Loading...
1999NEWS Public Works Engineering Code Enforcement LETTER Parks Report The Parks Crew picked up trash from the parks daily. They also worked on flooding rinks, which were opened on Tuesday. The warm weather has really made skating diffi- cult, but some kids are using the rinks. Boot hockey is what most of them are doing. The Parks Crew plowed the City cul-de-sacs, pedways and parking lots on Thursday of last week and Monday this week. Utility Report Rich checked the City's seven sanitary lift stations daily. He plowed snow on Thursday and Monday —Rich does the north end of the City. He ran all the generators and checked all the batteries to make sure they were ready —if needed New Year's Eve. Streets Report The Street Crew plowed snow on Thursday and on Monday. Tim does the south end streets, Dave does the west or (Industrial Park area). Tom ordered 150 tons of sand and 25 tons of salt to replace what has been used. They also worked on repairing mail boxes that they hit snowplow- ing. Code Enforcement Report The Pipeline December 30, 1999 constructed at the south east corner of Northland Drive and Mendota Heights Road across from the Super America sta- tion. The building is a 6,000 square foot office building. The plans submitted do not account for type III construction (masonry) or equivalent which is a requirement in our busi- ness and industrial zoned dis- tricts. They also have not pro- vided for the needed sound at- tenuation required for the air- craft noise zone they are in (noise zone 3). Paul is working with the architect to revise the plans to comply with these and other City Zoning Code issues. YEAR 2000 STREET PROJECT The Engineering Department has started working on the lay- out and design of the plans and specifications for the year 2000 street reconstruction and reha- bilitation project. Lake Drive will be reconstructed with Mu- nicipal State Aid (MSA) funds in accordance with MSA standards under this project. Conse- quently, Marc Mogan attended the one -day seminar on MSA construction projects conducted by MnDOT recently. The timing couldn't have been better to learn about the latest develop- ments in this process since it has been some time since the City has undertaken a MSA construction project of this scope and magnitude. CENTRE POINTE BUSINESS PARK Tax Increment Financing re- quest presented by Roseville Properties to install storm sewer improvements to serve Building Number 4, which is in the early stages of construc- tion, and the remaining unde- veloped portion of the Centre Pointe Business Park. Roseville Properties made good on their commitment to Mendota Heights to have these improve- ments in place before the end of the year when Nova Frost completed the installation of this storm sewer system last week. Y2K Rich Burrows and Tim Oster will be on duty starting 11:00 P.M. Friday night through midnight to make sure they are available for any emergencies. They will also both be carrying cell phones all day Friday and Sat- urday so that we can get them quickly to respond to any Y2K problems. All vehicles will be topped off with fuel and spare gas cans filled. Auxiliary gen- erators have been checked over and are ready for use. Three vehicles will be moved outside before midnight to be ready to shuttle generators or anything else that should be needed. If it looks like snow or ice —they will also move out some plow trucks. (The vehicles are being moved out because the heavy garage doors can not be opened without an electric ga- rage door opener). Plans have been submitted by RI Ryan Construction for the Late this fall Council approved a Happy 2000! Farris Incentive building to be NEWS Public WorksEngineering The Pipeline Code Enforcement LETTER December 23, 1999 Utility Report Rich checked the City's seven sanitary lift stations daily. When the frost is going into the ground and when it comes out are the two most frequent times for watermain breaks. This year was no exception, we had a break on Decorah Lane. According to our con- tract with St. Paul Water Util- ity, they fix these breaks and repair the street damage. While the main on Decorah was shut down for repair, we operated the fire hydrant by the Friendly Hills ice rinks — and the supply line broke. St. Paul Water Utility thinks be- cause the feed was different to that hydrant as a result of the ongoing repairs, water ham- mer occurred when our crew shut the hydrant off. Water hammer breaks water lines. Because this line only feeds the hydrant and does not serve any residential custom- ers, St. Paul Water Utility has three other breaks that do serve residents and is com- pleting those repairs where residents are affected first. This prevents us from flooding the rink —the rink that we were closest to having open. Parks Report The Parks Crew picked up trash from the parks daily. They continue to work hard at trying to establish skating rinks by flooding the rinks daily. They hope to have them open by December 27th. They are also still completing repairs to the warming houses. They plowed cul-de-sacs, trails and parks parking lots on Monday. St. Paul Water conducted train- ing on Wednesday, after the Friendly Hills fire hydrant lead break, to show everyone who floods how to operate the hy- drants —they need to be opened and closed slowly to avoid wa- ter hammer. Street Report We finally received enough snow to plow and sand. Three employees came in Sunday to do some plowing of main routes and sand slippery spots. Eve- ryone came in at 2:00 A.M. on Monday to plow the entire City. They were done plowing before noon. There were a large number of mail boxes vandalized in the City this week, and we got blamed for hitting them. The vandals used bats (?) and on occasion their vehicle to break the boxes. The ones we know about occurred on Willow Lane, Valley Curve, Faro Lane and Li- lac Lane. We ordered and received sand and salt to replace the amount we used —Tom tries to keep the storage bin full in case we get a "big one" 35E Bridge Design Meeting Held Patrice Bataglia, resident and Dakota County Commissioner, was appointed along with Art Werthuaser, resident and for- mer St. Paul Bridge Engineer, by the City Council to serve as the City's representatives on MnDOT's 35E aesthetic design committee. Patrice reported to me this week that the first meeting of the committee had been held. She said that the main elements the committee were reviewing were: the color of the support beams (they are looking at different shades of blue), having a pedestrian overlook and having landmarks at the ends of the bridge. She was impressed with the input from the St. Paul representa- tive —who was probably made very knowledgeable because of his recent dealings with several other bridges in St. Paul. Their next meeting is January 12th. Patrice said that she intends to report back to the City Council on the committee's progress soon. H-applu H-oLWL2l s NEWS Public WorksEngineering The Pipeline Code Enforcement LETTER December 17, 1999 Parks Report The Parks Crew performed daily trash pickups in the parks. They had to clean up Kensington Park of Christmas tree lights — presumably stolen ones that kids had scattered all over the park. They began flooding ice skating rinks —they hauled out their flooding equipment to the warm- ing houses, and met with the new attendants to go over the rules and train them on hydrant and hose use for flooding. They replaced a round globe light fixture on a pathway that was broken by vandals at Men- dakota Park. They also replaced a regulatory sign in Ivy Hills Park that informs pet owners that dogs must be on a leash and that the dog's owner is responsi- ble for the clean up and removal of their dogs excrement from any public or private property. The 1999-2000 Ice Rink Atten- dant staff met on Thursday, De- cember 16th. Eight rink atten- dants were in attendance. Staff for this rink season consists of eleven attendants, many of which are either high school stu- dents or college students back on winter break. Ice rink hours are as follows: Monday —Friday 3:30 to 8:30 p.m., Saturdays 11:00 a.m. to 8:30 p.m., and Sundays noon to 6:00 p.m. Re- served ice time for hockey prac- tice has decreased this season as many of the teams will be practicing at the West St. Paul Ice Arena due to the merger be- tween Mendota Heights and West St. Paul hockey programs. The tentative opening date for the ice rinks is set for Monday, December 27th. Flooding of the three hockey and three causal skating rinks located in Friendly Hills, Wentworth and Marie Parks began on Thursday by the three -member crew. Each application of water requires two hours per rink and can only be done when freezing conditions exist. The Parks Crew receives assistance from some of the rink attendants and local residents who have children that skate in the Mendota Heights Athletic As- sociation programs. Utility Report Rich checked the City's seven sanitary lift stations daily. Rich fixed a "rattling" manhole cover on Marie Avenue. Sometimes manhole covers get damaged and "rattle" or make a noise every time a car drives over them —the noise can be so loud that it dis- turbs residents inside their nearby homes. Street Report The City closed on the 11 plus acre site at Resurrection Ceme- tery last week. We now own the site, so this week we located a spot on the site to deposit our street sweepings next spring. The Street Crew began construc- tion of a driveway access to the site this week. They installed a culvert to allow drainage to con- tinue in the ditch under the drive- way and used street sweepings from the Mulvihill site by Acacia Cemetery where the City has been storing them for the past few years to build up a driveway. The Crew also performed street sign maintenance such as straightening skewed or fallen signs, replacement of stolen or damaged signs and replacement of faded signs. Regulatory signs such as parking restrictions are on "Engineer Grade" materials. These signs last up to four or five years. For the past several years the City has been using "High In- tensity" grade materials for stop, yield, and speed limit signs be- cause of the increased reflectivity of the material which can last up to ten years. Code Enforcement Report This week permits were issued for two new single-family homes to be constructed by Bjorklund Con- struction at 1854 Orchard Hill and the other home to be constructed by Heaver Construction at 1441 Clement Street. Warnke House The environmental clean up of the Warnke house located next to the Fire Hall was completed fol- lowing air quality testing on Wednesday. The well was filled with grout/concrete as required by the Dakota County Environ- mental Department and final demolition is scheduled for Fri- day, December 17th. All building materials including concrete foot- ings and slabs will be removed and the disturbed areas leveled and top -dressed with black dirt. Next spring the City Park Crew will seed the area and transplant several trees along the west and north property lines adjacent to the new Mendakota Country Club maintenance facility. £ sedgy fiiVS V1111M NEWS Public WorksEngineering The Pipeline Code Enforcement LETTER December 10, 1999 Parks Report The Parks crews removed, cleaned, and stored the pur- ple martin houses for the winter. They replaced some damage to the corner boards at the Wentworth Park hockey rink. They installed plow controls for the three Park crew trucks that are used for plowing cul-de-sacs during the winter. They also attended the annual Minne- sota Turf and Grounds Foun- dation Conference that were held at the Minneapolis Con- vention Center this week. Utility Report Rich checked the City's seven sanitary sewer lift stations daily. Rich also assisted Braun Pump, a private pump station supplier and Contrac- tor, in repairing a malfunc- tioning controller box at the Centre Pointe lift station. Rich cleaned some built-up grease from the controller floats at the Veronica Lane lift station. He performed an inspection for a storm sewer connection to the City's sys- tem for the new home under construction at 990 Diego Lane. This connection was installed to comply with a Council building permit con- dition requiring that John Mathern construct a drain pipe to insure that surface runoff can be drained from the rear yard upon comple- tion of this new home. Street Report The Street crew installed stop and street signs on Glen Toro Road in the newly completed development in the northwest quadrant of the Huber Drive and Delaware Avenue inter- section. They removed the hoods covering the no parking signs along Victoria Curve. They cleaned storm sewer grates in various locations throughout the City. They checked on street lights that were not operating in the Centre Pointe Business Park. They picked up parts for the grader, and started to update the control panel for the hy- draulic controllers in truck 308. They inventoried and prepared a list of trees that will be trimmed, and signs that will be targeted for future maintenance or replacement. John Ambrose performed re- pairs on the Parks broom and snow blower equipment. City Entrance Sign Significant progress was made this week on the construction of the City entrance/ monument sign located in the southeast corner of the Men- dota Heights Road and Dodd Road intersection. Installa- tion of the cut stone wall was completed last week, and on Saturday the face stone was mortared into place around the sign base. The mortar was washed with acid, and an anti -graffiti sealer was applied early Wednesday. The cap stone and sign were then in- stalled later Wednesday after- noon. Landscape trees were installed on Thursday around the entrance/monument sign. Two up -flood lights remain to be installed to illuminate the front of the sign after the electrical connections are made. Shrubs, ground cover plantings and turf will not be installed until next spring. View of City Entrance/Monument Sign NEWS Public Work The Pipeline Engineering Code Enforcement LETTER December 3, 1999 Parks Report Code Enforcement Report The Parks Crew worked on cleaning up the yard of the house that the City recently ac- quired and demolished on Lex- ington Avenue. They installed gutters over the doors on the Friendly Hills warming house and they installed berms around the rinks to contain the water used for flooding and making the ice skating rinks. Utility Report Rich checked the City's seven sanitary lift stations daily. Rich replaced a hydrant marker that was broken. He exercised the backup generator at the Men- dota Heights Road main sanitary sewer lift station. Street Report The Street Crew filled low spots_ in the gravel alley between Fre- mont and Hiawatha Avenues. They removed a dead tree from the boulevard at 513 Hiawatha Avenue. They repaired a pot- hole in the Crown Point neighborhood. Dave met with a resident at Lower Colonial and Cherry Hill Road to try and find an accept- able location for a street name sign that had been relocated to improve sight distance. He also worked with the Mayflower Building contractor to determine the location for a City street light that needs to be relocated from their driveway location. The Crew continued to install snow plow guide posts in un- curbed areas at homeowners re- quests. Dick and Paul have been attend- ing seminars put on by the State of Minnesota presenting the re- quirements of a new Energy Code that will be implemented April 2000. Although the changes appear in the Energy Code most of them relate to "indoor air quality" and the ma- jority of them are ventilation air requirements. The changes will be difficult for the contractors to implement and the City to en- force. A majority of the changes affect residential construction and will add significantly to the cost of building a new home. For example, it will be mandated that all new homes have an air ex- changer and that alone could in- crease the cost of a new home over$2,000. There were two new single family house permits issued this week. With these latest two the total of new homes constructed this year is 13. The St. Thomas Academy permit review was completed this week and their full permit was is- sued for their middle school ex- pansion. A footing foundation permit had been issued earlier and that work is currently under- way. There were a number of in- spections at Lloyd's Barbeque this week for their expansion work (the expansion work has Pretty much put them out of business for awhile so they are anxious to finish the work as soon as possible). Year 2000 Street Project Public hearing notices were mailed to 216 affected property owners last week to alert them of next Tuesday's public hearing on the proposed Year 2000 Street Reconstruction and Rehabilitation Improvement Project. The no- tices prompted a very limited amount of telephone calls or written comment. It will be in- teresting to see if this limited re- sponse correlates in any way to the actual turnout at the upcom- ing public hearing. Watershed Joint Powers Agreements Dakota County's Board of Com- missioners and staff recently no- tified the Lower Mississippi River Watershed Management Organi- zation (LMRWMO) that they were aware that the LMRWMO joint powers agreement (JPA) was due to expire on January Ist 2000 (see attached letter). They went on to state that the County would be obligated under state statute to petition the Board of Soil and Water Resources to establish a watershed district if there is no JPA in place. A watershed dis- trict established by the County under these circumstances would also be granted taxing authority. The County is encouraging the member communities of the LMRWMO to approve an exten- sion to the existing JPA to pre- vent this from happening. The Engineering Department will pre- sent an amendment for Council approval to extend the existing JPA for the LMRWMO, and possi- bly the Gun Club Lake Watershed Management Organization, at Council's second meeting in De- cember. Office of the County 3card Dakota County Administrtion Center 1590 Highway 55 Hastings. MN 550333 651 a38.4418 Fax 651 438.4-405 www.co.dakom.mo.us i� C O U N T. November 24, 1999 Mr. William Hankee, Chair Lower Mississippi River'Natershed Management C ganization 1101 Sibley Memorial Highway #309 Lilydale, MN 55118 Dear Mr. Hankee: Dakota Counfijs Board of Commissioners and staff are aware that the Lower. Mississippi River Watershed Management Organization (L&iRWMO) joint powers agreement (JPA) will expire on January 1, 2000. As you are aware, by statute, Dakota and Ramsey Counties must petition the Minnesota Board of Water and Soil Resources I or the establishment of a watershed district, if there is no JPA in place. The question of future watershed management has became an important one in many parts of the Metropolitan Area. Dakota County addressed surfacewater management in its recantly approved 2020 Comprehensive Plan. The County's 2020 Comprehensive Plan states that'Watershed Management Organizations (WMOs) will be the responsible governmental units for surface water management' Dakota County supports local control of surface water management decisions and would prefer not to petition to establish. a watershed district The Vermillion River WMO (VRWMO) is facing a situation similar to the LMRWMO with its JPA, and developed an extension amendment for its members to sign that will extend its currant JPA until the new JPA is developed and approved. I anc!csed a copy of the proposed extension to the VRWId10 JPA as an example of an amendment that, if signed by the LMRWMO members, would eliminate the need for Dakota and Ramsey Counties to petition to establish a watershed district Please consider developing a similar extension amendment to the LMRWMO JPA that will cover the time during which the LMRWI4i0's sacond generation watershed management plan and new JPA are developed and approved. Please encourage the member communities of the LMRWMO to sign a JPA extension amendment as soon as possible. I would appreciate it if you would discuss this issue at your December 2, 1999, meeting. If you have any questions, please call Lisa Ring at (612) 891-7018. Sincerely, , Michael E. Turner, Chair Dakota County Scard of Commissioners Dakota County Board of Commissioner. - Brandt Richardson, Dakota County Administrator Lynn'vlertzka, Diractor, Dakota County Office of Planning Rafael Ortega, Chair, Ramsey County Board of Commissioner LMRW;NO Member Community Mayors Phi! 5elficri, Minnesota Board of Water and Soil Resources Enc! Approved by the Town Board 19 Approved by the Town Board 19 Approved by the Torun Board 19 Approved by the Town -Board 1Q MARSHAN TOWNSHIP BY: Attest: EUREKA TOWNSHIP BY: Attest: CASTLE POCK 1 OWNSHTr BY: Attest: ®OUG"LAS TOWNSHIP BY: Attest: Approved by the Town Board NININGER TOWNSHIP 19 BY: Attest: CTC . . . . 91197 01 2 RNX:10I15/99 1 HIRD AMENDMENT TO JOINT POWERS AGREEMENT ESTABLISHING A WATERSHED MANAGEMENT COMMISSION FOB T HE VERMILLION RIVER WATERSHED THE PARTIES TO THIS -AGREEMENT are members of the Vermillion River Water Management Commission. This amendment is made pursuant to the authority conferred upon the parties by Minn. Stat. Sections 471.59 and 473.875, et sea. 1. EXISTING AGREEMENT. The existing Joint Powers Agreement for the Vermillion River Water Management Commission, including the First and Second Amendments thereto, are incorporated herein and shall remain in full force and effect, except as specifically amended by this Agreement. 2. PARAGRAPH-1.11 SUBDIVISION 1 of the Joint Powers Agreement is amended to provide: Each member agrees to be bound by the terms of this Agreement until August 1, 2000, and it may be continued thereafter upon the agreement of all the parties. 3. EFFECTIVE ®ATE. This Agreement shall be in full force and effect when all twenty-one (21) existing members approve and sign this Agreement. All members need not sign the same copy. IN WITNESS WHEREOF, the undersigned governmental units, by action of their -governing bodies, have caused this Agreement to be executed in accordance with the authority of Minn. Stat. § 471.59. Approved by the Town Board EMPIRE TOWNSHIP ,19 W Attest: 81797.01 1 RYK:10115l99 NEWS Public Works Engineering The Pipeline Code Enforcement LETTER November 24, 1999 Parks Report The Parks Crew picked up trash from the Parks daily. They cut up and removed a large tree limb that had fallen on the Valley Park pedway. They repaired a light fixture that had been damaged by vandals in Mendakota Park. They serviced and stored all their small equipment that is only used in the summer (changed oil, etc. on the weed whips and hand mowers). Street Report The Street Crew installed snow plow guide posts in non - curbed neighborhoods where we are known to have prob- lems locating the roadway when plowing. They filled in a wash out at Mendota Heights Road and Lexington Avenue where a street light conduit was exposed. They reinstalled some street name sings that were stolen in the Kressin neighborhood. They rebuilt a wing cylinder on plow truck #308. Len worked on servic- ing plow truck #312 and then after he was done, they in- stalled the wing, plow and sander on it for winter plow- ing. Utility Report Rich checked the City's seven sanitary sewer lift stations daily. He continued to work on flushing the Furlong neighborhood sanitary sewer lines. He installed replacement hydrant markers at various lo- cations in the City. ArcView GIS Software Up- date The Engineering Department has purchased and installed the latest ArcView GIS software program update on the Engi- neering Department's GIS com- puter station. The previous version of the software did not have the capability to import geographic information survey data into a format that could be incorporated into a plan for de- sign purposes. This software limitation prevented the Engi- neering Department from fully utilizing the vast amount of geographic information survey data that was at the Engineer- ing Department's disposal. This software program update now has this capability, and will likely become an invaluable and efficient source of geographic survey data for design purposes in the Engineering Department. Warnke House (Next to Fire Hall Mendota Heights has ownership rights to the existing property next to the fire hall under a life lease agreement with Mr. Warnke. City Council has not determined the future disposi- tion of the existing house next to the fire hall, but has directed the Engineering Department to solicit bid estimates for the possible demolition and resto- ration of the site. The first step in this process will be to per- form an environmental investi- gation of the building materials used to construct this 720 square foot home that was built in 1930. On Saturday morning, Excel Environmental was given access to the house to collect material samples for testing. Preliminary results indicate that there is an abundance of asbes- tos building materials used in the construction of this house. Demolition contractors will be asked to bid on the removal of the house including a separate bid to cover any environmental cleanup costs. Bid results should be available for the De- cember 7th Council meeting. Year 2000 Proiect Notices Attached are copies of the no- tices that were sent out to the residents informing them of the December 7th public hearing. Happy Thanksgiving City of Mendota Heights November 24, 1999 Subject: Year 2000 Street Reconstruction Project Public Hearing Notification Job No. 200001, Improvement No. 2000, Project No. 1 Dear Resident: Earlier this summer City Council identified potential neighborhoods for a year 2000 street reconstruction or rehabilitation project in Mendota Heights. Council directed staff to poll property owners to determine the level of interest to be chosen as the City's street reconstruction or rehabilitation project for the year 2000 in neighborhoods throughout the City including the Delaware Crossing, Ivy Falls, Rogers Lake, and Somerset areas. A letter describing street improvement projects, and a self-addressed postage paid postcard was sent to property owners in these neighborhoods. Property owners were asked to sign and mail these postcards back to City Hail no later than August 31, 1999 indicating their support or opposition for a year 2000 street project. The information packet was mailed on August l lth, 1999 to 75 affected property owners in Delaware Crossing, 55 property owners in Ivy Falls, 78 property owners in Rogers Lake and 98 property owners in the Somerset area. Property owners returned a high percentage of the postcards mailed out for this poll. The poll responses returned in descending percentage order by area were Ivy Falls 78%, Delaware Crossing 76%, Rogers Lake 76%, and Somerset 74%. Support for the initiation of a Year 2000 Street Improvement Project by residents responding to the poll in descending percentage order by area were Ivy Falls 88%, Rogers Lake 71 %, Delaware Crossing 60%, and Somerset 44%. Council ordered the preparation of a feasibility report by resolution to consider a public improvement project for a Year 2000 Street Improvement Project for the Delaware Crossing, Ivy Falls and Rogers Lake area at the September 7, 1999 Council meeting based on this poll and other input received. The proposed improvement project would upgrade all streets to meet current City Standard street criteria. City Standard streets have a 3.5". thick bituminous pavement surface constructed over a 6" gravel base with concrete curb and gutter, and storm sewer where appropriate. All streets are currently approximately 30 feet wide, except for the north/south segment of Lake Drive, and the segment of Swan Drive between Wagon Wheel and Cheri Lane, which are 27 and 24 feet wide respectively. All reconstructed streets, except the segment of Swan Drive between Wagon Wheel and Cheri Lane, would consist of a 30-foot width of bituminous pavement plus the addition of MnDot B618 concrete curb and gutter to each side of the pavement. The total width of this City Standard street section measures 34.33 feet between the outside edges of the concrete curb and gutter. The Swan Drive segment between Wagon Wheel and Cheri Lane would be reconstructed 26.33 feet wide between the outside edges of the concrete curb and gutter. (over) 1101 Victoria Curve • Mendota Heights, MN • 55118 (651) 452-1850 • FAX 452-8940 Residents November 24, 1999 Year 2000 Street Reconstruction Project Page 2 Residential property owners whose parcels currently have driveway access abutting one of the proposed improved streets would be assessed up to fifty percent (50%) of the project cost on a per lot basis for the street reconstruction improvements under this project. The property owner's fifty percent (50%) share of the preliminary estimated project cost is approximately $3,700 per lot. These special assessments could be paid up front without interest, or added to the property owner's taxes at an estimated average cost of $28 per month over a 19-year period at 7 % simple interest. Residents will be offered the opportunity to replace their entire existing driveway under this improvement project. This additional driveway replacement cost could be paid by the resident out of pocket, or added to the base special assessment over a 10-year period at 7 % simple interest. Attached is a copy of the formal public hearing notice to consider a street reconstruction improvement project to serve the Rogers Lake area neighborhood. A feasibility report has been prepared which describes the project in greater detail, and is available for review at City Hall. City Council invites you to attend and comment on this proposed improvement project at a public hearing scheduled for December 7, 1999, at 8:00 P.M at City Hall. If you so desire, you may also express your opinions or comments relative to this improvement project to me, or Jim Danielson, by telephone (651-452-1850), or preferably in writing, prior to this December 7, 1999 public hearing. Sincerely, Marc S. Mogan, P.E. Civil Engineer NvISM Enclosure City of Mendota Heights November 24, 1999 Subject: Year 2000 Street Rehabilitation Project Public Hearing Notification Job No. 200002, Improvement No. 2000, Project No. 1 Dear Resident: Earlier this summer City Council identified potential neighborhoods for a year 2000 street reconstruction or rehabilitation project in Mendota Heights. Council directed staff to poll property owners to determine the level of interest to be chosen as the City's street reconstruction or rehabilitation project for the year 2000 in neighborhoods throughout the City including the Delaware Crossing, Ivy Falls, Rogers Lake, and Somerset areas. A letter describing street improvement projects, and a self-addressed postage paid . postcard was sent to property owners in these neighborhoods. Property owners were asked to sign and mail these postcards back to City Hall no later than August 31, 1999 indicating their support or opposition for a year 2000 street project. The information packet was mailed on August 11th, 1999 to 75 affected property owners in Delaware Crossing, 55 property owners in Ivy Falls, 78 property owners in Rogers Lake and 98 property owners in the Somerset area. Property owners returned a high percentage of the postcards mailed out for this poll. The poll responses returned in descending percentage order by area were Ivy Falls 78%, Delaware Crossing 76%, Rogers Lake 76%, and Somerset 74%. Support for the initiation of a Year 2000 Street Improvement Project by residents responding to the poll in descending percentage order by area were Ivy Falls 88%, Rogers Lake 71 %, Delaware Crossing 60%, and Somerset 44%. Council ordered the preparation of a feasibility report by resolution to consider a public improvement project for a Year 2000 Street Improvement Project for the Delaware Crossing, Ivy Falls and Rogers Lake area at the September 7, 1999 Council meeting based on this poll and other input received. Streets