04 07 2026 CC PacketCITY OF MENDOTA HEIGHTS
CITY COUNCIL REGULAR MEETING AGENDA
April 7, 2026 at 6:00 PM
Mendota Heights City Hall, 1101 Victoria Curve, Mendota Heights
1.Call to Order
2.Roll Call
3.Pledge of Allegiance
4.Approval of the Agenda
The Council, upon majority vote of its members, may make additions or deletions to the
agenda. These items may be submitted after the agenda preparation deadline.
5.Public Comments - for items not on the agenda
Public comments provide an opportunity to address the City Council on items which are not
on the meeting agenda. All are welcome to speak. Individuals should address their
comments to the City Council as a whole, not individual members. Speakers are requested
to come to the podium and must state their name and address. Comments are limited to
three (3) minutes. No action will be taken; however, the Mayor and Council may ask
clarifying questions as needed or request staff to follow up.
6.Consent Agenda
Items on the consent agenda are approved by one motion of the City Council. If a
councilmember requests additional information or wants to make a comment on an item,
the item will be removed from the consent agenda and considered separately. Items
removed from the consent agenda will be taken up as the next order of business.
a.Approve Minutes from the March 17, 2026, City Council Work Session Meeting
b.Approve Minutes from the March 17, 2026, City Council Meeting
c.Approve Minutes from the March 17, 2026, City Council Closed Session Meeting
d.Acknowledge Minutes from the January 27, 2026, Planning Commission Meeting
e.Acknowledge Minutes from the February 24, 2026, Planning Commission Work
Session Meeting
f.Authorize the Purchase of Fire Department Turn-Out Gear
g.Approve a Massage Therapist License
Page 1 of 124
h.Approve Engineering/Public Works Department Out of Metro Travel Request
i.Approve Police Department Out of Metro Travel Request
j.Approve Resolution 2026-23 Proclaiming April 24, 2026, Arbor Day in Mendota
Heights
k.Approve 2025 Audit Fund Consolidation
l.Approve Office Support Assistant Hire
m.Approve Claims List
7.Presentations
8.Public Hearings
9.New and Unfinished Business
a.Resolution 2026-22 Approving the Lexington Heights Planned Unit Development
Amendment - Final Development Plan; And Ordinance No. 606 Approving a Zoning
Amendment to Planned Unit Development Overlay District (Planning Case Nos. 2025-
16 and 2026-03)
b.Resolution 2026-25 Approving a Conditional Use Permit for 655 Callahan Place
[Planning Case No. 2026-04]
c.Municipal Campus Project Update
10.Community / City Administrator Announcements
11.City Council Comments
12.Adjourn
Next Meeting
April 21, 2026 at 6:00PM
Information is available in alternative formats or with the use of auxiliary aids to individuals with
disabilities upon request by calling city hall at 651-452-1850 or by
emailing cityhall@mendotaheightsmn.gov.
Regular meetings of the City Council are cablecast on
NDC4/Town Square Television Cable Channel 18/HD798 and online at
townsquare.tv/Mendota-Heights-Streaming
Page 2 of 124
March 17, 2026, City Council Work Session Minutes Page - 1
CITY OF MENDOTA HEIGHTS
DAKOTA COUNTY
STATE OF MINNESOTA
DRAFT Minutes of the City Council Work Session
Tuesday, March 17, 2026
Pursuant to due call and notice thereof, a work session of the Mendota Heights City Council was
held at Mendota Heights City Hall, 1101 Victoria Curve, Mendota Heights, Minnesota.
CALL TO ORDER
Mayor Levine called the work session to order at 5:02 p.m. Councilors Lorberbaum, Mazzitello
and Paper were in attendance. Councilor Maczko was absent.
Others present included: City Administrator Cheryl Jacobson, Assistant City Administrator Kelly
Torkelson, Finance Director Kristen Schabacker, Public Works Director Ryan Ruzek, Parks &
Recreation Director/Assistant Public Works Director Meredith Lawrence, Community
Development Manager Sarah Madden, Assistant City Engineer Lucas Ritchie,
Administrative/Special Projects Coordinator Noel Mills Ford, City Attorney Amy Schmidt, and
City Clerk Nancy Bauer.
Also in attendance from LOGIS were Patty Hartwig, Client Services Group Supervisor, and Mike
McCauley, IT Security Operations Manager.
CITIES FOR SAFE AND STABLE COMMUNITIES COALITION
City Administrator Jacobson stated that the Cities for Safe and Stable Communities Coalition
established during Operation Metro Surge has shifted to operating more as a legislative advocacy
organization since the draw down of federal agents. Staff will continue to monitor the coalition
and track related bills in the legislature.
Mayor Levine stated she is connected with other Mayors, and they are discussing the coalition as
it is evolving.
After a brief discussion, it was the consensus of the Council not to join the Cities for Safe and
Stable Communities Coalition at this time.
CYBERSECURITY SERVICES – LOGIS SECURITY AS ASERVICE OFFERINGS
Patty Hartwig, Client Services Group Supervisor, and Mike McCauley IT Security Operations
Manager, from LOGIS introduced themselves.
Page 3 of 124
6.a
March 17, 2026, City Council Work Session Minutes Page - 2
Assistant City Administrator Torkelson reported that cybersecurity is a growing concern, and
claims are on the rise. In response, LOGIS has developed new cybersecurity services which were
outlined by staff and LOGIS representatives.
One option presented was Security as a Service, a reactive incident response program. This
service would provide access to cybersecurity experts at LOGIS, assist in responding to
cybersecurity incidents and help reduce the overall impact of incidents. The program includes
specialized software designed to detect potential cyberattacks or data breaches. The annual cost
for this service is $48,500 and would be in addition to the technical services that are already being
provided by LOGIS.
The second option presented was Vulnerability Management, a proactive service focused on
incident prevention. This program includes software and staffing to scan the City’s system for
vulnerabilities. The annual cost for this service is $24,750 to $32,750.
Staff noted that the Council will need to consider whether to continue with current practices,
contract for additional LOGIS services, or explore hiring an in-house IT employee. This
conversation will lead into the 2027 budget discussions.
P. Hartwig, LOGIS Client Services Group Supervisor, stated that the proposed services would add
another defensive layer to reduce risk, but noted that no system can provide absolute guarantees.
M. McCauley, LOGIS IT Security Operations Manager, explained that the Vulnerability
Management service is a reactive service and capable of detecting a breach or cyberattack in real
time.
Assistant City Administrator Torkelson clarified that the $24,750 to $32,750 reflects LOGIS staff
working one to two hours per week to address identified vulnerabilities.
The costs of adding LOGIS services versus hiring a new IT employee were discussed.
Assistant City Administrator Torkelson emphasized that without the services offered by LOGIS a
cyberattack could be devastating and costly. In such a scenario, the City would also need to
secure emergency contract services to assist with the City’s response. LOGIS services would
provide faster response capability, specialized expertise, and established systems.
Councilor Mazzitello inquired about the City’s insurance coverage. Assistant City Administrator
Torkelson noted that the city is insured through the League of Minnesota Cities.
Councilor Paper inquired about the amount of insurance coverage. Assistant City Administrator
Torkelson replied that the current coverage provides $500,000 of coverage which is an enhanced
insurance coverage amount.
Page 4 of 124
March 17, 2026, City Council Work Session Minutes Page - 3
It was the consensus of the Council to continue with the current LOGIS service model while
pursuing both new service offerings.
STATE LEGISLATIVE UPDATE
Administrative/Special Projects Coordinator Mills Ford reported that the Minnesota Legislature is
in the second year of the 2025-2026 biennium. She noted that there have been approximately
4,400 bills introduced into the House and 4,500 bills introduced into the Senate. It is a short
session, and the legislature is nearly halfway through the 12-week session.
Priority bills include gun violence & prevention, immigration/civil/human rights, fraud and
affordability.
City Administrator Jacobson noted that included in the work session packet was the proposed bill
and the House summary for the Starter Homes Act (HF3895/SF4123). The League of Minnesota
Cities negotiated concessions for some parts of the bill. The proposed bill would apply to the city.
The bill has strong bipartisan support, and if enacted, would take effect on January 1, 2028. Staff
will continue to monitor the bill’s progress.
Administrative/Special Projects Coordinator Mills Ford noted the other bills of City interest
including Property Tax Task Force (HF 3657/SF4262), and Sales Tax Exemption on Construction
Materials (HF 1248/SF 1724).
City Administrator Jacobson noted that Representative Angie Craig’s office had contacted staff
regarding available Federal funding and applying for the municipal campus project.
ADJOURNMENT
Councilor Mazzitello made a motion to adjourn the work session, and the motion was seconded by
Mayor Levine. Motion carried. The meeting adjourned at 5:52 p.m.
_________________________
Stephanie B. Levine, Mayor
ATTEST:
_____________________
Nancy Bauer, City Clerk
Page 5 of 124
This page is intentionally left blank
CITY OF MENDOTA HEIGHTS
DAKOTA COUNTY
STATE OF MINNESOTA
DRAFT Minutes of the Regular Meeting
Held Tuesday, March 17, 2026
Pursuant to due call and notice thereof, the regular meeting of the City Council, City of Mendota Heights,
Minnesota, was held at 6:00 p.m. at City Hall, 1101 Victoria Curve, Mendota Heights, Minnesota.
CALL TO ORDER
Mayor Levine called the meeting to order at 6:00 p.m. Councilors Lorberbaum, Paper, and Mazzitello
were also present. Councilor Maczko was absent.
PLEDGE OF ALLEGIANCE
Council, the audience, and staff recited the Pledge of Allegiance.
AGENDA ADOPTION
Mayor Levine presented the agenda for adoption. Councilor Mazzitello moved adoption of the agenda.
Councilor Paper seconded the motion.
Ayes: 4
Nays: 0
PUBLIC COMMENTS
No one from the public wished to be heard.
CONSENT AGENDA
Mayor Levine presented the consent agenda and explained the procedure for discussion and approval.
Councilor Lorberbaum moved approval of the consent agenda as presented, pulling item i.
a.Approval of March 3, 2026, City Council Minutes
b.Acknowledge Minutes from the November 12, 2025, Parks and Recreation Commission Meeting
c.Acknowledge Minutes from the February 10, 2026, Parks and Recreation Commission Work
Session
d.Approve the 2026-2027 Labor Contract with International Union of Operating Engineers (IUOE)
Representing the Facility Manager
e.Approve Resolution 2026-20 Formally Accepting a Monetary Donation for the Purchase of Picnic
Tables
f.Approve Garage Apron Replacement at Public Works Facility
g.Approve Purchase of a Truck-Mounted Digital Sign Board
Page 6 of 124
6.b
March 17, 2026 Mendota Heights City Council Page 2 of 4
h.Approve Resolution 2026-19 Sibley Memorial Highway Turnback
i.Approve Purchase Order for a Bioxide Solution Demonstration
j.Approve Monday Software Licensing Purchase
k.Approve the 2026 Street Sweeping Contract
l.Approval of Claims List
Councilor Mazzitello seconded the motion.
Ayes: 4
Nays: 0
PULLED CONSENT AGENDA ITEMS
I) APPROVE PURCHASE ORDER FOR A BIOXIDE SOLUTION DEMONSTRATION
Councilor Lorberbaum asked staff to provide additional information, recognizing that this has been a
concern in the Friendly Hills neighborhood.
Assistant City Engineer Lucas Ritchie stated that throughout the years, staff have been aware of sewer
odor concerns in the Friendly Hills neighborhood. Completed improvements in that neighborhood
rehabilitated the significantly corroded pipe and staff continued to hear about odor concerns from
residents. In a work session meeting, staff and the Council discussed installing an odor control unit. After
that meeting and more discussion with the Metropolitan Council, staff decided to try another solution to
treat the source of the odor. He then provided a brief overview of the bioxide solution 60-day trial. He
stated that staff are confident that this will extend to a permanent solution. This trial will also address the
issue without making the capital investment of putting in an odor control unit. It would take eight to 10
weeks to implement and could be a fairly quick solution.
Councilor Lorberbaum moved to approve PURCHASE ORDER FOR A BIOXIDE SOLUTION
DEMONSTRATION.
Councilor Mazzitello seconded the motion.
Ayes: 4
Nays: 0
PRESENTATIONS
No items scheduled.
PUBLIC HEARING
No items scheduled.
NEW AND UNFINISHED BUSINESS
A) RESOLUTION 2026-21 TO APPROVE PLANS AND AUTHORIZE ADVERTISEMENT FOR
BIDS FOR THE HAMPSHIRE ESTATES STREET IMPROVEMENTS
Assistant City Engineer Lucas Ritchie explained that the Council was being asked to approve Resolution
2026-21, approving the Final Plans and Specifications and authorizing advertisement for bids for the
Page 7 of 124
March 17, 2026 Mendota Heights City Council Page 3 of 4
Hampshire Estates Street Improvements. There was additional work added to the specifications. One of
the new items is at Hagstrom King Park, which includes the construction of a concrete bleacher pad and
an eight-foot-wide bituminous trail connecting the bleacher pad to the trail that will run along Mendota
Heights Road.
Councilor Paper asked when the project would begin.
Assistant City Engineer Lucas Ritchie replied that the contractor would be allowed time to complete the
work between May and October, but the project would not take that entire length. He noted that the project
could begin in May, June, or July, depending on the contractor’s schedule.
Councilor Paper asked for information on the bidding climate.
Assistant City Engineer Lucas Ritchie replied that this is the first project they are bidding this year, so he
had not yet seen any bids come in this year. He noted that they are bidding early in an attempt to receive
better pricing.
Councilor Paper asked if there would be a lot of dirt work for the concrete pad and pedway.
Assistant City Engineer Lucas Ritchie provided additional information on the scope of work, noting that
there is not a large amount of dirt work.
Councilor Mazzitello stated that the County has opened two bids, and they have come in close, or slightly
under the estimates. He noted that contractors will typically prepare their fuel prices for the year and
increases in fuel costs will not be felt until the next bidding year.
Councilor Mazzitello moved to adopt Resolution No. 2026-21 Approving Final Plans and Specifications,
and Authorizing Advertisement for Bids for the Hampshire Estates Street Improvement Project.
Councilor Lorberbaum seconded the motion.
Ayes: 4
Nays: 0
B) MUNICIPAL CAMPUS PROJECT UPDATE
Chris Ziemer, ICS, provided an update from the community kick-off event, community thought exchange
survey, the Project Oversight Committee, and architect progress. It was noted that the survey questions
will remain available on the website until March 22, 2026.
COMMUNITY ANNOUNCEMENTS
City Administrator Cheryl Jacobson announced upcoming community events and activities.
COUNCIL COMMENTS
Councilor Mazzitello commended the Public Works staff for their great response to the snowstorm this
last weekend. He offered a historical fact from March 17, 1776.
Page 8 of 124
March 17, 2026 Mendota Heights City Council Page 4 of 4
Councilor Lorberbaum announced the Wentworth Library in West St. Paul will reopen on May 6 and
listed the improvements that were made with grant money. She announced that it would be free cone day
at the West St. Paul Dairy Queen this Thursday.
Councilor Paper noted that we are one day closer to spring and commented that it was still light out.
Registration is now open for the Scott Patrick Memorial 5K.
Mayor Levine stated that the snow was fabulous and encouraged everyone to enjoy winter’s last hurrah.
ADJOURN
Councilor Paper moved to adjourn.
Councilor Mazzitello seconded the motion.
Ayes: 4
Nays: 0
Mayor Levine adjourned the meeting at 6:33 p.m.
Stephanie B. Levine
Mayor
ATTEST:
_______________________________
Nancy Bauer
City Clerk
Page 9 of 124
CITY OF MENDOTA HEIGHTS.
DAKOTA COUNTY
STATE OF MINNESOTA
Minutes of the City Council Closed
Session Held March 17, 2026
Pursuant to due call and notice thereof, a meeting of the City Council, City of Mendota Heights,
Minnesota was held at City Hall, 1101 Victoria Curve, Mendota Heights, Minnesota.
CALL TO ORDER
Mayor Levine called the meeting to order at 4:30 p.m. Councilors Lorberbaum, Mazzitello and
Paper were present. Councilor Maczko was absent.
Also in attendance were City Administrator Cheryl Jacobson, Attorney Jared Shepherd, Attorney
Amy Schmidt, Attorney Jason Kuboushek, Public Works Director Ryan Ruzek, and Community
Development Manager Sarah Madden.
CLOSED SESSION TO DISCUSS ATTORNEY/CLIENT PRIVILEGE MATTERS
A motion was made by Councilor Lorberbaum, seconded by Councilor Mazzitello, to adjourn to
a closed session pursuant to Minnesota Statutes, Section 13D.05, Subdivision 3(b) to receive
confidential legal advice from the City’s legal counsel regarding the City’s legal rights and
authority, regarding City of Mendota Heights v. Stephen Dick and Roy Dick, Dakota County
Court File No. 19HA-CV-26-1605. The motion passed 4-0.
ADJOURN
A motion was made by Councilor Mazzitello, seconded by Councilor Paper, to adjourn the
closed meeting at 4:56 p.m. The motion passed 4-0.
_________________________
Stephanie B. Levine, Mayor
ATTEST:
_____________________
Nancy Bauer, City Clerk
Page 10 of 124
6.c
This page is intentionally left blank
January 27, 2026 Mendota Heights Planning Commission Meeting Page 1 of 6
CITY OF MENDOTA HEIGHTS
DAKOTA COUNTY, MINNESOTA
PLANNING COMMISSION MINUTES
JANUARY 27, 2026
The regular meeting of the Mendota Heights Planning Commission was held on Tuesday, January
27, 2026, in the Council Chambers at City Hall, 1101 Victoria Curve, at 7:00 P.M.
The following Commissioners were present: Chair Litton Field, Commissioners Cindy Johnson,
Brian Udell, Jeff Nath, and Steve Goldade. Those absent: Commissioners Patrick Corbett and
Jason Stone.
Approval of Agenda
The agenda was approved as submitted.
Approval of December 29, 2025, Minutes
COMMISSIONER NATH MOVED, SECONDED BY COMMISSIONER GOLDADE, TO
APPROVE THE MINUTES OF DECEMBER 29, 2025.
AYES: 5
NAYS: 0
Hearings
A)PLANNING CASE 2026-01
HOMES BY TADITION, LLC, NORTHWEST CORNER OF GLEHNHILL ROAD
AND VICTORIA CURVE – MISSISSIPPI RIVER CORRIDOR CRITICAL AREA
PERMIT
Community Development Manager Sarah Madden explained that Homes by Tradition is the
applicant and owner’s representative of the vacant property at the northwest corner of Glenhill
Road and Victoria Curve (PID #27-81251-00-013) and has requested a Mississippi River Corridor
Critical Area (MRCCA) Permit to construct a new single-family home, with associated site work
and improvements.
Hearing notices were published and mailed to all properties within 350 feet of the site; no
comments or objections to this request were received.
Community Development Manager Sarah Madden provided a planning staff report and a
presentation on this planning item to the Commission (which is available for viewing through the
City’s website).
Staff recommended approval of this application based on the findings and with conditions.
Page 11 of 124
6.d
January 27, 2026 Mendota Heights Planning Commission Meeting Page 2 of 6
Commissioner Johnson provided background information on keystone species and asked staff for
more information on the Forest Alteration Permit and that process.
Community Development Manager Sarah Madden explained that the Forest Alteration Permit is
required when tree removal thresholds are triggered. She explained how that is reviewed by staff
and what is required to be shown on the plan. She stated that there are selective trees to be removed
in the bluff impact zone (BIZ), which are dead or diseased, along with those planned for removal
within the building pad.
Commissioner Johnson noted that there are additional steps identified within the ordinance for the
protection of trees during construction. She asked for clarification on a discrepancy for tags 52
and 60 and whether those would be removed or retained.
Chair Field opened the public hearing.
Dean Nelson, Homes by Tradition, commented that they are building a beautifully designed home
in a beautiful neighborhood. He stated that they carefully place the home on the property and
consider which trees will be removed or protected. He recognized the work that must still be done
to move or remove the pool. He noted that he would review and update the information related to
trees 52 and 60.
Chair Field asked if the applicant agrees to condition two related to the pool.
Mr. Nelson confirmed that they will adjust the placement of the pool and resubmit.
Alan Olstein, 1954 Glenhill Road, stated that he was involved in a previous discussion for the
development of this site back in 2020. He submitted a hydrogeological investigation of this area
related to the buildability and stability of the slope. He noted that the pool is proposed very close,
or within the BIZ. He asked that the City be the most conservative when judging the safety of this
proposed project with regard to the potential of failure and landslides. He did not believe that
some of the issues identified in the hydrogeological investigation had been addressed. He provided
a copy of the investigation report to staff.
Commissioner Goldade stated that he was a member of the Park and Recreation Commission
during that previous review. He recognized the concern from those below the bluff and asked
about the concern of the resident across the street.
Mr. Olstein stated that a catastrophic failure of this site could impact infrastructure and utilities
and have a broader impact on the community.
Stephen Golias, 1308 4th Street in Mendota, thanked the previous speaker for his comments. He
stated that he had grave concerns with the plan proposed in 2020 and is excited for this new plan,
although he still has similar concerns, as he is downhill from the project. He referenced the
proposed holding pond for the property and asked how that would be engineered. He asked if all
impervious drainage would go into that pond, the storm level to which the pond would be designed,
Page 12 of 124
January 27, 2026 Mendota Heights Planning Commission Meeting Page 3 of 6
and how water would percolate out. He also asked how the sewage would be handled. He
referenced the retaining walls and hoped that they would be built with a lifespan longer than 40
years.
Lynn Burow, 1219 Victoria Curve, commented on the trees that will be lost through this proposal
and asked for clarification if the trees within the right-of-way would be preserved. She also had
concerns with the drainage plan and impacts that could result from rainfall with the reduced
vegetation on the property.
Mr. Nelson stated that he shared the concerns of the first resident. He commented that he and his
clients are working with Braun Intertec who completed a study on the proposed footings,
foundation, and retaining wall. He stated that because Braun was involved in that original study,
they are comfortable with the finding that the construction is feasible and there would not be any
issues with drainage or slope with the proper retaining walls. He confirmed that all impervious
areas would drain to the infiltration basin, which would drain out over time. He stated that the
BIZ would be stabilized before, during, and beyond construction. He commented that they would
connect to the main sewer lines.
Commissioner Udell asked and received confirmation that Braun is involved to verify the data to
ensure the proposal is consistent with their findings in 2020.
James Grahams, Lake and Land Surveying, commented that the holding pond is more of a rain
garden, which would hold the one-inch storm and drain within 48 hours.
Kathy McGuire, 1942 Glenhill Road, commented that she has concerns with the environment and
maintaining the MRCC area. She recalled conflicts in 2020 between the University of Minnesota
comments and Braun comments, and asked that the City review both reports, as she believed that
the hydrology of the whole area was discussed rather than just the bluff.
Seeing no one further coming forward wishing to speak, Chair Field asked for a motion to close
the public hearing.
COMMISSIONER GOLDADE MOVED, SECONDED BY COMMISSIONER UDELL, TO
CLOSE THE PUBLIC HEARING.
AYES: 5
NAYS: 0
Commissioner Johnson asked if staff has recollection of that hydrology report.
Public Works Director Ryan Ruzek stated that the development proposed in 2020 was more dense.
He was not aware of any restrictions placed on the lot split completed in 2023. He stated that the
two lots that were created just needed to meet the MRCCA requirements, and he believed that this
request was compliant with the MRCCA requirements. He stated that the drainage requirements
are met by the infiltration basin proposed by the applicant. He commented that there are springs
Page 13 of 124
January 27, 2026 Mendota Heights Planning Commission Meeting Page 4 of 6
located along the bluff throughout the state. He believed that those are more within the BIZ. He
stated that there are no publicly mapped springs in this area.
Commissioner Goldade asked if anything had been learned from the bluff failures in other areas
of the community.
Public Works Director Ryan Ruzek replied that there were a couple of failures on Highway 13,
but that would not be apples to apples comparisons. He noted that the applicant is doing their due
diligence to prevent failures. He stated that existing homes on the Culligan cul-de-sac would have
a higher impact on the bluff than the home being proposed tonight.
Chair Field recalled that there were failures from the roadway, which impacted the bluff before
the failure occurred on 13.
Commissioner Johnson commented that this does not seem to be the same type of slope.
Public Works Director Ryan Ruzek stated that the new MRCCA ordinance includes slopes that
are not steep within the BIZ, confirming that this is not a steep slope area.
Commissioner Goldade asked for more information on the lifespan of the retaining wall.
Public Works Director Ryan Ruzek stated that he did not recall that discussion of the past. He
noted that this would be a boulder retaining wall and was unsure if there was a specific life for a
boulder wall, as boulders are naturally occurring. He noted that the retaining wall is related to the
pool and urged the Commission not to focus on that detail, as that will be removed or moved.
Commissioner Goldade asked if staff reviewed the report provided by the resident tonight prior to
the meeting.
Community Development Manager Sarah Madden stated that an updated Braun memo was
included in the packet, which referenced their work in the previous application and had been
updated for the one home. She confirmed that she did review the previous application from 2020
in advance of this application and meeting as well. She also provided additional information on
the 2023 lot split approval, which created the two lots and buildable areas.
Commissioner Udell recognized that the proposed density of development was different in 2020
and asked for more information on the hydrological report.
Public Works Director Ryan Ruzek stated that the 2020 development included roads, utilities,
large retaining walls, ponds, more homes, and homes closer to the bluff. He stated that the
neighbors privately contracted to have that report done. The Council considered all information
and denied the 2020 proposal, but then was comfortable approving the lot split that was completed
in 2023.
COMMISSIONER UDELL MOVED, SECONDED BY COMMISSIONER NATH, TO
RECOMMEND APPROVAL OF THE MRCCA-CRITICAL AREA PERMIT REQUEST BY
Page 14 of 124
January 27, 2026 Mendota Heights Planning Commission Meeting Page 5 of 6
HOMES BY TRADITION FOR A NEW SINGLE-FAMILY HOME ON THE VACANT
PROPERTY AT THE NORTHWEST CORNER OF GLENHILL ROAD AND VICTORIA
CURVE (PID #27-81251-00-013), WITH THE FOLLOWING CONDITIONS:
1.A BUILDING PERMIT, INCLUDING A GRADING PLAN, MUST BE APPROVED BY
THE CITY PRIOR TO THE COMMENCEMENT OF ANY SITE WORK.
2.THE SWIMMING POOL AND SURROUNDING POOL DECKING/PATIO AREA
MUST BE REMOVED FROM THE SITE PLAN, OR RELOCATED ELSEWHERE ON
THE SITE PLAN OUTSIDE THE BLUFFLINE SETBACK PRIOR TO THE CITY
TAKING ACTION ON THIS APPLICATION. NO STRUCTURES OR FACILITIES,
INCLUDING IMPERVIOUS SURFACES, MAY BE LOCATED WITHIN THE
BLUFFLINE SETBACK.
3.A SEPARATE FOREST ALTERATION PERMIT APPLICATION AND FOREST
MANAGEMENT PLAN IS REQUIRED TO BE SUBMITTED TO THE CITY PRIOR
TO BUILDING PERMIT ISSUANCE. THE APPLICANT SHALL POST A TREE
REPLACEMENT ESCROW WITH THE CITY AND SHALL MITIGATE TREE
REPLACEMENT IN APPROPRIATE AREAS OF THE PROPERTY AS REVIEWED
AND APPROVED BY THE NATURAL RESOURCES MANAGEMENT AND
COMMUNITY DEVELOPMENT MANAGER. IF COMPLIANCE WITH THE TREE
REPLACEMENT REQUIREMENT IS NOT FEASIBLE, THE CITY MAY APPROVE
ALTERNATIVE TREE REPLACEMENT MEASURES WITHIN THE FOREST
ALTERATION PERMIT.
4.A FINAL LANDSCAPING AND RESTORATION PLAN FOR THE DEVELOPED
AREA OF THE SITE MUST BE SUBMITTED FOR REVIEW AND APPROVAL BY
THE NATURAL RESOURCES MANAGER AS PART OF THE BUILDING PERMIT
SUBMITTAL PACKAGE, INCLUDING SEED MIX DETAILS, NATIVE PLANT
SPECIES, AND SIZING AND DSH OF REPLACEMENT TREES.
5.IN THE BLUFF IMPACT ZONE, ALL NEW VEGETATION ASSOCIATED WITH
THE RESTORATION PLAN MUST BE NATIVE AND SUITABLE FOR THE
EXISTING CONDITIONS OF THE SLOPE.
6.IN ANY AREAS WHERE BUCKTHORN WILL BE REMOVED, A BUCKTHORN
REPLACEMENT GROUNDCOVER MIX MUST BE INSTALLED TO PREVENT
EROSION.
7.THE PROPOSED PROJECT MUST COMPLY WITH ALL REQUIREMENTS OF THE
CITY’S LAND DISTURBANCE GUIDEANCE DOCUMENT. ALL PLANS MUST BE
REVIEWED AND APPROVED BY THE PUBLIC WORKS DIRECTOR.
8.ALL EROSION CONTROL REQUIREMENTS MUST BE PUT IN PLACE PRIOR TO
THE COMMENCEMENT OF ANY GRADING AND SITE WORK ACTIVITIES AND
MUST REMAIN IN PLACE FOR THE DURATION OF THE CONSTRUCTION
ACTIVITIES UNTIL PROPER SITE RESTORATION PLANS ARE COMPLETED,
INCLUDING A DUAL ROW OF PERIMETER CONTROL AT THE BACK OF THE
PROPERTY ADJACENT TO THE BLUFF, PERIMETER CONTROL SURROUNDING
THE INFILTRATION BASIN, AND EROSION CONTROL BLANKETS ON ANY
DISTURBED SLOPES 3:1 OR GREATER.
9.ALL GRADING AND CONSTRUCTION ACTIVITY MUST COMPLY WITH
APPLICABLE FEDERAL, STATE, AND LOCAL REGULATIONS AND CODES.
Page 15 of 124
January 27, 2026 Mendota Heights Planning Commission Meeting Page 6 of 6
10.ALL WORK ON SITE WILL ONLY BE PERFORMED BETWEEN THE HOURS OF
7:00 A.M. AND 8:00 P.M. MONDAY THROUGH FRIDAY; 9:00 A.M. TO 5:00 P.M.
ON WEEKENDS.
FURTHER DISCUSSION: Commissioner Johnson thanked staff for identifying the need to
remove or relocate the pool. She was also pleased to see the removal of buckthorn and a
requirement for replacement vegetation. She believed that the request met the MRCCA
requirements.
Commissioner Udell asked if any conditions should be added to clarify discrepancies in the tree
inventory report.
Commissioner Johnson stated that language could be added to update the removal status for tags
52 and 60. It was decided that it should be added as condition 11.
AYES: 5
NAYS: 0
Chair Field advised the City Council would consider this application at its February 4, 2026,
meeting.
New and Unfinished Business
Staff Announcements / Updates
Community Development Manager Sarah Madden provided an update on City Council actions on
cases reviewed by the Planning Commission. She noted an alternate date that could be considered
for the March meeting. It was confirmed that the meeting would be rescheduled to March 31,
2026. She noted that the February meeting may be canceled.
Adjournment
COMMISSIONER UDELL MOVED, SECONDED BY COMMISSIONER NATH, TO
ADJOURN THE MEETING AT 8:00 P.M.
AYES: 5
NAYS: 0
Page 16 of 124
February 24, 2026 Mendota Heights Planning Commission Work Session Meeting Page 1 of 1
CITY OF MENDOTA HEIGHTS
DAKOTA COUNTY, MINNESOTA
PLANNING COMMISSION WORK SESSION MINUTES
FEBRUARY 24, 2026
Pursuant to due call and notice thereof, a work session of the Planning Commission, City of Mendota Heights,
Minnesota was held at 1101 Victoria Curve, Mendota Heights, MN 55118.
Call To Order
Chair Litton Field called the meeting to order at 7:02pm. Commissioners Jason Stone, Cindy Johnson, Brian
Udell, Steve Goldade, Patrick Corbett, and Jeff Nath were also present.
City staff present included Ryan Ruzek, Public Works Director, Meredith Lawrence, Parks and Recreation
Director/Assistant Public Works Director, and Amy Schmidt, City Attorney.
Discussion
A)ZONING AND LAND USE TRAINING PRESENTATION
Attorney Amy Schmidt introduced herself to the Planning Commission and discussed her role in providing legal
services to the City of Mendota Heights. Attorney Schmidt presented the following items: the Planning
Commission’s Role, Zoning, Conditional Use Permits, Variances, Time Limits, Public Hearings, Public
Discretion, Open Meeting Law, and Conflicts of Interest.
The Commissioners discussed previous planning cases and their implications to the 2040 Comprehensive Plan,
state statute, city ordinances and code, and legal processes. Commissioner Schmidt answered questions
pertaining to legal concerns, precedent setting, and procedures for ensuring an efficient, thorough, and legal
centered review of planning cases.
Commissioners noted the training was very informative and should be a standard training moving forward.
B)TITLE 11: SUBDIVISION REGULATIONS ORDINANCE
Director Ruzek reviewed the draft Title 11: Subdivision Regulations Ordinance that has been prepared by
Community Development Manager Sarah Madden. The Commission provided Director Ruzek with some minor
edits to the Ordinance document and asked clarifying questions. Director Ruzek will provide the requested
edits, comments, and questions to Community Development Manager Madden to incorporate into the final
document.
Director Ruzek noted the City Council discussed the cul-de-sac component at their work session the week prior
and provided direction to staff to proceed with the 500-foot measurement.
The Commission provided their appreciation to staff for the updates to the Ordinance and noted this is an
improved document that will provide more clarity to staff, the commission, the city council, and the public
moving forward.
Adjournment
The commission adjourned the meeting at 8:36pm.
Page 17 of 124
6.e
This page is intentionally left blank
6.f
REQUEST FOR CITY COUNCIL ACTION
MEETING DATE: April 7, 2026
AGENDA ITEM: Authorize the Purchase of Fire Department Turn-Out Gear
ITEM TYPE: Consent Item
DEPARTMENT: Fire CONTACT: Dan Johnson, Fire Chief
ACTION REQUEST:
Authorize the purchase of six (6) sets of firefighter turn-out gear at the quoted amount of
$27,480 from Fire Equipment Specialties (FES Inc.).
BACKGROUND:
The 2026 Fire Department operating budget includes funding for the ongoing replacement of
firefighter turn-out gear. The department’s Gear and Uniform Committee continuously
evaluates the age and condition of firefighter turn-out gear, the amount of spare gear
available, and plans for providing the department’s most recent rookie class with proper gear.
FISCAL AND RESOURCE IMPACT:
This year new turnout gear will be purchased for the five new hires from 2025 and one
replacement set for a current firefighter. A quote from FES Inc., who is the only local supplier of
the department’s specified turn-out gear, was received in the amount of $4,580 per set. Total
purchase price of $27,480 for six sets.
The replacement of turn-out gear is a FY2026 budgeted expense.
ATTACHMENTS:
None
CITY COUNCIL PRIORITY:
Premier Public Services & Infrastructure, Inclusive and Responsive Government
Page 18 of 124
This page is intentionally left blank
6.g
REQUEST FOR CITY COUNCIL ACTION
MEETING DATE: April 7, 2026
AGENDA ITEM: Approve a Massage Therapist License
ITEM TYPE: Consent Item
DEPARTMENT: Administration CONTACT: Nancy Bauer, City Clerk
ACTION REQUEST:
Approve a new massage therapist license.
BACKGROUND:
Esteban Rubio has completed all application requirements for a massage therapist license and
has secured employment at the licensed massage establishment, Hush Therapeutic Massage.
Additionally, he has successfully passed a background check conducted by the Mendota
Heights Police Department.
FISCAL AND RESOURCE IMPACT:
N/A
ATTACHMENTS:
None
CITY COUNCIL PRIORITY:
Economic Vitality & Community Vibrancy, Inclusive and Responsive Government
Page 19 of 124
This page is intentionally left blank
6.h
REQUEST FOR CITY COUNCIL ACTION
MEETING DATE: April 7, 2026
AGENDA ITEM: Approve Engineering/Public Works Department Out of Metro Travel
Request
ITEM TYPE: Consent Item
DEPARTMENT: Engineering CONTACT: Ryan Ruzek, Public Works
Director
Lucas Ritchie, Assistant City
Engineer
ACTION REQUEST:
Approve out-of-metro travel for the Public Works Director and Assistant City Engineer to
attend the American Public Works Association (APWA) annual conference in Nisswa,
Minnesota.
BACKGROUND:
City policy requires that the city council approve any travel to a location outside the metro area
for city employees.
The American Public Works Association (APWA) annual conference will be held in Nisswa, MN,
from May 6–8, 2026. The conference is designed for Public Works professionals.
FISCAL AND RESOURCE IMPACT:
Attendance at this conference is a budgeted expense. Estimated lodging and conference
registration is $2,107 for staff to attend.
ATTACHMENTS:
None
CITY COUNCIL PRIORITY:
Premier Public Services & Infrastructure, Inclusive and Responsive Government
Page 20 of 124
This page is intentionally left blank
6.i
REQUEST FOR CITY COUNCIL ACTION
MEETING DATE: April 7, 2026
AGENDA ITEM: Approve Police Department Out of Metro Travel Request
ITEM TYPE: Consent Item
DEPARTMENT: Police CONTACT: Kelly McCarthy, Police Chief
ACTION REQUEST:
Approve a request for out of metro travel for Police Officers Hogan and Hagelee on April 28,
2026.
BACKGROUND:
Each year, the Jewish Community Relations Council facilitates a one-day trip to the US
Holocaust Memorial Museum in Washington DC. Officers will have the opportunity to
participate and learn about the role of police in Nazi Germany and to reflect on their role in a
democratic society today.
FISCAL AND RESOURCE IMPACT:
Cost of the training, including travel, is $435 per officer for a total of $870 to be paid from the
police training budget.
ATTACHMENTS:
None
CITY COUNCIL PRIORITY:
Premier Public Services & Infrastructure, Inclusive and Responsive Government
Page 21 of 124
This page is intentionally left blank
6.j
REQUEST FOR CITY COUNCIL ACTION
MEETING DATE: April 7, 2026
AGENDA ITEM: Approve Resolution 2026-23 Proclaiming April 24, 2026, Arbor Day in
Mendota Heights
ITEM TYPE: Resolution
DEPARTMENT: Natural Resources CONTACT: Krista Spreiter, Natural
Resources Manager
ACTION REQUEST:
The Council is asked to approve Resolution 2026-23, proclaiming April 24, 2026 Arbor Day in
Mendota Heights.
BACKGROUND:
Arbor Day is an excellent opportunity for residents to enhance and improve the tree canopy in
Mendota Heights by planting and preserving trees of diverse species. Planting trees provides
several benefits to property owners including energy savings, improving air quality, combating
climate change, providing pollinator and wildlife habitat, and increasing property values.
Residents should practice good tree care by checking existing trees for damage and disease,
as well as mulching and watering as needed. Thoughtful plans for tree planting and tree
maintenance can make a significant difference in the preservation and improvement of the
City’s urban forest.
Mendota Heights is celebrating Arbor Day in 2026 as part of a week-long Earth and Arbor Day
Celebration, Monday, April 20 through Friday, April 24. The week-long celebration includes
family events and programming such as outdoor yoga, find Lily the Frog, the Wall-E movie
shown at City Hall, the Free Book Buggie, a raptor show by the MN Raptor Center and free
supplies for a self-led city clean-up event. Details will be provided on social media and the
City’s website.
FISCAL AND RESOURCE IMPACT:
The cost of the Earth and Arbor Day event is estimated at $1,500. This includes prizes,
giveaways, and programming. Costs incurred would be taken from the city’s parks and
recreation programming budget, stormwater budget, as well as the City’s forestry budget.
ATTACHMENTS:
1.Proclamation - Arbor Day 2026
Page 22 of 124
CITY COUNCIL PRIORITY:
Economic Vitality & Community Vibrancy, Premier Public Services & Infrastructure,
Environmental Sustainability & Stewardship, Inclusive and Responsive Government
Page 23 of 124
CITY OF MENDOTA HEIGHTS
DAKOTA COUNTY, MINNESOTA
PROCLAMATION
WHEREAS, in 1872, the Nebraska Board of Agriculture established a special day to be set aside
for the planting of trees; and
WHEREAS, this holiday, called Arbor Day, was first observed with the planting of more than a
million trees; and
WHEREAS, Arbor Day is now observed throughout the nation and the world; and
WHEREAS, trees can be a solution to combat climate change by reducing the erosion of our
precious topsoil by wind and water, cutting heating and cooling costs, moderating the temperature,
cleaning the air, producing life-giving oxygen, and providing habitat for wildlife; and
WHEREAS, trees are a renewable resource, increase property values in our city, enhance the
economic vitality of business areas, and beautify our community.
