6:00 P.M. on Sunday at the
Veronica Lane lift station because of a
storm. John Boland and Tim Oster
were called in to bring in and run the
mobile generator. Once it was set up,
one of them had to remain with the lift
station until the power was restored at
9:00 A.M. Monday morning. Rich and
his summer helper, JP, jetted the sani-
tary sewer lines clean on Dodd Road
near 4th Avenue (lots of roots because
of the nearby oak trees), on 4th Av-
enue, Vandall Street and on Sunset
Lane.
Dodd Road
MnDOT conducted a preconstruction
meeting this week to discuss the mill
and overlay project scheduled for
Dodd Road. The contractor is Total
Asphalt and they intend to begin work
on this project next week. Total As-
phalt and MnDOT will be using the
Dodd RoadITH 110 intersection for
their assembly area and field offices.
Cherry Hill Addition Street Recon-
struction
Hardrives, Inc. has now begun to
backfill and grade the boulevards after
completing the major milestone task of
installing the first layer of bituminous
asphalt last week on the Cherry Hill
Street Reconstruction Project.
Hardrives, Inc. has also started the
task of reinstalling the mailboxes that
were removed when the project be-
gan. This mailbox work will take
more than a few days to complete.
Unfortunately, the Postal Service will
probably not switch the mail deliveries
back to these reinstalled mailboxes
until they are all in place. Last week
Council awarded a contract to Ace
Blacktop Inc. to reconstruct bitumi-
nous driveways requested by some
residents of Cherry Hill Addition neigh-
borhood. Ace Blacktop had hoped to
commence reconstruction on these bi-
tuminous driveways this week, but
those plans were delayed by the re-
cent inclement weather.
Lexington Avenue Trail Project
The Engineering Department contin-
ued gathering preliminary field survey
data this week to prepare for the pub-
lic hearing scheduled for this July for
the proposed pedestrian trail improve-
ment project. Residents that ap-
proached and talked with personnel
while they were in the field wanted to
know two things. They wanted to
know if this project would cost them
anything, and if it would adversely im-
pact the vegetation or landscaping on
their lots. Everyone seemed to be
able to relate to the City's concern
about safety. After learning that this
trail would be constructed without
funding from adjacent property own-
ers, they indicated that they would
support the proposed improvement
project.
Engineering was contacted by Eric
Flowers, reporter for the Sun Cur-
rent, this week who was gathering
information for an article he was
preparing on the trail. He informed
us that the several residents that he
talked with were not opposed to the
trail.
NEWS '
u is ors
EngineeringThePi*peline
o e Enforcement
June 4, 1999
Utility Report
Rich checked the City's seven sanitary
sewer lift stations daily. He also per-
formed a sanitary sewer connection in-
spection at the new Mendakota Coun-
try Club maintenance garage facility
now under construction. He cleaned
the sanitary sewer mains on Second
Avenue, Clement Avenue, Third Av-
enue and Sommerset Court with the
City's jetter this week (he found roots
and grease in the line on Third Av-
enue).
Street Report
The Street Crew worked with Engi-
neering to determine streets to be
slurry sealed this year. They graded
Dodge Lane, the only gravel street we
have left (together with one gravel al-
ley). They installed a new mail box
post at 1884 Valley Curve. They
worked on making some corrections
that were required as a result of the
OSHA inspection, placed a ground
fault interrupter in the Public Works
Garage break area (anything 3' or less
from a water supply needs one), they
ordered new hooks for the chain hoist
(ones with safety hooks), they installed
a number of new updated signs
throughout the shop area, etc. etc.
They placed backfill and sod behind
the recently repaired curbs. They
opened the storm pipe outlet that
drains into Friendly Hills Marsh from
Cheyenne Lane. They worked on pot-
hole patching - on Apache Lane and
Cheyenne Lane (temporary patches
for large holes).
Parks Report
The Parks Crew completed general
maintenance in the parks this week
including trash pick up, grass cutting,
dragging ball fields and striping and
chalking ball fields and soccer fields.
The Parks Crew along with all the
other workers out at the shop were im-
pacted by the recently conducted,
unannounced OSHA inspection that
occurred out at the Shop on Tuesday
of this week. The Parks Crew had to
make a number of corrections such as;
dispose of outdated, non -complying
gas cans and purchase replacements,
install new "grounded" electric plugs
for hand tools and a number of other
small things.
They replaced some dead shrubs
around park signs. They also had to
deal with vandalism repairs at - guess
where again - Kensington Comfort Sta-
tion, where someone entered the
women's bathroom and disconnected
a water supply line to the toilet, flood-
ing the room. Vandals also pushed
over the portable toilets at Hagstrom
King and Victoria Highlands Parks.
The Parks Crew had removed the toi-
lets from Marie, Wentworth and Valley
Parks already because they were con-
tinually being pushed over. We con-
tacted "Biff the toilet supplier and he
told us that if we put in "I" bolts an-
chored in concrete, they would attach
the toilets to them - preventing them
from being tipped over (we hope!). We
will be installing the concrete anchors
next week, so that we can return the
toilets to the parks.
One full-time with a part-time em-
ployee will work Saturday and Sunday
mornings this wekk to prepare the
fields at Mendakota Park for the Henry
Sibley fast pitch softball tournament.
Cherry Hill Addition Street Recon-
struction
Hardrives, Inc. resumed and com-
pleted the installation of the first layer
of bituminous asphalt on Tuesday on
the Cherry Hill Street Reconstruction
Project. They also finished replacing
all of the driveway aprons that were
removed at the start of the project ex -
cept for those driveways that some
residents have contracted through the
City to be reconstructed in their en-
tirety in conjunction with this project.
Council awarded a separate contract
to Ace Blacktop Inc. to reconstruct bi-
tuminous driveways that these resi-
dents requested at Tuesday's Council
meeting. Ace Blacktop indicated they
might be able to commence bitumi-
nous driveway reconstruction next
week. Hardrives, Inc. anticipates
commencing sod restoration after the
concrete has cured sufficiently, and
after Ace Blacktop has completed the
planned driveway reconstruction work.
The project is really looking good with
the concrete curb and gutter and first
layer of bituminous surface in place.
Compliments to Hardrives, Inc. for
making such significant progress in
such a relatively short time.
Glen Toro Second Addition
A pre -construction meeting was held
at 1:00 P.M. on Wednesday June 2,
1999 for the Glen Toro Second Addi-
tion improvement project. Municipal
Contracting Services is the Contractor
for the project. The project is rela-
tively small, but is by no means un-
complicated. The site presents some
challenges with regard to topography
and vegetation. The platting of the
property and the utility and street im-
provements were designed to respect
and protect these features. The Con-
tractor indicated that they are planning
to start construction on this project the
week of June 21st.
Lexington Avenue Trail Project
The Engineering Department began
gathering some preliminary field sur-
vey data this week to prepare for the
neighborhood meeting scheduled for
this July for the proposed pedestrian
trail improvement project.
NEWS
Public Works ThePi*peline
Engineering
Code Enforcement
LETTER May 28, 1999
Parks Report
The Parks Crew completed general
maintenance in the parks this week
including trash pick up, grass cutting,
dragging ball fields and striping and
chalking ball fields and soccer fields.
Two workers worked a few overtime
hours Saturday and Sunday to pre-
pare the fields at Mendakota and
Kensington Parks for a Sibley Sting
soccer tournament and a Visitation
softball playoff. They received their
new replacement Toro Groundmas-
ter lawnmower and put it in service
this week. They had to use their turf
sweeper at Ivy Falls and Mendakota
Park to remove the cut grass, be-
cause it was too thick. They acti-
vated the lawn irrigation systems this
week (still have not needed to use
them).
There are no tournaments or other
type of major park uses scheduled
for this weekend.
Utility Report
Rich checked the City's seven sani-
tary sewer lift stations daily. Rich
replaced a hydrant flag on Douglas
Road. He also assisted the Parks
Crew plant flowers at Mendakota
Park.
Street Report
The Street Crew assisted the Police
Department with their Bicycle Rodeo
by providing cones and barricades.
They worked on relamping street
lights within the Industrial Park.
(There were a number of lights out).
They had to take pickup truck #302
in to have its transmission checked
out, there was no overdrive. It
turned out to be an electrical prob-
lem.
They trimmed branches back that
were causing sight obstructions to
signs. They prepared the subgrade
for installing a replacement curb on
Apache Lane where we had to repair
a deep sanitary sewer service last
fall. They also worked on replacing
a broken storm water curb box inlet
on Commerce Drive by Associated
Bureau's driveway.
Cherry Hill Street Reconstruction
Hardrives, Inc. re-
claimed the remaining
pavement that had been
left in place to facilitate
storm sewer construc-
tion this past week.
The concrete readymix
trucker strike that
started on May 19th and
halted concrete curb
and gutter construction
on the Cherry Hill Re-
construction Project at the end
of last week was settled on May
21 st. Resolving this strike allowed
CurbMasters to resume and com-
plete the placement of the remaining
concrete curb and gutter on the pro-
ject this week. A period of favorable
weather and some commitment to
the completion of this project by
Hardrives, Inc., led to the placement
of the first layer of bituminous start-
ing on Friday on Farmdale Road and
Lower Colonial Drive. Hardrives,
Inc. continues to reduce the size of
the stockpiles this week near the
Wentworth Park tennis courts by
hauling out more of this excess ma-
terial.
Lower Mississippi WMO Meetinq
The second meeting of the water-
shed's Citizen Advisory Committee
was held at 7:00 P.M. on May 24th
in the Mendota Heights City Council
chambers. Enclosed is a copy of
the minutes for that meeting. The
next meeting has been scheduled
for Monday, June 28th at 6:30 P.M.
This next meeting will begin at the
Mendota Heights parking lot and
consist of a bus tour of important
and interesting facilities and sites
within the Lower Mississippi water-
shed.
Paving In Cherry Hill Addition
Other News
Construction started this week on the
Mendakota Park batting cages. The
new batting cages will be located
south of the existing multiuse struc-
ture between the four fields con-
nected by a path. The subgrade for
both the path and the batting cages
were prepared this week and the
fencing for the cages has been deliv-
ered. Guy is the general contractor
for this job.
CurbMasters replaced some sunken
curb within the Delaware Crossing,
Copperfield and Bridgeview Shores
neighborhoods this week.
Attachment:
0 LMWMOCAC Minutes
LOWER MISSISSIPPI
WATERSHED MANAGEMENT
ORGANIZATION
CITIZEN ADVISORY COMMITTEE
MEETING MINUTES
Monday May 24, 1999
7:00 — 9:00 P.M.
Mendota Heights City Hall
Members in Attendance: Jim Burkowski — St. Paul
Aethan Hart — West St. Paul
John Barthe - Lillydale
Mike Dwyer — Mendota Heights
Tim Bruckmueller— Mendota Heights
Jim Helseth — South St. Paul
Mark Linafelter — South St. Paul
John Ertel — West St. Paul
Others in Attendance: Karen Chandler— Barr Engineering
Marc Mogan — City of Mendota Heights
Laura Jester — Dakota County SWCD
Phil Belfiori — Board of Water and Soil Resources
Pat Lynch — Minnesota Department of Natural Resources
Judy Sventek — Metropolitan Council
L=nwer Mississippi River WMO
5124199 CAC Meeting Minutes
Introductions
Those present introduced themselves and the city or agency they represented.
Non -Point Source Pollution — Gene Soderbeck, Minnesota Pollution Control Agency
Gene discussed the sources of non -point source pollution in urban areas and how those
pollutants affect bodies of water. He showed a number of graphs to illustrate his points
(see attached). Specifically, Gene made several key points regarding urban stormwater
runoff:
A one-half inch rainfall is needed to generate the runoff and produce non -point
source pollution; about 85% of storm events are less than one-half inch of rain.
2. As urban cover or the percentage of impervious surfaces increase, biological
metrics which indicate the health of a waterbody, decline.
3. In general, residential lots have the least amount of impervious surfaces in urban
areas, while shopping centers have the most. Commercial and industrial
landuses fall in between.
4. Destabilized stream channels add more sediment to the waterway due to the
cutting of banks, etc. It takes a 10-year storm event in a forested watershed to
produce the same amount of unstable channels as a 2-year storm event in an
urban watershed.
5. Phosphorus loads increase as impervious surfaces increase, however good
storm water management can alleviate this problem.
6. There is a very long list of potential contamination sources in urban areas. (See
attachment.)
7. Watershed management organizations need to set resource goals and then look
for opportunities to meet those goals through activities such as erosion control,
rate and volume control, impervious surface control, public education, street
sweeping, pond maintenance, sand/salt storage, etc.
III. Stormwater Infiltration Technologies — Phil Belfiori, Board of Water and Soil Resources
Phil showed overheads and slides and discussed the need for stormwater infiltration
technologies and gave examples of some innovative ways of dealing with stormwater.
Specifically, he reported that these techniques reduce water pollution and treatment
costs by mimicking nature. Some examples of techniques include reducing impervious
surfaces in new developments, using grass swales instead of immediately ponding or
piping the water away, using "low" islands or green spaces in parking lots for infiltration
instead of raised islands, etc.
I_<=wer Mississippi River WMO
5/24199 CAC Meeting Minutes
Phil also mentioned that infiltration technologies do not work in every case. The soil
permeability needs to be fairly good.
Gene Soderbeck added that the small runoff events should be infiltrated, but that larger
storm events should be treated first because clays in the water will settle out last,
creating a barrier layer that won't allow infiltration in the future. Additionally, some
infiltrated water has the potential to contaminate groundwater.
There was some discussion among the group regarding the use infiltration technologies.
One comment was made that these ideas must be brought to the citizens and
developers. A question was raised regarding the current city ordinances and the
amount of impervious surfaces allowed, etc.
IV. LMRWMO Vision and Purpose Statement— Karen Chandler
Due to the lack of time, it was decided to discuss the vision and purpose statement at a
future meeting.
The next meeting is scheduled for Monday June 28'h. This meeting will include a tour of the
watershed and sites of interest to the CAC. A meeting time and place will be announced with
the agenda.
NEWS °
Public Works PPi*peline
Engineering v
Code Enforcement -
LETTER Mav21.1999
Parks Report
The Parks Crew completed general
maintenance in the parks this week
including trash pick up, grass cutting,
dragging ball fields, and striping and
chalking ball fields and soccer fields.
John Boland with Rich's help secured
the Purple Loosestrife plants needed
for our Loosestrife bug nursery this
week. Every year for the next several,
John will be working with the Dakota
County Environmental Department to
grow Loosestrife eating bugs, first in
our nursery at the shop, and then he
will transplant them to Loosestrife in-
fested areas. Hopefully within the next
few years, we will begin to get this
extremely aggressive plant under con-
trol within the City. Mendota Heights
has an extremely bad infestation of
Loosestrife throughout the City.
Because of all the wet weather the
Parks Crew worked overtime a couple
of days this week to try and catch up
on the mowing.
Two Parks Crew members will be
working two hours on both Saturday
and Sunday this weekend to prepare
the fields for the Visitation softball tour-
nament being conducted at Men-
dakota Park and for a soccer tourna-
ment being held at both Mendakota
and Kensington Parks.
Utility Report
Rich checked the City's seven sanitary
sewer lift stations daily. Rich also
trimmed the trees at the Veronica Lane
lift station site and mowed the grass at
all the lift stations two times this week.
He located a hydrant extension to
raise a hydrant that was partially
buried within the Bunker Hills Street
Reconstruction project (pre -pacer type
hydrants are no longer made and re-
pair parts are very difficult to find). He
responded to two, after hours lift sta-
tion alarms (Culligan and Veronica).
He also attended sexual harassment
training (all employees attended one of
two classes conducted this week).
Street Report
The Street Crew repaired washouts on
Orchard Place and Orchard Circle.
They relocated a mailbox and a warn-
ing sign in the "bubble" on northbound
Lilac Lane. A resident that lives in the
bubble has had problems with inatten-
tive or speeding drivers crossing over
the curb and striking her mail box -
hopefully these changes will solve her
problem.
They made up several new street signs
and installed them. They had to re-
move a downed tree from Arbor Court
and they continued to work on getting
bids for outfitting their new snowplow
truck.
Code Enforcement Report
The City has received several inquiries
recently concerning development of
the five residential lots platted as part
of the Dakota Bank and Super America
gas station development. It was
agreed to between the Developer and
the City that these residential lots
would not be developed until construc-
tion of the Bank, the Super America
gas station, the replacement screening
wall and landscape berm were com-
pleted.
The City has also been receiving calls
this week relative to violations of the
weed ordinance - the correct weather
conditions have certainly been present
to cause a big spurt in weed growth.