rehabilitated under this project would be resurfaced with a simple mill and bituminous overlay paving method where this design is appropriate and economically beneficial. The City will determine which sections of concrete curb and gutter will be replaced to repair damage or to insure proper drainage. Concrete gutter sections adjoining driveways were typically installed at the property owner's expense in conjunction with driveway construction after curb and gutter was placed on the abutting street. City policy has always been that all expenses related to private driveways are the responsibility of the property owner. For this reason I propose that the property owner make the decision regarding replacement of this concrete gutter section through driveways, and that the additional cost of this work be split between the property owner and City based on this items contract unit price cost (residents' est. share = $10/ft.) so that this work is not funded by other residents within the project area. (over) 1101 Victoria Curve • Nlendota Heights, NIN • 55118 (651) 452-1850 • FAX 452-8940 Residents November 24, 1999 Year 2000 Street Rehabilitation Project Page 2 Property owners whose parcels currently have driveway access abutting one of the proposed improved streets would be assessed up to fifty percent (50%) of the project cost on a per lot basis for the street rehabilitation improvements under this project. The property owner's fifty percent (50%) share of the preliminary estimated project cost is approximately $1,300 per lot. These special assessments could be paid up front without interest, or added to the property owner's taxes at an estimated average cost of $16 per month over a 10-year period at 7 % simple interest. Residents will be offered the opportunity to replace their entire existing driveway under this improvement project. This additional driveway replacement cost could be paid by the resident out of pocket, or added to the base special assessment over a 10-year term of the assessment at 7% simple interest. Attached is a copy of the formal public hearing notice to consider a street rehabilitation improvement project to serve the above referenced neighborhoods. A feasibility report has been prepared which describes the project in greater detail, and is available for review at City Hall. City Council invites you to attend and comment on this proposed improvement project at a public hearing scheduled for December 7, 1999, at 8:00 P.M at City Hail. If you so desire, you may also express your opinions or comments relative to this improvement project to me, or Jim Danielson, preferably in writing, or by telephone (651-452-1850), prior to this December 7, 1999 public hearing. Sincerely, Marc S. Mogan, P.E. Civil Engineer MSM Enclosure NEWS Public WorksEngineering The Pipeline Code Enforcement LETTER November 19, 1999 Parks Report The Parks Crew picked up trash from the Parks daily. They cut up and removed a downed tree that was on the pedway between Friendly Hills and the shopping cen- ter. They replaced a light that was broken by vandals in Mendakota Park. Utility Re ort Rich checked the City's seven sanitary lift stations daily. He inspected Lily - dale's storm sewer system as Council agreed to do for them. He checks their sys- tem twice a year, in the spring and in the fall and we bill Lilydale for his time. He installed a replacement hy- drant marker in Valley Curve. Rich flushed the sanitary sewer mains in the Furlong neighborhood (there had been a new house addi- tion that caused some sand to be in the line). Street Report The Street Crew installed the plow, wing and sander and removed the radio from Truck #303. They then de- livered it to Lakeland Ford because it was to be traded in for the new year 2000 plow truck that has now come in. The new truck is at "Falls Equipment" having its new plow, wing and sander installed. Mendota Meadows Last Friday Marc Mogan was subpoenaed by the attorney representing Cynthia Schanno to testify at the ar- bitration hearing in the case of Cynthia Schanno versus Mendota Meadows. The at- torney's line of questioning towards Marc was focused primarily about his observa- tions on the subject of the stability of the slope on the Schanno property on the east end of the development. The arbitrator was hoping that testimony from the individu- als remaining on the witness list would be concluded by this Monday. CAC Meeting of the Lower Mississippi WMO The watershed's Citizen Advi- sory Committee (CAC) meet- ing that had been scheduled for November 22nd, 1999 has tentatively been rescheduled to meet on January 24th 2000. Boulevard Tree Program Planting of the 30 boulevard trees requested by residents began on Wednesday and will be completed late this week or early next week, weather permitting. House Demolition Demolition of the house lo- cated at 2401 Lexington Ave- nue, just east of the water tower is scheduled to begin on Friday, November 19th or next Monday. Work was de- layed until the environmental clean-up required by the MPCA was completed on Thursday. Excel Environ- mental, hired by the City, collected samples of building materials that were sus- pected of containing asbestos at the site and submitted them for analysis. Samplers were collected of the follow- ing materials: wall plaster, furnace insulation, tar paper, electrical wire wrap, shingles, window caulking, 9x9 floor tile, sink undercoating, chim- ney brick, etc. Asbestos was detected in the window glaz- ing, heat shield behind an electrical wall heater and in the sink undercoating. The demolition and site restora- tion should be completed next week with only the clo- sure of the well, permit pending from the County, re- maining. The City Park Crew will seed and the disturbed areas and maintain the site until future use is determined for this one acre site. NEWS Public WorksEngineering The Pipeline Code Enforcement LETTER November 12, 1999 Parks Report The Parks Crew picked up trash from the Parks daily. They made repairs to the soccer nets and goals. They removed the rest of the soccer nets from Kensington. They hauled dirt and filled some settlement areas around the various parks and the Public Works Ga- rage. They installed dirt around the hockey rinks so that water will not leak out when they are flooded. Utility Report Rich checked the City's seven sanitary lift sta- tions daily. Rich per- formed sanitary sewer in- spections for new resi- dential connections at 2376 LeMay Lake Road and on Knollwood Court. He also installed a hy- drant marker on a hy- drant on Valley Curve. Street Report John Ambrose welded new side plates on the tail gate of the dump trucks to keep material from falling out of the sides when being dumped. Dave, Tim and John gave tours of the shop to three classes of preschoolers from Somerset Elemen- tary Monday, Tuesday and Wednesday of this week. Kids and their parents toured one class a day for three days. Tom told me that when one child was allowed to honk the horn on one of the large trucks he scared half the class to tears — live and learn. Dave replaced the light bulbs at the Mendota Heights Road and TH 55 traffic signal this week (replacing lights is our re- sponsibility at this signal). They performed sign maintenance at various lo- cations (replaced faded signs and straightened posts). They removed a brush pile left by MnDOT at Ivy Falls Avenue and Dodd Road. Code Enforcement Re- port A building permit was is- sued this week to Dewy Thorbeck to construct the first home in the Glen Toro Addition at Delaware Avenue and Huber Drive. The footings were dug and formed. A permit was is- sued to United Properties to finish off 8,580 square feet of office in their new three story building lo- cated at 1270 Northland Drive fronting on I 494. The name of the company to occupy the space is Page Net. A smaller com- pany called New Century Mortgage also received a permit to finish 1,260 square feet of office space in the same building. Eco Lab submitted a re- quest for a permit for a building modification to install a new elevator. Because the work also in- volves exterior work, the request was put on the November 16th City Coun- cil agenda for review and authorization to issue the permit. Kinko's who are currently located at 1395 Northland Drive (Mendota Heights Business Center) received a permit to ex- pand their business. NEWS Public WorksEngineering The Pipeline Code Enforcement LETTER October 22, 1999 Parks Report The Parks Crew completed general maintenance in the parks this week including daily trash pick up, grass cutting, mulching leaves and striping soccer fields. They striped the soccer fields for the last time this week. They cleaned the restrooms for the final time (they will be removing water meters, winterizing, and lock- ing up the restrooms for the season). They aerated some of the soccer fields and re- moved the soccer goals from the neighborhood parks. They started putting down the fall application of fertilizer. Utility Report Rich checked the City's seven sanitary lift stations daily. John Ambrose repaired the lock latch at the St. Thomas Academy lift station by welding it back together. Rich re- placed several hydrant mark- ers throughout the City. They get broken by kids (it's been a real problem by the Friendly Hills Middle School). Street Report John Ambrose finished fabri- cating and installing a safety device for the catch basin at Vail Drive and Lexington Ave- nue to calm the fears of the day care supervisor at Royal Redeemer Lutheran Church. They worked on straightening signs on Mendakota Drive and also fabricated and installed new street name signs at Aca- cia Boulevard, Valencour Circle, Glen Toro Drive and Huber Drive. They continued to pre- pare the trucks for plowing snow, #308 is totally ready to go, the others are almost ready but are being used to haul brush so they still need to have the plows, wings and sanders mounted. They also hauled brush to the Halloween Bonfire site and pushed it together in a pile. Dave worked with Total Electric, a private contractor, to replace burned out street lights in the Industrial Park and at City Hail. City Sian Construction On Wednesday, Total Construc- tion began work on the Monu- ment/City Entrance sign. Fol- lowing site preparation, the concrete footing for the sign base will be poured on Thurs- day. Work on the sign is scheduled to be completed in late November. Lexington Avenue House Demolition Demolition contractors have been contacted requesting bid proposals for the demolition and site restoration of the house located on Lexington Avenue east of the City Water Tower which was acquired by using TIF funds. The City takes possession of the house on No- vember 10th which then allows only three to four weeks for all necessary work items to be completed. The house will be demolished, concrete footings, slabs, walls as well as two sep- tic tanks will be removed. The well will be closed, many of the undesirable trees and shrubs will be removed, and the base- ment will be filled and top dressed with black dirt. The driveway will also be removed and the ditch line re- established along Lexington Avenue. In the spring, City Parks Crew will seed the site and begin routing mowing and maintenance. Code Enforcement Report The new Mayflower building had its footings poured this week —which is the first inspec- tion. The footing and founda- tion permit was issued for the Middle School Addition to St. Thomas Academy. Heaver Construction was issued a sin- gle family home permit for his new development on the end of Knollwood Lane, he still has five empty lots available. Code En- forcement received the building plans from Ryan Construction this week to build Centre Pointe IV. This is a 27,170 square foot building shell for an office structure on Centre Pointe Drive. NEWS Public WorksEngineering The Pipeline Code Enforcement LETTER October 15, 1999 Parks Report The Parks Crew completed general maintenance in the parks this week including daily trash pick up, grass cut- ting, and striping soccer fields. The Parks Crew per- formed the final round of grass cutting adjacent to the trails this week. They re- moved tree suckers that were growing up around the tennis courts fence lines. They trimmed and removed brush from along the Curley's neighborhood pedestrian trail. They removed a tree hazard from Kensington Park that was reported by a resi- dent (behind the US West building). Utility Report Rich was on a hunting vaca- tion this week, so Tom Olund performed his lift station du- ties. Tom had to call in a pri- vate contractor to replace the "alternator" at the Veronica Lane lift station. Each lift station has two pumps which alternate pumping and they were not alternating. Street Report The Street Crew fabricated a storm grate attachment for a storm inlet across from City Hall. (The new Royal Re- deemer day care supervisor was concerned that the openings were too large). They continued to prepare the trucks to plow snow. They worked on straightening and replacing signs. GlenToro Second Edition Municipal Contracting Ser- vices, Inc. is putting the fin- ishing touches on Glen Toro Road this week. All utilities have been installed and top- soil is being spread along the boulevards and disturbed ar- eas. The final lift of bitumi- nous will be added next spring so we can monitor any settle- ment that may occur during the next 6 months. ISTS Following Council direction, letters were sent out last week to notify possible own- ers of septic systems in the City that we are starting a maintenance program. Also sent was a copy of the pro- posed ordinance for the regu- lation of these systems. Re- sponse has been limited to several property owners who wished to have their names removed from the list or those asking direction for mainte- nance. In a couple cases we have found additional systems unbeknownst to the City. Y2k Proiects Engineering has been gather- ing information for proposed projects for the year 2000. Surveying has been taking place in the Rogers Lake area and along Lake Drive. Marc has been assimilating the in- formation for the feasibility report that will be presented soon. Code Enforcement Report St. Thomas Academy plans to construct a new middle school addition and plans for the ad- dition have been reviewed and approved for a footing and foundation permit. STA is currently working on licensing requirements for their sub- contractors. Paul noticed that Resurrection Cemetery was doing some ex- cavating and called to see what was going on. He was informed that they were pre- paring a base to install a statue. Statues are an al- lowed use within the Residen- tial District as decorative landscape features. Resurrec- tion has also submitted plans to construct a second mauso- leum. This construction will need to have a CUP issued prior to the construction. St Paul Water Report We received copies of St. Paul Water Utility's 1999 Water Quality Report this week. I thought it was an interesting, informative report and or- dered copies to include with the Pipeline. NEWS Public Works Engineering Code Enforcement LETTER Parks Report The Parks Crew completed gen- eral maintenance in the parks this week including daily trash pick up, grass cutting, and strip- ing soccer fields. The Parks Crew finished blowing out the lawn sprinkler systems and re- paired broken sprinkler heads. They repaired a toilet a Kensing- ton that was broken by vandals. They repaired and replaced bro- ken and damaged signs in Rogers Lake Park. Utility Repot Rich checked the City's seven sanitary lift stations daily. Rich performed preventative mainte- nance at the Mendota Heights Road and Lilydale lift stations by greasing the pumps and valves. He exercised the standby gen- erator at the Mendota Heights Road station. He replaced bro- ken hydrant markers on Winston Court, Concord Way and High- way 13 and Mendota Heights Road. Park Maintenance Several maintenance projects within the parks have been com- pleted or are ongoing by private contractors. Picnic shelters in Rogers Lake and Valley Park were re -roofed on Wednesday. When constructed in the early 70s the roofs were constructed of cedar shakes. Replacing them would have cost approxi- mately $14,000. The "Timberline" type asphalt shin- gles resemble cedar shakes, have a 40-year warranty, and are approximately one-third of the cost of cedar shakes. October 8, 1999 Prairie Restorations, Inc. is re- moving unwanted volunteer trees and weeds from the Ivy Park na- tive planting areas around the holding pond. They may also do a controlled burn this fall of the wildflower prairie grasses to bet- ter control invasive weed growth. R. L. Reynolds Landscape will be performing maintenance work on the landscape berms in North Kensington Park. Trees will be straightened, weeds removed, and shrubs replaced as neces- sary. With adequate weed con- trol, shrub growth will eventually spread to cover the entire berm, and thereby eliminate much of the future weed growth. Street Report The Street Crew patched pot- holes on Kay Avenue and Walsh Lane. They installed new signs in the Cherry Hills neighborhood. (We replace the signs in neighborhoods when their streets are redone.) They cleaned up some slurry seal complaints on Hampshire. They began outfit- ting some of the plow trucks for this winters snow plowing duties. (Oh no, it can't be that time al- ready, can it?) Augusta Shores Development Representatives of Hoffman Homes, Minnesota Department of Transportation, and City staff met on Wednesday to resolve site access issues associated with the proposed Augusta Shores de- velopment. After much discus- sion it was decided that the ac- cess road serving the develop- ment would be moved southerly to a location immediately north of Larsen's Greenhouse that would line up with the intersec- tion of Acacia Boulevard and Trunk Highway 13. 1999 Improvement Projects Assessment notices for the Cherry Hill Addition and Glen Toro Second Addition improve- ment projects were mailed out this week informing residents about the final dollar amounts and payment terms for the spe- cial assessments levied against their properties for the refer- enced projects. ISTS Program Notices were mailed out this week to residents of Mendota Heights that current data indi- cates have individual sewage treatment systems (ISTS). The notice informs residents that the City will soon be adopting a pro- posed ISTS ordinance as man- dated by State Statute, and re- quests that residents comment or ask any questions they might have about the ordinance as pro- posed. Year 2000 Street Proiect The Engineering Department continued gathering preliminary survey data in the Rogers Lake area that will be used in the preparation of the feasibility re- port for the year 2000 Street Project. Personnel News Nancy Bauer was on vacation this week enjoying some rest and re- laxation and the fall colors in Door County Wisconsin with her husband. Nancy will be back to work on Monday. MEWS Public Works =1� h e loft mi wpft e I m n Engineering Code Enforcement LETTER October 1, 1999 Parks Report The Parks Crew completed gen- eral maintenance in the parks this week including daily trash pick up, grass cutting and strip- ing soccer fields. The Parks Crew is now beginning to pre- pare for winter. They are work- ing on completing repairs to the warming houses at Friendly Hills and Wentworth Park. They are shutting down and blowing out the lawn sprinkler systems at Kensington Park, Mendakota Park, City Hall, Fire Department and Public Works Garage. They purchased paint and began re- painting the hockey rink boards. They attended a Toro seminar which highlighted Toro's new equipment. Utility Report Rich checked the City's seven sanitary lift stations daily. He also exercised the back up power generator at the Mendota Heights Road lift station and performed an inspection for a new residential sanitary sewer connection at 990 Diego Lane. Street Report The Street Crew had to repair the catch basin located at the corner of Medallion Drive and Lexington Avenue. Often times our catch basins have been a maintenance problem —often times failing on either the street side or lawn side and causing the street to settle near them. They graded the gravel alley lo- cated off from Fremont Avenue (the only constructed alley the City has). They painted pedes- trian crosswalk bars on Menda- kota Drive at Dodd Road and on Dakota Drive at Lexington Ave- nue. They patched potholes in the Ivy Falls and Sylvandale Road neighborhoods. They at- tended the Minnesota Fall Expo, which is a winter roadway main- tenance conference put on by MnDOT each fall for City, County and State workers. Dodd Road Update MnDOT's contractor who over- layed Dodd Road this summer has returned to do the corrective repairs to remove the 'bird baths". We are not convinced that what they did will work —we will see after the next rain storm if more work needs to be done. Code Enforcement Report Mayflower Distributing Company has now submitted their plans to construct a 71,423 square foot office warehouse (9,029 office, 62,394 warehouse) at 1155 Me- dallion Drive. The estimated building construction cost is $2.1 million. Council reviewed and approved plans at their August 17, 1999 meeting for this build- ing and authorized the Code En- forcement to issue a building permit. Mayflower's owner is Martin Abelvitz, who is also a resident of Mendota Heights. His business is warehousing and dis- tributing party favors. This building needs to get off to a fast start because their projected move -in date is for March 2000. Mendota Meadows Update City staff toured Mendota Mead- ows with representatives of Men- dota Homes and residents on Monday to perform an interim in- spection on the landscaping punch list items remaining to be completed in the development. Many items that appeared on this landscaping punch list have now been finished satisfactorily, and the number of items left to com- plete is relatively small. Glen Toro Second Addition Project The utility companies began in- stallation of the natural gas, tele- phone, electric, and cable televi- sion lines on the Glen Toro Sec- ond Addition on Tuesday. Personnel News Guy Kullander returned to work for a portion of the day on Tues- day. Guy was diagnosed and is being treated for an intestinal in- fection with antibiotics. Guy is improving but has been able to work for any extended period during the week. In other news, congratulations to Jim Danielson who became a grandfather for the second time on Monday, when daughter Theresa gave birth to his second grandson Sam. This is Theresa's and her husband's first child. Sam was 19 inches long and weighed in at six pounds 12 ounces. Theresa and Sam are both doing fine. NEWS Public WorksEngineering The Pipeline Code Enforcement LETTER September 23, 1999 Parks Report The Parks Crew completed general maintenance in the parks this week including daily trash pick up, grass cut- ting, and striping soccer fields. They repaired a dam- aged lawn sprinkler line at the Fire Department. They also picked up and removed brush from the Fire Department. They repaired the sprinkler system at City Hall. They re- placed a broken infant swing at Mendakota Park. They ser- viced their mowers (cleaned and sharpened their blades). They removed the sandstone blocks from Kensington Park. They cut the grass in the right-of-way at the north end of Pontiac Place. (The adjoin- ing neighbors have quit cut- ting their grass). Utilities Rich checked the City's seven sanitary sewer lift stations daily. He installed a marker on the hydrant at 867 Blue - bill. These markers are on all of our hydrants throughout the City and they are there so that the Fire Department can readily locate them in the winter when they may be covered with snow. He hired a private contractor to clean the grease from the wet wells (where the sewage builds up before it is pumped out) at the Mendota Heights Road and St. Thomas lift station. He reinstalled a backup pump from the Veronica lift station. It had been removed for main- tenance (rebuilt the motor and replaced the seals and bear- ings). Street Report They made up and installed new street name signs within the Somerset neighborhood. They trimmed trees at the Kay and Walsh intersection at the request of a school bus driver. They removed the dead elm trees at 1160 Dodd Road and a dead elm tree within Miriam Street right-of-way. They met with MTC about replacing their bus stop signs in the City —We will replace their signs and they will pay us for the work. They repaired a catch basin lo- cated at Medallion Drive and Lexington Avenue. They hauled clay to repair a storm water wash out area on Marie Avenue by Valley Park. MSA Traffic Counts Attached is a table showing MSA traffic counts that have been updated for 1999. The only unusual change was that Marie Avenue near Henry Sibley's count was back to normal. There must have been a large school event go- ing on in 1997 when the count was taken. Mendota Meadows Update Landscaping work continued this week on the Mendota Meadows townhome develop- ment. Trees have been re- placed and some areas have been re -sodded. Mendota Homes has requested and scheduled another walk- through inspection for next Monday with City staff. Glen Toro Second Addition Proiect The utility companies have in- formed us that they plan to start the installation of the natural gas, telephone, elec- tric, and cable television lines on the Glen Toro Second Addi- tion development next week. Ivy Keep North Penn Contracting, Inc. in- stalled a catch basin and a short segment of smaller di- ameter storm sewer in a rear yard between Butler Avenue and London Road to promote better rear yard drainage in this area. Personnel News Guy Kullander has been off sick this week. He went home early last Friday with abdomi- nal pains and a fever. By 5 pm last Friday he was admit- ted to the hospital. He was in the hospital until Tuesday. Doctors have been conducting additional tests throughout the week after his release from the hospital and so far have been unable to determine the cause of his condition. MENDOTA HEIGHTS TRAFFIC COUNTS ON MSA ROUTES Road Location Chippewa Avenue North of TH 149 South of TH 149 Decorah Lane East of TH 149 (Dodd Road) West of Huber Drive Emerson Avenue East of TH 149 (Dodd Road) Huber Drive West of Delaware Ave. North of Mendota Heights Road North of Decorah Lake Drive West of TH 149 (Dodd Road) Lexington Avenue North of Wagon Wheel Trail South of TH 110 North of TH 110 South of Marie Avenue North of Mendota Heights Road Marie Avenue West of County Road 63 (Delaware Ave.) East of TH 149 (Dodd Road) West of TH 149 (Dodd Road) East of Victoria Road West of Victoria Road East of Lexington Avenue Mendota Heights Road West of Delaware Avenue East of TH 149 (Dodd Road) West of TH 149 (Dodd Road) East of Lexington Avenue East of TH 55 West of TH 55 East of Pilot Knob Road East of TH 13 Northland Drive West of TH 55 East of Pilot Knob Road (Cty Rd 31) South Plaza Drive East of TH 149 (Dodd Road) Victoria Road North of Marie Avenue Cty Rd 45 South of TH 13 Wagon Wheel Trail West of TH 149 (Dodd Road) East of Lexington Avenue 1999 ADT 1997 ADT 1995 ADT 1993 ADT 1991 ADT 331 566 463 523 473 828 776 768 779 461 2126 2210 Not on system Not on system Not on system 2428 1359 Not on system Not on system Not on system 833 778 Not on system Not on system Not on system 1612 1474 1691 1393 1363 1215 1141 1233 729 764 No Counts No Counts 1083 1382 1433 639 618 Not on system Not on system Not on system 3393 3323 3273 3584 2444 7019 5650 5562 4883 4126 4912 4848 6414 3938 4360 2985 3141 3036 2437 2558 2334 No Counts 3101 2805 1659 2838 4455 2907 2802 3310 2693 4653 3035 2576 2834 3302 3959 3433 2966 4137 3519 3952 3409 3066 3689 1716 1964 1758 1778 2139 1104 1201 827 821 937 1952 1418 1501 1466 713 3678 3739 3304 3105 1694 3951 2605 2940 2223 1835 3507 3549 2541 1983 2599 7519 6827 3282 3345 2565 3510 4246 2788 2107 2384 4241 3885 3661 2862 2609 3270 2804 2504 3441 3412 1241 1177 Not on system Not on system Not on system 3777 1620 Not on system Not on system Not on system 904 1855 1925 1364 Not on system 3099 3412 3762 3343 2763 3453 4005 4442 4122 5035 802 937 993 1022 352 749 693 482 728 538 9-23-99 NEWS IN Public WorksEngineering The Pipeline Code Enforcement LETTER September 17, 1999 Parks Report The Parks Crew completed general maintenance in the parks this week including daily trash pick up, grass cutting and striping soccer fields. The Parks Crew also cleaned and hauled brush from off the ped- ways in South Valley Park. They repaired some of the soc- cer nets that have been dam- aged from use. They hauled extra picnic tables to Friendly Hills Park for a large party. Street Report The Street Crew hooded the "no parking" signs on Victoria Curve to allow for extra park- ing for Rosh Hashanah. They dropped of street barricades for a Sommerset neighborhood block party held last weekend. They are fabricating and in- stalling all new street name and regulatory signs within the Cherry Hills neighborhood. They received their new Ford plow truck this week and deliv- ered it to ]-Craft to have the dump body and hydraulics in- stalled. They worked on re- pairs to the overhead doors on the salt storage room. That salt is "EXTREMELY" corrosive, and any metal quickly rusts to dust that's in or near the room. They performed pot hole patching in the Hunter and Orchard area. They also completed several patches on the trails. Utility Report Rich checked the City's seven sanitary lift stations daily. This week Rich pulled, checked and maintained all the pumps from the sanitary sewer lift stations (see findings). Lift Station; Results; Centre Pointe Needs new electrical controller (lightning damage — turned into insurance) Culligan O.K. Veronica Lower seals leaking in one pump —sent in for repair Northland O.K. (By Brown Institute) St. Thomas O.K. Mendota Heights O.K. Road Marie Park Storm Sewer O.K. Lilydale O.K. (New pumps in- stalled last year) Mendota Meadows Update At the request of Mendota Homes, Marc and I performed an early inspection of John Mathern's progress with his landscaping corrections. For the first time there is GOOD NEWS to report. Mr. Mathern has hired a very competent contractor this time who is do- ing a very good job and pro- gress is being made. Even more work would have been completed had certain areas been dry enough to work on. We were able to check off many items from the list as being done and many others were well underway to being done — correctly. Glen Toro Second Addition Proiect Municipal Construction Services (MCS) placed the first layer of bituminous pavement on the streets in the development and the finished bituminous patches on Huber Drive late last Friday. Placement of the bituminous base course last week con- cludes work activities on the Glen Toro Second Addition Pro- ject for this construction season under the City's contract with MCS. The installation of natural gas, telephone, electric, and cable television in the develop- ment should be commencing soon. The developer has the responsibility of contracting di- rectly with the utility companies for this work. Work activities under the City's contract with MSC will resume again next construction season with the placement of the second layer of bituminous pavement on the new Glen Toro Road. Street Striping On Tuesday, the paint striping crew from Century Fence out of Forest Lake spent the day strip- ing the following streets: South Plaza Drive, Mendakota Drive, Dakota Drive, Glen Hill Road, Victoria Curve, Mendota Heights Road, Decorah Lane, and Huber Drive. These street constitute approximately 37% of the total street striping re- quired. Next year similar mile- age of streets will be restriped. The epoxy paint used is re- ported to have a "wear life" of from two to three years. NEWS � Public Works ThePi*peline Engineering Code Enforcement LETTER September 10, 