07 07 2026 CC Agenda PacketCITY OF MENDOTA HEIGHTS
CITY COUNCIL REGULAR MEETING AGENDA
July 7, 2026 at 6:00 PM
Mendota Heights City Hall, 1101 Victoria Curve, Mendota Heights
1.Call to Order
2.Roll Call
3.Pledge of Allegiance
4.Approval of the Agenda
The Council, upon majority vote of its members, may make additions or deletions to the
agenda. These items may be submitted after the agenda preparation deadline.
5.Public Comments - for items not on the agenda
Public comments provide an opportunity to address the City Council on items which are not
on the meeting agenda. All are welcome to speak. Individuals should address their
comments to the City Council as a whole, not individual members. Speakers are requested
to come to the podium and must state their name and address. Comments are limited to
three (3) minutes. No action will be taken; however, the Mayor and Council may ask
clarifying questions as needed or request staff to follow up.
6.Consent Agenda
Items on the consent agenda are approved by one motion of the City Council. If a
councilmember requests additional information or wants to make a comment on an item,
the item will be removed from the consent agenda and considered separately. Items
removed from the consent agenda will be taken up as the next order of business.
a.Approve Minutes from the June 16, 2026, City Council Meeting
b.Approve Minutes from the June 16, 2026, City Council Work Session Meeting
c.Approve Field Renovation Work at the Hagstrom-King Park Ballfield
d.Approve Resolution 2026-41 Accepting a Donation for a Property Valuation Appraisal
e.Approve a New Massage Therapist License
f.Approve Claims List
7.Presentations
a.Mendota Heights Community Foundation
Page 1 of 72
b.Oheyawahi Interpretive Design (Phase III)
8.Public Hearings
9.New and Unfinished Business
a.Municipal Campus Building Project - Police Station and City Hall Update and
Awarding Geotechnical Services Contract and Project Update
10.Community / City Administrator Announcements
11.City Council Comments
12.Adjourn
Next Meeting
July 21, 2026 at 6:00PM
Information is available in alternative formats or with the use of auxiliary aids to individuals
with disabilities upon request by calling city hall at 651-452-1850 or by
emailing cityhall@mendotaheightsmn.gov.
Regular meetings of the City Council are cablecast on
NDC4/Town Square Television Cable Channel 18/HD798 and online at
townsquare.tv/Mendota-Heights-Streaming
Page 2 of 72
CITY OF MENDOTA HEIGHTS
DAKOTA COUNTY
STATE OF MINNESOTA
DRAFT Minutes of the Regular Meeting
Held Tuesday, June 16, 2026
Pursuant to due call and notice thereof, the regular meeting of the City Council, City of Mendota Heights,
Minnesota, was held at 6:00 p.m. at City Hall, 1101 Victoria Curve, Mendota Heights, Minnesota.
CALL TO ORDER
Mayor Levine called the meeting to order at 6:00 p.m. Councilors Lorberbaum, Paper, Mazzitello, and
Maczko were also present.
PLEDGE OF ALLEGIANCE
Council, the audience, and staff recited the Pledge of Allegiance.
AGENDA ADOPTION
Mayor Levine presented the agenda for adoption. Councilor Mazzitello moved adoption of the agenda.
Councilor Lorberbaum seconded the motion.
Ayes: 5
Nays: 0
PUBLIC COMMENTS
Andrew Katz, 1960 Walsh Lane, thanked Public Works Director Ryan Ruzek for keeping residents who
desire a sound wall along Victoria at I-35E and Highway 62 well informed about the status of the MnDOT
application. He was disappointed that the City was not chosen, but believed that a sound study would
help for the next application. He asked if the nearby construction would impact the results. He spoke
about the safety of the intersections of Victoria Road and Walsh and Victoria Road and Kay Avenue,
noting a large retaining wall and vegetation that impacts the view of the walking path. He proposed adding
traffic mirrors at the double arrow signs, estimating a cost of $120 for the signs. He referenced the compost
enclosure at Mendakota Park, noting that they love the program but have concerns with the location, size,
and entrance. He suggested relocating the compost to the west side of the park, where the berm is. He
asked that another compost location be added to the new Municipal Campus project site. He referenced
the intersection of Dodd Road and South Plaza Drive, noting that intersection improvements were part of
the agreement with the developer, and the apartment project is nearing completion. He asked for more
information on when those improvements would be considered.
CONSENT AGENDA
Mayor Levine presented the consent agenda and explained the procedure for discussion and approval.
Councilor Lorberbaum moved approval of the consent agenda as presented.
a.Approval of June 2, 2026, City Council Minutes
Page 3 of 72
6.a
June 16, 2026, Mendota Heights City Council Page 2 of 5
b.Approval of May 26, 2026, City Council Work Session Minutes
c.Acknowledge Minutes from the March 10, 2026, Parks and Recreation Commission Meeting
d.Acknowledge Minutes from the May 12, 2026, Parks and Recreation Commission Work Session
e.Acknowledge January, February, March, April, and May 2026 Fire Synopses
f.Approve Resolution 2026-40 Appointing Election Judges for the 2026 State Primary and General
Election
g.Approve Liquor License Renewals
h.Approve On-Sale Intoxicating/Sunday Liquor License for Bricksworth Beer Co. LLC., 752 North
Plaza Drive
i.Grading Permit for 2320 Lexington Avenue, Lexington Heights Apartments
j.Approve the Planned Unit Development Agreement for First Amendment to Lexington Heights
Apartments Planned Unit Development
k.Approve the Proposal Submitted by MN Native Landscapes (MNL) and Authorize Staff to Enter
into a Contract with MNL for the Friendly Marsh Park Turf-to-Prairie Project
l.Approve Resolution 2026-38 Accepting a Donation to the Ivy Hills Playground Ribbon Cutting
m.Approve Resolution 2026-39 Accepting a Donation to the Cops and Bobbers Derby Day in Honor
of Cliff Timm
n.Approve Purchase of Bleachers for the Hagstrom-King Park Ballfield
o.Approve Purchase of New Duty Handguns for the Police Department
p.Approve May 2026 Treasurer’s Report
q.Approval of Claims List
Councilor Mazzitello seconded the motion.
Ayes: 5
Nays: 0
PRESENTATIONS
A)A CO-OP GROCERY STORE’S MODEL AND HOW IT BENEFITS MENDOTA HEIGHTS
William Boland introduced himself, providing information on the current food landscape and how things
continue to deteriorate. He reviewed the results of a study that compared processed food to non-processed
food. He provided additional information on the benefits of a co-op grocery store and community,
providing resources on how a co-op can be started. He believed that creating a co-op in Mendota Heights
would fill a gap and provide benefits to the community and surrounding communities.
Mayor Levine thanked Mr. Boland for his presentation.
PUBLIC HEARING
No items scheduled.
NEW AND UNFINISHED BUSINESS
A) CITY OF MENDOTA HEIGHTS FY2025 AUDIT REPORT
Kristen Schabacker explained that the Council was being asked to listen to the audit report results and ask
any questions.
Page 4 of 72
June 16, 2026, Mendota Heights City Council Page 3 of 5
Caroline Stustman, BerganKDV, presented the results of the FY2025 Audit, reporting a clean, or
unmodified opinion. She noted one internal control finding, which is very common for smaller cities,
related to the lack of segregation of accounting duties. She reported no issues of legal non-compliance.
She also provided an overview of different City funds.
Councilor Maczko noted that it shows a deficit fund balance for the Pilot Knob improvement of $85,000
and asked for more information.
Public Works Director Ryan Ruzek stated that the City was awarded $1,850,000 in State bonding for the
project, and the City is funding that project with reimbursement from the State. He stated that the City is
currently incurring those costs. He noted that the project is currently paused.
Councilor Maczko asked for more information on the statement related to investment risk.
Ms. Stustman explained that statement is related to the insurance the City covers versus its portfolio.
Councilor Maczko referenced the leases receivable mentioned in the report and asked for more
information on the reference to principal and interest.
Ms. Stustman replied that GASB requires the lease payment to be split between principal and interest.
She confirmed that these are leases for cellular providers on the water tower.
Councilor Maczko asked and received confirmation that the $7,000,000 in general obligation bonds is
related to the Fire Station.
Councilor Paper thanked the Finance Director for her work. He asked for clarification on whether the
City essentially has $29,000,000 in cash and investments.
Ms. Stustman replied that those are the investments the City is currently holding.
Councilor Mazzitello stated that the City has the best Finance Director, and they are very lucky to have
her.
Mayor Levine echoed that statement.
Councilor Lorberbaum reminded residents that the City has an AAA bond rating because they are doing
very well.
Mayor Levine referenced the net change in fund balance, noting that the fund balance increased by
$62,000. She reviewed the amount the City spent on capital projects, noting that the City was able to add
to its fund balance while making significant improvements.
Finance Director Kristen Schabacher reviewed the projects included in the $1,200,000 in capital projects
line item.
Mayor Levine noted the equipment reserve fund, which began five years ago, with the goal of having that
fund sufficiently cover the cost of equipment purchases. She noted that the fund balance could be drawn
down by $3,000,000 to assist with the cost of the Municipal Campus project. She recognized Finance
Director Kristen Schabacher and all the staff involved in the audit.