NOW, THEREFORE, BE IT RESOLVED, by the Mendota Heights City Council that all
citizens are urged to plant trees to promote the well-being of future generations.
BE IT FURTHER RESOLVED, by the Mendota Heights City Council as follows: I, Stephanie
B. Levine, Mayor of the City of Mendota Heights, do hereby proclaim April 24, 2026 as
ARBOR DAY
in Mendota Heights and I urge all people to celebrate Arbor Day and to support efforts to protect
our trees and urban forest.
Stephanie B. Levine
Mayor
ATTEST:
Nancy Bauer
City Clerk
Page 24 of 124
This page is intentionally left blank
6.k
REQUEST FOR CITY COUNCIL ACTION
MEETING DATE: April 7, 2026
AGENDA ITEM: Approve 2025 Audit Fund Consolidation
ITEM TYPE: Consent Item
DEPARTMENT: Finance CONTACT: Kristen Schabacker, Finance
Director
ACTION REQUEST:
Approve the consolidation of debt service and capital projects funds.
BACKGROUND:
As part of the annual audit process, the city will close out debt service and capital project funds
to the respective Consolidated Funds. The debt service funds to be closed out are for bond
issues that have been paid off. The capital project funds to be closed out are for past projects
that are complete and no longer have any activity. The consolidation of these funds will not
change how they are accounted for with the 2025 audit.
FISCAL AND RESOURCE IMPACT:
There is no budget impact for the consolidation of debt service and capital project funds.
ATTACHMENTS:
None
CITY COUNCIL PRIORITY:
Premier Public Services & Infrastructure
Page 25 of 124
This page is intentionally left blank
6.l
REQUEST FOR CITY COUNCIL ACTION
MEETING DATE: April 7, 2026
AGENDA ITEM: Approve Office Support Assistant Hire
ITEM TYPE: Consent Item
DEPARTMENT: Administration CONTACT: Kelly Torkelson, Assistant City
Administrator
ACTION REQUEST:
Approve the Hiring of Becca Melcher as a Part-Time Office Support Assistant.
BACKGROUND:
The Office Support Assistant is a critical role in city operations. This position welcomes visitors
to city hall, serves as the receptionist directing calls to the City, and supporting the city's
permitting process along with a wide assortment of other administrative functions. The Office
Support Assistant position is structured as a job share between two part-time staff. Following
the promotion of one of the current Office Support Assistants, the City Council authorized staff
to post the position. The City has completed a competitive search of candidates and
enthusiastically recommends the hiring of Becca Melcher as a Part-Time Office Support
Assistant for the City of Mendota Heights.
Becca Melcher has a range of professional experiences that will help her succeed in the
position. Staff are confident that she will be a valuable addition to the City of Mendota Heights.
FISCAL AND RESOURCE IMPACT:
This is a budgeted position with the City of Mendota Heights. Staff recommend the City
Council authorize the hiring of Becca Melcher with an hourly wage of $33.58 which is step-4 of
paygrade-5 of the 2026 Non-Union Employee Compensation Matrix with one week (16.5
hours) of vacation banked to start her employment with the City of Mendota Heights.
ATTACHMENTS:
None
CITY COUNCIL PRIORITY:
Premier Public Services & Infrastructure
Page 26 of 124
This page is intentionally left blank
Page 27 of 1246.m
Page 28 of 124
Page 29 of 124
Page 30 of 124
Page 31 of 124
Page 32 of 124
Page 33 of 124
Page 34 of 124
Page 35 of 124
Page 36 of 124
Page 37 of 124
Page 38 of 124
Page 39 of 124
This page is intentionally left blank
9.a
REQUEST FOR CITY COUNCIL ACTION
MEETING DATE: April 7, 2026
AGENDA ITEM: Resolution 2026-22 Approving the Lexington Heights Planned Unit
Development Amendment - Final Development Plan; And Ordinance No.
606 Approving a Zoning Amendment to Planned Unit Development Overlay
District (Planning Case Nos. 2025-16 and 2026-03)
ITEM TYPE: New and Unfinished Business
DEPARTMENT: Community Development CONTACT: Sarah Madden, Community
Development Manager
ACTION REQUEST:
Adopt Resolution 2026-22 Approving a Planned Unit Development Amendment - Final
Development Plan, for the Lexington Heights Planned Unit Development; and
Adopt Ordinance No. 606 Approving a Zoning Amendment to Planned Unit Development
Overlay District
INTRODUCTION:
The approval actions requested under this application, requesting construction of a new 84-
unit multifamily apartment building on the subject property are:
1.Planned Unit Development Amendment – Final Development Plan
2.Zoning Amendment to Planned Unit Development Overlay District
The duly noticed public hearing on the Zoning Amendment and Preliminary Development Plan
for the Planned Unit Development Amendment was held at the November 25, 2025 and
December 29, 2025 regular Planning Commission meetings. The City Council then voted
unanimously (5-0) on January 20, 2026 to approve the Preliminary Development Plan proposed
under Planning Case No. 2025-16 with certain findings-of-fact and conditions as outlined in
Resolution 2026-06 (attached to this report).
The next step in the Planned Unit Development (PUD) review process for this land use request
is approval of the Final Development Plan, which has been assigned as Planning Case No.
2026-03. This approval step includes adoption of the ordinance formalizing the approved
Zoning Amendment of the property from R-3 Multi-Family Residential to R-3/PUD Multi-
Family Residential District/Planned Unit Development Overlay District.
Page 40 of 124
If the City Council takes action to approve the Final Development Plan and adopt the Zoning
Amendment ordinance, the final step will be the execution of a Developer’s Agreement for the
PUD. The final version of this agreement would return to the City Council for adoption on the
Consent Agenda of a future meeting date once both parties have agreed to the terms of this
agreement.
BACKGROUND:
City Code Title 12: Zoning, in section 12-5B-8: Planned Unit Development outlines the
procedural provisions and minimum requirements for all Planned Unit Developments.
Subsection (J) of this ordinance outlines the controlling measures for a Planned Unit
Development following its completion. This applies to the application request proposed and
approved under Planning Case No. 2025-16, as the subject property is an existing Planned Unit
Development approved by City Council Resolution 83-95 on November 1, 1983.
Within 12-5B-8(J)3: Changes to Final Development Plan, the City Code requires that changes in
the use of common open space within a completed PUD to be processed by an Amendment to
the Final Development Plan pursuant to the same procedures for approval of a Zoning
Amendment. The application request modifies green space on the subject property, which is
why the City is processing this request under the same procedures for approval as a Zoning
Amendment. Additionally, the City’s Planned Unit Development Ordinance requires in all new
PUDs, that the full extent of the property be rezoned with a “Planned Unit Development
Overlay District”. Because this site was developed as a PUD prior to this Overlay District
requirement, this action on the Final Development Plan formalizes the Zoning Amendment
procedural steps to correct the property’s zoning designation as within the Overlay District. The
ordinance states that the adoption of the Zoning Amendment ordinance should take place
simultaneously with the approval of the Final Development Plan.
CHANGES IN FINAL PLANNED UNIT DEVELOPMENT:
Section 12-5B-8: Planned Unit Development of City Code requires that the applicant file the
Final Development Plan within six (6) weeks following the approval of the Preliminary
Development Plan by the City Council. The plans and materials for the Final Development Plan
were received by the City on February 25, 2026 in compliance with this requirement.
The City Council must review the Final Development Plan to determine that all conditions of
the approval of the Preliminary Development Plan have been satisfied. If the City Council
determines that the Final Development Plan is not in substantial conformity with the
Preliminary Development Plan, then the request may be referred back to the Planning
Commission to restart the review process, including holding an additional public hearing on
the changes. Staff does find that the provided plans are in substantial conformity with the
approvals under the Preliminary Development Plan.
Conditions of Approval – Preliminary Development Plan
1.The Applicant/Developer shall enter into a Development Agreement with the City of
Page 41 of 124
Mendota Heights.
Staff Comments: This condition will remain for the Final Development Plan. A
Development Agreement for the PUD will be required, and if this request is approved by
the City Council, the Development Agreement will be brought back to the City Council
at a future meeting date.
2.The new building shall be constructed only in conformance to building and site plans
certified by registered architects and engineers (as applicable); and in accordance with
all architectural and building standards found under Title 12-4B-3, Subpart E
“Architecture and Building Design Standards”
Staff Comments: This condition will remain for the Final Development Plan, and is a
requirement of the Base Zoning District (R-3).
3.The proposed water system shall be designed and constructed to Saint Paul Regional
Water Service (SPRWS) standards, including written approval of the design layout prior
to final City Council approval.
Staff Comments: This condition will remain for the Final Development Plan, and will be
satisfied prior to the City Council’s approval and authorization to execute the
Development Agreement.
4.The Developer/Applicant shall submit final grading, utility, and site plans, and
architectural construction drawings for permitting, subject to review and approval by the
Planning Department and Engineering Department as part of any building permit
application. Building and grading permits shall be obtained from the City prior to
construction commencement of any work.
Staff Comments: This condition will remain for the Final Development Plan, and will be
satisfied with the submittal of a building permit for this development.
5.All grading and construction activities as part of the proposed development shall be in
compliance with applicable federal, state, and local regulations and codes, as well as in
compliance with the City’s Land Disturbance Guidance Document.
Staff Comments: This condition will remain for the Final Development Plan, and is a base
requirement for all developments within the City.
6.The Final Development Plan shall include an updated landscape plan with a detailed
landscaping schedule for planned plant materials.
Staff Comments: The applicant has submitted new landscape plans with the Final
Development Plan that are compliant with this condition. There is one staff comment
that the Japanese Tree Lilac is no longer recommended for planting due to invasive
characteristics. There are four (4) trees of this type listed on the plant schedule. Staff
would recommend that these proposed trees be replaced with a different ornamental
tree type.
7.The Applicant/Developer will work with Planning staff to review and approve additional
plant materials within a buffer area between the proposed patio courtyard and the
reduced setback area from the east property line boundary with I-35E, along the north
property line which is shared with the R-1 zoned property, and in the area of
construction of the retaining wall and fire turnaround adjacent to the parking garage
entrance, by installing additional landscape materials including berms, hedges, or other
landscape materials where feasible.
Staff Comments: The applicant has submitted new landscape plans with the Final
Page 42 of 124
Development Plan. The plans are robust compared to the preliminary landscape plan
previously reviewed. The applicant has included perimeter plantings at the east property
line shared with the Interstate 35-E right-of-way, as well as at the north property line
shared with a single-family home.
The east perimeter plantings include primarily evergreen buffer trees, including
columnar arborvitae, Eastern Red Cedar, Black Hills Spruce, and Balsam Fir. In the line of
perimeter trees, there are also two Common Hackberry trees shown, a deciduous
overstory tree. In addition to the property perimeter line of screening trees, the
applicant has illustrated three columnar deciduous trees adjacent to the rear patio area,
and foundation plantings of perennial shrubs.
The north perimeter plantings at the shared property line with the single family home
include eight columnar evergreen trees extending inward from the front property line at
Lexington Avenue, as well as six columnar Swedish Aspen, five arborvitae, and lastly four
Balsam Fir at the point aligning with the exit of vehicles from the shared surface parking
area between the existing and proposed buildings.
The underground parking garage entrance has been relocated as part of the Final
Development Plan, so there is no need for the portion of the condition applying to the
retaining wall and the previously potential turnaround area. This site plan change is
discussed in the “Other Site Plan Revisions” section later in this report.
8.A performance bond or letter of credit shall be supplied by the applicant in an amount
equal to at least one and one-half (1 1/2) times the value of such screening,
landscaping, or other improvements, to be included as part of the Development
Agreement.
Staff Comments: This condition will remain for the Final Development Plan, will be
regulated in the Development Agreement, and is a base requirement for all new
developments within the City.
9.The Developer and/or their respective agents shall be jointly and severally responsible
for the maintenance of all landscaping in a condition presenting a healthy, neat and
orderly appearance and free from refuse and debris. Plants and ground cover which are
required by an approved site or landscape plan and which have died shall be replaced
as soon as seasonal or weather conditions allow. All landscape areas must be irrigated.
Staff Comments: This condition will remain for the Final Development Plan, and will be
outlined in the Development Agreement.
10.The Applicant/Developer will work with the fire department personnel in determining
final design, location and specifications to the fire safety access area to the north
portion of the new building.
Staff Comments: The underground parking garage entrance has been relocated as part
of the Final Development Plan, and this condition as written no longer applies. This
change has been reviewed by the City’s Fire Marshal and is discussed in the “Other Site
Plan Revisions” section later in this report.
11.A separate Forest Alteration Permit application and Forest Management Plan is required
to be submitted to the City prior to building permit issuance to confirm compliance with
Page 43 of 124
the Urban Forest Preservation Ordinance. The applicant shall post a tree replacement
escrow with the City and shall mitigate tree replacement in appropriate areas of the
property as reviewed and approved by the Natural Resources Manager and Community
Development Manager. If compliance with the tree replacement requirement is not
feasible, the City may approve alternative tree replacement measures within the Forest
Alteration Permit.
Staff Comments: This condition will remain for the Final Development Plan, and is a base
requirement for all developments within the City.
12.The Applicant/Developer shall provide additional architectural design details to better
integrate and coordinate with existing buildings.
Staff Comments: The applicant has submitted updated exterior elevations with the Final
Development Plan. The revisions include updated building materials, a modified
entry/lobby exterior design, and the addition of roof parapet details and colors to more
closely complement the existing buildings. A significant change includes a modification
to the 4th floor siding of an architectural metal vertical panel to provide visual
similarities to the “mansard” roof style of the existing buildings within the development
(illustrated below).
Other Site Plan Revisions
The surface parking lot changes as a result of this new building were a point of discussion
within the Preliminary Development Plan approval. Comments were brought forward from both
the members of the public at the Public Hearing, and from the Planning Commissioners and
City Councilors when reviewing the application request. Previously, the site plan included using
the existing singular entrance to the parking lot from Lexington Avenue, with a curved entrance
into the underground parking garage from the north end of the proposed building (shown
below).
Page 44 of 124
The civil site plan included an outlined area for a potential fire turnaround point arching off
from the garage entrance, however comments were received from residents within the existing
building that this would not be available for their use, or for the use of a moving truck or
delivery truck that may need to access the property and have no location for a safe turnaround.
There were also comments of concern with the retaining wall adjacent to the garage entrance
and its proximity to the tree canopy of the small wooded area at the northeast corner of the
subject property.
To resolve that issue, the applicant has eliminated the parking lot dead-end and replaced it
with a connection to the existing west driveway entrance into the existing building’s
underground parking (shown below). The applicant has indicated that the resulting design
simplifies vehicle circulation. The City’s Fire Marshal has reviewed the proposed plan and has
no issues with the alignment.
Previously, when this application was submitted for a Concept Plan in the early stages of the
PUD Amendment request, the plan included a shared drive aisle connection using that existing
underground garage entrance at the north end of the property. This was commented on by the
Planning Commission and City Council as something that should be modified to not impact the
adjacent property owner to the north with an increase in headlights from vehicles, and so that
less green space would be disturbed. This was taken into account when designing the
Preliminary Development Plan. In light of the comments received about parking lot circulation,
this alignment has been reinstated in the Final Development Plan. However, the original
concerns related to headlight screening have been addressed through the placement of
perimeter landscaping at the shared north property line, in compliance with Condition #7 in
the Preliminary Development Plan approval. The revised site plan alignment of the drive aisle
does not have an impact on required maximum impervious surface within the Planned Unit
Development – the development site is still compliant with that aspect of City Code.
Also related to the drive aisle and parking lot alignment, the applicant has shifted the garage
entrance from the north end of the building to the south corner. The garage entry would be
directly in line with the existing parking lot drive aisle at the southern end of the property
(shown below).
Page 45 of 124
This alignment removes the need for the retaining wall surrounding a north garage entrance,
which eliminates concerns with excavation in proximity to the northeast property corner trees.
Staff does not have concerns with this adjustment to the site plan, and finds it to be
substantially conforming with the Preliminary Development Plan, the intent of the conditions
relating to turnaround access, and the stated concerns of landscaping adjacent to the
previously illustrated retaining wall.
The applicant has also included updates to the site plan concerning additional exterior
improvements that can be completed in tandem with the new apartment building
development. Specifically, the property owner and applicant have included improvements to
recreation amenities to appeal to the majority of their residents. These include a renovation of
the existing basketball court into two pickleball courts, replacement of the existing grilling pad
area with two new concrete patio pads with pergola and community table grilling. Lastly, the
applicant has heard feedback from residents on desirable upgrades and would expand the
swimming pool concrete patio to allow for existing seating space in the warmer months. The
applicant has included these amenity improvements as a response to the previous meeting's
discussion on recreational amenities for residents of the entire development, as opposed to
just the new proposed building. The applicant would work with the City to incorporate these
upgrades into the Development Agreement for the PUD and make the improvements at the
same time as building construction. These improvements are illustrated on the civil site plan
attached to this report.
RECOMMENDATION:
The City Council is asked to discuss the Final Development Plan as proposed, and make two
separate motions to first Adopt Resolution 2026-22, Approving the Final Development Plan,
and then Adopt Ordinance No. 606, Approving the Zoning Amendment to Planned Unit
Development Overlay District.
The City Council also may direct staff and the applicant to return at a future meeting date with
revisions to the Final Development Plan and [draft] Resolution as determined through the
Council's discussion on the proposal. The current statutory review deadline for this Final
Page 46 of 124
Development Plan application request is April 26, 2026.
FISCAL AND RESOURCE IMPACT:
Not Applicable.
ATTACHMENTS:
1.Res. No. 2026-22 Approving a Final Development Plan - Amendment to the 1983 Lexington
Heights Apartments Planned Unit Development for the Property Located at 2300 Lexington
Avenue [Planning Case No. 2026-03]
2.Ordinance No. 606 An Ordinance Amending the Lexington Heights Planned UnitDevelopment, and a Zoning Amendment to Planned Unit Development Overlay District
3.Site Location Map
4.Excerpt - Minutes of the January 20, 2026 City Council Meeting
5.Resolution 2026-06 Approving Zoning Amendment & Prelim Dev Plan - January 20, 2026
6.Applicant Letter - Final PUD Submission, dated 2/25/26
7.Plan Revisions Memo, dated 4/2/26
8.Civil Plans - Lexington Heights Apartments - Final PUD, dated 4/2/26
9.Landscape Plans - Lexington Heights Apartments - Final PUD, dated 4/2/26
10. Architectural Plans - Lexington Heights Apartments - Final PUD, dated 2/25/26
CITY COUNCIL PRIORITY:
Economic Vitality & Community Vibrancy
Page 47 of 124
CITY OF MENDOTA HEIGHTS
DAKOTA COUNTY, MINNESOTA
RESOLUTION 2026-22
RESOLUTION APPROVING A FINAL DEVELOPMENT PLAN - AMENDMENT TO
THE 1983 LEXINGTON HEIGHTS APARTMENTS PLANNED UNIT DEVELOPMENT
FOR THE PROPERTY LOCATED AT 2300 LEXINGTON AVENUE
[PLANNING CASE NO. 2026-03]
WHEREAS Chase Real Estate (or “Applicant” or “Developer”) in cooperation with Riley
Family Lexington Heights Limited Partnership (Condor Living / Lexington Heights Apartments
and as “Owner”) has applied for a Planned Unit Development - Final Development Plan to amend
the 1983 Lexington Heights Apartments Planned Unit Development (PUD), as proposed under
Planning Case 2026-03 (84-Unit Apartment Building) (“Project”) for the property located at 2300
Lexington Avenue and legally described in Exhibit A; and
WHEREAS, the Final Development Plan to amend the PUD as presented herein would
authorize the construction of a new four-story multi-family apartment building containing 84-units
and associated resident amenities and exterior site improvements including a fitness area, patio
space, common lounge space, new landscaping, and stormwater management improvements; and
WHEREAS, the subject property is guided HDR-High Density Residential in the 2040
Comprehensive Plan and is situated in the R-3 Multi-Family Residential Zoning District; and
WHEREAS, on November 1, 1983, the City Council approved the Planned Unit
Development for Lexington Heights Apartments, as well as a Variance from the density
requirement to construct 225 units on an 18.2 acre site; and
WHEREAS, on April 17, 1984, the City Council approved the Final Plat for
LEXINGTON HEIGHTS ADDITION, which dedicated additional right-of-way and reduced the
size of the property to 16.3 acres; and
WHEREAS, on November 25, 2025, the Mendota Heights Planning Commission opened,
held, and closed a public hearing on the Zoning Amendment and Preliminary Development Plan
application request under Planning Case No. 2025-16 at their regular meeting, and whereupon
receiving the presented staff report and hearing testimony from three (3) residents on the
application, the Planning Commission recommended unanimously to table the requested
application to December 29, 2025; and
WHEREAS, on December 29, 2025, The Mendota Heights Planning Commission opened,
held, and closed the second public hearing on the Zoning Amendment and Preliminary
Development Plan application request under Planning Case No. 2025-16, and the tabled
application was presented by staff with follow-up on discussion items from the prior meeting, and
following discussion on this item a motion was made and seconded to deny the application which
Page 48 of 124
Res. No. 2026-22 Page 2 of 5
failed by a 2-4 vote. A second motion to approve the application with findings-of-fact and
conditions was made which resulted in a tied vote 3-3 and through discussion the Planning
Commission determined that this tied vote would be sent to the City Council for their discussion
and review of the application, including Planning Commission review comments; and
WHEREAS, on January 20, 2026, the Mendota Heights City Council adopted Resolution
No. 2026-06 Approving a Zoning Amendment and Preliminary Development Plan for an
Amendment to the 1983 Lexington Heights Apartments Planned Unit Development for the
property located at 2300 Lexington Avenue as presented under Planning Case No. 2025-16.
NOW THEREFORE BE IT RESOLVED by the Mendota Heights City Council that the
Planned Unit Development - Final Development Plan to amend the 1983 Lexington Heights
Apartments Planned Unit Development as proposed under Planning Case 2026-03, is hereby
approved with the following findings of fact:
1.The Applicant/Developer has submitted the Final Development Plan to the City within
six weeks of the City Council’s approval of the Preliminary Development Plan.
2.The proposed Planned Unit Development Amendment – Final Development Plan is
substantially in conformance with the Zoning Amendment and Preliminary
Development Plan as approved under Resolution No. 2026-06.
3.The proposed Planned Unit Development Amendment – Final Development Plan, is
consistent with the Comprehensive Plan and applicable City Code requirements for such
a planned development in the R-3 Multi Family Residential Base Zoning District and
HR – High Density Residential Land Use area.
4.The deviations of the Planned Unit Development Amendment include:
a.To allow an increase in density to 18.9 units per acre on the 16.31 acre site
b.To allow a reduced principal building setback from the east lot line of 25.2-ft
5.The proposed project utilizes the Planned Unit Development (PUD) zoning flexibility to
enhance development of the property without negatively impacting surrounding land
uses and natural resources.
6.The reduced setback at the east property line for the principal building does not pose any
threat to the general health, safety and welfare of the surrounding properties or diminishes
the usefulness of the planned development of this property.
7.The increase in residential net density to 18.9 units per acre will be an effective and unified
treatment of the existing Planned Unit Development; will provide additional housing unit
types that are in-demand within the community; and can be developed to harmonize with
existing development in the areas surrounding the project site and within the City as a
whole.
Page 49 of 124
Res. No. 2026-22 Page 3 of 5
8.Construction of the proposed 84-unit multi-family residential building will contribute to
a significant amount of the Metropolitan Council’s forecasted population and household
increases.
9.The proposed increased density is consistent with surrounding suburban communities
and would allow for the more efficient use of underutilized surface parking space as part
of the proposed development.
10.With the conditions included herein, the site will provide a significant investment into the
existing Multi-family residential areas of the City and will benefit the City with an
increased efficiency in use of land and increased building activity.
11.The proposed multi-family apartment building supports investment within existing
residential developments, supports the maintenance of the City’s existing housing stock,
and provides an opportunity for an apartment owner within the City to expand their
housing stock and provide additional residential housing units to the community.
BE IT FURTHER RESOLVED, by the Mendota Heights City Council that the Planned
Unit Development - Final Development Plan to amend the 1983 Lexington Heights Apartments
Planned Unit Development as proposed under Planning Case 2026-03, is hereby approved with
the following conditions:
1.The Applicant/Developer shall enter into a Development Agreement with the City of
Mendota Heights.
2.No Building Permits will be issued until the Applicant provides evidence to the City of the
recording of the Final Development Plan and the Development Agreement.
3.The Zoning Amendment approved under Resolution No. 2026-06 will be established by
rezoning the full extent of the project area to a Planned Unit Development Overlay District
in concurrence with the approved Final Development Plan.
4.The Variance from the density requirement to construct 225 units on an 18.2 acre site,
approved under Resolution No. 83-95 (paragraph three of said Resolution) is hereby
rescinded. With the exception of rescinding paragraph three of Resolution 83-95, all
conditions and approvals of the previously approved PUD (dated November 1, 1983) shall
remain in full force and effect.
5.The new building shall be constructed only in conformance to building and site plans
certified by registered architects and engineers (as applicable); and in accordance with all
architectural and building standards found under Title 12-4B-3, Subpart E “Architecture
and Building Design Standards”
6.The proposed water system shall be designed and constructed to Saint Paul Regional Water
Service (SPRWS) standards, including written approval of the design layout prior to final
City Council approval.
Page 50 of 124
Res. No. 2026-22 Page 4 of 5
7.The Developer/Applicant shall submit final grading, utility, and site plans, and
architectural construction drawings for permitting, subject to review and approval by the
Planning Department and Engineering Department as part of any building permit
application. Building and grading permits shall be obtained from the City prior to
construction commencement of any work.
8.All grading and construction activities as part of the proposed development shall be in
compliance with applicable federal, state, and local regulations and codes, as well as in
compliance with the City’s Land Disturbance Guidance Document.
9.A performance bond or letter of credit shall be supplied by the applicant in an amount equal
to at least one and one-half (1 1/2) times the value of such screening, landscaping, or other
improvements, to be included as part of the Development Agreement.
10.The Developer and/or their respective agents shall be jointly and severally responsible for
the maintenance of all landscaping in a condition presenting a healthy, neat and orderly
appearance and free from refuse and debris. Plants and ground cover which are required
by an approved site or landscape plan and which have died shall be replaced as soon as
seasonal or weather conditions allow. All landscape areas must be irrigated.
11.A separate Forest Alteration Permit application and Forest Management Plan is required
to be submitted to the City prior to building permit issuance to confirm compliance with
the Urban Forest Preservation Ordinance. The applicant shall post a tree replacement
escrow with the City and shall mitigate tree replacement in appropriate areas of the property
as reviewed and approved by the Natural Resources Manager and Community
Development Manager. If compliance with the tree replacement requirement is not
feasible, the City may approve alternative tree replacement measures within the Forest
Alteration Permit.
Adopted by the City Council of the City of Mendota Heights this 7th day of April, 2026.
CITY COUNCIL
CITY OF MENDOTA HEIGHTS
________________________________
Mayor Stephanie B. Levine
ATTEST
________________________________
Nancy Bauer, City Clerk
Page 51 of 124
Res. No. 2026-22 Page 5 of 5
EXHIBIT A
Legal Description
PID No. 27-44925-01-010
Lot 1, Block 1, Lexington Heights Addition
Drafted by: City of Mendota Heights
1101 Victoria Curve
Mendota Heights, MN 55118
Page 52 of 124
CITY OF MENDOTA HEIGHTS
DAKOTA COUNTY, MINNESOTA
ORDINANCE NO. 606
AN ORDINANCE AMENDING THE LEXINGTON HEIGHTS PLANNED UNIT
DEVELOPMENT, AND A ZONING AMENDMENT TO PLANNED UNIT DEVELOPMENT
OVERLAY DISTRICT
The City Council of the City of Mendota Heights does ordain as follows:
Section 1. Amendment. Title 12 of the Mendota Heights City Code is hereby amended to allow for a
new 84-unit apartment building in accordance with the Planned Unit Development Amendment Approval
under Resolution No. 2026-06 and Resolution No. 2026-22 and the Amended Planned Unit Development
Agreement on file in the City Clerk’s office dated _________________, 2026, for the following property
located within the City of Mendota Heights, Minnesota:
Lots 1, 2, and 3, Block 1; and Outlots A and B, all in Lexington Heights
Section 2. Rezoning. The City of Mendota Heights’ Official Zoning Map, County of Dakota, State of
Minnesota, shall be amended by rezoning 16.31 acres of land legally described in Section 1 of this
Ordinance from R-3 Multi Family Residential to R-3/PUD Multi Family Residential District/Planned
Unit Development Overlay District. The zoning map of the City of Mendota Heights referred to and
described in said Title 12, shall not be republished to show the aforesaid rezoning, but the Community
Development Manager or their designee shall appropriately mark the zoning map on file in the city
clerk’s office for the purpose of indicating the rezoning provided for in this ordinance and all of the
notations, references and other information shown thereon are hereby incorporated by reference and made
a part of this ordinance.
Section 3. Effective date.
This ordinance shall be effective immediately following adoption and publication according to law.
ADOPTED this 7th day of April, 2026 by the City Council for the City of Mendota Heights.
CITY COUNCIL
CITY OF MENDOTA HEIGHTS
___________________________________
Stephanie B. Levine, Mayor
ATTEST:
___________________________
Nancy Bauer, City Clerk
Page 53 of 124
6666666666666 6
666666666666666666
6
6
66666666666666666666666666666666*
!
³
!*
*
*
*
!
*
*
!
"!
*
""""
*
""
"
³
*
!
"
!
³
³
**!!
³
*
³"
³³
"
"
³
³³
³³
³³
³
³
!
!
*
!
!
6
666666666666
6!!2
!!2
!!2
!!2
!!2
!!2!!2!!2!!2
!!2
!!2
!!2
!!2 !!2 !!2
2300
2370
2330
2431 1031
2258
1145
2320
1062
2401 949
9491031
1031LEXINGTON AVEINTERSTATE 35EINTERSTATE 35E NB RAMPINTERSTATE 35ENearmap US Inc, Dakota County, MN
Site Location/Aerial MapLexington Heights PUD
Date: 11/21/2025
City ofMendotaHeights0310
SCALE IN FEET
GIS Map Disclaimer:This data is for informational purposes only and should not be substituted for a true title search, property appraisal, plat,survey, or for zoning verification. The City of Mendota Heights assumes no legal responsibility for the information containedin this data. The City of Mendota Heights, or any other entity from which data was obtained, assumes no liability for any errorsor omissions herein. If discrepancies are found, please contact the City of Mendota Heights.
Contact "Gopher State One Call" at 651-454-0002 for utility locations, 48 hours prior to any excavation.
Page 54 of 124
Councilor Lorberbaum moved to approve RESOLUTION 2026-04 APPOINTING CITY ADVISORYCOMMISSION MEMBERS.Councilor Mazzitello seconded the motion.Ayes: 5Nays: 0B) RESOLUTION 2026-06 CITY COUNCIL ACTION ON THE APPLICATION OF CHASE REALESTATE FOR A PRELIMINARY DEVELOPMENT PLAN AND ZONING AMENDMENT TO THELEXINGTON HEIGHTS PLANNED UNIT DEVELOPMENT AT 2300 LEXINGTON AVENUE(PLANNING CASE NO. 2025-16)Community Development Manager Sarah Madden provided a brief background on this item. The Councilwas being asked to consider an application request for a Preliminary Development Plan and ZoningAmendment to the Lexington Heights Planned Unit Development.Joe McElwain, Chase Real Estate, referenced information on recent housing reports, which show a lackof supply for residents, with a vacancy rate of one percent. The study noted that in order to reach a healthybalance of supply and demand, over the next five years, Mendota Heights would need to build over 1,200units of housing. He noted that only two percent of people live and work within Mendota Heights, whichmeans that 98 percent of those who work in Mendota Heights actually live in Mendota Heights. He statedthat they surveyed many of the apartments in Mendota Heights and found that all the buildings are 99percent occupied. He provided information on typical density for apartments, noting that the densitywithin the R-3 district is similar to the density of single-family residential. He provided backgroundinformation on the original approval for the Lexington Heights property that required a large amount ofparking, much of which is not needed. He stated that the proposal today would be a very efficient use ofspace, as they would reutilize a parking area and 14,000 square feet of grass to create additional housingunits. He referenced the requested setback reduction to the freeway and noted some comparisons alongthe corridor. He commented that the setback as proposed would be larger than other existing buildings.He noted that the height difference would be very small in the visual perception between the existingbuildings and the proposed four-story building. He provided images from a similar project that wascreated and built in Egan. He noted that the goal in this project would be to provide more apartment homefloorplan options. He believed that this project would provide benefit to the City while allowing expansionof a local property owner and manager in a cost-effective manner, through efficient use of space andwithout a request for financial assistance.Councilor Maczko stated that the housing report mentioned was not completed by the City and explainedthat it was done by the County on a county-wide scope. He noted that the Council discussed how MendotaHeights is almost fully developed, and people like the community for what it is. He stated that MendotaHeights has high-quality development with people who maintain their properties. He noted that in hisexperience, Mr. Riley does take excellent care of his property. He stated that if a community is doingthings well, there will always be more demand than supply, and if you tip that point, the things that peopleenjoy about the community may be taken away. He appreciated the additional information about theactual distance from the freeway, which does seem consistent with other buildings. He stated that hisconcern with the proximity to the freeway is that residents often complain about noise from the freeway.He recognized the density requested is higher than the allowed range and has concerns that this would betight on the site. He noted that the current layout allows for circulation, whereas the proposed layoutJanuary 20, 2026, Mendota Heights City CouncilPage 3 of 12Page 55 of 124
would essentially create a long dead-end. He noted that emergency vehicles would need to back up to getout of the site rather than circulating.Mr. McElwain stated that they have spoken with the City Engineer about additional options for circulationas well.Councilor Maczko stated that the other three buildings are three-story with the same style, and thisbuilding would look out of place as the architecture would not match. He stated that the site feels moreopen as it exists today. He commented that he would support additional buffering, especially to the north.He believed that the original PUD intended to preserve open space. He asked if there was any informationon why the parking for the 2300 property was designed on that side, as the other buildings have theirparking on the other side.Mr. McElwain identified the location of a gas line, which drove the original design and layout. He statedthat most apartment buildings are developed through PUDs.Councilor Maczko asked if there is a plan to add a building in front of the building to the south.Mr. McElwain replied that this proposed location is the only option on this site. He stated that Mr. Rileyhas other plans in the future to update the existing buildings, add amenities, and update landscaping.Mayor Levine asked staff to provide additional information on the use of a PUD for the originaldevelopment and whether it was intended to preserve open space.Community Development Manager Sarah Madden replied that generally, a PUD is used for apartmentbuildings because of the phased development approach or because there are multiple structures on oneproperty. She stated that the PUD ordinance in place in the 1980's allowed for flexible development anddid not get into the specificity that the current ordinance does. She stated that the flexibility at that timewas related to density, which was granted through a variance, and due to right-of-way changes, whichimpacted the density.Mayor Levine asked for more information on the historical density.Community Development Manager Sarah Madden stated that when the PUD was approved, there was nota listed range for density for this category, and instead was allowed at ten units per acre. She commentedthat since the 1990s, a range for density was created, with six to nine units per acre projected for the last30 years. She stated that the need for the variance was related to the possible unit rate that could havebeen achieved in the absence of the right-of-way creation.Mayor Levine asked if there are any existing apartment buildings in Mendota Heights within the six-to-nine-unit range.Community Development Director Sarah Madden replied that the property immediately to thewhich is a multi-family townhome development owned by Dakota County CDA, is within that range.south,January 20, 2026, Mendota Heights City CouncilPage 4 of 12Page 56 of 124
Councilor Mazzitello referenced the townhome property to the south, noting that townhomes aretraditionally considered medium-density development, although the zoning is R-3. He asked if there is ahigh-density development anywhere in Mendota Heights that is at or under nine units per acre.Community Development Manager Sarah Madden replied that she is not aware of any.Councilor Mazzitello commented that there is not an apartment building anywhere close to nine units peracre. He referenced the issue of architectural compatibility, noting that the concept shown is in the styleof a contemporary building that would be built today. He wondered if there was language in the originalDevelopment Agreement that stated that any future development would need to be architecturallycompatible.Community Development Manager Sarah Madden replied that this Development Agreement, perhaps dueto its age, does not have those architectural standards built in. She stated that the PUD ordinance doesspeak about compatibility between phases of development. She commented that the determination wasmade that the color scheme and general use of materials would be compatible under the constraints ofmodern construction. She noted that additional requirements could be made to increase compatibility.Councilor Maczko referenced the statement that the PUD was probably used for density, but believed thatthe variance covered the issue of density.Community Development Manager Sarah Madden replied that there was a variance from the density. Sheexplained that the original development came through as a PUD, and after a few review meetings, it wasdetermined that the variance should be used for density.Mayor Levine commented that in the past, a Conditional Use Permit (CUP) had been used as well, butnow a zoning amendment is used, and asked staff to provide additional input.Community Development Manager Sarah Madden explained that previously, a PUD was approvedthrough a CUP, and now a PUD is reviewed as an overlay zoning district. She stated that it is processedin the same way as a zoning amendment is reviewed, rather than the process for a CUP.Councilor Paper stated that the presentation tonight is the first mention he had seen of park dedication andasked if there would be park dedication for the project.Community Development Manager Sarah Madden commented that a park dedication recommendationhas not been included at this time.City Attorney Amy Schmidt stated that park dedication is part of a subdivision process, whereas this is anamendment to an existing development, and park dedication is not triggered.Councilor Lorberbaum noted a proposed height difference of 7.5 feet and asked for more information onthe statement that, visually, there would only be 4.5 feet difference.Mr. McElwain replied that there would be a seven-foot difference, but also noted the changes in gradeelevation between the existing building and the proposed building.January 20, 2026, Mendota Heights City CouncilPage 5 of 12Page 57 of 124
John Riley, property owner/applicant, confirmed that the new building would be seven feet higher thanthe existing building.Councilor Lorberbaum referenced the concept of a circular path for emergency vehicles and noted that inher conversations with Mr. Riley, he noted the desire not to disrupt trees in that manner, and perhapssomething could be done by the edge of the garage.Mr.McElwain stated that there are options for a full turnaround or a hammerhead turnaround.identified the area in which that could be placed.HeCouncilor Lorberbaum referenced the issue of the setback to the freeway and asked if the City cares aboutwhere the property line ends or the distance between the building and the freeway.Community Development Manager Sarah Madden explained that a setback is from the property line, butthe applicant has provided context on why they are supporting the request and why the City could considerthat request. She noted that there is a larger area between the property line and highway, and this lot isconsidered to be a double frontage lot. She noted that those are factors that the City can consider whenreviewing that request.Councilor Lorberbaum appreciated that Mr. Riley is respected and has a great record withincommunity. She stated that if the building were shortened a bit, the setback would be met.Mr. McElwain confirmed that is an option, but believed it to be impractical in this situation.theMayor Levine noted an email received about Lake Augusta and asked if this development would impactthe waters of Lake Augusta.Public Works Director Ryan Ruzek commented that there would be less runoff and improved water qualityas a result of the project because of the requirements of development. He noted that the existing pondwould need to be expanded as well.Mr.McElwain noted that because of changes in water quality requirements, they would need to makechanges to the site and would overall provide improvement to what exists today.Mayor Levine asked what would be improved on the site in return for the amendment to the PUD. Sherecognized that Lexington Heights is a desirable place to live, which is evident through the publiccomments and low vacancy rate.Mr. Riley commented that they would improve the water quality and treatment onsite. He stated that heenvisions a rejuvenation of the site as a whole, noting potential amenities such as a golf simulator andpickleball court. He stated that he attempts to do refreshes of the interior spaces, such as the lobby andclubhouse, which were done about ten years ago, and would be completed again. He stated that when thiswas originally constructed, there was laundry provided on each floor with laundry hook-ups in the units.He noted that since that time, they have installed in-unit washer and dryers, and there are discussions toconvert the larger laundry rooms for other uses such as workout areas or available for rental by residentsJanuary 20, 2026, Mendota Heights City CouncilPage 6 of 12Page 58 of 124
for storage, workspace, or other desired use. He stated that this would be an effort to bring the site intothe modern day.Mayor Levine asked for information on trees and vegetation.Mr. Riley commented that any trees removed would be replaced per City Code. He stated that he woulduse this opportunity to add more landscaping and vegetation on the site.Mr. McElwain noted that as the application progresses, they would complete a full landscaping plan,which would include the additional buffering and could also add more trees and entrance plantings. Henoted that there would be outdoor patios for the clubhouses that would have additional landscaping aswell.Mayor Levine recognized that this would be a redevelopment and that is the phase the city isredevelopment. She stated that a first-time homebuyer in 2021 was 31, whereas now the first-timehomebuyer is 40. She noted that a three-bedroom apartment does allow for a family with children andasked if there is a plan to provide amenities for children.in:Mr. Riley replied that there are playsets at some of the communities. He stated that the park is about .25miles away, and there are other amenities and recreation opportunities within the clubhouse. He statedthat if there was a need for a play area, he would consider doing that, but he has not experienced that needyet. He commented that they are seeing more people making the choice to rent rather than purchasehomes.Councilor Maczko asked if there could be drive lanes around the parking as proposed, which would allowfor the circulation of vehicles.Mr. McElwain stated that the intention was to leave greenspace around the building and includelandscaping around the building, which only leaves a 60-foot parking lot. He stated that if he followedthe scenario of Councilor Maczko, he would have to remove the landscaping and some of the green space.Mr. Riley stated that he prefers to include the turnaround by the garage, as they have discussed with theFire Department.Councilor Maczko commented that there are also Amazon deliveries coming daily.Mr. Riley commented that they would work on that, and if that is desired, they could accommodate thatchange.Councilor Mazzitello moved to adopt RESOLUTION NO. 2026-06 APPROVING A ZONINGAMENDMENT AND PRELIMINARY DEVELOPMENT PLAN - AMENDMENT TO THE 1983LEXINGTON HEIGHTS, WITH THE ADDITION OF THE FOLLOWING LANGUAGE TOCONDITION 10: AND TURNAROUND CAPABILITY TO THE NORTH SECTION OF THE NEWBUILDING PRIOR TO APPROVAL OF THE FINAL DEVELOPMENT PLAN.Councilor Paper seconded the motion.January 20, 2026, Mendota Heights City CouncilPage 7 of 12Page 59 of 124
Further discussion: Mayor Levine asked if water quality treatment is covered under the proposedconditions.Community Development Manager Sarah Madden stated that condition five references the City's LandDisturbance Guidance Document, which mentions stormwater improvements, and noted that conditionfour also addresses that item.Councilor Lorberbaum commented that the language used for the setback seems a bit harsh, using threat,and suggested using hazard to be less harsh.Councilor Mazzitello explained that a resolution must use the codified language, which is threat.Councilor Lorberbaum asked if anything would need to be added related to MnDOT permits.Public Works Director Ryan Ruzek replied that MnDOT is its own permitting agency. He stated thatMendota Heights does not have a noise permit. He noted that the other concern of MnDOT was relatedto drainage, and drainage would not flow towards the freeway.Councilor Maczko asked if there were items that could be added to make the appearance more compatiblewith the existing buildings.Community Development Manager Sarah Madden explained that if the Council would like, it could adda condition to increase compatibility. She stated that the proposed color scheme and some materials arecompatible.Councilor Maczko commented that the existing buildings seem to have covered patios, which make themlook more residential than commercial. He asked if there was anything the applicant could do to makethe building fit in better on the site.Councilor Mazzitello stated that this is the first plan, and the applicant will continue to work with staff.He noted that perhaps that is something that is included in the Development Agreement rather than thePreliminary Plat.Councilor Maczko commented that he wants it to be on the record.Mayor Levine stated that could be added as condition 12 and asked for assistance in drafting a potentialcondition.Community Development Manager Sarah Madden stated that she does have concerns about shoehorningsomething specific while also does not want to be too broad. She stated that condition 12 could direct theapplicant to continue to work with staff on incorporating architectural design features, which increasecompatibility to the existing structures and place within the development.Councilor Maczko suggested that the new condition read, provide additional architectural design detailsto better integrate and coordinate with existing buildings.January 20, 2026, Mendota Heights City CouncilPage 8 of 12Page 60 of 124
Councilor Maczko moved to amend THE MOTION TO INCLUDE CONDITION 12, PROVIDEADDITIONAL ARCHITECTURAL DESIGN DETAILS TO BETTER INTEGRATE ANDCOORDINATE WITH EXISTING BUILDINGS.Councilor Mazzitello seconded the motion.Ayes: 5Nays: 0Councilor Paper noted a goal within the Comprehensive Plan that this project would achieve related tohousing products and opportunities. He stated that this operator has been in the community for over 40years and is well-respected. He reviewed the density of the existing buildings in the R-3 district and statedthat the City is using flexibility to add to the housing stock on a property that fits well with a longer-termvision. He stated that low vacancy rates mean that there is demand and the product is deemed as quality.He stated that this project fits the stated goals of the City well, with a known developer who maintainstheir property to a high standard.Ayes: 5Nays: 0C) MUNICIPAL CAMPUS PROJECТCity Administrator Cheryl Jacobson provided a brief background on this item. The Council was beingasked to consider establishing a Municipal Campus Project Oversight Committee and to review theMunicipal Campus Project Communications and Engagement Plan.Assistant City Administrator Kelly Torkelson reviewed the project communications and engagement plan.Councilor Maczko asked how residents are able to influence the project.Assistant City Administrator Kelly Torkelson reviewed the different ways residents can provide input,which does influence the project. She stated that the goal is to identify different opportunities for thepublic to provide input.Councilor Maczko recognized that this is not going out for a referendum and therefore the City Councilwill be the decision makers. He noted that there are times when residents become informed and askedwhere the opportunities are that allow the public to speak and have an influence on what happens.Assistant City Administrator Kelly Torkelson noted that the items within the communications plan markedat level two would identify those opportunities. She recognized that the input would be provided to theCouncil, and it would still be the decision of the Council as to whether that input influences their decision.Mayor Levine asked for more information on opportunities that would be available for residents thatcannot attend something in person.Chris Ziemer, ICS, identified opportunities that would be available for residents to provide input withoutleaving their homes.January 20, 2026, Mendota Heights City CouncilPage 9 of 12Page 61 of 124
CITY OF MENDOTA HEIGHTS
DAKOTA COUNTY, MINNESOTA
RESOLUTION 2026-06
RESOLUTION APPROVING A ZONING AMENDMENT AND PRELIMINARY
DEVELOPMENT PLAN - AMENDMENT TO THE 1983 LEXINGTON HEIGHTS
APARTMENTS PLANNED UNIT DEVELOPMENT FOR THE PROPERTY LOCATED
AT 2300 LEXINGTON AVENUE
PLANNING CASE N0.2025-16]
WHEREAS Chase Real Estate (or "Applicant" or "Developer") in cooperation with Riley
Family Lexington Heights Limited Partnership (Condor Living / Lexington Heights Apartments
and as "Owner") has applied for a Zoning Amendment and Planned Unit Development -
Preliminary Development Plan to amend the 1983 Lexington Heights Apartments Planned Unit
Development (PUD), as proposed under Planning Case 2025-16 (84-Unit Apartment Building)
Project") for the property located at 2300 Lexington Avenue and legally described in Exhibit A;
and
WHEREAS, the Zoning Amendment and Preliminary Development Plan to amend the
PUD as presented herein would authorize the construction of a new four-story multi -family
apartment building containing 84-units and associated resident amenities and exterior site
improvements including a fitness area, patio space, common lounge space, new landscaping, and
stormwater management improvements; and
WHEREAS, the subject property is guided HDR-High Density Residential in the 2040
Comprehensive Plan and is situated in the R-3 Multi -Family Residential Zoning District; and
WHEREAS, on November 1, 1983, the City Council approved the Planned Unit
Development for Lexington Heights Apartments, as well as a Variance from the density
requirement to construct 225 units on an 18.2 acre site; and
WHEREAS, on April 17, 1984, the City Council approved the Final Plat for
LEXINGTON HEIGHTS ADDITION, which dedicated additional right -of --way and reduced the
size of the property to 16.3 acres; and
WHEREAS, on November 25, 2025, the Mendota Heights Planning Commission opened,
held, and closed a public hearing on the application request at their regular meeting, and
whereupon receiving the presented staff report and hearing testimony from three (3) residents on
the application, the Planning Commission recommended unanimously to table the requested
subdivision plat application to December 29, 2025; and
WHEREAS, on December 29, 2025, The Mendota Heights Planning Commission opened,
held, and closed the second public hearing on the application request, and the tabled application
was presented by staff with follow-up on discussion items from the prior meeting, and following
Page 62 of 124
discussion on this item a motion was made and seconded to deny the appncauon wmch Caned oy
a 2-4 vote. A second motion to approve the application with findings -of -fact and conditions was
made which resulted in a tied vote 3-3 and through discussion the Planning Commission
determined that this tied vote would be sent to the City Council for their discussion and review of
the application, including Planning Commission review comments; and
NOW THEREFORE BE IT RESOLVED by the Mendota Heights CAy Council that the
Zoning Amendment and Planned Unit Development - Preliminary Development Plan to amend
the 1983 Lexington Heights Apartments Planned Unit Development as proposed under Planning
Case 202546, is hereby approved with the following findings of fact:
1. The proposed Planned Unit Development Amendment —Preliminary Development Plan,
is consistent with the Comprehensive Plan and applicable City Code requirements for
such a planned development in the R-3 Multi Family Residential Base Zoning District
and HR — High Density Residential Land Use area.