1999 Parks Report The Parks Crew completed general maintenance in the parks this week including daily trash pick up, grass cutting, and striping soccer fields. They also began getting ready for winter (too soon I hope) by servicing all the mowers and ordering and receiving their fall application of fertilizer. The porta potty vandals struck again on Saturday when they burned the porta potty located in Victoria Highlands Parks. Now that we have the con- crete pads in place so that the porta potties can not be easily tipped over, all that left is burn- ing them - I guess we will have to install fire sprinklers next. Utility Report Rich checked the City's seven sanitary sewer lift stations daily. Rich also jetted sanitary sewer lines on Mendota Heights Road from Lloyd's Barbecue to the lift station and from Patterson's Dental to the lift station. He also cleaned North and South Freeway Roads where he found lots of roots in the lines. Street Report The Street Crew continued patching streets in the north end of the City this week. They installed posts around the radius of the center island at Douglas Road and Lilac Lane, where it remains un- curbed, the cars have been cutting across the grass. They cleaned some catch basins in Bunker Hills and they dropped off barricades for a neighbor- hood block party on Apache. Glen Toro Second Addition Project Work activities continue on the Glen Toro Second Addi- tion project by Municipal Con- struction Services (MSC). MSC brought in, placed, and compacted the balance of the Class 5 aggregate base this week. They also placed and adjusted the elevation of cast- ings on the sanitary sewer manholes to prepare for the placement of the first layer of bituminous pavement on the new Glen Toro Road. The pavement cuts in Huber Drive associated with sewer and water extensions to serve the development were also prepped for finished bitumi- nous patches. MSC was planning on placing the first layer of bituminous pavement on the streets in the develop- ment and the finished bitumi- nous patches on Huber Drive on Friday. Slurry Seal Project Update Struck and Irwin, Inc. began slurry seal application opera- tions on Wednesday and were finished by Thursday. All the concerns and angst that the residents expressed to staff leading up to the start of the work somehow never seems to materialize once the work begins. Mendota Meadows Update Either the stars in the sky are coming into alignment or Men- dota Homes is serious about rectifying the concerns in the Mendota Meadows townhome development because there seemed to be a significant amount of construction activity starting on Wednesday. Engi- neering Department staff met with the Contractor that Men- dota Homes hired to complete the punch list items to review and verify some drainage grade issues in the develop- ment and give some direction as to what is to be done. The Contractor seems to have the experience and qualifications necessary to meet the expec- tations that residents have for the remaining landscaping and drainage work that needs to be completed in this devel- opment. NEWS Public Works 1 e lne Engineering The Code Enforcement LETTER September 3, 1999 Parks Report The Parks Crew completed gen- eral maintenance in the parks this week including daily trash pick up, grass cutting, and striping soccer fields. The Parks crew worked on finishing up the conversion of the Civic Center softball field to a baseball field. They installed irri- gation lines and set sprinkler heads. They also hauled in and spread more rec rock and top - dressed the outfield. The field is now completed. We have to keep a watchful eye and hope that the public stays off the field until the grass has had a chance to root. The crew also had to clean up the Valley Park Pavilion area from some vandalism that occurred this week. Utility Report Rich is on a fishing vacation in Canada this week so JP, his sum- mer helper, has been checking the lift stations daily. When JP was done checking the lift stations he helped mow grass in the Parks be- cause all of their summer helpers have already left to go back to school. Street Report The Street Crew cleaned dirt and weeds from around a catch basin at Lexington Avenue and Vail next to the pedway and added a bitumi- nous flume around it. They contin- ued to repaint cross walks. They hauled roadside debris to hazardous waste disposal sites in Eagan - tires to BFI, debris to SKB and appliances to JR's. They per- formed blacktop patching on Diego Lane, Simard Street, Miriam Street, John Street, Junction Lane, Kirchner Avenue and Butler Av- enue. They installed new stop signs with orange accessory plates above them at Mears and Dorset to try and improve compliance with those stop signs. Delaware Avenue Valley Paving, Dakota County's contractor, who is to construct the right turn lane and separated trail to south bound Delaware Avenue at TH110 began work this week - just in time for school. They were delayed for one and one half months because Cable TV did not move their line from an overhead pole. Glen Toro Second Addition Project - Work activities continue on the Glen Toro Second Addition project by Municipal Construction Ser- vices (MSC). MSC completed the grading, preparation, and toleranc- ing of the street subgrade last Monday. MSC completed the placement and compaction of a portion of the aggregate base Wednesday, which was followed by the placement of concrete curb and gutter on the streets in the de- velopment. Year 2000 Street Proiect Poll Residents that were polled in neighborhoods under considera- tion for next year's street improve- ment project have now returned more than 70% of the postcards that were mailed out. The neigh- borhood's rank in descending or- der of support is as follows: Ivy Falls, Rogers Lake, Delaware Crossing, and Somerset (see at- tached). Slurry Seal Proiect Update Struck and Irwin, Inc. began deliv- ering material at the end of week in preparation of the start of the application of slurry seal to Men- dota Height's streets. Struck and Irwin, Inc. informed us that they expect to start work on Tuesday. Personnel News Curt Wimpee' returned from his two week Florida vacation on Thursday. He had a great time surfing, snorkeling, and visiting theme parks, friends, and rela- tives. Also on Thursday Ross Bintner finished his last day of work for a second summer as Temporary Engineering Aide in Mendota Heights. Ross did an- other outstanding job in the posi- tion. He was instrumental in up- dating and developing a great deal of data and information for the City's MSDS and AWAIR pro- grams that are required by OSHA. He begins his sophomore year in Civil Engineering at Michigan Tech. next Tuesday. Attachments: • 2000 Street Reconstruction Poll Results Star Tribune Article reprinted from Farmer's Almanac predict- ing 1999 Snowfall PAGE Al2 • STAR TRIBUNE * NATION MONDAY, AUGUST 30. 1999 Farmers' Almanac: Snowy end to'99 in Midwest Associated Press LEWISPON, MAi N B — Parts of the country have another Y2K problem to worry about: a power- ful storm in the last days of 1999. So says the Farmers' Almanac, which predicts a stormy Novem- ber and December, capped by more than a foot of snow in the last week of the year for the Mid- west and Northeast. But the clouds should part by the time champagne corks pop, said Sondra Duncan, the alma- nac's managing editor. This year's edition is due out Tuesday. For the North Central United States, which is one of the Alma- nac's seven regions and includes Minnesota, Duncan said we should expect snow at (lie begin- ning of November and in the middle of (lie mouth. "The good news is that it will be fair for Thanksgiving," she said Sunday. however, the region should expect an "intense storm" at the end of November, more snow in time for a white Christ- mas, and then clear and cold weather in the days leading up to the next millennium. After that, January and February don't look too stormy, she said. The National Weather Service harrumphs that the weather can't be predicted with any certainty so far in advance. But the 183- year-old Farmers' Almanac says its weather predictions are right 110 percent of the time. "We're older than the National Weather Service, and we affec- tionately call the National Weath- er Service anon -prophet," edi- tor Peter Geiger said. The Farmers' Almanac, not to be confused with the Old Farm- er's Almanac in New Hampshire, which is 24 years older, bases its weather forecast on a secret for- mula that involves sunspots, po- sition of the planets and tidal action caused by the moon. — Staff writer Paul Walsh contributed to this report. 2000 Street Reconstruction Poll Results 13% Ivy Falls Area ® Support ❑ Do Not Support 87% Surveyed Support Do Not Support Percent Reporting Falls 55 35 5 72.7% Rogers Lake me ®Support O Do Not Support Surveyed Support Do Not Support Percent Reporting Lake 78 40 17 73.1% Delaware Crossing ® Support ❑ Do Not Support Surveyed Support Do Not Support Percent Reporting Delaware Crossing 75 33 23 74.7% 57% Somerset ® Support ❑ Do Not Support Surveyed Support Do Not Support Percent Reporting Somerset 98 30 40 71.4% NEWS Public Works Engineering Code Enforcement LETTER Parks Report The Parks Crew completed general maintenance in the parks this week in- cluding daily trash pick up, grass cut- ting, and striping soccer fields. For the past two weeks the Parks Crew, has been removing rec-rock, spreading a blended topsoil mix (70% sand, 30% peat) and installing irrigation lines in the infield area of the ballfield. The Parks Crew "Team" also enlisted the help of Len Kenitz, our mechanic at Public Works, to assist on the street motor - grader which was used to reshape the work area so that there will be proper drainage once the turf infield is com- pleted. On Thursday, the fine of Maury Braun Landscaping began the fine grading and final prep work. This firm special- ized in athletic fields and will be in- stalling a sod product specifically grown for aggressive play. The Parks Crew will install irrigation heads following the sod operations. With normal weather conditions this winter the field should be in excellent playing condition for the spring baseball startup. They began trimming trees and brush overhanging the trails along Mendota Heights Road, Marie Avenue and Victo- ria Trail. The Crew also worked on Fri- day and overtime on Saturday to pre- pare for and staff the "Celebrate Men- dota Heights Parks" event last weekend. Utility Report Rich checked the City's seven sanitary sewer lift stations daily. Rich removed and cleaned the grease from the floats at the Veronica liftstation. The floats are mercury switches that operate the sta- tion. When the sewage reaches the highest level, the top float activates a high water alarm, the next float down turns on both pumps, the next one down, one pump and finally the lowest float The Pipeline turns the pumps off. Rich and his helper JP cleaned sanitary sewers on Warrior Drive, High Ridge Circle, Sibley Court, TH 110 Frontage Road (lots of sand and rocks), South Lane and Knob Road (lots of roots). He was called back last week- end when the railroad reported a blocked sanitary sewer (it fumed out to be a blocked MnDOT storm sewer). He was also called upon this week to rescue a woman who had dropped her car keys down a storm drain inlet at Lilac Lane and Douglas. Street Report The Street Crew graded Dodge Lane this week (one of our two remaining gravel roads). Dave worked on obtain- ing some Y2K compliance letters for our trucks. They trimmed bushes to improve the sight distance for traffic entering onto Dodd Road from Roundhill Road and removed a broken limb from near the trail on Lexington Avenue, both in re- sponse to resident complaints. They re- painted crosswalks. They worked onim- proving the stop signs at Mears and Dorset (straightened posts and replaced signs). They also did potholes and street repair patching on 4th Avenue and on Laura Street. They dropped off barri- cades for a street block party on James Road. Dave was called back on Tues- day evening to remove a large tree limb that had broken off, fallen across Dou- glas Road and was blocking traffic. The limb was from a very large tree that had a fancy tree house in it (the tree house was severely damaged). Dodd Road "Bird Baths" Tom Knuth and I met this week with Tom Ravn and Charles Graff from MnDOT to review "on the ground" our concerns with MnDOT's new mill and overlay project of Dodd Road. In reviewing all the plate beam guardrails, MnDOT could not find any that they felt were a problem and told us that they do not intend to make August 27, 1999 any changes. The same goes for the bituminous curbing. We did look at seven areas that were ponding water (bird baths) and discussed ways to re- move them. MnDOT promised to at- tempt to correct every one we looked at. They also promised to paint cross walks at South Plaza Drive and at Marie Av- enue. Glen Toro Second Addition Project Work activities continue on the Glen Toro Second Addition project by Munici- pal Construction Services (MSC). All underground utilities have been in- stalled and passed the required installa- tion testing procedures. MSC is now concentrating their efforts on grading, preparing, and lolerancing the street subgrade prior to the placement of ag- gregate base. This work will hopefully be followed early next week by the placement of concrete curb and gutter on the streets in this development. Year 2000 Street Project Poll Residents that were polled in neighbor- hoods under consideration for next year's street improvement project have now returned slightly more than 60% of the postcards that were mailed out. The neighborhood's rank in descending or- der of support is as follows: Ivy Falls, Rogers Lake, Delaware Crossing, and Somerset (see attached). Personnel News Marc Mogan received a voice mail mes- sage at the office on Thursday evening from Curt Wimpee' calling from the Jacksonville Jaguar versus Kansas City Chief football game. He said the game was great. He was looking forward to going surfing on the big surf spawned by the hurricanes in Florida and under the circumstances wasn't sure when he would make it back to the office. NEWS Public Works Engineering Code Enforcement LETTER Parks Report The Parks Crew completed general maintenance in the parks this week including trash pick up, grass cutting, and striping soccer fields. The Parks Crew delivered extra picnic tables to Rogers Lake Park for a large company picnic. They delivered soccer goals to the neighborhood parks (fall soccer practices started this week). The main work for the week was beginning reconstruction of the ball Feld at City Hall converting it from a softball field to a baseball field. The first order of work was hauling out all of the unneeded rec rock. It was hauled to neighbor- hood parks, where it was leveled out on existing infields by Len, who is the City's expert operator of the road grader. After this was completed, the Parks Crew hauled in and spread black dirt to replace the rec rock so that a grass infield can be established. Utility Report Rich checked the City's seven sani- tary sewer lift stations daily. Rich had to purchase and install a new hose for his jetter this week. His existing hose had been damaged to the point that it was a hazard as a result of freeing it from being hung up on the Callahan Willow tree roots last week. Upon installing his new hose, Rich jetted sanitary sewer lines on Callahan Place, Warrior Drive, Marie Avenue (Dodd to Sutton Lane), Spring Creek and all of Crown Point. He inspected new sanitary sewer connections at 623 Butler, 1948 Glenhill and 907 Carmen Lane. Street Report The Street Crew cleaned up some areas where street sand was build- ing up (end of Furlong and on Hunter The Pipeline Lane). They trimmed bushes at some intersection where sight dis- tance was a problem. They worked on patching streets in the north end of the City and patched near some replacement curbs on Pondview Drive. They began repainting crosswalks, they have 10 of them that need to be done this year. They had some trou- ble with vandalism when the bars were still wet, some kids drove right through the cones and over the wet paint. Dave surveyed a broken limb in an alley at 678 2nd Avenue and found it to be the City's. The limb was hang- ing directly over and threatening a home, so Dave arranged for a tree service to remove it. Glen Toro Second Addition Project Work activities continue on the Glen Toro Second Addition project by Mu- nicipal Construction Services (MCS). With the completion of wa- ter services and storm sewer within the new road right of way this week, MCS has finished all underground utility construction. They also com- pleted the bituminous patching on Huber Drive that was required as a result of connecting to the existing sanitary sewer and watermain. Slurry Seal Project Update Struck and Irwin, Inc. was in town this week performing crack filling on the streets that have been chosen for the application of slurry seal this year. The latest information from Struck and Irwin, Inc. is that they will August 19, 1999 arrive no sooner than the week of August 30 to apply the slurry seal to Mendota Heights' streets. Year 2000 Street Project Poll Residents that were polled in neigh- borhoods under consideration for next year's street improvement pro- ject have returned approximately 45% of the postcards that were mailed out. Early results in this poll show that there is support for street projects in the Ivy Falls and Rogers Lake neighborhoods, and opposition to street improvement projects in the Somerset and Delaware Crossing neighborhoods. GIS Software Update Kent Tupper, Senior GIS Specialist with Dakota County's Survey and Land Information Department met with Engineering Department staff on Tuesday to demonstrate and in- stall a user friendly GIS software module on the Engineering Depart- ment's GIS computer station. This software module's ability to effi- ciently identify adjacent properties within a specified distance to a par- ticular property will reduce the time and effort necessary to generate public hearing notification data on planning cases and engineering pro- jects. Personnel News Curt Wimpee' and the family left Thursday morning for a two week vacation in the new minivan to visit friends, relatives, and theme parks in Florida. Curt apparently couldn't find enough hot and humid weather here in Minnesota. NEWS Public Works Engineering Code Enforcement LETTER Parks Report The Parks Crew completed general maintenance in the parks this week including trash pick up, grass cutting, dragging, striping and chalking ball fields and soccer fields. The men's league softball playoffs are under- way. They aerated the soccer and ball fields at Kensington Park, the soccer fields at Mendakota Park, the neighborhood parks and at City Hall. They top dressed the soccer and ball fields and repaired worn areas on soccer fields with sod (mainly in front of the goals). They borrowed West St. Paul's power seeder for over seeding worn areas at Mendakota and Kensington Parks and they also fertilized the fields, all in an attempt to bring them into good condition for fall soccer. They striped all the neighborhood soccer fields with paint (Friendly Hills, Ivy, Wentworth, Victoria High- lands and the small field at Kensing- ton). Utility Report Rich checked the City's seven sani- tary sewer lift stations daily. Rich jetted the sanitary sewer lines on Delaware Avenue, Marie Avenue to Ridgewood Lane, Ridgewood Lane, and on Callahan Place. When jetting the sanitary sewer lines on Callahan Place, Rich encountered roots from a very large Willow tree and almost lost the nozzle on his jetting hose. He was finally able to free it (without having to dig up the street). He had to call in Infratech, a private sewer cleaning contractor, to have the roots cut out and removed from the line. While they were here, he also The Pipeline had them cut out some Willow tree roots from the line on Dodd Road at 4th Avenue. (Those Willow tree roots can be a real problem). Rich had to use his sewer jetter to open up a clogged storm sewer line on Huber Drive. Street Report The Street Crew is patching streets in the north end. They also repaired a dip in the Bridgeview Shores Addi- tion neighborhood. They rented a blacktop milling attachment for the bobcat to repair some larger cracks on Fremont, Hiawatha and Garden Lane. Code Enforcement Report Martin Costello, the City's Prosecut- ing Attorney, visited on Friday morn- ing to meet with the Code Enforce- ment Officers and Fire Marshal to plot strategy on several on -going code violators. This was a good meeting, with a lot of progress being made. We agreed to continue to meet on a regular basis until the backlot of cases is brought down. Glen Toro Second Addition Proiect Construction continues on the Glen Toro Second Addition project by Mu- nicipal Construction Services (MCS). The installation of water - main has been completed. Initial bacteria testing for the new water - main failed, therefore, the watermain was flushed and it is being tested once again. Water must remain stagnant in the new main for a mini- mum of 16 hours before a test sam- ple can be drawn. This testing has delayed the installation of water ser- August 13, 1999 vices for individual lots. Storm sewer should be completed this week clearing the way for final grad- ing of the street section upon com- pletion of the water services. Y2k (Street Proiects) Letters and return postcards were mailed out Wednesday this week to four neighborhoods in the city to de- termine interest in street rehabilita- tion projects for the 2000 construc- tion season. Two neighborhoods are being asked if they would like to have their streets reconstructed, in- cluding the addition of curb and gut- ter and storm sewer. The other two neighborhoods are being asked about a mill and overlay of their streets since they are currently con- structed urban. The neighborhoods being consid- ered are as follows: Rogers Lake area, Ivy Falls 2nd Addition, Somer- set View, and Delaware Crossing. The engineering department has al- ready received several calls in favor of all of the projects so far and the postcards are starting to trickle in. The deadline for responses is Au- gust 31 st. A. W.O.L. No, were not referring to any Viking personnel. Marc Mogan has been on vacation this week getting some much deserved R&R at Cass Lake. We'll find out how big the one that got away was on Monday. NEWS Public Works ePipeline Engineering Code Enforcement LETTER August 6, 1999 Parks Report The Parks Crew completed gen- eral maintenance in the parks this week including trash pick up, grass cutting, dragging,striping and chalking ball fields and soccer fields. They also installed a con- crete pad at Friendly Hills Park to serve as a base to attach the porta potty to. These bases have worked well so far - no porta pot- ties have been tipped over re- cently. They installed new grills at Friendly Hills and Rogers Lake Parks. They attended a confer- ence on Wednesday put on by the MN Sports Turf Managers Associ- ation. Utility Report Rich checked the City's seven sanitary sewer lift stations daily. Rich checked Lilydale's storm sewer system according to the agreement we have with them. He and his partner JP "jetted" sanitary sewers on Dodd Road from Went- worth to Marie Avenues, on Stan- wich Lane and Roundhill Road. (They finished the Somerset Park neighborhood). He had to locate and raise a manhole cover that had been buried on Dodd Road north of Stanwich Lane. Street Report The Street Crew patched streets on Fremont Avenue. They made up some replacement street signs. They trimmed back the brush and weeds on Freeway Road to im- prove the sight distance. They in- stalled black dirt and repaired the yards where sunken curbs had been replaced. Cherry Hill Addition Street Re- construction Jirik Sod returned to the Cherry Hill Addition street reconstruction project to replace sod that had not survived the 30 day warrantee pe- riod that is the Contractor's re- sponsibility. Sod that was obvi- ously dead, or yellow and had not rooted was replaced. Sod that looked to be under stress, but was well rooted was left in place with the expectation that it will recover as the weather becomes more fa- vorable for the growth and estab- lishment of sod. Glen Toro Second Addition Pro- ecct Work activities continue on the Glen Toro Second Addition project by Municipal Construction Ser- vices (MSC). MCS has completed the construction of sanitary sewer services within the new road right of way, and is in the process of in- stalling mainline watermain. MCS will commence storm sewer instal- lation after the watermain is fin- ished. NSP Electric began re- laying a buried electric cable that had to be lowered as a result of grading and street construction for the new Glen Toro Road. Delaware Avenue The Dakota County Highway De- partment completed paving a seg- ment of the southbound aggregate shoulder on Tuesday on Delaware Avenue between Copperfield Drive and Salem Church Road. This work was undertaken to pre- vent aggregate material from eroding along the edge of pave- ment and being deposited on the pavement at the inter- section of Copperfield Drive and Delaware Avenue after a heavy rainfall event. This shoulder paving should help to eliminate the unsafe driving condition that occurs when aggregate gets be- tween a vehicle's tires and the pavement causing a vehicle to slide if the driver breaks suddenly, turns sharply, or is traveling too fast. Code Enforcement Report We have found that prosecuting Zoning Ordinance violators is a slow, difficult process and there are currently several of them out- standing. We have come to an agreement with Martin Costello, the City's Prosecuting Attorney, to begin weekly face to face meetings until we are able to get these under control. Our first meeting is sched- uled for next Wednesday. Lloyd's Meats was issued a permit this week for their 12,157 sf expan- sion and interior remodeling pro- ject. Mendakota Country Club was also issued a demolition permit this week to remove their old mainte- nance facility and their under- ground fuel tank. NEWS s Public Works 1 e lne Engineering The Code Enforcement LETTER July29,1999 Parks Report The Parks Crew completed gen- eral maintenance in the parks this week including trash pick up, grass cutting, dragging, striping and chalking ball fields and soccer fields. The Parks Crew replaced two inoperable sprinkler heads at City Hall and a valve at Men- dakota Park. They repaired the damaged lawn at Kensington Park where a landscaping water line had been repaired. They removed brush and limbs from Parks and the Fire Hall that were downed as a result of Sunday nights' wind storm. They repaired a broken window on 504 (the big mower) with plexi glass. They painted the foul poles at the ballfields. Utility Report Rich checked the City's seven sanitary sewer lift stations daily. Rich had to remove a broken alu- minum cover from the Marie Park Storm Sewer lift station. He had to take it to a speciality shop that welds aluminum for repairs. He continued to work on building a retaining wall at the Mendota Heights Road lift station. He per- formed a new sanitary sewer con- nection inspection at 1046 London Road. He installed location posts at manholes in Valley Park. He flushed the sanitary sewer line at Winston Court where there is a rough spot in the line that catches material and can cause a problem. Street Report The Street Crew finished patching potholes in the Freeway Road and Wesley Lane areas. They patched the parking lot driveway where it was cut to install the new screen- ing fence at the Public Works Garage. They cleaned storm grates after Sundays' storm. They also cleaned up downed limbs and branches from the storm. They began patching streets in the neighborhoods to be seal coated: Fremont Avenue, Hiawatha Av- enue, Bridgeview Shores neigh- borhood, Mendakota Court and Park Place. Glen Toro Second Addition Project - The material fabrication and deliv- ery problems that curtailed con- struction at the end of the week were resolved, and Municipal Construction Services (MSC) re- sumed work activities Tuesday on the Glen Toro Second Addition project. The installation of main- line sanitary sewer is now com- pleted, and sanitary sewer service construction started late Friday. Delaware Avenue The Engineering Department re- ceived a complaint this week about unsafe driving conditions that occur occasionally at the in- tersection of Copperfield Drive and Delaware Avenue. It was pointed out that aggregate shoul- der material erodes from along the edge of pavement on Delaware Avenue between Copperfield Drive and Salem Church Road and ends up being deposited on the Copperfield Drive pavement after a heavy rainfall event. This aggregate acts like ball bearings between a vehicle's tires and the pavement, and can cause a vehi- cle to slide if the driver breaks suddenly, turns sharply, or is trav- eling too fast. The Engineering Department contacted the Dakota County Highway Department and requested that they investigate this situation. Dakota County looked into this matter and deter- mined that the best way to resolve this condition would be to pave a segment of the southbound shoul- der on Delaware Avenue. The Dakota County Highway Depart- ment scheduled this shoulder paving work for completion next week. OSHA Update Ross Bintner, Engineering Sum- mer Intern, has begun working on updating or creating the required OSHA safety training, data infor- mation and record documentation programs that were lacking when the OSHA inspection was per- formed in late May. Ross has completed the task of compiling the Material Safety Data Sheets (MSDS) and is now developing an Employee Right to Know Training Program for the City's Public Works, Engineering, and Adminis- tration Departments. NEWS Public Works ThePi*peline Engineering Code Enforcement LETTER July 23, 1999 Parks Report The Parks Crew completed general maintenance in the parks this week including trash pick up, grass cutting, dragging,striping and chalking ball fields and soccer fields. The Parks Crew installed home plates in the new batting cage at Mendakota Park. Terry and Mike worked overtime last weekend to staff the AAU thirteen -year -old State Baseball Tournament. As far as we know, everything went well. After the tournament was over the Parks Crew removed the baseball mounds and used the material to repair the warning tracks. They repaired a bro- ken lawn sprinkler at Kensington Park. John Boland planted the pur- ple loosestrife (beetle laden) plants at several wetlands throughout the City. John has been growing these bugs in his "nursery" at the Public Works Garage since early this spring. Utility Report Rich checked the City's seven sani- tary sewer lift stations daily. Rich performed maintenance to the land- scape in the island at the end of Cul- ligan Lane (trimmed the shrubs and sprayed the weeds). This island con- tains a sanitary sewer lift station. He cleaned the sanitary sewers on Deer Trail Court, part of Wachtler Avenue with the City's sewer jetter. He per- formed a sewer inspection at 1455 Mendota Heights Road (Lloyds Meats) where they installed two new cleanouts at angle points where they are relocating their line for their new building addition. He started installing a retaining wall at the Mendota Heights Road lift sta- tion to provide for easier access dur- ing cleaning operations. Street Report The Street Crew worked on repairs to the street lights within the Centre Pointe Business Park Area. They replaced bulbs and ballasts at sev- eral locations. George worked with Rich to assist him with the bobcat at the Mendota Heights Road lift station retaining wall project. The crew cut down and removed a dead tree in the right-of-way at 651 TH 110 Frontage Road. They cleaned up some sight obstructions at Knob