Page 5 of 72
June 16, 2026, Mendota Heights City Council Page 4 of 5
B) MUNICIPAL CAMPUS BUILDING PROJECT – POLICE STATION AND CITY HALL UPDATE
City Administrator Jacobson provided an update on the progress of the Municipal Campus Building
Project.
Councilor Maczko stated that the people who came and provided input have made a difference. He stated
that the Council had a discussion today that the building is too big and the costs need to be reduced. He
commented that the grant has been awarded, but the City has not yet made the decision as to whether to
accept the grant. He explained that the intent of the grant is supposed to decrease the cost of the project,
but more information is needed to determine if that would actually happen because of the requirements
that would come along with the grant funds. He commented that when people say something, they need
to acknowledge that they have heard them. He was disappointed that they would not be looking at a
scheme that would place the building in the same location on the property. He appreciated that TRAA is
open to removing that ballfield and moving it to another location.
Mayor Levine stated that the Council has heard the community and responded to that input. She
commented that initially, they had directed the architects to build once, future-ready, to fulfill the needs
for the next 20 years. She stated that direction was given today to build to the current need, with the
potential to expand should more space be needed in the future. She commented that they continue to work
with the legislators and the State to determine if the bonding money will be accepted to draw down the
cost for the community. She stated that there will be green space adjacent to City Hall, and they are
committed to including a baseball field of similar quality to be constructed in another location.
Councilor Lorberbaum stated that the Council received a copy of the petition, and it was clear that the
residents believe that the building was too large. She stated that they have heard those comments and they
are responding.
City Attorney Amy Schmidt stated that during the work session, discussion was held regarding the
decision to build a building and how the building would be financed. She reviewed the authority of the
City Council, and the legislature has not provided the ability to delegate that decision. She explained that
residents would have an ability to weigh in on financing of the building, noting that capital improvement
bonds are subject to a reverse referendum.
Councilor Mazzitello reminded the group of the four pillars they are committed to with respect to this
project, which include being fiscally responsible with transparent scope and costs, providing long-term
value to residents, efficient and effective public safety and municipal services, and that the facility be co-
located to maximize efficiency, safety, security, and convenience to the public. He stated that the City is
also committed to maintaining the services of the Mendota Heights Police Department. He stated that he
is also committed to replacing the baseball field somewhere else in the community, noting that he has
already found four potential locations where the field could be relocated. He believed they could have a
temporary field in place by this fall. He stated that he would be happy to spearhead that with staff.
COMMUNITY ANNOUNCEMENTS
City Administrator Cheryl Jacobson announced upcoming community events and activities.
Page 6 of 72
June 16, 2026, Mendota Heights City Council Page 5 of 5
COUNCIL COMMENTS
Councilor Paper congratulated former Mayor Garlock on a successful Officer Scott Patrick Memorial 5k,
noting that the weather was spectacular with a great turnout. He thanked the volunteers, City staff, and
those who participated. He stated that Gateway Bank has been an amazing sponsor since the beginning
and also recognized Goodfellas Landscaping for its sponsorship. He took a moment to remember Officer
Scott Patrick.
Councilor Maczko asked if staff could formally report back on public comments to the Council, as others
in the community may also be interested in those responses. He complimented the Ivy Hills playground
grand opening, noting the large turnout and positive comments that have been received.
Councilor Lorberbaum agreed that the park's grand opening was wonderful. She encouraged residents to
continue to provide input on the Municipal Campus project. She noted recent missing dogs and was
impressed by the outreach of the community to find those dogs.
Councilor Mazzitello stated that Friday is the Juneteenth holiday, which commemorates the end of an evil
period in American history. He stated that on June 12th, Women's Veterans Day was celebrated. He stated
that on the 4th of July, they will be celebrating the 250th anniversary of America and shared a historical
fact from June 7, 1776.
ADJOURN
Councilor Mazzitello moved to adjourn.
Councilor Paper seconded the motion.
Ayes: 5
Nays: 0
Mayor Levine adjourned the meeting at 7:20 p.m.
____________________________________
Stephanie B. Levine
Mayor
ATTEST:
_______________________________
Nancy Bauer
City Clerk
Page 7 of 72
This page is intentionally left blank
CITY OF MENDOTA HEIGHTS
DAKOTA COUNTY
STATE OF MINNESOTA
DRAFT Minutes of the City Council Work Session
Tuesday, June 16, 2026
Pursuant to due call and notice thereof, a work session of the Mendota Heights City Council was
held at Mendota Heights City Hall, 1101 Victoria Curve, Mendota Heights, Minnesota.
CALL TO ORDER
Mayor Levine called the work session to order at 4:30 p.m. Councilors Lorberbaum, Mazzitello
Maczko, and Paper were in attendance.
Others present included: City Administrator Cheryl Jacobson, Assistant City Administrator Kelly
Torkelson, Finance Director Kristen Schabacker, Public Works Director Ryan Ruzek, Parks &
Recreation Director/Assistant Public Works Director Meredith Lawrence, Police Chief Kelly
McCarthy, Police Captain Wayne Wegener, City Attorney Amy Schmidt, City Clerk Nancy
Bauer
MUNICIPAL CAMPUS BUILDING PROJECT – POLICE STATION AND CITY HALL
City Administrator Jacobson stated that several policy level questions regarding the Municipal
Campus Building project warrant further discussion. She asked that the City Council discuss and
provide clarification on its long-term vision, service assumptions, project priorities and desired
scope of the Municipal Campus Building Project.
Mayor Levine opened discussion on the Municipal Campus Building Project by acknowledging
that there is resident opposition to the project, and that a petition requesting a referendum has
been submitted. The Mayor identified several topics for further discussion including the project’s
cost, facility needs, overall project scope, potential impact on taxpayers and the project’s guiding
principles. The Mayor also suggested further discussion of the “dig once” and “future ready”
concepts to determine whether those principles should continue to guide the project.
Mayor Levine stated her preference to avoid a referendum and emphasized the importance of
helping the public understand the purpose, objectives, and long-term vision for the Municipal
Campus Building Project.
Councilor Mazzitello stated that he did not support reducing the quantity or quality of City
services and reaffirmed that the project’s highest priority is providing a new police station. He
noted that planning for future growth had been incorporated into the project scope but that the
Page 8 of 72
6.b
June 16, 2026, City Council Work Session Minutes Page - 2
public experienced "sticker shock" in response to the project's overall cost and building size. He
expressed support for reducing the size of the building to make the project more reasonable and
acceptable to the public.
Councilor Lorberbaum requested clarification regarding B3 costs and the inclusion of CJN in the
project budget. City Administrator Jacobson explained that the $33.1 million project budget
estimate did not include the B3 costs or the state funding, because these items were not known
when the estimate was prepared. She also noted that the budget includes CJN, consistent with
previous Council direction.
Councilor Mazzitello suggested organizing the project into three primary areas for discussion,
the Police Department, Administration, and common spaces. He stated that, in his view, a
"future-ready" building is one that meets the City's current needs while providing some
flexibility to accommodate future needs.
Councilor Mazzitello stated that the project's four guiding pillars should be maintained and
believed they could still be achieved within a revised design. He expressed support for retaining
the lower-level Police Department layout as currently proposed. If additional reductions were
necessary, he suggested reducing the number of lower-level parking stalls and decreasing the
upper-level footprint by reducing the number of workstations. He also suggested bringing the
exterior walls of the upper-level inward to align with the lower level.
Councilor Mazzitello reiterated that he did not support a referendum for the project.
City Attorney Schmidt reviewed general information about ballot questions and referendum
petitions. She noted that the petition submitted by residents requested an advisory election for
the building project. She explained that only certain matters may be submitted to a referendum
under Minnesota law and that the Legislature has delegated authority to cities to make specific
decisions, including those related to constructing municipal facilities such as a police station and
city hall. She noted that the City Council is responsible for decisions regarding municipal
operations, facilities, budgeting and long-term infrastructure.
City Attorney Schmidt further explained that the reverse referendum process applies to the
financing of the project following a public hearing on the proposed bond issuance. She
explained that residents would have 30 days after the hearing to submit a petition meeting the
requirements under Minnesota law, including ballot language consistent with the state statute and
validated signatures equal to at least 5 percent of the votes cast in the city’s most recent general
election. If those requirements were met, the question may be submitted to voters as a yes or no
ballot question.
Councilor Maczko asked for clarification regarding the referendum petition process, noting that
it would become relevant when Council determined how the project would be financed. City
Administrator Jacobson explained that the availability of a referendum petition process depends
Page 9 of 72
June 16, 2026, City Council Work Session Minutes Page - 3
on the type of financing used. She added that the financing method and bond type would be
evaluated and determined at the appropriate stage of the project.
Councilor Maczko stated that he would prefer not to submit the project to a referendum and
emphasized the importance of community acceptance and transparency throughout the process.
He stated that he did not believe the project's four guiding pillars needed to change but supported
reducing the size and scope of the project to better align with the City's current needs. He
suggested that combining storage areas and identifying other opportunities to reduce space could
decrease the building's overall footprint. Councilor Maczko also noted that relocating the
ballfield would add costs to the project.
Mayor Levine stated she agreed with scaling back the size and scope of the project for current
needs with flexibility built in to expand.