2. The deviations of the Planned Unit Development Amendment include:
a. To allow an increase in density to 18.9 units per acre on the 16.31 acre site
b. To allow a reduced principal building setback from the east lot line of 25.2-ft
3. The proposed project utilizes the Planned Unit Development (PUD) zoning flexibility to
enhance development of the property without negatively impacting surrounding land
uses and natural resources.
4. The reduced setback at the east property line for the principal building does not pose any
threat to the general health, safeTy and welfare of the surrounding properties or diminishes
the usefulness of the planned development of this property.
The increase in residential net density to 18.9 units per acre will be an effective and unified
treatment of the existing Planned Unit Development; will provide additional housing unit
types that are in -demand within the community; and can be developed to harmonize with
existing development in the areas surrounding the project site and within the City as a
whole.
6. Construction of the proposed 84-unit multi -family residential building will contribute to
a significant amount of the Metropolitan Council's forecasted population and household
increases.
7. The proposed increased density is consistent with surrounding suburban communities
and would allow for the more efficient use of underutilized surface parking space as part
of the proposed development.
Res. No. 2026-06 Page 2 of 6
Page 63 of 124
8. With the conditions included herein, the site will provide a significant investment into the
existing Multi -family residential areas of the City and will benefit the City with an
increased efficiency in use of land and increased building activity.
9. The proposed multi -family apartment building supports investment within existing
residential developments, supports the maintenance of the City's existing housing stock,
and provides an opportunity for an apartment owner within the City to expand their
housing stock and provide additional residential housing units to the community.
BE IT FURTHER RESOLVED, by the Mendota Heights City Council that the Zoning
Amendment and Planned Unit Development - Preliminary Development Plan to amend the 1983
Lexington Heights Apartments Planned Unit Development as proposed under Planning Case 2025-
16, is hereby approved with the following conditions:
The Applicant/Developer shall enter into a Development Agreement with the City of
Mendota Heights.
2. The new building shall be constructed only in conformance to building and site plans
certified by registered architects and engineers (as applicable); and in accordance with all
architectural and building standards found under Title 12-4B-3, Subpart E "Architecture
and Building Design Standards"
3. The proposed water system shall be designed and constructed to Saint Paul Regional Water
Service (SPRWS) standards, including written approval of the design layout prior to final
City Council approval.
4. The Developer/Applicant shall submit final grading, utility, and site plans, and
architectural construction drawings for permitting, subject to review and approval by the
Planning Department and Engineering Department as part of any building permit
application. Building and grading permits shall be obtained from the City prior to
construction commencement of any work.
5. All grading and construction activities as part of the proposed development shall be in
compliance with applicable federal, state, and local regulations and codes, as well as in
compliance with the City's Land Disturbance Guidance Document.
6. The Final Development Plan shall include an updated landscape plan with a detailed
landscaping schedule for planned plant materials.
The Applicant/Developer will work with Planning staff to review and approve additional
plant materials within a buffer area between the proposed patio courtyard and the reduced
setback area from the east property line boundary with I-35E, along the north property line
which is shared with the R-1 zoned property, and in the area of construction of the retaining
wall and fire turnaround adjacent to the parking garage entrance, by installing additional
landscape materials including berms, hedges, or other landscape materials where feasible.
Res. No. 2026-06 Page 3 of 6
Page 64 of 124
is. A pertormance bond or letter of credit shall be supplied by the applicant in an amount equal
to at least one and one-half (11/2) times the value of such screening, landscaping, or other
improvements, to be included as part of the Development Agreement.
9. The Developer and/or their respective agents shall be jointly and severally responsible for
the maintenance of all landscaping in a condition presenting a healthy, neat and orderly
appearance and free from refuse and debris. Plants and ground cover which are required
by an approved site or landscape plan and which have died shall be replaced as soon as
seasonal or weather conditions allow. All landscape areas must be irrigated.
10. The Applicant/Developerwlll work with the fire department personnel in determining final
design, location and specifications to the fire safety access area to the north portion of the
new building.
11. A separate Forest Alteration Permit application and Forest Management Plan is required
to be submitted to the City prior to building permit issuance to confirm compliance with
the Urban Forest Preservation Ordinance. The applicant shall post a tree replacement
escrow with the City and shall mitigate tree replacement in appropriate areas of the property
as reviewed and approved by the Natural Resources Coordinator and Community
Development Manager. If compliance with the tree replacement requirement is not
feasible, the City may approve alternative tree replacement measures within the Forest
Alteration Permit,
12. The Applicant/Developer shall provide additional architectural design details to better
integrate and coordinate with existing buildings.
Adopted by the City Council of the City of Mendota Heights this 20s' day of January, 2026.
CTTY COUNCIL
CTTY OF MENDOTA HEIGHTS
Mayor tephanie Levine
I:VYIY
N ncy BaAer, City Clerk
Res. No. 2026-06 Page 4 of 6
Page 65 of 124
Drafted by: City of Mendota Heights
1101 Victoria Curve
Mendota Heights, MN 55118
Res. No. 2026-06 Page 5 of 6
Page 66 of 124
r %nlolI A
Legal Description
PID No.27-44925-01-010
Lot 1, Block 1, Lexington Heights Addition
Drafted by: City of Mendota Heights
1101 Victoria Curve
Mendota Heights, MN 55118
Res. No. 2026-06 Page 6 of 6
Page 67 of 124
Lexington Heights Addition
Final PUD Submittal Plans
February 25, 2026
Sarah Madden, Community Development Manager
City of Mendota Heights, MN
RE: Lexington Heights Apartments - Addition
2320 Lexington Heights Ave S, Mendota Heights
Ms. Madden:
On behalf of Jon Riley and Lexington Heights Apartments, please find attached our Final PUD application and
plan materials for our proposed 84-Unit apartment building “Lexington Heights Addition”. We have made plan
improvements since our January 20th City Council Prelim PUD Meeting. Per Council’s guidance and conditions,
these are the main updates:
1. Eliminated parking lot dead-end and Fire Truck turn-around problem.
a. We are now connecting the existing west driveway by extending it to the parking lot.
b. Simplifies vehicle circulation.
c. Also affords us better, safer separation of resident traffic and construction-phase traffic.
2. Relocated our Garage Door entry.
i. Simplifies circulation; direct view and leads from existing surface lot drive aisle.
ii. Eliminates the tall northern retaining wall we had shown that would have involved
excavating against the NE property corner trees.
3. New Landscape Plans show a generous amount of trees and buffering along north property line and east
i35 property line as requested by Planning Commission and Council.
4. Updated Exterior Elevations: we have updated materials, improved entry lobby exterior design, added
roof parapet details and colors to better complement the existing buildings. The 4th floor siding will be a
high-quality architectural metal vertical panel to look like a 'mansard' roof to relate to the mansard roof
of the existing bldgs. The entry door / lobby has been enlarged to look like the storefront and windows
of the existing building entries.
Thank you,
Joe McElwain
Development Director
Chase Real Estate
Page 68 of 124
1
Lexington Heights Addition
Final PD Submittal - Staff Comments
April 7th, 2026
Sarah Madden, Community Development Manager
City of Mendota Heights, MN
RE: Lexington Heights Apartments - Addition
Post –Submittal – Plan Revision Comments
2320 Lexington Heights Ave S, Mendota Heights
Ms. Madden:
On behalf of Jon Riley and Lexington Heights Apartments, please find attached our revised civil plans
addressing trail elevation, storm pond EOF, and various utility -related questions. Also enclosed is the
updated landscaping plan, which reflects the revised tree survey and removal of identified invasive
species. A detailed narrative responding to staff comments from our final PUD submission is included on
page 2. We look forward to continuing to work with you and the City of Mendota Heights as we move to the
next steps.
Thank you,
Joe McElwain
Development Director
Chase Real Estate
Page 69 of 124
2
April 7, 2026
RE: Lexington Heights Addition City Comments - Summary of Revisions
1. Fire Truck Lane | Dead-end (Parking Lot drive lane revised layout)
• We revised the parking lot plan to do the obvious best solution; connect to the existing NW
driveway by extending it.
• Our new water service and stormwater pipes serving the new building is located along this north
stretch anyways; construction already had to occur along here.
• This will provide the fire truck continuous circulation requested through the site.
• This eliminates a significant retaining wall against the NE trees; where the previously proposed
garage door was located.
• This saves various trees that would have been eliminated to build that retaining wall.
• Additional Benefit: this will serve as the primary Construction Traffic entry to the new building;
providing for a separate / safe resident entry maintained to the South.
• Our neighbor to the north has reviewed and is okay with this new parking lot drive lane.
2. Landscape Plans
• We added extensive landscape screening -as requested- along the north shard property line and
i35 eastern property line.
3. Building Architecture
• Refer to the last page of the Architecture submittal; our team researched additional material
manufacturers to propose metal panel siding and real bed -depth brick products to better match
the existing building colors.
• The design is more contemporary; we believe it will complement the existing buildings while
offering a fresh design that new construction practices include; such as larger, higher quality
windows, metal non-combustible decks, taller ceilings, etc.
• The front door added more glass sim to the entries of the existing buildings.
4. Additional Site Recreation | Amenities
• The Owner is willing to provide additional outdoor amenities to the club house to serve the whole
property. These improvements can occur concurrently with the improvements to the new building.
See updated Civil Plan C401.
1. The basketball court will be renovated into pickleball courts.
2. New concrete patio pads will be installed for community dining tables and overhead
pergolas.
3. The pool patio will be expanded to increase capacity and provide space for additional
lounge seating.
Page 70 of 124
April 2nd, 2026
Joe McElwain
Chase Real Estate, Inc
2100 County Road 42 West
Burnsville, MN 55337
joe@chasere.com
RE: Lexington Heights – City Comment Responses
Dear Mr. McElwain,
Below is a summary of our revisions relating to the City of Mendota Heights comments received
on March 11, 2026:
Sheet C103:
•Trail removals shown on utility plan to ensure removals don’t occur with general
demolition, and happen closer to utility installation to keep trail downtime to a minimum
•Tree removals now included in sheet C401
•Revised sanitary service location should not impact existing driveway (~15’ separation)
Sheet C300:
•Bio-Rolls added to site facing side of trench drain for inlet protection
Sheet C400:
•EOF location and elevation now identified
Sheet C500:
•Notes added to ensure pipe is outside of trail section. Trail grade identified on grading
plan. Trail elevation below EOF, so no impact is expected.
•Sanitary service revised to tie into Eastern manhole with inside drop. City detail added to
sheet C700. Additional detail to be acquired and added prior to permit issuance.
Sincerely,
Eric Fagerberg, PE (MN)
Project Manager
Page 71 of 124
G GGGGGGGGGGGGGGGGGoo
G
G
G
G
G
G
G
G
G GGGGGG G
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXooooooo o
o
o
OHUOHUOHUOHUOHUOHUOHUOHUOHUOHUOHUOHUOHUOHUOHUOHUOHUOHUOHUOHUOHUOHUOHUE
E
E
E
EEEEEEEEEEEEEEOHU
E
E
E
E
E
E
E
E
T
T
V
T
>>>IIIIIIIIIIIII
XXXXI I I
I I
I
I
>>>>>>>>>>>BENCHMARK #1
TNH=892.69
PROPOSED
BUILDING
STMH-104
STMH-103
CBMH-102
CBMH-101
FES-100
STMH-106
CB-105
STMH-107
FES-200
OCS-201
RD-2
TRENCH DRAIN-1
RD-1
EXISTING
APARTMEN
T
BUILDING
EXISTING
TENNIS
COURT
EXISTING
POOL
EXISTING
CLUBHOUS
E
EXISTING
POND
LEXINGTON AVENUEINTERSTATE 35ESSMH-1
PROJECT NO.
24282
CAD FILE
02/25/26
DATE
REVISIONS
DRAWN BY Date:Reg.No.ERIC P. FAGERBERG5377202/25/262026-04-02 CITY COMMENTS2999 WEST C.R. 42, SUITE 100BURNSVILLE, MN 55306PHONE: 952-890-6044info@mnhill.comwww.mnhill.comI hereby certify that this plan,specification or report was preparedby me or under my direct supervisionand that I am a duly LicensedProfessional Engineer under the lawsof the State of Minnesota.PRELIMINARYMENDOTA HEIGHTS, MINNESOTALEXINGTON HEIGHTS ADDITIONCONDOR CORPORATIONFOR2320 LEXINGTON AVENUE, MENDOTA HEIGHTS, MN 55120F:\_Civil 3D Projects\24282\PRE-PLAT PLANS\24282TS.dwg - 4/02/2026 11:26AM24282TS
C100TITLE SHEETF:\_Civil 3D Projects\24282\PRE-PLAT PLANS\24282TS.dwg - 4/02/2026 11:26AMLOCATION MAP
NO SCALE
PROJECT COORDINATES
N 44° 52' 22.70"
W 93° 08' 42.62"
GENERAL CONTRACTOR REPRESENTATIVE:TBD
PROJECT ENGINEER:
CITY ENGINEER:
952-890-6044 (O)ERIC FAGERBERG, P.E. - JAMES R. HILL, INC.
PROJECT CONTACTS
RYAN RUZEK - PUBLIC WORKS DIRECTOR
DEVELOPER:JON RILEY - CONDOR CORPORATION XXX-XXX-XXXX (O)
651-255-1152 (O)
651-757-2859 (O)NPDES OFFICER:ELLIE BERGFALK - MPCA
LEGEND
EXISTING TELEPHONE PEDESTAL
EXISTING TRANSFORMER
EXISTING LIGHT POLE
EXISTING TREELINE/TREES>I
EXISTING STORM SEWER
EXISTING SANITARY SEWER
EXISTING WATERMAIN
>I
S
OHP EXISTING OVERHEAD POWER LINEOHP
EXISTING CURB & GUTTER
EXISTING FENCEXXXX
EXISTING ASPHALT
EXISTING CONCRETE
EXISTING GRAVEL
EXISTING RETAINING WALL
PROPOSED CONCRETE
PROPOSED ASPHALT SURFACE
PROPOSED SEDIMENT BASIN
PROPOSED INFILTRATION BASIN
SB-1
>>PROPOSED DRAINTILE
>>>>>>PROPOSED PERFORATED DRAINTILE
>>>>>>>>PROPOSED WATERMAINII
PROPOSED SANITARY SEWER
PROPOSED STORM SEWER
>>PROPOSED CURB & GUTTER
PROPOSED SANITARY SERVICE
PROPOSED WATER SERVICE
G G G EXISTING UNDERGROUND GAS
E E E EXISTING UNDERGROUND ELECTRIC
UFO UFO UFO EXISTING UNDERGROUND FIBER OPTIC
T T T EXISTING UNDERGROUND TELEPHONE
T
EXISTING TV PEDESTALTV
EXISTING WETLAND EDGE
EXISTING SOIL BORING LOCATION
PROPOSED RETAINING WALL
VUN
SITE
Know what's below.
before you dig.Call
R
SCALE IN FEET
0 60 120
DEVELOPMENT PLAN
LEXINGTON HEIGHTS APARTMENT
MENDOTA HEIGHTS, MINNESOTA
CONDOR CORPORATION
2320 LEXINGTON AVENUE, MENDOTA HEIGHTS, MN 55120
FOR
TITLE SHEET C100
INDEX
C400
C101GENERAL NOTES
GRADING & DRAINAGE PLAN
C500UTILITY PLAN
C600PAVING & DIMENSIONAL PLAN
EXISTING CONDITIONS C102
C300EROSION & SEDIMENT CONTROL PLAN
C301EROSION & SEDIMENT CONTROL SWPPP NOTES
C302EROSION & SEDIMENT CONTROL NOTES
CONSTRUCTION DETAILS C700-C701
DEMOLITION PLAN C103
CERTIFICATE OF SURVEY SHEET 1
BENCHMARKS
#1 TNH AT WEST SIDE OF NEW PARKING LOT
ELEV=892.69
C303EROSION & SEDIMENT CONTROL DETAILS
C401TREE PERSERVATION
Page 72 of 124
PROJECT NO.
24282
CAD FILE
02/25/26
DATE
REVISIONS
DRAWN BY Date:Reg.No.ERIC P. FAGERBERG5377202/25/262026-04-02 CITY COMMENTS2999 WEST C.R. 42, SUITE 100BURNSVILLE, MN 55306PHONE: 952-890-6044info@mnhill.comwww.mnhill.comI hereby certify that this plan,specification or report was preparedby me or under my direct supervisionand that I am a duly LicensedProfessional Engineer under the lawsof the State of Minnesota.PRELIMINARYMENDOTA HEIGHTS, MINNESOTALEXINGTON HEIGHTS ADDITIONCONDOR CORPORATIONFOR2320 LEXINGTON AVENUE, MENDOTA HEIGHTS, MN 55120F:\_Civil 3D Projects\24282\PRE-PLAT PLANS\24282GEN.dwg - 4/02/2026 11:26AM24282GEN
C101GENERAL NOTESEPF
TP-1
EXISTING TELEPHONE BOX
EXISTING ELECTRIC TRANSFORMER BOX
EXISTING TREELINE/TREES>I
EXISTING STORM SEWER
EXISTING SANITARY SEWER
EXISTING WATERMAIN
>I
EXISTING POWER POLE
EXISTING CURB & GUTTER
EXISTING FENCEXXXX
EXISTING ASPHALT
EXISTING CONCRETE
EXISTING GRAVEL
EXISTING RETAINING WALL
LEGEND
PROPOSED CONTOUR923
PROPOSED CONCRETE
PROPOSED ASPHALT SURFACE
PROPOSED SEDIMENT BASIN
PROPOSED INFILTRATION BASIN
PROPOSED DITCH CHECK - POST
GRADING/UTILITY CONSTRUCTION
PROPOSED SILT FENCEooooooooooooooooooooooooooooooooooooo
PROPOSED SILT FENCE POST CONSTRUCTION
PROPOSED WIMCO OR EQUAL
POST STORM SEWER CONSTRUCTION
PROPOSED YARD CB INLET PROTECTION POST
STORM SEWER CONSTRUCTION
PROPOSED TEMPORARY ROCK
CONSTRUCTION ENTRANCE
PROPOSED MNDOT "SOUTHERN BOULEVARD" SEED
MIX
SB-1
>>>>>>PROPOSED DRAINTILE
>>>>>>>>>>PROPOSED PERFORATED DRAINTILE
>>>>>>>>>>>>>>>>PROPOSED WATERMAINII
PROPOSED SANITARY SEWER
PROPOSED STORM SEWER
>>PROPOSED CURB & GUTTER
PROPOSED SANITARY SERVICE
PROPOSED WATER SERVICE
G G G EXISTING UNDERGROUND GAS
E E E EXISTING UNDERGROUND ELECTRIC
UFO UFO UFO EXISTING UNDERGROUND FIBER OPTIC
T T T EXISTING UNDERGROUND TELEPHONE
EXISTING TELEVISION BOX
EXISTING RAILROAD
EXISTING CONTOUR923
EXISTING WETLAND EDGE
EXISTING WETLAND
EXISTING SOIL BORING LOCATION
PROPOSED RETAINING WALL
PROPOSED EROSION CONTROL BLANKET
PROPOSED MNDOT "WET DITCH" SEED MIX
EOF PROPOSED EMERGENCY OVERFLOW
oooooooooooooooooooooooooooooooooooooPROPOSED GRADING LIMITS
PROPOSED SILT FENCE HEAVY DUTYllllllllllllllllllllllllllllllllllllACEXISTING AIR CONDITIONER
EXISTING AUTO SPRINKLER
EXISTING CLEANOUT
EXISTING CURB STOP
EXISTING ELECTRIC METER
EXISTING ELECTRIC OUTLET POST
EXISTING FLAGPOLE
EXISTING GROUND LIGHT
EXISTING GAS METER
EXISTING GAS VALVE
EXISTING GUY WIRE
EXISTING GUY WIRE POLE
EXISTING HANDHOLE
EXISTING LIFT STATION
EXISTING LIGHT POLE
EXISTING MAILBOX
EXISTING MANHOLE (UTILITY)
EXISTING MANHOLE (ELECTRIC)
EXISTING MANHOLE (TELEPHONE)
EXISTING MANHOLE (WATER)
EXISTING MONITORING WELL
EXISTING POST INDICATOR VALVE
EXISTING PROPANE TANK
EXISTING PIEZOMETER
EXISTING SEMAPHORE
EXISTING SPRINKLER HEAD
EXISTING SIGN
EXISTING VAULT
EXISTING VENT PIPE
EXISTING WELL
E
EXISTING GUARD POST
U
E
T
W
MW
Z
V
VP
EXISTING OVERHEAD POWEROHPOHPOHP
EXISTING OVERHEAD UTILITYOHUOHUOHU
EXISTING UNDERGROUND TELEVISIONTVTVTV
EXISTING DRAINTILE
>>>>>>>>>>>>EXISTING GUARD RAILoooo
EXISTING ADA PARKING
EXISTING TEST PIT LOCATION
T
TV
GOVERNING SPECIFICATIONS
CONTRACTOR AND ALL SUBCONTRACTORS SHALL OBTAIN COPIES OF THESE DOCUMENTS AND ALL WORK SHALL BE
IN ACCORDANCE WITH THEIR REQUIREMENTS:
1.THE CITY OF MENDOTA HEIGHTS STANDARD SPECIFICATIONS (2022 - CURRENT VERSION VARIES).
2.MINNESOTA DEPARTMENT OF TRANSPORTATION (MNDOT) STANDARD SPECIFICATIONS FOR CONSTRUCTION
(2025) AND ALL SUPPLEMENTAL SPECIFICATIONS.
3.CITY ENGINEERS ASSOCIATION OF MINNESOTA (CEAM) CONSTRUCTION STANDARD SPECIFICATION (2023).
4.MINNESOTA PLUMBING CODE (2020).
GENERAL NOTES
1.EXISTING CONDITIONS ARE BASED ON SURVEY PREPARED BY JAMES R. HILL, INC, DATED 04/11/2025. THE
CONTRACTOR IS RESPONSIBLE FOR VERIFYING SITE CONDITIONS AND SHALL NOTIFY THE ENGINEER OF ANY
DISCREPANCIES.
2.THE EXISTING SUBSURFACE UTILITY INFORMATION IN THESE PLANS IS UTILITY QUALITY LEVEL D DETERMINED IN
ACCORDANCE WITH THE “STANDARD GUIDELINE FOR INVESTIGATING AND DOCUMENTING EXISTING UTILITIES”,
ASCE/UESI/CI 38-22. CONTRACTOR IS RESPONSIBLE FOR VERIFYING THE LOCATION AND CONDITION OF
EXISTING UTILITIES AND NOTIFYING THE ENGINEER OF ANY DAMAGE OR DISCREPANCIES WITH THESE PLANS
PRIOR TO COMMENCING WORK. THE CONTRACTOR IS RESPONSIBLE FOR CONFIRMING LOCATION OF ALL
EXISTING UTILITIES, INCLUDING BY CONTACTING GOPHER STATE ONE CALL. CONTRACTOR SHALL BE
RESPONSIBLE FOR REPLACING ANY UTILITIES REQUIRED TO REMAIN IN SERVICE THAT HAVE BEEN REMOVED OR
DAMAGED. CONTRACTOR IS RESPONSIBLE FOR RELOCATING ALL EXISTING UTILITIES THAT CONFLICT WITH
THE PROPOSED IMPROVEMENTS. REPAIR/REPLACEMENT OF DAMAGED UTILITIES THAT WERE NOT IDENTIFIED
BY THE CONTRACTOR PRIOR TO COMMENCING WORK WILL BE DONE AT THE CONTRACTOR'S SOLE EXPENSE.
3.CONTRACTOR SHALL SCHEDULE AND HOLD A PRECONSTRUCTION MEETING PRIOR TO COMMENCING WORK.
A MINIMUM NOTICE OF 7 DAYS, INCLUDING TO CITY AND OTHER AGENCIES, SHALL BE PROVIDED. WHERE THE
CITY/AGENCIES DO NOT REQUIRE A PRECONSTRUCTION MEETING, A MINIMUM NOTICE OF 48 HOURS SHALL BE
PROVIDED PRIOR TO COMMENCING WORK.
4.CONTRACTOR SHALL CONTACT ALL UTILITY COMPANIES WITH UTILITIES WITHIN THE PROJECT AREA A
MINIMUM OF 48 HOURS PRIOR TO COMMENCING CONSTRUCTION.
5.CONTRACTOR SHALL BE RESPONSIBLE FOR APPLYING FOR, OBTAINING, AND COMPLYING WITH ALL REQUIRED
PERMITS. COPIES OF ALL REQUIRED PERMITS SHALL BE MAINTAINED ON SITE AT ALL TIMES.
6.WHERE PROVIDED, QUANTITIES ARE APPROXIMATE AND FOR CONVENIENCE ONLY. IT IS THE CONTRACTOR'S
RESPONSIBILITY TO VERIFY QUANTITIES AND TO PROVIDE THE QUANTITIES NECESSARY TO COMPLETE THE
PROPOSED IMPROVEMENTS.
7.CONTRACTOR SHALL MAINTAIN ACCESS, SERVICES (GARBAGE, MAIL, ETC.), UTILITY SERVICES AND DRAINAGE
(SURFACE AND SUBSURFACE) FOR ADJACENT PROPERTIES AT ALL TIME DURING CONSTRUCTION.
8.CONTRACTOR SHALL TAKE ALL PRECAUTIONS NECESSARY TO AVOID DAMAGE TO ADJACENT PROPERTIES AND
SITE FEATURES TO REMAIN, AND WILL BE SOLEY RESPONSIBLE FOR ANY DAMAGES.
9.CONTRACTOR SHALL PROVIDE RECORD PLANS, INCLUDING AS-BUILT SURVEY(S), AS REQUIRED BY RELEVANT
AGENCIES.
10.CONTRACTOR SHALL OBTAIN A COPY OF THE GEOTECHNICAL ENGINEERING SOILS REPORT AND CONSTRUCT
ALL IMPROVEMENTS IN ACCORDANCE WITH THE RECOMMENDATIONS OF THIS REPORT.
11.CONTRACTOR SHALL COORDINATE ALL REQUIRED TESTING WITH THE OWNER'S TESTING REPRESENTATIVE.
RE-WORK DUE TO TEST FAILURE(S), INCLUDING COSTS OF RETESTING, SHALL BE COMPLETED AT THE
CONTRACTOR'S EXPENSE.
12.CONTRACTOR SHALL BE RESPONSIBLE FOR TRAFFIC CONTROL IN ACCORDANCE WITH ALL APPLICABLE
AGENCY REQUIREMENTS, INCLUDING PREPARATION OF A TRAFFIC CONTROL PLAN IF REQUIRED. ALL TRAFFIC
CONTROL MEASURES SHALL COMPLY WITH THE LATEST EDITION OF THE MN MUTCD.
13.REFER TO ARCHITECTURAL PLANS, INCLUDING STRUCTURAL, MEP AND LANDSCAPING SECTIONS, FOR ALL
BUILDING AND BUILDING APPURTENANCE LOCATIONS AND DIMENSIONS, UTILITY SERVICE LOCATIONS,
PLANTINGS, AMENITY AREA DESIGNS, SITE ELECTRICAL IMPROVEMENTS, ETC.
14.SITE LIGHTING SHOWN FOR REFERENCE ONLY. SITE LIGHTING TO BE DESIGN-BUILD BY CONTRACTOR AND
SHALL MEET THE REQUIREMENTS OF THE CITY AND THE APPROVED PHOTOMETRIC PLAN -OR- REFER TO SITE
LIGHTING PLANS FOR EXACT LOCATIONS AND CONSTRUCTION DETAILS.
15.THE GOVERNING DOCUMENTS FOR CONSTRUCTION SHALL BE HARD COPIES AND/OR PDF PLANS. DESIGN
TOOLS UTILIZED IN PREPARATION OF THESE DOCUMENTS, INCLUDING BUT NOT LIMITED TO CIVIL 3D MODELS,
ARE NOT DELIVERABLES. CONTRACTOR IS CAUTIONED THAT THESE DESIGN TOOLS ARE NOT TO BE UTILIZED
FOR LAYOUT OR OTHER CONSTRUCTION ACTIVITIES.
16.ALL LOT AND EASEMENT DIMENSIONS ARE SUBJECT TO THE FINAL PLAT.
DEMOLITION NOTES
1.THIS PLAN IS BASED ON BEST AVAILABLE INFORMATION. CONTRACTOR SHALL FIELD VERIFY SITE CONDITIONS
PRIOR TO COMMENCING WORK TO CONFIRM SCOPE OF REQUIRED WORK. CONTRACTOR SHALL CONTACT THE
ENGINEER REGARDING ITEMS NOT IDENTIFIED FOR REMOVAL THAT MAY CONFLICT WITH PROPOSED
IMPROVEMENTS, REGARDLESS OF THE SCOPE OF REMOVALS SHOWN ON THE DEMOLITION PLAN.
2.CONTRACTOR IS RESPONSIBLE FOR ALL DEMOLITION, REMOVAL AND DISPOSAL AS NECESSARY TO
CONSTRUCT THE PROPOSED IMPROVEMENTS.
3.CONTRACTOR IS RESPONSIBLE FOR RESTORING AREAS IMPACTED BY DEMOLITION WITH MATERIALS IN
COMPLIANCE WITH PLANS (E.G. PAVEMENT, LANDSCAPING, SIDEWALK, ETC.), REGARDLESS OF THE SCOPE OF
REMOVALS SHOWN ON THE DEMOLITION PLAN.
4.CONTRACTOR SHALL PROTECT ALL EXISTING ITEMS TO REMAIN DURING ALL PHASES OF CONSTRUCTION.
5.UTILITIES TO BE ABANDONED SHALL BE REMOVED FROM PROPOSED BUILDING FOOTPRINT AND TO A DISTANCE
OF 10' BEYOND.
6.CONTRACTOR SHALL COORDINATE ALL UTILITY REMOVALS AND RELOCATION WITH THE AFFECTED UTILITY
COMPANIES PRIOR TO COMMENCING WORK.
7.UNLESS SPECIFICALLY NOTED FOR REMOVAL, CONTRACTOR SHALL PROTECT ALL TREES AND SHRUBS ON AND
ADJACENT TO THE SITE. PROTECTION MEASURES SHALL INCLUDE INSTALLATION OF 4' HIGH ORANGE PLASTIC
TREE PROTECTION FENCE AROUND THE DRIP LINE OF THE TREES/SHRUBS. CONTRACTOR SHALL PREVENT ALL
CONSTRUCTION TRAFFIC, STORAGE OF MATERIALS, ETC., WITHIN THE FENCED AREA.
8.CONTRACTOR SHALL REVIEW ALL TREE REMOVALS WITH OWNER AND ENGINEER PRIOR TO COMMENCING
REMOVALS.
9.ALL REMOVALS SHALL BE UNDERCUT TO SUITABLE MATERIAL AND BROUGHT TO GRADE WITH SUITABLE
MATERIAL AS DIRECTED BY THE OWNERS TESTING REPRESENTATIVE.
EROSION & SEDIMENT CONTROL NOTES & DETAILS
GENERAL EROSION & SEDIMENT CONTROL NOTES
1.CONTRACTOR SHALL BE RESPONSIBLE FOR SUBMITTING THE APPLICATION FOR THE MPCA GENERAL
STORMWATER PERMIT FOR CONSTRUCTION ACTIVITY (GENERAL PERMIT).