Road and TH 110 Frontage Road, South Lane and at Summit and Marie Avenue. They worked on patching pot holes within the Free- way Road Addition. Glen Toro Second Addition Project - Municipal Construction Services (MSC) continued work activities this week on the Glen Toro Second Ad- dition project by constructing con- nections to the existing utilities in Huber Drive. Sanitary sewer and water main were extended from the respective mains to a point just north of the NSP overhead transmission line. Material fabrication and deliv- ery problems curtailed construction at the end of the week. We expect that these material issues will be re- solved and that construction will re- sume early next week. Code Enforcement Upon receiving a complaint from a neighbor, Paul investigated a project on Woodridge Drive. He found that a homeowner was completing a backyard landscaping project to re- move a pool, regrade their backyard and install slope protection mea- sures of questionable design to sta- bilize the very steep slope. The pro- ject did not have a critical area permit nor was the contractor licensed. Paul stopped the work. Engineering is investigating what measures need to be taken to protect the backyard and slope from erosion while the homeowner prepares a plan and pro- cesses a permit. The backyard looks like a war zone (see pictures). View of Backyard NEWS Public Works ePipeline Engineering Code Enforcement LETTER July 16,1999 Parks Report The Parks Crew completed general maintenance in the parks this week including trash pick up, grass cutting, dragging ball fields and striping and chalking ball fields and soccer fields. The parks crew continued to work on finishing the batting cage at Men- dakota Park. They replaced a lawn sprinkling valve at the City Hall's base- ball field. They prepared Mendakota Park for the State AAU Baseball Tour- nament, built mounds, washed down concrete, brought in more trash barrels and set up posts for installing marker tape to control access (they charge ad- mission). The fields look GREAT! The tournament starts Friday morning and runs through Sunday. Terry and Mike will be working overtime this weekend to staff this tournament. They installed some sprinkler heads at the old fire hall site to improve lawn maintenance. Utility Report Rich checked the City's seven sani- tary sewer lift stations daily. Rich worked on cleaning the sanitary sewer lines in Evergreen Knolls this week (Evergreen Knoll, Gryc Court, Pamela Lane and Deer Trail Point). Rich was called back on Friday after- noon to replace a broken manhole cover at the intersection of Emerson and Wachtler, the old one had bro- ken in half and was at the bottom of the manhole. Rich responded to a call from 2530 Arbor Point about sewer problems. He found a 20 pound sand bag in a manhole which was slowing flow. He removed the sand bag and flushed the line clean. Street Report The Street Crew provided barricades to the Police Department for use at Mendota Days. They trimmed some brush obscuring signs. They in- stalled the "No Standing or Stopping' signs on Mendota Heights Road as we agreed to do last winter for Friendly Hills Middle School. They installed a cross walk sign at the ped- way on Maple Park Drive at the re- quest of a resident. They patched potholes in the Freeway Road Addi- tion. They worked with a resident living at Kay and Walsh to try and solve a problem where cars were cutting the corner across her yard. (They installed posts to prevent cars from cutting the corner and those posts were pulled out). Cherry Hill Addition Street Recon- struction The small quantity of concrete curb and gutter and concrete driveway pavement that needed to be re- moved and replaced in isolated ar- eas throughout the project was com- pleted late last Friday. The private bituminous driveway reconstruction that was requested by some resi- dents of Cherry Hill Addition neigh- borhood was completed this Wednesday by Ace Blacktop as well. Ace Blacktop has requested that these property owners not drive over these bituminous driveways for a week to give the pavement a chance to cure. Hardrives, Inc. wisely decided to wait until these two work items were completed be- fore proceeding with the placement of the second and final layer of bitu- minous pavement. Hardrives, Inc. has for all intents and purposes completed this project when they fin- ished placing the second and final layer of bituminous pavement late Thursday. Dodd Road Mill and Overlay Construction activity on the MnDOT Dodd Road mill and overlay project in Mendota Heights continued this week with restoration and landscap- ing activities. We received com- plaints about the installation of guardrails, and some potential ad- verse sight distance concerns asso- ciated with their placement. Glen Toro Second Addition Project Municipal Construction Services (MSC) began construction activities this week by stripping topsoil within the right of way areas, and rough grading operations near the pro- posed Glen Toro Road and Huber Drive intersection. Connections to the existing sanitary sewer and wa- termain laterals in Huber Drive should occur early next week. Code Enforcement Report Mr. John Jacobs applied for and re- ceived a permit to modify his shed to be a 144 square foot shed at a com- plying location on his property. Paul and Dick have met twice with archi- tects designing a middle school addi- tion for St. Thomas Academy. They were doing code compliance reviews and were notified during these re- views that this addition will trigger the requirement for them to comply with MN SBC Code 1306 which does re- quire installing fire protection throughout the entire building (fire sprinklers). NEWS 0 Public eyng TheP*pel1ine Engineering Code Enforcement LETTER JUIV9.1999 Parks Report The Parks Crew completed general maintenance in the parks this week including trash pick up, grass cutting, dragging ball fields, striping and chalking ball fields and soccer fields and trimming shrubs around park signs. They repaired some broken lawn sprinkler heads at Mendakota Park and at the City Hall ballfield. They repaired some broken swings at Mendakota Park. They planted an Ash tree on Watersedge Terrace (replacement boulevard tree). They worked on constructing the new bat- ting cage at Mendakota Park (they installed the pitcher's protection fences, home plates and hung the netting). They trimmed over -hanging branches along trails. Mendota Heights Athletic Association has their softball and baseball tourna- ments scheduled for this weekend, Terry and Mike will work overtime to staff these tournaments. Utility Report Rich checked the City's seven sani- tary sewer lift stations daily. Rich and his summer helper cleaned sani- tary sewer mains with the City's fet- ter this week on Bachelor Avenue, Lansford Lane, Sutton Lane, and Trail Road. Rich performed a new sewer connection inspection at 2376 LeMay Lake Road. Rich was called in Saturday at 6:30 A.M. to clear a power outage at the Veronica lift sta- tion. Street Report The Street Crew removed downed trees from Valley Curve, Marie Av- enue, Summit Lane and 2270 Cop- perlield. They hauled debris from various projects to SKB Landfill in Rosemount. They patched potholes on the "Avenues" and on Highway 110 Frontage Road. They repaired a washout by a culvert near Orchard Circle and Orchard Place. They cleaned storm grates. They installed some replacement signs where some had been stolen. They re- moved the stones from the overlook at Kensington Park (we have re- ceived numerous complaints about them). Cherry Hill Addition Street Recon- struction There is a small amount of concrete curb and gutter, and concrete drive- way pavement that needs to be re- moved and replaced in isolated ar- eas throughout the project. We want to see that these repairs are completed before the Contractor proceeds with the placement of the second and final layer of bituminous pavement. Also, paving should be- gin shortly by Ace Blacktop on the private bituminous driveways or- dered at additional expense by some residents in the Cherry Hill Ad- dition neighborhood. Dodd Road Mill and Overlay Construction activity on the MnDOT Dodd Road mill and overlay project in Mendota Heights continued this week with the placement of bitumi- nous pavement in driveway aprons and side street intersections. Some of this work was completed without enough consideration given to drainage, and we anticipate that it will need to be redone based on our observations after Thursday's rain- fall. Glen Toro Second Addition Proiect Municipal Construction Services (MSC) requested locates of under- ground utilities in the project area this week signifying that the start of construction activity on this project is imminent. Hopefully rough grading will begin early next week. Lower Mississippi WMO Meeting The third meeting of the watershed's Citizen Advisory Committee (CAC) was held on Monday, June 28th. The meeting consisted of a staff guided bus tour of important facilities and interesting sites within the Lower Mississippi watershed. The 9 members of the CAC that attended the tour representing almost all of the communities in the Lower Mis- sissippi Watershed found it to be in- teresting and educational. Mendota Homes Landscaping In- spection Marc and Jim along with Jack Barber and a contingent of Mendota Homes residents performed a landscaping and grading inspection of the project on Wednesday of this week. As usual, progress has been made, but more remains to be done. We hope to perform a final inspection in time to bring the results back to Council for their first meeting in August. NEWS Public Works Engineering Code Enforcement LETTER Parks Report The Parks Crew completed general maintenance in the parks this week in- cluding trash pick up, grass cutting, dragging ball fields and striping and chalking ball fields and soccer fields. The Parks Crew applied weed killer for a second time in parks where it was needed and also at the Fire Department and at City Hall. They restained the pic- nic tables and moved a number of them to Wentworth Park to accommodate use by a large group. They also moved them later to Friendly Hills for a large group there. (This is a service we provide upon request). They removed and cleaned up a large Willow tree from Rogers Lake Park that had been dam- aged by a summer storm. Utility Report Rich checked the City's seven sanitary sewer lift stations daily. Rich, along with his summer helper jetted the following sanitary sewer lines clean this week; Park Place Drive, Boardwalk Court, Bluff Circle, Park Circle and easement, Farm - dale Road, Cherry Hills Road (all of Park Place and Cherry Hills II subdivisions). He discovered a large amount of grease in the Farmdale Road line. He replaced a hydrant marker on Somerset Road and painted a hydrant on Valley Curve. Street Report The Street Crew made up several street name signs and installed them. They loaded and hauled six loads of debris that was left on Dodd Road by a contrac- tor. They cleaned storm grates. They spread black dirt and seeded where a storm damaged a tree which had to be removed on Staples. They performed pot hole repairs on the Avenue Streets. They replaced light bulbs on the traffic signal at Mendota Heights Road and TH 55. They performed maintenance on the bobcat. The Pipeline Forty gallons of diesel fuel were spilled at 2415 Northland Drive in a truck acci- dent. The fuel entered our storm sewer system and Public Works had to assist in the clean up. The fuel ended up in the outlet at a Brown Institute. The Dakota County Environ- mental Office and the Minnesota PGA were notified and the MPCA su- pervised the -- clean-up (see photo).Y°" Cherry Hill Addi- tion Street Re- construction Hardrives' sub- contractor respon sible for boulevard restoration, Jirik Sod, has com- pleted placing sod in the disturbed areas throughout the Cherry Hill neighborhood. Ace Blacktop has placed Class 5 aggre- gate in all of the private bituminous driveways that are being totally recon- structed at the property owners' addi- tional cost. Ace Blacktop informed us that they plan to start paving these driveways next week. Dodd Road Mill and Overlay Construction activity on MnDOT'S Dodd Road mill and overlay project in Men- dota Heights was in full force again this week with pavement milling and paving operations. Traffic delays were com- mon because of the traffic control mea- sures imposed around the equipment and labor in the construction work zone. We received complaints from motorists July 2, 1999 about inadequate traffic control warn- ings for local cross street traffic in the area, and from people that drove through the construction zone and got tack coat or asphalt on their vehicles. Brown Institute Stormwater Outfall fitted to absorb spilled diesel fuel. Glen Toro Sec- ond Addition Proiect Municipal Con- struction Services (MSC) completed chipping trees and brush that were cleared from areas that are to be graded for street construc- tion within the proposed right of way, or where utilities are to be installed. Hope- fully rough grad- ing will begin next week and signify the start of inten- sified construction activity on this pro- ject. Mathern Townhome Inspection Mr. John Mathern, Developer of the Mendota Heights Townhomes located at the intersection of Dodd Road and Men- dota Heights Road has completed his final townhome and is working with the City and his residents to finalize his land- scaping so that his letter of credit can be released. He had a deadline at the end of June to complete the work. Marc and I along with Jack Barber, one of his resi- dents performed a preliminary inspection of the work without the Developer. We found that, once again, although progress has been made, there were still many shortcomings. We will be contact- ing Mr. Mathern for an inspection with him included next week, but - we are frustrated. NEWS ' Public Works The Pi*peline Engineering Code Enforcement LETTER June 25,1999 Parks Report The Parks Crew completed general main- tenance in the parks this week including trash pick up, grass cutting, dragging ball fields and striping and chalking ball fields and soccer fields. They also spread dirt around the batting cages and repaired sprinkler lines. They installed a drain on the warning track of field #1. Five crewmem- bers worked eight hours at Mendakota Park building pitching mounds, washing down cement areas, installing 75 foot baselines, hauling rec rock onto warning tracks, dragging fields, and hauling in more picnic tables and trash containers to pre- pare for the upcoming baseball tourna- ment. They also leveled all mounds and graded around all infields at Mendakota Park. They also installed sprinkler heads at City Hall along the curb at Victoria Curve. They started cutting grass along pedways and weed whipped around sign posts along pedways. They worked on the John Deere tractor changing and repairing nozzles that apply water to control the dust that is generated when dragging infields. Utility Report Rich checked the City's seven sanitary sewer lift stations daily. He jetted sanitary sewer lines on Sylvandale and Sylvandale Court North, Sylvandale Court South, and Ivy Falls Court (which had lots of sand). He also mowed the grass at the Veronica Lane lift station. Street Report The Street Crew hauled out debris from the Public Works backlot and took it to SKB Landfill. They cleaned up stump grindings, filled it with black dirt and seeded for a tree that fell during one of our storms thissea- son in the Somerset neighborhood. They installed dirt around the outside radius of Kay and Walsh Lane where vehicles were cutting the corner causing ruts and in- stalled snow posts. The Street Crew also did pothole patching in the Kressin and Lake Drive area. They made up various street name signs and cleaned storm grates. They also pulled out the barricades at Marie and Callahan. Cherry Hill Addition Street Reconstruc- tion Hardrives, Inc. has finished reinstalling all the mailboxes that were removed when the project began, and the Postal Service has now resumed the usual mail deliveries to residents in the neighborhood. Hardrives has completed the placement of castings on manholes and the adjustments to gate valves that lie within the newly paved street section to prepare for the placement of the second and final layer of bituminous. Hardrives has completed backfilling the boulevards, and subcontractor responsible for boulevard restoration (Jirik Sod) has begun placing sod. The private bituminous driveway reconstruction that was re- quested by some residents of Cherry Hill Addition neighborhood started Wednesday when Ace Blacktop began removing bitu- minous driveway surfaces and started prepping driveways for paving. Dodd Road Mill and Overlay Construction activity on MnDOT'S Dodd Road mill and overlay project intensified in Mendota Heights this week with the start of pavement milling and paving operations on the northbound lane. Traffic delays were common because of the traffic con- trol measures imposed around the equip- ment and labor in the construction work zone. MnDOT recommended that mo- torists use alternate routes, and it ap- peared that the traveling public heeded that advice based on the reduction in the number of complaints received at City Hall as the week progressed. 1999 Slurry Seal It is time again to decide which streets should be slurry sealed in the City this construction season. Mendota Heights has been dedicating funds in the City's budget since 1988 to perform slurry seal street maintenance during the summer months in Mendota Heights. Bituminous street pave- ments that are structurally sound and are expected to last five years or more are candidates for the application of this slurry seal to the bituminous surface. Slurry seal is applied to asphalt surfaces to improve the moisture resistance of the street sec- tion, retard the inevitable oxidation of the asphalt mix, and improve the friction prop- erties of the driving surface. Streets that are being recommended for this years work include Fremont Avenue, Garden Lane, Hiawatha Avenue, Mendakota Drive, Mendakota Court, Mendota Heights Circle, Bridgeview Court, Pondhaven Circle, Pondhaven Lane, Westview Circle, West - view Terrace, Hampshire Dr., Hampshire Court, and Park Lane. Wetland News The Engineering Department submitted a grant funding application recently that has been made available for certain educa- tional activities that promote water quality and wildlife protection measures by the Dakota County Environmental Education Program. This application was submitted to secure funding to purchase storm water information medallions that St. Thomas Academy (STA) Environmental Science Class students have agreed to affix to storm water inlets. These medallions are intended to remind and educate people about the direct link that debris and runoff entering these catch basin inlets can have on the quality of receiving waters. The Dakota County Environmental Education Program approved a $1,000 funding grant to purchase these medallions. This grant program requires a 25% local match that will be fulfilled by a provision of the pro- gram that places a dollar value on each hour of donated time spent installing these medallions by STA staff and students. Lower Mississippi WMO Meeting The third meeting of the watershed's Citi- zen Advisory Committee (CAC) will be held at 6:30 P.M. on Monday, June 28th. This next meeting will originate from the Mendota Heights parking lot and consist of a staff guided bus tour of important facili- ties and interesting sites within the Lower Mississippi watershed. Attachments: • CAC Meeting Minutes • CAC Preliminary Bus Tour Agenda LOWER MISSISSIPPI RIVER WATERSHED MANAGEMENT ORGANIZATION CITIZEN ADVISORY COMMITTEE MEETING MINUTES Monday May 24, 1999 7:00 — 9:00 P.M. Mendota Heights City Hall Members in Attendance: Jim Burkowski - St Paul. Aethan Hart- West St. Paul John Barthe - Lilydale Mike Dwyer - Mendota Heights Tim Bruckmueller -Mendota Heights Jim Helseth - South St. Paul Mark Linafelter - South St. Paul John Ertel - West St. Paul Others in Attendance: Karen Chandler- Barr Engineering Marc Mogan - City of Mendota Heights Laura Jester- Dakota County SWCD Phil Belfiori - Board of Water and Soil Resources Pat Lynch - Minnesota Department of Natural Resources Judy Sventek - Metropolitan Council-__- - --- Lower Mississippi River WMO 5124199 CAC Meeting Minutes Phil also mentioned that infiltration technologies do not work in every case. The soil permeability needs to be fairly good. Gene Soderbeck discussed the need for pre -settlement treatment of runoff before infiltration in some cases. This is due to clays in the water, which settle out last, creating a barrier layer that won't allow infiltration in the future. Additionally, some infiltrated water has the potential to contaminate groundwater. There was some discussion among the group regarding the use of infiltration technologies. One comment was made that these ideas must be brought to the citizens and developers. A question was raised regarding the current city ordinances and the amount of impervious surfaces they allowed, etc. IV. LMRWMO Vision and Purpose Statement— Karen Chandler Due to the lack of time, it was decided to discuss the vision and purpose statement at a future meeting. The next meeting is scheduled for Monday June 28t'. This meeting will include a tour of the watershed and sites of interest to the CAC. A meeting time and place will be announced with the agenda. Preliminary Tour Agenda 1. Mendota Heights City Hall — Begin tour from parking lot 2. Ivy Falls Creek, Mendota Heights — Detention pond with staged outlet • effect on flow rate • water quality — View creek channel from road 3. Lower Lilydale, Lilydale (St. Paul — Former housing tract —frequent flooding Parks) 4. Harriet Island, St. Paul — No longer an island (story?) 5. Holman Field, St. Paul — Flood control levees — Frequency and depth of flooding 6. Simon's Ravine at Concord, South — Houses and businesses removed for safety St. Paul 7. Simon's Ravine at 19'', South St. Paul — Kaposia Dam (high hazard) • Water level July 1987 • Washout August 1977 — View construction 8. Simon's Ravine at Emerson Pond, — Detention pond with water quality outlet West St. Paul • Effect on flow rate • Water quality • Control on downstream flow rate — View "wilderness area" 9. Simon's Ravine at Wentworth Ponds, — Detention pond West St. Paul • Effect on flow rate • Water quality • Valve — 1987 Storm comments 10. Babcock Trai, Inver Grove Heights — Stormwater management planning in the 110-494 corridor (possibly visit Schmitt Lake) 11. Schmitt Lake, Inver Grove Heights — 110-494 corridor system of ponds 12. Siedel's Pond, South St. Paul and Inver — Landlocked Grove Heights — Water quality (WMO study) 13. Mississippi River at 494, South St. Paul — Boat launch — Levees 14. Landlocked Pond with Outlet, Inver — DP-29B Pumped Outlet, controlled water levels Grove Heights 15. Landlocked Pond without Outlet, Inver — City Offices Pond: Expected vs. actual level Grove Heights 16. Marcott Lakes, Inver Grove Heights — Valued water bodies, landlocked. Effort to minimize urban impacts 17. Mud Lake, West St. Paul — Citizen involvement in lake improvements 207002.doc W. I \V ' r ! i ' rc. 1 31 Ll �4.. LOWER MISSISSIPPI RIVER WATERSHED MANAGEMENT ORGANIZATION CITIZEN ADVISORY COMMITTEE YOU'RE INVITED ON A WATERSHED TOUR MONDAY DUNE 28' 6:30 — 9:30 P.M. Starting at the Mendota Heights City Hall In lieu of a meeting, we will be touring various sites throughout the watershed to get better acquainted with issues facing water management in -the area and past projects implemented to address these issues.. The bus will leave the Mendota Heights City Hall promptly at 6:30 p.m. and will return around 9:30 p.m. Please R.S.V.P. with Laura Jester 651/480-7784 as soon as possible. The City Hall is located at 1101 Victoria Curve in the northwest comer of the intersection of Lexington Ave. and Hwy 110, just west of 35E. NEWS Public Works Engineering Code Enforcement LETTER Street Report The Street Crew delivered and picked up barricades at 2219 Apache street that were used for a block party. They furnished tempo- rary "No Parking" signs on wood laths to Linda Kieffer who lives on Nina Court that she will use to re- strict parking in the vicinity of Sibley High School during an upcoming band concert. They hooded the "No Parking" signs on Victoria Curve for a barmitzvah at Beth Jacob Syna- gogue. They also reinstalled the post and street name sign at Eagle Ridge and Marie Avenue. They worked on pothole patching in the Kressin Avenue area. They hauled debris from the back of the Public Works Garage to the SKB landfill. Utility Report Rich checked the City's seven sani- tary sewer lift stations daily. Rich jetted the sanitary sewer lines start- ing on Sylvandale and then jetted Medora, Emerson, Knollwood Lane, and Knollwood Court. He also mowed the grass at the Veronica lift station. He performed a sewer in- spection at 1128 Highway 13 and 1256 Wachtler Avenue. Parks Report The Parks Crew completed general maintenance in the parks this week including trash pick up, grass cut- ting, dragging ball fields, striping, and chalking ball fields and soccer fields. John Boland began raising beetles at the Public Works bug nursery that will then be introduced into some of the City's wetlands in an attempt to control or eliminate the Purple Loosestrife growth. The Parks Crew also formed and placed The Pipeline cement pads that will enable the porta-potties to be anchored to the ground and locked in Marie, Valley, and Wentworth Parks to prevent them from being tipped over. They formed and installed cement pad footings for the installation of barbecue grills at Kensington and Wentworth Parks. They sharpened mower blades, washed trucks and serviced some of the parks equip- ment. They cleaned up bathrooms and contacted a plumber to replace bathroom fixtures that were de- stroyed as a result of the vandalism last weekend at Kensington and Mendakota Park. They pulled sprin- kler lines at Mendakota Park around the baseball batting cages, set heads, and backfilled around the sprinkler heads, batting cages and the blacktop pedway. Cherry Hill Addition Street Recon- struction Hardrives, Inc. is continuing to back - fill and grade the boulevards. Hardrives continues to reinstall mail- boxes that were removed when the project began. Hardrives has begun to place castings on manholes and adjust gate valves that lie within the newly paved street section to pre- pare for the placement of the second and final layer of bituminous. Glen Toro Second Addition Project Work began this week on the Glen Toro Second Addition Project. Mu- nicipal Construction Services (MSC) started clearing trees and brush from areas that are to be graded for street construction within the pro- posed right of way, or where utilities are to be installed. Rough grading will hopefully begin next week. June 18, 1999 Dodd Road Mill and Overlay MnDot's Dodd Road mill and overlay construction project began this week. NSP Gas started performing repairs and installing anode protec- tion on some of their gas lines. Pavement construction activities will follow after NSP Gas has completed this work. Traffic will be restricted by an on duty flagperson on those highway segments where pavement milling and asphalt paving opera- tions are in progress. The project is scheduled for completion in early August. MnDot recommends that motorists use alternate routes. Mendakota Park Batting Cages The gravel was placed inside the concrete maintenance strip and the trail paved on Wednesday by Ace Blacktop. Fenc-Co. Inc., began placing the fence fabric and gates to complete the double batting cage on Thursday. Public Works Screen/Privacy Fence Fenc-Co, Inc., began installing the posts for the privacy fence at the Public Works Facility. The fence is intended to screen the storage area area behind the maintenance garage from view. Work should be completed next week. Staff News Jim Danielson loaded up the family minivan and left early Monday morn- ing for a two -week summer vacation to Disney World and Florida's Gulf Coast. We expect Jim to return to work on Monday, June 28th. NEWS Public Works 1 e In e Engineering The Code Enforcement LETTER June11.1999 Street Report The Street Crew cleaned all of the storm grates that were plugged be- cause of the storms. The mowing contractor's grass from the boulevards had floated on to them. John Ambrose had to be called in Sunday to clear several trees that had been blown down during the storm and were im- peding traffic. The entire crew worked on removing downed trees and limbs from the boulevard areas on Monday (Overlook, Staples, Mears and Dorset). Greenleaf, a private contrac- tor, had to be hired to remove a tree from the boulevard at #6 Staples be- cause a large branch was broken and hanging precariously over a home. Ex -Mayor Lockwood had called in this request because the home involved was next to his and the residents were gone on vacation. The Street Crew borrowed a bituminous paver from the City of Eagan this week for use in patching our streets. Mark Olson was contracted this week to mow the boulevard areas that have high weeds. Parks Report The Parks Crew completed general maintenance in the parks this week including trash pick up, grass cutting, dragging ball fields and striping and chalking ball fields and soccer fields. The Parks Crew repaired the sprinkler lines at Mendakota Park where they were damaged due to the batting cage construction. They installed base an- chors at 60 feet at the four fields at Mendakota Park. They fertilized the lawns at Mendakota and Kensington Parks, City Hall and the Fire Station. They picked up numerous downed limbs in the parks and along the ped- ways on Monday that were there as a result of Sundays storm and they be- gan installing concrete bases in Marie, Valley, and Wentworth Parks to be used as anchors for the porta potties. One full-time and one part-time em- ployee will be working overtime this weekend at Mendakota Park to pre- pare the fields for Mendota Heights Athletic Association's in-house 8-13 year old baseball tournaments. Utility Report Rich checked the City's seven sanitary sewer lift stations daily. The power went out at 6:00 P.M. on Sunday at the Veronica Lane lift station because of a storm. John Boland and Tim Oster were called in to bring in and run the mobile generator. Once it was set up, one of them had to remain with the lift station until the power was restored at 9:00 A.M. Monday morning. Rich and his summer helper, JP, jetted the sani- tary sewer lines clean on Dodd Road near 4th Avenue (lots of roots because of the nearby oak trees), on 4th Av- enue, Vandall Street and on Sunset Lane. Dodd Road MnDOT conducted a preconstruction meeting this week to discuss the mill and overlay project scheduled for Dodd Road. The contractor is Total Asphalt and they intend to begin work on this project next week. Total As- phalt and MnDOT will be using the Dodd RoadITH 110 intersection for their assembly area and field offices. Cherry Hill Addition Street Recon- struction Hardrives, Inc. has now begun to backfill and grade the boulevards after completing the major milestone task of installing the first layer of bituminous asphalt last week on the Cherry Hill Street Reconstruction Project. Hardrives, Inc. has also started the task of reinstalling the mailboxes that were removed when the project be- gan. This mailbox work will take more than a few days to complete. Unfortunately, the Postal Service will probably not switch the mail deliveries back to these reinstalled mailboxes until they are all in place. Last week Council awarded a contract to Ace Blacktop Inc. to reconstruct bitumi- nous driveways requested by some residents of Cherry Hill Addition neigh- borhood. Ace Blacktop had hoped to commence reconstruction