Councilor Lorberbaum stated that the project's guiding pillars should remain in place and that the
design should include some capacity for future growth. She noted that residents have expressed a
desire for the project to be scaled back and stated that the size of the building should be reduced.
She also suggested that relocating the ballfield should be considered. Councilor Lorberbaum
added that she would need additional information regarding CJN before determining whether it
should be included in the building.
Councilor Paper stated that he has heard from many residents and emphasized the importance of
clearly communicating the need for improvements to the Police Department facilities. He
expressed the view that the overall scale of the building is too large, particularly the common
areas, meeting rooms, and community room. Councilor Paper stated that he has also heard
support for the project but noted that the ballfield remains a significant community concern.
Mayor Levine stated she agreed with the comments made. The size, scope, and cost of the
building is concerning to residents. Future ready should be redefined to be built for current need
with some flexibility for the future.
City Administrator Jacobson reported that staff had met with the Department of Public Safety
grants manager regarding the project funding. She explained that the state funding was awarded
for the predesign and design phases of the project. If the City wished to use the funding for
construction, legislative approval would be required, which would extend the process. She also
noted that the grant is not available for reimbursement of costs incurred prior to the end of the
legislative session.
City Administrator Jacobson stated that Minnesota Management and Budget (MMB) has
indicated that eligible predesign and design costs incurred on or after May 18, the final day of the
legislative session, may be considered for reimbursement. She noted that MMB will issue
guidance and the necessary forms to administer the grant. She also reported that the project's B3
dashboard has been established.
Page 10 of 72
June 16, 2026, City Council Work Session Minutes Page - 4
Councilor Mazzitello asked what was required for the B3 requirements. City Administrator
Jacobson said that is not known yet.
Mayor Levine stated that Adam Crepeau of the Two Rivers Athletic Association had expressed
that construction of a new police station and city hall was a higher priority than retaining the
existing ballfield at its current location. The Mayor stated that, according to Mr. Crepeau, the
association would support relocating the ballfield to Mendakota Park, Friendly Hills Park, or
fields in West St. Paul, provided that a suitable field would be available for use by May 2027.
City Administrator Jacobson asked for clarification on whether CJN should be included in the
project. Councilor Mazzitello and Councilor Lorberbaum both stated that more information was
needed.
Councilor Maczko expressed concern about the site topography, the proposed building location
on the site, and the overall design of the building. He stated that while two ways in and two ways
out for the Police Department is desirable, it may be more of a nice to have. He also noted that
soil borings had not yet been completed on the ballfield site and expressed the opinion that
preserving the ballfield had not been seriously evaluated.
Mayor Levine asked what cost savings would result from the proposed changes. It was noted that
the building footprint needs to be reduced, which would reduce office space and square off the
building.
Councilor Mazzitello noted that, based on current estimates and prior to completion of a detailed
design, the project cost is approximately $485 per square foot. He also suggested that the
existing City Hall building could be repurposed for storage, which would allow storage space to
be removed from the new building. He stated that this change would reduce the overall footprint
of the proposed building.
ADJOURNMENT
Mayor Levine adjourned the meeting at 5:56 p.m.
_________________________
Stephanie B. Levine, Mayor
ATTEST:
_____________________
Nancy Bauer, City Clerk
Page 11 of 72
6.c
REQUEST FOR CITY COUNCIL ACTION
MEETING DATE: July 7, 2026
AGENDA ITEM: Approve Field Renovation Work at the Hagstrom-King Park Ballfield
ITEM TYPE: Consent Item
DEPARTMENT: Parks and Rec CONTACT: Meredith Lawrence, Parks and
Recreation/Assistant Public
Works Director
John Boland, Public Works
Superintendent
ACTION REQUEST:
Approve field renovation work at the Hagstrom-King Park ballfield by Magic Turf in the
amount of $15,097.50.
BACKGROUND:
In addition to poor drainage at this field, the Two Rivers Athletic Association (TRAA) has
brought forth concerns regarding the infield surface and lips that have developed at the
Hagstrom-King ballfield. Staff worked to develop the scope of the renovation work needed,
which includes the following:
•Correct arc to 60 feet from the 46 foot pitching rubber
•Haul and spread City supplied soil to lift right field and help with existing drainage
•Lift and grade infield to match new elevation utilizing existing aglime and
estimated 50 tons of City supplied new aglime
•Prepare and seed dirt areas
•Construct new clay mound at 46'
•Install new home plate
•Install new pitching ribber
•Install new base anchors at 60 feet (double first base anchor)
This project is anticipated to be completed by mid-August based on scheduling collaboration
with TRAA. The field will have new seed in areas which will result in the field being closed for
the remainder of the 2026 season.
FISCAL AND RESOURCE IMPACT:
Included in the FY2026 Public Works-Parks Maintenance budget was $15,000 for this project.
Page 12 of 72
Staff has received the following bids for this project:
•Magic Turf: $15,097.50
•Minnesota Sodding Company (MSC): $27,985.44
Magic Turf has done work for the City of Mendota Heights in the past and staff feel they do a
great job.
ATTACHMENTS:
None
CITY COUNCIL PRIORITY:
Premier Public Services & Infrastructure, Economic Vitality & Community Vibrancy, Inclusive
and Responsive Government
Page 13 of 72
6.d
REQUEST FOR CITY COUNCIL ACTION
MEETING DATE: July 7, 2026
AGENDA ITEM: Approve Resolution 2026-41 Accepting a Donation for a Property Valuation
Appraisal
ITEM TYPE: Consent Item
DEPARTMENT: Engineering CONTACT: Ryan Ruzek, Public Works
Director
ACTION REQUEST:
Approve Resolution 2026-41 accepting a donation for a property valuation appraisal of 2095
Valencour Circle.
BACKGROUND:
There is a single-family home adjacent to Oheyawahe/Historic Pilot Knob at 2095 Valencour
Circle. This is the last home remaining on Valencour Circle. The Oheyawahe Task Force is
recommending that the city acquire the home if/when it becomes available to become part of
Oheyawahe. The Pilot Knob Preservation Association is donating $3,500 for this appraisal.
The intention of the appraisal is to estimate the home valuation for both private fundraising
and public budgeting.
FISCAL AND RESOURCE IMPACT:
The $3,500 donation will be used to contract with a third-party appraiser. The City is grateful
for the generosity of this financial donation.
ATTACHMENTS:
1.Resolution 2026-41 Formally Accepting a Donation for a Property Valuation Appraisal of
2095 Valencour Circle
CITY COUNCIL PRIORITY:
Economic Vitality & Community Vibrancy, Premier Public Services & Infrastructure,
Environmental Sustainability & Stewardship, Inclusive and Responsive Government
Page 14 of 72
CITY OF MENDOTA HEIGHTS
DAKOTA COUNTY, MINNESOTA
RESOLUTION 2026-41
FORMALLY ACCEPTING A DONATION FOR A PROPERTY VALUATION
APPRAISAL OF 2095 VALENCOUR CIRCLE
WHEREAS, the City of Mendota Heights desires to follow Minnesota Statute 465.03
“Gifts to Municipalities”; and
WHEREAS, the Minnesota Statute requires a resolution to accept gifts to municipalities;
and
WHEREAS, the City has previously acknowledged gifts with a resolution; and
WHEREAS, the City Council of the City of Mendota Heights has duly considered this
matter and wish to acknowledge the civic mindedness of citizens and officially recognize their
donations.
NOW, THEREFORE, IT IS HEREBY RESOLVED that the City Council of the City
of Mendota Heights formally accepts $3,500 for a property valuation appraisal of 2095
Valencour Circle. The property owner, David Doty, has approved the appraisal to proceed.
Adopted by the City Council of the City of Mendota Heights this 7th day of July, 2026.
CITY COUNCIL
CITY OF MENDOTA HEIGHTS
Stephanie B. Levine, Mayor
ATTEST:
_________________________
Nancy Bauer, City Clerk
Page 15 of 72
6.e
REQUEST FOR CITY COUNCIL ACTION
MEETING DATE: July 7, 2026
AGENDA ITEM: Approve a New Massage Therapist License
ITEM TYPE: Consent Item
DEPARTMENT: Administration CONTACT: Nancy Bauer, City Clerk
ACTION REQUEST:
Approve a new massage therapist license.
BACKGROUND:
Bethany Catlin has completed all application requirements for a new massage therapist license
and has secured employment at the licensed massage establishment, Hush Therapeutic
Massage. She has also successfully passed a background check conducted by the Mendota
Heights Police Department.
FISCAL AND RESOURCE IMPACT:
N/A
ATTACHMENTS:
None
CITY COUNCIL PRIORITY:
Premier Public Services & Infrastructure
Page 16 of 72
This page is intentionally left blank
Page 17 of 726.f
Page 18 of 72
Page 19 of 72
Page 20 of 72
Page 21 of 72
Page 22 of 72
Page 23 of 72
Page 24 of 72
Page 25 of 72
Page 26 of 72
Page 27 of 72
Page 28 of 72
Page 29 of 72
Page 30 of 72
Page 31 of 72
Page 32 of 72
Page 33 of 72
Page 34 of 72
7.a
REQUEST FOR CITY COUNCIL ACTION
MEETING DATE: July 7, 2026
AGENDA ITEM: Mendota Heights Community Foundation
ITEM TYPE: Presentation
DEPARTMENT: Administration CONTACT: Cheryl Jacobson, City
Administrator
ACTION REQUEST:
Informational. Ansis Viksnins will present information on the Mendota Heights Community
Foundation.