2.THE CONTRACTOR SHALL BE RESPONSIBLE FOR COMPLETING ROUTINE INSPECTIONS, AND DOCUMENTING THE
INSPECTIONS AND RESULTING MAINTENANCE ACTIVITIES IN ACCORDANCE WITH THE GENERAL PERMIT.
3.THE STORMWATER POLLUTION PREVENTION PLAN (SWPPP) CONSISTS OF THE EROSION AND SEDIMENT
CONTROL PLANS (SHEETS C2.01 - C2.04), INCLUDING PLANS, DETAILS, NOTES AND NARRATIVE, ALONG WITH
THE GENERAL STORMWATER PERMIT FOR CONSTRUCTION ACTIVITY AND ALL RELATED DOCUMENTS. THE
CONTRACTOR AND ALL SUBCONTRACTORS INVOLVED WITH GROUND DISTURBING ACTIVITIES SHALL OBTAIN A
COPY OF THE FULL SWPPP AND FOLLOW THE REQUIREMENTS THEREIN AT ALL TIMES.
4.CONTRACTOR SHALL PHASE CONSTRUCTION TO MINIMIZE DISTURBED AREA AND DURATION OF EXPOSED
SOILS.
5.CONTRACTOR SHALL INSTALL BMPS SHOWN ON THE EROSION CONTROL PLANS AS SOON AS PRACTICABLE.
ALL DOWNSTREAM BMPS SHALL BE INSTALLED PRIOR TO COMMENCING GROUND DISTURBING ACTIVITIES IN
AN AREA.
6.BMPS SHALL REMAIN IN PLACE UNTIL ALL TRIBUTARY AREAS HAVE ACHIEVED FINAL STABILIZATION IN ACCOR
7.THE EROSION AND SEDIMENT CONTROL PLANS REFLECT SITE CONDITIONS PRIOR TO CONSTRUCTION (PHASE I)
AND AFTER CONSTRUCTION IS COMPLETE (PHASE II). THE CONTRACTOR SHALL SUPPLEMENT THE BMPS
SHOWN ON THESE PLANS AS NECESSARY THROUGHOUT CONSTRUCTION TO MEET THE INTENT AND
REQUIREMENTS OF THE SWPPP AND APPLICABLE PERMITS, AT NO ADDITIONAL COST TO OWNER.
8.CONTRACTOR SHALL UPDATE THE SWPPP TO REFLECT PROGRESS, INCLUDING INSTALLATION/REMOVAL OF
BMPS, DISTURBANCE/STABILIZATION OF SOILS, ETC. CONTRACTOR SHALL KEEP A COPY OF THE AMENDED
SWPPP ON SITE.
9.BEST MANAGEMENT PRACTICES (BMPS) CONTRACTOR SHALL MAINTAIN ALL BMPS IN ACCORDANCE WITH
GENERAL PERMIT REQUIREMENTS, INCLUDING TIMING OF MAINTENANCE.
10.CONTRACTOR SHALL STABILIZE ALL DISTURBED SOILS THAT WILL WHERE CONSTRUCTION ACTIVITY WILL NOT
OCCUR FOR A PERIOD OF 7 CALENDAR DAYS. STABILIZATION MUST BE INITIATED IMMEDIATELY UPON
COMPLETION OF GROUND DISTURBING ACTIVITIES. STABILIZATION REQUIREMENTS ARE AS FOLLOWS:
a.TEMPORARY STABILIZATION (ONE YEAR COVER CROP):
i.a.MAY 1 - AUGUST 1: MNDOT SEED MIX OATS (O), AT A RATE OF 100 LBS/ACRE.
ii.b.AUGUST 1 - OCTOBER 1: MNDOT SEED MIX WINTER WHEAT (WW) AT A RATE OF 100 LBS/ACRE.
ij.PERMANENT STABILIZATION SHALL COMPLY WITH THE LANDSCAPE PLANS.
ik.SEEDED AREAS SHALL RECEIVE MNDOT TYPE 1 MULCH AT A RATE OF 2 TONS PER ACRE.
11.ALL TEMPORARY STOCKPILES SHALL BE ENCIRCLED WITH PERIMETER CONTROL BMP(S) AND STABILIZED PER
THE TIMELINE DESCRIBED ABOVE. STOCKPILES SHALL NOT BE PLACED WITHIN 50' OF SURFACE WATERS, AND
SHALL BE PLACED AWAY FROM CONVEYANCES SUCH AS CURB AND GUTTER.
12.AREAS WITH SLOPES OF 3:1 OR STEEPER SHALL BE STABILIZED WITH EROSION CONTROL BLANKETS OR SOD.
13.CONTRACTOR SHALL DENOTE WASHOUT LOCATION ON THE SWPPP AND WITH A SIGN ON SITE. ALL LIQUID
AND SOLID WASTES FROM WASHOUT ACTIVITIES SHALL BE CONTAINED AND PREVENTED FROM CONTACTING
THE GROUND. ALL WASTE SHALL BE DISPOSED OF IN ACCORDANCE WITH APPLICABLE REGULATIONS.
14.THE PROPOSED INFILTRATION BASIN(S) SHALL BE STAKED OFF AND PROTECTED BY SILT FENCE AT ALL TIMES
FROM COMPACTION, SEDIMENTATION, AND OTHER ACTIVITIES IMPACTING THE INFILTRATION CAPABILITIES OF
THE SOIL. REFER TO INFILTRATION NOTES SECTION ON SHEET C101 FOR COMPLETE REQUIREMENTS.
15.CONTRACTOR SHALL PROVIDE DUST CONTROL THROUGHOUT CONSTRUCTION ACTIVITIES WITH APPROVED
MATERIALS/METHODS.
FOLLOWING COMPLETION OF ALL CONSTRUCTION ACTIVITY, AND WHEN FINAL STABILIZATION IS ACHIEVED IN
ACCORDANCE WITH THE GENERAL PERMIT, THE CONTRACTOR SHALL CONTACT THE OWNER AND ENGINEER PRIOR
TO REMOVING BMPS. UPON CONCURRENCE FROM THE OWNER AND ENGINEER, THE CONTRACTOR SHALL SUBMIT
THE NOTICE OF TERMINATION FOLLOWING COMPLETION OF CONSTRUCTION ACTIVITY AND FINAL STABILIZATION IN
ACCORDANCE WITH THE GENERAL PERMIT.
SITE PLAN
SITE PLAN NOTES
1.DIMENSIONS ARE TO THE FACE OF CURB UNLESS NOTED OTHERWISE.
2.CONTRACTOR SHALL CONSTRUCT GUTTER OUT IN LOCATIONS WHERE DRAINAGE PATTERNS DIRECT RUNOFF
AWAY FROM CURBS. ALL OTHER AREAS TO BE GUTTER IN DESIGN.
3.ALL SIGNS, PAVEMENT MARKINGS, ETC, SHALL CONFIRM TO THE MINNESOTA MANUAL ON UNIFORM TRAFFIC
CONTROL DEVICES (MN MUTCD) AND APPLICABLE CITY REQUIREMENTS.
4.PRIOR TO PLACEMENT OF PAVEMENT, CONTRACTOR SHALL VERIFY GRADES ALONG ADA ROUTES AND
LOADING AREAS ARE IN ACCORDANCE WITH THE CURRENT MN ACCESSIBILITY CODE. MAXIMUM SLOPE IN THE
DIRECTION OF TRAVEL ALONG AN ADA ROUTE SHALL BE NO STEEPER THAN 1:20, WITH A CROSS SLOPE NO
STEEPER THAN 1:48. LOADING ZONES, INCLUDING PARKING STALLS AND STRIPED AREAS ADJACENT TO
ACCESSIBLE PARKING STALLS, SHALL BE NO STEEPER THAN 1:48. CONTACT THE ENGINEER IF ADA CODE IS NOT
MET IN ANY REQUIRED AREA. SLOPES IN EXCESS OF CODE MAXIMUM SHALL BE REMOVED AND REPLACED
WITH ACCEPTABLE SLOPES AT NO ADDITIONAL COST TO OWNER.
5.PAVEMENT SECTIONS SHALL COMPLY WITH THE RECOMMENDATIONS OF THE GEOTECHNICAL ENGINEER'S
SOILS REPORT.
GRADING PLAN
GRADING AND DRAINAGE NOTES
1.PROPOSED CONTOURS AND SPOT ELEVATIONS ARE TO FINISHED SURFACE ELEVATION. SPOT ELEVATIONS
ALONG PROPOSED CURB REPRESENT GUTTER ELEVATIONS UNLESS NOTED OTHERWISE.
2.THE SITE HAS NOT BEEN DESIGNED TO BALANCE. CONTRACTOR SHALL BE RESPONSIBLE TO DETERMINE
EARTHWORK QUANTITIES FOR BIDDING PURPOSES, INCLUDING SOIL CORRECTIONS. CONTRACTOR SHALL
DISPOSE OF EXCESS MATERIALS AND/OR IMPORT SUITABLE MATERIALS AS REQUIRED TO GRADE SITE PER
PLANS, SPECIFICATIONS AND SOIL REPORT(S).
3.CONTRACTOR SHALL OBTAIN PERMITS FOR AND COMPLETE DEWATERING AS NECESSARY.
4.CONTRACTOR SHALL ENSURE ALL FINISHED SURFACES PROVIDE POSITIVE DRAINAGE. THIS INCLUDES
EVALUATION OF GRADES PRIOR TO PLACEMENT OF FINAL SURFACES (PAVEMENT/TOPSOIL/ETC.) TO CONFIRM
FINISHED GRADES WILL DRAIN BY GRAVITY. CONTACT THE ENGINEER TO REVIEW AREAS OF POTENTIAL POOR
DRAINAGE.
5.CONTRACTOR SHALL PROVIDE A LOADED TRUCK FOR TEST ROLLS AND COMPLETE SUBSEQUENT SOIL
CORRECTIONS, BOTH AT THE DIRECTION OF THE OWNER'S TESTING REPRESENTATIVE.
6.IF ALLOWED BY OWNER, CONTRACTOR MAY PROPOSE TRENCH BORROW TO ACQUIRE STRUCTURALLY
SUITABLE MATERIAL. TRENCH BORROW OPERATIONS MUST MAINTAIN A MINIMUM SEPARATION OF 10' FROM
THE TOP OF THE TRENCH TO THE PROPOSED BUILDING AND EXTEND AT A SLOPE OF 1:1 OR FLATTER FROM
THERE. ALL TRENCH BORROW ACTIVITIES SHALL BE DONE AT THE DIRECTION OF THE OWNER'S TESTING
REPRESENTATIVE.
7.FINAL GRADE TOLERANCES: FINAL GRADES SHALL BE WITHIN 0.05' OF PROPOSED ELEVATION. ANY AMOUNT OF
VARIATION FROM PROPOSED GRADES THAT NEGATIVELY IMPACTS SURFACE DRAINAGE IS NOT BE ACCEPTABLE
AND WILL BE CORRECTED BY THE CONTRACTOR AT NO COST TO OWNER.
8.RETAINING WALLS ARE TO BE DESIGN BUILD BY THE CONTRACTOR, AND CONSTRUCTED OF A MATERIAL AND
DESIGN SELECTED BY THE OWNER. CONTRACTOR SHALL PROVIDE CERTIFIED ENGINEERED DRAWINGS OF ALL
PROPOSED RETAINING WALLS, ALONG WITH A LETTER CERTIFYING THAT ALL WALLS WERE CONSTRUCTED IN
ACCORDANCE WITH THESE PLANS.
9.EXISTING TREES TO REMAIN SHALL BE PROTECTED AT ALL TIMES (SEE DEMOLITION/LANDSCAPE/TREE
PRESERVATION PLANS).
INFILTRATION NOTES
1.CONTRACTOR SHALL PROTECT INFILTRATION AREA(S) FROM CONSTRUCTION TRAFFIC AND SEDIMENT-LADEN
RUNOFF AT ALL TIMES. PRIOR TO COMMENCING GROUND DISTURBING ACTIVITIES, INSTALL PERIMETER
CONTROL BMPS AROUND INFILTRATION AREA AS SHOWN ON THE EROSION CONTROL PLANS. PERIMETER
CONTROL BMPS ARE TO REMAIN IN PLACE UNTIL ALL TRIBUTARY AREAS HAVE ACHIEVED FINAL STABILIZATION
AND THE ENGINEER HAS APPROVED REMOVAL.
2.CONTRACTOR SHALL NOT EXCAVATE WITHIN 3' OF THE PROPOSED INFILTRATION BASIN BOTTOM UNTIL FINAL
STABILIZATION ON ALL TRIBUTARY AREAS HAS BEEN ACHIEVED AND ENGINEER HAS APPROVED EXCAVATION.
3.ALL INLETS TO THE BASIN SHALL BE CONSTRUCTED WITH BYPASSES TO PREVENT RUNOFF FROM REACHING
THE BASIN. BYPASSES SHALL REMAIN IN PLACE UNTIL BASIN CONSTRUCTION IS COMPLETED AND FINAL
STABILIZATION HAS BEEN ESTABLISHED WITHIN THE BASIN BOTTOM AND ALL TRIBUTARY AREAS, AS APPROVED
BY THE ENGINEER.
4.EXCAVATION OF THE INFILTRATION AREA SHALL BE COMPLETED FROM OUTSIDE THE FOOTPRINT OF THE BASIN.
IF WORK IS NECESSARY WITHIN THE BASIN FOOTPRINT, ONLY LOW GROUND PRESSURE TRACKED EQUIPMENT
IS ALLOWED TO COMPLETE THE WORK. RUBBER TIRE OR OTHER HIGH-PRESSURE EQUIPMENT IS NOT
PERMITTED WITHIN THE BASIN FOOTPRINT.
5.FOLLOWING EXCAVATION, CONTRACTOR SHALL DECOMPACT INFILTRATION BASIN SOILS TO A DEPTH OF AT
LEAST 18 INCHES BELOW SUBGRADE. DECOMPACTION SHALL BE ACCOMPLISHED WITH A BACKHOE RIPPER
ATTACHMENT OR OTHER METHOD APPROVED BY THE ENGINEER.
6.INFILTRATION TESTING IS REQUIRED PRIOR TO PLACEMENT OF INFILTRATION MEDIA. TESTING SHALL BE
COMPLETED BE EITHER A DOUBLE RING INFILTROMETER TEST MEETING THE REQUIREMENTS OF ASTM D3385
(MINIMUM 2 TESTS PER BASIN, PLUS ONE ADDITIONAL TEST FOR EACH O.5 ACRE OF BASIN FLOOR AREA) OR BY
MASS INFILTRATION TEST. MASS INFILTRATION TEST SHALL BE COMPLETED BY FLOODING THE BASIN TO A
DEPTH SPECIFIED BY THE ENGINEER, WITH RATES MEASURED BY THE OWNERS TESTING REPRESENTATIVE. IF
ANY SINGLE TEST RESULT IS BELOW THE REQUIRED INFILTRATION RATE OF 0.9 INCHES PER HOUR, OR IF THE
MASS INFILTRATION TEST FAILS TO COMPLETELY DRAIN WITHIN 48 HOURS, CONTRACTOR SHALL AMEND THE
SOILS AND RETEST UNTIL THE AVERAGE RATE IS COMPLIANT AT NO COST TO OWNER. CONTRACTOR WILL BE
RESPONSIBLE FOR THE COST OF ALL RETESTING FOLLOWING THE INITIAL ROUND OF TESTS.
7.CONTRACTOR SHALL SUBMIT CERTIFICATION THAT INFILTRATION MEDIA IS COMPLIANT WITH THE SPECIFIED
MIX REQUIREMENTS A MINIMUM OF TWO WEEKS PRIOR TO DELIVERING MATERIAL TO SITE. INFILTRATION
MEDIA SHALL BE INSTALLED AS SOON AFTER COMPLIANT TEST RESULTS ARE REVIEWED AND ACCEPTED AS
PRACTICABLE. CONSTRUCTION EQUIPMENT IS NOT PERMITTED WITHIN THE BASIN FOOTPRINT DURING OR
AFTER PLACEMENT OF INFILTRATION MEDIA. PLACEMENT AND SPREADING OF INFILTRATION MEDIA SHALL BE
ACCOMPLISHED WITH AN EXCAVATOR FROM OUTSIDE THE INFILTRATION BASIN FOOTPRINT.
8.BASIN SHALL BE PLANTED IN ACCORDANCE WITH THE LANDSCAPE PLANS. CONTRACTOR SHALL
RESEED/REPLANT AREAS WHERE VEGETATION IS NOT ESTABLISHED AS NECESSARY UNTIL COVERAGE IS
ACHIEVED.
UTILITY PLAN
UTILITY NOTES
1.CONTRACTOR SHALL COMPLY WITH THE CITY SPECIFICATIONS AND CITY ENGINEER ASSOCIATION OF
MINNESOTA (CEAM) FOR ALL UTILITIES LOCATED WITHIN PUBLIC RIGHT-OF-WAY AND PUBLIC EASEMENTS.
a.IN ADDITION TO COMPLYING WITH THE ABOVE SPECIFICATIONS, CONTRACTOR SHALL COMPLY WITH THE
CURRENT VERSION OF THE MINNESOTA PLUMBING CODE FOR ALL UTILITIES NOT WITHIN PUBLIC
RIGHTS-OF-WAY/EASEMENTS.
b.MATERIALS SHALL MEET ALL STANDARDS REFERENCED IN THESE SPECIFICATIONS
2.UNLESS NOTED OTHERWISE, ALL WATERMAIN TO BE PVC C-900 OR DUCTILE IRON CLASS 52
3.SANITARY SEWER MAINS, SERVICES AND FITTINGS
a.ALL SANITARY SEWER TO BE INSTALLED WITH A MINIMUM COVER OF 7.5'. WHERE THIS COVER CANNOT
BE ACHIEVED, CONTRACTOR SHALL INSTALL INSULATION IN ACCORDANCE WITH CITY SPECIFICATIONS
AND STANDARD DETAILS.
b.SANITARY SEWER MATERIALS SHALL BE IN ACCORDANCE WITH THE FOLLOWING:
i.ALL MATERIALS OUTSIDE OF PUBLIC ROW/EASEMENTS SHALL BE IN ACCORDANCE WITH THE
MATERIALS TABLE LISTED IN THE CURRENT VERSION OF THE MN PLUMBING CODE AS
FOLLOWS:
1.PVC SCHEDULE 40 UP TO A DEPTH OF 22' OF COVER OR AS SPECIFIED IN THE
GOVERNING SPECIFICATIONS.
2.WHERE DEPTH EXCEEDS THIS MAXIMUM, CONTRACTOR SHALL COMPLETE THE
MNDLI ALTERNATE DESIGN REVIEW PROCESS TO RECEIVE APPROVAL FOR A
MATERIAL THAT COMPLIES WITH CITY SPECIFICATIONS FOR MAXIMUM DEPTH OF COVER.
ii. PIPE WITHIN PUBLIC ROW/EASEMENTS:
1.IN ACCORDANCE WITH CITY SPECIFICATIONS. WHERE CITY SPECIFICATIONS DO
NOT LIST MATERIAL BASED ON DEPTH, THE FOLLOWING SHALL APPLY:
a.DEPTH UP TO 16' SHALL BE SDR 35
b.DEPTH FROM 16' TO 22' SHALL BE SDR 26
c.DEPTH FROM 22' TO 32' SHALL BE PVC C900
d.DEPTH OVER 32' SHALL BE DIP
c.CONTRACTOR SHALL PROVIDE TRACER WIRE FOR SANITARY SEWER MEETING THE STANDARDS OF THE
CITY SPECIFICATIONS.
4.WATER MAINS, SERVICES AND FITTINGS
a.ALL WATERMAINS AND SERVICES TO BE INSTALLED WITH A MINIMUM COVER OF 7.5'. WHERE THIS
COVER CANNOT BE ACHIEVED, CONTRACTOR SHALL INSTALL INSULATION IN ACCORDANCE WITH CITY
SPECIFICATIONS AND STANDARD DETAILS.
b.ALL MATERIALS SHALL BE IN ACCORDANCE WITH THE FOLLOWING:
i.ALL MATERIALS OUTSIDE PUBLIC ROW/EASEMENTS SHALL BE IN ACCORDANCE WITH THE
MATERIALS TABLE LISTED IN THE CURRENT VERSION OF THE MN PLUMBING CODE.
ii.ALL MATERIALS WITHIN THE PUBLIC ROW/EASEMENTS SHALL BE IN ACCORDANCE WITH CITY
SPECIFICATIONS.
c.CONTRACTOR SHALL PROVIDE TRACER WIRE FOR WATER MEETING THE STANDARDS OF THE CITY
SPECIFICATIONS.
5.STORM SEWER MAINS, SERVICES AND FITTINGS
a.ALL STORM SEWER ROOF DRAINS TO BE INSTALLED WITH A MINIMUM COVER OF 7.5'. WHERE THIS
COVER CANNOT BE ACHIEVED, CONTRACTOR SHALL INSTALL INSULATION IN ACCORDANCE WITH CITY
SPECIFICATIONS AND STANDARD DETAILS, UP TO THE FIRST DOWNSTREAM STRUCTURE.
b.STORM SEWER MATERIALS SHALL BE IN ACCORDANCE WITH THE FOLLOWING:
i.ALL MATERIALS OUTSIDE OF PUBLIC ROW/EASEMENTS SHALL BE IN ACCORDANCE WITH THE
MATERIALS TABLE LISTED IN THE CURRENT VERSION OF THE MN PLUMBING CODE.
1.ALL ROOF DRAINS/BUILDING STORM CONNECTIONS SHALL BE PVC SCH40.
2.RCP AND/OR HDPE IN ACCORDANCE WITH CITY/CEAM SPECIFICATIONS ARE
ACCEPTABLE PROVIDED THE CONTRACTOR OBTAIN APPROVAL FROM MN
DEPARTMENT OF LABOR AND INDUSTRY FOR ALTERNATE MATERIALS. IN THIS CASE,
STORM SEWER CROSSING WATERMAIN (WITHIN 10' HORIZONTALLY OF WATERMAIN)
AND/OR WITHIN 10' OF A BUILDING SHALL BE IN ACCORDANCE WITH THE MATERIALS LISTED IN
THE CURRENT VERSION OF THE MN PLUMBING CODE.
3.ALL MANHOLE CONNECTIONS SHALL BE MADE WITH FLEXIBLE GASKETED
WATERTIGHT CONNECTIONS IN ACCORDANCE WITH THE CURRENT VERSION OF THE
MN PLUMBING CODE.
ii. PIPE WITHIN PUBLIC ROW/EASEMENTS:
1.RCP IN ACCORDANCE WITH CITY STANDARDS.
c.CONTRACTOR SHALL PROVIDE TRACER WIRE FOR STORM SEWER MEETING THE STANDARDS OF THE
CITY SPECIFICATIONS.
6.PIPE JOINT DEFLECTION AND PIPE CURVATURE SHALL NOT EXCEED MANUFACTURER'S SPECIFICATIONS.
7.CONTRACTOR SHALL PROVIDE A MINIMUM HORIZONTAL SEPARATION OF 10' FROM OUTSIDE OF ALL
SANITARY/STORM SEWER PIPES/STRUCTURES/FITTINGS AND WATER MAINS/SERVICES/FITTINGS.
8.WHERE WATERMAIN AND SEWERS CROSS, A MINIMUM VERTICAL SEPARATION OF 18” (OUTSIDE TO OUTSIDE)
SHALL BE PROVIDED, AND NO WATERMAIN JOINTS SHALL BE LOCATED WITHIN 10' OF THE CROSSING.
INSTALL INSULATION IN ACCORDANCE WITH APPLICABLE SPECIFICATIONS AND DETAILS.
9.FILL BELOW PROPOSED UTILITY LOCATIONS SHALL BE PLACED IN ACCORDANCE WITH THE
RECOMMENDATION OF THE GEOTECHNICAL REPORT AND TESTED/OBSERVED BY THE OWNER'S TESTING
CONSULTANT.
10.CONTRACTOR SHALL INSTALL BUILDING FOUNDATION DRAINS IN ACCORDANCE WITH THE
RECOMMENDATIONS OF THE GEOTECHNICAL REPORT AND THE STRUCTURAL ENGINEER. BUILDING DRAINS
ARE NOT SHOWN ON THE CIVIL PLANS. CONTRACTOR SHALL CONTACT THE CIVIL ENGINEER TO DISCUSS
BUILDING DRAIN CONNECTION LOCATIONS TO THE SITE STORM SEWER SYSTEM.
11.CONTRACTOR SHALL INSTALL SITE SUBGRADE DRAINS IN ACCORDANCE WITH THE RECOMMENDATION OF
THE GEOTECHNICAL REPORT.
12.CONTRACTOR SHALL PERFORM TESTING AND, WHERE REQUIRED, SUBMIT REPORTS IN ACCORDANCE WITH
THE REQUIREMENTS OF THE AGENCIES HAVING JURISDICTION, INCLUDING BUT NOT LIMITED TO THE CITY,
MDH, AND MNDLI. COPIES OF ALL TEST RESULTS SHALL BE PROVIDED TO THE OWNER, ENGINEER AND
UTILITY PROVIDER.
13.REFER TO MEP PLANS FOR ALL BUILDING UTILITY ENTRANCE LOCATIONS AND ELEVATIONS. CONTACT THE
CIVIL ENGINEER AND MEP IMMEDIATE IF A DISCREPANCY BETWEEN CIVIL AND BUILDING PLANS IS
DISCOVERED.
14.WHERE A CONFLICT BETWEEN WATER AND SEWER EXISTS, CONTRACTOR SHALL LOWER WATERMAIN IN
ACCORDANCE WITH PLUMBING CODE REQUIREMENTS AND CITY SPECIFICATIONS AND DETAILS. PLANS DO
NOT DEPICT VERTICAL CONFLICTS - CONTRACTOR IS RESPONSIBLE FOR DETERMINING LOCATIONS WHERE
CONFLICTS EXIST AND INCLUDING THE REQUIRED ADJUSTMENTS IN THE BASE BID.
15.WATERMAINS AND SERVICES SHALL BE INSTALLED WITHOUT INTERMITTENT HIGH POINTS. HIGH POINTS
SHALL BE LOCATED AT HYDRANTS OR AS NOTED ON PLANS.
16.ALL REQUIRED OBSERVATIONS SHALL BE COMPLETED PRIOR TO BACKFILLING UTILITIES. CONTRACTOR
SHALL PROVIDE A MINIMUM OF 48 HOURS NOTICE FOR REQUIRED INSPECTIONS.
17.CONTRACTOR SHALL PROVIDE COPIES OF RECORD PLANS TO OWNER AND ENGINEER FOLLOWING
COMPLETION OF UTILITY INSTALLATION. ADDITIONALLY, CONTRACTOR SHALL PROVIDE RECORD
PLANS/AS-BUILT SURVEY(S) TO AGENCIES IN ACCORDANCE WITH EACH AGENCY'S REQUIREMENTS. WHERE
REQUIRED, UNDERGROUND UTILITIES SHALL BE SURVEYED BY A LICENSED SURVEYOR PRIOR TO
PLACEMENT OF BACKFILL.
Page 73 of 124
G GGGGGGGGGGGGGGGGGGGGGGGGGGoooo
G G
G
G
G
G
G
G
G
G
G
G
G GGGGGGGG G G
oX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXooooooooooo
o
o
o oOHUOHUOHUOHUOHUOHUOHUOHUOHUOHUOHUOHUOHUOHUOHUOHUOHUOHUOHUOHUOHUOHUOHUOHUOHUOHUOHUOHUOHUOHUOHUOHUOHUOHUOHUOHUOHUOHUE
E
E
E
E
E
EEEEEEEEEEEEEEEEEEEEEEOHU OHU
E
E
E
E
E
E
E
E
E
E
E
E ET
T
V
T
>>>>>>>IIIIIIIIIIIIIIIIIIII
EX 12" FES
INV.=880.99
EX 12" FES
INV.=879.71
EX 24" FES
INV.=877.10
EX SSMH
RIM=887.91
INV.=869.51
EX SSMH
RIM=881.21
INV.=870.56
EX SSMH
RIM=882.76
INV.=871.30
EX 12" FES
INV.=880.00
EX 12" FES
INV.=879.94
EX 12" FES
INV.=879.37
EX 12" FES
INV.=879.27
EX SSMH
RIM=891.16
INV.=868.09EX 12" SANEX 12" SANEX 12" SANEX 12" WMEX 12" WMBENCHMARK
TNH=892.69
EX 12" SAN
EXISTING
APARTMEN
T
BUILDING
GARAGE
GARAGEEXISTING
TENNIS
COURT
EXISTING
POOL
EXISTING
CLUBHOUS
E
EXISTING
POND880882 88488688889089289
0
89
2
888
886
886888
890
892
884
882
882
884
886886884882882880878882
880
882
884
886
888
890
892
8968
9
8
9
0
0
90
2
9049
0
6
9
0
8
9
1
0
892894894
8928
8
6884
LEXINGTON AVENUEINTERSTATE 35EPROJECT NO.
24282
CAD FILE
02/25/26
DATE
REVISIONS
DRAWN BY Date:Reg.No.ERIC P. FAGERBERG5377202/25/262026-04-02 CITY COMMENTS2999 WEST C.R. 42, SUITE 100BURNSVILLE, MN 55306PHONE: 952-890-6044info@mnhill.comwww.mnhill.comI hereby certify that this plan,specification or report was preparedby me or under my direct supervisionand that I am a duly LicensedProfessional Engineer under the lawsof the State of Minnesota.PRELIMINARYMENDOTA HEIGHTS, MINNESOTALEXINGTON HEIGHTS ADDITIONCONDOR CORPORATIONFOR2320 LEXINGTON AVENUE, MENDOTA HEIGHTS, MN 55120F:\_Civil 3D Projects\24282\PRE-PLAT PLANS\24282EXC.dwg - 4/02/2026 11:26AM24282EXC
C102EXISTING CONDITIONSJSO
LEGEND
Know what's below.
before you dig.Call
R
SCALE IN FEET
0 40 80
TP-1
EXISTING TELEPHONE BOX
EXISTING ELECTRIC TRANSFORMER BOX
EXISTING TREELINE/TREES>I
EXISTING STORM SEWER
EXISTING SANITARY SEWER
EXISTING WATERMAIN
>I
S
EXISTING POWER POLE
EXISTING CURB & GUTTER
EXISTING FENCEXXXX
EXISTING ASPHALT
EXISTING CONCRETE
EXISTING GRAVEL
EXISTING RETAINING WALL
SB-1
G G G EXISTING UNDERGROUND GAS
E E E EXISTING UNDERGROUND ELECTRIC
EXISTING TELEVISION BOX
EXISTING CONTOUR923
EXISTING SOIL BORING LOCATION
EXISTING CURB STOP
EXISTING ELECTRIC METER
EXISTING ELECTRIC OUTLET POST
EXISTING FLAGPOLE
EXISTING GAS METER
EXISTING HANDHOLE
EXISTING LIGHT POLE
EXISTING VAULT
E
V
EXISTING OVERHEAD POWEROHPOHPOHP
EXISTING OVERHEAD UTILITYOHUOHUOHU
EXISTING DRAINTILE
>>>>>>>>>>>>EXISTING ADA PARKING
EXISTING TEST PIT LOCATION
T
TV
AC EXISTING AIR CONDITIONER
EXISTING AUTO SPRINKLER
Page 74 of 124
G GGGGGGGGGGGGGGGGGGGGGGGGGGoooo
G G
G
G
G
G
G
G
G
G
G
G
G GGGGGGGG G G
oX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXooooooooooo
o
o
o oOHUOHUOHUOHUOHUOHUOHUOHUOHUOHUOHUOHUOHUOHUOHUOHUOHUOHUOHUOHUOHUOHUOHUOHUOHUOHUOHUOHUOHUOHUOHUOHUOHUOHUOHUOHUOHUOHUE
E
E
E
E
E
EEEEEEEEEEEEEEEEEEEEEEOHU OHU
E
E
E
E
E
E
E
E
E
E
E
E ET
T
V
T
>>>>>>>IIIIIIIIIIIIIIIIIIII
EX 12" FES
INV.=880.99
EX 12" FES
INV.=879.71
EX 24" FES
INV.=877.10
EX SSMH
RIM=887.91
INV.=869.51
EX SSMH
RIM=881.21
INV.=870.56
EX SSMH
RIM=882.76
INV.=871.30
EX 12" FES
INV.=880.00
EX 12" FES
INV.=879.94
EX 12" FES
INV.=879.37
EX 12" FES
INV.=879.27
EX SSMH
RIM=891.16
INV.=868.09
BENCHMARK
TNH=892.69880882884886888890892 89
0
89
2
888
886
886888
890
892
884
882
882
884
886886884882882880878882
880
882
884
886
888
890
892
8968
9
8
9
0
0
90
2
9049
0
6
9
0
8
9
1
0
892894894
8928
8
6884 REMOVE EX ASP
REMOVE EX CURB
AND GUTTER
(TYP.)
SAW CUT
EX ASP
REMOVE EX CURB
AND GUTTER
(TYP.)
REMOVE EX LAND SCAPE
REMOVE EX CONCRETE
SIDEWALK
REMOVE EX
LIGHT POLE
(TYP.)
REMOVE EX
LIGHT POLE
(TYP.)
SAW CUT
EX ASP
LEXINGTON AVENUEINTERSTATE 35ESAW CUT
EX ASP
REMOVE EX
LIGHT POLE
(TYP.)
EXISTING
APARTMEN
T
BUILDING
EXISTING
TENNIS
COURT
EXISTING
POOL
EXISTING
CLUBHOUS
E
EXISTING
POND
PROJECT NO.
24282
CAD FILE
02/25/26
DATE
REVISIONS
DRAWN BY Date:Reg.No.ERIC P. FAGERBERG5377202/25/262026-04-02 CITY COMMENTS2999 WEST C.R. 42, SUITE 100BURNSVILLE, MN 55306PHONE: 952-890-6044info@mnhill.comwww.mnhill.comI hereby certify that this plan,specification or report was preparedby me or under my direct supervisionand that I am a duly LicensedProfessional Engineer under the lawsof the State of Minnesota.PRELIMINARYMENDOTA HEIGHTS, MINNESOTALEXINGTON HEIGHTS ADDITIONCONDOR CORPORATIONFOR2320 LEXINGTON AVENUE, MENDOTA HEIGHTS, MN 55120F:\_Civil 3D Projects\24282\PRE-PLAT PLANS\24282DEMO.dwg - 4/02/2026 11:26AM24282DEMO
C103DEMOLITION PLANEPF
LEGEND
Know what's below.
before you dig.Call
R
SCALE IN FEET
0 40 80
TP-1
EXISTING TELEPHONE BOX
EXISTING ELECTRIC TRANSFORMER BOX
EXISTING TREELINE/TREES>I
EXISTING STORM SEWER
EXISTING SANITARY SEWER
EXISTING WATERMAIN
>I
S
EXISTING POWER POLE
EXISTING CURB & GUTTER
EXISTING FENCEXXXX
EXISTING ASPHALT
EXISTING CONCRETE
EXISTING GRAVEL
EXISTING RETAINING WALL
SB-1
G G G EXISTING UNDERGROUND GAS
E E E EXISTING UNDERGROUND ELECTRIC
EXISTING TELEVISION BOX
EXISTING CONTOUR923
EXISTING SOIL BORING LOCATION
EXISTING CURB STOP
EXISTING ELECTRIC METER
EXISTING ELECTRIC OUTLET POST
EXISTING FLAGPOLE
EXISTING GAS METER
EXISTING HANDHOLE
EXISTING LIGHT POLE
EXISTING VAULT
E
V
EXISTING OVERHEAD POWEROHPOHPOHP
EXISTING OVERHEAD UTILITYOHUOHUOHU
EXISTING DRAINTILE
>>>>>>>>>>>>EXISTING ADA PARKING
EXISTING TEST PIT LOCATION
T
TV
AC EXISTING AIR CONDITIONER
EXISTING AUTO SPRINKLER
PROPOSED LIGHT POLE REMOVAL
PROPOSED CURB AND GUTTER REMOVAL
PROPOSED PAVEMENT REMOVAL
PROPOSED SAW CUT
Page 75 of 124
oooo
o
7
28 28
16
4
13
12
19
1.Subject property's addresses are 2300 and 2320 Lexington Avenue,
Mendota Heights, its property identification numbers are
27-44925-01-010 and 27-44925-00-010.
2.The bearing system is based on the North line of Lot 1, Block 1,
LEXINGTON HEIGHTS ADDITION which is assumed to bear North 89
degrees 55 minutes 14 seconds East.
3.Field work was completed 6/16/2025.
4.The building(s) and exterior dimensions of the outside wall at ground
level are shown on the survey. It may not be the foundation wall.
5.No specific title search for existence or non-existence of recorded or
un-recorded easements has been conducted by the surveyor as a part of
this survey. Only easements per the recorded plat are shown.
6.The gross area of the subject property is 6.713 Acres or 292,409 square
feet.
NOTES
Lot 1, Block 1, and Outlot A, LEXINGTON HEIGHTS ADDITION, Dakota County,
Minnesota.
PROPERTY DESCRIPTION
I hereby certify that this survey, plan or report was prepared by me or under
my direct supervision and that I am a duly Licensed Land Surveyor under the
laws of the State of Minnesota. That this survey does not purport to show all
improvements, easements or encroachments, to the property except as
shown thereon.
Signed this 20th day of June, 2025
Marcus F. Hampton MN L.S. No. 47481
SURVEYOR'S CERTIFICATE
The vertical datum is NAVD88.
Benchmark
Top nut hydrant east of building at 2300 Lexington Avenue.
Elevation = 892.69
BENCHMARK 2999 WEST C.R. 42, SUITE 100, BURNSVILLE, MN 55306PHONE: 952.890.6044 www.jrhinc.comPLANNERS / ENGINEERS / SURVEYORS2300 AND 2320 LE;INGTON AVENUEMENDOTA HEIGHTS, MINNESOTACERTIFICATE OF SURVEYFORCONDOR CORPORATIONDRAWN BY
DATE
REVISIONS
PLM
6/20/2025
CAD FILE
24282s.dwg
PRO-ECT NO.
24282-00
FILE NO.
1-25-036
SHEET 1 OF 1James R. Hill, Inc.LEGEND
FOUND IRON PIPE
AIR CONDITIONER UNIT
AUTO SPRINKLER
FLAGPOLE
BOLLARD
LIGHT POLE
SIGN
HANDICAP PARKING STALL
STONE RETAINING WALL
HANDHOLE
TELEPHONE BOX
OVERHEAD UTILITY
UNDERGROUND FIBER OPTIC
TRANSFORMER
ELECTRIC METER
ELECTRIC OUTLET POST
POWER POLE
UNDERGROUND ELECTRIC
GAS METER
UNDERGROUND GAS
SANITARY MANHOLE
HYDRANT
MANHOLE
DECIDUOUS
CONIFEROUS
TREE LINE
CHAIN LINK FENCE
FLARED END SECTION
PARKING STALL COUNT#
LANDSCAPE MATERIAL
BITUMINOUS SURFACE
CONCRETE SURFACE
PAVER SURFACE
o WOOD FENCE
METAL FENCE
BLOCK RETAINING WALL
WOOD RETAINING WALL
RIP RAP
GARBAGE CAN
GRILL
PRELIMINARY
Page 76 of 124
G GGGGGGGGGGGGGGGGGGGGGGGGGGoooo
G G
G
G
G
G
G
G
G
G
G
G
G GGGGGGGG G G
oX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXooooooooooo
o
o
o oOHUOHUOHUOHUOHUOHUOHUOHUOHUOHUOHUOHUOHUOHUOHUOHUOHUOHUOHUOHUOHUOHUOHUOHUOHUOHUOHUOHUOHUOHUOHUOHUOHUOHUOHUOHUOHUOHUE
E
E
E
E
E
EEEEEEEEEEEEEEEEEEEEEEOHU OHU
E
E
E
E
E
E
E
E
E
E
E
E ET
T
V
T
>>>>>>>IIIIIIIIIIIIIIIIIIII
XXXXXXI I I I
I
I I
I
I
I
>>>>>>>>>>>>>>>>>>>>>>EXISTING
CLUBHOU
S
E
POOL
POND
12" RCP
12" RCP12" CIP12" CIP12" RCP12" RCPLEXINGTON AVENUEINTERSTATE 35E892 890
888
89
0
892
892
890888
886
884
882
880
880878882884886888890892
886884882884
882
884
88
6 886888
890
892
8928948968989009029049069
0
8
910
912
892894896898900906 908
910
91
2
892894896898900902904882
892890890 892
888884 890888886888 89489287889289
4892
880882884886890888880882882880EXISTING
APARTMEN
T
BUILDING
EXISTING
TENNIS
COURT
EXISTING
POOL
EXISTING
CLUBHOUS
E
EXISTING
POND ooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooo
oooooooooooooo
oooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooo
oooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooo▲
▲
▲
▲
▲
▲
BIO-ROLLS FOR TRENCH
DRAIN INLET PROTECTION
PROJECT NO.