on these bi- tuminous driveways this week, but those plans were delayed by the re- cent inclement weather. Lexington Avenue Trail Project The Engineering Department contin- ued gathering preliminary field survey data this week to prepare for the pub- lic hearing scheduled for this July for the proposed pedestrian trail improve- ment project. Residents that ap- proached and talked with personnel while they were in the field wanted to know two things. They wanted to know if this project would cost them anything, and if it would adversely im- pact the vegetation or landscaping on their lots. Everyone seemed to be able to relate to the City's concern about safety. After learning that this trail would be constructed without funding from adjacent property own- ers, they indicated that they would support the proposed improvement project. Engineering was contacted by Eric Flowers, reporter for the Sun Cur- rent, this week who was gathering information for an article he was preparing on the trail. He informed us that the several residents that he talked with were not opposed to the trail. NEWS ' u is ors EngineeringThePi*peline o e Enforcement June 4, 1999 Utility Report Rich checked the City's seven sanitary sewer lift stations daily. He also per- formed a sanitary sewer connection in- spection at the new Mendakota Coun- try Club maintenance garage facility now under construction. He cleaned the sanitary sewer mains on Second Avenue, Clement Avenue, Third Av- enue and Sommerset Court with the City's jetter this week (he found roots and grease in the line on Third Av- enue). Street Report The Street Crew worked with Engi- neering to determine streets to be slurry sealed this year. They graded Dodge Lane, the only gravel street we have left (together with one gravel al- ley). They installed a new mail box post at 1884 Valley Curve. They worked on making some corrections that were required as a result of the OSHA inspection, placed a ground fault interrupter in the Public Works Garage break area (anything 3' or less from a water supply needs one), they ordered new hooks for the chain hoist (ones with safety hooks), they installed a number of new updated signs throughout the shop area, etc. etc. They placed backfill and sod behind the recently repaired curbs. They opened the storm pipe outlet that drains into Friendly Hills Marsh from Cheyenne Lane. They worked on pot- hole patching - on Apache Lane and Cheyenne Lane (temporary patches for large holes). Parks Report The Parks Crew completed general maintenance in the parks this week including trash pick up, grass cutting, dragging ball fields and striping and chalking ball fields and soccer fields. The Parks Crew along with all the other workers out at the shop were im- pacted by the recently conducted, unannounced OSHA inspection that occurred out at the Shop on Tuesday of this week. The Parks Crew had to make a number of corrections such as; dispose of outdated, non -complying gas cans and purchase replacements, install new "grounded" electric plugs for hand tools and a number of other small things. They replaced some dead shrubs around park signs. They also had to deal with vandalism repairs at - guess where again - Kensington Comfort Sta- tion, where someone entered the women's bathroom and disconnected a water supply line to the toilet, flood- ing the room. Vandals also pushed over the portable toilets at Hagstrom King and Victoria Highlands Parks. The Parks Crew had removed the toi- lets from Marie, Wentworth and Valley Parks already because they were con- tinually being pushed over. We con- tacted "Biff the toilet supplier and he told us that if we put in "I" bolts an- chored in concrete, they would attach the toilets to them - preventing them from being tipped over (we hope!). We will be installing the concrete anchors next week, so that we can return the toilets to the parks. One full-time with a part-time em- ployee will work Saturday and Sunday mornings this wekk to prepare the fields at Mendakota Park for the Henry Sibley fast pitch softball tournament. Cherry Hill Addition Street Recon- struction Hardrives, Inc. resumed and com- pleted the installation of the first layer of bituminous asphalt on Tuesday on the Cherry Hill Street Reconstruction Project. They also finished replacing all of the driveway aprons that were removed at the start of the project ex - cept for those driveways that some residents have contracted through the City to be reconstructed in their en- tirety in conjunction with this project. Council awarded a separate contract to Ace Blacktop Inc. to reconstruct bi- tuminous driveways that these resi- dents requested at Tuesday's Council meeting. Ace Blacktop indicated they might be able to commence bitumi- nous driveway reconstruction next week. Hardrives, Inc. anticipates commencing sod restoration after the concrete has cured sufficiently, and after Ace Blacktop has completed the planned driveway reconstruction work. The project is really looking good with the concrete curb and gutter and first layer of bituminous surface in place. Compliments to Hardrives, Inc. for making such significant progress in such a relatively short time. Glen Toro Second Addition A pre -construction meeting was held at 1:00 P.M. on Wednesday June 2, 1999 for the Glen Toro Second Addi- tion improvement project. Municipal Contracting Services is the Contractor for the project. The project is rela- tively small, but is by no means un- complicated. The site presents some challenges with regard to topography and vegetation. The platting of the property and the utility and street im- provements were designed to respect and protect these features. The Con- tractor indicated that they are planning to start construction on this project the week of June 21st. Lexington Avenue Trail Project The Engineering Department began gathering some preliminary field sur- vey data this week to prepare for the neighborhood meeting scheduled for this July for the proposed pedestrian trail improvement project. NEWS Public Works ThePi*peline Engineering Code Enforcement LETTER May 28, 1999 Parks Report The Parks Crew completed general maintenance in the parks this week including trash pick up, grass cutting, dragging ball fields and striping and chalking ball fields and soccer fields. Two workers worked a few overtime hours Saturday and Sunday to pre- pare the fields at Mendakota and Kensington Parks for a Sibley Sting soccer tournament and a Visitation softball playoff. They received their new replacement Toro Groundmas- ter lawnmower and put it in service this week. They had to use their turf sweeper at Ivy Falls and Mendakota Park to remove the cut grass, be- cause it was too thick. They acti- vated the lawn irrigation systems this week (still have not needed to use them). There are no tournaments or other type of major park uses scheduled for this weekend. Utility Report Rich checked the City's seven sani- tary sewer lift stations daily. Rich replaced a hydrant flag on Douglas Road. He also assisted the Parks Crew plant flowers at Mendakota Park. Street Report The Street Crew assisted the Police Department with their Bicycle Rodeo by providing cones and barricades. They worked on relamping street lights within the Industrial Park. (There were a number of lights out). They had to take pickup truck #302 in to have its transmission checked out, there was no overdrive. It turned out to be an electrical prob- lem. They trimmed branches back that were causing sight obstructions to signs. They prepared the subgrade for installing a replacement curb on Apache Lane where we had to repair a deep sanitary sewer service last fall. They also worked on replacing a broken storm water curb box inlet on Commerce Drive by Associated Bureau's driveway. Cherry Hill Street Reconstruction Hardrives, Inc. re- claimed the remaining pavement that had been left in place to facilitate storm sewer construc- tion this past week. The concrete readymix trucker strike that started on May 19th and halted concrete curb and gutter construction on the Cherry Hill Re- construction Project at the end of last week was settled on May 21 st. Resolving this strike allowed CurbMasters to resume and com- plete the placement of the remaining concrete curb and gutter on the pro- ject this week. A period of favorable weather and some commitment to the completion of this project by Hardrives, Inc., led to the placement of the first layer of bituminous start- ing on Friday on Farmdale Road and Lower Colonial Drive. Hardrives, Inc. continues to reduce the size of the stockpiles this week near the Wentworth Park tennis courts by hauling out more of this excess ma- terial. Lower Mississippi WMO Meetinq The second meeting of the water- shed's Citizen Advisory Committee was held at 7:00 P.M. on May 24th in the Mendota Heights City Council chambers. Enclosed is a copy of the minutes for that meeting. The next meeting has been scheduled for Monday, June 28th at 6:30 P.M. This next meeting will begin at the Mendota Heights parking lot and consist of a bus tour of important and interesting facilities and sites within the Lower Mississippi water- shed. Paving In Cherry Hill Addition Other News Construction started this week on the Mendakota Park batting cages. The new batting cages will be located south of the existing multiuse struc- ture between the four fields con- nected by a path. The subgrade for both the path and the batting cages were prepared this week and the fencing for the cages has been deliv- ered. Guy is the general contractor for this job. CurbMasters replaced some sunken curb within the Delaware Crossing, Copperfield and Bridgeview Shores neighborhoods this week. Attachment: 0 LMWMOCAC Minutes LOWER MISSISSIPPI WATERSHED MANAGEMENT ORGANIZATION CITIZEN ADVISORY COMMITTEE MEETING MINUTES Monday May 24, 1999 7:00 — 9:00 P.M. Mendota Heights City Hall Members in Attendance: Jim Burkowski — St. Paul Aethan Hart — West St. Paul John Barthe - Lillydale Mike Dwyer — Mendota Heights Tim Bruckmueller— Mendota Heights Jim Helseth — South St. Paul Mark Linafelter — South St. Paul John Ertel — West St. Paul Others in Attendance: Karen Chandler— Barr Engineering Marc Mogan — City of Mendota Heights Laura Jester — Dakota County SWCD Phil Belfiori — Board of Water and Soil Resources Pat Lynch — Minnesota Department of Natural Resources Judy Sventek — Metropolitan Council L=nwer Mississippi River WMO 5124199 CAC Meeting Minutes Introductions Those present introduced themselves and the city or agency they represented. Non -Point Source Pollution — Gene Soderbeck, Minnesota Pollution Control Agency Gene discussed the sources of non -point source pollution in urban areas and how those pollutants affect bodies of water. He showed a number of graphs to illustrate his points (see attached). Specifically, Gene made several key points regarding urban stormwater runoff: A one-half inch rainfall is needed to generate the runoff and produce non -point source pollution; about 85% of storm events are less than one-half inch of rain. 2. As urban cover or the percentage of impervious surfaces increase, biological metrics which indicate the health of a waterbody, decline. 3. In general, residential lots have the least amount of impervious surfaces in urban areas, while shopping centers have the most. Commercial and industrial landuses fall in between. 4. Destabilized stream channels add more sediment to the waterway due to the cutting of banks, etc. It takes a 10-year storm event in a forested watershed to produce the same amount of unstable channels as a 2-year storm event in an urban watershed. 5. Phosphorus loads increase as impervious surfaces increase, however good storm water management can alleviate this problem. 6. There is a very long list of potential contamination sources in urban areas. (See attachment.) 7. Watershed management organizations need to set resource goals and then look for opportunities to meet those goals through activities such as erosion control, rate and volume control, impervious surface control, public education, street sweeping, pond maintenance, sand/salt storage, etc. III. Stormwater Infiltration Technologies — Phil Belfiori, Board of Water and Soil Resources Phil showed overheads and slides and discussed the need for stormwater infiltration technologies and gave examples of some innovative ways of dealing with stormwater. Specifically, he reported that these techniques reduce water pollution and treatment costs by mimicking nature. Some examples of techniques include reducing impervious surfaces in new developments, using grass swales instead of immediately ponding or piping the water away, using "low" islands or green spaces in parking lots for infiltration instead of raised islands, etc. I_<=wer Mississippi River WMO 5/24199 CAC Meeting Minutes Phil also mentioned that infiltration technologies do not work in every case. The soil permeability needs to be fairly good. Gene Soderbeck added that the small runoff events should be infiltrated, but that larger storm events should be treated first because clays in the water will settle out last, creating a barrier layer that won't allow infiltration in the future. Additionally, some infiltrated water has the potential to contaminate groundwater. There was some discussion among the group regarding the use infiltration technologies. One comment was made that these ideas must be brought to the citizens and developers. A question was raised regarding the current city ordinances and the amount of impervious surfaces allowed, etc. IV. LMRWMO Vision and Purpose Statement— Karen Chandler Due to the lack of time, it was decided to discuss the vision and purpose statement at a future meeting. The next meeting is scheduled for Monday June 28'h. This meeting will include a tour of the watershed and sites of interest to the CAC. A meeting time and place will be announced with the agenda. NEWS ° Public Works PPi*peline Engineering v Code Enforcement - LETTER Mav21.1999 Parks Report The Parks Crew completed general maintenance in the parks this week including trash pick up, grass cutting, dragging ball fields, and striping and chalking ball fields and soccer fields. John Boland with Rich's help secured the Purple Loosestrife plants needed for our Loosestrife bug nursery this week. Every year for the next several, John will be working with the Dakota County Environmental Department to grow Loosestrife eating bugs, first in our nursery at the shop, and then he will transplant them to Loosestrife in- fested areas. Hopefully within the next few years, we will begin to get this extremely aggressive plant under con- trol within the City. Mendota Heights has an extremely bad infestation of Loosestrife throughout the City. Because of all the wet weather the Parks Crew worked overtime a couple of days this week to try and catch up on the mowing. Two Parks Crew members will be working two hours on both Saturday and Sunday this weekend to prepare the fields for the Visitation softball tour- nament being conducted at Men- dakota Park and for a soccer tourna- ment being held at both Mendakota and Kensington Parks. Utility Report Rich checked the City's seven sanitary sewer lift stations daily. Rich also trimmed the trees at the Veronica Lane lift station site and mowed the grass at all the lift stations two times this week. He located a hydrant extension to raise a hydrant that was partially buried within the Bunker Hills Street Reconstruction project (pre -pacer type hydrants are no longer made and re- pair parts are very difficult to find). He responded to two, after hours lift sta- tion alarms (Culligan and Veronica). He also attended sexual harassment training (all employees attended one of two classes conducted this week). Street Report The Street Crew repaired washouts on Orchard Place and Orchard Circle. They relocated a mailbox and a warn- ing sign in the "bubble" on northbound Lilac Lane. A resident that lives in the bubble has had problems with inatten- tive or speeding drivers crossing over the curb and striking her mail box - hopefully these changes will solve her problem. They made up several new street signs and installed them. They had to re- move a downed tree from Arbor Court and they continued to work on getting bids for outfitting their new snowplow truck. Code Enforcement Report The City has received several inquiries recently concerning development of the five residential lots platted as part of the Dakota Bank and Super America gas station development. It was agreed to between the Developer and the City that these residential lots would not be developed until construc- tion of the Bank, the Super America gas station, the replacement screening wall and landscape berm were com- pleted. The City has also been receiving calls this week relative to violations of the weed ordinance - the correct weather conditions have certainly been present to cause a big spurt in weed growth. Cherry Hitt Street Reconstruction The wet conditions that we have been experiencing recently did not appear to hinder progress on the Cherry Hill Street Reconstruction Project this past week. Driving conditions on these streets have held up relatively well. The wet weather did create some soft spots in some of the driveway aprons in the neighborhood. Hardrives, Inc. replaced this soft material with crushed rock. Storm sewer construc- tion began on Monday. Penn Con- tracting completed most of the storm sewer work by Friday. Hardrives, Inc., had their concrete curb and gutter subcontractor, CurbMasters, on the project installing concrete curb and gutter this week. CurbMasters placed over 50% of the concrete curb and gutter on the project starting on Tues- day. We were expecting CurbMasters to resume placing another 2,000 lineal feet of concrete curb and gutter the next day, but those plans were post- poned when the local concrete readymix truckers went out on strike on Wednesday. Hopefully this strike will be resolved shortly, thereby allow- ing resumption of concrete curb and gutter construction. Hardrives, Inc. hauled out roughly 1,000 cubic yards of excess material this week from stockpiles near the Wentworth Park tennis courts. Hardrives, Inc. has been very efficient on the project to this point, and has made significant progress towards completion of the work under some difficult circum- stances. Lower Mississippi WMO Meeting The second meeting of the water- shed's Citizen Advisory Committee is scheduled for May 24th at 7:00 P.M. in the Mendota Heights City Council chambers. Enclosed is a copy of the agenda for this meeting. NEWS Public Works PPi*peline Engineering v Code Enforcement LETTER May 14,1999 Parks Report The Parks Crew picked up trash, mowed grass, striped ball fields daily in the parks. They were also ham- pered all this week by the rainy weather. The grass is getting long - but we can not cut when it's raining. They cut down and removed dead trees from Kensington and Mendakota Parks. It happened again! Kensington, our worst park for vandalism had vandals enter the men's restroom and remove a fitting from a water supply line. The water flooded the whole room for eight hours. Fortunately this time the van- dals did not plug the floor drain so that helped drain some of the water away. We also had a porta potty tipped over (even though the supplier is staking them down this year), and we had the porta potty at Hagstrom King Park van- dalized with graffiti. Utility Report Rich checked the City's seven sanitary sewer lift stations daily. Rich cleaned the sanitary sewer main located on Mendota Heights Road, the street that serves Lloyd's Meats, with the City's jetter. We have a problem with grease build up in that section and need to clean it more often. He attended a pump workshop on Tuesday that was put on at Braun Pump and sponsored by the MPCA. It was a hands on type workshop where they worked on re- pairs to pumps (they used Lilydale's pump as an example pump). He per- formed some maintenance at the Northland Drive lift station. A power supply cord bracket had corroded and broken off. He arranged for Pipe Services, a pri- vate contractor to come in and vacuum clean all of our sanitary sewer lift sta- tion's wet wells and the Public Works Garages' and Fire Hall's sand pits. This is an annual preventative mainte- nance service that Rich arranges for each spring. Street Report The Street Crew dropped off and picked up the barricades and cones used for last Saturday's Annual Spring Clean -Up day held at Mendota Plaza. They checked the storm gates after the rain storms. They drafted the specifications for the dump body and snow removal equip- ment to be attached to the new 5-ton snowplow truck that has been ordered. They delivered the specifications to three companies for bidding. P.D. called in Tim Oster, to clear a tree that was downed and blocking traffic on Victoria Curve. They worked on straightening signs. Cherry Hill Street Reconstruction The persistent and significant precipi- tation that fell this week slowed the steady work progress that Hardrives, Inc. had been making on the Cherry Hill Street Reconstruction Project. The driving conditions on these streets were surprisingly good and erosion problems were minimal con- sidering that 3+ inches of rain fell on the neighborhood throughout the week. Some of the driveway aprons that had been removed last week near the street became saturated making access to some residents' garages dif- ficult. Hardrives, Inc. addressed this situation by placing and compacting rock in the affected driveway aprons. The storm sewer installation that was planned to begin the week of May 10th was postponed because of the rain and will now begin on May 17th. Penn Contracting expects to finish storm sewer construction in less than two weeks with favorable weather. Most of the storm sewer work will take place on Cherry Hill Road between Wachtler Avenue and Ivy Lane. Hardrives, Inc. started hauling out ex- cess material on Friday generated during boulevard grading that they had been stockpiling near the Went- worth Park tennis courts. Hardrives, Inc. has indicated that their concrete curb and gutter subcontractor may commence concrete curb and gutter construction as early as next week. Reel 'em In! Bait that Hook! The word is spreading. The "HOT" fishing news is not all with the Gover- nor. A keen eyed staff member reports that Friday afternoon nine parked cars were observed on Wagon Wheel Trail, near the "S" curve. Upon inspection, he observed fifteen anglers fishing Rogers Lake. City Hall has received several reports from residents that the fish, large Crappies, were being caught in Roger's Lake. Well the en- thusiasm of the anglers fishing in the lake authenticates these rumors. The DNR has been sampling the lake to determine size and numbers of fish in the lake and will be reporting their find- ings soon to the City. Good Luck Anglers NEWS Public Works ThePi*peline Engineering Code Enforcement LETTER May7,1999 Parks Report The Parks Crew picked up trash daily in the parks. They also cut the grass in the parks, but were rained out for a couple of days. They dragged all the softball infields and striped them. They marked and striped all the soccer fields at Kensington and Mendakota Parks. They installed new irrigation water lines at City Hall and at the old Fire Hall site. They had to repair the backflow preventor on the irrigation system at the Fire Hall. They planted a flowering crab tree at City Hall by the Police entrance. This tree was donated by the Mendota Heights Garden Club as has been their tradition every spring. They also planted four trees donated by "The Friends of the Parks', one Black Hills Spruce at Ivy Hills Park, two Black Hills Spruce at Went'North Park and one Maple at Mendakota Park. Utility Report Rich checked the City's seven sanitary sewer lift stations daily. He had to repair the steps at the Mendota Heights Road lift station. He trimmed the trees in the island at the Culligan Lane lift station and mowed the grass at the Veronica Lane lift station. There was a watermain break last Fri- day on Sylvandale Avenue between Laura and Sylvandale Courts. It had apparently been leaking for a long time without being reported, so when St. Paul Water Utility dug the hole to re- pair it, they encountered a large area of very saturated soil which kept cav- ing in. This made their work go much slower and made the repair hole much larger. St. Paul Water Utility also re- paired a leaking hydrant on Thursday of this week at the intersection of Creek Avenue and Dodd Road. They omitted informing one of the residents served by the line that he would be out of water and he was upset. It was a quick repair though and he was back in service in a couple of hours. Street Report The Streets Crew began installing per- manent bituminous patches to the streets this week with "hot mix". Hot mix is now available from the asphalt plants. They installed some Class 5 (rock) where it was needed on the shoulders of the roads. They straight- ened signs and installed new crime watch signs for the Police Department. They checked and cleaned storm grates after the rain storm. Code Enforcement Report Kraus Anderson, United Properties' contractor, for their new three story of- fice building has sufficiently satisfied the life safety issues and completed enough of the building to allow Everen Securities to move into the third floor. In order to meet this Monday morning move in deadline, Kraus Anderson had 50 electricians and many other trades people working overtime all weekend long. Judge Lynch found the resident at 769 Sibley Memorial Highway guilty of vio- lating the City's Zoning Ordinance this week. The resident has unscreened piles of debris and other assorted refuse visible from the street and adja- cent property. The homeowner was given until June 1st to clean up his property (now, I guess we'll just have to wait and see if he complies and cleans up). Cherry Hill Street Reconstruction Construction began this week with partial driveway pavement re- movals, boulevard excavation, and the lowering of manholes and gate valves. Bituminous reclamation operations fol- lowed starting Wednesday. The first stage of bituminous reclamation was completed by the end of the week. The bituminous pavement that was not reclaimed at this time was the pavement that was beyond and adja- cent to the limits of the storm sewer trenches. Storm sewer installation will start the week of May 10th by Penn Contracting who is the subcontractor responsible for the storm sewer con- struction on the project. Penn Con- tracting expects to finish storm sewer construction in less than two weeks with favorable weather. Most of the storm sewer work will take place on Cherry Hill Road between Wachtler Avenue and Ivy Lane. The pavement that has been left in place to facilitate storm sewer construction will be re- claimed after the storm sewer system has been installed. The temporary mailboxes that Hardrives, Inc. in- stalled at the location requested by the Post Office on the west side of Wachtler at Cherry Hill created some safety concerns. After hearing the concerns expressed by the residents the Post Office agreed that a better lo- cation for the mailboxes would be far- ther south on the west side of Wachtler at Park Place. The Contrac- tor resolved the residents safety con- cerns when they shifted mailboxes to that location on Wednesday. The rain on Friday forced the Contractor to de- vote some time and material to im- prove the condition of driveway aprons, but curtailed most of the other work on the project. Attachment: • Smolik Thank You Letter - --- -- --AIL) NEWS Public Works ePl*peli*ne Engineering Code Enforcement LETTER April 30, 1999 Parks Report The Parks Crew picked up trash from the parks daily. They stripped truck 503 including re- moving the radio and delivered the truck to Grossman Chevrolet as a trade-in for their new replacement truck. They then picked up their new truck from Grossman and de- livered it to Reach Equipment to have the plow attachment equip- ment installed. They attended an athletic and sports and turf work- shop on Friday. Floyd Perry, who is a nationally recognized expert on turf management put on the workshop. The workshop was held at Minnetonka's City Hall where Mr. Perry addressed spring turf repair of football/soccer fields, seeding, care and maintenance of pitchers mound's etc. The Parks Crew built a new base- ball pitcher's mound at the Civic Center ball field site by City Hall as recently authorized by Council. Utility Report Rich checked the City's seven sanitary sewer lift stations daily. Rich raked sticks and grass and started mowing lift station lots this week. Street Report McPhillips, the street sweeping contractor, finished sweeping the streets in record time this year. They brought in six machines and worked twelve hours a day for three days and were finished! Dave submitted the renewal forms to Dakota County for the waste - hauling licenses that are required for the City to be able to haul and dispose of anything at Pine Bend Landfill. They finished sod dam- age repairs. They picked up some tires and other rubbish found along Wagon Wheel Trail. They coordi- nated with US West to remove a downed limb that was lying across the US West line in an alley. Cherry Hill Street Reconstruction A pre -construction meeting was held on Tuesday of this week with Hardrives, Inc. and various utility company representatives to final- ize plans for the reconstruction of the Cherry Hill neighborhood streets. Construction is slated to begin next week with partial drive- way pavement removals, boule- vard excavation, and the lowering of manholes and gate valves in anticipation of bituminous recla- mation near the end of next week. Bituminous reclamation will be performed in two stages. The first stage will reclaim pavement where storm sewer will be installed in the neighborhood and the second stage will be to reclaim all remain- ing pavement after the installation of storm sewer has been com- pleted. Storm sewer installation will start the week of May 10th. Most of the storm sewer work will take place on Cherry Hill Road be- tween Wachtler Avenue and Ivy Lane. Hardives, Inc. has elected to install temporary mailboxes for the neighborhood on Wachtler Av- enue. The Contractor realizes that it may take residents some time to adjust to getting their the mail from these temporary central- ized mailboxes, but one important advantage of this arrangement is that residents can be assured that Postal Service mail deliveries will not be interrupted throughout the duration of the project. Hardrives expects to finish the entire job by early August with favorable weather. Attached is a copy of a project information letter that was mailed to the residents this week. Code Enforcement Report Tension is high out at United Prop- erties new three story office build- ing currently under construction along TH 494. Everen Securities have been promised a May 1st move in date and the building is not ready. Both Paul and Dick will be very busy Friday Morning with last minute inspections, but with all the work remaining it is question- able whether or not the space will be available. Dick testified at a court hearing on Wednesday with Karen Kampa, one of the City's prosecuting attor- ney against Mr. Harold Hanson on his yard debris violations. Mr. Han- son lives at the intersection of Wachtler Avenue and TH 13. Judge Lynch listened to the testi- mony of both sides and will make his decision in the near future. Attachment., ♦ Letter to Cherry Hill Residents Mendota April27, 1999 city of Heights TO: Cherry Hill Addition and Surrounding Area Residents, and Property Owners FROM: Marc S. Mogan, P.E., Civil Engineer SUBJECT: Cherry Hill Addition Street Reconstruction Project Information Job No. 9714, Improvement No. 99, Project No. 1 CONTRACT STATUS Mendota Heights received bids on March 25, 1999, and awarded the contract for the Cherry Hill Addition Street Reconstruction project to Hardrives, Inc. at their council meeting on April 6, 1999. The low bid submitted by Hardrives, Inc. was within the budgeted figures as presented in the feasibility report that Council accepted in November 1999. Hardrives, Inc. is an established bituminous Contractor based in Rogers that has completed numerous street reconstruction projects of similar nature recently in the metro area. Northern States Power Company (NSP) has a limited amount of gas distribution system work to do in the Cherry Hill Addition neighborhood compared to other recent City Street Reconstruction Projects. The gas distribution system in Cherry Hill Addition meets current standards and will not be replaced or modified. NSP gas service will be interrupted briefly to the odd numbered houses on Cherry Hill Road between Wachtler and Ivy Lane when the storm sewer is installed on this section of the project. PROJECT MESSAGE LIME The City has telephone messaging service to update residents on the projects' status, and hopefully be more efficient responding to any concerns or requests you might have. This messa,zine line is available 24 hours a day, seven days a week. Please call 612-794-6331 for brief periodic project updates, or to leave a message that does not require immediate attention. CONSTRUCTION DETAILS AND SEQUENCE It is incumbent on the Contractor to schedule their equipment and manpower as is necessary to complete this project by September 3, 1999 according to the terms of this contract. The start, sequence, duration, time lag between, and completion, of work items on anv given block within the project area is at the Contractor's sole discretion. Consequently, it will be difficult to predict when construction might start, or how long it may take to complete on your block. This Contractor will make every reasonable effort to minimize inconvenience to the residents throughout the course of this project by insuring reasonable access to private property, and garages at all times (except as noted on p.2, item 8), and by satisfactorily maintaining the condition of the street and driveway surfaces for the period of time they remain unpaved. IIoI N ictorin Cime • )Iendota liei0t5, '�I` 55118 (651) '52 IS90 • FAX = 2-59=0 Cherry Hill Addition Residents and Property Owners April 27, 1999 Page Two The construction sequence for work on any particular street will include some, or all of the following items in the general order outlined below. 