Cherry Hitt Street Reconstruction
The wet conditions that we have been
experiencing recently did not appear
to hinder progress on the Cherry Hill
Street Reconstruction Project this past
week. Driving conditions on these
streets have held up relatively well.
The wet weather did create some soft
spots in some of the driveway aprons
in the neighborhood. Hardrives, Inc.
replaced this soft material with
crushed rock. Storm sewer construc-
tion began on Monday. Penn Con-
tracting completed most of the storm
sewer work by Friday. Hardrives, Inc.,
had their concrete curb and gutter
subcontractor, CurbMasters, on the
project installing concrete curb and
gutter this week. CurbMasters placed
over 50% of the concrete curb and
gutter on the project starting on Tues-
day. We were expecting CurbMasters
to resume placing another 2,000 lineal
feet of concrete curb and gutter the
next day, but those plans were post-
poned when the local concrete
readymix truckers went out on strike
on Wednesday. Hopefully this strike
will be resolved shortly, thereby allow-
ing resumption of concrete curb and
gutter construction. Hardrives, Inc.
hauled out roughly 1,000 cubic yards
of excess material this week from
stockpiles near the Wentworth Park
tennis courts. Hardrives, Inc. has
been very efficient on the project to
this point, and has made significant
progress towards completion of the
work under some difficult circum-
stances.
Lower Mississippi WMO Meeting
The second meeting of the water-
shed's Citizen Advisory Committee is
scheduled for May 24th at 7:00 P.M.
in the Mendota Heights City Council
chambers. Enclosed is a copy of the
agenda for this meeting.
NEWS
Public Works PPi*peline
Engineering v
Code Enforcement
LETTER May 14,1999
Parks Report
The Parks Crew picked up trash,
mowed grass, striped ball fields daily
in the parks. They were also ham-
pered all this week by the rainy
weather. The grass is getting long -
but we can not cut when it's raining.
They cut down and removed dead
trees from Kensington and Mendakota
Parks.
It happened again! Kensington, our
worst park for vandalism had vandals
enter the men's restroom and remove
a fitting from a water supply line. The
water flooded the whole room for eight
hours. Fortunately this time the van-
dals did not plug the floor drain so that
helped drain some of the water away.
We also had a porta potty tipped over
(even though the supplier is staking
them down this year), and we had the
porta potty at Hagstrom King Park van-
dalized with graffiti.
Utility Report
Rich checked the City's seven sanitary
sewer lift stations daily. Rich cleaned
the sanitary sewer main located on
Mendota Heights Road, the street that
serves Lloyd's Meats, with the City's
jetter. We have a problem with grease
build up in that section and need to
clean it more often. He attended a
pump workshop on Tuesday that was
put on at Braun Pump and sponsored
by the MPCA. It was a hands on type
workshop where they worked on re-
pairs to pumps (they used Lilydale's
pump as an example pump). He per-
formed some maintenance at the
Northland Drive lift station. A power
supply cord bracket had corroded and
broken off.
He arranged for Pipe Services, a pri-
vate contractor to come in and vacuum
clean all of our sanitary sewer lift sta-
tion's wet wells and the Public Works
Garages' and Fire Hall's sand pits.
This is an annual preventative mainte-
nance service that Rich arranges for
each spring.
Street Report
The Street Crew dropped off and
picked up the barricades and cones
used for last Saturday's Annual Spring
Clean -Up day held at Mendota Plaza.
They checked the storm gates after the
rain storms.
They drafted the specifications for the
dump body and snow removal equip-
ment to be attached to the new 5-ton
snowplow truck that has been ordered.
They delivered the specifications to
three companies for bidding.
P.D. called in Tim Oster, to clear a tree
that was downed and blocking traffic
on Victoria Curve. They worked on
straightening signs.
Cherry Hill Street Reconstruction
The persistent and significant precipi-
tation that fell this week slowed the
steady work progress that Hardrives,
Inc. had been making on the Cherry
Hill Street Reconstruction Project.
The driving conditions on these
streets were surprisingly good and
erosion problems were minimal con-
sidering that 3+ inches of rain fell on
the neighborhood throughout the
week. Some of the driveway aprons
that had been removed last week near
the street became saturated making
access to some residents' garages dif-
ficult. Hardrives, Inc. addressed this
situation by placing and compacting
rock in the affected driveway aprons.
The storm sewer installation that was
planned to begin the week of May
10th was postponed because of the
rain and will now begin on May 17th.
Penn Contracting expects to finish
storm sewer construction in less than
two weeks with favorable weather.
Most of the storm sewer work will take
place on Cherry Hill Road between
Wachtler Avenue and Ivy Lane.
Hardrives, Inc. started hauling out ex-
cess material on Friday generated
during boulevard grading that they
had been stockpiling near the Went-
worth Park tennis courts. Hardrives,
Inc. has indicated that their concrete
curb and gutter subcontractor may
commence concrete curb and gutter
construction as early as next week.
Reel 'em In! Bait that Hook!
The word is spreading. The "HOT"
fishing news is not all with the Gover-
nor. A keen eyed staff member reports
that Friday afternoon nine parked cars
were observed on Wagon Wheel Trail,
near the "S" curve. Upon inspection,
he observed fifteen anglers fishing
Rogers Lake. City Hall has received
several reports from residents that the
fish, large Crappies, were being
caught in Roger's Lake. Well the en-
thusiasm of the anglers fishing in the
lake authenticates these rumors. The
DNR has been sampling the lake to
determine size and numbers of fish in
the lake and will be reporting their find-
ings soon to the City.
Good Luck Anglers
NEWS
Public Works ThePi*peline
Engineering
Code Enforcement
LETTER May7,1999
Parks Report
The Parks Crew picked up trash daily
in the parks. They also cut the grass in
the parks, but were rained out for a
couple of days. They dragged all the
softball infields and striped them.
They marked and striped all the soccer
fields at Kensington and Mendakota
Parks. They installed new irrigation
water lines at City Hall and at the old
Fire Hall site. They had to repair the
backflow preventor on the irrigation
system at the Fire Hall.
They planted a flowering crab tree at
City Hall by the Police entrance. This
tree was donated by the Mendota
Heights Garden Club as has been their
tradition every spring. They also
planted four trees donated by "The
Friends of the Parks', one Black Hills
Spruce at Ivy Hills Park, two Black Hills
Spruce at Went'North Park and one
Maple at Mendakota Park.
Utility Report
Rich checked the City's seven sanitary
sewer lift stations daily. He had to
repair the steps at the Mendota
Heights Road lift station. He trimmed
the trees in the island at the Culligan
Lane lift station and mowed the grass
at the Veronica Lane lift station.
There was a watermain break last Fri-
day on Sylvandale Avenue between
Laura and Sylvandale Courts. It had
apparently been leaking for a long time
without being reported, so when St.
Paul Water Utility dug the hole to re-
pair it, they encountered a large area
of very saturated soil which kept cav-
ing in. This made their work go much
slower and made the repair hole much
larger. St. Paul Water Utility also re-
paired a leaking hydrant on Thursday
of this week at the intersection of
Creek Avenue and Dodd Road. They
omitted informing one of the residents
served by the line that he would be out
of water and he was upset. It was a
quick repair though and he was back in
service in a couple of hours.
Street Report
The Streets Crew began installing per-
manent bituminous patches to the
streets this week with "hot mix". Hot
mix is now available from the asphalt
plants. They installed some Class 5
(rock) where it was needed on the
shoulders of the roads. They straight-
ened signs and installed new crime
watch signs for the Police Department.
They checked and cleaned storm
grates after the rain storm.
Code Enforcement Report
Kraus Anderson, United Properties'
contractor, for their new three story of-
fice building has sufficiently satisfied
the life safety issues and completed
enough of the building to allow Everen
Securities to move into the third floor.
In order to meet this Monday morning
move in deadline, Kraus Anderson had
50 electricians and many other trades
people working overtime all weekend
long.
Judge Lynch found the resident at 769
Sibley Memorial Highway guilty of vio-
lating the City's Zoning Ordinance this
week. The resident has unscreened
piles of debris and other assorted
refuse visible from the street and adja-
cent property. The homeowner was
given until June 1st to clean up his
property (now, I guess we'll just have
to wait and see if he complies and
cleans up).
Cherry Hill Street Reconstruction
Construction began this week
with partial driveway pavement re-
movals, boulevard excavation, and the
lowering of manholes and gate valves.
Bituminous reclamation operations fol-
lowed starting Wednesday. The first
stage of bituminous reclamation was
completed by the end of the week.
The bituminous pavement that was
not reclaimed at this time was the
pavement that was beyond and adja-
cent to the limits of the storm sewer
trenches. Storm sewer installation will
start the week of May 10th by Penn
Contracting who is the subcontractor
responsible for the storm sewer con-
struction on the project. Penn Con-
tracting expects to finish storm sewer
construction in less than two weeks
with favorable weather. Most of the
storm sewer work will take place on
Cherry Hill Road between Wachtler
Avenue and Ivy Lane. The pavement
that has been left in place to facilitate
storm sewer construction will be re-
claimed after the storm sewer system
has been installed. The temporary
mailboxes that Hardrives, Inc. in-
stalled at the location requested by
the Post Office on the west side of
Wachtler at Cherry Hill created some
safety concerns. After hearing the
concerns expressed by the residents
the Post Office agreed that a better lo-
cation for the mailboxes would be far-
ther south on the west side of
Wachtler at Park Place. The Contrac-
tor resolved the residents safety con-
cerns when they shifted mailboxes to
that location on Wednesday. The rain
on Friday forced the Contractor to de-
vote some time and material to im-
prove the condition of driveway
aprons, but curtailed most of the other
work on the project.
Attachment:
• Smolik Thank You Letter
- --- --
--AIL)
NEWS
Public Works ePl*peli*ne
Engineering
Code Enforcement
LETTER April 30, 1999
Parks Report
The Parks Crew picked up trash
from the parks daily. They
stripped truck 503 including re-
moving the radio and delivered the
truck to Grossman Chevrolet as a
trade-in for their new replacement
truck. They then picked up their
new truck from Grossman and de-
livered it to Reach Equipment to
have the plow attachment equip-
ment installed. They attended an
athletic and sports and turf work-
shop on Friday. Floyd Perry, who
is a nationally recognized expert
on turf management put on the
workshop. The workshop was
held at Minnetonka's City Hall
where Mr. Perry addressed spring
turf repair of football/soccer fields,
seeding, care and maintenance of
pitchers mound's etc.
The Parks Crew built a new base-
ball pitcher's mound at the Civic
Center ball field site by City Hall as
recently authorized by Council.
Utility Report
Rich checked the City's seven
sanitary sewer lift stations daily.
Rich raked sticks and grass and
started mowing lift station lots this
week.
Street Report
McPhillips, the street sweeping
contractor, finished sweeping the
streets in record time this year.
They brought in six machines and
worked twelve hours a day for
three days and were finished!
Dave submitted the renewal forms
to Dakota County for the waste -
hauling licenses that are required
for the City to be able to haul and
dispose of anything at Pine Bend
Landfill. They finished sod dam-
age repairs. They picked up some
tires and other rubbish found along
Wagon Wheel Trail. They coordi-
nated with US West to remove a
downed limb that was lying across
the US West line in an alley.
Cherry Hill Street
Reconstruction
A pre -construction meeting was
held on Tuesday of this week with
Hardrives, Inc. and various utility
company representatives to final-
ize plans for the reconstruction of
the Cherry Hill neighborhood
streets. Construction is slated to
begin next week with partial drive-
way pavement removals, boule-
vard excavation, and the lowering
of manholes and gate valves in
anticipation of bituminous recla-
mation near the end of next week.
Bituminous reclamation will be
performed in two stages. The first
stage will reclaim pavement where
storm sewer will be installed in the
neighborhood and the second
stage will be to reclaim all remain-
ing pavement after the installation
of storm sewer has been com-
pleted. Storm sewer installation
will start the week of May 10th.
Most of the storm sewer work will
take place on Cherry Hill Road be-
tween Wachtler Avenue and Ivy
Lane. Hardives, Inc. has elected
to install temporary mailboxes for
the neighborhood on Wachtler Av-
enue. The Contractor realizes
that it may take residents some
time to adjust to getting their the
mail from these temporary central-
ized mailboxes, but one important
advantage of this arrangement is
that residents can be assured that
Postal Service mail deliveries will
not be interrupted throughout the
duration of the project. Hardrives
expects to finish the entire job by
early August with favorable
weather. Attached is a copy of a
project information letter that was
mailed to the residents this week.
Code Enforcement Report
Tension is high out at United Prop-
erties new three story office build-
ing currently under construction
along TH 494. Everen Securities
have been promised a May 1st
move in date and the building is
not ready. Both Paul and Dick will
be very busy Friday Morning with
last minute inspections, but with all
the work remaining it is question-
able whether or not the space will
be available.
Dick testified at a court hearing on
Wednesday with Karen Kampa,
one of the City's prosecuting attor-
ney against Mr. Harold Hanson on
his yard debris violations. Mr. Han-
son lives at the intersection of
Wachtler Avenue and TH 13.
Judge Lynch listened to the testi-
mony of both sides and will make
his decision in the near future.
Attachment.,
♦ Letter to Cherry Hill Residents
Mendota
April27, 1999
city of
Heights
TO: Cherry Hill Addition and Surrounding Area Residents, and Property Owners
FROM: Marc S. Mogan, P.E., Civil Engineer
SUBJECT: Cherry Hill Addition Street Reconstruction Project Information
Job No. 9714, Improvement No. 99, Project No. 1
CONTRACT STATUS
Mendota Heights received bids on March 25, 1999, and awarded the contract for the Cherry
Hill Addition Street Reconstruction project to Hardrives, Inc. at their council meeting on April 6,
1999. The low bid submitted by Hardrives, Inc. was within the budgeted figures as presented in the
feasibility report that Council accepted in November 1999. Hardrives, Inc. is an established
bituminous Contractor based in Rogers that has completed numerous street reconstruction projects
of similar nature recently in the metro area. Northern States Power Company (NSP) has a limited
amount of gas distribution system work to do in the Cherry Hill Addition neighborhood compared
to other recent City Street Reconstruction Projects. The gas distribution system in Cherry Hill
Addition meets current standards and will not be replaced or modified. NSP gas service will be
interrupted briefly to the odd numbered houses on Cherry Hill Road between Wachtler and Ivy
Lane when the storm sewer is installed on this section of the project.
PROJECT MESSAGE LIME
The City has telephone messaging service to update residents on the projects' status, and
hopefully be more efficient responding to any concerns or requests you might have. This
messa,zine line is available 24 hours a day, seven days a week. Please call 612-794-6331 for
brief periodic project updates, or to leave a message that does not require immediate attention.
CONSTRUCTION DETAILS AND SEQUENCE
It is incumbent on the Contractor to schedule their equipment and manpower as is
necessary to complete this project by September 3, 1999 according to the terms of this contract.
The start, sequence, duration, time lag between, and completion, of work items on anv given
block within the project area is at the Contractor's sole discretion. Consequently, it will be
difficult to predict when construction might start, or how long it may take to complete on your
block. This Contractor will make every reasonable effort to minimize inconvenience to the
residents throughout the course of this project by insuring reasonable access to private property,
and garages at all times (except as noted on p.2, item 8), and by satisfactorily maintaining the
condition of the street and driveway surfaces for the period of time they remain unpaved.
IIoI N ictorin Cime • )Iendota liei0t5, '�I` 55118 (651) '52 IS90 • FAX = 2-59=0
Cherry Hill Addition Residents
and Property Owners
April 27, 1999
Page Two
The construction sequence for work on any particular street will include some, or all of
the following items in the general order outlined below.
1. Removal and salvage of sprinkler heads within 15 feet of the existing street pavement
for subsequent reinstallation upon completion of street construction. Note: This task
will be the responsibility of the homeowner or their lawn or irrigation service.
2. Relocation of mailboxes further back from the street in the their current location, or to
other centralized locations situated throughout the project.
3. Removal of sod and topsoil along the edge of the existing bituminous surface.
4. Bituminous reclamation/removal of the existing pavement surface.
5. Partial removal of the existing driveway surface, and placement of temporary gravel.
6. Storm sewer construction.
7. Necessary subgrade correction prior to roadway reconstruction.
8. Concrete curb and gutter construction. Residents are asked to park in the street in
front of their homes, and refrain from driving over new concrete for a period of 3-4
days after construction. (Please contact us if this is a hardship due to disability.)
9. Placement of any additional required Class 5 aggregate base.
10. Installation of first layer of blacktop (Projected completion date of July 3)
11. Driveway replacement to the extent disturbed. (See Driveway Replacement section for
information about replacing your entire driveway by this Contractor.)