24282
CAD FILE
02/25/26
DATE
REVISIONS
DRAWN BY Date:Reg.No.ERIC P. FAGERBERG5377202/25/262026-04-02 CITY COMMENTS2999 WEST C.R. 42, SUITE 100BURNSVILLE, MN 55306PHONE: 952-890-6044info@mnhill.comwww.mnhill.comI hereby certify that this plan,specification or report was preparedby me or under my direct supervisionand that I am a duly LicensedProfessional Engineer under the lawsof the State of Minnesota.PRELIMINARYMENDOTA HEIGHTS, MINNESOTALEXINGTON HEIGHTS ADDITIONCONDOR CORPORATIONFOR2320 LEXINGTON AVENUE, MENDOTA HEIGHTS, MN 55120F:\_Civil 3D Projects\24282\PRE-PLAT PLANS\24282ERC.dwg - 4/02/2026 11:26AM24282ERC
C300
EPF
Know what's below.
before you dig.Call
R
SCALE IN FEET
0 40 80
PROPOSED CONTOUR923
PROPOSED EMERGENCY OVERFLOW
PROPOSED GRADING LIMITS
LEGEND
PROPOSED CONCRETE
PROPOSED BITUMINOUS SURFACE
PROPOSED SEDIMENT BASIN
PROPOSED INFILTRATION BASIN
PROPOSED WATERMAINII
PROPOSED SANITARY SEWER
PROPOSED STORM SEWER
>>PROPOSED CURB & GUTTER
PROPOSED SANITARY SERVICE
PROPOSED WATER SERVICE>I
>I
OHP OHP
X X X X
G G G
E E E
UFO UFO UFO
T T T
EXISTING TELEPHONE PEDESTAL
EXISTING TRANSFORMER
EXISTING LIGHT POLE
EXISTING TREELINE/TREES
EXISTING STORM SEWER
EXISTING SANITARY SEWER
EXISTING WATERMAIN
EXISTING OVERHEAD POWER LINE
EXISTING CURB & GUTTER
EXISTING FENCE
EXISTING ASPHALT
EXISTING CONCRETE
EXISTING UNDERGROUND GAS
EXISTING UNDERGROUND ELECTRIC
EXISTING UNDERGROUND FIBER OPTIC
EXISTING UNDERGROUND TELEPHONE
EXISTING TV PEDESTAL
EXISTING CONTOUR923
EXISTING SOIL BORING LOCATION
S
TV
T
EXISTING MANHOLE (ELECTRIC)
EXISTING SIGN
EXISTING VAULT
E
V
PROPOSED SILT FENCEooooooooooooooooooooooooooooooooooooo
PROPOSED SILT FENCE POST CONSTRUCTION
PROPOSED WIMCO OR EQUAL
POST STORM SEWER CONSTRUCTION
PROPOSED YARD CB INLET PROTECTION POST
STORM SEWER CONSTRUCTION
PROPOSED TEMPORARY ROCK
CONSTRUCTION ENTRANCE
PROPOSED MNBWSR SEED MIX 33-261oooooooooooooooooooooooooooooooooooooEOF
SB-1
EROSION & SEDIMENT CONTROL PLANPROPOSED SILT DIKE▲▲▲▲▲▲▲▲▲
Page 77 of 124
PROJECT NO.
24282
CAD FILE
02/25/26
DATE
REVISIONS
DRAWN BY Date:Reg.No.ERIC P. FAGERBERG5377202/25/262026-04-02 CITY COMMENTS2999 WEST C.R. 42, SUITE 100BURNSVILLE, MN 55306PHONE: 952-890-6044info@mnhill.comwww.mnhill.comI hereby certify that this plan,specification or report was preparedby me or under my direct supervisionand that I am a duly LicensedProfessional Engineer under the lawsof the State of Minnesota.PRELIMINARYMENDOTA HEIGHTS, MINNESOTALEXINGTON HEIGHTS ADDITIONCONDOR CORPORATIONFOR2320 LEXINGTON AVENUE, MENDOTA HEIGHTS, MN 55120F:\_Civil 3D Projects\24282\PRE-PLAT PLANS\24282ERD.dwg - 4/02/2026 11:26AM24282ERD
C301
VUN
SITE
1-MILE RADIUS
USGS MAP
1" = 400'
USDA SOIL MAP
1" = 100'
ESTIMATED EROSION AND SEDIMENT CONTROL QUANTITIES
CONSTRUCTION ROCK ENTRANCE EA 1
STANDARD DUTY SILT FENCE LF 1365
HEAVY DUTY SILT FENCE LF 0
SILT DIKE LF 0
MNDOT SEED MIX WET DITCH (STORMWATER BASIN)AC 0.2
MNDOT SEED MIX SOUTHERN BOULEVARD (GENERAL MIX) - 1.5X AC 1.0
REAR YARD INLET PROTECTION EA 1
WIMCO OR APPROVED EQUAL INLET PROTECTION EA 2
Lexington Heights Apartments - Mendota Heights, MN
These plans shall be considered part of the project Storm Water Pollution Prevention Plan
(SWPPP.) A copy of the SWPPP shall remain on site throughout active construction.
PROJECT SUMMARY
Lexington Heights Apartments is a multi-family residential development project. The project
includes construction of building pads, streets, utilities and stormwater management basins.
TYPE OF PROJECT: Development of 1 multi-family apartment building.
TYPE OF WORK: Clearing and grubbing, demolition of existing houses, mass grading, utility and
street construction and installation of phone, communication, gas and electric utilities.
TOTAL SITE AREA:6.71 AC
TOTAL DISTURBED AREA:2.41 AC
EXISTING IMPERVIOUS AREA:2.36 AC
PROPOSED (DESIGN) IMPERVIOUS AREA:2.74 AC (0.38 AC NET INCREASE)
IMPAIRED WATERS: There is an impaired lake within a 1-mile radius of the site.
Augusta Lake has an EPA-approved impairment for: Nutrients
These impairment(s) are considered to be construction related parameters and require the
additional best management practices (BMPs) found in items 23.9 and 23.10 of the permit if the
project has a discharge point on the project within 1 mile (aerial radius measurement) of, and
flows to the impaired water.
23.9:
Permittees must immediately initiate stabilization of exposed soil areas, as described in item 8.4,
and complete the stabilization within seven (7) calendar days after the construction activity in
that portion of the site temporarily or permanently ceases.
23.10:
Permittees must provide a temporary sediment basin as described in Section 14 for common
drainage locations that serve an area with five (5) or more acres disturbed at one time.
Also a mandatory Stormwater Pollution Prevention Plan (SWPPP) review is required by the
MPCA if the project will disturb over 50 acres and has a discharge point on the project within 1
mile (aerial radius measurement) of, and flows to the impaired water. Owners must submit the
application for coverage and the SWPPP at least 30-days before the construction start date. The
SWPPP can be attached electronically when using the online application.
ENVIRONMENTAL REVIEW
No environmental reviews were performed for the site, nor were any required by the City of
Mendota Heights or for other agency approvals.
CONSTRUCTION PHASING
Mass grading will be one phase. Site grading and demolition may occur simultaneously. Mass
grading is anticipated to take 3-4 weeks, which will include the construction of the stormwater
basins. Utility installation will immediately follow grading. Upon completion of utilities, street
construction will take place. Final construction work prior to home construction includes
installation of phone, cable, gas and electric utilities, as well as retaining wall construction.
MPCA STORMWATER PERMIT - RESPONSIBILITY
Chase Development is the Owner for the development. The owner will apply for the Stormwater
Permit and shall remain responsible for implementation of the SWPPP until final stabilization and
filing of the N.O.T. or Subdivision Registration Form.
OWNER:
Jon Riley - Condor Corporation
PERMITTEE:
Joe McElwain - Chase Development - 612-384-8266
OPERATOR(S):
Name - Name - XXX-XXX-XXXX
ENGINEER:
Eric P. Fagerberg, PE, Proj. Mgr - James R. Hill, Inc. - 952-890-6044
LGU CONTACT:
Ryan Ruzek- Mendota Heights - 651-255-1152
MPCA COMPLIANCE:
Ellie Bergfalk - 651-757-2859
The Contractor shall follow the implementation sequence as described on these plans.
Amendments shall be made as site conditions change. Amendments shall be reviewed by the
engineer.
IMPLEMENTATION OF THE SWPPP
The GENERAL CONTRACTOR (GC) or their subcontractor is responsible for implementation of
the SWPPP. Contractor has or will provide trained personnel responsible for inspection of
erosion and sediment control BMPs. Either the Contractor or their subcontractor will provide
trained personnel responsible for installing and maintaining erosion and sediment control BMPs.
Long term operation and maintenance of the permanent stormwater management system will
the responsibility of City of Mendota Heights.
DOCUMENTATION OF TRAINED INDIVIDUALS
Prior to start of construction, GC and/or their subcontractors shall ensure they have proper
documentation for all individuals involved in implementing the SWPPP, as well as all involved
individuals as described in section 21 of the General Stormwater Permit.
SWPPP Design: Eric P Fagerberg, PE, training by University of Minnesota “Design of
Construction SWPPP, 6/1/2023-5/31/2026. Instructor: Online.
SWPPP Contact for Contractor: Name - XXX-XXX-XXXX
Alternate SWPPP Contact for Contractor: Name - XXX-XXX-XXXX
REQUIREMENTS FOR NOTICE OF TERMINATION (NOT)
Before the submitting the NOT, the permittee must meet the following requirements:
1.All construction activity associated with the project must be completed.
2.All pervious surfaces must be stabilized with permanent vegetative cover having a growth
density of 70% of the expected full growth density (unless a specific area of the site
specifies no vegetation.)
3.The stormwater treatment system (basins, pipes, structures, ditches, swales, etc.) is
cleaned, removing all accumulation of sediment and debris.
4.All synthetic erosion and sediment prevention BMPs have removed.
RECORD RETENTION
During construction, the Contractor must retain a copy of the SWPPP and any amendments
thereto on site at all times (or on the portion of the site for which the Contractor has control.)
The SWPPP may be kept in a designated repository, in the construction field office or in an
on-site vehicle during normal working hours. Copies of all maintenance records, inspection
reports shall also be retained on site with the SWPPP.
Upon completion of all construction and submittal of the NOT, the Owner shall retain the
SWPPP documents for no less than three years, including the final SWPPP, other stormwater
related permits, inspection and maintenance records, SWMP operational and maintenance
agreements, and any other documents or binding agreements that relate to the operation and
maintenance of the SWMP.
GC and/or their subcontractors shall ensure they have proper documentation for all individuals
involved.
POTENTIAL FOR EROSION AND DISCHARGE OF SEDIMENT
There is moderate potential for erosion to occur. Certain portions of the site have grades
exceeding 5% and shall be closely managed to prevent erosion. Temporary sediment traps or
basins shall be considered in the final SWPPP implementation. Redundant protection is required
along all wetlands. Contractor shall be required to appropriately manage individual
erosion-prone areas, using BMP's suitable for the particular application.
GENERAL CONSTRUCTION SEQUENCING
1.Install perimeter control. Install inlet protection on existing structures.
2.Perform any clearing, as needed.
3.Perform demolition and debris removal.
4.Place topsoil perimeter berms and stabilize with seed and mulch.
5.Grade stormwater basins. Perform mass grading. As sheet drainage patterns develop, place
silt fence or filter dikes as necessary to dissipate sediment transfer.
6.Construct utilities and pavements.
7.Construct buildings and structures.
8.Install phone, cable, gas and electric utilities.
9.Stabilize basins and swales with final stabilization. Stabilize landscape areas with final
permanent vegetation, landscaping or turf. Stabilize future development areas with temp
seed and mulch until final site development stage.
GUIDANCE FOR TIMING OF BMP INSTALLATION
Prior to Start of Construction
1.Install all new perimeter control BMPs as specified on plans prior to start of construction.
Ensure that all existing perimeter control BMPs are functional.
2.Install or establish stabilized construction entrance.
3.Install protection devices on existing ponds, outlets, storm sewer inlets, etc. prior to start of
construction.
4.Install sediment control practices on down gradient site perimeters
During Construction
1.Identify topsoil stockpile locations and stabilize with temporary seed and mulch.
2.Areas in which construction becomes inactive must have stabilization commence
immediately and be completed no later than 7 days after construction activity in that area
has either temporarily or permanently ceased.
3.Provide temporary or permanent energy dissipation at all pipe outlets within 24 hours of
connection to a Surface Water.
4.Minimize active construction areas. Where possible, establish final grade and stabilize with
permanent vegetation, particularly around stormwater basins, filter strips, berms, etc.
5.During grading construction, utilize street “hold down” areas for sediment trapping. Direct
overland construction runoff towards stormwater basins to the fullest extent practicable.
6.After construction is completed and grades are certified in a particular area of the site,
review that the area is ready for permanent vegetation or other permanent cover.
7.Identify locations where topsoil stockpiles will be placed for builders. Stabilize with
temporary seed and mulch and install perimeter control around stockpile circumference.
Stockpiles shall be located outside of natural buffers or surface waters, included stormwater
conveyances, unless there is a bypass in place.
During Inactivity or After Construction
1.Areas in which construction becomes inactive must have stabilization commence
immediately and be completed no later than 7 days after construction activity in that area
has either temporarily or permanently ceased.
2.Final stabilization cover types are shown on Sheet X of the plan set. Final cover consists of
vegetation, paved or gravel surfaces, sod, landscaping and buildings.
3.At the point where vegetated cover has achieved 70% of expected full growth density,
vegetated areas can be considered fully stabilized. Removal of synthetic sediment control
BMPs can be initiated.
4.Basins that have received sediment deposits shall be re excavated to plan grade, removing
accumulated sediment. Verify final grade and basin capacities.
5.Inlet protection devices can be removed from structures as the attributing drainage area
becomes fully stabilized.
6.Maintain street and drive sweeping activities until construction activities are fully
completed.
EROSION CONTROL BMPs
The construction plans anticipate the use of, but are not limited to, the following Erosion Control
BMPs:
1.Stabilized Construction Entrance
2.Temporary straw mulch as needed.
3.Seed and mulch
4.Erosion Control Blanket
5.Turf Reinforcement Mat (TRM)
6.Rip rap
7.Minimize active or disturbed work areas
SEDIMENT CONTROL BMPs
The construction plans anticipate the use of, but are not limited to, the following Sediment
Control BMPs
1.Sediment traps constructed in street subcut or other strategic locations.
2.Rock filter dikes in street subcut.
3.Utilize permanent stormwater basins as Temporary Sediment Basins.
4.Silt fence at project perimeter or toe of slopes.
5.Inlet protection on existing catch basins.
6.Inlet protection on existing culverts.
7.Inlet protection after utility construction.
8.Rock checks or bio roll checks.
9.Linear control along back of new curb and gutter or concrete (bio-roll or silt fence).
10.Post construction silt fence along normal wetted perimeters of basins and filter strips.
11.Routine street sweeping adjacent to construction entrance.
Refer to plans for designated locations of BMPs, details and implementation notes.
All BMP's selected and implemented shall be appropriate for the time of year, the current site
conditions and for the estimated duration of use.
Enhancing sedimentation with the use chemicals and chemical treatment systems is NOT
anticipated for this project.
BASIN AND TRAP DEWATERING BMPs
Should the need arise for basin or trap dewatering, Contractor shall utilize a floating skimmer
pump intake, such that the water is drawn from the surface of the basin. Pumped effluent shall
be discharged, to the extent feasible, over well-vegetated upland areas. Effluent shall not be
discharged into Surface Waters in a visually turbid state. Turbid effluent shall be filtered with
mechanical devices, chemical filtering, or a combination thereof, until it is no longer visually
turbid.
POLLUTION CONTROL BMPs
BMP's and good housekeeping should be implemented to prevent spills, pollutants or chemicals
from entering the drainage system.
1.Fueling: A fixed fueling station is not anticipated. Contractor will be required to implement
BMPs for onsite re-fueling of equipment.
2.Concrete Washout: Refer to MPCA's recommendation for concrete washouts. The
developer has the ability to adjust location or to provide alternative washout containment.
3.There is not an anticipated need for storing chemicals, paints, solvents or other potentially
toxic or hazardous materials on site. If at some point there is a need to store them on site,
they must be stored in a receptacle or container capable of retaining spills. The container
must be fenced and locked from unauthorized access.
4.Portable toilets shall be positioned and secured to prevent tipping over.
SEED & MULCH SPECIFICATIONS
Seed placed for permanent cover or final stabilization requires 6” minimum topsoil cover.
Exception: Infiltration basins - see basin details for soil type). Multiple site visits will be required
to accommodate permanent or temporary stabilization as required during the phases of
construction. Refer to MnDOT Seeding Manual, Latest Edition for more details.
1) General Mix
A.Seed: Mesic Inslope at a rate of 65 lb/acre
B.Fertilizer: Type 1 20-10-20 NPK at a rate of 200 lb/acre
C.Mulch: MNDOT Type 1 at a rate of 2 tons/acre
2) Native Mix
A.Seed: BWSR Mix 32-231 Mesic to Dry Prairie at a rate of 37.5 lb/acre
B.Fertilizer: Type 1 20-10-20 NPK at a rate of 200 lb/acre
C.Mulch: MNDOT Type 3 at a rate of 2 tons/acre
3) Stormwater Basins/Wet Soils
A.Seed: BWSR Mix 33-261 Stormwater at a rate of 35.0 lb/acre
B.Fertilizer: Type 3 slow release 22-5-10 NPK at a rate of 200 lb/acre
C.Mulch: MNDOT Type 3 at a rate of 2 tons/acre
4) Temporary Cover Crop
A.Seed: MNDOT Winter Wheat at a rate of 100.0 lb/acre
B.Fertilizer: Type 1 20-10-20 NPK at a rate of 200 lb/acre
C.Mulch: MNDOT Type 1 at a rate of 2 tons/acre
INSPECTION AND MAINTENANCE OF BMPs
Routine Inspection
1.Rock Entrances - Inspect weekly. If rock becomes filled with sediment and tracked material
to the extent the purpose ceases to function, remove the contaminated rock and replace
with new rock.
2.Stabile Concrete Entrance - Inspect weekly. Remove dirt and debris and sweep regularly to
control dust.
3.Silt fence - Inspect weekly, particularly for damaged sections, breaches, down-gradient
areas, flow concentration points, scour areas and sections adjacent to sensitive areas.
Where capacity is filled to more than 50% of depth, sediment shall be removed to restore
capture capacity.
4.Sediment traps and basins - Inspect weekly. Where capacity is filled to more than 50% of
depth, sediment shall be removed to restore capture capacity within 72 hours of discovery.
5.Inlet Protection - Inspect weekly or more frequently as needed after multiple rainfalls less
than 0.5”. Verify intake capacity is not compromised. Where capacity is filled to more than
50% of depth, sediment shall be removed to restore capture capacity.
6.Slope - inspect steep slopes for rills and gullies, often forming after placement of topsoil,
seed and erosion control blanket. As a guide, repair and re stabilize eroded areas where rills
exceed 6” in depth.
7.Inspect other site-specific BMP's on a weekly basis minimum.
Rain Event Inspection - Mandatory, within 24 hours after a rain event 0.5” or greater. Complete
all items associated with Routine Inspection. Furthermore, inspect site for breaches, failures,
scours and gullying. Take corrective actions as necessary to restore functionality to the BMP's. If
a given situation is discovered to be prone to repetitive failure, advise the Engineer and
Contractor for SWPPP and BMP amendments.
ADDITIONAL SWPPP NOTES
1.All Erosion and Sediment Control facilities shall be maintained by the Contractor during the
construction operations. Any temporary facilities which are to be removed as called for on
these plans and specifications shall be removed by the Contractor at the time directed by
the engineer. The Contractor shall then restore the subsequently disturbed areas in
accordance with these plans and specifications.
2.Wherever practical and feasible, the Contractor shall protect and preserve existing natural
trees, grass and other vegetative cover in effort to provide natural buffering and filtering of
runoff.
3.Contractor shall be adaptable in adjusting construction schedules in anticipation of weather
forecasts of precipitation, in order to minimize risk of erosion and sediment transport.
4.It is the responsibility of the Contractor to keep public streets, travel ways, parking lots and
trails utilized for ingress to and egress from the construction site free of dirt, sediment and
debris, resulting from construction activity. Cost for this shall be considered incidental to
the contract.
5.Adequate control of dust shall be maintained by the Contractor. Cost for dust control shall
be considered incidental to the contract.
6.Perimeter controls shall not be removed until final stabilization of areas draining toward the
control devices.
7.When temperatures do not exceed 40° F, areas that require seed and mulch stabilization
shall be dormant seeded. Application rate shall be two times the normal rate. No dormant
seeding shall be done on ice or snow greater than 2” in depth.
8.Any areas that were seeded that do not achieve 70% coverage shall be reseeded at the
Contractor's expense, where coverage limitation is caused by lack of seed germination and
growth.
STORMWATER BASIN MAINTENANCE
All stormwater basins within the project will be owned and maintained by the City. Suggested
practices are as follows:
1.For the first three years after construction, basins should be inspected for obvious signs of
erosion, such as gullies, rills or sediment plumes. Identify the cause and take corrective
measures such that grades are restored and surfaces re-established with appropriate
vegetation.
2.During the first year after final stabilization, mow the slopes of stormwater basins,
approximately 30-day intervals, 6”-8” high. Over-seed any areas not fully established.
3.Inspect for sediment accumulation at the pipe outlets into the pond at the completion of
sod installation of last lot in plat. Remove sediment. Re-inspect every 3-5 years.
4.Inspect inlets and outlets for blockage or debris buildup annually. Remove debris as
necessary to allow for inlets and outlets to function as designed.
5.Verify basin design capacity after 15 to 20 years of service.
TURF AND VEGETATION MAINTENANCE
Year 1
a.Establishment (spring seeding)
1.Prepare site: Late April-May
2.Seed: April 15th - July 20th
b.Maintenance
1.When vegetation reaches 10-14 inches tall, mow down to 6-8 inches. The site shall be
mowed at least 3 times from the planting date until September 30th. Mowings will be
approximately 30 days apart.
2.Weed Control - mowing should help control annual weeds.
c.Establishment (fall seeding)
1.Prepare site: Late August - early September
2.Seed: September 20th - October 20th
3.The following spring is Year 1 in the maintenance plan.
d.Evaluation
1.Cover crop growing within 2 weeks of planting (except dormant plantings).
2.Seedlings spaced 1-6 inches apart in drill rows.
3.Native grass seedlings may only be 4-6 inches tall.
4.If there is a flush of growth from foxtail, etc., mow as necessary.
Year 2
a.Maintenance:
1.When vegetation reaches 10-14 inches tall, mow down to 6-8 inches. The site shall be
mowed twice between June 1st and July 31st. Mowings will be approximately 30 days apart.
2.Weed control - Mowing should help control annual weeds. Spot spray thistles, etc. 1 time
between August 1st and September 30th once vegetation has grown back after the second
mowing.
b.Evaluation
1.Cover crop will be gone unless winter wheat is used in fall planting.
2.Grasses forming clumps 1-6 inches apart in drill rows, but still short.
3.Some flowers should be blooming (Black eyed Susans, Wild Bergamot, etc.)
4.If there is a flush of growth from foxtail, etc., mow site to a height of 6-8 inches.
Year 3
a.Maintenance:
1.Spot spray perennial and first-year biennial weeds. Spot mow annual and second-year
biennial weeds. Spot treatments must occur once every 3 to 5 weeks from June 1st to
September 30th. At least three treatment cycles must be completed during this date
window. Treatments must occur before weeds set seed.
b.Evaluation:
2.Planting should begin to resemble a prairie, with tall grasses, flowers, etc.
GENERAL PERMIT NOTE
VISIT THE MPCA WEB SITE FOR THE LATEST INFORMATION ON THE
CONSTRUCTION STORMWATER PERMIT:
https://www.pca.state.mn.us/business-with-us/construction-stormwater EROSION & SEDIMENT CONTROLSWPPP NOTESKANARANZI LOAM
HSG B
MAYER SILT LOAM
HSG X
QUAM SILT LOAM
HSG C/D
CRYSTALL LAKE SILT LOAM
HSG C
WAUKEGAN SILT LOAM
HSG B
KANARANZI LOAM
HSG B
KANARANZI LOAM
HSG B
KANARANZI LOAM
HSG B
QUAM SILT LOAM
HSG C/D
Page 78 of 124
PROJECT NO.
24282
CAD FILE
02/25/26
DATE
REVISIONS
DRAWN BY Date:Reg.No.ERIC P. FAGERBERG5377202/25/262026-04-02 CITY COMMENTS2999 WEST C.R. 42, SUITE 100BURNSVILLE, MN 55306PHONE: 952-890-6044info@mnhill.comwww.mnhill.comI hereby certify that this plan,specification or report was preparedby me or under my direct supervisionand that I am a duly LicensedProfessional Engineer under the lawsof the State of Minnesota.PRELIMINARYMENDOTA HEIGHTS, MINNESOTALEXINGTON HEIGHTS ADDITIONCONDOR CORPORATIONFOR2320 LEXINGTON AVENUE, MENDOTA HEIGHTS, MN 55120F:\_Civil 3D Projects\24282\PRE-PLAT PLANS\24282ERD.dwg - 4/02/2026 11:26AM24282ERD
C302
VUNEROSION & SEDIMENT CONTROLNOTES1.1 Permit Coverage. [Minn. R. 7090]
1.2 This permit is required for construction activity that results in land disturbance of equal to or greater than one (1) acre or if a
project is part of a common plan of development or sale that ultimately will disturb greater than one (1) acre, and authorizes,
subject to the terms and conditions of this permit, the discharge of stormwater associated with construction activity.
[Minn. R. 7090]
1.3 Construction activity covered by this permit cannot commence until coverage under this permit is effective as described in
item 3.3 through 3.4 or, if applicable, until the Minnesota Pollution Control Agency (MPCA) has issued an individual National
Pollutant Discharge Elimination System (NPDES)/State Disposal System (SDS) construction stormwater permit for the project.
[Minn. R. 7090]
1.4 This permit covers all areas of the State of Minnesota except land wholly within the boundaries of a federally recognized
Indian Reservation owned by a tribe or a tribal member or land held in trust by the federal government for a tribe or tribal
member.[Minn. R. 7090]
1.5 Coverage under this permit is not required when all stormwater from construction activity is routed directly to and treated by a
"treatment works," as defined in Minn. Stat. Section 115.01, subd. 21, operated under an individual NPDES/SDS permit with a Total
Suspended Solids (TSS) effluent limit. [Minn. R. 7090]
1.6 This permit covers ongoing projects covered under any previous construction stormwater permit that are not complete on
the issuance date of this permit. Permittees must either remain in compliance with the previous permit and terminate
coverage within 18 months of the issuance date of this permit or comply with this permit, including updating the
Stormwater Pollution Prevention Plan (SWPPP), within the 18-month period. Permittees of previously permitted projects
are not required to incorporate any additional requirements regarding the permanent stormwater treatment system
included in this reissued permit. [Minn. R. 7090]
1.7 Coverage for projects that extend beyond the expiration date of this permit remains effective for a grace period of 18
months.If Permittees cannot complete projects during the grace period, the MPCA will extend coverage under the next
permit and permittees must comply with the requirements of the new permit including updating the SWPPP. Permittees
are not required to follow changes to the permanent stormwater treatment section of the next permit. [Minn. R. 7090]
2.1 Prohibitions and Limitations of Coverage. [Minn. R. 7090]
2.2 The owner must develop a complete and accurate SWPPP that complies with item 5.2 prior to submitting the application for
coverage and starting construction activity. Failure to prepare a SWPPP prior to submitting the application may result in
permit revocation. [Minn. R. 7090]
2.3 This permit prohibits discharges of any material other than stormwater treated in compliance with this permit and
discharges from dewatering or basin draining activities in accordance with Section 10. Prohibited discharges include, but are
not limited to, wastewater from washout of concrete, stucco, paint, form release oils, curing compounds and other
construction materials, fuels, oils, or other pollutants used in vehicle and equipment operation and maintenance, soaps or
solvents used in vehicle and equipment washing and maintenance, and other hazardous substances or wastes. [Minn. R. 7090]
2.4 This permit does not authorize stormwater discharges related to the placement of fill into waters of the state requiring
local, state or federal authorizations (such as U.S. Army Corps of Engineers Section 404 permits, Minnesota Department of
Natural Resources (DNR) Public Waters Work permits or local governmental unit (LGU) Wetland Conservation Act
replacement plans or determinations). [Minn. R. 7090]
2.5 This permit does not authorize stormwater discharges associated with industrial activity except for construction activity.
Permittees must obtain coverage for discharges associated with industrial activity under a separate NPDES/SDS permit once
day-to-day operational activities commence even if construction is ongoing. [Minn. R. 7090]
2.6 This permit does not authorize discharges from non-point source agricultural and silvicultural activities excluded from
NPDES permit requirements under 40 CFR pt. 122.3(e). [Minn. R. 7090]
2.7 This permit does not authorize stormwater discharges to Prohibited, Restricted, Special or Impaired waters unless
permittees follow the additional stormwater requirements in Section 23. [Minn. R. 7090]
2.8 This permit does not replace or satisfy any environmental review requirements including those under the Minnesota
Environmental Policy Act or the National Environmental Policy Act. The owner must verify completion of any environmental
review required by law, including any required Environmental Assessment Work Sheets or Environmental Impact
Statements, Federal environmental review, or other required review prior to applying for coverage under this permit. If any
part of your common plan of development or sale requires environmental review, coverage under this permit cannot be obtained
until such environmental review is complete. [Minn. R. 7090]
2.9 This permit does not replace or satisfy any review requirements for discharges adversely impacting State or Federally
designated endangered or threatened species or a designated critical habitat. The owner must comply with the National
Historic Preservation Act and conduct all required review and coordination related to historic preservation, including
significant anthropological sites and any burial sites, with the Minnesota Historic Preservation Officer. [Minn. R. 7090]
2.10 This permit does not authorize discharges to wetlands unless the permittee complies with the requirements in Section 22.
Coverage under this permit cannot be issued until the requirements for wetland permits, decisions, other determinations,
or the mitigative sequence required in section 22 have been finalized and documented. [Minn. R. 7050.0186]
3.1 Application and Coverage Effective Date. [Minn. R. 7090]
3.2 The owner and operator must submit a complete and accurate on-line application with the appropriate fee to the MPCA for
each project that disturbs one (1) or more acres of land or for a common plan of development or sale that will ultimately
disturb one (1) or more acres. [Minn. R. 7090]
3.3 For projects or common plans of development or sale that disturb less than 50 acres or do not discharge stormwater within 1
mile (aerial radius measurement) of a special or impaired water, permittees do not need to submit the SWPPP with the application.
Permit coverage for these projects is effective upon application and completing the payment process. [Minn. R.7090]
3.4 For certain projects or common plans of development or sale disturbing 50 acres or more, the complete SWPPP must be
included with the application and submitted at least 30 days before the start of construction activity. This applies if there is
a discharge point on the project within one mile (aerial radius measurement) of, and flows to, a special water listed in item
23.3 through 23.6 or an impaired water as described in item 23.7. Permit coverage for these projects is effective upon
submitting the application and complete SWPPP, completing the payment process and receiving a determination from the
MPCA that the review of the SWPPP is complete. The determination may take longer than 30 days if the SWPPP is
incomplete. If the MPCA fails to contact the permittees within 30 days of application receipt, coverage is effective 30 days
after completing the payment process. [Minn. R. 7090]
3.5 The application requires listing all persons meeting the definition of owner and operator as permittees. The owner is
responsible for compliance with all terms and conditions of this permit. The operator is responsible for compliance with
Sections 3, 4, 6-22, 24 and applicable requirements for construction activity in Section 23. [Minn. R. 7090]
3.6 Permittees will receive coverage notification in a manner determined by the MPCA. [Minn. R. 7090]
3.7 For construction projects where the owner or operator changes (e.g., an original developer sells portions of the property to
various homebuilders or sells the entire site to a new owner), the current owner and the new owner or operator must
submit a complete permit modification form provided by the MPCA. The current owner and the new owner or operator
must submit the form prior to the new owner or operator commencing construction activity or no later than 30 days after
taking ownership of the property. [Minn. R. 7090]
3.8 For construction projects where the owner or operator changes, the current owner must provide a SWPPP to the new
owner and operator that specifically addresses the remaining construction activity. The new owner or operator can
implement the original SWPPP, modify the SWPPP, or develop a new SWPPP. Permittees must ensure their activities do not
render another party's erosion prevention and sediment control BMPs ineffective. [Minn. R. 7090]
4.1 Termination of Coverage. [Minn. R. 7090]
4.2 Permittees must submit a NOT within 30 days after all termination conditions listed in Section 13 are complete.[Minn. R. 7090]
4.3 Permittees must submit a NOT within 30 days after selling or otherwise legally transferring the entire site, including permit
responsibility for roads (e.g., street sweeping) and stormwater infrastructure final clean out, or transferring portions of a site to
another party. The permittees' coverage under this permit terminates at midnight on the submission date of the NOT.[Minn. R.
7090]
4.4 Permittees may terminate permit coverage prior to completion of all construction activity if they meet all of the following
conditions:
a.construction activity has ceased for at least 90 days; and
b.at least 90 percent (by area) of all originally proposed construction activity has been completed and permanent cover has
been established on those areas; and
c.on areas where construction activity is not complete, permanent cover has been established; and
d.the site complies with item 13.3 through 13.7.
After permit coverage is terminated under this item, any subsequent development on the remaining portions of the site will
require permit coverage if the subsequent development itself or as part of the remaining common plan of development or
sale will result in land disturbing activities of one (1) or more acres in size. [Minn. R. 7090]
4.5 Permittees may terminate coverage upon MPCA approval after submitting information documenting the owner cancelled
the project. [Minn. R. 7090]
5.1 Stormwater Pollution Prevention Plan (SWPPP) Content. [Minn. R. 7090]
5.2 The owner must develop and implement a SWPPP. The SWPPP must include items 5.3 through 5.26. [Minn. R. 7090]
5.3 The SWPPP must incorporate specific Best Management Practices (BMP) used to comply with the requirements of this
permit. [Minn. R. 7090]
5.4 The SWPPP must include a narrative describing the timing for installation of all erosion prevention and sediment control
BMPs and a description of the permanent stormwater treatment systems. [Minn. R. 7090]
5.5 The SWPPP must include the location and type of all temporary and permanent erosion prevention and sediment control
BMPs along with procedures used to establish additional temporary BMPs as necessary for the site conditions during
construction. Standard details and/or specifications for BMPs must be included in the final plans and specifications for the
project. [Minn. R. 7090]
5.6 The SWPPP must include the calculations and other information used for the design of temporary sediment basins and any of
the permanent stormwater treatment systems required in Section 15. [Minn. R. 7090]
5.7 The SWPPP must include estimated quantities anticipated at the start of the project for the life of the project for all erosion
prevention and sediment control BMPs (e.g., linear feet of silt fence or square feet of erosion control blanket). [Minn. R. 7090]
5.8 The SWPPP must include the number of acres of impervious surface for both pre- and post-construction. [Minn. R. 7090]
5.9 The SWPPP must include a site map with existing and final grades, including drainage area boundaries, directions of flow
and all discharge points where stormwater is leaving the site or entering a surface water. The site map must indicate the
areas of steep slopes. The site map must also include impervious surfaces, soil types and locations of potential pollutant-
generating activities as identified in Section 12. [Minn. R. 7090]
5.10 The SWPPP must include a map of all surface waters, existing wetlands, and stormwater ponds or basins that can be
identified on maps such as United States Geological Survey 7.5-minute quadrangle maps, the National Wetland Inventory
map or equivalent maps and are within one mile (aerial radius measurement) from the project boundaries that will receive
stormwater from the construction site, during or after construction. The SWPPP must identify if the surface waters are
special or impaired waters. [Minn. R. 7090]
5.11 The SWPPP must include a site map showing construction activity areas that are adjacent to and drain to Public Waters for
which the DNR has promulgated "work in water restrictions" during specified fish spawning time frames. [Minn. R. 7090]
5.12 Permittees must identify locations of 50' buffer zones as required in item 9.17 and 100' permanent buffer zones as required in
item 23.11, on plan sheets in the SWPPP. [Minn. R. 7090]
5.13 If permittees determine compliance with the following requirements is infeasible, they must document the determination in
the SWPPP:
a.temporary sediment basins as described in Section 14; and
b.for linear projects, if the permanent stormwater treatment system cannot be constructed within the right-of-way, a
reasonable attempt must be made to obtain additional right-of-way (item 15.9); and
c.buffer zones as described in item 9.17 and item 23.11. [Minn. R. 7090]
5.14 If permittees determine that a temporary sediment basin is infeasible as described in item 14.10, the SWPPP must describe
the alternative BMPs used. [Minn. R. 7090]
5.15 Where systems cannot meet the full volume reduction requirement on-site, (e.g., the site has infiltration prohibitions, see
item 16.14 through item 16.21) the permittee must document the reasons in the SWPPP. [Minn. R. 7090]
5.16 The SWPPP must include any stormwater mitigation measures proposed to be part of the final project in any environmental
review document, endangered species review, archeological or other required local, state or federal review conducted for the
project. For purposes of this permit, mitigation measures mean actions necessary to avoid, minimize, or mitigate for impacts
related to erosion prevention, sediment control, the permanent stormwater treatment system, pollution
prevention management measures and discharges associated with the project's construction activity. [Minn. R. 7090]
5.17 The SWPPP must describe the methods used for permanent cover of all exposed soil areas. [Minn. R. 7090]
5.18 Permittees must identify the locations of areas where construction will be phased to minimize the duration of exposed soil
areas in the SWPPP. [Minn. R. 7090]
5.19 For projects with a discharge point on the project within one (1) mile (aerial radius measurement) of and which flows to an
impaired water, permittees must identify the impaired water(s), and any United States Environmental Protection Agency
(USEPA)-approved Total Maximum Daily Load (TMDL) for the pollutant(s) or stressor(s) described in item 23.7. Permittees'
identification must include those TMDLs approved at any time prior to permit application submittal and are still in effect.
[Minn. R. 7090]
5.20 Permittees must document in the SWPPP, all trained individuals identified in item 21.2. Documentation must include:
a.names of personnel required to be trained; and
b.dates of training and name of instructor(s) and entity providing training; and
c.content of training course.