1. Removal and salvage of sprinkler heads within 15 feet of the existing street pavement for subsequent reinstallation upon completion of street construction. Note: This task will be the responsibility of the homeowner or their lawn or irrigation service. 2. Relocation of mailboxes further back from the street in the their current location, or to other centralized locations situated throughout the project. 3. Removal of sod and topsoil along the edge of the existing bituminous surface. 4. Bituminous reclamation/removal of the existing pavement surface. 5. Partial removal of the existing driveway surface, and placement of temporary gravel. 6. Storm sewer construction. 7. Necessary subgrade correction prior to roadway reconstruction. 8. Concrete curb and gutter construction. Residents are asked to park in the street in front of their homes, and refrain from driving over new concrete for a period of 3-4 days after construction. (Please contact us if this is a hardship due to disability.) 9. Placement of any additional required Class 5 aggregate base. 10. Installation of first layer of blacktop (Projected completion date of July 3) 11. Driveway replacement to the extent disturbed. (See Driveway Replacement section for information about replacing your entire driveway by this Contractor.) 12. Finished grading of boulevards, and the installation of sod within disturbed areas. Note: The Contractor is responsible for watering sod for 30 days after installation. After that 'DO -day period has expired, the Homeowner is responsible watering the sod, and should continue to water it sufficiently over the next 12-month period. 13. Installation of second layer of blacktop. Note: City has the option, and may choose to delay construction of the second layer of blacktop until June of 2000. MAIL AND NEWSPAPER DELIVERY The Contractor may elect to place temporary mailboxes in central locations throughout the neighborhood. The StarTribune has asked that each customer call their circulation department at 612-673-4343 to request that the newspaper be delivered to your home instead of the newspaper box for the duration of the project if mailboxes are placed in central locations. The St. Paul Pioneer Press has alreadv been notified of this project, and therefore no further action on your part is necessary. Please contact us if you experience any mail or newspaper delivery problems relative to the arrangement the Contractor has established for mailboxes on this project. Cherry hill Addition Residents April 27, 1999 and Property Owners Page Three PRIVATE IRRIGATION SYSTEMS AND BOULEVARD LANDSCAPING The City's Contractor will avoid or protect all clearly visible existing irrigation system components and landscaping as much as possible. This project may affect some landscaping (walls, shrubs, fences, invisible fences, etc.), and most irrigation system components, within 15 feet of the existing pavement edge. Please contact the Engineering Department immediately to inform us of the existence of a private irrigation system or for confirmation of affected landscaping. Irrigation system involvement may include salvaging sprinkler heads, capping, tapping, or laying irrigation lines, adjusting or relocating sprinkler heads, and irrigation system testing. The variety of private irrigation systems used and our unfamiliarity with your irrigation system logically suggest that the homeowner or their irrigation service be best qualified to do this work. Residents generally are sensitive when private landscaping is affected and want control over its restoration or replacement as well. For the reasons, the City requests that residents make their own arrangements to restore their private irrigation systems or disturbed landscaping. Please contact the Engineering Department if you're affected to coordinate landscape restoration, and irrigation system repairs and operation so as not to restrict, delay, or damage street construction. Please have your landscaping, irrigation, or invisible fencing service provide you with a written estimate for this work, and submit a copy of this estimate to the City. The Engineering Department must review and approve these landscape restoration and irrigation system repair estimates prior to authorization of any work by the property owner. The City will pay the landscaping or irrigation service directly for this work as an expense under the City's project. Note: We don't expect the cost of a typical irrigation system repair to exceed $350. DRIVEWAY REPLACEMENT Cherry Hill Addition residents can elect to replace their entire driveway under this project. This additional driveway replacement cost could be paid by the resident out of pocket, or added to the base special assessment over the 19-year tern of the assessment at 7% simple interest. Bituminous driveway replacement includes removing the existing bituminous surface, shaping and compacting the existing aggregate base plus a variable quantity of new aggregate as may be necessary to make grade, placing a 3" thick compacted layer of bituminous surface, and restoring any sod disturbed along the driveway. The quote for this work is $29 per square yard. Concrete driveway replacement includes removing the existing concrete surface, shaping and compacting the existing aggregate base plus a variable quantity of new aggregate as may be necessary to make grade, placing a 6" layer of non -reinforced concrete pavement, and restoring any sod disturbed along the driveway. The quote for this work is $45 per square yard. Any driveway replaced under this arrangement would be guaranteed for a period of two years. If you are interested in replacing your entire driveway as described in this section by IIardrives, Inc. for the above quoted prices, or by a different Contractor for a lower price if one could be found, please fill out the form at the bottom of the last page of this notice, and return it to the City no later than May 15. Cherry Hill Addition Residents and Property Owners TERMS AND OBLIGATIONS FORPROPERTY OWNERS April 27, 1999 Page Pour Residents have a significant role on a project like this. In order to complete this project in an efficient and timely manner we ask the residents to understand and accept the following: 1. The Engineering Department functions as the primary representative for the City and you as a property owner, in all matters associated with this project. The City Engineering Department must deliver all Contractor directives. 2. The City and its Contractor requires right of entry onto your property to perform certain work in order to complete this project. The plans may include partial replacement of your driveway, and the finished grading and restoration of sod in the boulevard area. It may be necessary for the City to survey and/or place construction stakes on your property in order to construct these proposed improvements. Don't be concerned about stakes that may appear on your property, and please don't remove them. Construction stakes usually signify an offset distance and elevation, rather than the improvements' actual location. 3. Our improvement project incorporates design elements consistent with standard engineering practice. If there is some concern about your property that you think we may have overlooked, or should know about, please contact the Engineering Department. 4. Please refrain from parking on the street throughout (lie duration of the project except for the period of concrete curb and gutter construction as described in item 8, page 2. 5. Property owners who assist the Contractor's watering obligation immediately after sod replacement (see item 12, page 2) promote its survival, and help reduce follow-up repairs. SUNINIATION If you have a concern or complaint regarding some aspect of this project which you feel merits immediate attention during normal business hours, please contact the Engineering Department between 8:00 a.m. through 4:30 p.m., Monday through Friday at 651-452-1850. If there is an emergency related to this project which requires immediate attention after hours, please contact the Mendota Heights Police Department at 651-450-1111 (dispatcher). City staff would like to thank you in advance for your patience and understanding in this significant undertaking. We will do everything we can to deliver this project within budget, and insure that the expectations of the neighborhood and the City have been achieved. Please contact the Engineering Department, or tine 651-452-1850, if you have any questions or comments. Sincerely, Marc S. Mogan, P.E. Civil Engineer ILINIS OI' DRIVEWAY REPLACEMENT AND REOUEST FOR PRICE QUOTE 'rhe following conditions apply to the reconstruction of private driveways in conjunction with the Cherry Hill Addition Street Reconstruction project: I . 'file property owner must gram the Contractor and the City right of entry onto their property and sign a hold harmless agreement to reconstruct their driveway. 2. The additional cost of this driveway mplacentcin work could be paid by the resident out of pocket, or added ill their base special assessment, mid spread out over the 19 year teen of the assessment at 7 7 simple interest. 3. "file property owner must sign a waiver of public hearing to add the cost of this work to their special assessuem. 4. The cost quoted m ttis tittle to replace a bituminous driveway is $29 per square yard. 5. "rhe cost quoted at this time to replace a concrete driveway is $45 per square yard. 6. Driveways constructed in conjunction with this project would be guaranteed for a period of two years. Cut here and return to City hall Residents interested in receiving a norbinding price quote to replace their driveway ill conjunction with the Cherry I [ill Addition Street Reconstruction project are asked to fill out this fornt and return it to the City by May I5, 1999. NAME: ADDRESS: PI IONC NUMBER: (11) (W) 1)JtI Vi?W AY NI A FR I AI. 1)CSIIZFD _— __ --------------- NEWS Public Works Engineering Code Enforcement LETTER Parks Report The Parks Crew picked up trash in the parks this week. The Parks Crew serviced all their summertime equipment including the small engines on the hand mowers, aerator, edger, etc. They sharpened the blades on their mowers and replaced the jack stand for the trailer to the John Deere tractor. They marked the softball fields for a Sibley High School girls softball tour- nament that was held at Men- dakota Park last Saturday. They had to replace the ele- ment in the hot water heater at the Kensington Park comfort station. They installed bases at the Civic Center Field for the St. Thomas Academy baseball team. They dragged all the ballfields. Utility Report Rich checked the City's seven sanitary sewer lift stations daily. He also greased the pumps at the Mendota Heights Road and Lilydale sanitary sewer lift stations. He coordinated Braun Pump's en- try into Lilydale's lift station when they removed a pump, completely rebuilt it and rein- stalled it. He performed some routine maintenance on his electric sump pump. The Pipeline Street Report The Street Crew worked on repairing sod that was dam- aged by snow plowing opera- tions. Dave Sorby participated in the table top exercise held last Thursday at the Fire Sta- tion with the Fire Department and Police Department. The main goal of this exercise was to prepare for dealing with se- vere summer storms. They repaired Mrs. O'Brien, Falls View Court, fence which was damaged last winter during snow plowing operations. They worked on straightening up sign posts at various loca- tions throughout the City. They worked on cleaning up the back lot at the Public Works Garage - they removed all the scrap metal. Street sweeping operations began on this Thursday. McPhillips, the sweeping con- tractor, arrived with five sweepers at seven A.M. on Thursday, April 22nd, and worked for two hours, at which time they had to quit because the sand was too wet from the rain. It is their intention to sweep with six sweepers twelve hours a day until they are finished. April 22, 1999 Turn Lane To Be Con- structed Last year Independent School District #197 requested that Dakota County construct a right hand turn lane on Delaware Avenue north of T.H. 110. Dakota County felt that their request was a valid one and asked the City to par- ticipate according to their nor- mal 55-45 cost share program. We also felt that the request was valid, but asked them to include West St. Paul in the formula because Delaware is a border line road with West St. Paul. We further requested them to include a separated trail. The County agreed to both of these City requests, however their bids came in Way over estimate and they rejected them. The County notified me this week that they have rebid the work this sum- mer with a larger project and now have received an excel- lent bid. Valley Paving is the low bidder and will complete the work sometime after school is out, probably in July. Attachment. • 1999 Gun Club Lake Newsletter NEWS Public Works ThePi*peline Engineering Code Enforcement LETTER April 16, 1999 Parks Report The Parks Crew picked up trash daily in the parks. The Parks Crew removed downed limbs along ped- ways and in parks from Thursday's strong winds. They dragged and graded all softball fields for the start of the season. They worked on the design of the baseball batting cage that is to be installed at Mendakota Park, and also striped the foul lines. They cut some downed tree stumps closer to the ground in various parks in preparation for a stump grinder contractor to come in and remove them. Utility Report Rich checked the City's seven sani- tary sewer lift stations daily. He fin- ished flushing the Cherry Hills neigh- borhood sanitary sewer lines in an- ticipation of the street reconstruction project. He performed sanitary sewer inspections for new connec- tions at 1648 Dodd Road and 829 Hilltop Road. He cleared a sanitary blockage that occurred on Farmdale and backed sewage up into 1411 Farmdale Road. The sewer block- age was reported by the resident at 4:30 on Tuesday. The resident dis- covered the blockage when he no- ticed the sewage backing up into his basement. Rich, with assistance from Mike Maczko had to remove a very large buildup of grease from a 10" line in order to restore flow. Rich checked Lilydale's storm sewer system this week and found no prob- lems. (We have an agreement with Lilydale to have Rich check their storm sewers periodically and charge them for our costs). Rich coordinated with Braun Pump to come in and replace the float rack at the Veronica Lift Station. Street Report The Street Crew discovered another mailbox to repair this week, Mrs. O'Brien's on Falls View Court. She had numerous other concerns that the Street Crew addressed with her when they were out working on her mailbox. The Street Crew also re- moved numerous signs throughout the City that were in the right-of-way and violated the City's Zoning Ordi- nance. They continued to patch potholes with cold mix bituminous (temporary patches) this week. They began re- moving the snow removal equipment from the trucks. They also attended a Maintenance Expo, sponsored by MnDOT and Minnesota Street Su- perintendents Association. Some of the topics covered at the conference were: "Gravel Road Maintenance" (we still have a gravel alley and street) "Personal Safety" "Concrete Maintenance" "Dealing With Insect Pests" (bites, stings) "Pavement Maintenance" (manage- ment programs, pothole repair) "Equipment Inspection" Code Enforcement Report Dick performed his first inspections on the new maintenance garage at Mendakota Country Club this week, when he looked at their footings and the west foundation wall. There are always numerous ongoing inspec- tions being performed by code en- forcement. We only mention the new or significant ones in this weekly re- port. Remodelings and basement finishing projects have been ex- tremely popular this year. LMRWMO Citizen Advisory Com- mittee Kickoff Meeting The kickoff meeting of the Citizen Advisory Committee (CAC) Lower Mississippi River Watershed Man- agement Organization (LMRWMO) will be held on Monday, April 19, 1999, at 7:00 P.M. in the Guard Room at the Inver Grove Heights Community Center, 8055 Barbara Avenue East. Mendota Heights vol- unteer representatives serving on the CAC are Mike Dwyer, 558 Stone Road, and Tim Bruckmueller, 678 Third Avenue. Attached is a copy of the agenda for Monday's meeting and meeting location map. Wednesday Meetings Wednesday evening was an ex- tremely busy night at City Hall with three meetings going on at once. Charlotte Shover, Dakota County's Environmental Education Coordina- tor held a program in the Council Chambers on Healthy Wetlands. The City's Citizen monitoring team was on hand to meet with the partici- pants. The team will also be at next weeks City Council meeting to pre- sent the results of the 1998 study. Attachments: ♦ CAC Meeting Agenda ♦ CAC Meeting Map ♦ Wetlands Meeting Notice Agenda Lower Mississippi River Watershed Management Organization Citizen Advisory Committee Meeting #1/Kick-Off Meeting April 19, 1999 1. Introductions -- Karen Chandler, Barr Engineering 2. Overview of Lower Mississippi River WMO -- Karen Chandler, Barr Engineering 3. Watershed Management Organizations and Water Management Planning -- Phil Belfiori, Minnesota Board of Water and Soil Resources 4. More Background Information about Lower Mississippi River WMO, what they've done and where to go from here -- Karen Chandler, Barr Engineering 5. Role of Citizen Advisory Committee - Ron Struss, Minnesota Board of Water and Soil Resources/University of Minnesota Extension Service 6. Lower Mississippi River WMO draft statement of vision and purpose -- Karen Chandler, Barr Engineering 7. Future Citizen Advisory Committee Meetings, wheretwhen 8. Citizen Advisory Committee officers 9. Adjourn Thank you for attending, your input is important! Directions to the City of Inver Grove Heights Community Center, 8055 Barbara Avenue East: From I-494, go south on Highway 52 to 80th Street, turn right (west) at 80th Street, turn left (south) at fast street (Barbara Avenue), building is on your right. From Highway 55, go north on Highway 52 to 80th Street, turn right (west) at 80th Street, then turn left (south) at Barbara Avenue, building is on your right. See attached map. USB011 P:\23\19\572\419AGEND.WPD/KCL 86't�tF' �t M;arcott�ake ` `9a in the 1999 Dakota County Wetland Health Evaluation Project, a volunteer citizen wetland monitoring program. All programs are free and open to the public Sponsored by: The Dakota County Environmental Education Program 4100 220i° Street West, Farmington, MN 55024 651-480-7734 The Dakota County Environmental Education Program is a cooperative partnership between the Dakota County Department of Environmental Management, Dakota County Office of Planning Dakota County Soil and Water Conservation District, and the University of d1linnesota Extension Service, Dakota County. DEWS • Public Works Pipeline Engineering - The Code Enforcement LETTER Parks Report The Parks Crew picked up trash daily in the parks. They finished sweeping all of the trails this week. They began cleaning and storing their winter equipment and bring- ing out their summer equipment this week. They worked on acti- vating the water in the Mendakota and Kens- ington Park comfort stations. They cleaned them up and opened them for the season. F_ grind some tree stumps that were left over from last summer. Dave at- tended the annual League of Min- nesota Cities "Safety and Loss" sem- inar. Utility Report I good Ducks returning home to Marie Park Rich checked the City's seven sani- tary sewer lift stations daily. Rich performed a sanitary sewer connec- tion inspection for a new home being constructed at 532 Miriam by Math - ern Homes. He started flushing the sanitary sewer mains within the Cherry Hills neighborhood. We do that flushing and cleaning so that we are assured the lines are clean be- fore projects start so that there will be no question that any blockages that occur are the responsibility of the contractor. Rich and Tom also had to remove a dead dog from the end of a culvert. The dog was block- ing water from flowing into the Cop- perfield Pond. The dog was swollen and ripe and Rich said that it was the worst job that he has had to do work- ing for the City. Street Report The Street Crew finished repairing all of the mailboxes that were damaged last winter during snow plow opera- tions. They hired a contractor to Code Enforcement Report The Code Enforcement Officers is- sued three new home permits this week; Carmen Tuminnelly is con- structing a new home for himself on Carmen Lane, Roy Kingsley is con- structing one on South Lane and there is also a new one on London Road. A second pool permit was also issued. Federal Aid Preservation Program Application The Engineering Department sub- mitted an application under the Fed- eral Aid Preservation Program to MnDOT for the installation of emer- gency vehicle preemption (EVP) at the intersection of Delaware Avenue and Highway 110 last month. We learned this week that the Mendota Heights project was just one of the many projects totaling $45 million that the project selection committee April 9, 1999 chose not to finance with $9 million of available funding under this pro- gram. Attached is a list of the suc- cessful projects and unsuccessful projects. The selection committee included members from City, County and Re- gional governments as well as Mn/DOT representatives. The se- lection committee chose projects based on the following criteria: • economies of scale: (system- wide projects corridor work that entailed a significant section of the system), • administrative economics: (suitability for combined con- tracts), • simplicity: (no right-of-way pur- chases, no major construction, no complicated issues, and no additional work required), • restoration: (proposed work would significantly extend the life of the road- way/structure/vehicle etc.- not just maintain it), and • equity: (available funding that was fairly distributed to all local partners). Federal Aid and Dakota County will fund $1.156 million (80%) and $0.327 million (20%), respectively, of the selected county projects. One of the seven projects is to micro - pave the Big Rivers Regional Trail along the Minnesota River from Mendota Heights Road to just north east of 1-35E. Attachment: ♦ Successful and Unsuccessful Projects by Agency O O i pOO '8108 O O O IS IS.Oi O f N O � IO! 00 IH 8 ON �,mi O O'O! IN O f0 m O fIY'OI O N Im lm m rn O m N "I (m'lm N gym! m (fl N N Ij )tOp� m A P 10IP in� N O INOI b im lNl IN L ^ f (O(pp H IN I�IMI M N N itm+ll�'f' q INN n ,� 1' MiN;H; N LL ( I I IIOIIN� I I!'I ;8Io1 ON o r S I S8ISI 8m (IaS�Ot 1I8m[7 ;Il!ao6h) i! SSm g I mS oh ♦((a� O If '8 Otp ID ^ f f 1 I H88h HO N N N HIM N8 N M NS NG H HiN H jH H N ig � I 8 0 8 So8 0 8$ ggi0 S I8 8 S g 8 8 �SSIS a H b N O S O 8 O 8 O O SI^ IO b Im O N m 0 OIO O n w O O O O O O �O IIO m m O m 0 Olm m 0 O m O W O m O O C V Y m Oi I[i b f N Oi Ola7 n H M H NH N N H N H H H H M r 1 C O 0 m � � mm 5 W U 't U m n m U U p Z C •O CO m O U O U U CliO U m 0 0 C .m+ mCli Q A = L O L >> ° 9 S V L t L = 0 m L p W 0 J G O O O 'W y C O O O O tl U O O U C E cc m C C C tl W OtlO C 0 Im OWO`C OobOcmC aWC aO ;OSmOQ ;;EmOqq O 2y° m mo 3 @ E ° E O j` -cc 0 c o 'mo a o c = °mO;Eq omCOoa m 1 o E mimS>P ImT -C(U'�� ¢ IO >> l > a a a c R O 5 E m U a m �m 3' E >` c a �m8Ia m= y a'm c tl W N Id O m.91 0 O 0 m~ c;m >�tl OWN7lm' ®. c o $ °mC N W W J W J W J t� m W m I° O� m IJ m J jL W b m b p y U m E O W � L Q C m C m m m'O I V m m j T m m Wlmlm O m O tom a: a —2 a: Cr ; o V IH ! I j .9 U d c.o a lIFS o d d d d C m U IU CI° C U U U U U Ob tl IUI :': o °ImI°� Imo. IAI 'o m 'o m o m `o m '° m 'o " a O DI°IO O To 0 !Z; Z; 2�: o Y IY' Y � Y s s Y IYi o,m CI CIN tl Q O Q U F c ICI Q IQ IQ C;__ im Im O'er I-Im ;mmi m '�U UIU'= a' m ,m Cl 'OI m l O m O m O ID m m 0 ICIW a199:m Wj21 m = b oz KQ iK U� (9 W A W m Iy h INI NIfA UY m C1C9 6. N IN w ✓-0 iml 8 S iS m S S O O S N C SO S S O S S j N iPi 10 S 8 ig�$ o n g 00 g O �'b P 0 m Q m N A a imp m O M N N T I1T tp C t0 PP s� O .N- pp rO N N C I N'N N 609 I I 8 O QO ISp IS N N 8 O S S O S IS f S O S O O i0 O O O 10 i� M n N S O O 8 N SI b A 8Ia S O O IS ITO O C O N OIN N N y0 m m G fCI N N N N M N N N 8 8 g S8 8 o S o S 8 0 8 88 SO 8 a 8 8 pQ O S (1pp N t00 N S 8 O 8 N (H O 8 pq S S O O V �1 N M O 01 N N O O O O SIN N n O O O O $ r O O �O (p u1 O O O O O h fv r m O O N N O O QQ O'f th N h N r0 ttpp O H N N N N N I m L U U cc c ,g o m m0a O = = O O 0 C y W m O UU U S m w NS T 2 m m m mN W 3 c F-= oil m m fU c o E y 'p IJ qoq m = q 0 0 O j 0 0 0 U 0 O O m O O o Y rn m 00 0 0 0 o mt- m W H,t2 m » C m mx or 3 o o 0 o S p 0 0' K t y a m o = o m N b 00 Ci O O m n m m •� •� p U U C m n n M 0 m b o m 0c O O •cc O r 3 W O1 E o 0 c o o m m m m >> e c 'C = •C 'C > > > m 'C •Co mm2 > C Y N j >S > > QQ Q m 'cm =• a0 aWrn 2 m ao0 4 6 W m C U O p � oUf MWBm� m m = m m» M = m O n n n m c 3 m q U 'c �rn �c rn W N nS0 l7 m mP n:�atp m C am C 9 >. (A u) a m> m ml r0 U E m wam noSm nQ,8Eow8 = —m El mg qA cmrn �mE m O C mtm Mac m m 0 sn 0 maeZ n m0Co $c C m EapN amm c mdOO! Co $mm nM- Cb K I i- y ~ D U O O O O U O U p U c c �< < o to a e W e$ a m m m m m m F- F- F M a c c m o O -I o o O— m m m m 00 O O O O c c c c C— c_ c O'21� U O m m Imm m m0 m mp,m m Imo _c =2 2 c c Iii =' im �i Z m 2 ! :i I� 7 o z Y m Oii O I O I S.O S M Y m S f IS S !G S N S S S m N OSig p IBIS �!•I 10 o 8 8 m P f9 6110 t0 tp P 'O Ito N P �,h O S O N O O O ISIO OO O n O O 'S S N b 61 S S O N O M N S i�i O 1 (6(pp� 1 N 10 O IO ;P 8 N �O O 8 101 O !O ON � Itlf N P P t0 tc O fN1 O I IQ N O S � N O P OII�I N O O N In f Im N M t.j (p O NH H MIN N N H M iM tatpp N N H M p w N H tNtpp N H w ♦m 10 I N O O O O10 O Y (Op t0 IO S A S O !o N ti O S S t0 A O m f` O Wit O t7 O t00 1� N A ((pp IA N c7 t7 I: O 10 O m W A N N H O11H H N N N N N 17 N N N M N (D 17 N N N H N M N N H N H H m N N y Q m m o¢ U U U u n c E `m $ 5 5 c t!? m a m m y W o' m m c c m o 0 0 0 o D 2 m o N N O 9 C NmN m O LN M a LT U O 8 O C O J = C = J J C LL W m O 0 O Q O O O O m SJ " q j q O O� Q S 'S '1' i_, 'i. C m H O td $ 0 J $ C C C C 2� U 9 J E = 0> m y 2w a oQ q o o ooyOcc 'tN� > > > > �m FO$m > N3: � 0 O O O O Oy o Q o m m m m rna o > > > > > 'oE m z >aaa a� m a V ui m m t m E d m c W E E E c m o a s o m b 'S m E p m o c a' cc O� CO .� > t0 O Um .2 N S C .� ym Imo O)U y O�0 m00 4 J m 0 •J C '� O O. Q OOC O y m Nqq m m 0> OI� m C Q U 0 NN s a U m (Nm OLaC n O'- 9 00 aC aCUOIwIU0 0 C wU0 J m C m — C Ot ✓O U-a ON IL 6 LY 0 9 U p A $9 O._ U O._ EIJIm a MIMM as Z' 0 3 � s 0 8 9 m y y E G C G� O Y y 6��c L_ m 0 i� C d m �. I� U m �. m �I m MIX! 0! 0 0 U IK � 1 0 m C U Iy � Y 9 = 3 y m 0 in a 0 w y y C ~ O Is C C O G C C' O O O O ~ ~ If T >. Is Q CI ® 0 J m m 7 m > > m OI ¢Q 0 y T 0 m T 0 0 T 0 TI T ml m m y m a ILA ,L� ml � - >> a a a m a a Z �I� m m m E m Im m s U UI O O m C ,m12) K m m m m m O > > z U.. p 'UI w2 a a m 2 S> O I 1 N NI N IN N m m. S ! N S S S S S I♦O iSi Q S S �S S S G IS) O O o O N C W O tp (Qp (D O O pO 8 O1 h (J O �p N N N N Q Q Q 8 Q Q O t� �O Q w Q O P $ g 101 101 O $ 8 O O O g 10 O O O O sum o$ 8 �o;�N Flo o m N g m g N (o 8 t m C6 tp N N � IN eV N tV (h O (p pj S S S S S OIS O O S O O S S S O O S O O 10 S S O n pp 8 N O O n_ O r O O H m r C N O S t♦'i Q h O 8 i+j O O nln m h cl Yf �O OOi_ M P1 flpn N N 1� ¢ m a o 10 N m m m 3 U m ¢ U m O _ O= Y 0 W 0 q w G m U) 4i F- N o m U p U y P m V y Y W lJ' 6 _ m A I- C N m S C 5 co E 2 o a= m G> 8 N�8 o yac= 3 U�m L0 0:m U m 17w O =07 Um O .Q N L OD cis = o ie @ m C �a m l�V 2�2 rn t7SQ Ur¢ c 2 w o = O S,a2 y ® m Y m� Q .. m 5 F ¢ 2 ¢ c ° O S y 0 U O V) N R L U C O Wy 3 c 0 = 0 EioUrn 2 0 U L ¢U M V O S c y c. -U�U O 0 - P3U c mM 'Q`o C cM m� 6`° `0m c No O o c c S o m$ A ¢ 9 a o a = Y0 'Ntc ¢L) NNpi 'a 2UE.2g CL 0 E NyNrn �E> iUm :CE(oa oUm ca o o m3$ > m m omrn mym N¢O ai L >a omm 2 75 C p a c m m IL L U 0 o` a O E =0 a F m U m m y y O E cc Cy > U J w m 0. a E m i nNm mmc mnm ya c7Z m a m J m 9 MO00 y 6,0C = aO tm0y nIC w�d: m K m K C s m a n m K E >. am m g o O d m m m I_ D m = IC I U U U iW U _ _ = c O O O O O OIma O O (O O O O O O I16 h 'm m N m $ jwI N N I(nlwlN Vo- f3/1 ! (p IN F 7 > > > 3 r5 3 3 Y Y Y Y > CC I I I I g m ipo of S to is p5 P iSi � S) pS 8 OI O Oj � ItD: m Ito i� O b N tWp- p MI � :Ni N n N N I IOI I I Ip ( I I N O iO1 f ISI O O S Is IS I a P N N 01 H N p p p N S a S S O S O m N A O N w N N cyt 0 IN O ^ N cl N N aO N O N N M r N O U Cc c O c U U 3 c W m O L L Q G o L to > to > a. W W W LJ W W Q m Q y W O O > !p 9 0 m W o o _ < cc c > > N U o > a a` 3 a a m 0 3 _m W W � s � W C a 3 WIN 'W !1 E SiLu wc�c w m W J J W � J IO U IU',l� 19 ID o C. i m j i I I Unsuccessful Projects by Agency Type Agency Proposed Work Total Cost SIG Anoka Install EVP system $60,000.00 I LED replacement & signal painting — SIG Anoka Co. Partial funding $144,980.00 SIG Bloomington LED replacement —Partial funding $287,023.32 SIG Brooklyn Pk LED replacement —Partial funding � I $73,600.00 SIG Burnsville ,Signal Rehabilitation $116,175.00 SIG Carver Co. (LED replacement & EVP install $12,500.00 HUB Como -Harriet StreetcarLineiRestorerailbed $456,120.00 SIG Dakota Co I LED replacement —Partial funding $356,300.00 SIG (Dakota Co Signal Painting & Controller & Cabinet Replacements —Partial funding $214,000.00 SIG Edina LED replacement —Partial funding $165,200.00 PAV Hennepin Co. MicroPaving/Pvmnt Markings $337,438.67 SIG Hennepin Co. Signal/Cabinet painting $360,000.00 SIG Mendota His EVP install $7,500.00 VEH IMetro Transit Vehicle Rehab $8,432,000.00 PAV IMinneapolis I MicroPaving/Pvmnt Markings $20,053.00 SGN IMinneapolis I Replace Type C signs $625,000.00 SIG IMinneapolis I LED replacement $2,563,000.00 SIG IMinneapolis I Install EVP on A -minors $9,782,000.00 SIG (Minneapolis Replace controllers/cabinets $4,487,000.00 SIG Minneapolis Renovate Lighting Poles $4,256,000.00 SIG IMinneapolis I Paint Signal Poles $3,583,000.00 SIG IMinneapolis LED replacement $1,659,000.00 BRG Mn/DOT Deck repair, overlay,rail replace $100,000.00 BRG Mn/DOT Deck repair, oveday,rail replace $100,000.00 GRID Mn/DOT Upgrade old/damaged crash cushions $210,000.00 GRID Mn/DOT (Replace median box beam to g-rail or wall $250,000.00 SIG Mn/DOT Interconnect 2 signal systems $8,550.00 SIG I Mn/DOT !LED replacement —Partial funding $125,000.00 SIG !Mn/DOT LED replacement $214,000.00 SIG !Mn/DOT LED replacement $59,600.06 SIG !Mn/DOT ILED replacement $250,900.00 SIG IMn/DOT !LED replacement $204,200.00 SIG IMn/DOT Signal Painting at 53 intersections $318,000.00 Unsuccessful Projects by Agency SIG iMn/DOT LED replacement j $458,400.00 SIG IMn/DOT LED replacement 1 $130,000.00 SIG ;Mn/DOT LED replacement $152,500.00 BRG &Rec oardCar bridges over M'haha Creek Board $1,250,000.00 BKE I jMpls Park & Rec Board Bring 15 ped/bike bridges over Whaha Creek to ADA & stateaid compliance $1,250,000.00 HUB MVTA Asphalt pave gravel lot with 3" overlay, �regrade for drainage, re -stripe $10,600.00 HUB IMVTA MicroPavmg/PvmntMarkings $19,944.00 SIG Ramsey Co Replace Red indicators w/LED @ 14 intersections; Paint signals @ 87, replace cab/controller @ 13.