BACKGROUND:
The Mendota Heights Community Foundation is a Minnesota non-profit corporation with a
mission of bringing people to serve, strengthen and celebrate the community of Mendota
Heights.
FISCAL AND RESOURCE IMPACT:
N/A
ATTACHMENTS:
None
CITY COUNCIL PRIORITY:
Economic Vitality & Community Vibrancy
Page 35 of 72
This page is intentionally left blank
7.b
REQUEST FOR CITY COUNCIL ACTION
MEETING DATE: July 7, 2026
AGENDA ITEM: Oheyawahi Interpretive Design (Phase III)
ITEM TYPE: Presentation
DEPARTMENT: Natural Resources CONTACT: Krista Spreiter, Natural
Resources Manager
ACTION REQUEST:
Informational. Full Circle Indigenous Planning + Design will present the Oheyawahi
Interpretive Design (Phase III).
BACKGROUND:
In 2019, the City of Mendota Heights appointed a six-member task force to advise the City
Council on the management of Oheyawahi/Pilot Knob. The task force has worked closely with
city staff to guide natural resources, interpretive planning, and propose grant funding for
capital improvements. It also continues to collaborate with its partners, the Pilot Knob
Preservation Association, and Dakota County. With City Council authorization, the
Oheyawahi/Pilot Knob Task Force applied for and received a grant from the Minnesota
Historical Society (MHS) for the development of Phase III of the interpretation plan for the
Oheyawahi/Pilot Knob Preservation site. Full Circle Indigenous Planning + Design was selected
as the preferred consultant for the project. The interpretive project is in the third phase of four
phases. Phases include: (1) Indigenous development of themes for interpretation, (2) concept
design for interpretation on site, (3) development of design, text and images for interpretative
modules, and (4) fabrication and installation of interpretive modules.
The current phase of the project developed graphic design content that engages and educates
visitors about the cultural, historical and natural resources of this significant Dakota sacred site
for the themes and stories developed in Phase I and Phase II of this project.
All phases of the Interpretive Project have focused on engagement with the Indigenous
community, and furthering collaboration with the City, County and Pilot Knob Preservation
Association, in order to provide a thorough and comprehensive interpretation and educational
experience for school groups, tour groups and all visitors. The interpretive designs and content
of the design are intended to guide the ways that people respectfully engage, learn, and listen
to this sacred site.
FISCAL AND RESOURCE IMPACT:
Page 36 of 72
None at this time.
ATTACHMENTS:
1.Oheyawahi Final Design
CITY COUNCIL PRIORITY:
Premier Public Services & Infrastructure, Environmental Sustainability & Stewardship,
Economic Vitality & Community Vibrancy, Inclusive and Responsive Government
Page 37 of 72
Oheyawahi Interpretive Design (Phase III) - Final
June 30, 2026
Full Circle
Indigenous Planning + Design
Page 38 of 72
Oheyawahi Interpretive Design (Phase III)p. 2
TABLE OF CONTENTS
Introduction 3
Site Experience 4
Design Guidelines & Assumptions 5
Assumptions 6
Acacia Blvd Entry (AC)7
Valencour Circle Area (VA) 11
Big River Regional Trail Entry (BR) 13
Trail Intersection (TI)15
Seven Council Fires Overlook (SC) 17
Site Logo 19
Cost 20
Full Circle
Indigenous Planning + Design
Acknowledgement
Full Circle Indigenous Planning + Design, the City of Mendota Heights, Dakota County, and the Pilot Knob
Preservation Association extend our gratitude to the individuals who contributed their knowledge, insights,
and support to this project. Special thanks to community members and cultural advisors who generously
shared their time and expertise to help shape this work. Your contributions were vital to ensuring this
interpretive project reflects the stories, values, and significance of this place.
Prepared for:
•City of Mendota Heights
Prepared by:
•Dakota Advisory Group
•Juanita Espinosa, Iyekiyapiwin (Darlene St. Clair), Cante Maza (Neil McKay), Gwen Westerman,
and Samantha Odegard
•Full Circle Indigenous Planning
•Sam Olbekson, Regine Kennedy, Cherish Renville
•106 Group
•Alyssa Rupp
In collaboration with:
The Dakota Advisory Group of elders, teachers, and leaders who have provided insight and guidance.
Funded by: Minnesota Legacy Amendment Arts and Cultural Heritage Fund
This project was made possible in part by the people of Minnesota through a
grant funded by an appropriation to the Minnesota Historical Society from the
Minnesota Arts and Cultural Heritage Fund.
Page 39 of 72
Oheyawahi Interpretive Design (Phase III)p. 3
INTRODUCTION
Oheyawahi, also known as Oheyawahe, is a sacred place in Mni Sota Makoce. It is part
of a constellation of culturally significant sites in the Bdote area where the Minnesota
and Mississippi Rivers come together. For millennia, Dakota people gathered and buried
relatives here. Cultural connections continue even though the site has been deeply
impacted. Dakota place names are descriptive and Dakota language is embedded in this
place. For consistency, because there are different names for this sacred site, this plan
will use "Oheyawahi" throughout.
Oheyawahi means “I have come here to pray”
Oheyawahe means “the hill much visited”
This site has also become a place for non-Dakota people to learn about the relationship
between Dakota people and their homeland and Oheyawahi and its connections to the
larger Bdote landscape. Oheyawahi is a special place of power and it is important that all
visitors understand how to engage with the land respectfully. Oheyawahi is not a park or
a recreational area, but a place of deep meaning where the relationship between people
and ancestors is memorialized.
PROJECT UNDERSTANDING
This Interpretive Design Project builds on previous work to help shape
the experience of this place. The interpretive designs and content are
intended to guide the ways that people respectfully engage, learn, and
listen to all that the land has to say.
The outcome of this project will be interpretive content for five
interpretive nodes that will engage and educate visitors about the
cultural, historical, and natural resources of this significant Dakota
sacred site. The design is developed from the themes and stories
outlined in the previous stages of work and will consider diverse
audiences of varying abilities and learning styles.
This interpretive project is the third of four phases: (1) Indigenous
development of interpretive themes, (2) Concept Design for interpretation
on site, (3) Development of interpretive text and graphics for
interpretive structures and the fabrication-ready designs for these
structures, (4) Fabrication and installation of interpretive modules.
Working closely with the site design and engineering consultant, this
project will bring ideas to reality, preparing designs in anticipation of the
fourth phase: fabrication and installation.
THIS PLACE HAS MANY NAMES
Page 40 of 72
Oheyawahi Interpretive Design (Phase III)p. 4
SITE EXPERIENCE
Map pictured is a preliminary concept and only used here for demonstration purposes
Seven Council Fires Overlook (SC)
Purpose: To explain the meaning of the Seven
Council Fires stones and to let people know that
it’s acceptable to sit on the stones.
Big Rivers Regional Trail Entry (BR)
Purpose: To provide a transition area from the
regional trail to the sacred site.
Valencour Circle Entry (VC)
Purpose: Welcome Indigenous, especially Dakota,
people and provide a place to rebuild cultural
presence at this site through education and
potentially through ceremony.
Trail Intersection (TI)
Purpose: To provide a place to rest and reflect,
and experience solitude and quiet, while also
acknowledging that this area will be used
occasionally for groups to gather.
Acacia Boulevard Entry (AC)
Purpose: Landing and launching: This area has a sense of
arrival and leaving the city behind. This is a place for school
groups and tours to assemble.
For this project phase, this is considered the "main" entrance.
Interpretation in this plan exists at five logical locations. At entry points, visitors
experience site orientation and guidance about how to be here respectfully. In the
interior of the site, visitors are provided places to pause and reflect. Each location has
a unique purpose and a common story thread that weaves through the site.
“Light on the land” and “less is more” have been the repeated guidance especially
related to signage and physical structures. Throughout, the interpretation seeks to
elevate Dakota- and Indigenous-created materials, including digital media, teaching
curricula, and text and graphic content. Additionally, the interpretive messages have
been simplified to provide essential information to visitors related to care and healing
of the land. Other interpretive messages should be delivered digitally or through
light-touch methods such as audio, programming, or a website.
1
4 2
5
3
Page 41 of 72
Oheyawahi Interpretive Design (Phase III)p. 5
DESIGN GUIDELINES
Color Palette
Saturated colors are the focus of this graphic design identity. They
are vibrant, energizing, and can tell stories that are reflective of
what you might see in Dakota artwork. Light on the land earth tones
support the primary colors and are used sparingly.
Typography
The Noto type family has been chosen to support Dakota
orthography, while remaining geometric, legible, and approachable
Color Inspiration
Light
Medium
Bold
Black
Noto Sans
Light
Medium
Bold
Black
Noto Serif
Page 42 of 72
Oheyawahi Interpretive Design (Phase III)p. 6
ASSUMPTIONS
OHEYAWAHIYAHIPI KIN WASTEBench rendering not to scale
Material Assumptions
•All graphic panels should be constructed from a durable, outdoor-
grade materials, such as aluminum or high-pressure laminate (HPL).