12. Finished grading of boulevards, and the installation of sod within disturbed areas.
Note: The Contractor is responsible for watering sod for 30 days after installation.
After that 'DO -day period has expired, the Homeowner is responsible watering the sod,
and should continue to water it sufficiently over the next 12-month period.
13. Installation of second layer of blacktop. Note: City has the option, and may choose to
delay construction of the second layer of blacktop until June of 2000.
MAIL AND NEWSPAPER DELIVERY
The Contractor may elect to place temporary mailboxes in central locations throughout the
neighborhood. The StarTribune has asked that each customer call their circulation department at
612-673-4343 to request that the newspaper be delivered to your home instead of the newspaper
box for the duration of the project if mailboxes are placed in central locations. The St. Paul
Pioneer Press has alreadv been notified of this project, and therefore no further action on your
part is necessary. Please contact us if you experience any mail or newspaper delivery problems
relative to the arrangement the Contractor has established for mailboxes on this project.
Cherry hill Addition Residents April 27, 1999
and Property Owners Page Three
PRIVATE IRRIGATION SYSTEMS AND BOULEVARD LANDSCAPING
The City's Contractor will avoid or protect all clearly visible existing irrigation system
components and landscaping as much as possible. This project may affect some landscaping
(walls, shrubs, fences, invisible fences, etc.), and most irrigation system components, within 15
feet of the existing pavement edge. Please contact the Engineering Department immediately to
inform us of the existence of a private irrigation system or for confirmation of affected
landscaping. Irrigation system involvement may include salvaging sprinkler heads, capping,
tapping, or laying irrigation lines, adjusting or relocating sprinkler heads, and irrigation system
testing. The variety of private irrigation systems used and our unfamiliarity with your irrigation
system logically suggest that the homeowner or their irrigation service be best qualified to do this
work. Residents generally are sensitive when private landscaping is affected and want control
over its restoration or replacement as well. For the reasons, the City requests that residents make
their own arrangements to restore their private irrigation systems or disturbed landscaping. Please
contact the Engineering Department if you're affected to coordinate landscape restoration, and
irrigation system repairs and operation so as not to restrict, delay, or damage street construction.
Please have your landscaping, irrigation, or invisible fencing service provide you with a
written estimate for this work, and submit a copy of this estimate to the City. The Engineering
Department must review and approve these landscape restoration and irrigation system repair
estimates prior to authorization of any work by the property owner. The City will pay the
landscaping or irrigation service directly for this work as an expense under the City's project.
Note: We don't expect the cost of a typical irrigation system repair to exceed $350.
DRIVEWAY REPLACEMENT
Cherry Hill Addition residents can elect to replace their entire driveway under this project.
This additional driveway replacement cost could be paid by the resident out of pocket, or added
to the base special assessment over the 19-year tern of the assessment at 7% simple interest.
Bituminous driveway replacement includes removing the existing bituminous surface,
shaping and compacting the existing aggregate base plus a variable quantity of new aggregate as
may be necessary to make grade, placing a 3" thick compacted layer of bituminous surface, and
restoring any sod disturbed along the driveway. The quote for this work is $29 per square yard.
Concrete driveway replacement includes removing the existing concrete surface, shaping
and compacting the existing aggregate base plus a variable quantity of new aggregate as may be
necessary to make grade, placing a 6" layer of non -reinforced concrete pavement, and restoring
any sod disturbed along the driveway. The quote for this work is $45 per square yard.
Any driveway replaced under this arrangement would be guaranteed for a period of two
years. If you are interested in replacing your entire driveway as described in this section by
IIardrives, Inc. for the above quoted prices, or by a different Contractor for a lower price if one
could be found, please fill out the form at the bottom of the last page of this notice, and return it
to the City no later than May 15.
Cherry Hill Addition Residents
and Property Owners
TERMS AND OBLIGATIONS FORPROPERTY OWNERS
April 27, 1999
Page Pour
Residents have a significant role on a project like this. In order to complete this project
in an efficient and timely manner we ask the residents to understand and accept the following:
1. The Engineering Department functions as the primary representative for the City and you
as a property owner, in all matters associated with this project. The City Engineering
Department must deliver all Contractor directives.
2. The City and its Contractor requires right of entry onto your property to perform certain
work in order to complete this project. The plans may include partial replacement of
your driveway, and the finished grading and restoration of sod in the boulevard area. It
may be necessary for the City to survey and/or place construction stakes on your property
in order to construct these proposed improvements. Don't be concerned about stakes that
may appear on your property, and please don't remove them. Construction stakes usually
signify an offset distance and elevation, rather than the improvements' actual location.
3. Our improvement project incorporates design elements consistent with standard
engineering practice. If there is some concern about your property that you think we may
have overlooked, or should know about, please contact the Engineering Department.
4. Please refrain from parking on the street throughout (lie duration of the project except for
the period of concrete curb and gutter construction as described in item 8, page 2.
5. Property owners who assist the Contractor's watering obligation immediately after sod
replacement (see item 12, page 2) promote its survival, and help reduce follow-up repairs.
SUNINIATION
If you have a concern or complaint regarding some aspect of this project which you feel
merits immediate attention during normal business hours, please contact the Engineering
Department between 8:00 a.m. through 4:30 p.m., Monday through Friday at 651-452-1850. If
there is an emergency related to this project which requires immediate attention after hours,
please contact the Mendota Heights Police Department at 651-450-1111 (dispatcher).
City staff would like to thank you in advance for your patience and understanding in this
significant undertaking. We will do everything we can to deliver this project within budget, and
insure that the expectations of the neighborhood and the City have been achieved. Please contact
the Engineering Department, or tine 651-452-1850, if you have any questions or comments.
Sincerely,
Marc S. Mogan, P.E.
Civil Engineer
ILINIS OI' DRIVEWAY REPLACEMENT AND REOUEST FOR PRICE QUOTE
'rhe following conditions apply to the reconstruction of private driveways in conjunction with the Cherry Hill
Addition Street Reconstruction project:
I . 'file property owner must gram the Contractor and the City right of entry onto their property and sign a hold
harmless agreement to reconstruct their driveway.
2. The additional cost of this driveway mplacentcin work could be paid by the resident out of pocket, or added ill
their base special assessment, mid spread out over the 19 year teen of the assessment at 7 7 simple interest.
3. "file property owner must sign a waiver of public hearing to add the cost of this work to their special assessuem.
4. The cost quoted m ttis tittle to replace a bituminous driveway is $29 per square yard.
5. "rhe cost quoted at this time to replace a concrete driveway is $45 per square yard.
6. Driveways constructed in conjunction with this project would be guaranteed for a period of two years.
Cut here and return to City hall
Residents interested in receiving a norbinding price quote to replace their driveway ill conjunction with the Cherry
I [ill Addition Street Reconstruction project are asked to fill out this fornt and return it to the City by May I5, 1999.
NAME:
ADDRESS:
PI IONC NUMBER: (11) (W)
1)JtI Vi?W AY NI A FR I AI. 1)CSIIZFD _— __ ---------------
NEWS
Public Works
Engineering
Code Enforcement
LETTER
Parks Report
The Parks Crew picked up
trash in the parks this week.
The Parks Crew serviced all
their summertime equipment
including the small engines on
the hand mowers, aerator,
edger, etc. They sharpened
the blades on their mowers
and replaced the jack stand
for the trailer to the John
Deere tractor. They marked
the softball fields for a Sibley
High School girls softball tour-
nament that was held at Men-
dakota Park last Saturday.
They had to replace the ele-
ment in the hot water heater at
the Kensington Park comfort
station. They installed bases
at the Civic Center Field for
the St. Thomas Academy
baseball team. They dragged
all the ballfields.
Utility Report
Rich checked the City's seven
sanitary sewer lift stations
daily. He also greased the
pumps at the Mendota
Heights Road and Lilydale
sanitary sewer lift stations. He
coordinated Braun Pump's en-
try into Lilydale's lift station
when they removed a pump,
completely rebuilt it and rein-
stalled it. He performed some
routine maintenance on his
electric sump pump.
The Pipeline
Street Report
The Street Crew worked on
repairing sod that was dam-
aged by snow plowing opera-
tions. Dave Sorby participated
in the table top exercise held
last Thursday at the Fire Sta-
tion with the Fire Department
and Police Department. The
main goal of this exercise was
to prepare for dealing with se-
vere summer storms. They
repaired Mrs. O'Brien, Falls
View Court, fence which was
damaged last winter during
snow plowing operations.
They worked on straightening
up sign posts at various loca-
tions throughout the City.
They worked on cleaning up
the back lot at the Public
Works Garage - they removed
all the scrap metal.
Street sweeping operations
began on this Thursday.
McPhillips, the sweeping con-
tractor, arrived with five
sweepers at seven A.M. on
Thursday, April 22nd, and
worked for two hours, at which
time they had to quit because
the sand was too wet from the
rain. It is their intention to
sweep with six sweepers
twelve hours a day until they
are finished.
April 22, 1999
Turn Lane To Be Con-
structed
Last year Independent School
District #197 requested that
Dakota County construct a
right hand turn lane on
Delaware Avenue north of
T.H. 110. Dakota County felt
that their request was a valid
one and asked the City to par-
ticipate according to their nor-
mal 55-45 cost share program.
We also felt that the request
was valid, but asked them to
include West St. Paul in the
formula because Delaware is
a border line road with West
St. Paul. We further requested
them to include a separated
trail. The County agreed to
both of these City requests,
however their bids came in
Way over estimate and they
rejected them. The County
notified me this week that they
have rebid the work this sum-
mer with a larger project and
now have received an excel-
lent bid. Valley Paving is the
low bidder and will complete
the work sometime after
school is out, probably in July.
Attachment.
• 1999 Gun Club Lake
Newsletter
NEWS
Public Works ThePi*peline
Engineering
Code Enforcement
LETTER April 16, 1999
Parks Report
The Parks Crew picked up trash
daily in the parks. The Parks Crew
removed downed limbs along ped-
ways and in parks from Thursday's
strong winds. They dragged and
graded all softball fields for the start
of the season. They worked on the
design of the baseball batting cage
that is to be installed at Mendakota
Park, and also striped the foul lines.
They cut some downed tree stumps
closer to the ground in various parks
in preparation for a stump grinder
contractor to come in and remove
them.
Utility Report
Rich checked the City's seven sani-
tary sewer lift stations daily. He fin-
ished flushing the Cherry Hills neigh-
borhood sanitary sewer lines in an-
ticipation of the street reconstruction
project. He performed sanitary
sewer inspections for new connec-
tions at 1648 Dodd Road and 829
Hilltop Road. He cleared a sanitary
blockage that occurred on Farmdale
and backed sewage up into 1411
Farmdale Road. The sewer block-
age was reported by the resident at
4:30 on Tuesday. The resident dis-
covered the blockage when he no-
ticed the sewage backing up into his
basement. Rich, with assistance
from Mike Maczko had to remove a
very large buildup of grease from a
10" line in order to restore flow.
Rich checked Lilydale's storm sewer
system this week and found no prob-
lems. (We have an agreement with
Lilydale to have Rich check their
storm sewers periodically and
charge them for our costs).
Rich coordinated with Braun Pump to
come in and replace the float rack at
the Veronica Lift Station.
Street Report
The Street Crew discovered another
mailbox to repair this week, Mrs.
O'Brien's on Falls View Court. She
had numerous other concerns that
the Street Crew addressed with her
when they were out working on her
mailbox. The Street Crew also re-
moved numerous signs throughout
the City that were in the right-of-way
and violated the City's Zoning Ordi-
nance.
They continued to patch potholes
with cold mix bituminous (temporary
patches) this week. They began re-
moving the snow removal equipment
from the trucks. They also attended
a Maintenance Expo, sponsored by
MnDOT and Minnesota Street Su-
perintendents Association. Some of
the topics covered at the conference
were:
"Gravel Road Maintenance" (we still
have a gravel alley and street)
"Personal Safety"
"Concrete Maintenance"
"Dealing With Insect Pests" (bites,
stings)
"Pavement Maintenance" (manage-
ment programs, pothole repair)
"Equipment Inspection"
Code Enforcement Report
Dick performed his first inspections
on the new maintenance garage at
Mendakota Country Club this week,
when he looked at their footings and
the west foundation wall. There are
always numerous ongoing inspec-
tions being performed by code en-
forcement. We only mention the new
or significant ones in this weekly re-
port. Remodelings and basement
finishing projects have been ex-
tremely popular this year.
LMRWMO Citizen Advisory Com-
mittee Kickoff Meeting
The kickoff meeting of the Citizen
Advisory Committee (CAC) Lower
Mississippi River Watershed Man-
agement Organization (LMRWMO)
will be held on Monday, April 19,
1999, at 7:00 P.M. in the Guard
Room at the Inver Grove Heights
Community Center, 8055 Barbara
Avenue East. Mendota Heights vol-
unteer representatives serving on
the CAC are Mike Dwyer, 558 Stone
Road, and Tim Bruckmueller, 678
Third Avenue. Attached is a copy of
the agenda for Monday's meeting
and meeting location map.
Wednesday Meetings
Wednesday evening was an ex-
tremely busy night at City Hall with
three meetings going on at once.
Charlotte Shover, Dakota County's
Environmental Education Coordina-
tor held a program in the Council
Chambers on Healthy Wetlands.
The City's Citizen monitoring team
was on hand to meet with the partici-
pants. The team will also be at next
weeks City Council meeting to pre-
sent the results of the 1998 study.
Attachments:
♦ CAC Meeting Agenda
♦ CAC Meeting Map
♦ Wetlands Meeting Notice
Agenda
Lower Mississippi River Watershed Management Organization
Citizen Advisory Committee
Meeting #1/Kick-Off Meeting
April 19, 1999
1. Introductions -- Karen Chandler, Barr Engineering
2. Overview of Lower Mississippi River WMO -- Karen Chandler, Barr Engineering
3. Watershed Management Organizations and Water Management Planning -- Phil Belfiori,
Minnesota Board of Water and Soil Resources
4. More Background Information about Lower Mississippi River WMO, what they've done and
where to go from here -- Karen Chandler, Barr Engineering
5. Role of Citizen Advisory Committee - Ron Struss, Minnesota Board of Water and Soil
Resources/University of Minnesota Extension Service
6. Lower Mississippi River WMO draft statement of vision and purpose -- Karen Chandler, Barr
Engineering
7. Future Citizen Advisory Committee Meetings, wheretwhen
8. Citizen Advisory Committee officers
9. Adjourn
Thank you for attending, your input is important!
Directions to the City of Inver Grove Heights Community Center, 8055 Barbara Avenue East:
From I-494, go south on Highway 52 to 80th Street, turn right (west) at 80th Street, turn left
(south) at fast street (Barbara Avenue), building is on your right.
From Highway 55, go north on Highway 52 to 80th Street, turn right (west) at 80th Street, then
turn left (south) at Barbara Avenue, building is on your right.
See attached map.
USB011 P:\23\19\572\419AGEND.WPD/KCL
86't�tF'
�t
M;arcott�ake `
`9a
in the 1999 Dakota County Wetland Health Evaluation Project,
a volunteer citizen wetland monitoring program.
All programs are free and open to the public
Sponsored by:
The Dakota County Environmental Education Program
4100 220i° Street West, Farmington, MN 55024
651-480-7734
The Dakota County Environmental Education Program is a cooperative partnership between the Dakota County Department of
Environmental Management, Dakota County Office of Planning Dakota County Soil and Water Conservation District, and the
University of d1linnesota Extension Service, Dakota County.
DEWS •
Public Works Pipeline
Engineering - The
Code Enforcement
LETTER
Parks Report
The Parks Crew picked up trash
daily in the parks. They finished
sweeping all of the trails this week.
They began cleaning
and storing their winter
equipment and bring-
ing out their summer
equipment this week.
They worked on acti-
vating the water in the
Mendakota and Kens-
ington Park comfort
stations. They cleaned
them up and opened
them for the season. F_
grind some tree stumps that were left
over from last summer. Dave at-
tended the annual League of Min-
nesota Cities "Safety and Loss" sem-
inar.
Utility Report I good Ducks returning home to Marie Park
Rich checked the City's seven sani-
tary sewer lift stations daily. Rich
performed a sanitary sewer connec-
tion inspection for a new home being
constructed at 532 Miriam by Math -
ern Homes. He started flushing the
sanitary sewer mains within the
Cherry Hills neighborhood. We do
that flushing and cleaning so that we
are assured the lines are clean be-
fore projects start so that there will
be no question that any blockages
that occur are the responsibility of
the contractor. Rich and Tom also
had to remove a dead dog from the
end of a culvert. The dog was block-
ing water from flowing into the Cop-
perfield Pond. The dog was swollen
and ripe and Rich said that it was the
worst job that he has had to do work-
ing for the City.