—Partial funding $627,500.00 SIG Richfield LED replacement, install EVP—Partial funding $267,294.00 SIG Rockford LED & Signal Revisions $11,780.00 BRG Saint Paul Plate Beam guardrail install to protect bridge piers $20,000.00 SIG Scott Co. (SignaVCabinetpainting $22,500.00 SIG Scott Co. Install EVP system $120,000.00 SIG Scott Co. Interconnect 9 signal systems $231,000.00 SIG St. Louis Park LED replacement —Partial funding $407,000.00 SIG St. Paul FiberOptic Interconnect System $90,000.00 SIG St. Paul FiberOptic Interconnect System $145,500.00 SIG St. Paul FiberOptic Interconnect System $120,000.00 SIG St. Paul Intersection improvement $100,000.00 SIG St. Paul Paint signals @112 intersections $168,000.00 SIG St. Paul Install LED ped sigs at 9 locations $44,500.00 PAV Washington Co. MicroPaving/Pvmnt Markings $547,660.00 SIG Washington Co. Paint signal, LED replace, sig revisions, and software for traffic management —Partial Funding $56,645.00 SIG Wayzata LED replacement —Partial funding $53,760.00 SGN Willemie Replace Type C signs $9,000.00 SIG Woodbury LED replacement —Partial funding $219,605.00 NEWS Public Works The Pi*peli*ne Engineering Code Enforcement LETTER April 2, 1999 Parks Report The Parks Crew picked up trash at all the parks daily. They con- tinued sweeping the pedways, but have been sweeping only in the mornings this week, be- cause kids are off from school and the pedways are getting lots of use during the day. They cleaned the tennis courts and reinstalled the nets. They at- tended a Minnesota Sports Turf Managers Workshop on Wednesday. They reinstalled the trash barrels and biffs in the parks this week. They swept the rec rock off from the edge of the infields at Mendakota Park. They removed some limbs from the pedway on Victoria Road by Victoria Highlands. Utility Report Rich checked the City's seven sanitary sewer lift stations daily. Rich finished his annual check- ing of the trunk sanitary sewer line and found no more prob- lems. He flushed some sanitary sewer lines that are in ease- ment areas and are inaccessi- ble to the jetter. Street Report The Street Crew called and had the sweeping contractor, McPhillips, come in early and sweep Lilac Lane because of a safety concern from the Police Department. McPhillips has notified us that they will be tied up in Oakdale until April 21st, at which time they said they will bring in six machines and do our streets very rapidly. The Street Crew worked on mail box repairs and sod damage that occurred as result of snow plowing. They continued to patch potholes as they discov- ered them and as reported. On Thursday, they attended a sem- inar on traffic control and sig- nage sponsored by Warning Lites, 3M and MnDOT. Some of the topics and issues covered were: "Principals and Devices for Traffic Control", distribution of new field manuals, discus- sion on protection against tort liabilities, updating on Federal Highway Association approved signage, to include notice that, florescent yellow - green signs have now been tested and are approved for use around and in school zones. Code Enforcement Report A record week for commercial sign permits occurred this week when four were applied for and will be placed on the next City Council agenda for review and approval. (Three in Centre Pointe and one on Waters Drive). Mendakota Country Club picked up their building permit this week for their new maintenance facility to be con- structed along Dodd Road near the Fire Hall. R.J. Ryan is the general contractor. And finally the last sure sign of spring ar- rived this week, when Valley Pools applied and received the first new swimming pool permit. Watershed Citizen Advisory Committee Mike Dwyer, 558 Stone Road, and Tim Bruckmueller, 678 Third Avenue, have been ap- pointed by Mendota Heights to serve as Mendota Heights' rep- resentatives on the Citizen Ad- visory Committee (CAC) of the Lower Mississippi River Water- shed Management Organization (LMRWMO). Pat Davies, 687 Woodridge Drive, has been named to serve as the alternate member for the two appointees on this committee. The Citizen Advisory Committee is charged with providing community input to identify strategies for protect- ing water resources that will be included in the upcoming revi- sion of the Watershed Manage- ment Plan for the LMRWMO. The first meeting of the CAC has been scheduled for April 19th at 7:00 P.M. at the Inver Grove Heights Community Cen- ter. Barr Engineering will be sending out confirmation no- tices to the CAC members and alternates for this meeting date and time. NEWS Public Works Engineering Code Enforcement LETTER Parks Report The Parks Crew picked up trash at all the parks daily. The Parks Crew converted the Toro machines from their winter duties to their summer duties. They removed the snow blower attachments and installed the grass cutting decks (and pedway sweeping broom). They ordered and received a shipment of fertilizer. They began sweeping the pedways. They reinstalled the martin houses. Utility Report Rich checked the City's seven sani- tary sewer lift stations daily. Rich continued to walk and check the City's sanitary sewer main this week. He found and removed a stick from a manhole. He took his hydrant me- ter to St. Paul Water Utility for its annual reading and calibrating. Rich uses this meter when he refills the sewer jetter machine by connecting to fire hydrants. Street Report The Street Crew was patching pot- holes with "cold mix" this week. They responded to complaints and also did ones that they found them- selves. John Ambrose completed some "hard face" welding on the plow slides and also did welding re- pairs to the John Deer tractor (Parks) and to the asphalt tray for the bitumi- nous hot box attachment. They made and installed replacement street name signs at various loca- tions throughout the City. They were able to begin working on mailbox re- pairs because the frost is now out of the ground. Code Enforcement Update A sure sign that spring is here - there were two new applications for build- ing permits for new home starts this week - Mendota Homes is construct- ing a new home on Miriam Street and Sussel Homes is constructing one on Hilltop Road. The home on Hilltop is a replacement for one that was lost due to fire in 1994. United Properties applied for a building permit this week for their first tenant space finish at their new three story office building located on 1-494 (Everen Securities). The TAJ building located on North- land Drive next to General Pump has received their C.O. and are now oc- cupying their facility. The C.O. was issued contingent upon their com- pleting their outside work (landscaping and paving) once the weather allows. Cherry Hill Addition Street Recon- struction Eight bids were received on March 25th for the Cherry Hill Addition Street Reconstruction project. Hardrives, Inc. was the low bidder on the project. The bids are as follows: Hardrives, Inc. McNamara Contracting, Inc. Valley Paving, Inc. OptiCon, Inc. Bituminous Roadways, Inc. Pine Bend Paving, Inc. Midwest Asphalt Corporation C.S. McCrossan Construction, Inc. $338,188.80 $339,106.55 $339,42230 $344,185.67 $349,059.50 $375,125.00 $407,17220 $422,473.00 Hardrives, Inc. based in Rogers, Min- nesota has not worked in Mendota Heights before despite being one of the larger paving contractors in the metro area. The Engineering De- partment is checking references in March 26, 1999 anticipation of a contract award rec- ommendation for Council considera- tion at the April 6th meeting. Watershed Citizen Advisory Com- mittee The Lower Mississippi River Water- shed Management Organization (LMRWMO), an independent gov- ernment organization that provides water resources management for the communities in the lower Mississippi River watershed, solicited volunteers to serve on a Citizen Advisory Com- mittee (CAC). This Citizen Advisory Committee is charged with providing community input to identify strategies for protecting water resources that will be included in the upcoming revi- sion of the Water Management Plan for the LMRWMO. This search gen- erated a pool of 22 individuals that have volunteered from the member communities of Inver Grove Heights, Lilydale, Mendota Heights, St. Paul, South St. Paul, Sunfish Lake and West St. Paul to serve on this Citizen Advisory Committee (see attached). The LMRWMO Board of Managers acted at their March 25th meeting to appoint, within the next week, up to two individuals from each of the seven member cities. The indi- viduals serving on the CAC will be appointed by each member community. Extra volunteers can serve as al- ternates, attend meetings, and receive correspon- dence for the duration of this en- deavor. The LMRWMO Board of Managers directed Barr Engineering to work out the details and schedul- ing for the first meeting of the CAC as soon as possible. J U �.. � V1 •% C_0 U a Ui U1 � ^O � a � T F � ct LO cz cd 0. ^O C �a p y cGJ C j C tU'S v J 'tGn E N F C 1 � p V y 1 ✓^� :J n Zi .^. N F ��� b T U ^p E O F R O 3 r� ova ti cz G �za� ° a ci a� U a1 noC m1 E 0 x � x Cd o a E N r N co m C Chi C E a0 L'] C�'J rN-I .i c� ,� um] r�-I co �n co -0 .'— m v m � ' co 10 y Lo Lo CV lli CJ rco i h O 4 j C7 G: O0 m L: a Ln 0 O Up M r0 W m h l(J h tom• � LO O 'p 'd' O N y O y c F N Y _ Lo rl IC] Lo L- LO C v M U to am Lo cv cO Lq cv 10 L7 c� co c� Ur CO UJJ v v 3 . ,� cp h m O to co c� m m h o Lo to _ 0 0 0 h n 7 T L��'D 'L- `S` Zcz g �Ll' m ��'1 U y R rya Y Y r0 Y,. U] U) CO R M OW C CS T co i � R F1 H m c. 3 a C ci m C 7 Q w V y U O U O V 'p �" .-r 'n, O1 H h� Lq V t� O O' U rC CO H cC M Gr h H Lh'J h H M. H co H O a C F _ C a m O h 0 z CO d c a+ N G 0 CC U O L Q O c N Mn m U) > O 'y D N_ Q � N C d N JU ^ N G U m > O G T 1 FD aJ C cz hn c o .= w N -O C U C >1 C ' ....0 GO i. 'u00cammoo .mi I -a 0 °o:mG3 mm'wm 3 3 c _ >� _ G �� G m� m C" m m o cum q C a ^� m OL CZ m G cG°i .n 00+ U ai a " C 4 F EEa� 2✓ 3P. Li u°i o 3 u z P.wC; �� 3G7 P. co U x r1 N m N N c0 N O C- O N ca t O O N in O ti O N N m 10 O c" V' O cAO h114 to 00000^O <M N co co Co C' O) N .-1 W N l`• r1 N cz d' N NN C') cli L7 NN1.7 it �t- cocas t Cl to to d Id, co m C O 'i �-1 N N *-1 r-i '-I '-1 lO L�] N 'i e-i lO N N Lo ro Lo acoca LO 1fJ r-1 r-i in Lobo LO co vcv co co to covc0 3 > co co co LO L a � o z z z Lo > z N > CD O z V ti U IC: o-0i c. J i1 F. o -a r+ .T. O .V� C O c O � L U CO p U U � m G r = _ � > m Z y ^ O Z a 5%• T � 4 > = ? ^ r'a a� O O L bn m m O U y m tll N> G$ O r O U] c7 4 C CD E G 7 k NCr r� y w, O c L" E o c o• E C Y a _„ cr E m c 'm -= :' E 3 cn o -zj T >G H C fC > oN �LN ro .PU] O 6C. . oU E o V x J � M H r^ FL F4 F4 0 co LO to C-U co V' 47 U w M (7i N M [� m LJ [? Lam• D] 0 Oo M tD OW N � L) � c' N N Lo M � 3 N rl M LJ 'U� Lo O LO M (�ajJ L7 �. to 10 ,� .y � v r LC y V, d� yi M V' w V' o V' d' d� V� �T C 'i •-1 L] M .-1 e-1 L1 L) L.� L7 ^.y IC L7 O Ifi Li i a cn co to to EC.0 LC m to tD L7 I CZC, O m i LC % 1L.0 h L� [� of co co �z I� LO 10 LC J CO ULO nL0 LO 7 tO 710 My x,o ❑ # a d� 6 o '� o r ^ oar _ as E� ❑a o r, °° .0 Cy UQ ,. (� Da •w C °d C w .-. U O n co G: ca y t�GO .a 'O O EOi y N M C .ucn n� /-� UI Ul ai m Q U GO+ O cNtl n O '^ ti 7. ,� Y Fi '7 G H U1 U) Y Y *„� 10 pl M pl CO U �O �" CJ 0 C� LC y r C L U <+' L: cc 01 O N O Z 7 i� a JU T � a a G m p a _Cq E m0a UM p C' O G t3 N ti Ca G " i N o o ^ cs ° r aCi F�1 Gy N O N <D CI N Lei OM) to m CN'�] m Lo In aI, "V rc m M �c C tiM Litt s to �o to a CD to CD cv cp m c0 w� �z z m qCw �:r T M d � CN7 U U 3 c � E (0 = p N p N N N N Z NEWS Public Works ThePi*peline Engineering Code Enforcement LETTER March19,1999 Parks Report The Parks Crew did daily trash pickups in the parks. They responded to complaints and re- moved snow on some of the ped- ways. They worked on mainte- nance and improvements to their equipment in anticipation of the upcoming summer season. They acquired some new 55 gallon drums and are modifying them to be used as trash barrels in the parks this summer (cutting off the tops and painting them). They finished cleaning out the wood duck houses in Friendly Hills, Hagstrom-King, Marie, Valley and Victoria Highlands Parks. Utility Report Rich checked the City's seven sanitary sewer lift stations daily. Rich had to repair the ac- cess door to the St. Thomas Academy lift station which had been damaged during plowing operations. Rich is also continu- ing to check the sanitary sewer main lines and this week found and removed a large rock from a manhole near the scenic over- look on TH13. He replaced burned out lights within the con- trol panels at the Veronica and Culligan Lane lift stations. Rich discovered a leaking seal in Lilydale's sanitary sewer lift station pumps and coordi- nated Braun Pump to come in and complete the repairs (Lilydale pays Mendota Heights an annual fee to have Rich do routine maintenance on their lift station). Street Report The Street Crews purchased some more sand and salt and mixed it - hopefully they will not have to use it. They worked on repairing mailboxes that were damaged as a result of snow plowing. They did some pothole repairs throughout the City (they use cold mix now and have to come back next summer and re- place them with more permanent repairs). They cleaned out the boxes from the plow trucks, inspected and made minor repairs as needed. They made up and re- placed street name signs that have been knocked over. They worked on preparing the specifi- cations for the attachments to the new plow truck that was ordered to replace the old International. MnDOT Proiects Update MnDOT's office of State Aid conducted an open house at the Dakota County Western Service Center in Apple Valley this week to present their projects sched- uled for construction this year and give the cities an opportunity to identify any potential conflicts or concerns. There were very few projects in Dakota County this year, but there is one in Mendota Heights. MnDOT will be milling and over- laying Dodd Road (TH149) all the way through the City. The project is scheduled to begin in mid -June and be finished in August. They do not intend to close the road to traffic for the construction, they will do it "under traffic' with the use of flaggers. They did remind us that Dodd Road is on the list to be turned back some day, probably to Dakota County. Lexington Avenue Pedway Mr. Larry Craighead, Parks and Recreation Commissioner has requested that the County construct a trail along Lexington Avenue (letter attached). The County responded to his request this week and the County's letter is also attached. Mr. Craighead also attended a City Council meeting and made the same re- quest from them. The Council asked staff to investigate the fea- sibility of using MSA funds to con- struct the project. We are cur- rently completing the investiga- tion. We had looked at the possi- bilities before and found the pro- ject to be extremely expensive and very challenging from an en- gineering design standpoint. Attachments: • Mr. Craighead's Letter • Dakota County's Letter • Met Council - Sewer Flows 1839 Faro Lane Mendota Heights, MN 55118 February 19, 1999 Mr. Donald Theison Dakota County Highway Commissioner 14955 Galaxie Road Apple Valley, MN 55124 Dear Mr. Theisen, I would like to bring to your attention a concern I have about the safety of people walking, jogging, and biking along Lexington Avenue between Highway 110 and Mendota Road. Lexington Avenue in Mendota Heights is a Dakota County road and is served by both the County and the city of Mendota Heights. This section of Lexington is a two lane road with two -foot sand shoulders. It has a long rolling hill, steep falloffs on each side, and overhanging tree limbs. There are driveways, a school bus garage, city maintenance garage, and new businesses at Highway 110. There is increased traffic from the change in traffic flow after reconstruction of the Mendota Bridge. This road has not seen any improvements in my 23 years in the area. I have been run off the road several times while walking to work at 2465 Lexington. Cars have nearly missed me while riding my bike to work and on weekends. A car passed me on the hill last week going over 60 miles per hour. Pedestrians use the road daily, including several high school teams running along the road after school. I have spoken to the Mendota Heights City Police Chief, Scott Johnson, and the City Administrator, Kevin Batchelder, about my concerns and would like to see improvements made to the road before some serious accidents occur. They encouraged me to write letters addressing these concerns to our city and to your attention. I believe that standard shoulders and a bike path connecting existing paths should be constructed between Highway 110 and Mendota Road. This would considerably improve pedestrian safety on Lexington. Police Chief Johnson supports this safety improvement. I spoke with Lisa Vermillion, a Northern Dakota County roadway engineer about this section of road and she has a copy of my comments. I will direct letters to Patrice Batagiia, District 3 Dakota County Commissioner, and Jim Danielson, Director of Public Works in Mendota Heights, asking for their additional support in this request. Thank you, D Lawrence W. Craighead cc: S.Johnson K. Batchelder MAP,. N. 1999 9:02AM DAKOTA CTY HWY DEPT 61289171 1 NO, 7101- P. 2 DAKOTA COUNTY HIGHWAY DEPARTMENT 14965 GALAXIE AVENUE 3RD March 5, 1999 Mr. Lawrence W. Craighead 1839 Faro Lane Mendota Heights, MN 55118 Subject: Lexington Avenue Pedestrian Safety Dear Mr. Craighead: DONALD J. THEISEN, P.E. COUNTY ENGINEER Telephone (612) 891-7100 Fax (612) 891-7127 APPLE VALLEY. MINNESOTA 55124.8579 Thank you for bringing your concern about pedestrian and bicycle safety on Lexington Avenue between Mendota Heights Road and Highway 110 to Dakota County and the City of Mendota Heights. Our staff and City staff have discussed this issue and are investigating the feasibility of a project to address your concerns. This is a common challenge in our County. Our older roadways were built to standards that were adequate at the time. As traffic volumes increase along with the demand for walking and biking trips, there is an increase in potential conflicts. The addition of an area to walk or bike does create impacts and these must be weighed against community benefits. We will work with the City on this issue. If a project is feasible, it can be scheduled by the City and County. Please feel free to contact me or Don Thelen, County Engineer at (612) 891-7102 if you have any further questions. Sincerely, Patrice Bataglia Dakota County Commissioner cc: Brandt Richardson, County Administrator Louis Breimhurst, Physical Development Director Donald Theisen, County Engineer N: Lexington PedSatery- Premed on recycled p4pe5 20% pail-consvmer 1 AN EQUAL OPPORTUNITY EMPLOYER /III Metropolitan Working for the Region, Planning for the Future III Environmental Services March 12, 1999 James Danielson Public Works Director City of Mendota Heights 1101 Victoria Curve Mendota Heights, MN 55118-4167 RE: Flow Calculation for the Second Quarter of 1999 Cost Allocation Dear Mr. Danielson: The Metropolitan Council Environmental Services Division has measured and/or calculated the flows (units in millions of gallons) for the months of October, November and December 1998 generated within your community to be as follows: Third Quarter 1998: 165.09 Fourth Quarter 1998: 137.85 This information is considered to be preliminary and may be adjusted based on further review. The above flow calculations includes estimates for any unmetered connections that either enter or leave your community. Attached is a graph showing only metered flow, by month, for this year and the previous three years. Therefore, the quarterly flow volume shown above may not equate to the total 3 month flow volumes given in the chart. The fourth quarter 1998 volume shown above will be used to allocate costs for your community during second quarter 1999. If you have any questions or require additional information, please call me at 651-602-1116, or Kyle Colvin at 651-602-1151. ely, Donald S. Bluhm Municipal Services Manager DSB:JLE 2gtr$99 cc: Kevin Howe, Metropolitan Council District 15 Jean Erickson, Metropolitan Council Environmental Services 230 East Firth Street St. Paul, Minnesota 55101-1626 (651) 602-1OUb tax ouz-t ta3 L vvi i i i An E"I" OPPonunfg. EmPl'," ; V . > r......_. o LO z�� ---- ; ... + M r LO ' d i 0 CJ j 6 �# d g I i a9 Mi col N CD ICO 1 wt 1 CO LO i C%i ; r CV j Lt; d ;LOs -CD i-`-o------- +. m dt CD � cD ; - _ .......... ---------- a LO LO CO r M ? N M i L6 i r� i N W ? Cu i M i M of i ID LA w Ltd j �' L. C3 i to CD 1 CD i Q L4, i Lii L.'a 60 i -r - Liy i La'3 ..;.._r - ... . Lo Li c�9 i t3 i bCO i -e ; Lo :�4 "tt MCI, j CD ? ice. Co in m m! 4n ri ri r; e- '� A I 3 ,I : i NEWS Public Works ThePi*peline Engineering Code Enforcement LETTER March 12,1999 Parks Report The Parks crew finished attending Toro University on Friday. They worked on repairs to the hydraulic pump that left the plow on truck 503 inoperable. They plowed snow Tuesday, Wednesday and Thurs- day. They plowed their cul-de-sac routes on Tuesday and the pedways and their parking lots on Wednesday and Thursday. Utility Report Rich checked the City's seven sani- tary sewer lift stations daily. Rich had Braun Pump out to change the guide rails in the Veronica and Culli- gan lift stations. The guide rails are used for removing the pumps for maintenance, because they sit in sewage, they deteriorate over time and need replacing. Rich found a 100 pound sand bag in the sanitary sewer manhole at Cheyenne and Pontiac (the beginning of the trunk sewer main). Rich found the sand bag as part of his normal mainte- nance check of the trunk lines and he has no idea of how it got in there. He had to borrow a special removal apparatus from West St. Paul to re- move the bag. Rich plowed his nor- mal route Monday and Tuesday dur- ing the storm (the north end). He plowed out his lift stations the day after the storm. Street Report The Street Crews big event for the week was dealing with the 16" snowfall that occurred this past week. They plowed main routes on Monday until 6:00 P.M. and then they returned at midnight and plowed all day until 6:00 P.M. again. The snowfall set a record, was wet, heavy and consequently took a lot longer than normal to plow. We received mixed reviews from residents on our efforts. The one's whose streets were done first were very apprecia- tive and the ones who were com- pleted last became very frustrated. The crews were not only slowed by the depth, density, and weight of the snow, but also by having to take one truck out of service for a period of time to replace a fuel pump. We did plow one pass through the north end in an attempt to provide those resi- dents early access. I have attached a copy of a map showing the plow routes. MnDOT and St. Paul Near Agree- ment on 1-35E Bridge An agreement is now being ne- gotiated between the St. Paul City Council and the Minnesota Depart- ment of Transportation (MnDOT) that is expected to clear the way for the reconstruction of the 1-35E bridge over the Mississippi River. The two parties are hoping to have a memo- randum of understanding ready for City Council approval in the next few weeks. St. Paul City Council is the only local governmental unit that has not yet approved MnDOT's plan for re- placing the 67-foot-wide span with a 124-foot-wide, $27 million structure. MnDOT hopes to complete the final design for the bridge next year, with construction to follow from 2001 to 2003. However, if a decision is not made in the next few weeks, it could push back those plans. MnDOT and St. Paul are confi- dent an agreement can be reached that will not delay the project, and will address issues raised by St. Paul neighborhood groups. This plan already has the sup- port of the Ramsey and Dakota County boards and the cities of Men- dota Heights, Mendota, Lilydale, Ea- gan, Burnsville, Farmington, Inver Grove Heights, Rosemount and West St. Paul. The memorandum of under- standing between the city and Mn- Dot, as proposed, asks MnDOT to agree not to convert the auxiliary lanes into through lanes prior to Jan- uary 1, 2015, without the approval of the city of St. Paul. It asks MnDOT to commit to supporting the 1984 fed- eral court order that dictated the width, design and 45 mph speed limit of the 1-35E Parkway. It also in- cludes provisions for protecting Crosby Farm Park by limiting the width of the southbound entrance ramp from Shepard Road. Federal -Aid Preservation Program Application The Engineering Department submit- ted an application this week to hope- fully be chosen for the installation of emergency vehicle preemption (EVP) at the intersection of Delaware Avenue and Highway 110 under this program. If this project were chosen under this program, MnDOT would administer eight federal aid contracts for this work with the local agencies funding 20% of the project cost. Attachments: • Plow Routes • Safety Study for the intersection Of Victoria at Marie 3sxaafi -9= 4:oe8_: N N N U U U N N N N N N C I C I I C i C ri N i N rl N �i C I C I C I C .i ri rl fi f1 ri .i E U E U E U E C N N C N C U N > .0 E :G . .i O1 ttl O .rA 0 a E Cl h F£ h •• N f'1 P at 3k .. ak N N N N 7 a 0 O O O O a a a a February 26, 1999 Mr. Peter Sorenson 14955 Galaxy Avenue Apple Valley, Minnesota 55124 Dakota County Highway Department Dear Mr. Sorenson: On Wednesday, February 24th, my 20-year-old son was involved in a severe auto accident at the corner of Victoria Road and Marie Avenue. If he did not have airbags in his automobile, he probably would not have made it. I talked with the police chief of Mendota Heights, and he has been concerned about this corner over the last year that he's been chief of police. We have lived in Mendota Heights'and have driven through this corner over the last 14 years. Each time we go through this corner, we are very concerned about people pulling out in front of us because the vision down Victoria Road is very difficult on both ways. We have also witnessed other accidents on this particular corner over the last few years. The police chief mentioned to me that Victoria Road is a County road and asked me to contact you to plead to make this intersection a four-way stop. Victoria Road going south from highway 13 has no stopsigns on it through its whole course. As you approach Marie Avenue which runs east and west across Victoria Road, there is very limited vision both ways. The accident occurred in the evening hours which made vision even more difficult. I'm hoping that if more discussion would be needed that you would help guide me in pursuing this matter. If anything good can come out of this 3hole situation, I would hope that we would be able to prevent future accidents which are bound to occur at this intersection. Sincerely, me Hocks, I.D. JH/gar y5i - Gsv 33�6 February 26, 1999 Mr. Jim Danielson Chief of Police Mendota Heights Dear Mr. Danielson: This is the letter that I had sent Mr. Peter Sorenson concerning the matter of the intersection at Victoria Road and Marie Avenue. If you also feel that this is a matter which should be brought to the attention of both the County and the City of Mendota Heights, I would appreciate your help in establishing this as a four-way stop intersection. If you need to reach me at my home number, it's 452-3330. My office number is 451-8050. Thanks for your help. Sincerely, / mes Hocks, M.D. JH/gar DA KOTA COUNTY HIGHWAY DEPARTMENT 14955 GALAXIE AVENUE 3RD March 4, 1999 Dr. James Hocks, M.D. 1025 Victoria court Mendota Heights, MN 55118 Re: Victoria Road at Marie Avenue Dear Dr. Hocks: DONALD J. THEISEN, P.E. COUNTY ENGINEER Telephone (612) 891-7100 Fax (612) 891-7127 APPLE VALLEY, MINNESOTA 55124-8579 This is in response to your letter dated February 26, 1999 requesting installation of a four- way stop. I have ordered a new study of this intersection to determine appropriate traffic control. Our study will be completed this spring. I will forward the results to the City of Mendota Heights for further discussion when it is completed. The last study was performed in 1995. That study indicated that the current traffic control was appropriate and operating with a minimum of safety problems. Our new study will evaluate the current conditions and look for changes that would indicate if a four-way stop would be appropriate. I am sorry that your son was involved in a vehicle crash at this intersection. Unfortunately, no traffic control device has shown to eliminate traffic crashes. We do experience severe crashes and fatalities at our traffic control signals and four-way stop signs. I appreciate the time and effort you have taken to describe your concerns to us. You may contact me at (612) 891-7103 at any time to discuss this intersection. Sincerely, %- Peter L. Sorenson Traffic Engineer cc: Commissioner Patrice Bataglia Brandt Richardson, County Administrator Lou Breimhurst, Physical Development Director James Danielson, Mendota Heights Public Works Director Scott Johnson, Mendota Heights Police Chief N:Hocks AN EQUAL OPPORTUNITY EIMPLOYER Pnntea on recycled paper. 20°n pos4consumer A s NEWS o Public WorksThe l EngPipelineineering Code Enforcement LETTER March 5, 1999 Parks Reoort The Parks Crew picked up trash at all the parks daily. They cleaned out the wood duck houses this week, so that they will be ready for those ducks when they return soon for next season. The crew also attended "Toro University" this week for con- tinuing their education on turf grass maintenance. Utilitv Reoort Rich checked the City's seven sani- tary sewer lift stations daily. He also performed sewer connection inspec- tions for new homes at 1129 Orchard Circle and at 619 Kirchner Avenue. Rich started walking and checking the 27 inch sanitary sewer main lo- cated in the valley. He does this annually looking for problems (so far he has not found any). Braun Pump was hired to come in and repair the check valves at the Centre Pointe lift station. (Rich was sick two days this week). Street Report The Street Crew received a request to remove the ice that had built up in a low spot in the road on Orchard Place. They chipped and removed three truck loads of ice. They worsted an writing specifications for the new dump body, hydraulics and snow removal equipment to be in- stalled on the new truck that has been ordered to replace r303. The new truck is scheduled to arrive next summer and we hope to have it available for picwing duties next win- ter. The crcn also continued to pick uo trash in various neighborhoods throughout the City. Dakota County enacted their 1999 Road Restrictions this week, a sure sign of spring. Enaineerina Report Engineering is expecting a busy summer this year with the streets be- ing reconstructed within the Cherry Hill neighborhood, all the public utili- ties being installed for the Glen Toro Addition (Shepard property) and pos- sibly the Hoffman Homes Town- house project to be built at the north end of Resurrection Cemetery, therefore we are currently trying to hire a summer intern. Ross Bintner our intern last year has expressed some interest and we hope that we can get him to come back (we will avoid the training period). 