If permittees do not know the names of the individuals at the time of application, the permittees must ensure they
document training before construction activity commences. [Minn. R. 7090]
5.21 The SWPPP must identify a person knowledgeable and experienced in the application of erosion prevention and sediment
control BMPs who will coordinate with all contractors, subcontractors, and operators on-site to oversee the
implementation of the SWPPP. [Minn. R. 7090]
5.22 The SWPPP must describe any specific chemicals and chemical treatment systems used for enhancing the sedimentation
process and how it achieves compliance with item 9.19. [Minn. R. 7090]
5.23 The SWPPP must identify the person(s), organizations, or entities responsible for long-term operation and maintenance of
permanent stormwater treatment systems. [Minn. R. 7090]
5.24 The SWPPP must describe methods to minimize soil compaction and preserve topsoil. Minimizing soil compaction is not
required where the function of a specific area dictates compaction. [Minn. R. 7090]
5.25 The SWPPP must include any site assessments for groundwater or soil contamination required in item 16.15.[Minn. R.
7090]
5.26 The SWPPP must account for the following factors in designing temporary erosion prevention and sediment control BMPs:
a.the expected amount, frequency, intensity, and duration of precipitation; and
b.the nature of stormwater runoff and run-on at the site, including factors such as expected flow from impervious surfaces,
slopes, and site drainage features; and
c.the stormwater volume, velocity, and peak flowrates to minimize discharge of pollutants in stormwater and to minimize
channel and streambank erosion and scour in the immediate vicinity of discharge points; and
d.the range of soil particle sizes expected to be present. [Minn. R. 7090]
6.1 SWPPP Amendments. [Minn. R. 7090]
6.2 One of the individuals described in item 21.2.a or item 21.2.b or another qualified individual must complete all SWPPP
changes. Changes involving the use of a less stringent BMP must include a justification describing how the replacement
BMP is effective for the site characteristics. [Minn. R. 7090]
6.3 Permittees must amend the SWPPP within 7 days to include additional or modified BMPs whenever there is a change in
design, construction, operation, maintenance, weather or seasonal conditions having a significant effect on the discharge of
pollutants to surface waters or groundwater. [Minn. R. 7090]
6.4 Permittees must amend the SWPPP within 7 days to include additional or modified BMPs whenever inspections or
investigations by the site owner or operator, USEPA or MPCA officials indicate the SWPPP is not effective in eliminating or
significantly minimizing the discharge of pollutants to surface waters or groundwater or the discharges are causing water
quality standard exceedances (e.g., nuisance conditions as defined in Minn. R. 7050.0210, subp. 2) or the SWPPP is not
consistent with the objectives of a USEPA approved TMDL. [Minn. R. 7050.0210]
7.1 BMP Selection and Stormwater Management. [Minn. R. 7090]
7.2 Permittees must select, install, and maintain the BMPs identified in the SWPPP and in this permit in an appropriate and
functional manner and in accordance with relevant manufacturer specifications and accepted engineering practices to
minimize the discharge of pollutants in stormwater from construction activities. Examples of stormwater management
practices for this section include but are not limited to wet sedimentation basins, temporary depressions to hold
stormwater, stormwater routing, dikes, berms, pumping, and stormwater treatment BMPs. Permittees must phase and
incorporate stormwater management principles as the construction progresses. Unless infeasible, temporary or permanent
wet sedimentation basins (when required, see section 14 and 15) should be constructed as a first step in the process and
stormwater routed to these. [Minn. R. 7090]
7.3 Permittees must not disturb more land (i.e., phasing) than can be effectively inspected and maintained in accordance with
Section 11. [Minn. R. 7090]
7.4 If permittees will be using some type of erosion control netting on the site as part of the soil stabilization techniques,
permittees are encouraged to use products that have been shown to minimize impacts on wildlife. The U.S. Fish & Wildlife
Service recommends using types of netting practices that are considered "wildlife friendly," including those that use natural
fiber or 100 percent biodegradable materials and that use a loose weave with a non-welded, movable jointed netting.
Products that are not wildlife friendly include square plastic netting that are degradable (e.g., photodegradable, UV-
degradable, oxo-degradable), netting made from polypropylene, nylon, polyethylene, or polyester. Other recommendations
include removing the netting product when it is no longer needed. More information may be found at:
https://www.fws.gov/initiative/protecting-wildlife/make-change-wildlife-friendly-erosion-control-products. There also may
be State, Tribal, or local requirements about using wildlife friendly erosion control products. See Minnesota Department of
Transportation requirements at: https://www.mndot.org/environment/erosion/rolled-erosion-prevention-products.html.
[Minn. R. 7050]
8.1 Erosion Prevention Practices. [Minn. R. 7090]
8.2 Before work begins, permittees must delineate the location of areas not to be disturbed. [Minn. R. 7090]
8.3 Permittees must minimize the need for disturbance of portions of the project with steep slopes. When steep slopes must be
disturbed, permittees must use techniques such as phasing and stabilization practices designed for steep slopes (e.g., slope
draining and terracing). [Minn. R. 7090]
8.4 Permittees must stabilize all exposed soil areas, including stockpiles. Stabilization must be initiated immediately to limit soil
erosion when construction activity has permanently or temporarily ceased on any portion of the site and will not resume for a
period exceeding 14 calendar days (7 days for sites discharging to special or impaired waters, see section 24). Stabilization must
be completed no later than 14 calendar days after the construction activity has ceased. Stabilization is not required on
constructed base components of roads, parking lots and similar surfaces. Stabilization is not required on temporary stockpiles
without significant silt, clay or organic components (e.g., clean aggregate stockpiles, demolition concrete
stockpiles, sand stockpiles) but permittees must provide sediment controls at the base of the stockpile. [Minn. R. 7090]
8.5 For Public Waters that the Minnesota DNR has promulgated "work in water restrictions" during specified fish spawning time
frames, permittees must complete stabilization of all exposed soil areas within 200 feet of the water's edge, and that drain to
these waters, within 24 hours during the restriction period. [Minn. R. 7090]
8.6 Permittees must stabilize the normal wetted perimeter of the last 200 linear feet of temporary or permanent drainage
ditches or swales that drain water from the site within 24 hours after connecting to a surface water or property edge.
Permittees must complete stabilization of remaining portions of temporary or permanent ditches or swales within 14
calendar days (7 days for sites discharging to special or impaired waters, see section 24) after connecting to a surface water
or property edge and construction in that portion of the ditch temporarily or permanently ceases. [Minn. R. 7090]
8.7 Temporary or permanent ditches or swales being used as a sediment containment system during construction (with
properly designed rock-ditch checks, bio rolls, silt dikes, etc.) do not need to be stabilized. Permittees must stabilize these
areas within 24 hours after their use as a sediment containment system ceases. [Minn. R. 7090]
8.8 Permittees must not use mulch, hydromulch, tackifier, polyacrylamide or similar erosion prevention practices within any
portion of the normal wetted perimeter of a temporary or permanent drainage ditch or swale section with a continuous
slope of greater than 2 percent. Examples of acceptable erosion prevention practices include blankets, poly, riprap, etc.
[Minn. R. 7090]
8.9 Permittees must provide temporary or permanent energy dissipation at all pipe outlets within 24 hours after connection to a
surface water or permanent stormwater treatment system. [Minn. R. 7090]
9.1 Sediment Control Practices. [Minn. R. 7090]
9.2 Permittees must establish sediment control BMPs on all downgradient perimeters of the site and downgradient areas of the
site that drain to any surface water, including curb and gutter systems. Permittees must locate sediment control practices
upgradient of any buffer zones. Permittees must install sediment control practices before any upgradient land-disturbing
activities begin and must keep the sediment control practices in place until they establish permanent cover. [Minn. R. 7090]
9.3 If downgradient sediment controls are overloaded, based on frequent failure or excessive maintenance requirements,
permittees must install additional upgradient sediment control practices or redundant BMPs to eliminate the overloading
and amend the SWPPP to identify these additional practices as required in item 6.3. [Minn. R. 7090]
9.4 Temporary or permanent drainage ditches and sediment basins designed as part of a sediment containment system (e.g.,
ditches with rock-check dams) require sediment control practices only as appropriate for site conditions. [Minn. R. 7090]
9.5 A floating silt curtain placed in the water is not a sediment control BMP to satisfy item 9.2 except when working on a
shoreline or below the waterline. Immediately after the construction activity (e.g., installation of rip rap along the shoreline)
in that area is complete, permittees must install an upland perimeter control practice if exposed soils still drain to a surface
water.[Minn. R. 7090]
9.6 Permittees must re-install all sediment control practices adjusted or removed to accommodate short-term activities such as
clearing or grubbing, or passage of vehicles, immediately after the short-term activity is completed. Permittees must re-
install sediment control practices before the next precipitation event even if the short-term activity is not complete.
[Minn. R. 7090]
9.7 Permittees must protect all storm drain inlets using appropriate BMPs during construction until they establish permanent
cover on all areas with potential for discharging to the inlet. [Minn. R. 7090]
9.8 Permittees may remove inlet protection for a particular inlet if a specific safety concern (e.g. street flooding/freezing) is
identified by the permittees or the jurisdictional authority (e.g., city/county/township/Minnesota Department of
Transportation engineer). Permittees must document the need for removal in the SWPPP. [Minn. R. 7090]
9.9 Permittees must provide silt fence or other effective sediment controls at the base of stockpiles on the downgradient
perimeter prior to the initiation of stockpiling. Sediment controls must be managed in accordance with section 9.6.
[Minn. R. 7090]
9.10 Permittees must locate stockpiles outside of natural buffers or surface waters, including stormwater conveyances such as
curb and gutter systems unless there is a bypass in place for the stormwater. [Minn. R. 7090]
9.11 Permittees must install a vehicle tracking BMP to minimize the track out of sediment from the construction site or onto
paved roads within the site. [Minn. R. 7090]
9.12 Permittees must use street sweeping in addition to vehicle tracking BMPs if vehicle tracking BMPs alone are not adequate
to prevent sediment tracking onto the street. [Minn. R. 7090]
9.13 Permittees must install temporary sediment basins as required in Section 14. [Minn. R. 7090]
9.14 In any areas of the site where final vegetative stabilization will occur, permittees must restrict vehicle and equipment use
to minimize soil compaction. [Minn. R. 7090]
9.15 Permittees must preserve topsoil on the site, unless infeasible. [Minn. R. 7090]
9.16 Permittees must direct discharges from BMPs to vegetated areas unless infeasible. [Minn. R. 7090]
9.17 Permittees must preserve a 50-foot natural buffer or, if a buffer is infeasible on the site, provide redundant (double)
perimeter sediment controls when a surface water is located within 50 feet of the project's earth disturbances and
stormwater flows to the surface water. Permittees must install perimeter sediment controls at least 5 feet apart unless
limited by lack of available space. Natural buffers are not required adjacent to road ditches, judicial ditches, county ditches,
stormwater conveyance channels, storm drain inlets, and sediment basins. If preserving the buffer is infeasible, permittees
must document the reasons in the SWPPP. Sheet piling and other impermeable barriers installed in a manner that retains all
stormwater are considered redundant perimeter control. [Minn. R. 7090]
9.18 Any sediment control made of soil must be temporarily or permanently stabilized within 24 hours. [Minn. R. 7090]
9.19 Permittees must use polymers, flocculants, or other sedimentation treatment chemicals in accordance with accepted
engineering practices, dosing specifications and sediment removal design specifications provided by the manufacturer or
supplier. The permittees must use conventional erosion and sediment controls prior to chemical addition and must direct
treated stormwater to a sediment control system for filtration or settlement of the floc prior to discharge. [Minn. R. 7090]
10.1 Dewatering and Basin Draining. [Minn. R. 7090]
10.2 Permittees must not cause nuisance conditions (see Minn. R. 7050.0210, subp. 2) in surface waters from dewatering and
basin draining (e.g., pumped discharges, trench/ditch cuts for drainage) discharges. Permittees must discharge turbid or
sediment-laden waters related to dewatering or basin draining to a sediment control (e.g. sediment trap or basin, filter bag)
designed to prevent discharges with visual turbidity. To the extent feasible, use well-vegetated (e.g., grassy or wooded),
upland areas of the site to infiltrate dewatering water before discharge. Permittees are prohibited from using receiving
waters as part of the treatment area. Permittees must visually check and photograph the discharge at the beginning and at
least once every 24 hours of operation to ensure adequate treatment has been obtained and nuisance conditions will not result
from the discharge. [Minn. R. 7050.0210]
10.3 If nuisance conditions result from the discharge, Permittees must cease dewatering immediately and corrective actions
must occur before dewatering is resumed. Nuisance conditions includes, but is not limited to, a sediment plume in the
discharge or the discharge appears cloudy, or opaque, or has a visible contrast, or has a visible oil film, or has aquatic
habitat degradation that can be identified by an observer. [Minn. R. 7050.0210]
10.4 If permittees must discharge water containing oil or grease, they must use an oil-water separator or suitable filtration
device (e.g., cartridge filters, absorbents pads) prior to discharge. [Minn. R. 7090]
10.5 Permittees must discharge all water from dewatering or basin-draining activities in a manner that does not cause erosion or
scour in the immediate vicinity of discharge points or inundation of wetlands in the immediate vicinity of discharge points
that causes significant adverse impact to the wetland. [Minn. R. 7090]
10.6 If permittees use filters with backwash water, they must haul the backwash water away for disposal, return the backwash
water to the beginning of the treatment process, or incorporate the backwash water into the site in a manner that does not cause
erosion. [Minn. R. 7090]
11.1 Inspections and Maintenance. [Minn. R. 7090]
11.2 Permittees must ensure a trained person, as identified in item 21.2.b, will inspect the entire construction site at least once
every seven (7) days during active construction and within 24 hours after a rainfall event greater than 1/2 inch in 24 hours.
[Minn. R. 7090]
11.3 Permittees must inspect and maintain all permanent stormwater treatment BMPs. [Minn. R. 7090]
11.4 Permittees must inspect all erosion prevention and sediment control BMPs and Pollution Prevention Management
Measures to ensure integrity and effectiveness. Permittees must repair, replace or supplement all nonfunctional BMPs with
functional BMPs by the end of the next business day after discovery unless another time frame is specified in item 11.5 or
11.6.Permittees may take additional time if field conditions prevent access to the area. [Minn. R. 7090]
11.5 During each inspection, permittees must inspect areas adjacent to the project, surface waters, including drainage ditches
and conveyance systems but not curb and gutter systems, for evidence of erosion and sediment deposition. Permittees
must remove all deltas and sediment deposited in areas adjacent to the project, surface waters, including drainage ways,
catch basins, and other drainage systems and restabilize the areas where sediment removal results in exposed soil.
Permittees must complete removal and stabilization within seven (7) calendar days of discovery unless precluded by legal,
regulatory, or physical access constraints. Permittees must use all reasonable efforts to obtain access. If precluded, removal
and stabilization must take place within seven (7) days of obtaining access. Permittees are responsible for contacting all
local, regional, state and federal authorities and receiving any applicable permits, prior to conducting any work in surface
waters.[Minn. R. 7090]
11.6 Permittees must inspect construction site vehicle exit locations, streets and curb and gutter systems within and adjacent to
the project for sedimentation from erosion or tracked sediment from vehicles. Permittees must remove sediment from all
paved surfaces within one (1) calendar day of discovery or, if applicable, within a shorter time to avoid a safety hazard to
users of public streets. [Minn. R. 7090]
11.7 Permittees must repair, replace or supplement all perimeter control devices when they become nonfunctional or the
sediment reaches 1/2 of the height of the device. [Minn. R. 7090]
11.8 Permittees must drain temporary and permanent sedimentation basins and remove the sediment when the depth of
sediment collected in the basin reaches 1/2 the storage volume within 72 hours of discovery. [Minn. R. 7090]
11.9 Permittee's must inspect and photograph dewatering discharges at the beginning and at least once every 24 hours during
operation. Dewatering discharges that only last for minutes, as opposed to hours, and do not reach a surface water, do not require
photographs or documentation. [Minn. R. 7090]
11.10 Permittees must ensure that at least one individual present on the site (or available to the project site in three (3) calendar
days) is trained in the job duties described in item 21.2.b. [Minn. R. 7090]
11.11 Permittees may adjust the inspection schedule described in item 11.2 as follows:
a.inspections of areas with permanent cover can be reduced to once per month, even if construction activity continues on
other portions of the site; or
b.where sites have permanent cover on all exposed soil and no construction activity is occurring anywhere on the site,
inspections can be reduced to once per month and, after 12 months, may be suspended completely until construction
activity resumes. The MPCA may require inspections to resume if conditions warrant; or
c.where construction activity has been suspended due to frozen ground conditions, inspections may be suspended.
Inspections must resume within 24 hours of runoff occurring, or upon resuming construction, whichever comes first.
d.for projects where a pollinator habitat or native prairie type vegetated cover is being established, inspections may be
reduced to once per month if the site has temporary vegetation with a density of 70% temporary uniform cover. If after 24
months no significant erosion problems are observed, inspections may be suspended completely until the termination
requirements in section 13 have been met. [Minn. R. 7090]
11.12 Permittees must record all inspections and maintenance activities within 24 hours of being conducted and these records
must be retained with the SWPPP. These records must include:
a.date and time of inspections; and
b.name of persons conducting inspections; and
c.accurate findings of inspections, including the specific location where corrective actions are needed; and
d.corrective actions taken (including dates, times, and party completing maintenance activities); and
e.date of all rainfall events greater than 1/2 inches in 24 hours, and the amount of rainfall for each event. Permittees must
obtain rainfall amounts by either a properly maintained rain gauge installed on-site, a weather station that is within one (1) mile of
your location, or a weather reporting system that provides site specific rainfall data from radar summaries; and
f.if permittees observe a discharge during the inspection, they must record and should photograph and describe the
location of the discharge (i.e., color, odor, settled or suspended solids, oil sheen, and other obvious indicators of pollutants);
and
g.any amendments to the SWPPP proposed as a result of the inspection must be documented as required in Section 6
within seven (7) calendar days; and
h.all photographs of dewatering activities and documentation of nuisance conditions resulting from dewatering activities as
described in section 10. [Minn. R. 7090]
12.1 Pollution Prevention Management Measures. [Minn. R. 7090]
12.2 Permittees must place construction materials and landscape materials under cover (e.g., plastic sheeting or temporary
days)or protect them by similarly effective means designed to minimize contact with stormwater. Permittees are not
required to cover or protect products which are either not a source of contamination to stormwater or are designed to be
exposed to stormwater. [Minn. R. 7090]
12.3 Permittees must place pesticides, fertilizers and treatment chemicals under cover (e.g., plastic sheeting or temporary roofs) or
protect them by similarly effective means designed to minimize contact with stormwater. [Minn. R. 7090]
12.4 Permittees must store hazardous materials and toxic waste, (including oil, diesel fuel, gasoline, hydraulic fluids, paint
solvents, petroleum-based products, wood preservatives, additives, curing compounds, and acids) in sealed containers to
prevent spills, leaks or other discharge. Storage and disposal of hazardous waste materials must be in compliance with
Minn. R. ch. 7045 including secondary containment as applicable. [Minn. R. 7090]
12.5 Permittees must properly store, collect and dispose solid waste in compliance with Minn. R. ch. 7035. [Minn. R. 7035]
12.6 Permittees must position portable toilets so they are secure and will not tip or be knocked over. Permittees must properly
dispose sanitary waste in accordance with Minn. R. ch. 7041. [Minn. R. 7041]
12.7 Permittees must take reasonable steps to prevent the discharge of spilled or leaked chemicals, including fuel, from any area
where chemicals or fuel will be loaded or unloaded including the use of drip pans or absorbents unless infeasible.
Permittees must ensure adequate supplies are available at all times to clean up discharged materials and that an
appropriate disposal method is available for recovered spilled materials. Permittees must report and clean up spills
immediately as required by Minn. Stat. 115.061, using dry clean up measures where possible. [Minn. Stat. 115.061]
12.8 Permittees must limit vehicle exterior washing and equipment to a defined area of the site. Permittees must contain runoff
from the washing area in a sediment basin or other similarly effective controls and must dispose waste from the washing activity
properly. Permittees must properly use and store soaps, detergents, or solvents. [Minn. R. 7090]
12.9 Permittees must provide effective containment for all liquid and solid wastes generated by washout operations (e.g.,
concrete, stucco, paint, form release oils, curing compounds and other construction materials) related to the construction
activity. Permittees must prevent liquid and solid washout wastes from contacting the ground and must design the
containment so it does not result in runoff from the washout operations or areas. Permittees must properly dispose liquid
and solid wastes in compliance with MPCA rules. Permittees must install a sign indicating the location of the washout
facility. [Minn. R. 7035, Minn. R. 7090]
13.1 Permit Termination Conditions. [Minn. R. 7090]
13.2 Permittees must complete all construction activity and must install permanent cover over all areas prior to submitting the
NOT. Vegetative cover must consist of a uniform perennial vegetation with a density of 70 percent of its expected final growth
Vegetation is not required where the function of a specific area dictates no vegetation, such as impervious surfaces
or the base of a sand filter. [Minn. R. 7090]
13.3 Permittees must clean the permanent stormwater treatment system of any accumulated sediment and must ensure the
system meets all applicable requirements in Section 15 through 19 and is operating as designed. [Minn. R. 7090]
13.4 Permittees must remove all sediment from conveyance systems prior to submitting the NOT. [Minn. R. 7090]
13.5 Permittees must remove all temporary synthetic erosion prevention and sediment control BMPs prior to submitting the
NOT.Permittees may leave BMPs designed to decompose on-site in place. [Minn. R. 7090]
13.6 For residential construction only, permit coverage terminates on individual lots if the lot is sold to the homeowner,
structures are finished, and permanent cover has been established. For lots that are sold to the homeowner where
permanent cover has not been established, coverage terminates if temporary erosion prevention and downgradient
perimeter control is properly installed and the permittee distributes the MPCA's "Homeowner Fact Sheet" to the
homeowner. [Minn. R. 7090]
13.7 For construction projects on agricultural land (e.g., pipelines across cropland), permittees must return the disturbed land to its
preconstruction agricultural use prior to submitting the NOT. [Minn. R. 7090]
13.8 When submitting the NOT, Permittees must include either ground or aerial photographs showing the requirements of 13.2
have been met. Permittees are not required to take photographs of every distinct part of the site, however the conditions
portrayed must be substantially similar to those areas that are not photographed. Photographs must be clear and in focus and must
include the date the photo was taken. [Minn. R. 7090]
14.1 Temporary Sediment Basins. [Minn. R. 7090]
14.2 Where ten (10) or more acres of disturbed soil (5 acres for sites discharging to special or impaired waters, see section 24)
drain to a common location, permittees must provide a temporary sediment basin to provide treatment of the runoff
before it leaves the construction site or enters surface waters. Permittees may convert a temporary sediment basin to a
permanent basin after construction is complete. The temporary basin is no longer required when permanent cover has
reduced the acreage of disturbed soil to less than ten (10) acres draining to a common location. [Minn. R. 7090]
14.3 The temporary basin must provide live storage for a calculated volume of runoff from a two (2)-year, 24-hour storm from
each acre drained to the basin or 1,800 cubic feet of live storage per acre drained, whichever is greater. [Minn. R. 7090]
14.4 Where permittees have not calculated the two (2)-year, 24-hour storm runoff amount, the temporary basin must provide
3,600 cubic feet of live storage per acre of the basins' drainage area. [Minn. R. 7090]
14.5 Permittees must design basin outlets to prevent short-circuiting and the discharge of floating debris. [Minn. R. 7090]
14.6 Permittees must design the outlet structure to withdraw water from the surface to minimize the discharge of pollutants.
Permittees may temporarily suspend the use of a surface withdrawal mechanism during frozen conditions. The basin must
include a stabilized emergency overflow to prevent failure of pond integrity. [Minn. R. 7090]
14.7 Permittees must provide energy dissipation for the basin outlet within 24 hours after connection to a surface water.
[Minn. R. 7090]
14.8 Permittees must locate temporary basins outside of surface waters and any buffer zone required in item 23.11.[Minn. R. 7090]
14.9 Permittees must construct the temporary basins prior to disturbing 10 or more acres of soil draining to a common location.
[Minn. R. 7090]
14.10 Where a temporary sediment basin meeting the requirements of item 14.3 through 14.9 is infeasible, permittees must
install effective sediment controls such as smaller sediment basins and/or sediment traps, silt fences, vegetative buffer
strips or any appropriate combination of measures as dictated by individual site conditions. In determining whether
installing a sediment basin is infeasible, permittees must consider public safety and may consider factors such as site soils,
slope, and available area on-site. Permittees must document this determination of infeasibility in the SWPPP.[Minn. R. 7090]
15.1 Permanent Stormwater Treatment System. [Minn. R. 7090]
15.2 Permittees must design and implement the project so all stormwater discharged from the project during and after
construction activities does not cause a violation of state water quality standards, including nuisance conditions, erosion in
receiving channels or on downslope properties, or a significant adverse impact to wetlands caused by inundation or
decrease of flow. [Minn. R. 7090]
NPDES REQUIREMENTS
15.3 Permittees must design and construct a permanent stormwater treatment system to treat the water quality volume if the
project's ultimate development replaces vegetation and/or other pervious surfaces creating a net increase of one (1) or more
acres of cumulative impervious surface. [Minn. R. 7090]
15.4 Permittees must calculate the water quality volume as one (1) inch times the net increase of impervious surfaces created by
the project. [Minn. R. 7090]
15.5 Permittees must first consider volume reduction practices on-site (e.g., infiltration or other) when designing the permanent
stormwater treatment system. If this permit prohibits infiltration as described in item 16.14 through item 16.21, permittees may
consider a wet sedimentation basin, filtration basin or regional pond. This permit does not consider wet sedimentation basins and
filtration systems to be volume reduction practices. [Minn. R. 7090]
15.6 For projects where the full volume reduction requirement cannot be met on-site, (e.g., the site has infiltration prohibitions),
permittees must document the reasons in the SWPPP. [Minn. R. 7090]
15.7 Permittees must discharge the water quality volume to a permanent stormwater treatment system prior to discharge to a
surface water. For purposes of this item, surface waters do not include man-made drainage systems that convey
stormwater to a permanent stormwater treatment system. [Minn. R. 7090]
15.8 Where the proximity to bedrock precludes the installation of any of the permanent stormwater treatment practices
required by Sections 15 through 19, permittees must install other treatment such as grassed swales, smaller ponds, or grit
chambers, prior to the discharge of stormwater to surface waters. [Minn. R. 7090]
15.9 For linear projects where permittees cannot treat the entire water quality volume within the existing right-of-way,
permittees must make a reasonable attempt to obtain additional right-of-way, easement or other permission for
stormwater treatment during the project planning process. Documentation of these attempts must be in the SWPPP.
Permittees must still consider volume reduction practices first as described in item 15.5. If permittees cannot obtain
additional right-of-way, easement or other permission, they must maximize the treatment of the water quality volume prior
to discharge to surface waters. [Minn. R. 7090]
16.1 Infiltration Systems. [Minn. R. 7090]
16.2 Infiltration options include, but are not limited to: infiltration basins, infiltration trenches, rainwater gardens, bioretention
areas without underdrains, swales with impermeable check dams, and natural depressions. If permittees utilize an infiltration
system to meet the requirements of this permit, they must incorporate the design parameters in item 16.3
through item 16.21. Permittees must follow the infiltration prohibition in item 16.14 anytime an infiltration system is
designed, including those not required by this permit. [Minn. R. 7090]
16.3 Permittees must design infiltration systems such that pre-existing hydrologic conditions of wetlands in the vicinity are not
impacted (e.g., inundation or breaching a perched water table supporting a wetland). [Minn. R. 7090]
16.4 Permittees must not excavate infiltration systems to final grade, or within three (3) feet of final grade, until the contributing
drainage area has been constructed and fully stabilized unless they provide rigorous erosion prevention and sediment controls
(e.g., diversion berms) to keep sediment and runoff completely away from the infiltration area. [Minn. R. 7090]
16.5 When excavating an infiltration system to within three (3) feet of final grade, permittees must stake off and mark the area so
heavy construction vehicles or equipment do not compact the soil in the infiltration area. [Minn. R. 7090]
16.6 Permittees must use a pretreatment device such as a vegetated filter strip, forebay, or water quality inlet (e.g., grit
chamber) to remove solids, floating materials, and oil and grease from the runoff, to the maximum extent practicable,
before the system routes stormwater to the infiltration system. [Minn. R. 7090]
16.7 Permittees must design infiltration systems to provide a water quality volume (calculated as an instantaneous volume) of
one (1) inch of runoff, or one (1) inch minus the volume of stormwater treated by another system on the site, from the net
increase of impervious surfaces created by the project. [Minn. R. 7090]
16.8 Permittees must design the infiltration system to discharge all stormwater (including stormwater in excess of the water
quality volume) routed to the system through the uppermost soil surface or engineered media surface within 48 hours.
Permittees must route additional flows that cannot infiltrate within 48 hours to bypass the system through a stabilized
discharge point. [Minn. R. 7090]
16.9 Permittees must provide a means to visually verify the infiltration system is discharging through the soil surface or filter
media surface within 48 hours or less. [Minn. R. 7090]
16.10 Permittees must provide at least one soil boring, test pit or infiltrometer test in the location of the infiltration practice for
determining infiltration rates. [Minn. R. 7090]
16.11 For design purposes, permittees must divide field measured infiltration rates by 2 as a safety factor or permittees can use
soil-boring results with the infiltration rate chart in the Minnesota Stormwater Manual to determine design infiltration
rates.When soil borings indicate type A soils, permittees should perform field measurements to verify the rate is not above 8.3
inches per hour. This permit prohibits infiltration if the field measured infiltration rate is above 8.3 inches per hour.
[Minn. R. 7090]
16.12 Permittees must employ appropriate on-site testing to ensure a minimum of three (3) feet of separation from the
seasonally saturated soils (or from bedrock) and the bottom of the proposed infiltration system. [Minn. R. 7090]
16.13 Permittees must design a maintenance access, typically eight (8) feet wide, for the infiltration system. [Minn. R. 7090]
16.14 This permit prohibits permittees from constructing infiltration systems that receive runoff from vehicle fueling and
maintenance areas including construction of infiltration systems not required by this permit. [Minn. R. 7090]
16.15 This permit prohibits permittees from constructing infiltration systems where infiltrating stormwater may mobilize high
levels of contaminants in soil or groundwater. Permittees must either complete the MPCA's contamination screening
checklist or conduct their own assessment to determine the suitability for infiltration. Permittees must retain the checklist
or assessment with the SWPPP. For more information and to access the MPCA's "contamination screening checklist" see the
Minnesota Stormwater Manual. [Minn. R. 7090]
16.16 This permit prohibits permittees from constructing infiltration systems in areas where soil infiltration rates are field
measured at more than 8.3 inches per hour unless they amend soils to slow the infiltration rate below 8.3 inches per hour.
[Minn. R. 7090]
16.17 This permit prohibits permittees from constructing infiltration systems in areas with less than three (3) feet of separation
distance from the bottom of the infiltration system to the elevation of the seasonally saturated soils or the top of bedrock.
[Minn. R. 7090]
16.18 This permit prohibits permittees from constructing infiltration systems in areas of predominately Hydrologic Soil Group type
D soils (clay). [Minn. R. 7090]
16.19 This permit prohibits permittees from constructing infiltration systems within a Drinking Water Supply Management Area
(DWSMA) as defined in Minn. R. 4720.5100, subp. 13, if the system will be located:
a.in an Emergency Response Area (ERA) within a DWSMA classified as having high or very high vulnerability as defined by the
Minnesota Department of Health; or
b.in an ERA within a DWSMA classified as moderate vulnerability unless a regulated MS4 Permittee performed or approved a
higher level of engineering review sufficient to provide a functioning treatment system and to prevent adverse impacts to
groundwater; or
c.outside of an ERA within a DWSMA classified as having high or very high vulnerability, unless a regulated MS4 Permittee
performed or approved a higher level of engineering review sufficient to provide a functioning treatment system and to prevent
adverse impacts to groundwater.
See "higher level of engineering review" in the Minnesota Stormwater Manual for more information. [Minn. R. 7090]
16.20 This permit prohibits permittees from constructing infiltration systems in areas within 1,000 feet upgradient or 100 feet
downgradient of active karst features. [Minn. R. 7090]
16.21 This permit prohibits permittees from constructing infiltration systems in areas that receive runoff from the following
industrial facilities not authorized to infiltrate stormwater under the NPDES stormwater permit for industrial activities:
wood preserving facilities; automobile salvage yards; scrap recycling and waste recycling facilities; hazardous waste
treatment, storage, or disposal facilities; or air transportation facilities that conduct deicing activities. [Minn. R. 7090]
17.1 Filtration Systems. [Minn. R. 7090]
17.2 Filtration options include but are not limited to: sand filters with underdrains, biofiltration areas, swales using underdrains
with impermeable check dams and underground sand filters. If permittees utilize a filtration system to meet the permanent
stormwater treatment requirements of this permit, they must comply with items 17.3 through 17.11. [Minn. R. 7090]
17.3 Permittees must not install filter media until they construct and fully stabilize the contributing drainage area unless they
provide rigorous erosion prevention and sediment controls (e.g., diversion berms) to keep sediment and runoff completely
away from the filtration area. [Minn. R. 7090]
17.4 Permittees must design filtration systems to remove at least 80 percent of TSS. [Minn. R. 7090]
17.5 Permittees must use a pretreatment device such as a vegetated filter strip, small sedimentation basin, water quality inlet,
forebay or hydrodynamic separator to remove settleable solids, floating materials, and oils and grease from the runoff, to the
maximum extent practicable, before runoff enters the filtration system. [Minn. R. 7090]
17.6 Permittees must design filtration systems to treat a water quality volume (calculated as an instantaneous volume) of one (1)
inch of runoff, or one (1) inch minus the volume of stormwater treated by another system on the site, from the net increase of
impervious surfaces created by the project. [Minn. R. 7090]
17.7 Permittees must design the filtration system to discharge all stormwater (including stormwater in excess of the water
quality volume) routed to the system through the uppermost soil surface or engineered media surface within 48 hours.
Additional flows that the system cannot filter within 48 hours must bypass the system or discharge through an emergency
overflow. [Minn. R. 7090]
17.8 Permittees must design the filtration system to provide a means to visually verify the system is discharging through the soil
surface or filter media within 48 hours. [Minn. R. 7090]
17.9 Permittees must employ appropriate on-site testing to ensure a minimum of three (3) feet of separation between the
seasonally saturated soils (or from bedrock) and the bottom of the proposed filtration system. [Minn. R. 7090]
17.10 Permittees must ensure that filtration systems with less than three (3) feet of separation between seasonally saturated soils
or from bedrock are constructed with an impermeable liner. [Minn. R. 7090]
17.11 The permittees must design a maintenance access, typically eight (8) feet wide, for the filtration system. [Minn. R. 7090]
18.1 Wet Sedimentation Basin. [Minn. R. 7090]
18.2 Permittees using a wet sedimentation basin to meet the permanent stormwater treatment requirements of this permit
must incorporate the design parameters in item 18.3 through 18.10. [Minn. R. 7090]
18.3 Permittees must design the basin to have a permanent volume of 1,800 cubic feet of storage below the outlet pipe for each
acre that drains to the basin. The basin's permanent volume must reach a minimum depth of at least three (3) feet and
must have no depth greater than 10 feet. Permittees must configure the basin to minimize scour or resuspension of solids.
[Minn. R. 7090]
18.4 Permittees must design the basin to provide live storage for a water quality volume (calculated as an instantaneous volume)
of one (1) inch of runoff, or one (1) inch minus the volume of stormwater treated by another system on the site, from the net
increase in impervious surfaces created by the project. [Minn. R. 7090]
18.5 Permittees must design basin outlets so the water quality volume discharges at no more than 5.66 cubic feet per second (cfs)
per acre of surface area of the basin. [Minn. R. 7090]
18.6 Permittees must design basin outlets to prevent short-circuiting and the discharge of floating debris. Basin outlets must
have energy dissipation. [Minn. R. 7090]
18.7 Permittees must design the basin to include a stabilized emergency overflow to accommodate storm events in excess of the
basin's hydraulic design. [Minn. R. 7090]
18.8 Permittees must design a maintenance access, typically eight (8) feet wide, for the basin. [Minn. R. 7090]
18.9 Permittees must locate basins outside of surface waters and any buffer zone required in item 23.11. Permittees must design
basins to avoid draining water from wetlands unless the impact to the wetland complies with the requirements of Section 22.
[Minn. R. 7090]
18.10 Permittees must design basins using an impermeable liner if located within active karst terrain. [Minn. R. 7090]
19.1 Regional Wet Sedimentation Basins. [Minn. R. 7090]
19.2 When the entire water quality volume cannot be treated by volume reduction practices on-site, permittees can use or
create regional wet sedimentation basins provided they are constructed basins, not a natural wetland or water body,
(wetlands used as regional basins must be mitigated for, see Section 22). The owner must ensure the regional basin
conforms to all requirements for a wet sedimentation basin as described in items 18.3 through 18.10 and must be large
enough to account for the entire area that drains to the regional basin. Permittees must verify that the regional basin will
discharge at no more than 5.66 cfs per acre of surface area of the basin and must provide a live storage volume of one-inch
times all the impervious area draining to the basin. Permittees cannot significantly degrade waterways between the project
and the regional basin. The owner must obtain written authorization from the applicable LGU or private entity that owns
and maintains the regional basin. [Minn. R. 7090]
20.1 SWPPP Availability. [Minn. R. 7090]
20.2 Permittees must keep the SWPPP on-site, or electronically available on-site, during normal working hours with personnel
who have operational control over the applicable portion of the site, including all changes to the SWPPP, inspections, and
maintenance records. [Minn. R. 7090]
21.1 Training Requirements. [Minn. R. 7090]
21.2 Permittees must ensure all of the following individuals receive training and the content and extent of the training is
commensurate with the individual's job duties and responsibilities with regard to activities covered under this permit:
a.Individuals preparing the SWPPP for the project.
b.Individuals overseeing implementation of, revising and/or amending the SWPPP and individuals performing inspections
for the project. One of these individuals must be available for an on-site inspection within 72 hours upon request by the MPCA.
c.Individuals performing or supervising the installation, maintenance and repair of BMPs. [Minn. R. 7090]
21.3 Permittees must ensure individuals identified in Section 21 receive training from local, state, federal agencies, professional
organizations, or other entities with expertise in erosion prevention, sediment control, permanent stormwater treatment and the
Minnesota NPDES/SDS Construction Stormwater permit. Permittees must ensure these individuals attend a refresher-training
course every three (3) years. [Minn. R. 7090]
22.1 Requirements for Discharges to Wetlands. [Minn. R. 7050.0186]
22.2 If the project has any discharges with the potential for significant adverse impacts to a wetland, (e.g., conversion of a
natural wetland to a stormwater pond) permittees must demonstrate that the wetland mitigative sequence has been
followed in accordance with items 22.3 or 22.4. [Minn. R. 7050.0186]
22.3 If the potential adverse impacts to a wetland on a specific project site are addressed by permits or other approvals from an
official statewide program (U.S. Army Corps of Engineers 404 program, Minnesota Department of Natural Resources, or the State
of Minnesota Wetland Conservation Act) that are issued specifically for the project and project site, permittees may
use the permit, decision or other determination issued by these agencies to show the potential adverse impacts are
addressed. For purposes of this permit, deminimus actions are determinations by the permitting agency that address the
project impacts, whereas a non-jurisdictional determination does not address project impacts. [Minn. R. 7090]
22.4 If there are impacts from the project not addressed in one of the permits, decisions or other determinations discussed in
item 22.3 (e.g., permanent inundation or flooding of the wetland, significant degradation of water quality, excavation,
filling, draining), permittees must minimize all adverse impacts to wetlands by utilizing appropriate measures. Permittees
must use measures based on the nature of the wetland, its vegetative community types and the established hydrology.