Street Report
The Street Crew finished repairing all
of the mailboxes that were damaged
last winter during snow plow opera-
tions. They hired a contractor to
Code Enforcement Report
The Code Enforcement Officers is-
sued three new home permits this
week; Carmen Tuminnelly is con-
structing a new home for himself on
Carmen Lane, Roy Kingsley is con-
structing one on South Lane and
there is also a new one on London
Road. A second pool permit was
also issued.
Federal Aid Preservation Program
Application
The Engineering Department sub-
mitted an application under the Fed-
eral Aid Preservation Program to
MnDOT for the installation of emer-
gency vehicle preemption (EVP) at
the intersection of Delaware Avenue
and Highway 110 last month. We
learned this week that the Mendota
Heights project was just one of the
many projects totaling $45 million
that the project selection committee
April 9, 1999
chose not to finance with $9 million
of available funding under this pro-
gram. Attached is a list of the suc-
cessful projects and unsuccessful
projects.
The selection committee included
members from City, County and Re-
gional governments as well as
Mn/DOT representatives. The se-
lection committee chose projects
based on the following criteria:
• economies of scale: (system-
wide projects corridor work that
entailed a significant section of
the system),
• administrative economics:
(suitability for combined con-
tracts),
• simplicity: (no right-of-way pur-
chases, no major construction,
no complicated issues, and no
additional work required),
• restoration: (proposed work
would significantly extend the
life of the road-
way/structure/vehicle etc.- not
just maintain it), and
• equity: (available funding that
was fairly distributed to all local
partners).
Federal Aid and Dakota County will
fund $1.156 million (80%) and
$0.327 million (20%), respectively,
of the selected county projects. One
of the seven projects is to micro -
pave the Big Rivers Regional Trail
along the Minnesota River from
Mendota Heights Road to just north
east of 1-35E.
Attachment:
♦ Successful and Unsuccessful
Projects by Agency
O
O
i pOO '8108
O
O
O
IS
IS.Oi
O f
N O
�
IO!
00
IH
8
ON
�,mi
O
O'O!
IN
O
f0
m
O fIY'OI
O
N
Im
lm
m rn
O
m
N
"I
(m'lm
N
gym!
m
(fl
N
N
Ij
)tOp�
m
A
P
10IP
in�
N O
INOI
b
im lNl
IN
L
^
f
(O(pp
H IN
I�IMI
M
N
N
itm+ll�'f'
q
INN
n
,�
1'
MiN;H;
N
LL
(
I
I
IIOIIN�
I
I!'I
;8Io1
ON
o
r S
I
S8ISI
8m
(IaS�Ot
1I8m[7
;Il!ao6h)
i!
SSm
g
I
mS
oh
♦((a�
O
If
'8
Otp
ID
^
f
f
1
I
H88h
HO
N
N
N
HIM
N8
N
M
NS
NG
H
HiN
H jH
H
N
ig
�
I
8
0
8
So8
0
8$
ggi0
S
I8
8
S
g
8
8
�SSIS
a
H
b
N
O
S
O
8
O
8
O
O
SI^
IO
b
Im
O
N
m
0
OIO
O
n
w
O
O
O
O
O
O
�O
IIO
m
m
O
m
0
Olm
m
0
O
m
O
W
O
m
O
O
C
V
Y
m
Oi
I[i
b
f
N
Oi
Ola7
n
H
M
H
NH
N
N
H
N
H
H
H
H
M
r
1
C
O
0
m
�
�
mm
5
W
U
't
U
m
n
m
U
U
p
Z
C
•O CO
m
O
U
O
U
U
CliO
U
m
0
0
C
.m+
mCli
Q
A
=
L
O
L
>>
° 9
S V
L
t
L
=
0
m
L
p W
0
J
G
O
O
O
'W
y
C
O
O
O
O
tl
U
O
O
U C
E cc
m
C
C
C
tl
W
OtlO
C 0
Im
OWO`C
OobOcmC
aWC
aO
;OSmOQ
;;EmOqq
O
2y°
m
mo
3
@ E
°
E
O
j`
-cc
0
c
o
'mo
a
o
c =
°mO;Eq
omCOoa
m
1
o
E
mimS>P
ImT
-C(U'��
¢
IO
>>
l
>
a
a
a
c
R
O
5
E m
U
a
m
�m
3'
E
>`
c
a
�m8Ia
m=
y
a'm c
tl
W
N
Id
O
m.91
0
O
0
m~
c;m
>�tl
OWN7lm'
®.
c o
$ °mC
N W
W
J
W
J
W
J
t�
m
W
m
I°
O�
m
IJ
m
J
jL
W
b
m
b p
y
U
m E
O
W
�
L
Q C
m C
m
m
m'O
I
V m
m j T
m
m Wlmlm
O
m
O
tom
a: a —2
a:
Cr
;
o
V
IH
!
I
j
.9
U
d
c.o
a
lIFS
o
d
d
d
d
C
m
U IU
CI°
C
U
U
U
U
U
Ob
tl
IUI
:':
o
°ImI°�
Imo.
IAI
'o
m
'o
m
o
m
`o
m
'°
m
'o
"
a
O
DI°IO
O To
0 !Z;
Z;
2�:
o
Y IY'
Y �
Y
s
s
Y IYi
o,m
CI
CIN
tl
Q
O
Q U F
c ICI
Q IQ
IQ
C;__
im
Im
O'er
I-Im
;mmi
m '�U
UIU'=
a'
m ,m
Cl 'OI
m l
O
m
O
m
O ID
m
m
0 ICIW
a199:m
Wj21
m
=
b
oz
KQ
iK
U�
(9
W
A
W
m Iy
h
INI
NIfA
UY
m C1C9 6.
N IN
w
✓-0
iml
8
S
iS
m
S
S
O
O
S
N
C
SO
S
S
O
S
S
j
N
iPi
10
S
8
ig�$
o
n
g
00
g
O
�'b
P
0
m
Q
m
N
A
a
imp
m
O
M
N
N
T
I1T
tp
C
t0
PP
s�
O
.N-
pp
rO
N
N
C
I
N'N
N
609
I
I
8
O
QO
ISp
IS
N
N
8
O
S
S
O
S
IS
f
S
O
S
O
O
i0
O
O
O
10
i�
M
n
N
S
O
O
8
N
SI
b
A
8Ia
S
O
O
IS
ITO
O
C
O
N
OIN
N
N
y0
m
m
G
fCI
N
N
N
N
M
N
N
N
8
8
g
S8
8
o
S
o
S
8
0
8
88
SO
8
a
8
8
pQ
O
S
(1pp
N
t00
N
S
8
O
8
N
(H
O
8
pq
S
S
O
O
V
�1
N
M
O
01
N
N
O
O
O
O
SIN
N
n
O
O
O
O
$
r
O
O
�O
(p
u1
O
O
O
O
O
h
fv
r
m
O
O
N
N
O
O
QQ
O'f
th
N
h
N
r0
ttpp
O
H
N
N
N
N
N
I
m
L
U
U
cc
c
,g
o
m
m0a
O
=
=
O
O
0
C
y
W
m
O
UU
U
S
m
w
NS
T
2 m
m
m
mN
W
3
c
F-=
oil
m
m
fU
c
o
E
y
'p
IJ
qoq
m
=
q
0
0
O
j
0
0
0
U
0 O
O
m
O
O
o
Y
rn
m
00
0
0
0
o
mt-
m
W
H,t2
m
»
C
m
mx or
3
o
o
0
o
S p
0
0'
K
t
y
a
m
o
=
o m N
b
00
Ci
O
O
m
n
m m
•�
•�
p
U
U C
m
n
n M
0 m
b
o
m
0c
O
O
•cc
O
r
3
W O1 E
o
0 c
o
o
m
m
m
m
>>
e
c
'C =
•C
'C
>
>
>
m
'C
•Co
mm2
>
C Y N
j
>S
>
>
QQ
Q
m
'cm
=•
a0
aWrn
2
m ao0
4 6
W
m C
U
O
p
�
oUf
MWBm�
m
m
=
m
m»
M =
m
O
n
n
n
m
c
3
m q
U
'c
�rn
�c
rn W
N
nS0
l7
m
mP
n:�atp
m
C
am
C 9
>.
(A
u) a
m>
m
ml
r0
U
E
m
wam
noSm
nQ,8Eow8
=
—m
El
mg
qA
cmrn
�mE
m
O C
mtm
Mac
m
m 0
sn
0
maeZ
n
m0Co
$c
C
m
EapN
amm c
mdOO!
Co
$mm
nM-
Cb
K
I
i-
y
~
D
U
O
O
O
O
U
O
U
p U
c
c
�<
<
o to
a
e
W
e$
a
m
m
m
m
m
m
F-
F-
F
M
a
c
c
m
o
O -I
o
o
O—
m
m
m
m
00
O
O
O
O
c
c
c
c
C—
c_
c
O'21�
U
O
m
m Imm
m
m0
m
mp,m
m Imo
_c
=2
2
c
c
Iii
=' im
�i
Z
m
2 !
:i I�
7
o z
Y
m
Oii O
I O
I S.O
S M
Y
m S
f
IS
S !G
S
N
S
S
S
m
N
OSig
p
IBIS
�!•I
10
o
8
8
m
P
f9
6110
t0 tp
P
'O Ito
N
P
�,h
O
S
O
N
O
O
O
ISIO
OO
O
n
O
O
'S
S
N
b
61
S
S
O
N
O
M
N
S
i�i
O
1 (6(pp�
1
N
10
O IO
;P
8
N
�O
O
8
101
O
!O
ON
�
Itlf
N
P
P
t0
tc
O
fN1
O
I
IQ
N
O
S
�
N
O
P
OII�I
N
O
O
N In
f
Im
N
M
t.j
(p
O
NH
H
MIN
N
N
H
M iM
tatpp
N
N
H
M
p
w
N
H
tNtpp
N
H
w
♦m
10
I
N
O
O
O
O10
O
Y
(Op
t0
IO
S
A
S
O
!o
N
ti
O
S
S
t0
A
O
m
f`
O
Wit
O
t7
O
t00
1�
N
A
((pp
IA
N
c7
t7
I:
O
10
O
m
W
A
N
N
H
O11H
H
N
N
N
N
N
17
N
N
N
M
N
(D
17
N
N
N
H
N
M
N
N
H
N
H
H
m
N
N
y Q
m
m
o¢
U
U
U
u
n
c E
`m
$
5
5
c t!?
m
a
m
m
y
W
o'
m
m
c c
m
o
0
0
0
o
D 2
m
o N
N
O
9 C
NmN
m
O
LN
M
a
LT
U
O 8
O
C
O
J
=
C
=
J
J
C
LL
W
m
O
0
O
Q
O
O
O
O
m
SJ " q
j
q
O
O�
Q
S
'S
'1'
i_,
'i.
C m H
O
td
$
0 J
$
C
C
C
C
2�
U 9
J
E
=
0>
m
y
2w
a
oQ
q
o
o
ooyOcc
'tN�
>
>
>
>
�m
FO$m
>
N3:
�
0
O
O
O
O
Oy
o
Q
o
m
m
m
m
rna
o
>
>
>
>
>
'oE
m
z
>aaa
a�
m
a
V ui m
m t m
E
d
m
c
W
E
E
E
c
m
o
a s
o
m b
'S
m
E
p m
o
c
a'
cc
O� CO
.�
>
t0
O Um .2
N
S
C
.�
ym
Imo
O)U
y
O�0
m00
4
J m 0
•J
C
'�
O
O.
Q OOC O y
m
Nqq
m
m 0>
OI�
m C
Q
U
0
NN
s
a
U m
(Nm
OLaC
n
O'-
9
00
aC
aCUOIwIU0
0
C
wU0
J
m C
m
— C
Ot
✓O
U-a ON
IL
6 LY 0 9
U
p
A
$9
O._
U
O._
EIJIm
a
MIMM
as
Z'
0
3
� s 0
8
9
m y y E
G C G�
O Y y
6��c
L_ m
0
i�
C
d
m
�. I�
U m
�.
m �I
m MIX!
0!
0 0
U
IK
� 1
0 m
C U
Iy
� Y
9
= 3 y
m
0 in a 0
w y y C
~
O
Is
C
C
O
G
C
C' O
O
O
O
~
~
If
T
>. Is
Q
CI
®
0
J
m
m
7
m
>
>
m
OI
¢Q
0
y
T
0
m
T
0
0
T
0
TI T
ml m
m y
m
a ILA
,L�
ml
�
-
>>
a
a
a
m
a
a
Z
�I�
m
m
m
E
m Im
m
s
U
UI
O
O
m
C
,m12)
K
m
m
m
m
m
O
>
>
z
U.. p
'UI
w2
a
a
m
2
S>
O
I
1
N
NI N
IN
N
m
m.
S
!
N
S
S
S
S
S
I♦O
iSi
Q
S
S
�S
S
S
G
IS)
O
O
o
O
N
C
W
O
tp
(Qp
(D
O
O
pO
8
O1
h
(J
O
�p
N
N
N
N
Q
Q
Q
8
Q
Q
O
t�
�O
Q
w
Q
O
P
$
g
101
101
O
$
8
O
O
O
g
10
O
O
O
O
sum
o$
8
�o;�N
Flo
o
m
N
g
m
g
N
(o
8
t
m
C6
tp
N
N
�
IN
eV
N
tV
(h
O
(p
pj
S
S
S
S
S
OIS
O
O
S
O
O
S
S
S
O
O
S
O
O
10
S
S
O
n
pp
8
N
O
O
n_
O
r
O
O
H
m
r
C
N
O
S
t♦'i
Q
h
O
8
i+j
O
O
nln
m
h
cl
Yf
�O
OOi_
M
P1
flpn
N
N
1�
¢
m
a o
10
N
m
m
m
3
U
m ¢
U
m
O
_
O= Y
0
W
0
q
w
G
m
U)
4i F-
N
o m
U
p
U
y
P
m
V
y
Y W
lJ' 6
_
m A
I- C
N
m
S C
5
co
E
2
o
a= m
G>
8
N�8
o
yac=
3
U�m
L0
0:m
U
m
17w
O =07
Um
O
.Q
N
L
OD
cis
=
o
ie
@
m C
�a
m
l�V
2�2
rn
t7SQ
Ur¢ c
2
w
o
=
O
S,a2
y
® m Y
m�
Q ..
m
5
F
¢ 2
¢
c
°
O S y 0
U
O
V)
N
R L U
C O
Wy
3
c 0
=
0
EioUrn
2 0
U
L
¢U
M V O S
c
y
c.
-U�U
O
0
-
P3U c
mM
'Q`o
C
cM
m�
6`° `0m
c
No
O
o c
c
S o m$
A
¢
9
a
o
a
=
Y0
'Ntc
¢L)
NNpi
'a
2UE.2g
CL
0
E
NyNrn
�E>
iUm
:CE(oa
oUm
ca
o
o
m3$
>
m m
omrn
mym
N¢O
ai
L
>a
omm
2
75
C
p
a
c
m
m
IL
L
U
0
o`
a
O
E
=0
a
F
m
U
m
m
y
y O
E
cc
Cy
>
U
J
w
m 0.
a
E
m
i
nNm mmc
mnm ya
c7Z
m
a
m
J
m
9
MO00
y
6,0C
=
aO
tm0y
nIC
w�d:
m
K
m
K
C
s
m a n m
K E >.
am
m g
o
O
d
m
m
m
I_
D
m
= IC
I
U
U
U
iW
U
_
_
=
c
O
O
O
O
O
OIma
O
O (O
O
O
O
O
O
I16
h
'm
m
N
m
$ jwI
N
N I(nlwlN
Vo-
f3/1 !
(p IN
F
7
>
>
>
3
r5
3
3
Y
Y
Y
Y
>
CC
I
I
I
I
g m
ipo
of
S
to
is
p5
P iSi �
S)
pS
8
OI
O
Oj
� ItD:
m
Ito
i�
O
b
N
tWp-
p
MI
�
:Ni
N
n
N N
I
IOI
I I
Ip
(
I
I
N
O
iO1
f
ISI
O
O
S
Is
IS
I
a
P
N
N
01
H
N
p
p
p
N
S
a
S
S
O
S
O
m
N
A
O
N
w
N
N
cyt
0
IN
O
^
N
cl
N
N
aO
N
O
N
N
M
r
N
O
U
Cc
c
O
c
U
U
3
c
W
m
O
L
L
Q
G
o
L
to
>
to
>
a.