•All forms should be constructed from metal (i.e. corten steel),
treated with a darker, warm, red-brown color, at roughly the size
specified on the exhibit pages.
•Mounting mechanisms cannot penetrate the ground due to the
sacredness of the site as a cemetery. The intent is to use a large
rock to secure the base (right).
•Material choice for all items should balance factors such as budget,
appropriateness on the landscape, and design/aesthetic intent.
•Site furnishings are specified and provided by others.
•Final details, such as base cutouts and logo stamp, to be resolved
collaboratively with the Dakota Advisory Group, Task Force, City,
and fabricator.
Page 43 of 72
Oheyawahi Interpretive Design (Phase III)p. 7
1
Interpretive Themes
• Gather & Honor
• Connect & Belong
• Learn & Reflect
Purpose
To welcome visitors into a sacred Dakota
site with care and intention. This is a place
of arrival and transition, where people leave
behind the city and prepare themselves to
enter respectfully and mindfully. Landing and
launching: This area has a sense of arrival
and leaving the city behind. This is a place for
school groups and tours to assemble.
Notes
• A QR code adhered to the brochure
holder links to more interpretation
content, potentially including audio
(actual QR code and website landing page
to be determined in Phase 4 prior to panel
fabrication).
ACACIA BLVD ENTRY (AC)
AC-01 - Entry Point AC-02 - Gathering Area
Renderings demonstrate design intent onlyOHEYAWAHI
Page 44 of 72
Oheyawahi Interpretive Design (Phase III)p. 8OHEYAWAHIOheyawahi wic̣aḣapi héc̣a: oyaƞke de uƞyuonihaƞpi k’a
nakuƞ ded mniuƞkiciyapi cée. Oṭokahetaƞhaƞ Daḳota oyate
ded hípi k’a wótakuye wic̣aḣapi, wac̣ekiya hípi k’a wódaḳota
káġapi. Oyaƞke ded oyate kiƞ wakiksuyapi k’a wowac̣iƞye
k’a nakuƞ wówaḳaƞ awiyukcaƞpi cée. Daḳota ec̣iyataƞhaƞ
maḳoc̣e kiƞ wótakuye héc̣a. Tohaƞn mauƞnipi kiƞhaƞ,
tohaƞn wóuƞhdakapi kiƞhaƞ, tohaƞn táku anauƞġoptaƞpi
kiƞhaƞ wac̣iƞuƞksapapi cée.
Iwaṡteda máni wo. Inina wo. P̣eżi kahihiyeda kaḣbokeg he
wayaka wo. Aic’ibdeza wo. Héc̣ed wauƞspeic’ic̣iyab cée. De
oṡkad maḳoc̣e héc̣a ṡni.
Oheyawahi is a cemetery: a sacred place of gathering and
honoring. Since time immemorial, Dakota people have come to
this hill for burials, ceremonies, and treaties. You are entering
a place that carries memory, responsibility, and spirit. For
Dakota people, land is a relative. That means how we walk,
speak, and listen matters. The land will teach you, if you let her.
Slow down. Be quiet. Watch the way the grasses move. Notice
what your body feels. That is how learning begins. This is not
a space for recreation. It is a space to reconnect with the land,
with its history, and with your own awareness of place
and sacredness.
I Have Come Here to Pray
Oheyawahi
OHEYAWAHI
Wóohoda is the Dakota value of respect
for all of creation. Dakota people come
here with prayer ties and offerings for
their relatives. Please respect these
sacred items by not touching or
disturbing them.
Daḳota ekta tohaƞn wóohodag he
iwouƞhdakap c̣a tag owas ahouƞkip̣api cée.
Daḳota oyate wauƞyaƞ k’a c̣aƞdi wapaḣdate
ahipi cée. Héc̣ed wótakuye wic̣akiksuyapi
cée. Wauƞyaƞ kiƞ dena waḳaƞdapi. Hena
épaṭaƞp ṡni wo. Hena icup ṡni wo.Minnesota Historical SocietyAC-01: ENTRY POINT SIGN
Oheyawahi is a cemetery: a sacred place of
gathering and honoring. Since time immemorial,
Dakota people have come to this hill for burials,
ceremonies, and treaties. You are entering a
place that carries memory, responsibility, and
spirit. For Dakota people, land is a relative. That
means how we walk, speak, and listen matters.
The land will teach you, if you let her.
Slow down. Be quiet. Watch the way the
grasses move. Notice what your body feels.
That is how learning begins. This is not a space
for recreation. It is a space to reconnect with
the land, with its history, and with your own
awareness of place and sacredness.
Wóohoda is the Dakota value of
respect for all of creation. Dakota
people come here with prayer ties
and offerings for their relatives.
Please respect these sacred items
by not touching or disturbing them.
Dakota translation
•Brochure Holder Size: 4" w x 6" h
•Cutout letters detail on the side
72"
24"
33"
16"
Page 45 of 72
Oheyawahi Interpretive Design (Phase III)p. 9
AC-02: GATHERING AREA SIGNS
Be Here
With
Respect
Wóohoda
Every
Step is a
Prayer
Wóc̣ekiya
Wóohoda is the Dakota value of respect. A common
Dakota lesson is to respect all of creation—land, sky,
plants, animals, air, water, yourself, and each other.
Ú ƞṡ iic’iya wo.
Wócekiya is the Dakota value of prayer—
speaking with the creator. A common
Dakota lesson is that every step is a prayer.
Ded wó c̣ekiye hduha má nipi cé e.
Top
Front
Top
Front
Attached to bench at the top right
corner, creating a wrap effect
8"
8"
8"
Page 46 of 72
Oheyawahi Interpretive Design (Phase III)p. 10
AC-02: GATHERING AREA SIGNS
Wóohoda
Wócekiya
Routed or painted at the top right
corner of a bench, creating an
impression effect
4"
4"
22"
22"
Page 47 of 72
Oheyawahi Interpretive Design (Phase III)p. 11
VALENCOUR CIRCLE ENTRY (VA)
2
Interpretive Themes
Connect & Belonging
Purpose
Welcome Indigenous, especially Dakota,
people and provide a place to rebuild
cultural presence at this site through
education and potentially through ceremony.
Notes
• This form is simply a smaller version of
the main entry form
• A QR code adhered to the brochure
holder links to more interpretation
content, potentially including audio
(actual QR code and website landing page
to be determined in Phase 4 prior to panel
fabrication).YAHIPI KIN WASTERenderings demonstrate design intent only
Page 48 of 72
Oheyawahi Interpretive Design (Phase III)p. 12
Walk gently. Notice what
the land is sharing with you.
Iwaṡteda máni wo Maḳoc̣e kiƞ
de táku nic’u kiƞ abdeza wo
Yahig waṡte ye/do Ded wótakuye uƞkiṭapi wic̣uƞḣapi.
Óhini maḳoc̣e kiƞ de waḳaƞ. Waṡicu ahiṭip ṡni ec̣ed
Daḳota oyate ded úƞṡiya híba wac̣ekiyapi, ṭeḣiƞdapi
wic̣ayuonihaƞpi k’a nakuƞ maḳoc̣eg de awayakapi cée.
Henaḣ wic̣aḣapig de awauƞyakapi. Héc̣ed ehaƞna Daḳota
wótakuye uƞkiṭawapi héc̣uƞpi cée.
It is good that you are here. Our ancestors rest here.
This land has always been sacred. Before roads, before
development, Dakota people came here to pray, to honor
loved ones, and to care for the land. We continue to
protect this cemetery place, just as our ancestors did.
This is not a space for loud gatherings
or recreation. It is a space for
remembering and for being
in relationship with the land.
Welcome
Yahipi Kin Waste
Minnesota Historical SocietyVA-01-A: ENTRY POINT SIGN
It is good that you are here. Our
ancestors rest here. This land has
always been sacred. Before roads,
before development, Dakota people
came here to pray, to honor loved
ones, and to care for the land. We
continue to protect this cemetery
place, just as our ancestors did.
This is not a space for loud gatherings
or recreation. It is a space for
remembering and for being
in relationship with the land.
Dakota translation
YAHIPI KIN WASTEWalk gently. Notice what the land is
sharing with you.
•Brochure Holder Size: 4" w x 6" h
•Cutout letters detail on the side
24.25"
16"
54"
24"
Page 49 of 72
Oheyawahi Interpretive Design (Phase III)p. 13
BIG RIVERS REGIONAL TRAIL ENTRY (BR)
3
Interpretive Themes
Gather & Honor
Purpose
To provide a transition area from the
regional trail to the sacred site.
Notes
•This form is simply a smaller version of
the main entry form
•Also at this location are plans for a
Dakota County sign (like the one
pictured left). It would be independent
from the Oheyawahi-specific sign and is
not in this scope.
•A QR code adhered to the brochure
holder links to more interpretation
content, potentially including audio
(actual QR code and website landing page
to be determined in Phase 4 prior to panel
fabrication).