These measures include in order of preference:
a.avoid all significant adverse impacts to wetlands from the project and post-project discharge;
b.minimize any unavoidable impacts from the project and post-project discharge;
c.provide compensatory mitigation when the permittees determine(s) that there is no reasonable and practicable
alternative to having a significant adverse impact on a wetland. For compensatory mitigation, wetland restoration or
creation must be of the same type, size and whenever reasonable and practicable in the same watershed as the impacted
wetland. [Minn. R. 7050.0186]
23.1 Additional Requirements for Discharges to Special (Prohibited, Restricted, Other) and Impaired Waters. [Minn. R. 7090]
23.2 The BMPs identified for each special or impaired water are required for those areas of the project draining to a discharge
point on the project that is within one mile (aerial radius measurement) of special or impaired water and flows to that
special or impaired water. [Minn. R. 7090]
23.3 Discharges to the following special waters identified as Prohibited in Minn. R. 7050.0335 subp. 3 must incorporate the BMPs
outlined in items 23.9, 23.10, 23.11, 23.13 and 23.14:
a.Boundary Waters Canoe Area Wilderness; Voyageurs National Park; Kettle River from the site of the former dam at
Sandstone to its confluence with the Saint Croix River; Rum River from Ogechie Lake spillway to the northernmost
confluence with Lake Onamia.
b.Those portions of Lake Superior North of latitude 47 degrees, 57 minutes, 13 seconds, East of Hat Point, South of the
Minnesota-Ontario boundary, and West of the Minnesota-Michigan boundary;
c.Scientific and Natural Areas identified as in Minn. R. 7050.0335 Subp. 3: Boot Lake, Anoka County; Kettle River in sections
15, 22, 23, T 41 N, R 20, Pine County; Pennington Bog, Beltrami County; Purvis Lake-Ober Foundation, Saint Louis County; waters
within the borders of Itasca Wilderness Sanctuary, Clearwater County; Iron Springs Bog, Clearwater County;
Wolsfeld Woods, Hennepin County; Green Water Lake, Becker County; Blackdog Preserve, Dakota County; Prairie Bush
Clover, Jackson County; Black Lake Bog, Pine County; Pembina Trail Preserve, Polk County; and Falls Creek, Washington
County. [Minn. R. 7050.0335, subp. 3]
23.4 Discharges to the following special waters identified as Restricted in Minn. R. 7050.0335 subp.1 must incorporate the BMPs
outlined in items 23.9, 23.10 and 23.11:
a.Lake Superior, except those portions identified as prohibited in item 23.3.b;
b.Mississippi River in those portions from Lake Itasca to the southerly boundary of Morrison County that are included in the
Mississippi Headwaters Board comprehensive plan dated February 12, 1981;
c.Scenic or Recreational River Segments: Saint Croix River, entire length; Cannon River from northern city limits of Faribault
to its confluence with the Mississippi River; North Fork of the Crow River from Lake Koronis outlet to the Meeker-Wright county
line; Kettle River from north Pine County line to the site of the former dam at Sandstone; Minnesota River from Lac que Parle
dam to Redwood County State Aid Highway 11; Mississippi River from County State Aid Highway 7 bridge in Saint Cloud to
northwestern city limits of Anoka; and Rum River from State Highway 27 bridge in Onamia to Madison and Rice streets in Anoka;
d.Lake Trout Lakes identified in Minn. R. 7050.0335 including lake trout lakes inside the boundaries of the Boundary Waters
Canoe Area Wilderness and Voyageurs National Park;
e.Calcareous Fens listed in Minn. R. 7050.0335, subp. 1. [Minn. R. 7050.0335, subp. 1]
23.5 Discharges to the Trout Lakes (other special water) identified in Minn. R. 6264.0050, subp. 2 and Minn. R. 7050.0420 must
incorporate the BMPs outlined in items 23.9, 23.10 and 23.11. [Minn. R. 6264.0050, subp. 2, Minn. R. 7050]
23.6 Discharges to the Trout Streams (other special water) listed in Minn. R. 6264.0050, subp. 4 and Minn. R. 7050.0420 must
incorporate the BMPs outlined in items 23.9, 23.10, 23.11 and 23.12. [Minn. R. 6264.0050, subp. 4, Minn. R. 7050]
23.7 Discharges to impaired waters or a water with an USEPA approved TMDL for any of the impairments listed in this item must
incorporate the BMPs outlined in items 23.9 and 23.10. Impaired waters are waters identified as impaired under section
303 (d) of the federal Clean Water Act for phosphorus (nutrient eutrophication biological indicators, nutrients), turbidity,
TSS, dissolved oxygen or aquatic biota (fish bioassessment, aquatic plant bioassessment and aquatic macroinvertebrate
bioassessment, benthic macroinvertebrate bioassessment). Terms used for the pollutants or stressors in this item are
subject to change. [Minn. R. 7090]
23.8 Where the additional BMPs in this Section conflict with requirements elsewhere in this permit, items 23.9 through 23.14
take precedence. [Minn. R. 7090]
23.9 Permittees must immediately initiate stabilization of exposed soil areas, as described in item 8.5 & 8.8, and complete the
stabilization within seven (7) calendar days after the construction activity in that portion of the site temporarily or
permanently ceases. [Minn. R. 7090]
23.10 Permittees must provide a temporary sediment basin as described in Section 14 for common drainage locations that serve
an area with five (5) or more acres disturbed at one time. [Minn. R. 7090]
23.11 Permittees must include an undisturbed buffer zone of not less than 100 linear feet from a special water (not including
tributaries) and must maintain this buffer zone at all times, both during construction and as a permanent feature post
construction, except where a water crossing or other encroachment is necessary to complete the project. Permittees must
fully document the circumstance and reasons the buffer encroachment is necessary in the SWPPP and include restoration
activities. This permit allows replacement of existing impervious surface within the buffer. Permittees must minimize all
potential water quality, scenic and other environmental impacts of these exceptions by the use of additional or redundant
(double)BMPs and must document this in the SWPPP for the project. [Minn. R. 7090]
23.12 Permittees must design the permanent stormwater treatment system so the discharge from the project minimizes any
increase in the temperature of trout streams resulting from the one (1) and two (2) year 24-hour precipitation events. This
includes all tributaries of designated trout streams located within the same Public Land Survey System (PLSS) Section.
Permittees must incorporate one or more of the following measures, in order of preference:
a.Provide stormwater infiltration or other volume reduction practices as described in item 15.4 and 15.5, to reduce runoff.
Infiltration systems must discharge all stormwater routed to the system within 24 hours.
b.Provide stormwater filtration as described in Section 17. Filtration systems must discharge all stormwater routed to the
system within 24 hours.
c.Minimize the discharge from connected impervious surfaces by discharging to vegetated areas, or grass swales, and
through the use of other non-structural controls.
d.If ponding is used, the design must include an appropriate combination of measures such as shading, vegetated swale
discharges or constructed wetland treatment cells that limit temperature increases. The pond must be designed as a dry pond
and should draw down in 24 hours or less.
e.Other methods that minimize any increase in the temperature of the trout stream. [Minn. R. 7090]
23.13 Permittees must conduct routine site inspections once every three (3) days as described in item 11.2 for projects that
discharge to prohibited waters. [Minn. R. 7090]
23.14 If discharges to prohibited waters cannot provide volume reduction equal to one (1) inch times the net increase of
impervious surfaces as required in item 15.4 and 15.5, permittees must develop a permanent stormwater treatment system
design that will result in no net increase of TSS or phosphorus to the prohibited water. Permittees must keep the plan in the
SWPPP for the project. [Minn. R. 7090]
24.1 General Provisions. [Minn. R. 7090]
24.2 If the MPCA determines that an individual permit would more appropriately regulate the construction activity, the MPCA
may require an individual permit to continue the construction activity. Coverage under this general permit will remain in
effect until the MPCA issues an individual permit. [Minn. R. 7001.0210, subp. 6]
24.3 If the permittee cannot meet the terms and conditions of this general permit, an owner may request an individual permit, in
accordance with Minn. R. 7001.0210 subp. 6. [Minn. R. 7001.0210, subp. 6]
24.4 Any interested person may petition the MPCA to require an individual NPDES/SDS permit in accordance with 40 CFR
122.28(b)(3). [40 CFR 122.28(b)(3)]
24.5 In addition to the requirement found in section 20, permittees must make the SWPPP, including all inspection reports,
maintenance records, training records and other information required by this permit, available to federal, state, and local
officials within three (3) days upon request for the duration of the permit and for three (3) years following the NOT.
[Minn. R. 7090]
24.6 Permittees may not assign or transfer this permit except when the transfer occurs in accordance with the applicable
requirements of item 3.7 and 3.8. [Minn. R. 7090]
24.7 Nothing in this permit must be construed to relieve the permittees from civil or criminal penalties for noncompliance with
the terms and conditions provided herein. Nothing in this permit must be construed to preclude the initiation of any legal action
or relieve the permittees from any responsibilities, liabilities, or penalties to which the permittees is/are or may be subject to
under Section 311 of the Clean Water Act and Minn. Stat. Section 115 and 116, as amended. Permittees are not
liable for permit requirements for activities occurring on those portions of a site where the permit has been transferred to
another party as required in item 3.7 or the permittees have submitted the NOT as required in Section 4. [Minn. R. 7090]
24.8 The provisions of this permit are severable. If any provision of this permit or the application of any provision of this permit to
any circumstances is held invalid, the application of such provision to other circumstances, and the remainder of this permit must
not be affected thereby. [Minn. R. 7090]
24.9 The permittees must comply with the provisions of Minn. R. 7001.0150, subp. 3 and Minn. R. 7001.1090, subp. 1(A), 1(B),
1(C), 1(H), 1(I), 1(J), 1(K), and 1(L). [Minn. R. 7001]
24.10 The permittees must allow access as provided in 40 CFR 122.41(i) and Minn. Stat. Section 115.04. The permittees must
allow representatives of the MPCA or any member, employee or agent thereof, when authorized by it, upon presentation of
credentials, to enter upon any property, public or private, for the purpose of obtaining information or examination of
records or conducting surveys or investigations. [40 CFR 122.41(i)]
24.11 For the purposes of Minn. R. 7090 and other documents that reference specific sections of this permit, "Stormwater
Discharge Design Requirements" corresponds to Sections 5, 6 and 14 through 21; "Construction Activity Requirements"
corresponds to Sections 7 through 13; and "Appendix A" corresponds to Sections 22 and 23. [Minn. R. 7090]
Page 79 of 124
PROJECT NO.
24282
CAD FILE
02/25/26
DATE
REVISIONS
DRAWN BY Date:Reg.No.ERIC P. FAGERBERG5377202/25/262026-04-02 CITY COMMENTS2999 WEST C.R. 42, SUITE 100BURNSVILLE, MN 55306PHONE: 952-890-6044info@mnhill.comwww.mnhill.comI hereby certify that this plan,specification or report was preparedby me or under my direct supervisionand that I am a duly LicensedProfessional Engineer under the lawsof the State of Minnesota.PRELIMINARYMENDOTA HEIGHTS, MINNESOTALEXINGTON HEIGHTS ADDITIONCONDOR CORPORATIONFOR2320 LEXINGTON AVENUE, MENDOTA HEIGHTS, MN 55120F:\_Civil 3D Projects\24282\PRE-PLAT PLANS\24282ERD.dwg - 4/02/2026 11:26AM24282ERD
C303
VUNEROSION & SEDIMENT CONTROL DETAILSPage 80 of 124
ooo ooEXISTINGCLUBHOUSEPOOLPONDPARKING GARAGEBELOW GRADEPATIOGARAGEPROPOSED INFILTRATION BASIN
12" RCP12" RCP12" CIP 12" CIP12" RCP12" RCP PROPOSED INFILTRATION BASINBOTTOM=878.00OLE=878.75100 YEAR HWL=879.49INFILTRATION CAPACITY=4,587 CFHALF-STOP ELEVATORAT MAIN ENTRANCELEXINGTON AVENUE
INTERSTATE 35E11.17%PROPOSED BUILDINGFFE=896.00GFE=885.33GS895.60GS/EOF895.00CB/LP889.63GS890.40TC/CB883.32TC/CB883.82TC890.60TC891.20MATCH EX TC883.34TC894.32TC895.06TC/HP894.15TC893.75MATCH EX TC???TC891.30TC891.20TC891.40TC888.75TC888.48TC885.83GS890.10GS889.80TC/HP894.65TC888.30TC888.17GS895.50GS894.45GS890.46GS890.80GS894.30GS894.00GS896.00GS896.00GS896.00GS895.50GS895.50GS896.00GS895.60GS895.60TC885.83TC/LP885.50TC/LP885.50MATCH EX TC888.03FULL TC890.53TC/G890.10TC/G890.20FULL TC890.77TC890.80TC890.50TC889.35GS894.00GS893.00GS890.77GS892.13GS892.71GS894.28GS893.25MATCH EX TC882.28CONC891.16892890888890892892890888886884882880880878882884886888890892886884882884882884886886888890
8928
9
2
894896898900902904906908910912892894896898900906908910912892894896898900902904882892890890892888884890888886
TC888.65TC887.97TC887.87TC888.35MATCH EX TC888.07TC888.20GS882.00GS882.00GS882.00GS882.00GS896.00888CONC888.78894
892 878TC891.85TC892.20892TC893.828948
9
2TW:886.1BW:886.1TW:888.5BW:886.1TW:888.5BW:886.1TW:888.5BW:886.1TW:886.1BW:886.1880882884886 890888 880882GS878.00GS878.00GS878.00GS878.00882880EXISTINGAPARTMENTBUILDINGEXISTINGTENNISCOURTEXISTINGPOOLEXISTINGCLUBHOUSEEXISTINGPONDEX BIT879.62EOF881.50PROJECT NO.24282CAD FILE02/25/26DATEREVISIONSDRAWN BYDate:Reg.No.
ERIC P. FAGERBERG
5377202/25/262026-04-02 CITY COMMENTS2999 WEST C.R. 42, SUITE 100
BURNSVILLE, MN 55306
PHONE: 952-890-6044
info@mnhill.com
www.mnhill.com
I hereby certify that this plan,
specification or report was prepared
by me or under my direct supervision
and that I am a duly Licensed
Professional Engineer under the laws
of the State of Minnesota.
P
R
E
L
I
M
I
N
A
R
Y
MENDOTA HEIGHTS, MINNESOTA
LEXINGTON HEIGHTS ADDITION
CONDOR CORPORATIONFOR
2320 LEXINGTON AVENUE, MENDOTA HEIGHTS, MN 55120
F:\_Civil 3D Projects\24282\PRE-PLAT PLANS\24282G.dwg - 4/02/2026 11:27AM
GRADING & DRAINAGE PLAN PROPOSED CONCRETEPROPOSED ASPHALT SURFACEPROPOSED INFILTRATION BASINPROPOSED WATERMAINIIPROPOSED SANITARY SEWERPROPOSED STORM SEWER>>PROPOSED CURB & GUTTERPROPOSED RETAINING WALLPROPOSED CONTOUR923PROPOSED EMERGENCY OVERFLOWPROPOSED GRADING LIMITSEXISTING TELEPHONE BOXEXISTING ELECTRIC TRANSFORMER BOXEXISTING TREELINE/TREES>IEXISTING STORM SEWEREXISTING SANITARY SEWEREXISTING WATERMAIN>IEXISTING CURB & GUTTEREXISTING ASPHALTEXISTING CONCRETESB-1EEEEXISTING UNDERGROUND ELECTRICEXISTING TELEVISION BOXEXISTING SOIL BORING LOCATIONEXISTING CLEANOUTEXISTING SIGNTTVGGGEXISTING UNDERGROUND GASEXISTING CONTOUR923LEGEND24282GC400Know what'sbelow.before you dig.CallRSCALE IN FEET04080EPFPage 81 of 124
G GGGGGGGGGGGGGGGGGGGGGGGGGGoooo
G G
G
G
G
G
G
G
G
G
G
G
G GGGGGGGG G G
oX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXooooooooooo
o
o
o oOHUOHUOHUOHUOHUOHUOHUOHUOHUOHUOHUOHUOHUOHUOHUOHUOHUOHUOHUOHUOHUOHUOHUOHUOHUOHUOHUOHUOHUOHUOHUOHUOHUOHUOHUOHUOHUE
E
E
E
E
E
EEEEEEEEEEEEEEEEEEEEEEOHU OHU
E
E
E
E
E
E
E
E
E
E
E
E ET
T
V
T
>>>>>>>IIIIIIIIIIIIIIIIIIII
XXXXXXI I I I
I
I I
I
I
I
>>>>>>>>>>>>>>>>>>>>>>EXISTING
APARTMEN
T
BUILDING
EXISTING
TENNIS
COURT
EXISTING
POOL
EXISTING
CLUBHOUS
E
EXISTING
POND
PROPOSED BUILDING
INTERSTATE 35ELEXINGTON AVENUE(MNDOT R/W PLAT NO. 19-37)30000
TRD 10 ASH
30001
TRD 8 ASH
30002
TRD 10 8 ASH
30003
TRD 8 ASH
30004
TRD 8 ASH
30005
TRD 7 ASH
30006
TRD 9 ASH 30007
TRD 8 ASH
30008
TRD 10 ASH
30009
TRD 8 ASH
30010
TRD 7 ASH30011
TRD 6 ASH
30012
TRD 7 ASH
30013
TRD 6 ASH
30014
TRD 8 6 ASH
30015
TRD 11 10 ASH
30016
TRD 8 ASH
30017
TRD 7 ASH
30018
TRD 7 ASH
30019
TRD 10 ASH
30020
TRD 22 WALNUT
30021
TRD 8 WALNUT
30022
TRD 14 14 ASH
30023
TRD 12 BASSWOOD
30024
TRD 10 BASSWOOD
30025
TRD 9 ASH
30026
TRD 18 WALNUT
30027
TRD 12 12 OAK30028
TRD 9 MAPLE
30029
TRD 9 ASH
30030
TRD 7 MAPLE
30031
TRD 8 MAPLE
30032
TRD 12 WALNUT
30033
TRD 13 12 11 WALNUT
20026
" ASH
20029
" SPRUCE
20031
" SPRUCE
20071
" ASH
20107
" SPRUCE
20108
" SPRUCE
20109
" SPRUCE
20116
" ASH
20117
" SPRUCE
20166
18" LOCUST
20167
18" LOCUST
20173
10" SOFT MAPLE
20179
11" PINE
20183
15" CRAB
20184
8" CRAB
20195
4" PINE
20203
10" SOFT MAPLE
20209
6" SOFT MAPLE
20214
11" PINE
20221
24" LOCUST
20222
18" LOCUST
20224
19" LOCUST
20234
16" LOCUST
20261
24" LOCUST
20265
8" SOFT MAPLE
20275
10" CRAB
20276
12" CRAB
20277
15" CRAB
20278
10" CRAB
20279
12" CRAB
20280
15" CRAB
20293
17" CRAB
20294
11" PINE
20295
14" SOFT MAPLE
20296
15" SOFT MAPLE 20297
11" SOFT MAPLE
20298
18" ASH
20299
8" SOFT MAPLE
20300
6" OAK
20301
14" SOFT MAPLE
20302
17" SOFT MAPLE
20369
20" ASH
PROJECT NO.
24282
CAD FILE
02/25/26
DATE
REVISIONS
DRAWN BY Date:Reg.No.ERIC P. FAGERBERG5377202/25/262026-04-02 CITY COMMENTS2999 WEST C.R. 42, SUITE 100BURNSVILLE, MN 55306PHONE: 952-890-6044info@mnhill.comwww.mnhill.comI hereby certify that this plan,specification or report was preparedby me or under my direct supervisionand that I am a duly LicensedProfessional Engineer under the lawsof the State of Minnesota.PRELIMINARYMENDOTA HEIGHTS, MINNESOTALEXINGTON HEIGHTS ADDITIONCONDOR CORPORATIONFOR2320 LEXINGTON AVENUE, MENDOTA HEIGHTS, MN 55120F:\_Civil 3D Projects\24282\PRE-PLAT PLANS\24282TP.dwg - 4/02/2026 11:27AM24282TP
C401TREE PERSERVATIONVUN
LEGEND
Know what's below.
before you dig.Call
R
SCALE IN FEET
0 40 80
EXISTING TREE
GRADING/DISTURBANCE LIMITS
REMOVE TREE
EXISTING TREE (OFF-SITE)
TREE REMOVAL
POINT NO.SIZE (IN.)SPECIES
20026 XX ASH
20029 XX SPRUCE
20031 XX SPRUCE
20071 XX ASH
20107 XX SPRUCE
20108 XX SPRUCE
20109 XX SPRUCE
20116 XX ASH
20117 XX SPRUCE
20294 11 PINE
20295 14 SOFT MAPLE
20296 15 SOFT MAPLE
20297 56 SOFT MAPLE
20298 18 ASH
20299 20 SOFT MAPLE
20300 6 OAK
20369 20 ASH
30000 10 ASH
30001 8 ASH
30004 8 ASH
30005 7 ASH
30012 7 ASH
30013 6 ASH
30014 14 ASH
30015 21 ASH
30016 8 ASH
30017 7 ASH
30018 7 ASH
30025 9 ASH
30028 9 MAPLE
30029 9 ASH
30030 7 MAPLE
30031 8 MAPLE
30032 12 WALNUT
TOTAL TREES
REMOVED 35
TOTAL
CALIPERS INCH
REMOVED 317
Page 82 of 124
G GGGGGGGGGGGGGGGGGGGGGGGGGGoooo
G G
G
G
G
G
G
G
G
G
G
G
G GGGGGGGG G G
oX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXooooooooooo
o
o
o oOHUOHUOHUOHUOHUOHUOHUOHUOHUOHUOHUOHUOHUOHUOHUOHUOHUOHUOHUOHUOHUOHUOHUOHUOHUOHUOHUOHUOHUOHUOHUOHUOHUOHUOHUOHUOHUOHUE
E
E
E
E
E
EEEEEEEEEEEEEEEEEEEEEEOHU OHU
E
E
E
E
E
E
E
E
E
E
E
E ET
T
V
T
>>>>>>>IIIIIIIIIIIIIIIIIIII
XXXXXXI I I I
I
I I
I
I
I
>>>>>>>>>>>>>>>>>>>>>>STMH-104
RE 892.84
15" INV 884.75 S
18" INV 883.00 NW
BLD=9.84'
CB-105
RE 889.63
15" INV 885.67 N
BLD=3.96'
STMH-103
RE 891.66
18" INV 881.47 SE
18" INV 879.55 W
12" INV 879.55 S
BLD=12.11'
CBMH-102
RE 883.32
18" INV 878.99 E
18" INV 878.99 S
BLD=4.33'
CBMH-101
RE 883.82
18" INV 878.89 N
24" INV 878.93 SW
4.0' SUMP INV 874.89
BLD=8.93'
PROVIDE PRESERVER ENERGY DISSIPATOR & SKIMMER
SIZE PER MANUFACTURERS RECOMMENDATIONS
STMH-107
RE 888.98
12" INV 882.70 N
12" INV 882.79 SE
12" INV 888.48 NE
BLD=6.28'
FES-100
24" INV 878.75 NE
FES-200
18" INV 877.10 E
OCS-201
RE 879.03
18" INV 877.20 W
BLD=1.83'
162 LF - 18"
HDPE @ 0.3
5
%
25 LF - 18"
HDPE @ 0.40%
153
L
F
-
1
8
"
HDP
E
@
1
.
0
0
%102 LF - 15"HDPE @ 0.90%37 LF - 18"
RCP CL 5 @ 0.26%
RD-1
12" INV 890.00 W
16 LF - 12"
PVC SCH-40 @ 0.00%
STMH-106
12" INV 881.08 S
12" INV 881.08 N
12" INV 890.00 E153 LF - 12"HDPE @ 1.00%202 LF - 12"HDPE @ 0.80%41 LF - 12"
HDPE @ 0.50%
TRENCH DRAIN-1
RE 885.00
12" INV 883.00 NW
BLD=2.00'
SEE DETAIL
32 LF - 12"
PVC SCH-40 @ 4.68%
RD-2
12" INV 890.00 SW
157 LF - 8" PVCC-900 @ 1.10%EX SSMH
RIM=887.91
INV.=869.51
EX SSMH
RIM=891.16
INV.=868.09
EX 12" SAN
EX 12" SAN
8" SANITARY SERVICE
8" PLUG INV = 873.40
COORDINATE GAS MAIN CROSSING
W/ XXXXXXXXXX12" X 8" WET TAP W/ 8" G.V. & BOX
FIELD VERIFY SIZE AND LOCATION
PRIOR TO CONSTRUCTION
REPAIR LEXINGTON AVE TO EXISTING CONDITIONS
CONTRACTOR TO PROVIDE TRAFFIC CONTROL PLAN
8" PVC C-900
8" PVC
C
-
9
0
0 12'8" PVC WATER SERVICE
PROVIDE 8" PLUG
TOP GAS MAIN = XXX.XX
TOP WATERMAIN = 886.60TOP GAS MAIN = XXX.XX
TOP STORM SEWER = 881.54
TOP GAS MAIN = XXX.XX
TOP STORM SEWER = 883.53
LEXINGTON AVENUEINTERSTATE 35EEX SSMH
RIM=881.21
INV.=870.56
EX SSMH
RIM=882.76
INV.=871.30
EX 12" SANEX 12" SANEX 12" WMEX 12" WMPROPOSED BUILDING
FFE=896.00
GFE=885.3388 LF - 24"RCP CL 3
@ 0.20
%
SAW CUT EX PAVING
TO INSTALL WATER MAIN
RE-GRADE DITCH AS REQUIRED TO ENSURE
CONNECTION FROM FES-200 TO EX FES
REPAIR TRAIL TO EXISTING CONDITION
AFTER OUTLET CONSTRUCTION
TRAIL GRADE OVER PIPE MUST ENSURE
PIPE IS OUTSIDE OF TRAIL SECTION
(3" BIT + 6" CL 5)
COORDINATE UTILITY RELOCATION WITH
SMALL UTILITY COMPANIES IF REQUIRED
EX 24" FES
INV.=877.10
EXISTING
APARTMEN
T
BUILDING
EXISTING
TENNIS
COURT
EXISTING
POOL
EXISTING
CLUBHOUS
E
EXISTING
POND
SSMH-1
RE 890.41
8" INV 871.57 SE
8" INV 871.67 N
BLD=18.84'
FIELD VERIFY LOC & ELEV PRIOR TO CONSTRUCTION
REPAIR DISTURBED ARES TO EXISTING CONDITION
MATCH EXISTING GRADES AND SECTIONS
44 L
F
-
8
"
P
V
C
C-9
0
0
@
1
.
1
0
%
EX SSMH
RE 889.58
8" INV 871.08 NW
8" INV 867.80 W
8" INV 867.80 E
BLD=21.78'
CONSTRUCT INSIDE DROP PER CITY DETAIL S-4/S-5
SHORING/TRENCH BOXES MAY BE REQUIRED DURING CONTSRUCTION
TO KEEP DISTURBANCES OUTSIDE MNDOT ROW
FIELD VERIFY LOC & ELEV PRIOR TO CONSTRUCTION
REPAIR DISTURBED AREAS TO EXISTING CONDITION
MATCH EXISTING GRADES AND SECTIONS (IF REQ'D)
COORDINATE WITH CITY STAFF TO PROVIDE SAN. BYPASS
IF WORK WITHIN MH IS REQUIRED
SAW CUT EX PAVING
TO INSTALL STORM SEWER
PROJECT NO.
24282
CAD FILE
02/25/26
DATE
REVISIONS
DRAWN BY Date:Reg.No.ERIC P. FAGERBERG5377202/25/262026-04-02 CITY COMMENTS2999 WEST C.R. 42, SUITE 100BURNSVILLE, MN 55306PHONE: 952-890-6044info@mnhill.comwww.mnhill.comI hereby certify that this plan,specification or report was preparedby me or under my direct supervisionand that I am a duly LicensedProfessional Engineer under the lawsof the State of Minnesota.PRELIMINARYMENDOTA HEIGHTS, MINNESOTALEXINGTON HEIGHTS ADDITIONCONDOR CORPORATIONFOR2320 LEXINGTON AVENUE, MENDOTA HEIGHTS, MN 55120F:\_Civil 3D Projects\24282\PRE-PLAT PLANS\24282U.dwg - 4/02/2026 11:27AM24282U
C500UTILITY PLANEPF
LEGEND
PROPOSED CONCRETE
PROPOSED BITUMINOUS SURFACE
PROPOSED SEDIMENT BASIN
PROPOSED INFILTRATION BASIN
PROPOSED WATERMAINII
PROPOSED SANITARY SEWER
PROPOSED STORM SEWER
>>PROPOSED CURB & GUTTER
PROPOSED SANITARY SERVICE
PROPOSED WATER SERVICE>I
>I
OHP OHP
X X X X
G G G
E E E
UFO UFO UFO
T T T
EXISTING TELEPHONE PEDESTAL
EXISTING TRANSFORMER
EXISTING LIGHT POLE
EXISTING TREELINE/TREES
EXISTING STORM SEWER
EXISTING SANITARY SEWER
EXISTING WATERMAIN
EXISTING OVERHEAD POWER LINE
EXISTING CURB & GUTTER
EXISTING FENCE
EXISTING ASPHALT
EXISTING CONCRETE
EXISTING UNDERGROUND GAS
EXISTING UNDERGROUND ELECTRIC
EXISTING UNDERGROUND FIBER OPTIC
EXISTING UNDERGROUND TELEPHONE
EXISTING TV PEDESTAL
EXISTING SOIL BORING LOCATION
S
TV
T
EXISTING MANHOLE (ELECTRIC)
EXISTING SIGN
EXISTING VAULT
E
V
SB-1
Know what's below.
before you dig.Call
R
SCALE IN FEET
0 40 80
TRENCH DRAIN DETAIL
INV. =883.00INV.=883.00
NEENAH R-4990-DX TYPE 'A'
GRATE OR APPROVED EQUAL
RIM TO MATCH PROPOSED
ASPHALT.
TC
885.50
RIM=885.00
12" HDPE 12"NOT TO SCALE
18" RCPINV
877.20
879.50
878.7548" SLANT TOP
SPLIT GRATE
(SEE DETAIL)
RIM ELEV 878.75
9"
OUTLET STRUCTURE 201 (OCS-201)
NOT TO SCALE
Page 83 of 124
G GGGGGGGGGGGGGGGGGGGGGGGGGGoooo
G G
G
G
G
G
G
G
G
G
G
G
G GGGGGGGG G G
oX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXooooooooooo
o
o
o oOHUOHUOHUOHUOHUOHUOHUOHUOHUOHUOHUOHUOHUOHUOHUOHUOHUOHUOHUOHUOHUOHUOHUOHUOHUOHUOHUOHUOHUOHUOHUOHUOHUOHUOHUOHUOHUOHUE
E
E
E
E
E
EEEEEEEEEEEEEEEEEEEEEEOHU OHU
E
E
E
E
E
E
E
E
E
E
E
E ET
T
V
T
>>>>>>>IIIIIIIIIIIIIIIIIIII
XXXXXX9'TYP33 9'TYP14
24'
TYP
PROPOSED BUILDING
PARKING G
A
R
A
G
E
BELOW GR
A
D
E
PATIO
15'
25.2'PROPOSED INFILTRATION BASIN62.3'
44'
18'
TYP
18'
TYP24'R 36'
TO FA
C
E
GARAGER60'R3
'MAINENTRANCELEXINGTON AVENUEINTERSTATE 35E5'EXISTING
APARTMEN
T
BUILDING
EXISTING
TENNIS
COURT
EXISTING
POOL
EXISTING
CLUBHOUS
E
EXISTING
POND R3'R
3
'
R
3
'R6'R3'
A
A
C
C
D
D
E
E
E
D
B
F
F
C
G
5'R3'R3'
R
3
'R3'14
26
17
30'
EXPAND POOL
CONCRETE PATIO
NEW CONCRETE PATIO PADS:
- PERGOLA
- COMMUNITY TABLE
- GRILLING
REMOVE EXISTING
GRILL PADS
RENOVATION OF EXISTING
TENNIS COURT INTO (2)
PICKLEBALL COURTS
REMOVE EXISTING
GRILL PAD
28'15'
PROJECT NO.
24282
CAD FILE
02/25/26
DATE
REVISIONS
DRAWN BY Date:Reg.No.ERIC P. FAGERBERG5377202/25/262026-04-02 CITY COMMENTS2999 WEST C.R. 42, SUITE 100BURNSVILLE, MN 55306PHONE: 952-890-6044info@mnhill.comwww.mnhill.comI hereby certify that this plan,specification or report was preparedby me or under my direct supervisionand that I am a duly LicensedProfessional Engineer under the lawsof the State of Minnesota.PRELIMINARYMENDOTA HEIGHTS, MINNESOTALEXINGTON HEIGHTS ADDITIONCONDOR CORPORATIONFOR2320 LEXINGTON AVENUE, MENDOTA HEIGHTS, MN 55120F:\_Civil 3D Projects\24282\PRE-PLAT PLANS\24282PAV.dwg - 4/02/2026 11:27AM24282PAV
C600
VUN
Know what's below.
before you dig.Call
R
SCALE IN FEET
0 40 80 PAVING & DIMENSIONAL PLANLEGEND
PROPOSED CONCRETE
PROPOSED BITUMINOUS SURFACE
PROPOSED SEDIMENT BASIN
PROPOSED INFILTRATION BASIN
PROPOSED CURB & GUTTER
OHP OHP
X X X X
EXISTING TELEPHONE PEDESTAL
EXISTING TRANSFORMER
EXISTING LIGHT POLE
EXISTING OVERHEAD POWER LINE
EXISTING CURB & GUTTER
EXISTING FENCE
EXISTING ASPHALT
EXISTING CONCRETE
EXISTING TV PEDESTALTV
T
EXISTING MANHOLE (ELECTRIC)
EXISTING SIGN
EXISTING VAULT
E
V
KEY NOTES
5' WIDE CONCRETE SIDEWALKA
RIBBON CURBB
DEVELOPMENT SUMMARY
GROSS PROJECT AREA (LOT 1, BLOCK 1 & OUTLOT A)6.71 AC/ 292,409 SF
EXISTING IMPERVIOUS AREA 2.36 AC/102,677 SF
NET IMPERVIOUS AREA INCREASE 0.38 AC/ 16,383 SF
TOTAL IMPERVIOUS AREA 2.74 AC/119,060 SF (40.7%)
FRONT SETBACK 50 FEET
REAR SETBACK 40 FEET
SIDE SETBACK 40 FEET
EXISTING ZONING PUD (R-3 UNDERLYING)
PROPOSED ZONING PUD (R-3 UNDERLYING)
BUILDING FOOTPRINT 22,571 SF
PROPOSED PARKING PROVIDED
61 NEW SURFACE STALLS FOR NEW BUILDING
84 GARAGE STALLS TOTAL
84 UNITS (110 BEDROOMS)
145 STALLS (SURFACE + GARAGE) TOTAL
145 STALLS/84 UNITS = 1.73 STALLS/UNIT
145 STALLS/110 BEDROOMS = 1.32 STALLS/BEDROOM
PARKING STALL AREA (INCLUDING ADA ACCESS) = 10,867SF
REQUIRED LANDSCAPE AREA (10%) = 1,087 SF
PROVIDED LANDSCAPED ISLAND AREA = 1,351 SF
EXISTING PARKING
45 SURFACE STALLS FOR EXISTING BUILDING
75 GARAGE STALLS
75 UNITS (120 BEDROOMS)
120 STALLS (SURFACE + GARAGE) TOTAL
120 STALLS/75 UNITS = 1.60 STALLS/UNIT
120 STALLS/120 BEDROOMS = 1.00 STALLS/BEDROOM
SITE PLAN NOTES
1.SEE GENERAL NOTES, SHEET C101, FOR ADDITIONAL RELEVANT INFORMATION.
2.EXISTING SURFACE LOT SHALL BE RE-STRIPED AS SHOWN. ERADICATION AT A MINIMUM
WILL BE REQUIRED. MILL & OVERLAY OR CHIP SEAL ARE ADDITIONAL OPTIONS OWNER MAY
ELECT TO UTILIZE ON REMAINING EXISTING BITUMINOUS.
3.CLUBHOUSE IMPROVEMENTS COMPLETED BY OTHERS
PROPOSED RETAINING WALL
RETAINING WALLC
B612 CONCRETE CURB & GUTTERD
TIP OUT CURBE
PEDESTRIAN RAMPF
6' TRANSITION TO FULL CURBG
TYPICAL PARKING LOT SECTION
8" - MnDOT 2211, CLASS 5 AGGREGATE BASE,
100% CRUSHED STONE/RECYCLE
2" - SPNWB230C NON-WEAR COURSE
MnDOT SPEC. 2357 BITUMINOUS TACK COAT
1.5" - SPWEB240C WEAR COURSE
GEOTEXTILE FABRIC/APPROVED SUBGRADE
BITUMINOUS
PAVEMENT
CONCRETE
SIDEWALK
RIBBON CURB
CLASS 5
SLOPE VARIES
CONCRETE SIDEWALK
NOT TO SCALE
4" CL 5 AGGREGATE BASE (2211)
100% CRUSHED
4" CONCRETE SIDEWALK (2531)
5'1'1'
20"7"TYPICAL PARKING SPACE SIGNING & STRIPING
NOT TO SCALE
ADA PARKING SIGN (R7-8m)
VAN ACCESSIBLE (R7-8b)
B612 CURB & GUTTER
9'9'9'18'3'4" SOLID WHITE LINE
INTERNATIONAL SYMBOL OF ACCESSIBILITY
45°0'
0
.
0
"
'
ADA PARKING SIGN (R7-8m)
VAN ACCESSIBLE (R7-8b)
NO PARKING
12" SOLID WHITE LETTERING (OPTIONAL)
6' TRANSITION FROM RIBBON
TO FULL B612 CURB & GUTTER
9' WIDE RIBBON CURB
FLUSH WITH ASPHALT
6'6'
6' TRANSITION FROM RIBBON
TO FULL B612 CURB & GUTTER
Page 84 of 124
PROJECT NO.
24282
CAD FILE
02/25/26
DATE
REVISIONS
DRAWN BY Date:Reg.No.ERIC P. FAGERBERG5377202/25/262026-04-02 CITY COMMENTS2999 WEST C.R. 42, SUITE 100BURNSVILLE, MN 55306PHONE: 952-890-6044info@mnhill.comwww.mnhill.comI hereby certify that this plan,specification or report was preparedby me or under my direct supervisionand that I am a duly LicensedProfessional Engineer under the lawsof the State of Minnesota.PRELIMINARYMENDOTA HEIGHTS, MINNESOTALEXINGTON HEIGHTS ADDITIONCONDOR CORPORATIONFOR2320 LEXINGTON AVENUE, MENDOTA HEIGHTS, MN 55120F:\_Civil 3D Projects\24282\PRE-PLAT PLANS\24282D.dwg - 4/02/2026 11:27AMCONSTRUCTION DETAILS24282D
C700
VUN
Page 85 of 124
PROJECT NO.