W
W
W
LJ
W
W
Q
m
Q
y
W
O
O
>
!p
9
0
m
W
o
o
_
< cc
c
>
>
N
U o
>
a
a`
3
a a
m
0
3
_m
W
W �
s �
W
C
a
3 WIN
'W
!1
E SiLu
wc�c
w
m W
J
J
W �
J
IO
U IU',l�
19
ID
o C. i m
j
i
I
I
Unsuccessful Projects by Agency
Type Agency Proposed Work
Total Cost
SIG Anoka Install EVP system
$60,000.00
I LED replacement & signal painting —
SIG Anoka Co.
Partial funding
$144,980.00
SIG Bloomington LED replacement —Partial funding
$287,023.32
SIG Brooklyn Pk LED replacement —Partial funding
� I
$73,600.00
SIG Burnsville ,Signal Rehabilitation
$116,175.00
SIG
Carver Co.
(LED replacement & EVP install
$12,500.00
HUB
Como -Harriet
StreetcarLineiRestorerailbed
$456,120.00
SIG
Dakota Co
I
LED replacement —Partial funding
$356,300.00
SIG
(Dakota Co
Signal Painting & Controller & Cabinet
Replacements —Partial funding
$214,000.00
SIG
Edina
LED replacement —Partial funding
$165,200.00
PAV
Hennepin Co.
MicroPaving/Pvmnt Markings
$337,438.67
SIG
Hennepin Co.
Signal/Cabinet painting
$360,000.00
SIG
Mendota His
EVP install
$7,500.00
VEH
IMetro Transit
Vehicle Rehab
$8,432,000.00
PAV
IMinneapolis
I MicroPaving/Pvmnt Markings
$20,053.00
SGN
IMinneapolis
I Replace Type C signs
$625,000.00
SIG
IMinneapolis
I LED replacement
$2,563,000.00
SIG
IMinneapolis
I Install EVP on A -minors
$9,782,000.00
SIG
(Minneapolis
Replace controllers/cabinets
$4,487,000.00
SIG
Minneapolis
Renovate Lighting Poles
$4,256,000.00
SIG
IMinneapolis
I Paint Signal Poles
$3,583,000.00
SIG
IMinneapolis
LED replacement
$1,659,000.00
BRG
Mn/DOT
Deck repair, overlay,rail replace
$100,000.00
BRG
Mn/DOT
Deck repair, oveday,rail replace
$100,000.00
GRID
Mn/DOT
Upgrade old/damaged crash cushions
$210,000.00
GRID
Mn/DOT
(Replace median box beam to g-rail or
wall
$250,000.00
SIG
Mn/DOT
Interconnect 2 signal systems
$8,550.00
SIG
I
Mn/DOT
!LED replacement —Partial funding
$125,000.00
SIG
!Mn/DOT
LED replacement
$214,000.00
SIG
!Mn/DOT
LED replacement
$59,600.06
SIG
!Mn/DOT
ILED replacement
$250,900.00
SIG
IMn/DOT
!LED replacement
$204,200.00
SIG
IMn/DOT
Signal Painting at 53 intersections
$318,000.00
Unsuccessful Projects by Agency
SIG
iMn/DOT LED replacement j $458,400.00
SIG
IMn/DOT LED replacement
1 $130,000.00
SIG
;Mn/DOT LED replacement
$152,500.00
BRG
&Rec
oardCar bridges over M'haha Creek
Board
$1,250,000.00
BKE
I
jMpls Park & Rec
Board
Bring 15 ped/bike bridges over Whaha
Creek to ADA & stateaid compliance
$1,250,000.00
HUB
MVTA
Asphalt pave gravel lot with 3" overlay,
�regrade for drainage, re -stripe
$10,600.00
HUB
IMVTA
MicroPavmg/PvmntMarkings
$19,944.00
SIG
Ramsey Co
Replace Red indicators w/LED @ 14
intersections; Paint signals @ 87,
replace cab/controller @ 13.—Partial
funding
$627,500.00
SIG
Richfield
LED replacement, install EVP—Partial
funding
$267,294.00
SIG
Rockford
LED & Signal Revisions
$11,780.00
BRG
Saint Paul
Plate Beam guardrail install to protect
bridge piers
$20,000.00
SIG
Scott Co.
(SignaVCabinetpainting
$22,500.00
SIG
Scott Co.
Install EVP system
$120,000.00
SIG
Scott Co.
Interconnect 9 signal systems
$231,000.00
SIG
St. Louis Park
LED replacement —Partial funding
$407,000.00
SIG
St. Paul
FiberOptic Interconnect System
$90,000.00
SIG
St. Paul
FiberOptic Interconnect System
$145,500.00
SIG
St. Paul
FiberOptic Interconnect System
$120,000.00
SIG
St. Paul
Intersection improvement
$100,000.00
SIG
St. Paul
Paint signals @112 intersections
$168,000.00
SIG
St. Paul
Install LED ped sigs at 9 locations
$44,500.00
PAV
Washington Co.
MicroPaving/Pvmnt Markings
$547,660.00
SIG
Washington Co.
Paint signal, LED replace, sig
revisions, and software for traffic
management —Partial Funding
$56,645.00
SIG
Wayzata
LED replacement —Partial funding
$53,760.00
SGN
Willemie
Replace Type C signs
$9,000.00
SIG
Woodbury
LED replacement —Partial funding
$219,605.00
NEWS
Public Works The Pi*peli*ne
Engineering
Code Enforcement
LETTER April 2, 1999
Parks Report
The Parks Crew picked up trash
at all the parks daily. They con-
tinued sweeping the pedways,
but have been sweeping only in
the mornings this week, be-
cause kids are off from school
and the pedways are getting
lots of use during the day. They
cleaned the tennis courts and
reinstalled the nets. They at-
tended a Minnesota Sports Turf
Managers Workshop on
Wednesday. They reinstalled
the trash barrels and biffs in the
parks this week. They swept
the rec rock off from the edge of
the infields at Mendakota Park.
They removed some limbs from
the pedway on Victoria Road by
Victoria Highlands.
Utility Report
Rich checked the City's seven
sanitary sewer lift stations daily.
Rich finished his annual check-
ing of the trunk sanitary sewer
line and found no more prob-
lems. He flushed some sanitary
sewer lines that are in ease-
ment areas and are inaccessi-
ble to the jetter.
Street Report
The Street Crew called and had
the sweeping contractor,
McPhillips, come in early and
sweep Lilac Lane because of a
safety concern from the Police
Department. McPhillips has
notified us that they will be tied
up in Oakdale until April 21st, at
which time they said they will
bring in six machines and do our
streets very rapidly.
The Street Crew worked on mail
box repairs and sod damage
that occurred as result of snow
plowing. They continued to
patch potholes as they discov-
ered them and as reported. On
Thursday, they attended a sem-
inar on traffic control and sig-
nage sponsored by Warning
Lites, 3M and MnDOT. Some of
the topics and issues covered
were: "Principals and Devices
for Traffic Control", distribution
of new field manuals, discus-
sion on protection against tort
liabilities, updating on Federal
Highway Association approved
signage, to include notice that,
florescent yellow - green signs
have now been tested and are
approved for use around and in
school zones.
Code Enforcement Report
A record week for commercial
sign permits occurred this week
when four were applied for and
will be placed on the next City
Council agenda for review and
approval. (Three in Centre
Pointe and one on Waters
Drive). Mendakota Country
Club picked up their building
permit this week for their new
maintenance facility to be con-
structed along Dodd Road near
the Fire Hall. R.J. Ryan is the
general contractor. And finally
the last sure sign of spring ar-
rived this week, when Valley
Pools applied and received the
first new swimming pool permit.
Watershed Citizen Advisory
Committee
Mike Dwyer, 558 Stone Road,
and Tim Bruckmueller, 678
Third Avenue, have been ap-
pointed by Mendota Heights to
serve as Mendota Heights' rep-
resentatives on the Citizen Ad-
visory Committee (CAC) of the
Lower Mississippi River Water-
shed Management Organization
(LMRWMO). Pat Davies, 687
Woodridge Drive, has been
named to serve as the alternate
member for the two appointees
on this committee. The Citizen
Advisory Committee is charged
with providing community input
to identify strategies for protect-
ing water resources that will be
included in the upcoming revi-
sion of the Watershed Manage-
ment Plan for the LMRWMO.
The first meeting of the CAC
has been scheduled for April
19th at 7:00 P.M. at the Inver
Grove Heights Community Cen-
ter. Barr Engineering will be
sending out confirmation no-
tices to the CAC members and
alternates for this meeting date
and time.
NEWS
Public Works
Engineering
Code Enforcement
LETTER
Parks Report
The Parks Crew picked up trash at
all the parks daily. The Parks Crew
converted the Toro machines from
their winter duties to their summer
duties. They removed the snow
blower attachments and installed the
grass cutting decks (and pedway
sweeping broom). They ordered and
received a shipment of fertilizer.
They began sweeping the pedways.
They reinstalled the martin houses.
Utility Report
Rich checked the City's seven sani-
tary sewer lift stations daily. Rich
continued to walk and check the
City's sanitary sewer main this week.
He found and removed a stick from
a manhole. He took his hydrant me-
ter to St. Paul Water Utility for its
annual reading and calibrating. Rich
uses this meter when he refills the
sewer jetter machine by connecting
to fire hydrants.
Street Report
The Street Crew was patching pot-
holes with "cold mix" this week.
They responded to complaints and
also did ones that they found them-
selves. John Ambrose completed
some "hard face" welding on the
plow slides and also did welding re-
pairs to the John Deer tractor (Parks)
and to the asphalt tray for the bitumi-
nous hot box attachment. They
made and installed replacement
street name signs at various loca-
tions throughout the City. They were
able to begin working on mailbox re-
pairs because the frost is now out of
the ground.
Code Enforcement Update
A sure sign that spring is here - there
were two new applications for build-
ing permits for new home starts this
week - Mendota Homes is construct-
ing a new home on Miriam Street and
Sussel Homes is constructing one on
Hilltop Road. The home on Hilltop is
a replacement for one that was lost
due to fire in 1994. United Properties
applied for a building permit this
week for their first tenant space finish
at their new three story office building
located on 1-494 (Everen Securities).
The TAJ building located on North-
land Drive next to General Pump has
received their C.O. and are now oc-
cupying their facility. The C.O. was
issued contingent upon their com-
pleting their outside work
(landscaping and paving) once the
weather allows.
Cherry Hill Addition Street Recon-
struction
Eight bids were received on March
25th for the Cherry Hill Addition
Street Reconstruction project.
Hardrives, Inc. was the low bidder on
the project. The bids are as follows:
Hardrives, Inc.
McNamara Contracting, Inc.
Valley Paving, Inc.
OptiCon, Inc.
Bituminous Roadways, Inc.
Pine Bend Paving, Inc.
Midwest Asphalt Corporation
C.S. McCrossan Construction, Inc.
$338,188.80
$339,106.55
$339,42230
$344,185.67
$349,059.50
$375,125.00
$407,17220
$422,473.00
Hardrives, Inc. based in Rogers, Min-
nesota has not worked in Mendota
Heights before despite being one of
the larger paving contractors in the
metro area. The Engineering De-
partment is checking references in
March 26, 1999
anticipation of a contract award rec-
ommendation for Council considera-
tion at the April 6th meeting.
Watershed Citizen Advisory Com-
mittee
The Lower Mississippi River Water-
shed Management Organization
(LMRWMO), an independent gov-
ernment organization that provides
water resources management for the
communities in the lower Mississippi
River watershed, solicited volunteers
to serve on a Citizen Advisory Com-
mittee (CAC). This Citizen Advisory
Committee is charged with providing
community input to identify strategies
for protecting water resources that
will be included in the upcoming revi-
sion of the Water Management Plan
for the LMRWMO. This search gen-
erated a pool of 22 individuals that
have volunteered from the member
communities of Inver Grove Heights,
Lilydale, Mendota Heights, St. Paul,
South St. Paul, Sunfish Lake and
West St. Paul to serve on this Citizen
Advisory Committee (see attached).
The LMRWMO Board of Managers
acted at their March 25th meeting to
appoint, within the next
week, up to two individuals
from each of the seven
member cities. The indi-
viduals serving on the CAC
will be appointed by each
member community. Extra
volunteers can serve as al-
ternates, attend meetings,
and receive correspon-
dence for the duration of this en-
deavor. The LMRWMO Board of
Managers directed Barr Engineering
to work out the details and schedul-
ing for the first meeting of the CAC as
soon as possible.
J U
�..
�
V1 •% C_0 U
a
Ui U1 �
^O � a � T F
�
ct LO
cz
cd
0. ^O C
�a
p
y
cGJ C j
C tU'S
v J
'tGn
E
N F
C 1
� p V y 1
✓^�
:J
n Zi
.^.
N F
��� b T U ^p
E
O
F R O
3
r�
ova ti
cz G
�za� ° a
ci
a�
U
a1
noC m1
E
0
x
�
x
Cd
o
a E
N
r
N
co m C
Chi
C E a0
L']
C�'J rN-I
.i c�
,�
um] r�-I
co �n
co -0
.'—
m v
m � '
co
10
y
Lo
Lo CV
lli
CJ rco
i h
O 4 j
C7 G:
O0
m L: a
Ln 0
O Up
M r0
W
m h l(J
h tom• �
LO O 'p
'd' O
N
y
O
y
c
F
N Y
_
Lo rl
IC]
Lo L-
LO C
v
M U
to
am
Lo
cv cO
Lq
cv
10 L7
c� co c�
Ur CO UJJ
v
v 3
.
,�
cp
h
m
O
to
co
c�
m
m
h
o Lo
to
_
0
0
0
h
n 7
T
L��'D
'L-
`S`
Zcz
g
�Ll'
m
��'1
U y R
rya
Y
Y
r0 Y,.
U] U) CO
R
M
OW
C CS
T
co i
� R
F1
H
m c.
3 a C ci m C
7
Q
w
V
y
U
O U
O V
'p �" .-r 'n, O1 H
h�
Lq V
t�
O
O'
U
rC
CO H
cC M
Gr
h H
Lh'J
h H
M. H
co H
O a
C
F
_
C
a
m
O
h
0
z
CO d
c a+
N G
0
CC U
O L
Q O c
N Mn m
U) > O
'y D
N_ Q
� N
C
d N
JU
^
N
G
U m
>
O G
T
1
FD
aJ
C
cz
hn
c o
.= w N -O
C
U C
>1
C
'
....0 GO i.
'u00cammoo
.mi I -a 0
°o:mG3
mm'wm
3
3 c
_
>� _
G �� G m�
m
C"
m
m
o cum q C a ^�
m OL CZ m
G
cG°i .n
00+
U
ai a " C 4 F EEa�
2✓ 3P. Li u°i
o
3 u z
P.wC;
�� 3G7
P. co
U
x
r1 N
m N N
c0
N O
C- O
N ca
t O
O N in
O ti O
N N
m 10
O c"
V'
O
cAO
h114
to
00000^O
<M N
co co
Co
C' O)
N .-1
W N l`•
r1
N cz
d' N
NN
C') cli L7
NN1.7
it
�t-
cocas
t Cl
to to
d
Id,
co
m
C
O
'i �-1
N N *-1
r-i
'-I '-1
lO L�]
N 'i
e-i lO
N N Lo
ro Lo
acoca
LO 1fJ
r-1 r-i in
Lobo
LO
co
vcv
co co
to
covc0 3
>
co
co
co
LO
L
a
�
o
z
z
z
Lo
>
z
N
>
CD
O
z
V
ti
U
IC:
o-0i
c.
J i1
F.
o
-a
r+
.T.
O .V�
C
O
c O
�
L
U
CO
p
U
U
�
m
G
r
=
_
�
>
m
Z
y
^
O
Z
a
5%•
T
�
4
>
=
?
^ r'a
a�
O
O L
bn
m m
O U
y
m tll
N>
G$
O r
O
U]
c7 4
C CD
E
G 7
k NCr r�
y
w,
O
c
L"
E o c
o•
E C Y
a _„
cr E m
c 'm
-= :'
E
3
cn o
-zj
T
>G
H
C fC
>
oN
�LN
ro
.PU]
O
6C.