Renderings demonstrate design intent onlyOȞÉYAWAHE
Page 50 of 72
Oheyawahi Interpretive Design (Phase III)p. 14
BR-01: ENTRY SIGN
Pahag de wic̣aḣapi hec̣a. Daḳota ekta oyaƞke kiƞ de
waḳaƞuƞdapi k’a detaƞhaƞ ehaƞna wóyakapi k’a
wókiksuye hduha mauƞnipi cée. C̣aƞkug dena káġapi
ṡni ec̣ed oyate uƞkiṭapi máni hípi k’a nakuƞ wáta ohna
hípi cée. C̣aƞku kiƞ dena ohna táku oóta uƞkaḳip̣api.
Iwaṡteda máni uƞniṡipi. Aic’ibdeza wo Waṭoṭo k’a
wóaḣmuƞye abdeza wo Oyaƞke kiƞ ded hóṭaƞkaya
mníciyap ṡni k’a ṣkátapi ṡni.
This hill is a cemetery. It is a Dakota sacred place that holds
our stories and memories. Our ancestors are nearby. Long
before these paved trails, our people traveled this region
on foot and by water. These trails are layered with history.
We ask you to move gently. Be present.
Notice the plants, the sounds, and the
feeling of being here. This isn’t a space
for loud gatherings or recreation.
The Hill Much Visited
Oḣeyawahe, Ohiyawahi
Please park your bike and
move with care and respect
through this sacred site.
Naic’ihmihma ékihnaka k’a oyaƞke
waḳaƞ kiƞ de ópta úƞṡiya k’a
ihduonihaƞyaƞ op̣iic’iya wo.Minnesota Historical SocietyThis hill is a cemetery. It is a Dakota
sacred place that holds our stories and
memories. Our ancestors are nearby.
Long before these paved trails, our people
traveled this region on foot and by water.
These trails are layered with history.
We ask you to move gently. Be present.
Notice the plants, the sounds, and the
feeling of being here. This isn’t a space
for loud gatherings or recreation.
Dakota translation
OȞÉYAWAHEPlease park your bike and move with care
and respect through this sacred site.
•Brochure Holder Size: 4" w x 6" h
•Cutout letters detail on the side
24.25"
16"
54"
24"
Page 51 of 72
Oheyawahi Interpretive Design (Phase III)p. 15
4
Interpretive Themes
Listen & Respect
Purpose
To provide a place to rest and reflect, and
experience solitude and quiet, while also
acknowledging that this area will be used
occasionally for classroom groups to gather.
Notes
•N/A
TRAIL INTERSECTION (TI)
Renderings demonstrate design intent only
Page 52 of 72
Oheyawahi Interpretive Design (Phase III)p. 16
You Are Here
ACACIA BLVD
HWY 52
N
Steep Grade
Moderate GradeMISSISSIPPI RIVER200 ft
Henaḣ wic̣aḣapi ded mniuƞkic̣iyapi, wac̣euƞkiyapi k’a
nakuƞ wauƞspeuƞkic’ic̣iyapi cée. Ṭate, p̣eżuta k’a
wamaḳaṡkaƞ táku óta uƞspeuƞḳiyapi cée
This is a cemetery where we continue to gather,
pray, and learn. The land teaches us. The wind, the
medicines, the animals—they all carry knowledge.
Wótakuye Paha
The Hill of All The Relatives
CG-01: TRAIL INTERSECTIONTI-01: TRAIL INTERSECTION
12"
14"
43"
15"
A slightly darker coloration creates
the oak leaf design on the base
Page 53 of 72
Oheyawahi Interpretive Design (Phase III)p. 17
5
Interpretive Themes
Listen & Respect
Purpose
To explain the meaning of the Seven
Council Fires stones and to let people know
that it’s acceptable to sit on the stones.
Notes
•Space is left at the top and bottom
of the panel design in case exposed
hardware is needed.
SEVEN COUNCIL FIRES OVERLOOK (SC)
Renderings demonstrate design intent only
Page 54 of 72
Oheyawahi Interpretive Design (Phase III)p. 18
SC-01: SEVEN COUNCIL FIRES OVERLOOK
Seven Council Fires
Oceti Ŝakowiŋ
This is the way Dakota people describe
ourselves as a nation. The land here is
part of a larger web of sacred sites. You
don’t need to know everything to feel the
power of this place. Just be still. Take a
seat. Listen. Be open.
Dec̣ed Daḳota oyate uƞkihdawapi. Maḳoc̣e
déc̣iya oyaƞke tóna waḳaƞuƞdapi yuḳe.
Tag owas sdodyapte ṡni gaṡ oyaƞke kiƞ de
wówaḳaƞ yuḳeg he ṭaƞiƞ. Inina yaƞka wo
Íyotaka wo Anaġoptaƞ wo Abdes uƞ wo.
A cutout creates the shape
in the base
12"
6"
27"
6"
Page 55 of 72
Oheyawahi Interpretive Design (Phase III)p. 19
OHEY A W A H IOHEY A W A H EBlack and white Color with alternate spelling Color with alternate spelling
SITE LOGO
Inspired by the ever-flowing change, movement, and connection present
at Oheyawahi, land and water come together to create this mark. As the
river passes through these two elements, it carries with it the respect of
this place. By reflecting two similiar but unique shapes together, you might
see an oak leaf and references to Kapemni.
Although not currently anticipated on any proposed signage or site
design, the mark is available for when it is needed; whether that is in on-
site interpretation, brochures, digital media, a website, etc. Its qualities
could help inspire other initiatives for this place.
Page 56 of 72
Oheyawahi Interpretive Design (Phase III)p. 20
COSTS
These estimates are based on the final design and 2026 costs for a
turnkey fabrication and installation approach (i.e., a single provider
for all fabrication and installation). Costs for boulders are currently
unknown and using onsite boulders, placed by a project partner may
be a possibility (e.g., Acacia Cemetery may have boulders available
and may be able to place them onsite). An annual escalation rate
is included. Of note is that material and labor costs, especially for
fabrication and installation, are currently quite dynamic.
Pre-Production & Production (CA) $12,960
Acacia Entry $36,666
Valencour Entry $21,384
Big Rivers Regional Trail Entry $19,800
Trail Intersection $19,100
Seven Council Fires Overlook $16,400
TOTAL $126,310
Page 57 of 72
Oheyawahi Interpretive Design (Phase III)p. 21
COST DETAILS
Pre-Production & Production (CA)
Components Description Unit Estimated
Cost Total Estimated Cost
Pre-Production (3-6 months)$8,000.00
Content & Design
Project Management
Review and finalize all content
Coordinate on or off site boulder selection
and placement
Production/CA (1-2 months)$4,000.00
Project Management & CA Client and team meetings, onsite consultation
Cost Escalation Rate 8%$960.00
Subtotal for Pre-Production & CA 1 $12,960.00
Acacia Entry
Components Description Unit Estimated
Cost Total Estimated Cost
FABRICATION
AC-01 Entry Sign $19,750.00
base 72"h x 24"w sign base structure, hardware,
fabrication, and shipping
$16,000.00
graphic panel 33" h x 16"w graphic panel with content;
fabrication and shipping
$3,750.00
AC-02 Benchs $10,700.00
benches wood benches (qty 2, 6'-8' long x approx. 18"
high x 15" deep), clear finish, wood species
tbd (oak preferred)
$6,000.00
bench routing Dakota language per bench, approx. 4"h x
22"w
$3,700.00
graphic panel 16" h x 8"w bent panel with content $1,000.00
Other Costs $6,216.00
installation $3,500.00
boulders non-ground penetrating sign weight; provided
by city or partners
$0.00
fabrication escalation rate 8%$2,716.00
Total for Acacia Entry $36,666.00
Page 58 of 72
Oheyawahi Interpretive Design (Phase III)p. 22
COST DETAILS
Valencour Entry
Components Description Unit Estimated
Cost Total Estimated Cost
FABRICATION
VA-01 Entry Sign $16,300.00
base / hardware fabrication 54"h x 24"w sign base structure, hardware,
fabrication, and shipping
$13,000.00
graphic panel 24.25" h x 16"w vertical panel with content;
fabrication and shipping
$3,300.00
Other Costs $5,084.00
installation $3,500.00
boulders non-ground penetrating sign weight (see
Acacia Entry); option to install on existing
concrete pad/driveway apron
$0.00
fabrication escalation rate 8%$1,584.00
Total for Valencour Entry $21,384.00
Big Rivers Regional Trail Entry
Components Description Unit Estimated
Cost Total Estimated Cost
FABRICATION
BR-01 Entry Sign $16,300.00
base / hardware fabrication 54"h x 24"w sign base structure, hardware,
fabrication, and shipping
$13,000.00
graphic panel 24.25" h x 16"w vertical panel with content;
fabrication and shipping
$3,300.00
Other Costs $3,500.00
installation install at new trailhead plaza, wood surface
(or comparable)
$3,500.00
fabrication escalation rate 8%$1,864.00
Total for BRRT Entry $19,800.00
Page 59 of 72
Oheyawahi Interpretive Design (Phase III)p. 23
COST DETAILS
Trail Intersection
Components Description Unit Estimated
Cost Total Estimated Cost
FABRICATION
TI-01 Sign $15,600.00
base / hardware fabrication 43"h x 15"w sign base structure, hardware,
fabrication, and shipping;
corten base with stamped logo image
$14,100.00
panel 12" h x 14"w vertical panel with content;
fabrication and shipping
$1,500.00
Other Costs $3,500.00
installation $3,500.00
boulders non-ground penetrating sign weight (see
Acacia Entry)
$0.00
fabrication escalation rate 8%$1,528.00
Total for Trail Intersection $19,100.00
Seven Council Fires Overlook
Components Description Unit Estimated
Cost Total Estimated Cost
FABRICATION
TI-01 Sign $12,900.00
base / hardware fabrication 27"h x 6"w sign base structure, hardware,
fabrication, and shipping;
corten base with triangle cutout
$11,800.00
panel 12" h x 6"w vertical panel with content;
fabrication and shipping
$1,100.00
Other Costs $3,500.00
installation $3,500.00
boulders non-ground penetrating sign weight (see
Acacia Entry)
$0.00
fabrication escalation rate 8%$1,312.00
Total $16,400.00
Page 60 of 72
This page is intentionally left blank
9.a
REQUEST FOR CITY COUNCIL ACTION
MEETING DATE: July 7, 2026
AGENDA ITEM: Municipal Campus Building Project - Police Station and City Hall Update
and Awarding Geotechnical Services Contract and Project Update
ITEM TYPE: New and Unfinished Business
DEPARTMENT: Administration CONTACT: Cheryl Jacobson, City
Administrator
ACTION REQUEST:
Staff and/or ICS will provide a project status update and the City Council is asked to award a
contract for geotechnical services for the Municipal Campus Building Project.