1999 Slurry Seal Program It is net too early to think about the slurry seal program for 1999, with the summer construction season right around the proverbial corner. Mr. James Buchanan of Struck and Irwin visited with Engineering and Public Works Department staff last week to follow up on any concerns that the City may have had regarding past work, and to ask the City to consider initialing future work sometime in June as opposed to the City's typical August or September date of com- pleticn 'Cr this work. The City will have tc decide which streets should be SNr! saaiec in 1999. i ne buccei has_cr.',d'=nt funding to seal slichdy more tInan two miles c7f streets. Stree:5 m,ai are siructura!ly scunc and have an expected remaining ser- vice life of greater than five years would qualify. The Engineering De- partment is seeking input regarding which neighborhood streets, or street segments might meet this criteria, to help decide which streets should be included in this years work. Code Enforcement Report The City Council at their meeting Tuesday night asked about the sta- tus of bleacher safety within the City. Guy had already researched the City's bleachers and reported that they were not high enough and did not require any modifications. Dick and Paul will be making site visits to further ensure their compliance. Council asked that the Code En- forcement Officer send a written in- quiry to all of the City's schools (District 197, St. Thomas Academy and Visitation) to determine if their bleachers are in compliance and if they are not what actions they intend to take to bring them within compli- ance. A second single family home permit was issued this week to Mendota Homes to construct a new home on a vacant lot at Miriam and Diego Lane Al—mc.`,ment: • Da:tcta County Road Restric- ticns TO: FROM: DATE: SUBJECT DAKOTA COUNTY HIGHWAY DEPARTMENT MEMORANDUM DAKOTA COUNTY SHERIFF AND CITY POLICE CHIEFS Donald J. TF,eisen, COUNTY HIGHWAY ENGINEER MARCH 1, 1E99 LOAD RESTRICTIONS Load restrictions will be placed on various County highways beginning , March 2, 1999. The following listed roads will be restricted for eight (8) weeks. These restrictions may change as conditions warrant. You wA be notified when the restrictions have been removed. COUNTY AXLE WT. DATE ROAD NO. LIMITS POSTING POSTED 4 ButlefA•enue 9Ton 5 1-35 to T.H. 13 9 Ton 5S CR 70 to Scott County line Ton g 6 Thompson Avenue Ton 9 Ton 8 Wentworth-Wachler 9 Scott Caunbj 8ne to CR 31 7 Ton 11 CR42toTH13 9Ton 14 TH 110 to TH 56 9 Ton 23 South County line to CR 86 5 Ton 23 CR86to78 7 Ton 23 CR73toTH50 9Ton 23 TH 50 to CR 9 Ton o 23 CR9m140th Ton 24 From CR 56 east to bridge 9 Ton 26 TH 13 to TH 55 9 Ton 25 TH55toTH3 7 Ton 26 TH 3 to CR 56 9Ton 28 TH 13 to TH 149 9 Ton 28 TH 3 to CR 56 9 Ton 30 TH13toTH3 9Ton 31 CR73toCR74 STon 31 CR M to CR 50 9 Ton 31 CR 50 to CR 58 1 Ton 31 CR58toTH55 9 Ton 32 @35�1 10Ton 32 Rive!P.idce Blvd. to CR 71 9 Ton '3 CR 42 to 140th Street 9 Ton 140th Street to CR 31 7 Ton CR5toTH3 9Ton 42 West County line to TH 55 9 Ton e2 TH 55 to East Jet. CR 87 7 Ton - East JcL CR 87 to TH 61 9 Ton CR 32 to TH 55 9Ton ' f`.lenwta Heights Road ,., TH 110-on Gross `Neicht TH 110 to TH 13 9 Ton C c� - CR 43 to TH 13 9 Ton TH 13 to Rams_; , COUn IL,e 5 Ton CR 5 to CSAH 31 ' TH 5 to TH 61 c Ton TH 5::o CR '.- 9 Tcn -' TH 35 :o TH 3 9 Tcn NEWS Public Works Engineering The Plepeline Code Enforcement LETTER Parks Report The Parks Crew picked up trash at all the parks daily. They also performed main- tenance on their snow- blower. They also hauled in the hockey nets from the rinks and continued working on cleaning out the warming houses. They worked on obtaining bids for purchas- ing a replacement truck for #503. 503 is a 10-year old 3/4 ton pickup that was bud- geted for replacement in 1999. They had to clean snow from the trails as a result of Wednesday's snow storm. They attended a Turf Seminar on Thursday. Utility Report Rich checked the City's seven sanitary sewer lift sta- tions daily. There was a watermain break Sunday af- ternoon on Ocala Lane. St. Paul Water responded to a call from the Police Depart- ment and fixed the break. Watermain breaks are most common in the fall and in the spring when the frost is ei- ther going in or coming out of the ground. Rich checked the sanitary sewer lines in the area Monday after the break to make sure that there was no damage to them caused by the break. There was not any damage, however flow in the line in Ocala was sluggish and he cleaned it. He reinstalled hydrant flags on fire hy- drants on Emerson Avenue and Laura Court where they were missing. Rich walked and checked the sanitary sewer lines that travel through easements by Som- erset School and he found no problems. Street Report The Street Crew picked up trash along Mendota Heights Road and Medallion Drive this week. When the snow melts all kinds of trash tends to show up. They also had to repair the sander and February 26, 1999 spinner motor on plow truck #308. John Ambrose be- gan fabricating a storage shelf for storing replace- ment cutting edges for the plows and for bobcat at- tachments. They emptied out the plow truck boxes from sand and salt and washed them out. (I wish that the boxes could stay empty for the rest of the winter - but this was just for a mid winter clean out and maintenance check). They had to sand the streets and scrape the main roads on Wednesday from the 1-1/2" snow storm. This week Len performed his annual duty of getting emission tests on all the City's gas operated vehi- cles that are over five years old. We were fortunate once again this year be- cause all the vehicles passed the test - even "The General". NEWS Public Works ThePi*peline Engineering Code Enforcement LETTER February 19, 1999 Street Report The Street Crew came in at 2:00 A.M., Friday, February 12th and plowed the streets. There was only 1-1/2" of snow, but there was heavy drifting in some areas. The cul-de-sacs were not plowed so the Parks Crew which normally plows them, plowed the pedways right away. Fire Marshal Paul Kaiser per- formed his annual fire inspec- tion at the Public Works garage this week. He found that the light bulbs in the exit lights and the batteries in the emergency lighting required replacement, the Street Crew performed these corrections. They also performed mainte- nance on their chain saws. They changed the cutting edge on plow truck number 312. They also continued to scrape streets and open catch basins where needed. Parks Report The Parks Crew picked up trash at the parks and checked the skating rinks and warming houses daily. They plowed the trails and parking lots from last Thurs- day/Friday's snow/ice storm. They worked on closing up warming houses for the sea son and checked inventory and cleaned and put things away until next winter (flooding hoses, etc.). Utility Report Rich checked the City's seven sanitary sewer lift stations daily. He performed a sewer inspection. He worked on maintenance to his two vehi- cles, the sewer jetter and his utility truck. (He also is re- sponsible for the portable gen- erator). The radiator hose had to be replaced in his truck. Watershed Seminar Jim and Curt attended a 1/2 day Storm Water Seminar held in Bloomington on Thursday. The seminar was hosted by Met Council, the Board of Wa- ter and Sewer Resources and Dakota County County Envi- ronmental Services. The gen- eral message of the seminar was that we have made great strides toward educating the public on protecting our streams and wetlands over the last few years. Remember to buy low or no phosphorus type lawn fertilizer (the City does) and keep grass clippings and leaves from entering the storm sewer (do not mow your clip- pings into the street and rake the leaves from there too). These actions are the most important ones you can take to reduce algae in the ponds. Erosion Control Breakfast Seminar Series Marc Mogan attended the fourth and final weekly install- ment of an erosion control seminar this week. These seminars were sponsored by the Minnesota Pollution Con- trol Agency, Dakota County Soil and Water Conservation District, Minnesota Erosion Control Association, and the Dakota County Environmental Education Program. Discus- sion topics in this series in- cluded National Pollutant Dis- charge Elimination System (NPDES) Construction Per- mits, Erosion Control Best Management Practices, pro- ject planning and design, new products and practices, speci- fication writing, plan review, ordinances, program imple- mentation and financing, in- spection and enforcement. The program emphasized those design practices that can be used to help minimize erosion on construction pro- jects, and offered specific rec- ommendations on what should be included in a community's local erosion control ordinance to make the program effective. NEWS Public Works ThePi*peline Engineering Code Enforcement LETTER February 12, 1999 Parks Report The Parks Crew picked up trash at the parks and checked the skating rinks and warming houses daily. They repaired the snowblower on the 580-D Toro (the large mower which has a snowblower mounted on it in the winter for clearing trails). They had to repair some valves that are used for flooding the hockey rinks. They also re- moved a stone bench from the Hu- ber Drive and Mendota Heights Road overlook. The bench had been vandalized repeatedly. The skating rinks were in terrible shape this week because of the warm weather and we do not think that we will be able to get them back into safe skating shape again. They are most likely closed for the season. Utility Report Rich checked the City's seven sanitary sewer lift stations daily. He also continued to work on his record keeping this week. He ex- ercised the large emergency gen- erator at the Mendota Heights Road lift station. He flushed out the wet well at the Centre Pointe sanitary sewer lift station. He per- formed a sewer inspection at 784 Bachelor Avenue. He cleaned the grease off the floats at the Veron- ica sanitary sewer lift station and checked the flow in the line coming from Lloyds Meats (it was ok). Street Report The Street Crew sanded the City as a result of the freezing rain storm on Thursday. They installed heated wiper blades on truck #308. The blades get iced up when plow- ing and we are trying these new blades to see if it solves that prob- lem. They had to open many catch basins that were blocked and were ponding water from all the recent melting. There are a string of street lights that are shorting out in the Indus- trial Park. Dave is working to try and solve the problem - so far they keep shorting out, so we feel that he will need to call in an electrician. They replaced the cutting edge on the loader bucket and sanded sev- eral slippery spots in the City over the course of the week. Code Enforcement Report The Code Enforcement Depart- ment reports that the first single family home permit has been sub- mitted for 1999. The house to be built is 1129 Orchard Circle and the contractor is Santanni Homes. Freeway Road Study Begins Admnistrative and Engineering Staff met with Ross Fefercorn, Aaron Parker and Gaius Nelson on Wednesday to transfer maps and information so that they can begin their Freeway Road Redevelop- ment Study. Patrick Hollister and I met with Gary Stevenson, Dakota County Surveyor, his staff and Aaron Parker on Friday to acquire more information and maps to use as background. Ross is working to try and be ready for an initial work shop at the end of March. Federal -Aid Preservation Pro- g am Marc Mogan attended a MnDOT presentation on Thursday to learn about a Federal -Aid Program that will provide significant funding for specific types of projects on eligi- ble roadways of a certain func- tional classification. The roadways in Mendota Heights that would qualify under these functional clas- sifications are the segment of Highway 110 east of 1-35E, and Dodd Road north of Highway 110. Eligible projects include pavement preservation, guardrail and end treatment, bridge rehabilitation, and sign replacement, bike and pedestrian rehabilitation, transit hubs and rail rehabilitation, and transit vehicle rehabilitation. Mn- DOT will administer eight federal aid contracts for these specific types of work with the local agen- cies funding 20% of the project cost. The Fire Chief desires for Mendota Heights to make applica- tion and hopefully be chosen for the installation of emergency vehi- cle preemption (EVP) at the inter- section of Delaware Avenue and Highway 110 under this program. Attachements: • Spicer letter • MnDOT Load Restriction letter .4 rMendota Heightsi s February 9, 1999 Terry Blum City of Mendota Heights 1101 Victoria Curve Mendota Heights, MN 55118 Dear- i, U `,� On behalf of the Parks and Recreation Commission, I would like to thank you and the other members of the Public Works team for your excellent job in maintaining our parks facilities during the year 1998. The City's residents have benefited greatly from your efforts in this -regard, and the Commission looks forward to working with you in 1999. Chair of the Parks a ecreation Commission cc: Jim Danie Direc or of Public Works 1101 Victoria Curve � Mendota Heights, MN • 55118 (612) 452-1850 FAX 452-8940 Minnesota Department of Transportation Engineering Services and Operations Divisions Technical Memorandum No. 99-06-MRR-03 February 1, 1999 TO: Distribution 57, 618 and 650 FROM: David S. Ekern diV Patrick flu Director/Assistant Chief Engineer Director Engineering Services Division Operations Division SUBJECT: Guidelines for Posting Spring Load Restrictions This Technical Memorandum will continue in force until June, 2002, unless superseded or placed in the Geotechnical and Pavement Manual prior to that date. PURPOSE AND USE The purpose of this technical memorandum is to provide a uniform statewide procedure for determining the dates that spring load restrictions will be placed and removed on the Minnesota Trunk Highway System. POLICY 1. The Districts will submit their restricted roadway segments for the annual ROAD RESTRICTIONMAP to the Director of the Office of Road & Vehicle Information and Services by December 31 of the preceding year. 2. The annual ROAD RESTRICTIONMAP will be mailed to all those on the Mn/DOT mailing list in late January or early February, along with an explanation of the new procedure for notification of postings. This mailing will be the only mail notification of the procedure to the general public. 3. A toll -free telephone number (1-800-723-6543) and local telephone number (651-406-4701) and Internet Site (htto-//mnroad dot state mn.us) have been established in order to provide information on postings in each frost zone as quickly and conveniently as possible. A 3-day notice of restrictions will be provided using a recorded telephone message with more detailed status reports available on the Internet site. Mailings will no longer be used. The start of the load restriction period will be determined for each zone using measured and forecast daily temperatures for several cities within each frost zone. The criteria used to determine when the load restrictions will be placed is when the cumulative thawing index for a zone exceeds 25 F degree-days based on the 3-day weather forecast, with predicted increases well in excess of 25 F degree-days. -MORE- Technical Memorandum No. 99-06-MRR-03 Page 2 February 1, 1999 The intent is to use the 3-day advance forecast temperatures to ensure that the postings are on at the beginning of the thaw and at the same time provide 3 days of notice to the public that the posting period is coming. The calculation is made using the following formula: Thawing Index = Average Daily Temperature — Reference Temperature The reference temperature varies linearly from 29 degrees F on February I to 24 degrees F on March 15. The cumulative thawing index is the summation of the daily thawing indices. 5. The load restriction period will be 8 weeks in duration for all frost zones. Implementation The procedures goes into effect spring of 1999. Any questions regarding this Technical Memorandum should be directed to John Siekmeier Physical Research Section, Office of Materials and Road Research at 651n79-5299. Any questions regarding the publication or distribution of this technical memorandum should be referred to Andrew Halverson, Acting Design Standards Engineer, at 651/296-3023 or Helen Blair, Administrative Assistant, at 651/296-2381. NEWS Public Works ThePl*pell*ne Engineering Code Enforcement LETTER February 5, 1999 Parks Report This week the Parks Crew picked up trash at the parks daily, cleaned the rinks, broomed and flooded them. The forecast for the week- end is for very warm weather, we will continue to try to stretch the ice skating and hockey seasons, but with 40` degree weather forecast and with the sun getting ever higher and higher in the sky, we know that we will have to shut them down very soon. It is not unusual to have to close the skat- ing rinks the middle of February anyway. There are already frost boils forming on both Marie and Wentworth Park rinks. The Friendly Hills rink has worked out great this winter, with the bitumi- nous base it, was the first rink to have ice available (after three days of flooding) and now, is has no frost boils. Marie Park is sched- uled to have its hockey boards re- placed this summer and we will be recommending at paving this rink next. The crew worked on repairing the snowblower, repairing the breaker box for the lights at Friendly Hills and repairing the furnace at Marie Park warming houses. Utility Report Rich checked the City's seven sanitary sewer lift stations daily. He concentrated on maintenance and repair to his sewer jetter this week. He took apart the nozzles, oiled and cleaned them. He got caught up on some of his paper- work (documenting which areas have had their sewers cleaned). He flushed the North Freeway Road sanitary sewer line. Street Report This week we finally had a respite from all the snowfalls and ice storms, we used the week to get caught up on clean up and repair. The crew cleaned up several cul- de-sacs from snow and ice build up at the request of some residents who lived on them. They also sanded the City Hall parking lot the day of the Council meeting. They worked on repairing some of the mail boxes that have been hit and worked with Len to fix a snow- plow. Code Enforcement Report Council adopted an Ordinance amendment at their February 2nd meeting that established a one year time limit for completing build- ing permits within the residential districts. All applicants will now be notified of this requirement at the time they acquire a building permit and will be contacted a short pe- riod of time prior to expiration of the one year, reminding them of the permit expiration and to establish a final inspection. MnDOT Backs off on Metrifica- tion MnDOT, as a result of the Feds removing their mandate, and at the urging from contractors and City and County Engineers, have de- cided not to require that plans be completed in metric (see attached memo). MnDOT was also follow- ing the lead taken by our neighbor- ing states. This reversal will make life easier and less confusing for plan preparation at the City. MnDOT Answers 1-35E Upgrade Question Maureen Hunter, 647 Marie Av- enue, wanted MnDOT to upgrade 1-35E to three lanes from the south end of the new river bridge to TH110 at the same time the bridge is upgraded and replaced (attached is MnDOT's response to her request). Attachments: • MnDOT memo on metrification • MnDOT response to Maureen Hunter's letter Olund Catches Big Walleye on Mille Lacs NEWS Pn i Works ThePl*peli*ne Engineering Code Enforcement LETTER December 29, 1999 Parks Report The Parks Crew completed general parks maintenance to include trash pickup and daily warming house cleanings. They had to repair the door and the gas flue at the Friendly Hills warming house. They had to plow cul-de-sacs, pedways, parking lots and ice skating rinks. They flooded the rinks when weather allowed and broomed them daily. When it is too warm they can not flood be- cause it will not freeze. Utility Report Rich checked the City's seven sanitary sewer lift stations daily. Rich attended the MPCA Waste Water Collector Systems Seminars at the Thunderbird Hotel in Bloom- ington. MPCA is the licensing authority for sewer workers and conducts a re- fresher course an- Date: nually. Beside plow- 1/22/99 ing his main line routes, Rich also 1/25/99 plowed out his lift stations when 1/26/99 needed this past week. 1/27/99 Census 2000 Final corrections and updates of the Census address list pro- vided by the U.S. Department of Commerce were completed this week by Guy Kullander and Nancy Bauer. This up- dated computer disk required almost 600 address correc- tions, deletions or additions. A by-product of this effort is a complete mailing list of all 4,257 residences in the City, including apartments, condo- miniums and duplexes. There are 2,479 residences in zip code area 55118 (north of Highway 110) and 1,778 in 55120 (south of Highway 110). Street Report Tom Olund had to order addi- tional sand and salt this week, and on numerous other occa- sions this winter. Tom wants to try and keep our sand/salt storage building as full as pos- sible in case there is a signifi- cant storm and the area sup- pliers would run low. This week he ordered in 50 tons of salt ($25/ton) and 300 tons of sand ($2.85/ton delivered). We mix our sand and salt at a ratio of about 15-20% salt to sand (depending on how bad the ice is). The Street Department also worked on repairing their equipment this week. They put cutting edges on the front plows of trucks 303 and 308. They repaired the salt distribu- tor on 304 and the strobe lights on 304 and 308. They replaced a circuit board on 308 and a power supply on 304. Plowing is tough on equip- ment. Plowing Events This Week: Work Done: Snow Amount: Clean thoroughfares and sand throughout Freezing rain/sleet/snow = 1" Sanded Snowed lightly Sunday Sanded Freezing rain Sanded Freezing rain NEWS Public Works Engineering Code Enforcement LETTER Utility Report Rich checked the City's seven sani- tary sewer lift stations daily. Rich and Tom Olund attended the annual Minnesota Wastewaters Collection seminar in Bloomington, MN. It is mandated by the State that license holders attend this conference on an annual basis in order to renew their licenses. Both Tom and Rich hold these licenses and the City is re- quired to have at least one licensed employee. They both broke away from the conference to help with plowing when needed. Code Enforcement Report Dick attended the annual school for building officials which was con- ducted at the University of Minnesota last week. At the school he learned about the new energy code that is proposed to be adopted by the State for implementation in July of 1999. This new code addresses indoor air quality. It is a complicated code that was difficult for the building inspec- tors to interpret and they were all concerned that educating the con- tractors to comply with the code will be difficult. They were also presented with the details for a new accessibility code which goes into effect later this year. Accessibility codes address use of buildings by disabled people. Watershed Advisory Appointments The Lower Mississippi River Water- shed Management Organization (LMRWMO), an independent gov- ernment organization that provides water resources management for the communities in the lower Mississippi The Pipeline River watershed, is searching for persons to serve on a Citizen Advi- sory Committee (CAC). This Citizen Advisory Committee will provide community input into the upcoming revision of the Water Management Plan for the LMRWMO. The LMRWMO Water Management Plan will identify strategies for pro- tecting the water resources in our watershed. Local communities in this watershed include the cities of Inver Grove Heights, Lilydale, Men- dota Heights, St. Paul, South St. Paul, Sunfish Lake, and West St. Paul. The LMRWMO will appoint representatives from each city to the CAC. One of the first tasks of the commit- tee will be to review and comment on the proper role of the LMRWMO in water resource management. Com- mittee members will also be asked to review draft documents as the plan progresses. The time commitment for the CAC members would be ap- proximately one evening meeting per month in one of the member cities for the duration of the January 22, 1999 Street Report This week was another snowy one. We have been lucky and still have not had the big dumper yet, but all these little ones add up too and resi- dents are beginning to get grouchy (they are calling in with complaints). The biggest complaint by far is "They are putting aII the snow in my drive- way." This complaint is most preva- lent with cul-de-sac homes because there is so little space to put the snow with all the driveways, mail boxes and landscaping concentrated in one little circle. In between snowfall events this week the street crew was making repairs to equipment and mail boxes that were hit. They were also addressing other snow plow complaints. John Ambrose and Len Kanitz worked with the Parks Crews to re- pair the snowblower which was dam- aged during use. It is used to clear snow from the trails. This weeks snow events were as follows: planning process, which is expected to Date: Work Done: Snow last about a year. Amount: Prospective mem- 1-15-99 Clean up streets and sand bers should have an from 5.6" snowfall interest in environ- mental manage- 1-18-99 Plow snow - all areas 3.5" ment, and water re- sources manage- 1-19-99 Clean up streets and sand ment. Anyone inter- ested in serving in 1-21-99 Plow snow - all areas 1.6" this capacity should contact Marc Mo- On 1-21-99, #304 loses wing on Mears and Dorset. gan for more infor- mation. Snow total for the week 5.1 inches NEWS Public Works ThePi*peline Engineering Code Enforcement LETTER January 15, 1999 Parks Report The Parks Crew picked up trash and checked the ice skating rink warming houses daily. Besides their normal plowing duties (the Parks Crew plows the City's 100 or so cul-de-sacs) they also have to plow the hockey rinks, the parks parking lots, and the pedways. They also have to broom the ice rinks clean and flood them when they have time in between snow plowing duties. Utility Report Rich checked the City's seven sanitary sewer lift stations daily. Besides plowing his normal main line snow plow route (the north end), Rich also plowed out his lift station lots this week. He had a sewer blockage at 684 North Freeway Road to deal with on Monday. When jetting it out he found the line to be plugged with roots, grease and a screw driver. Street Report The Street Crew workers plow three of the four main line plowing routes. This month has had only three days so far where it has not snowed (the fifth snowiest on record so far) This week we plowed to some extent every day but one: Date: Snow Work Amount: Done: 1-8-99 2" Plowed entire City 1-10-99 1.5" Clean up main line and sand 1-11-99 1.5" Clean up main line and sand 1-12-99 5.6" Plowed all areas 1-13-99 2" Plowed all areas 1-14-99 5.6" Plowed all areas 18.2" total Dodd Road Improvements MnDOT notified us this week by sending us the plans for a project to do a mill and overlay to im- prove Dodd Road (TH149) this summer. The pro- ject will also widen and improve shoulders, re- place non -complying mailboxes and add quite a bit of new guard rail where there are steep slopes adjacent to the highway. Sand Disposal Site Since Public Works lost its street sweeping sand disposal site at Freeway Road a couple of years ago, we have been looking for another one. For awhile we were considering using the McNeill site located behind Hudson Trucking, however be- cause of several complications with that site, we are now looking for another site. We met with the Director of Resurrection Cemetery and some of his staff this week, to see if we could acquire a site from them. They told us that they will present the idea to their Board February 8th for an an- swer. Go Vikings ! ! NEWS Public Works ThePi*peline Engineering Code Enforcement LETTER January 8, 1999 Parks Report The Parks Department plowed cul-de-sacs, pedways, ice rinks and parking lots this week. They also checked the parks warming houses. They repaired the broom and wiring on the big trailer. They also repaired the plow on the pick- up truck. The Parks Crew also broomed and flooded the ice rinks. With the new area code in effect they also recoded the cell phones for the warming houses. Utility Report Rich checked the City's seven sanitary sewer lift stations daily. Rich monitors Lilydale's lift station under an agreement with Lilydale. Braun Pump met with Rich to perform an operation and maintenance in- spection of Lildyale's lift sta- tion this week. Braun Pump will be contacting Lilydale to recommend which parts should be replaced and what lift station modifications should be made to insure that the system is maintained in good operating condition. He also plowed on the City's north end Saturday, Sunday, and Wednesday this week. Rich also plowed and shoveled the City's lift stations twice. Street Report The arrival of the seasons first significant snowfall was the big news in the Street Department this week. The Street Depart- ment mixed salt and sand and placed three applications. They plowed snow in all areas and cleaned up Saturday, Sunday, Monday, Tuesday and Wednesday. They in- stalled fender mirrors on truck 312 to aid snow plowing. Code Enforcement Report Dick performed the final in- spections at the Brown Insti- tute culinary school this week. There are a few punch list items to complete but the work was far enough along so that he could issue a Certificate of Occupancy (C.O.). City Hall employees are more than will- ing to volunteer as taste testers if needed. Personnel Report Two significant milestones in the long history of the U.S. Army Reserves occurred re- cently. 1998 marked the re- serves 90th anniversary, as well as Jim Danielson's last full year in service. Jim was gone this past week indoctrinating his replacement, and tying up loose ends. Jim will retire from the Army Reserves as Colonel after many years of service. Colonel is the Army Reserve's highest civilian rank. Engineering Report This week the Engineering De- partment did design work on the Cherry Hill Addition Street Reconstruction, and the Thompson Avenue Stormwa- ter Diversion projects. MnDOT requested further in- formation from the City for a permit application submitted in conjunction with the City's en- trance sign on Dodd Road. The Engineering Department also worked on the 1998 Sewer Use Summary re- quested by Metropolitan Council Environmental Ser- vices. MCES compiles and uses population, sewer con- nection, and water supply data to update their Comprehen- sive Sewer Plans and allocate sewer use charges throughout the service area.