.
oU
E
o
V
x
J
� M
H
r^
FL
F4 F4
0
co LO
to
C-U
co V'
47 U
w
M
(7i
N M
[�
m LJ
[? Lam•
D] 0
Oo
M
tD OW
N �
L)
�
c'
N N
Lo M
� 3
N
rl M
LJ
'U� Lo
O LO
M (�ajJ
L7
�.
to
10
,� .y
� v
r
LC
y
V,
d� yi
M V'
w
V' o
V'
d'
d� V�
�T
C
'i •-1
L] M
.-1 e-1
L1 L)
L.�
L7 ^.y
IC
L7
O
Ifi
Li
i
a
cn co
to to
EC.0
LC
m to
tD
L7
I
CZC,
O
m
i
LC
% 1L.0
h
L�
[�
of
co
co
�z
I�
LO
10
LC
J
CO
ULO
nL0
LO
7
tO
710
My
x,o ❑ #
a
d�
6
o '� o
r
^
oar
_
as
E�
❑a
o r,
°°
.0 Cy
UQ
,. (�
Da
•w
C
°d
C
w
.-. U O n
co
G:
ca
y
t�GO
.a
'O
O EOi y
N
M C
.ucn
n�
/-� UI
Ul
ai
m
Q
U
GO+ O
cNtl n
O '^
ti
7. ,�
Y
Fi
'7 G H U1
U)
Y
Y
*„�
10 pl
M pl
CO
U
�O
�" CJ
0
C�
LC
y r
C
L
U
<+'
L:
cc
01
O
N
O
Z
7
i�
a
JU
T �
a
a G m
p
a
_Cq
E
m0a
UM
p C' O
G t3
N
ti Ca G
" i
N
o
o
^ cs
° r
aCi
F�1 Gy
N O
N
<D CI
N Lei
OM) to
m CN'�]
m
Lo In
aI, "V
rc
m M
�c
C
tiM
Litt
s
to
�o to
a
CD
to CD
cv cp
m
c0
w�
�z
z
m
qCw
�:r
T
M d
� CN7
U
U
3
c
�
E
(0
=
p
N
p
N
N
N
N
Z
NEWS
Public Works ThePi*peline
Engineering
Code Enforcement
LETTER March19,1999
Parks Report
The Parks Crew did daily
trash pickups in the parks. They
responded to complaints and re-
moved snow on some of the ped-
ways. They worked on mainte-
nance and improvements to their
equipment in anticipation of the
upcoming summer season. They
acquired some new 55 gallon
drums and are modifying them to
be used as trash barrels in the
parks this summer (cutting off the
tops and painting them). They
finished cleaning out the wood
duck houses in Friendly Hills,
Hagstrom-King, Marie, Valley
and Victoria Highlands Parks.
Utility Report
Rich checked the City's
seven sanitary sewer lift stations
daily. Rich had to repair the ac-
cess door to the St. Thomas
Academy lift station which had
been damaged during plowing
operations. Rich is also continu-
ing to check the sanitary sewer
main lines and this week found
and removed a large rock from a
manhole near the scenic over-
look on TH13. He replaced
burned out lights within the con-
trol panels at the Veronica and
Culligan Lane lift stations.
Rich discovered a leaking
seal in Lilydale's sanitary sewer
lift station pumps and coordi-
nated Braun Pump to come in
and complete the repairs
(Lilydale pays Mendota Heights
an annual fee to have Rich do
routine maintenance on their lift
station).
Street Report
The Street Crews purchased
some more sand and salt and
mixed it - hopefully they will not
have to use it. They worked on
repairing mailboxes that were
damaged as a result of snow
plowing. They did some pothole
repairs throughout the City (they
use cold mix now and have to
come back next summer and re-
place them with more permanent
repairs).
They cleaned out the boxes
from the plow trucks, inspected
and made minor repairs as
needed. They made up and re-
placed street name signs that
have been knocked over. They
worked on preparing the specifi-
cations for the attachments to the
new plow truck that was ordered
to replace the old International.
MnDOT Proiects Update
MnDOT's office of State Aid
conducted an open house at the
Dakota County Western Service
Center in Apple Valley this week
to present their projects sched-
uled for construction this year
and give the cities an opportunity
to identify any potential conflicts
or concerns.
There were very few projects
in Dakota County this year, but
there is one in Mendota Heights.
MnDOT will be milling and over-
laying Dodd Road (TH149) all the
way through the City. The project
is scheduled to begin in mid -June
and be finished in August. They
do not intend to close the road to
traffic for the construction, they
will do it "under traffic' with the
use of flaggers. They did remind
us that Dodd Road is on the list
to be turned back some day,
probably to Dakota County.
Lexington Avenue Pedway
Mr. Larry Craighead, Parks
and Recreation Commissioner
has requested that the County
construct a trail along Lexington
Avenue (letter attached). The
County responded to his request
this week and the County's letter
is also attached. Mr. Craighead
also attended a City Council
meeting and made the same re-
quest from them. The Council
asked staff to investigate the fea-
sibility of using MSA funds to con-
struct the project. We are cur-
rently completing the investiga-
tion. We had looked at the possi-
bilities before and found the pro-
ject to be extremely expensive
and very challenging from an en-
gineering design standpoint.
Attachments:
• Mr. Craighead's Letter
• Dakota County's Letter
• Met Council - Sewer Flows
1839 Faro Lane
Mendota Heights, MN 55118
February 19, 1999
Mr. Donald Theison
Dakota County Highway Commissioner
14955 Galaxie Road
Apple Valley, MN 55124
Dear Mr. Theisen,
I would like to bring to your attention a concern I have about the safety of people
walking, jogging, and biking along Lexington Avenue between Highway 110 and
Mendota Road. Lexington Avenue in Mendota Heights is a Dakota County road and is
served by both the County and the city of Mendota Heights.
This section of Lexington is a two lane road with two -foot sand shoulders. It has a long
rolling hill, steep falloffs on each side, and overhanging tree limbs. There are driveways,
a school bus garage, city maintenance garage, and new businesses at Highway 110.
There is increased traffic from the change in traffic flow after reconstruction of the
Mendota Bridge. This road has not seen any improvements in my 23 years in the area.
I have been run off the road several times while walking to work at 2465 Lexington.
Cars have nearly missed me while riding my bike to work and on weekends. A car passed
me on the hill last week going over 60 miles per hour. Pedestrians use the road daily,
including several high school teams running along the road after school.
I have spoken to the Mendota Heights City Police Chief, Scott Johnson, and the City
Administrator, Kevin Batchelder, about my concerns and would like to see improvements
made to the road before some serious accidents occur. They encouraged me to write
letters addressing these concerns to our city and to your attention.
I believe that standard shoulders and a bike path connecting existing paths should be
constructed between Highway 110 and Mendota Road. This would considerably improve
pedestrian safety on Lexington. Police Chief Johnson supports this safety improvement.
I spoke with Lisa Vermillion, a Northern Dakota County roadway engineer about this
section of road and she has a copy of my comments. I will direct letters to Patrice
Batagiia, District 3 Dakota County Commissioner, and Jim Danielson, Director of Public
Works in Mendota Heights, asking for their additional support in this request.
Thank you, D
Lawrence W. Craighead
cc: S.Johnson
K. Batchelder
MAP,. N. 1999 9:02AM DAKOTA CTY HWY DEPT 61289171 1
NO, 7101- P. 2
DAKOTA COUNTY
HIGHWAY DEPARTMENT
14965 GALAXIE AVENUE 3RD
March 5, 1999
Mr. Lawrence W. Craighead
1839 Faro Lane
Mendota Heights, MN 55118
Subject: Lexington Avenue Pedestrian Safety
Dear Mr. Craighead:
DONALD J. THEISEN, P.E.
COUNTY ENGINEER
Telephone (612) 891-7100
Fax (612) 891-7127
APPLE VALLEY. MINNESOTA 55124.8579
Thank you for bringing your concern about pedestrian and bicycle safety on Lexington Avenue
between Mendota Heights Road and Highway 110 to Dakota County and the City of Mendota
Heights. Our staff and City staff have discussed this issue and are investigating the feasibility of
a project to address your concerns.
This is a common challenge in our County. Our older roadways were built to standards that were
adequate at the time. As traffic volumes increase along with the demand for walking and biking
trips, there is an increase in potential conflicts. The addition of an area to walk or bike does
create impacts and these must be weighed against community benefits.
We will work with the City on this issue. If a project is feasible, it can be scheduled by the City
and County.
Please feel free to contact me or Don Thelen, County Engineer at (612) 891-7102 if you have any
further questions.
Sincerely,
Patrice Bataglia
Dakota County Commissioner
cc: Brandt Richardson, County Administrator
Louis Breimhurst, Physical Development Director
Donald Theisen, County Engineer
N: Lexington PedSatery-
Premed on recycled p4pe5 20% pail-consvmer 1 AN EQUAL OPPORTUNITY EMPLOYER
/III Metropolitan
Working for the Region, Planning for the Future III
Environmental Services
March 12, 1999
James Danielson
Public Works Director
City of Mendota Heights
1101 Victoria Curve
Mendota Heights, MN 55118-4167
RE: Flow Calculation for the Second Quarter of 1999 Cost Allocation
Dear Mr. Danielson:
The Metropolitan Council Environmental Services Division has measured and/or
calculated the flows (units in millions of gallons) for the months of October, November
and December 1998 generated within your community to be as follows:
Third Quarter 1998: 165.09
Fourth Quarter 1998: 137.85
This information is considered to be preliminary and may be adjusted based on further
review.
The above flow calculations includes estimates for any unmetered connections that either
enter or leave your community. Attached is a graph showing only metered flow, by
month, for this year and the previous three years. Therefore, the quarterly flow volume
shown above may not equate to the total 3 month flow volumes given in the chart.
The fourth quarter 1998 volume shown above will be used to allocate costs for your
community during second quarter 1999. If you have any questions or require additional
information, please call me at 651-602-1116, or Kyle Colvin at 651-602-1151.
ely,
Donald S. Bluhm
Municipal Services Manager
DSB:JLE
2gtr$99
cc: Kevin Howe, Metropolitan Council District 15
Jean Erickson, Metropolitan Council Environmental Services
230 East Firth Street St. Paul, Minnesota 55101-1626 (651) 602-1OUb tax ouz-t ta3 L vvi i i i
An E"I" OPPonunfg. EmPl',"
;
V
. > r......_.
o LO
z��
---- ; ...
+ M r LO ' d
i 0 CJ j 6
�# d
g I
i a9 Mi col N CD
ICO 1 wt 1 CO LO
i C%i ; r CV j Lt;
d ;LOs -CD i-`-o------- +.
m
dt CD � cD
; - _ .......... ----------
a LO LO CO r
M ? N M i L6
i
r� i N W
? Cu i M i M of i
ID
LA w Ltd
j �'
L. C3 i to CD 1 CD
i Q L4, i Lii L.'a 60
i
-r
- Liy i La'3
..;.._r - ... .
Lo
Li c�9 i
t3 i bCO
i -e ; Lo :�4
"tt MCI, j
CD ? ice. Co
in
m m! 4n
ri ri r; e-
'� A I 3
,I : i
NEWS
Public Works ThePi*peline
Engineering
Code Enforcement
LETTER March 12,1999
Parks Report
The Parks crew finished attending
Toro University on Friday. They
worked on repairs to the hydraulic
pump that left the plow on truck 503
inoperable. They plowed snow
Tuesday, Wednesday and Thurs-
day. They plowed their cul-de-sac
routes on Tuesday and the pedways
and their parking lots on Wednesday
and Thursday.
Utility Report
Rich checked the City's seven sani-
tary sewer lift stations daily. Rich
had Braun Pump out to change the
guide rails in the Veronica and Culli-
gan lift stations. The guide rails are
used for removing the pumps for
maintenance, because they sit in
sewage, they deteriorate over time
and need replacing. Rich found a
100 pound sand bag in the sanitary
sewer manhole at Cheyenne and
Pontiac (the beginning of the trunk
sewer main). Rich found the sand
bag as part of his normal mainte-
nance check of the trunk lines and
he has no idea of how it got in there.
He had to borrow a special removal
apparatus from West St. Paul to re-
move the bag. Rich plowed his nor-
mal route Monday and Tuesday dur-
ing the storm (the north end). He
plowed out his lift stations the day
after the storm.
Street Report
The Street Crews big event for
the week was dealing with the 16"
snowfall that occurred this past
week. They plowed main routes on
Monday until 6:00 P.M. and then
they returned at midnight and plowed
all day until 6:00 P.M. again. The
snowfall set a record, was wet, heavy
and consequently took a lot longer
than normal to plow. We received
mixed reviews from residents on our
efforts. The one's whose streets
were done first were very apprecia-
tive and the ones who were com-
pleted last became very frustrated.
The crews were not only slowed by
the depth, density, and weight of the
snow, but also by having to take one
truck out of service for a period of
time to replace a fuel pump. We did
plow one pass through the north end
in an attempt to provide those resi-
dents early access. I have attached
a copy of a map showing the plow
routes.
MnDOT and St. Paul Near Agree-
ment on 1-35E Bridge
An agreement is now being ne-
gotiated between the St. Paul City
Council and the Minnesota Depart-
ment of Transportation (MnDOT) that
is expected to clear the way for the
reconstruction of the 1-35E bridge
over the Mississippi River. The two
parties are hoping to have a memo-
randum of understanding ready for
City Council approval in the next few
weeks.
St. Paul City Council is the only
local governmental unit that has not
yet approved MnDOT's plan for re-
placing the 67-foot-wide span with a
124-foot-wide, $27 million structure.
MnDOT hopes to complete the final
design for the bridge next year, with
construction to follow from 2001 to
2003. However, if a decision is not
made in the next few weeks, it could
push back those plans.
MnDOT and St. Paul are confi-
dent an agreement can be reached
that will not delay the project, and will
address issues raised by St. Paul
neighborhood groups.
This plan already has the sup-
port of the Ramsey and Dakota
County boards and the cities of Men-
dota Heights, Mendota, Lilydale, Ea-
gan, Burnsville, Farmington, Inver
Grove Heights, Rosemount and
West St. Paul.
The memorandum of under-
standing between the city and Mn-
Dot, as proposed, asks MnDOT to
agree not to convert the auxiliary
lanes into through lanes prior to Jan-
uary 1, 2015, without the approval of
the city of St. Paul. It asks MnDOT
to commit to supporting the 1984 fed-
eral court order that dictated the
width, design and 45 mph speed limit
of the 1-35E Parkway. It also in-
cludes provisions for protecting
Crosby Farm Park by limiting the
width of the southbound entrance
ramp from Shepard Road.
Federal -Aid Preservation Program
Application
The Engineering Department submit-
ted an application this week to hope-
fully be chosen for the installation of
emergency vehicle preemption
(EVP) at the intersection of Delaware
Avenue and Highway 110 under this
program. If this project were chosen
under this program, MnDOT would
administer eight federal aid contracts
for this work with the local agencies
funding 20% of the project cost.
Attachments:
• Plow Routes
• Safety Study for the intersection
Of Victoria at Marie
3sxaafi
-9=
4:oe8_:
N
N
N
U
U
U
N N
N
N N
N
C I
C I I
C i
C
ri N
i N
rl N
�i
C I
C I
C I
C
.i ri
rl fi
f1 ri
.i
E U
E U
E U
E
C N
N C
N
C
U N
> .0
E :G
.
.i O1
ttl O
.rA
0
a E
Cl h
F£
h
••
N
f'1
P
at
3k
..
ak
N
N
N
N
7
a
0
O
O
O
O
a
a
a
a
February 26, 1999
Mr. Peter Sorenson
14955 Galaxy Avenue
Apple Valley, Minnesota 55124
Dakota County Highway Department
Dear Mr. Sorenson:
On Wednesday, February 24th, my 20-year-old son was involved in a severe
auto accident at the corner of Victoria Road and Marie Avenue. If
he did not have airbags in his automobile, he probably would not have
made it. I talked with the police chief of Mendota Heights, and he
has been concerned about this corner over the last year that he's been
chief of police.
We have lived in Mendota Heights'and have driven through this corner
over the last 14 years. Each time we go through this corner, we are
very concerned about people pulling out in front of us because the
vision down Victoria Road is very difficult on both ways. We have
also witnessed other accidents on this particular corner over the last
few years. The police chief mentioned to me that Victoria Road is
a County road and asked me to contact you to plead to make this intersection
a four-way stop. Victoria Road going south from highway 13 has no
stopsigns on it through its whole course. As you approach Marie Avenue
which runs east and west across Victoria Road, there is very limited
vision both ways. The accident occurred in the evening hours which
made vision even more difficult.
I'm hoping that if more discussion would be needed that you would help
guide me in pursuing this matter. If anything good can come out of
this 3hole situation, I would hope that we would be able to prevent
future accidents which are bound to occur at this intersection.
Sincerely,
me Hocks, I.D.
JH/gar
y5i -
Gsv 33�6
February 26, 1999
Mr. Jim Danielson
Chief of Police Mendota Heights
Dear Mr. Danielson:
This is the letter that I had sent Mr. Peter Sorenson concerning the
matter of the intersection at Victoria Road and Marie Avenue. If you
also feel that this is a matter which should be brought to the attention
of both the County and the City of Mendota Heights, I would appreciate
your help in establishing this as a four-way stop intersection. If
you need to reach me at my home number, it's 452-3330. My office number
is 451-8050. Thanks for your help.