BACKGROUND:
The Municipal Campus Building Project is the proposed construction of a new Police Station
and City Hall. The new building will replace the existing facility located at 1101 Victoria Curve,
which was built in the late 1980s.
Project Status
On June 2, the City Council approved moving the project to the Design Development phase.
The purpose of this stage is to advance the concepts and ideas from schematic design to a
more precise and buildable design. This phase includes a higher level of detail than what is
developed in schematic design such as dimensions and materials. The goal of this stage is to
ensure that the design is technically feasible and meets code, budget and city requirements.
The City Council's original direction was to evaluate a "dig-once, future-ready" municipal
campus building capable of supporting the City's long-term operational needs. The initial
schematic design was developed using a 20-year planning horizon, with assumptions of
modest organizational growth over the next two decades. The design focused on operational
needs, workplace functionality, public accessibility and service delivery requirements.
After receiving feedback from some residents that the building felt too big, and the estimated
cost was too high, the City Council directed staff during their June 16 work session to scale
back the building design. The updated direction is to reduce square footage and building
features to develop a building that meets current/immediate (2026) space needs, while
allowing for some flexibility for the future. Project architects are now working to incorporate
the Council's feedback into the next iteration of building design plans.
Page 61 of 72
Geotechnical Services - Contract Award
On June 11, 2026, ICS issued a Request for Proposals (RFP) for geotechnical services to
support design and engineering for the Municipal Campus project. RFPs are commonly used
for contracts that are not required to be competitively bid, such as contracts for professional
services. Minnesota Statutes recognize services requiring specialized, technical, scientific or
professional training as professional services.
The RFP project scope included a total of 13 soil borings, nine of which will be drilled to a
depth of 30 feet and four drilled to a depth of 15 feet depending on the identified location on
the site. In addition to soil analysis and below-grade compositions, the borings shall indicate
water levels and other pertinent geotechnical information to aid project architects and
engineers in the project's design. A geotechnical report will be provided.
ICS solicited cost proposals from three firms, and received proposals from:
1.American Engineering Testing, Inc.
2.Braun Intertec
ICS and city Engineering staff have evaluated both proposals, including compliance with the
specifications of the RFP, technical approach, cost, and prior work performance and
recommend the selection of Braun Intertec. Braun Intertec is part of the city's professional
services consultant pool for geotechnical/soils analysis and material testing.
Minnesota Data Practices (MN Statutes §13.591, subd. 3(b)): Because this project involves
responses to a formal Request for Proposals (RFP), some information is not yet public under
the Minnesota Data Practices Act. Data submitted by a business in response to an RFP remain
private or nonpublic until the evaluation process is complete. Completion of the evaluation
process means that the city has completed negotiating the contract with the selected vendor,
part of which is approval by the city council. After the city has completed the evaluation
process, all remaining data submitted by all responders are public, except for trade secret
data.
FISCAL AND RESOURCE IMPACT:
Geotechnical services were included as part of the preliminary design phase budget for the
Municipal Campus project. The final fiscal impact will be known after contract negotiations are
complete at which time the contract amount and other proposal data will become public.
ATTACHMENTS:
1.Geo Tech Services RFP - Mendota Heights
CITY COUNCIL PRIORITY:
Premier Public Services & Infrastructure
Page 62 of 72
Request for Proposal
Mendota Heights Civic Campus
Geo Tech Services
RELEASE DATE: June 11, 2026
SUBSTANTIAL COMPLETION: ASAP
Page 63 of 72
www.ics-builds.com 2
TABLE OF CONTENTS
Pg. 3……………………. Proposal Guidelines
Pg. 4……………………. Design Team
Pg. 5……………………. Summary of Work
-Project Scope
Pg. 6……………………. General Conditions
-Schedule
-Permits
-Payment Procedures
Pg. 7…………………… Insurance Requirements
Pg. 9………………….. Bid Form
RFP Attachments
- Boring Locations Site Map
Page 64 of 72
www.ics-builds.com 3
Proposal Guidelines
ICS, on behalf of the City of Mendota Heights is requesting proposals for
Geotechnical Services for the following project:
Mendota Heights Police Station & City Hall Facility
Project Documents for prospective contractors are attached to this RFP, and
are also available by contacting the Program Manager:
Kyle Walter
ICS Project Director
1139 Franklin Avenue, Suite #1
Sauk Rapids, Minnesota 56379
(320) 309-9227
kyle.walter@ics-builds.com
Proposals are due by 5:00pm on Wednesday, June 17, 2026, and are to be
submitted via email to the Program Manager. No oral, telegraphic or
telephonic proposals or modifications will be considered. Proposals shall be
valid for a period of thirty (30) days after the due date.
Prospective Firms are to provide a proposal to furnish all labor and materials
for Services as set forth in this request for proposal. It is the intent of the
Owner to Contract with the lowest qualified firm, provided the proposal has
been submitted in accordance with the RFP Documents and does not exceed
the funds available.
For questions regarding this RFP, please contact Kyle Walter, ICS Senior Project
Manager, at (320) 309-9227 or kyle.walter@ics-builds.com. No others are to be
contacted regarding this RFP.
The Owner reserves the right to reject any or all proposals, and waive
informalities or irregularities in submitted proposals, and accept the proposal
which, in the Owner’s judgement, is in the Owner’s own best interest.
The Owner requires Substantial Completion of the project is as soon as
possible.
Page 65 of 72
www.ics-builds.com 4
Design Team
Project Name: Mendota Heights Police Station & City Hall Facility
Owner: City of Mendota Heights
1101 Victoria Curve
Mendota Heights, Minnesota, 55118
Program Manager: ICS
Kyle Walter
1139 Franklin Avenue, Suite #1
Sauk Rapids, MN 56379
(320) 309-9227
kyle.walter@ics-builds.com
Architect: BKV
222 N 2nd St #101
Minneapolis, MN 55401
Civil Engineer: Design Tree Engineering
1139 Franklin Avenue, Suite #5
Sauk Rapids, MN 56379
Structural Engineer: Design Tree Engineering
1139 Franklin Avenue, Suite #5
Sauk Rapids, MN 56379
Page 66 of 72
www.ics-builds.com 5
Summary of Work
1. Project Scope
The work requested is for complete soil borings, testing analysis and publish
report with structural and civil recommendations based on the analysis of
soils and other below grade compositions.
The attached Site maps indicate a quantity of borings requested at the site.
(13 total)
It is the responsibility of each responder to this proposal request to become
familiar with the sites and locations and account for boring access conditions
(fields, parking lots, etc.)
Each boring shall be drilled to a minimum depth as indicated below for
appropriate analysis relating to the planned building or site as required by
the structural and civil engineers.
Borings 1-9: 30’ depth
Borings 10-13: 15’ depth
In addition to soils analysis and below grade compositions, the borings shall
also indicate water levels encountered and other pertinent geo-technical
information to aid the architects and engineers in the projects design
Special coordination will need to take place with borings 1-7 as they are
scheduled to take place withing an active baseball field. Borings will need to
be completed by 3pm each day, work area cleaned and leveled, and rig
moved outside of fence to accommodate baseball games.
All work furnished under this RFP shall be installed at the following
locations:
a. At: Mendota Heights City Hall
1101 Victoria Curve
Mendota Heights, Minnesota, 55118
For: City of Mendota Heights
Page 67 of 72
www.ics-builds.com 6
General Conditions
1. Schedule
A. Work shall be completed as follows:
a. Start on site work and submittal process immediately upon
Contract award.
B. Provide an anticipated schedule with contract award taking place one
week after proposal due date.
2. Permits
A. When applicable, the Contractor shall secure and pay for the building
permit as well as for other permits, fees, licenses, and inspections by
government agencies necessary for proper execution and completion
of the Work that are customarily secured after execution of the
Contract and legally required at the time bids are received or
negotiations concluded.