Sincerely,
/ mes Hocks, M.D.
JH/gar
DA KOTA COUNTY
HIGHWAY DEPARTMENT
14955 GALAXIE AVENUE 3RD
March 4, 1999
Dr. James Hocks, M.D.
1025 Victoria court
Mendota Heights, MN 55118
Re: Victoria Road at Marie Avenue
Dear Dr. Hocks:
DONALD J. THEISEN, P.E.
COUNTY ENGINEER
Telephone (612) 891-7100
Fax (612) 891-7127
APPLE VALLEY, MINNESOTA 55124-8579
This is in response to your letter dated February 26, 1999 requesting installation of a four-
way stop. I have ordered a new study of this intersection to determine appropriate traffic
control. Our study will be completed this spring. I will forward the results to the City of
Mendota Heights for further discussion when it is completed.
The last study was performed in 1995. That study indicated that the current traffic control
was appropriate and operating with a minimum of safety problems. Our new study will
evaluate the current conditions and look for changes that would indicate if a four-way stop
would be appropriate.
I am sorry that your son was involved in a vehicle crash at this intersection. Unfortunately, no
traffic control device has shown to eliminate traffic crashes. We do experience severe
crashes and fatalities at our traffic control signals and four-way stop signs. I appreciate the
time and effort you have taken to describe your concerns to us. You may contact me at (612)
891-7103 at any time to discuss this intersection.
Sincerely,
%-
Peter L. Sorenson
Traffic Engineer
cc: Commissioner Patrice Bataglia
Brandt Richardson, County Administrator
Lou Breimhurst, Physical Development Director
James Danielson, Mendota Heights Public Works Director
Scott Johnson, Mendota Heights Police Chief N:Hocks
AN EQUAL OPPORTUNITY EIMPLOYER
Pnntea on recycled paper. 20°n pos4consumer A
s
NEWS o
Public WorksThe l
EngPipelineineering
Code Enforcement
LETTER March 5, 1999
Parks Reoort
The Parks Crew picked up trash at
all the parks daily. They cleaned out
the wood duck houses this week, so
that they will be ready for those
ducks when they return soon for next
season. The crew also attended
"Toro University" this week for con-
tinuing their education on turf grass
maintenance.
Utilitv Reoort
Rich checked the City's seven sani-
tary sewer lift stations daily. He also
performed sewer connection inspec-
tions for new homes at 1129 Orchard
Circle and at 619 Kirchner Avenue.
Rich started walking and checking
the 27 inch sanitary sewer main lo-
cated in the valley. He does this
annually looking for problems (so far
he has not found any). Braun Pump
was hired to come in and repair the
check valves at the Centre Pointe lift
station. (Rich was sick two days this
week).
Street Report
The Street Crew received a request
to remove the ice that had built up in
a low spot in the road on Orchard
Place. They chipped and removed
three truck loads of ice. They
worsted an writing specifications for
the new dump body, hydraulics and
snow removal equipment to be in-
stalled on the new truck that has
been ordered to replace r303. The
new truck is scheduled to arrive next
summer and we hope to have it
available for picwing duties next win-
ter. The crcn also continued to pick
uo trash in various neighborhoods
throughout the City.
Dakota County enacted their 1999
Road Restrictions this week, a sure
sign of spring.
Enaineerina Report
Engineering is expecting a busy
summer this year with the streets be-
ing reconstructed within the Cherry
Hill neighborhood, all the public utili-
ties being installed for the Glen Toro
Addition (Shepard property) and pos-
sibly the Hoffman Homes Town-
house project to be built at the north
end of Resurrection Cemetery,
therefore we are currently trying to
hire a summer intern. Ross Bintner
our intern last year has expressed
some interest and we hope that we
can get him to come back (we will
avoid the training period).
1999 Slurry Seal Program
It is net too early to think about the
slurry seal program for 1999, with the
summer construction season right
around the proverbial corner. Mr.
James Buchanan of Struck and Irwin
visited with Engineering and Public
Works Department staff last week to
follow up on any concerns that the
City may have had regarding past
work, and to ask the City to consider
initialing future work sometime in
June as opposed to the City's typical
August or September date of com-
pleticn 'Cr this work. The City will
have tc decide which streets should
be SNr! saaiec in 1999. i ne buccei
has_cr.',d'=nt funding to seal slichdy
more tInan two miles c7f streets.
Stree:5 m,ai are siructura!ly scunc
and have an expected remaining ser-
vice life of greater than five years
would qualify. The Engineering De-
partment is seeking input regarding
which neighborhood streets, or street
segments might meet this criteria, to
help decide which streets should be
included in this years work.
Code Enforcement Report
The City Council at their meeting
Tuesday night asked about the sta-
tus of bleacher safety within the City.
Guy had already researched the
City's bleachers and reported that
they were not high enough and did
not require any modifications. Dick
and Paul will be making site visits to
further ensure their compliance.
Council asked that the Code En-
forcement Officer send a written in-
quiry to all of the City's schools
(District 197, St. Thomas Academy
and Visitation) to determine if their
bleachers are in compliance and if
they are not what actions they intend
to take to bring them within compli-
ance.
A second single family home permit
was issued this week to Mendota
Homes to construct a new home on
a vacant lot at Miriam and Diego
Lane
Al—mc.`,ment:
• Da:tcta County Road Restric-
ticns
TO:
FROM:
DATE:
SUBJECT
DAKOTA COUNTY HIGHWAY DEPARTMENT
MEMORANDUM
DAKOTA COUNTY SHERIFF AND CITY POLICE CHIEFS
Donald J. TF,eisen, COUNTY HIGHWAY ENGINEER
MARCH 1, 1E99
LOAD RESTRICTIONS
Load restrictions will be placed on various County highways beginning , March 2, 1999. The
following listed roads will be restricted for eight (8) weeks. These restrictions may change as
conditions warrant. You wA be notified when the restrictions have been removed.
COUNTY AXLE WT. DATE
ROAD NO. LIMITS POSTING POSTED
4
ButlefA•enue
9Ton
5
1-35 to T.H. 13
9 Ton
5S
CR 70 to Scott County line
Ton
g
6
Thompson Avenue
Ton
9 Ton
8
Wentworth-Wachler
9
Scott Caunbj 8ne to CR 31
7 Ton
11
CR42toTH13
9Ton
14
TH 110 to TH 56
9 Ton
23
South County line to CR 86
5 Ton
23
CR86to78
7 Ton
23
CR73toTH50
9Ton
23
TH 50 to CR 9
Ton
o
23
CR9m140th
Ton
24
From CR 56 east to bridge
9 Ton
26
TH 13 to TH 55
9 Ton
25
TH55toTH3
7 Ton
26
TH 3 to CR 56
9Ton
28
TH 13 to TH 149
9 Ton
28
TH 3 to CR 56
9 Ton
30
TH13toTH3
9Ton
31
CR73toCR74
STon
31
CR M to CR 50
9 Ton
31
CR 50 to CR 58
1 Ton
31
CR58toTH55
9 Ton
32
@35�1
10Ton
32
Rive!P.idce Blvd. to CR 71
9 Ton
'3
CR 42 to 140th Street
9 Ton
140th Street to CR 31
7 Ton
CR5toTH3
9Ton
42
West County line to TH 55
9 Ton
e2
TH 55 to East Jet. CR 87
7 Ton
-
East JcL CR 87 to TH 61
9 Ton
CR 32 to TH 55
9Ton
'
f`.lenwta Heights Road ,., TH 110-on
Gross
`Neicht
TH 110 to TH 13
9 Ton
C
c�
-
CR 43 to TH 13
9 Ton
TH 13 to Rams_; , COUn IL,e
5 Ton
CR 5 to CSAH 31
'
TH 5 to TH 61
c Ton
TH 5::o CR '.-
9 Tcn
-'
TH 35 :o TH 3
9 Tcn
NEWS
Public Works
Engineering The
Plepeline
Code Enforcement
LETTER
Parks Report
The Parks Crew picked up
trash at all the parks daily.
They also performed main-
tenance on their snow-
blower. They also hauled in
the hockey nets from the
rinks and continued working
on cleaning out the warming
houses. They worked on
obtaining bids for purchas-
ing a replacement truck for
#503. 503 is a 10-year old
3/4 ton pickup that was bud-
geted for replacement in
1999. They had to clean
snow from the trails as a
result of Wednesday's snow
storm. They attended a Turf
Seminar on Thursday.
Utility Report
Rich checked the City's
seven sanitary sewer lift sta-
tions daily. There was a
watermain break Sunday af-
ternoon on Ocala Lane. St.
Paul Water responded to a
call from the Police Depart-
ment and fixed the break.
Watermain breaks are most
common in the fall and in the
spring when the frost is ei-
ther going in or coming out
of the ground. Rich checked
the sanitary sewer lines in
the area Monday after the
break to make sure that
there was no damage to
them caused by the break.
There was not any damage,
however flow in the line in
Ocala was sluggish and he
cleaned it. He reinstalled
hydrant flags on fire hy-
drants on Emerson Avenue
and Laura Court where they
were missing. Rich walked
and checked the sanitary
sewer lines that travel
through easements by Som-
erset School and he found
no problems.
Street Report
The Street Crew picked up
trash along Mendota
Heights Road and Medallion
Drive this week. When the
snow melts all kinds of trash
tends to show up. They also
had to repair the sander and
February 26, 1999
spinner motor on plow truck
#308. John Ambrose be-
gan fabricating a storage
shelf for storing replace-
ment cutting edges for the
plows and for bobcat at-
tachments. They emptied
out the plow truck boxes
from sand and salt and
washed them out. (I wish
that the boxes could stay
empty for the rest of the
winter - but this was just for
a mid winter clean out and
maintenance check).
They had to sand the
streets and scrape the main
roads on Wednesday from
the 1-1/2" snow storm.
This week Len performed
his annual duty of getting
emission tests on all the
City's gas operated vehi-
cles that are over five years
old. We were fortunate
once again this year be-
cause all the vehicles
passed the test - even "The
General".
NEWS
Public Works ThePi*peline
Engineering
Code Enforcement
LETTER February 19, 1999
Street Report
The Street Crew came in at
2:00 A.M., Friday, February
12th and plowed the streets.
There was only 1-1/2" of snow,
but there was heavy drifting in
some areas. The cul-de-sacs
were not plowed so the Parks
Crew which normally plows
them, plowed the pedways
right away.
Fire Marshal Paul Kaiser per-
formed his annual fire inspec-
tion at the Public Works
garage this week. He found
that the light bulbs in the exit
lights and the batteries in the
emergency lighting required
replacement, the Street Crew
performed these corrections.
They also performed mainte-
nance on their chain saws.
They changed the cutting
edge on plow truck number
312. They also continued to
scrape streets and open catch
basins where needed.
Parks Report
The Parks Crew picked up
trash at the parks and
checked the skating rinks and
warming houses daily. They
plowed the trails and parking
lots from last Thurs-
day/Friday's snow/ice storm.
They worked on closing up
warming houses for the sea
son and checked inventory
and cleaned and put things
away until next winter (flooding
hoses, etc.).
Utility Report
Rich checked the City's seven
sanitary sewer lift stations
daily. He performed a sewer
inspection. He worked on
maintenance to his two vehi-
cles, the sewer jetter and his
utility truck. (He also is re-
sponsible for the portable gen-
erator). The radiator hose had
to be replaced in his truck.
Watershed Seminar
Jim and Curt attended a 1/2
day Storm Water Seminar held
in Bloomington on Thursday.
The seminar was hosted by
Met Council, the Board of Wa-
ter and Sewer Resources and
Dakota County County Envi-
ronmental Services. The gen-
eral message of the seminar
was that we have made great
strides toward educating the
public on protecting our
streams and wetlands over the
last few years. Remember to
buy low or no phosphorus type
lawn fertilizer (the City does)
and keep grass clippings and
leaves from entering the storm
sewer (do not mow your clip-
pings into the street and rake
the leaves from there too).
These actions are the most
important ones you can take to
reduce algae in the ponds.
Erosion Control Breakfast
Seminar Series
Marc Mogan attended the
fourth and final weekly install-
ment of an erosion control
seminar this week. These
seminars were sponsored by
the Minnesota Pollution Con-
trol Agency, Dakota County
Soil and Water Conservation
District, Minnesota Erosion
Control Association, and the
Dakota County Environmental
Education Program. Discus-
sion topics in this series in-
cluded National Pollutant Dis-
charge Elimination System
(NPDES) Construction Per-
mits, Erosion Control Best
Management Practices, pro-
ject planning and design, new
products and practices, speci-
fication writing, plan review,
ordinances, program imple-
mentation and financing, in-
spection and enforcement.
The program emphasized
those design practices that
can be used to help minimize
erosion on construction pro-
jects, and offered specific rec-
ommendations on what should
be included in a community's
local erosion control ordinance
to make the program effective.
NEWS
Public Works ThePi*peline
Engineering
Code Enforcement
LETTER February 12, 1999
Parks Report
The Parks Crew picked up trash at
the parks and checked the skating
rinks and warming houses daily.
They repaired the snowblower on
the 580-D Toro (the large mower
which has a snowblower mounted
on it in the winter for clearing
trails). They had to repair some
valves that are used for flooding
the hockey rinks. They also re-
moved a stone bench from the Hu-
ber Drive and Mendota Heights
Road overlook. The bench had
been vandalized repeatedly.
The skating rinks were in terrible
shape this week because of the
warm weather and we do not think
that we will be able to get them
back into safe skating shape
again. They are most likely closed
for the season.
Utility Report
Rich checked the City's seven
sanitary sewer lift stations daily.
He also continued to work on his
record keeping this week. He ex-
ercised the large emergency gen-
erator at the Mendota Heights
Road lift station. He flushed out
the wet well at the Centre Pointe
sanitary sewer lift station. He per-
formed a sewer inspection at 784
Bachelor Avenue. He cleaned the
grease off the floats at the Veron-
ica sanitary sewer lift station and
checked the flow in the line coming
from Lloyds Meats (it was ok).
Street Report
The Street Crew sanded the City
as a result of the freezing rain
storm on Thursday. They installed
heated wiper blades on truck #308.
The blades get iced up when plow-
ing and we are trying these new
blades to see if it solves that prob-
lem. They had to open many catch
basins that were blocked and were
ponding water from all the recent
melting.
There are a string of street lights
that are shorting out in the Indus-
trial Park. Dave is working to try
and solve the problem - so far they
keep shorting out, so we feel that
he will need to call in an electrician.
They replaced the cutting edge on
the loader bucket and sanded sev-
eral slippery spots in the City over
the course of the week.
Code Enforcement Report
The Code Enforcement Depart-
ment reports that the first single
family home permit has been sub-
mitted for 1999. The house to be
built is 1129 Orchard Circle and
the contractor is Santanni Homes.
Freeway Road Study Begins
Admnistrative and Engineering
Staff met with Ross Fefercorn,
Aaron Parker and Gaius Nelson on
Wednesday to transfer maps and
information so that they can begin
their Freeway Road Redevelop-
ment Study. Patrick Hollister and I
met with Gary Stevenson, Dakota
County Surveyor, his staff and
Aaron Parker on Friday to acquire
more information and maps to use
as background. Ross is working to
try and be ready for an initial work
shop at the end of March.
Federal -Aid Preservation Pro-
g am
Marc Mogan attended a MnDOT
presentation on Thursday to learn
about a Federal -Aid Program that
will provide significant funding for
specific types of projects on eligi-
ble roadways of a certain func-
tional classification. The roadways
in Mendota Heights that would
qualify under these functional clas-
sifications are the segment of
Highway 110 east of 1-35E, and
Dodd Road north of Highway 110.
Eligible projects include pavement
preservation, guardrail and end
treatment, bridge rehabilitation,
and sign replacement, bike and
pedestrian rehabilitation, transit
hubs and rail rehabilitation, and
transit vehicle rehabilitation. Mn-
DOT will administer eight federal
aid contracts for these specific
types of work with the local agen-
cies funding 20% of the project
cost. The Fire Chief desires for
Mendota Heights to make applica-
tion and hopefully be chosen for
the installation of emergency vehi-
cle preemption (EVP) at the inter-
section of Delaware Avenue and
Highway 110 under this program.
Attachements:
• Spicer letter
• MnDOT Load Restriction letter
.4
rMendota Heightsi
s
February 9, 1999
Terry Blum
City of Mendota Heights
1101 Victoria Curve
Mendota Heights, MN 55118
Dear- i, U `,�
On behalf of the Parks and Recreation Commission, I would like to thank you and the
other members of the Public Works team for your excellent job in maintaining our parks
facilities during the year 1998. The City's residents have benefited greatly from your
efforts in this -regard, and the Commission looks forward to working with you in 1999.
Chair of the Parks a ecreation Commission
cc: Jim Danie Direc or of Public Works
1101 Victoria Curve � Mendota Heights, MN • 55118 (612) 452-1850 FAX 452-8940
Minnesota Department of Transportation
Engineering Services and Operations Divisions
Technical Memorandum No. 99-06-MRR-03
February 1, 1999
TO: Distribution 57, 618 and 650
FROM: David S. Ekern diV Patrick flu
Director/Assistant Chief Engineer Director
Engineering Services Division Operations Division
SUBJECT: Guidelines for Posting Spring Load Restrictions
This Technical Memorandum will continue in force until June, 2002, unless superseded or placed
in the Geotechnical and Pavement Manual prior to that date.
PURPOSE AND USE
The purpose of this technical memorandum is to provide a uniform statewide procedure for
determining the dates that spring load restrictions will be placed and removed on the Minnesota
Trunk Highway System.
POLICY
1. The Districts will submit their restricted roadway segments for the annual ROAD
RESTRICTIONMAP to the Director of the Office of Road & Vehicle Information and
Services by December 31 of the preceding year.
2. The annual ROAD RESTRICTIONMAP will be mailed to all those on the Mn/DOT mailing
list in late January or early February, along with an explanation of the new procedure for
notification of postings. This mailing will be the only mail notification of the procedure to the
general public.
3. A toll -free telephone number (1-800-723-6543) and local telephone number (651-406-4701)
and Internet Site (htto-//mnroad dot state mn.us) have been established in order to provide
information on postings in each frost zone as quickly and conveniently as possible. A 3-day
notice of restrictions will be provided using a recorded telephone message with more detailed
status reports available on the Internet site. Mailings will no longer be used.
The start of the load restriction period will be determined for each zone using measured and
forecast daily temperatures for several cities within each frost zone. The criteria used to
determine when the load restrictions will be placed is when the cumulative thawing index for a
zone exceeds 25 F degree-days based on the 3-day weather forecast, with predicted increases
well in excess of 25 F degree-days.
-MORE-
Technical Memorandum No. 99-06-MRR-03
Page 2
February 1, 1999
The intent is to use the 3-day advance forecast temperatures to ensure that the postings are on
at the beginning of the thaw and at the same time provide 3 days of notice to the public that
the posting period is coming.
The calculation is made using the following formula:
Thawing Index = Average Daily Temperature — Reference Temperature
The reference temperature varies linearly from 29 degrees F on February I to 24 degrees F on
March 15.
The cumulative thawing index is the summation of the daily thawing indices.
5. The load restriction period will be 8 weeks in duration for all frost zones.
Implementation
The procedures goes into effect spring of 1999. Any questions regarding this Technical
Memorandum should be directed to John Siekmeier Physical Research Section, Office of
Materials and Road Research at 651n79-5299.
Any questions regarding the publication or distribution of this technical memorandum should be
referred to Andrew Halverson, Acting Design Standards Engineer, at 651/296-3023 or Helen
Blair, Administrative Assistant, at 651/296-2381.
NEWS
Public Works ThePl*pell*ne
Engineering
Code Enforcement
LETTER February 5, 1999
Parks Report
This week the Parks Crew picked
up trash at the parks daily, cleaned
the rinks, broomed and flooded
them. The forecast for the week-
end is for very warm weather, we
will continue to try to stretch the ice
skating and hockey seasons, but
with 40` degree weather forecast
and with the sun getting ever
higher and higher in the sky, we
know that we will have to shut
them down very soon. It is not
unusual to have to close the skat-
ing rinks the middle of February
anyway. There are already frost
boils forming on both Marie and
Wentworth Park rinks. The
Friendly Hills rink has worked out
great this winter, with the bitumi-
nous base it, was the first rink to
have ice available (after three days
of flooding) and now, is has no
frost boils. Marie Park is sched-
uled to have its hockey boards re-
placed this summer and we will be
recommending at paving this rink
next.
The crew worked on repairing the
snowblower, repairing the breaker
box for the lights at Friendly Hills
and repairing the furnace at Marie
Park warming houses.
Utility Report
Rich checked the City's seven
sanitary sewer lift stations daily.
He concentrated on maintenance
and repair to his sewer jetter this
week. He took apart the nozzles,
oiled and cleaned them. He got
caught up on some of his paper-
work (documenting which areas
have had their sewers cleaned).
He flushed the North Freeway
Road sanitary sewer line.
Street Report
This week we finally had a respite
from all the snowfalls and ice
storms, we used the week to get
caught up on clean up and repair.
The crew cleaned up several cul-
de-sacs from snow and ice build
up at the request of some residents
who lived on them. They also
sanded the City Hall parking lot the
day of the Council meeting. They
worked on repairing some of the
mail boxes that have been hit and
worked with Len to fix a snow-
plow.
Code Enforcement Report
Council adopted an Ordinance
amendment at their February 2nd
meeting that established a one
year time limit for completing build-
ing permits within the residential
districts. All applicants will now be
notified of this requirement at the
time they acquire a building permit
and will be contacted a short pe-
riod of time prior to expiration of the
one year, reminding them of the
permit expiration and to establish a
final inspection.
MnDOT Backs off on Metrifica-
tion
MnDOT, as a result of the Feds
removing their mandate, and at the
urging from contractors and City
and County Engineers, have de-
cided not to require that plans be
completed in metric (see attached
memo). MnDOT was also follow-
ing the lead taken by our neighbor-
ing states. This reversal will make
life easier and less confusing for
plan preparation at the City.
MnDOT Answers 1-35E Upgrade
Question
Maureen Hunter, 647 Marie Av-
enue, wanted MnDOT to upgrade
1-35E to three lanes from the south
end of the new river bridge to
TH110 at the same time the bridge
is upgraded and replaced
(attached is MnDOT's response to
her request).
Attachments:
• MnDOT memo on metrification
• MnDOT response to Maureen
Hunter's letter
Olund Catches Big
Walleye on Mille
Lacs
NEWS
Pn i Works ThePl*peli*ne
Engineering
Code Enforcement
LETTER December 29, 1999
Parks Report
The Parks Crew completed
general parks maintenance to
include trash pickup and daily
warming house cleanings.
They had to repair the door
and the gas flue at the
Friendly Hills warming house.
They had to plow cul-de-sacs,
pedways, parking lots and ice
skating rinks. They
flooded the rinks when
weather allowed and broomed
them daily. When it is too
warm they can not flood be-
cause it will not freeze.
Utility Report
Rich checked the City's seven
sanitary sewer lift
stations
daily. Rich attended the
MPCA Waste Water Collector
Systems Seminars
at the
Thunderbird Hotel in
Bloom-
ington. MPCA is the
licensing authority
for sewer workers
and conducts a re-
fresher course an-
Date:
nually. Beside plow-
1/22/99
ing his main line
routes, Rich also
1/25/99
plowed out his lift
stations when
1/26/99
needed this past
week.
1/27/99
Census 2000
Final corrections and updates
of the Census address list pro-
vided by the U.S. Department
of Commerce were completed
this week by Guy Kullander
and Nancy Bauer. This up-
dated computer disk required
almost 600 address correc-
tions, deletions or additions. A
by-product of this effort is a
complete mailing list of all
4,257 residences in the City,
including apartments, condo-
miniums and duplexes. There
are 2,479 residences in zip
code area 55118 (north of
Highway 110) and 1,778 in
55120 (south of Highway 110).
Street Report
Tom Olund had to order addi-
tional sand and salt this week,
and on numerous other occa-
sions this winter. Tom wants to
try and keep our sand/salt
storage building as full as pos-
sible in case there is a signifi-
cant storm and the area sup-
pliers would run low. This
week he ordered in 50 tons of
salt ($25/ton) and 300 tons of
sand ($2.85/ton delivered).
We mix our sand and salt at a
ratio of about 15-20% salt to
sand (depending on how bad
the ice is).
The Street Department also
worked on repairing their
equipment this week. They
put cutting edges on the front
plows of trucks 303 and 308.
They repaired the salt distribu-
tor on 304 and the strobe
lights on 304 and 308. They
replaced a circuit board on 308
and a power supply on 304.
Plowing is tough on equip-
ment.
Plowing Events This Week:
Work Done: Snow Amount:
Clean thoroughfares and sand throughout Freezing rain/sleet/snow = 1"
Sanded Snowed lightly Sunday
Sanded Freezing rain
Sanded Freezing rain
NEWS
Public Works
Engineering
Code Enforcement
LETTER
Utility Report
Rich checked the City's seven sani-
tary sewer lift stations daily. Rich
and Tom Olund attended the annual
Minnesota Wastewaters Collection
seminar in Bloomington, MN. It is
mandated by the State that license
holders attend this conference on an
annual basis in order to renew their
licenses. Both Tom and Rich hold
these licenses and the City is re-
quired to have at least one licensed
employee. They both broke away
from the conference to help with
plowing when needed.
Code Enforcement Report
Dick attended the annual school for
building officials which was con-
ducted at the University of Minnesota
last week. At the school he learned
about the new energy code that is
proposed to be adopted by the State
for implementation in July of 1999.
This new code addresses indoor air
quality. It is a complicated code that
was difficult for the building inspec-
tors to interpret and they were all
concerned that educating the con-
tractors to comply with the code will
be difficult.
They were also presented with the
details for a new accessibility code
which goes into effect later this year.
Accessibility codes address use of
buildings by disabled people.
Watershed Advisory Appointments
The Lower Mississippi River Water-
shed Management Organization
(LMRWMO), an independent gov-
ernment organization that provides
water resources management for the
communities in the lower Mississippi
The Pipeline
River watershed, is searching for
persons to serve on a Citizen Advi-
sory Committee (CAC). This Citizen
Advisory Committee will provide
community input into the upcoming
revision of the Water Management
Plan for the LMRWMO.
The LMRWMO Water Management
Plan will identify strategies for pro-
tecting the water resources in our
watershed. Local communities in
this watershed include the cities of
Inver Grove Heights, Lilydale, Men-
dota Heights, St. Paul, South St.
Paul, Sunfish Lake, and West St.
Paul. The LMRWMO will appoint
representatives from each city to the
CAC.
One of the first tasks of the commit-
tee will be to review and comment on
the proper role of the LMRWMO in
water resource management. Com-
mittee members will also be asked to
review draft documents as the plan
progresses. The time commitment
for the CAC members would be ap-
proximately one evening meeting per
month in one of the
member cities for the duration of the
January 22, 1999
Street Report
This week was another snowy one.
We have been lucky and still have
not had the big dumper yet, but all
these little ones add up too and resi-
dents are beginning to get grouchy
(they are calling in with complaints).
The biggest complaint by far is "They
are putting aII the snow in my drive-
way." This complaint is most preva-
lent with cul-de-sac homes because
there is so little space to put the snow
with all the driveways, mail boxes
and landscaping concentrated in one
little circle.
In between snowfall events this week
the street crew was making repairs to
equipment and mail boxes that were
hit. They were also addressing other
snow plow complaints.
John Ambrose and Len Kanitz
worked with the Parks Crews to re-
pair the snowblower which was dam-
aged during use. It is used to clear
snow from the trails.
This weeks snow events were as follows:
planning process,
which is expected to
Date:
Work Done: Snow
last about a year.
Amount:
Prospective mem-
1-15-99
Clean up streets and sand
bers should have an
from 5.6" snowfall
interest in environ-
mental manage-
1-18-99
Plow snow - all areas 3.5"
ment, and water re-
sources manage-
1-19-99
Clean up streets and sand
ment. Anyone inter-
ested in serving in
1-21-99
Plow snow - all areas 1.6"
this capacity should
contact Marc Mo-
On 1-21-99,
#304 loses wing on Mears and Dorset.
gan for more infor-
mation.
Snow total for the week 5.1 inches
NEWS
Public Works ThePi*peline
Engineering
Code Enforcement
LETTER January 15, 1999
Parks Report
The Parks Crew picked up trash and checked the
ice skating rink warming houses daily. Besides
their normal plowing duties (the Parks Crew plows
the City's 100 or so cul-de-sacs) they also have to
plow the hockey rinks, the parks parking lots, and
the pedways. They also have to broom the ice
rinks clean and flood them when they have time in
between snow plowing duties.
Utility Report
Rich checked the City's seven sanitary sewer lift
stations daily. Besides plowing his normal main
line snow plow route (the north end), Rich also
plowed out his lift station lots this week. He had a
sewer blockage at 684 North Freeway Road to
deal with on Monday. When jetting it out he found
the line to be plugged with roots, grease and a
screw driver.
Street Report
The Street Crew workers plow three of the four
main line plowing routes. This month has had only
three days so far where it has not snowed (the fifth
snowiest on record so far) This week we plowed
to some extent every day but one:
Date:
Snow
Work
Amount:
Done:
1-8-99
2"
Plowed entire City
1-10-99
1.5"
Clean up main line and sand
1-11-99
1.5"
Clean up main line and sand
1-12-99
5.6"
Plowed all areas
1-13-99
2"
Plowed all areas
1-14-99
5.6"
Plowed all areas
18.2" total
Dodd Road Improvements
MnDOT notified us this week by sending us the
plans for a project to do a mill and overlay to im-
prove Dodd Road (TH149) this summer. The pro-
ject will also widen and improve shoulders, re-
place non -complying mailboxes and add quite a
bit of new guard rail where there are steep slopes
adjacent to the highway.
Sand Disposal Site
Since Public Works lost its street sweeping sand
disposal site at Freeway Road a couple of years
ago, we have been looking for another one. For
awhile we were considering using the McNeill site
located behind Hudson Trucking, however be-
cause of several complications with that site, we
are now looking for another site. We met with the
Director of Resurrection Cemetery and some of
his staff this week, to see if we could acquire a
site from them. They told us that they will present
the idea to their Board February 8th for an an-
swer.
Go Vikings ! !
NEWS
Public Works ThePi*peline
Engineering
Code Enforcement
LETTER January 8, 1999
Parks Report
The Parks Department plowed
cul-de-sacs, pedways, ice
rinks and parking lots this
week. They also checked the
parks warming houses. They
repaired the broom and wiring
on the big trailer. They also
repaired the plow on the pick-
up truck.
The Parks Crew also broomed
and flooded the ice rinks. With
the new area code in effect
they also recoded the cell
phones for the warming
houses.
Utility Report
Rich checked the City's seven
sanitary sewer lift stations
daily. Rich monitors Lilydale's
lift station under an agreement
with Lilydale. Braun Pump
met with Rich to perform an
operation and maintenance in-
spection of Lildyale's lift sta-
tion this week. Braun Pump
will be contacting Lilydale to
recommend which parts
should be replaced and what
lift station modifications should
be made to insure that the
system is maintained in good
operating condition. He also
plowed on the City's north end
Saturday, Sunday, and
Wednesday this week. Rich
also plowed and shoveled the
City's lift stations twice.
Street Report
The arrival of the seasons first
significant snowfall was the big
news in the Street Department
this week. The Street Depart-
ment mixed salt and sand and
placed three applications.
They plowed snow in all areas
and cleaned up Saturday,
Sunday, Monday, Tuesday
and Wednesday. They in-
stalled fender mirrors on truck
312 to aid snow plowing.
Code Enforcement Report
Dick performed the final in-
spections at the Brown Insti-
tute culinary school this week.
There are a few punch list
items to complete but the work
was far enough along so that
he could issue a Certificate of
Occupancy (C.O.). City Hall
employees are more than will-
ing to volunteer as taste
testers if needed.
Personnel Report
Two significant milestones in
the long history of the U.S.
Army Reserves occurred re-
cently. 1998 marked the re-
serves 90th anniversary, as
well as Jim Danielson's last full
year in service. Jim was gone
this past week indoctrinating
his replacement, and tying up
loose ends. Jim will retire from
the Army Reserves as Colonel
after many years of service.
Colonel is the Army Reserve's
highest civilian rank.
Engineering Report
This week the Engineering De-
partment did design work on
the Cherry Hill Addition Street
Reconstruction, and the
Thompson Avenue Stormwa-
ter Diversion projects.
MnDOT requested further in-
formation from the City for a
permit application submitted in
conjunction with the City's en-
trance sign on Dodd Road.
The Engineering Department
also worked on the 1998
Sewer Use Summary re-
quested by Metropolitan
Council Environmental Ser-
vices. MCES compiles and
uses population, sewer con-
nection, and water supply data
to update their Comprehen-
sive Sewer Plans and allocate
sewer use charges throughout
the service area.