3. Payment Procedures
A. Invoicing:
a. Contractor to email invoice for payment directly to the Program
Manager on or before the 25th day of the month for the work
performed through the end of the month. No faxed or mailed
invoices will be accepted.
B. Contract Price Modifications:
a. Contractor may propose a change by submitting a request for
change to the Program Manager, describing the proposed
change and its full effect on the Work, with a statement
describing the reason for the change and the effect on the work
by separate or other contractors.
b. Execution of Change Order: Program Manager will issue Change
Orders for signatures of parties as provided in the Conditions of
the Contract.
Page 68 of 72
www.ics-builds.com 7
Insurance Requirements
Coverages, whether written on an occurrence or claims-made basis,
shall be maintained without interruption from the date of
commencement of the Work until the date of final payment and
termination of any coverage required to be maintained after final
payment, and, with respect to the Contractor’s completed operations
coverage, until the expiration of the period for correction of Work or for
such other period for maintenance of completed operations coverage.
A. Workers’ Compensation:
1) Employer’s Liability: $100,000 per accident
$500,000 disease, policy limit
$100,000 disease, each employee
2) Waiver of Subrogation
B. Comprehensive or Commercial General Liability (including
Premises-Operations; Independent Contractor’s Protective;
Products and Completed Operations; Broad Form Property
Damage):
1) Bodily Injury: $1,000,000 each occurrence
$2,000,000 aggregate
2) Property Damage: $1,000,000 each occurrence
$2,000,000 aggregate
3) Products and completed Operations to be maintained for 2
years after final payment:
$1,000,000 aggregate
4) Property Damage Liability Insurance shall provide X, C and U
coverage.
5) Broad Form Property Damage Coverage shall include
Completed Operations.
6) Waiver of Subrogation
Page 69 of 72
www.ics-builds.com 8
C. Contractual Liability:
1) Bodily Injury:$1,000,000 each occurrence
$2,000,000 aggregate
2) Property Damage: $1,000,000 each occurrence
$2,000,000 aggregate
D. Personal Injury, with Employment Exclusion deleted:
$2,000,000 aggregate
Employment Practices Liability
$1,000,000 aggregate
E. Business Auto Liability (including owned, non-owned and hired
vehicles):
1) Bodily Injury:$1,000,000 each person
$1,000,000 each occurrence
2) Property Damage: $1,000,000 each occurrence
3) Waiver of Subrogation
F. If the General Liability coverages are provided by a Commercial
Liability policy, the:
1) General Aggregate must be written on a per project basis.
2) Fire Damage Limit shall be not less than $100,000 on any one
fire.
3) Medical Expense Limit shall be not less than $5,000 on any one
person.
G. Umbrella Excess Liability: $3,000,000 over primary insurance
$10,000 retention for self-insured
hazards, each occurrence
Page 70 of 72
www.ics-builds.com 9
Bid Form
BID PROPOSAL FOR: City of Mendota Heights
1101 Victoria Curve
Mendota Heights, Minnesota, 55118
BID TO: City of Mendota Heights
1101 Victoria Curve
Mendota Heights, Minnesota, 55118
BID FROM: __________________________________________________________________
We have examined the Contract Documents for the proposed Mendota Heights Police Station and City Hall project,
as prepared by Design Tree Engineering, Sauk Rapids, Minnesota, and the conditions affecting the work.
In accordance therewith, the undersigned proposes to furnish all labor and materials for Construction as set forth in
the Contract Documents.
1. I agree to complete the Project, provided a contract is executed within 15 calendar days of proposal due
date
2. I understand the Owner reserves the right to reject any or all bids, and it is agreed that this bid may not
be withdrawn for a period of thirty (30) days from the opening thereof.
The Bidder agrees to perform all work for the Sum of:
___________________________________________Dollars $__________________________
a. Unit Price: State the amount to be added to the Contract to perform additional borings and analysis as requested.
Unit Price of $_________________ Per boring
DATE ____________________
FIRM NAME ______________________________________________________________
OFFICIAL ADDRESS ________________________________________________________
________________________________________________________
TELEPHONE NUMBER (____)___________ FAX NUMBER (____)____________
BY _________________________________________________________________
TITLE (Owner or Officer) ______________________________________________
Page 71 of 72
CO
CO
CO
CO
CO
CO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO FO
FO FO
FO
FO FO
FO
FO FOFOFOFOFOFO
FO
FO
FO
FO
FO
FO FO FO
FO
FO
FO
FO
FO FO FO FO
FO FO
FO
FO
FO
FO FO
UGE
UGE
UGE
UGE
UGE
UGE
UGE OHEOHEOHEOHE
OHEOHEOHEOHEOHEOHEOHEOHEOHEOHElllCO
UGEUGEUGEUGE UGEUGEUGEUG
EUGEUGEUGEFOFOFOFO FO FO FO FO FO
FOFOFOFOFOFOFOFOFOFOFOOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEllllllllllllllS00°12'42"E 415.85N89°57'25"E
24.16
S00°10'03"E 236.80S27°40'36"W 190.22S82°42'54"E
20.50
S07°17'38"W20.00S82°42'22"E
71.72
S00°10'03"E 223.20N00°12'41"W 1237.75(NORTH 650.00)(EAST 684.98)N00°12'41"W 2650.97XXXXXXX
X
X
X X X X X X X X X X X X X X X X
STORAGE / DATA
RR
RR
JAN
WELLNESS
WRITING
OPEN OFFICE AREA
?
?
CHANGING
CHANGINGLOCKERS
?
SHARED SARGENTOFFICE
SHARED SARGENTOFFICE
RECORDS
CONFERENCE
PARKING INFORMATION
PARKING STALLS X STALLS
ACCESSIBLE STALLS X STALLS
TOTAL STALLS X STALLS
PROPERTY INFORMATION
TOTAL PROPERTY AREA X AC
DISTURBED AREA X ±AC
EXISTING IMPERVIOUS AREA X AC
PROPOSED IMPERVIOUS AREA X AC
SITE LEGEND
LIGHT DUTY BITUMINOUS PAVEMENT
HEAVY DUTY BITUMINOUS PAVEMENT
CONCRETE PAVEMENT
CONCRETE SIDEWALK
CURB AND GUTTER
TIPPED CURB AND GUTTER
RETAINING WALL
CHAINLINK FENCE
WOOD/VINYL (PRIVACY) FENCE
TRAFFIC CONTROL SIGNAGE
PAINTED DIRECTIONAL ARROW
PAINTED ACCESSIBLE PARKING SYMBOL
NOTES:
1. ALL DIMENSIONS SHOWN ARE TO FLOW LINE, CENTERLINE OF FENCE,
EDGE OF PAVEMENT, OR EXTERIOR FACE OF BUILDING, UNLESS
OTHERWISE NOTED.
2. CONTRACTOR SHALL VERIFY ALL PLAN AND DETAIL DIMENSIONS PRIOR
TO CONSTRUCTION.
3. ALL CROSSWALK STRIPING SHALL BE WHITE IN COLOR.
4. ALL INTERIOR PARKING STALL STRIPING SHALL BE 4" AND YELLOW IN
COLOR.
5. ACCESSIBLE PARKING STALL STRIPING, ACCESS AISLE, SYMBOL, AND
SIGNAGE SHALL BE IN ACCORDANCE WITH LOCAL AUTHORITY
REQUIREMENTS.
6. CONTRACTOR SHALL MAINTAIN FULL ACCESS TO ADJACENT PROPERTIES
DURING CONSTRUCTION AND TAKE ALL PRECAUTIONS NECESSARY TO
AVOID PROPERTY DAMAGE TO ADJACENT PROPERTIES.
7. ALL SITE WORK SHALL BE PERFORMED IN ACCORDANCE WITH THE
RECOMMENDATIONS OF THE GEOTECHNICAL ENGINEER.
8. CONTRACTOR SHALL PROVIDE A TEMPORARY PEDESTRIAN ACCESS ROUTE
PLAN FOR ANY WORK PERFORMED WITHIN THE PUBLIC RIGHT-OF-WAY.
9. CONTRACTOR SHALL PROVIDE A TEMPORARY TRAFFIC CONTROL PLAN
FOR ANY WORK PERFORMED WITHIN THE PUBLIC RIGHT-OF-WAY.
10. GOPHER STATE ONE CALL DAMAGE PREVENTION SYSTEM FOR BURIED
UTILITIES. 1-800-252-1166. CONTRACTOR SHALL HIRE A PRIVATE
UTILITY LOCATOR TO ASSIST WITH PRIVATE UTILITY LOCATES.
1
2
D4 MOUNTABLE CURB AND GUTTER
B612 CURB AND GUTTER
CURB TRANSITION
ADA PEDESTRIAN RAMP (SEE DETAILS)
TRUNCATED DOMES (SEE DETAILS)
CONCRETE DRIVE APRON
CROSSWALK STRIPING
BUS PARKING STRIPING
PARKING STRIPING
1.5" MILL & OVERLAY
3
4
5
KEY NOTES:
6
7
8
9
10
0'40'80'
SHEET TITLE UP
TO 3 LINES IF
NEEDED
M0.1
Page 72 of 72