24282
CAD FILE
02/25/26
DATE
REVISIONS
DRAWN BY Date:Reg.No.ERIC P. FAGERBERG5377202/25/262026-04-02 CITY COMMENTS2999 WEST C.R. 42, SUITE 100BURNSVILLE, MN 55306PHONE: 952-890-6044info@mnhill.comwww.mnhill.comI hereby certify that this plan,specification or report was preparedby me or under my direct supervisionand that I am a duly LicensedProfessional Engineer under the lawsof the State of Minnesota.PRELIMINARYMENDOTA HEIGHTS, MINNESOTALEXINGTON HEIGHTS ADDITIONCONDOR CORPORATIONFOR2320 LEXINGTON AVENUE, MENDOTA HEIGHTS, MN 55120F:\_Civil 3D Projects\24282\PRE-PLAT PLANS\24282D.dwg - 4/02/2026 11:27AMCONSTRUCTION DETAILS24282D
C701
VUN
Page 86 of 124
STORM BASINPER CIVIL PLANSNATIVE SEED MIXPROPOSED BUILDINGDECKDECKDECKDECKDECKDECKDECKDECKDECK
DECKDECKDECK
DECKDECKDECKDECKDECKDECKDECKINTERST
A
T
E
3
5
-
E EXISTING TREES & BRUSH TO REMAINTURF SODTURF SODTURF SODTURF SODEXISTING LANDSCAPEEXISTING LANDSCAPEEXISTING LANDSCAPEEXISTING BUILDINGEXISTINGBUILDINGPER SCHEDULE ONSHEET L102TURF SODTURF SOD EXISTING LAWNEXISTING LAWNEXISTING LAWNEXISTING LAWNTURF SODEXISTING LAWN6' TURF SOD MOW STRIPPAVING PERCIVIL PLANSPAVING PERCIVIL PLANSSIDEWALK PER CIVIL PLANSSEED TO FENCE EDGESEED TO FENCE EDGESEED BETWEEN LOT LINE AND FENCEEXISTING LAWNTURF SODTURF SODTURF SODNATIVE SEED MIXPER SCHEDULE ONSHEET L102SEED/SOD LINE36" MOW STRIPSEED/SOD LINESEED/SOD LINE12' NATIVE GRASS BUFFER STRIPSEED BETWEEN LOT LINE AND FENCE12" NATIVE GRASS BUFFER STRIPEASEMENTEASEMENTPAVING PER CIVIL PLANSFURNITURE BY OTHERSBUILDINGENTRYGARAGEENTRYEVERGREEN TREE, TYP.DECIDUOUS COLUMNAR TREE, TYP.COLUMNAR DECIDUOUS TREE, TYP.ORNAMENTAL TREES, TYP.FOUNDATION PLANTING AREA, TYP. ROCK MULCH PER NOTESNATIVE GRASS SEEDTO DISTURBED LIMITS.FIELD VERIFY.NATIVE GRASS SEEDTO DISTURBED LIMITS.FIELD VERIFY.COLUMNAR EVERGREEN TREE, TYP.BUFFER PLANTING, TYP.OUTLINE OF STRUCTURE BELOW.DO NOT PLANT ABOVE.FOUNDATION PLANTING AREA, TYP. ROCK MULCH PER NOTESFOUNDATION PLANTING AREA, TYP. ROCK MULCH AREA PER NOTESOVERSTORYDECIDUOUSTREE, TYP.NATIVE SHRUBSAND GRASSES, TYP.OVERSTORYDECIDUOUSTREE, TYP.OVERSTORYDECIDUOUSTREE, TYP.FOUNDATION PLANTING AREA, TYP. ROCK MULCH PER NOTESOVERSTORY DECIDUOUS TREE, TYP.EVERGREEN TREE, TYP.COLUMNAR EVERGREEN TREE, TYP.BUFFER PLANTING, TYP.OVERSTORY DECIDUOUS TREE, TYP.COLUMNAR DECIDUOUS TREE, TYP.COLUMNAR DECIDUOUS TREE, TYP.LANDSCAPE EDGER PER NOTESLANDSCAPE EDGER PER NOTESLANDSCAPE EDGER PER NOTESTURF SOD TODISTURBED LIMITS.FIELD VERIFY.TURF SOD TODISTURBED LIMITS.FIELD VERIFY.TURF SOD TO DISTURBEDLIMITS. FIELD VERIFY.TURF SODORNAMENTALDECIDUOUSTREES, TYP.LANDSCAPE EDGER PER NOTESWOOD MULCH PER NOTES. WOOD MULCH TOEDGE OF EXISTINGCURB, TYP.WOOD MULCH TOEDGE OF PROPOSEDCURB, TYP.SPADED EDGE AT LOT LINEOR TAPER AS NECESSARYDateDrawn ByChecked ByProject Number1301 American Blvd. ESuite 100Bloomington, MN 55425tel: (612) 879-6000fax: (612) 879-6666www.kaaswilson.comam a duly Licensed Landscape ArchitectI hereby certify that this plan, specifi-cation, or report was prepared by me orunder my direct supervision and that ITyped Name under the laws of the State of Minnesota.Registration NumberDateBenjamin D. Hartberg, PLABHAL02/25/202626117Lexington HeightsApartmentsMendota Heights, MNLandscape Architect:CALYX DESIGN GROUP475 Cleveland Ave. N. Suite 101ASaint Paul, MN 55104(651) 788-9018Civil Engineering:James R Hill, Inc.2999 West County Rd. 42, Suite 100Burnsville, MN 55306Phone: (952) 890-6044Rev. No.Revision Date SignaturePrepared for:Condor Corporation2320 Lexington AvenueMendota Heights, MN 5512048084PRELIM
INARY
1 City Comments 04/02/2026
L101PLANLANDSCAPELANDSCAPE LAYOUT PLAN:1.Landscape contractor to provide a new irrigation layout plan for the property. See landscape note #17 onSheet L102.2.See Civil Engineer's plans for grading layout and requirements3.Contractor to coordinate any work in the right-of-way with City of Mendota Heights Public WorksDepartment.4.Sod all disturbed areas except plant beds and areas noted to receive rock mulch.5.Place a minimum of 6" topsoil or slope dressing on all areas disturbed by construction,includingright-of-way boulevards, unless specified otherwise.6.Trim existing trees to remain that have branches over-hanging the work zone. Engage a certified arboristto perform tree trimming.7.Coordinate irrigation connection in the building with the General Contractor and Mechanical Contractor forthe project. Coordinate irrigation sleeving with earthwork and paving contractors.8.Landscape contractor is responsible for verification of soils and graded condition prior to mobilization andshall notify the General Contractor if earthwork is not acceptable. Landscape contractor is responsible forfine grading, or grade to within 1" of final set elevation.GENERAL NOTES:Existing Tree To RemainLANDSCAPE LEGEND:New Turf SodNative Seed-MesicSee Sheet L103Landscape EdgerSee Sheet L102See Sheet L102Rock MulchNative Seed-UplandSee Sheet L103SYMBOLCODEBOTANICAL NAMECOMMON NAMESIZECONTAINERQTYCOLUMNAR TREEAR2Acer rubrum `Red Rocket``Red Rocket` Red Maple2.5" Cal.B&B3BJ2Betula platyphylla 'Jefpark'Parkland Pillar® Asian White Birch2.5" Cal.B&B6PEPopulus tremula `Erecta`Columnar Swedish Aspen2.5" Cal.B&B9EVERGREEN TREESABAbies balsameaBalsam Fir6` Hgt.B&B7JEJuniperus virginianaEastern Red Cedar8` Hgt.B&B8PdPicea glauca `Densata`Black Hills Spruce6` Hgt.B&B6TOThuja occidentalisAmerican Arborvitae6` Hgt.B&B5TAThuja occidentalis `Art Boe` TMNorth Pole Arborvitae6` Hgt.B&B19ORNAMENTAL TREESMSMalus x `Spring Snow`Spring Snow Crab Apple1.5" Cal.B&B4OVERSTORY TREESASAcer x freemanii `Sienna`Sienna Glen Maple2.5" Cal.B&B2BRBetula nigraRiver Birch2.5" Cal.B&B4COCeltis occidentalisCommon Hackberry2.5" Cal.B&B3GDGleditsia triacanthos inermis 'Draves' TMStreet Keeper Honey Locust4" Cal.B&B2OVOstrya virginianaAmerican Hophornbeam2.5" Cal.B&B2QRQuercus rubraNorthern Red Oak2.5" Cal.B&B3SHRUBSAmAronia melanocarpa `Morton` TMIroquis Beauty Black Chokeberry5 gal.Pot9Cr2Clethra alnifolia `Ruby Spice`Ruby Spice Clethra5 gal.Pot15CiCornus sericea `Isanti`Isanti Redosier Dogwood5 gal.Pot26DlDiervilla loniceraDwarf Bush Honeysuckle3 gal.Pot27EcEuonymus fortunei `Canadale Gold`Canadale Gold Euonymus3 gal.Pot15JfJuniperus chinensis `Sea Green`Sea Green Juniper5 gal.Pot27RgRhus aromatica `Gro-Low`Gro-Low Fragrant Sumac5 gal.Pot5Sm3Spiraea x bumalda `Goldmound`Gold Mound Spirea5 gal.Pot8ANNUALS/PERENNIALSNwNepeta x faassenii `Walkers Low`Walkers Low Catmint1 gal.Pot9GRASSESAg2Andropogon gerardiiBig Blue Stem1 gal.Pot44CkCalamagrostis x acutiflora `Karl Foerster`Feather Reed Grass1 gal.Pot33PLANT SCHEDULERefer to Civil Plans for Tree Inventory (See Sheet C401)Number of Trees to be Planted due to New Construction: 83Page 87 of 124
DateDrawn ByChecked ByProject Number1301 American Blvd. ESuite 100Bloomington, MN 55425tel: (612) 879-6000fax: (612) 879-6666www.kaaswilson.comam a duly Licensed Landscape ArchitectI hereby certify that this plan, specifi-cation, or report was prepared by me orunder my direct supervision and that ITyped Name under the laws of the State of Minnesota.Registration NumberDateBenjamin D. Hartberg, PLABHAL02/25/202626117Lexington HeightsApartmentsMendota Heights, MNLandscape Architect:CALYX DESIGN GROUP475 Cleveland Ave. N. Suite 101ASaint Paul, MN 55104(651) 788-9018Civil Engineering:James R Hill, Inc.2999 West County Rd. 42, Suite 100Burnsville, MN 55306Phone: (952) 890-6044Rev. No.Revision Date SignaturePrepared for:Condor Corporation2320 Lexington AvenueMendota Heights, MN 5512048084PRELIM
INARY
1 City Comments 04/02/2026
L102TOMAHAWK TREE STABILIZER STAKES.MINIMUM (2) PER TREE.SODROOT BALL TO SIT ON MOUNDEDMULCH - 4" DEEP - SEE SPECPLANTING SOIL - SEE SPEC.TOPSOILSUBGRADEOTHERWISE. NO MULCH TO BE IN CONIFER TO HAVE SHREDDEDHARDWOOD MULCH UNLESS NOTED PLACE ROOT BALL SO THAT BASALFLARE IS 1" ABOVE SURROUNDINGCONTACT WITH TRUNK.NOTE: SUBGRADE, REMOVE BURLAPDRAIN SYSTEM IS NECESSARY4" DIAMETER AUGERED HOLE, 42" MIN. DEPTH. FILLED W/ 3/4" DIAMETER DRAIN ROCK. COVER W/ 6" FILTER FABRIC.FOR HEAVY CLAY SOILS.FROM TOP 1/3 OF ROOT BALLGRADE.THE CONTRACTOR IS RESPONSIBLE FORENSURING THE TREES ARE IN A PLUMBPOSITION THROUGHOUT THE WARRANTY PERIOD.TREE HEIGHT MEASURED FROM TOP OF ROOT
BALL TO BASE OF CENTRAL LEADER.LANDSCAPE DETAILS, NOTES, AND SCHEDULES:1L102DECIDUOUS TREE PLANTING - SECTIONNOT TO SCALE............................................................ON CENTER SPACING AS STATED ON PLANWIDTH OF HOLE EXCAVATION SHALL EXTEND A MINIMUM OF 6INCHES BEYOND THE PLANTS ROOT SYSTEM.3'' DEPTH WATERING BASINPLANTING SOIL PER NOTES.MULCH PER PLAN NOTEFINISHED GRADEPLANT ACCORDING TO PLANTING DETAILS FOR ISOLATEDPLANTING LOCATIONS WITH THE EXCEPTION OF REDUCEDHOLE WIDTH.2L102TYP. SHRUB PLANTING - SECTIONNOT TO SCALE1'-6" (MIN.)4"FACE OF WALL OR BACK OF CURB.MULCH PER NOTESLANDSCAPE EDGER PER NOTES3 OZ. LANDSCAPE FABRIC, TURN-UPFINISHED GRADEPITCH SUB-GRADE TO DRAIN AWAYFROM BUILDING WALLS & CURBS.NOTES: SEE GRADING PLAN FOR CROSS SLOPE DIRECTION.PLANT BED WIDTH VARIES, SEE PLAN.AT EDGES, OVERLAP SEAMS 4".SEE PLANSWIDTHS MAY VARYSUBMIT ROCK MULCH SAMPLE FOR OWNER APPROVAL.LANDSCAPE FABRIC TO BE FREE-DRAINING.3L102MULCH AND EDGER DETAILNOT TO SCALE1. Tree saucer mulch to be four inches (4") depth natural single-shred hardwood mulch for trees outside of a plant bed. Install per tree planting detail.2. Refer to civil plan sheets for grading, drainage, site dimensions, survey, tree removal, proposed utilities & erosion control.3. All plant material shall comply with the latest edition of the American Standard for Nursery Stock, American Association of Nurserymen. Unless notedotherwise, deciduous shrubs shall have at least 5 canes at the specified shrub height. Plant material shall be delivered as specified.4. Plan takes precedence over plant schedule if discrepancies in quantities exist.5. All proposed plants shall be located and staked as shown.6. Adjustment in location of proposed plant material may be needed in field. Should an adjustment be required, the client will provide field approval.Significant changes may require city review and approval.7. The project landscape contractor shall be held responsible for watering and properly handling all plant materials brought on the site both before and afterinstallation. Schedule plant deliveries to coincide with expected installation time within 36 hours.8. All plant materials shall be fertilized upon installation as specified.9. The landscape contractor shall provide the owner with a watering schedule appropriate to the project site conditions and to plant material growthrequirements.10. If the landscape contractor is concerned or perceives any deficiencies in the plant selections, soil conditions, drainage or any other site condition thatmight negatively affect plant establishment, survival or guarantee, they must bring these deficiencies to the attention of the landscape architect & client priorto bid submission. Plant bed drainage concerns during plant installation shall be brought to the attention of the Owner and General Contractor immediately.11. Contractor shall establish to his/ her satisfaction that soil and compaction conditions are adequate to allow for proper drainage at and around thebuilding site.12. Contractor is responsible for ongoing maintenance of all newly installed material until time of owner acceptance. Any acts of vandalism or damagewhich may occur prior to owner acceptance shall be the responsibility of the contractor. Contractor shall provide the owner with a maintenance programincluding, but not limited to, pruning, fertilization and disease/pest control.13. The contractor shall guarantee newly planted material through one calendar year from the date of written owner acceptance. Plants that exhibit morethan 10% die-back damage shall be replaced at no additional cost to the owner. The contractor shall also provide adequate tree wrap and deer/rodentprotection measures for the plantings during the warranty period.14. This layout plan constitutes our understanding of the landscape requirements listed in the ordinance. Changes and modifications may be requested bythe city based on applicant information, public input, council decisions, etc.15. The landscape contractor shall be responsible for obtaining any permits and coordinating inspections as required throughout the work process.16. Plant size & species substitutions must be approved in writing prior to acceptance in the field.17. The landscape contractor shall provide a quote and furnish an Irrigation Layout Plan for head-to-head coverage of all tree, turf and shrub planting areas.Use commercial-grade irrigation equipment and provide product cut-sheets and (4) copies of the proposed layout plan to the landscape architect for reviewand approval. Coordinate irrigation connection point, controller, back-flow and valve locations with the builder & general contractor.18. All edger shall be professional grade black vinyl lawn edging, 5 inch tall x 20 feet long (minimum) straight lengths. Anchor every 18" on-center(minimum). Edger must be UV stable. Submit sample for Owner review.19. Landscape Contractor is responsible for coordination with the General Contractor, to protect the new improvements on and off-site during landscapework activities. Report any damage to the General Contractor immediately.20. MULCH: Plant beds noted to receive rock mulch shall be 4" depth of 1-1/2" dia. trap rock mulch, Dresser Trap Rock Inc. or equal. Plant beds noted toreceive wood mulch shall be 4" depth of Western Red Cedar wood mulch. Submit mulch samples for Owner approval. Do not install weed mat underperennials, with the exception of ornamental grasses.21 All planting, seeding, and sodded areas shall be prepared prior to installation activities with a harley power box rake or equal to provide a firm plantingbed free of stones, sticks, construction debris, etc.22. Turf installation activity shall conform to all rules and regulations as established in the MnDOT Seeding Manual, 2024 edition, for turf bed preparation,installation, maintenance, and warranty.23. The Landscape Contractor shall furnish samples of all landscape materials for approval prior to installation.24. The Landscape Contractor shall clear and grub the underbrush from within the work limits to remove dead branches, leaves, trash, weeds and foreignmaterials. Remove trees where noted on the plan, including the stump to 30" below grade.25. The landscape contractor shall contact Gopher State One Call no less than 48 hours before digging for field utility locations.26. The landscape contractor shall be responsible for the removal of erosion control measures once vegetation has been established to the satisfaction ofthe municipal staff. This includes silt curtain fencing and sediment logs placed in the landscape.27. The landscape contractor shall be responsible for visiting the site to become familiar with the conditions prior to bidding and installation. Coordinate withthe general contractors on matters such as fine grading, landscaped area conditions, staging areas, irrigation connection to building, etc.28. See Site and Civil plans for additional information regarding the project.29. All sub-cut areas of the site that are designated on the site plan as open space for landscape shall have no less than 6" of imported, pulverized topsoil.Slope away from building.30. Landscape contractor must prove the open sub-grade of all planting areas after their excavation is capable of infiltrating a minimum requirement of1/4-inch of water per hour prior to installation of plant materials, topsoil, irrigation, weed mat, and mulch. Planting areas not capable of meeting thisrequirement shall have 4" diameter X 48" depth holes augured every 36" on-center and filled with MnDOT Free-Draining Coarse Filter Aggregate. Re-testsub-grade percolation for compliance to infiltration minimum requirement.31. Landscape contractor shall coordinate tree removal activities and ensure all trees designated for removal are gone before start of landscape installation.Grind stump to 30" below grade and back-fill with topsoil.32. Landscape contractor shall include in their bid to remove any existing shrubs, sod, edger, fabric, and edger that interferes with new improvements shownin this package.33. Landscape contractor to install tree trunk protection for all newly planted deciduous trees.STAKE TREES AS NEEDED TO MAINTAIN ANUPRIGHT AND PLUMB HABIT. USE NON-MARRINGTREE-GUY WEBBING AND CABLES OR STAKES.INSTALL 6" WHITE DRAIN TILE TRUNK GUARDMARK THE NORTH SIDE OF THE TREE IN THENURSERY, AND ROTATE TREE TO FACENORTH AT THE SITE WHEN EVER POSSIBLE.4 IN. HIGH EARTH SAUCER BEYOND EDGE OFROOT BALL (FOR ISOLATED TREES ONLY).REMOVE ALL TWINE, ROPE AND WIRE, AND BURLAPFROM TOP THIRD OF ROOT BALL.IF PLANT IS SHIPPED WITH A WIRE BASKET AROUND THE ROOT BALL,CUT THE WIRE BASKET IN FOUR PLACES AND FOLD DOWN 8 IN. INTOPLANTING HOLE.PLACE ROOT BALL ON UNEXCAVATED OR TAMPED SOIL.NOTE: FOR DIMENSIONS OF PLANTING AREAS SEEPLAN, SOIL BACKFILL SHALL BE GARDEN BLENDSOIL ( EQUAL MIX OF COMPOST, SAND & SOIL ) PERNOTES.TAMP SOIL AROUND ROOT BALL BASE FIRMLY WITH FOOTPRESSURE SO THAT ROOT BALL DOES NOT SHIFT.WOOD MULCH. DO NO PLACE MULCH INCONTACT WITH TREE TRUNK. MAINTAINTHE MULCH WEED-FREE FOR AFTERPLANTING.NOTES:ENSURE TREE PIT PASSES REQUIRED PERCOLATION TESTING.OPEN BURLAP AND REMOVE EXCESSSOIL UNTIL THE TOP OF THE FIRSTMAJOR ROOT IS VISIBLE. PLANT TOTHIS DEPTH TO HELP PREVENTENCIRCLING ROOTS.ONLY PRUNE DEAD BRANCHES THE FIRST YEARAFTER PLANTING.MULCH RING: 4' DIAMETER MINIMUM, 6' DIAMETERPREFERRED.DOUBLE STAKE WITH 1" POLYPROPYLENEWEBBING THROUGH THE EYE OF THE CINCH-TIERUBBER SUPPORTS. AVOID DAMAGE TO THEROOT BALL WITH SUPPORT STAKES.NURSERY GRADE FIBERGLASS TREE STAKES.11/16" x 6'-0".4L102CONIFEROUS TREE PLANTING DETAILNOT TO SCALELANDSCAPE NOTES:MIN.MIN.SEE PLANPERENNIAL PLANT18" MIN.6"EDGE CONDITION VARIES - SEE PLAN.MULCH PER NOTES.PLANTING SOIL PER NOTES.CONTRACTOR PREPARED SUBGRADENOTE:HAND-LOOSEN ROOTS OF CONTAINERIZEDPLANT MATERIALS.5L102TYP. PERENNIAL PLANTING DETAILNOT TO SCALE6"EXISTING SOD BLADEEXISTING THATCH LAYERSOILNEW SOD BLADENEW THATCH LAYERSOILSUB CUT FOR NEW SODTHATCH LAYERS TO HAVEMATCHING ELEVATION1"3/4"4"CONCRETE SIDEWALK* THATCH LAYERS TO MATCH* NO THATCH ABOVE ADJACENT GRADE* SUB-CUT AND FINAL GRADE BY SOD INSTALLEROR CURB6L102TURF SOD TO EXISTING SOD DETAILNOT TO SCALELANDSCAPENOTES &DETAILSPage 88 of 124
DateDrawn ByChecked ByProject Number1301 American Blvd. ESuite 100Bloomington, MN 55425tel: (612) 879-6000fax: (612) 879-6666www.kaaswilson.comam a duly Licensed Landscape ArchitectI hereby certify that this plan, specifi-cation, or report was prepared by me orunder my direct supervision and that ITyped Name under the laws of the State of Minnesota.Registration NumberDateBenjamin D. Hartberg, PLABHAL02/25/202626117Lexington HeightsApartmentsMendota Heights, MNLandscape Architect:CALYX DESIGN GROUP475 Cleveland Ave. N. Suite 101ASaint Paul, MN 55104(651) 788-9018Civil Engineering:James R Hill, Inc.2999 West County Rd. 42, Suite 100Burnsville, MN 55306Phone: (952) 890-6044Rev. No.Revision Date SignaturePrepared for:Condor Corporation2320 Lexington AvenueMendota Heights, MN 5512048084PRELIM
INARY
1 City Comments 04/02/2026
L103LANDSCAPE DETAILS, NOTES, AND SCHEDULES:Native Seed Areas noted per plan: (unless otherwise noted on civil plans), shall be:MnDOT #33-261 seed mixture for Stormwater Treatment Basin South & West, drop-seeded into thetopsoil layer at 35.0 lbs per acre. Submit seed mix for approval. Grading and Erosion Control per CivilPlans and Specifications.Add 20lbs per acre of MnDOT 21-111 Oats Cover Crop.NATIVE SEED MIX:NATIVE SEEDING INSTALLATION METHOD:Drop Seeding Onto Tilled SitesThis is the "standard" method for seeding on prepared sites such as those on construction projects.a)Site Preparation: The site should be prepared by loosening topsoil to a minimum depth of 3inches.b)Fertilizer: Use a fertilizer analysis based on a soil test or a general recommendation is a10-10-10 (NPK) commercial grade analysis at 200 lbs/acre.c)Seed Installation: Seed should be installed with a drop seeder that will accurately meter thetypes of seed to be planted, keep all seeds uniformly mixed during the seeding and containdrop seed tubes for seed placement (Brillion-type). The drop seeder should be equipped with acultipacker assembly to ensure seed-to-soil contact.d)Seeding Rates: Rates are specified in the mixture tabulation for the specified mix.e)Packing: If the drop seeder is not equipped with a cultipacker, the site should be cultipackedfollowing the seeding to ensure seed-to-soil contact.f)Mulch: Cover soil with a hydromulch consisting of natural wood fiber or paper fiber, water, andM-Binder at 100 lbs per acre.Note: Heavy equipment is not allowed in the infiltration basins to keep soils from getting compacted.If any compaction occurs due to seeding operations, the soils must be uncompacted.NATIVE SEED REQUIRED MAINTENANCE - 3 YRS:Native Grass and Forb Mixtures (mixtures beginning with the number 3)Year 1Establishment (spring seeding):1)Prepare site - Late April - May2)Seed - May 1 - June 1Maintenance:1)Mow (6-8 inches) - every 30 days after planting until September 30.2)Weed Control - mowing should help control annual weeds. Spot spray thistles, etc.Establishment (fall seeding):1)Prepare site - Late August - early September2)Seed - late September to freeze-upMaintenance (following season):1)Mow (6-8 inches) - once in May, June, and July2)Weed Control - mowing should keep annual weeds down. Spot spray thistles, etc.Evaluation:1)Cover crop growing within 2 weeks of planting (except dormant plantings).2)Seedlings spaced 1-6 inches apart in drill rows.3)Native grass seedlings may only be 4-6 inches tall.4)If there is a flush of growth from foxtail etc., mow as necessary.Year 2Maintenance:1)Mow (6-8 inches) one time between June 1 - August 15 before weeds set seed.2)Weed Control - mowing should keep annual weeds down. Spot spray thistles, etc.3)Some sites may not require much maintenance the second year.Evaluation:1)Cover crop will be gone unless winter wheat was used in a fall planting.2)Grasses forming clumps 1-6 inches apart in drill rows, but still short.3)Some flowers should be blooming (black-eyed Susans, bergamot, etc.).4)If there is a flush of growth from foxtail etc., mow site.Year 3Maintenance:1)Mow only if necessary.2)Weed Control - Spot spray thistles, etc.3)Sites usually do not require much maintenance the third year.Evaluation:1)Planting should begin looking like a prairie - tall grasses, flowers, etc.Long-termMaintenance:1)Weed Control - Spot spray thistles, etc.2)Burning (3-5 year rotation) alternate spring and fall if possible.3)Haying (3-5 year rotation) late summer or early fall. Alternate with burning (may substitute forburning).4)Burning two years in a row will really "clean up" rough-looking sites.NATIVE SEED MIX:Native Seed Areas noted per plan: (unless otherwise noted on civil plans), shall be:MnDOT Southern Shortgrass Roadside Mix, drilled into the topsoil layer at 160.0 lbs per acre. Submitseed mix for approval. Grading and Erosion Control per Civil Plans and Specifications.IRRIGATION SYSTEM PERFORMANCE REQUIREMENTS:1. IRRIGATION SYSTEM SHOULD AVERAGE 40(+/-) PSI AT THE BASE OF ALL SPRINKLER HEADS. NOTIFY LANDSCAPE ARCHITECT IF EXISTING PRESSURE DIFFERS. BUILDINGPRESSURE IS NOT KNOWN.2. IRRIGATION CONTRACTOR TO PREPARE FULL IRRIGATION LAYOUT PLANS FOR LANDSCAPE ARCHITECT'S REVIEW. LAYOUT WORK AS ACCURATELY AS POSSIBLE. THECONTRACTOR MAY MAKE MINOR ADJUSTMENTS TO THE LOCATION AND SPACING AS NECESSARY TO ACCOMMODATE ACTUAL FIELD CONDITIONS. HEAD LOCATIONS SHALL BEFLAGGED AND REVIEWED BY THE LANDSCAPE ARCHITECT PRIOR TO INSTALLATION.3. COORDINATE SLEEVING AND IRRIGATION PIPE / HEAD / INTERNAL PLUMBING INSTALLATION WITH THE WORK OF OTHERS.4. ALL MATERIALS SHALL BE INSTALLED AS DETAILED ON DRAWINGS. (HOWEVER, IF THE CONTRACT DRAWINGS AND/OR SPECIFICATIONS DO NOT THOROUGHLY DESCRIBE THEMETHOD OR TECHNIQUES TO BE USED, THE CONTRACTOR SHALL FOLLOW THE INSTALLATION METHODS ISSUED BY THE MANUFACTURER. ALL SUCH LITERATURE MUST BESUBMITTED 48 HOURS PRIOR TO INSTALLATION FOR REVIEW AND APPROVAL BY THE LANDSCAPE ARCHITECT.)5. CHECK AND VERIFY ALL EXISTING AND PROPOSED SITE CONDITIONS, UTILITIES AND SERVICES PRIOR TO TRENCHING.6. LATERAL PIPING TO BE A MINIMUM OF 12 INCHES DEEP AND MAINLINES A MINIMUM OF 18 INCHES DEEP.7. ALL MAIN LINE PIPING AND LATERAL PIPE OF 1-1/2" AND LARGER SHALL BE PVC (SDR 26 / CLASS 160). ALL OTHER LATERAL PIPE OF 1-1/4" AND SMALLER MAY BEPOLYETHYLENE.8. ALL TEES AND ELBOWS SHALL BE PVC (160 PSI). INCLUDE THRUST BLOCKING AT TEE AND ELBOW POINTS.9. ALL SPRINKLERS SHALL BE COMMERCIAL GRADE HUNTER HEADS.10. ADJUST HEADS FOR GRADE, AS NECESSARY, AFTER TURF GRASS HAS BEEN ESTABLISHED AND ALL SETTLEMENT AT HEADS HAS OCCURRED.11. ALL AUTOMATIC CONTROLLERS, RISERS, BACKFLOW PREVENTERS AND HOSE BIBS SHALL BE SET PLUM. SPRINKLER HEAD RISERS, QUICK COUPLER VALVES AND ALL VALVESWITH STEMS SHALL BE SET PERPENDICULAR TO FINISHED GRADE.12. CONTROL VALVE WIRES, INCLUDING THE GROUND WIRE, SHALL BE #12 GAUGE U.F.U.L. APPROVED DIRECT BURIAL. UNDERGROUND CONNECTIONS SHALL BE MADE WITH 3-MWIRE CONNECTORS (DBY) OR APPROVED EQUAL.13. TRACER-WIRE IS TO BE PLACED OVER ALL MAIN AND LATERAL LINES.14. PLACE ALL VALVES IN APPROVED VALVE BOXES.15. USE TEFLON TAPE ON ALL THREADED JOINTS.16. BRAND EACH VALVE BOX WITH 2" HIGH LETTERING SHOWING ZONE NUMBER AND CONTROLLER LETTER (EXAMPLE 'A3'). THIS STAMP IS TO MATCH THE ZONE SHOWN ON THE PLAN UNLESS OTHERWISE DIRECTED BY LANDSCAPE ARCHITECT.17. CONDUCT PERFORMANCE TEST IN THE PRESENCE OF OWNER AND LANDSCAPE ARCHITECT FOLLOWING COMPLETION OF SYSTEM INSTALLATION.18. CONDUCT AND DEMONSTRATE WINTERIZATION AND SPRING START-UP PROCESS TO OWNER IN THE FALL OF COMPLETION.19. LANDSCAPE ARCHITECT SHALL BE NOTIFIED TO VERIFY TRENCH DEPTHS BEFORE BACKFILLING.20. IRRIGATION CONTRACTOR TO COORDINATE MECHANICAL ROOM WATER CONNECTION POINT WITH MECHANICAL ENGINEER AND PLUMBING CONTRACTOR.21.AFTER INSTALLATION OF DRIP IRRIGATION PIPE IS COMPLETE AND PRIOR TO SODDING OR MULCH INSTALLATION, THE CONTRACTOR SHALL CONTACT THE LANDSCAPEARCHITECT TO REVIEW THE INSTALLATION OF THE DRIP IRRIGATION SYSTEM.22. LANDSCAPE CONTRACTOR TO ADJUST HEADS IN THE FIELD TO ENSURE WATER DOES NOT SPRAY THE BUILDING FACE OR PAVED AREAS.23.COORDINATE LOCATION OF ROOFTOP-MOUNTED ATMOSPHERIC MOISTURE (RAIN) SENSOR WITH OWNER AND ARCHITECT.24.COORDINATE LOCATION OF SLEEVING UNDER PAVED AREAS WITH GENERAL CONTRACTOR, EARTHWORK, AND PAVING SUB-CONTRACTORS.25.SUBMIT LAYOUT PLAN AND PRODUCT DATA TO THE LANDSCAPE ARCHITECT FOR REVIEW AND APPROVAL PRIOR TO INSTALLATION.26.IRRIGATION BID SHALL INCLUDE (1) FALL SHUT-DOWN AND (1) SPRING START-UP (SPRING OF THE YEAR FOLLOWING INSTALLATION).27.THIS PROJECT WILL USE HUNTER COMMERCIAL IRRIGATION PRODUCTS.28.PROVIDE THE OWNER WITH MANUFACTURER'S INSTRUCTION MANUAL FOR CONTROLLER. POST IRRIGATION ZONE LAYOUT MAP AT 8"x10" NEXT TO THE CONTROLLER FORREFERENCE.29.PROVIDE THE OWNER WITH AN AS-BUILT PLAN (PAPER AND CAD .DWG) UPON COMPLETION OF INSTALLATION.Existing boundary, location, topographic, and utility information shown on this plan is from a field survey from Hill, Inc.·Do not begin tree clearing work until tree protection measures are in place and to the permit approval of the City Forester hasbeen granted.·Critical Root Zone:Install high density polyethylene safety fence, 4 ft. high, international orange, at the Drip Line or at the Critical Root Zone whichever is greater, of trees to be preserved per detail, prior to commencement of earthwork activity. Field-staking of the fence location(s) subject to City approval.·Where silt fence and proposed tree protection fence overlap, place the tree protection fence on the outside of the silt fence,double-staked at the break-point.·Install 48" Tall Orange Snow Fence at the Drip Line of Existing Trees to Remain.·The contractor shall prune the canopy of existing trees to remain where the canopy is in jeopardy of damage due to the newimprovements shown. It is recommended that the contractor hire a certified arborist to perform the pruning. Any branches brokenduring construction shall be immediately trimmed and wounds painted to prevent further damage.·Perform work in accordance with the laws, ordinances, rules, regulations, and orders of public authority having jurisdiction.Secure and pay for permits, governmental fees and licenses necessary for the proper execution of the demolition work.·Provide protective coverings and enclosures as necessary to prevent damage to existing work that is to remain. Existing work toremain may include items such as trees, shrubs, lawns, sidewalks, drives, curbs, utilities, buildings and/or other structures on oradjacent to the demolition site. Provide temporary fences and barricades as required for the safe and proper execution of thework and the protection of persons and property.·Remove debris, waste, and rubbish promptly from the site. On-site burial of debris is not permitted. Burn no debris on the site.Salvage material not otherwise indicated to be reused shall become the Contractor's property and is to be removed promptlyfrom the site and disposed of in strict accordance with all applicable laws, regulations, and/or statutes.·Buildings, features, surfaces, and other descriptive references shown on this drawing are for informational purposes only. Fieldverify all information relevant to the project prior to proceeding with the work. Visit the site and determine all site conditions andhazards.·This plan is a guide as to the anticipated amount of disturbance expected due to proposed improvements. The contractor isexpected to take all necessary precautions to ensure trees noted to remain are not damaged during construction. Do not storematerial or drive within the drip line of existing trees to remain. Be aware of overhead branches for clearance of material andequipment.·This plan is not a guarantee that existing trees will survive during/post construction, but rather a guide to help assure theirprotection and greatest chances of survival at the surface level. Further protection measures outside this scope could involveecologists, foresters and arborists.·Notify the Owner's Representative when tree protection fencing is taken down to perform work in conjunction with the newimprovements noted in this plan set. The contractor is responsible for re-erecting the tree protection fence immediately after thework is complete, when ever possible·Trees shown as existing to remain (be preserved) that are damaged / killed as a result of construction activities are subject toreplacement per the City Tree Replacement penalty. Replacement trees are to be paid for at no additional expense to the Owner.TREE PRESERVATION & PROTECTION NOTES:SEEDINGSCHEDULES& NOTESPage 89 of 124
kaas wilson architects
Lexington Heights AptsSITE CONTEXT
0.2 2/25/2026
Lexington Heights Apts
2/25/2026
GROSS AREA - TOTAL
Level Area
Level 4 23,617 ft²
Level 3 23,617 ft²
Level 2 23,617 ft²
Level 1 23,600 ft²
Level -1 26,488 ft²
Grand total 120,939 ft²HWY 35ELEXINGTON AVE S.LEXINGTON HEIGHTS
APARTMENTS
PARKING PROVIDED:
60 SURFACE FOR NEW BUILDING
43 REMAIN FOR EXISTING BUILDING
(103 TOTAL PROPOSED SURFACE LOT)
144 STALLS / 84 UNITS = 1.71 STALLS/UNIT
144 STALLS / 110 BEDROOMS = 1.31 STALLS/BEDROOM
EXISTING BUILDING
75 UNITS (120 BEDROOMS)
GARAGE STALLS = 75
SURFACE PROPOSED = 45
TOTAL PARKING = 120 STALLS
120 STALLS / 75 UNITS = 1.60 STALLS/UNIT
120 STALLS / 120 BEDROOMS = 1.00 STALLS/BEDROOM
PARKING
Level Type Count
Level -1 Garage Stalls 71
Level -1 Garage Stalls - Tandem 13
84
Level 1 Surface 60
60
144PROPOSED SITEUNIT MIX - GROSS AREA
Name Count
Bedroo
ms
Unit Gross
Area
Total Area %Main Floor
1BR
Unit A1 16 16 708 ft² 11,328 ft² 19%
Unit A2 4 4 792 ft² 3,167 ft² 5%
Unit A3 4 4 709 ft² 2,837 ft² 5%
Unit A4 8 8 786 ft² 6,291 ft² 10%
32 32 23,622 ft² 38%
1BR +D
Unit B1 30 30 923 ft² 27,690 ft² 36%
30 30 27,690 ft² 36%
2BR
Unit C2 4 8 1,154 ft² 4,617 ft² 5%
Unit C4 3 6 1,097 ft² 3,290 ft² 4%
Unit C5 3 6 1,047 ft² 3,140 ft² 4%
Unit C6 4 8 1,286 ft² 5,144 ft² 5%
14 28 16,191 ft² 17%
2BR + D
Unit C3 4 8 1,597 ft² 6,389 ft² 5%
Unit D1 4 12 1,363 ft² 5,453 ft² 5%
8 20 11,842 ft² 10%
Grand total 84 110 79,345 ft² 100%
Page 90 of 124
1
2
E X I S T I N G 3 -S T O R Y B U I L D I N G
E X I S T I N G 3 -S T O R Y
B U I L D I N G
E X I S T I N G
P O O L B U I L D I N G
PROPOSED 4-STORY
84 UNIT BUILDING
4
COLORED SITE PLAN
ASPHALT
SIDEWALK 1
SIDEWALK 2
GRASS 1
GRASS 2
WATER
BUILDING
1 BUILDING ENTRANCE
2 GARAGE ENTRANCE
3 LANDSCAPED COURTYARD
- GARAGE BELOW
SITE PLAN KEY
4 PATIO AMENITY
kaas wilson architects
Lexington Heights AptsSITE PLAN
2.0 2/25/2026
1" = 60'-0"1 SD Site Plan
Page 91 of 124
6.1
1
6.1
5
6.1 6
6.1
2
6.13
6.1
4
25,064 ft²
Parking Garage
416 ft²
Trash
Color Scheme Legend
Circulation
Core
Garage18'-0"14'-0"18'-0"18'-0"9 '-0 "
9 '-0 "
9 '-0 "
9 '-0 "
9'-0"
9'-0"
9'-0"9'-0"9'-0"9'-0"16'-0"8'-0"8'-0"8'-0"
UNEXCAVATED
8'-0"8'-0"8'-0"
13'-8"24'-0"Utility24'-0"24'-0"24'-0"24'-0"Stair AStair B6.2
1
6.2
2
kaas wilson architects
Lexington Heights AptsFLOOR PLANS
3.0 2/25/2026
1" = 30'-0"1 Level -1
PARKING
Level Type Count
Level -1 Garage Stalls 71
Level -1 Garage Stalls - Tandem 13
84
Level 1 Surface 60
60
144
Page 92 of 124
Color Scheme Legend
1BR
1BR +D
2BR
2BR + D
Circulation
Common Area
Core
6.1
1
6.1
5
6.1 6
6.1
2
6.13
6.1
4
PATIO AMENITY
946 ft²
WFH / Coffee Bar
700 ft²
Fitness
1,097 ft²
Club Room
759 ft²
Lobby
792 ft²
Unit A2 786 ft²
Unit A4
1,286 ft²
Unit C6
1,597 ft²
Unit C3
708 ft²
Unit A1
786 ft²
Unit A4 923 ft²
Unit B1
923 ft²
Unit B1
923 ft²
Unit B1
708 ft²
Unit A1
708 ft²
Unit A1
708 ft²
Unit A1
709 ft²
Unit A3
1,154 ft²
Unit C2
1,363 ft²
Unit D1
923 ft²
Unit B1
923 ft²
Unit B1
923 ft²
Unit B1
6.2
1
6.2
2
kaas wilson architects
Lexington Heights AptsFLOOR PLANS
3.1 2/25/2026
1" = 30'-0"1 Level 1
Page 93 of 124
6.1
1
6.1
5
6.1 6
6.1
2
6.13
6.1
4
1,597 ft²
Unit C3
708 ft²
Unit A1
708 ft²
Unit A1
708 ft²
Unit A1 1,363 ft²
Unit D1
1,154 ft²
Unit C2
792 ft²
Unit A21,286 ft²
Unit C6
1,047 ft²
Unit C5
923 ft²
Unit B1
1,097 ft²
Unit C4
923 ft²
Unit B1
923 ft²
Unit B1
923 ft²
Unit B1
923 ft²
Unit B1
923 ft²
Unit B1
923 ft²
Unit B1
923 ft²
Unit B1
709 ft²
Unit A3
708 ft²
Unit A1
786 ft²
Unit A4
786 ft²
Unit A4
6.2
1
6.2
2
kaas wilson architects
Lexington Heights AptsFLOOR PLANS
3.2 2/25/2026
1" = 30'-0"1 Level 2
Page 94 of 124
6.1
1
6.1
5
6.1 6
6.1
2
6.13
6.1
4
Color Scheme Legend
1BR
1BR +D
2BR
2BR + D
Circulation
Core
1,597 ft²
Unit C3
708 ft²
Unit A1
786 ft²
Unit A4 923 ft²
Unit B1
923 ft²
Unit B1
923 ft²
Unit B1
923 ft²
Unit B1
923 ft²
Unit B1
923 ft²
Unit B1
923 ft²
Unit B1
923 ft²
Unit B1786 ft²
Unit A4
792 ft²
Unit A2
1,286 ft²
Unit C6
1,047 ft²
Unit C5
708 ft²
Unit A1
709 ft²
Unit A3
1,154 ft²
Unit C2
1,097 ft²
Unit C4
708 ft²
Unit A1 708 ft²
Unit A1 1,363 ft²
Unit D1
6.2
1
6.2
2
1" = 30'-0"1 Level 3
kaas wilson architects
Lexington Heights AptsFLOOR PLANS
3.3 2/25/2026
Page 95 of 124
6.1
1
6.1
5
6.1 6
6.1
2
6.13
6.1
4
1,597 ft²
Unit C3
708 ft²
Unit A1
786 ft²
Unit A4 923 ft²
Unit B1
923 ft²
Unit B1
923 ft²
Unit B1
923 ft²
Unit B1
923 ft²
Unit B1
923 ft²
Unit B1
923 ft²
Unit B1
923 ft²
Unit B1786 ft²
Unit A4
792 ft²
Unit A2
1,286 ft²
Unit C6
1,047 ft²
Unit C5
708 ft²
Unit A1
709 ft²
Unit A3
1,154 ft²
Unit C2
1,097 ft²
Unit C4
708 ft²
Unit A1 708 ft²
Unit A1 1,363 ft²
Unit D1
6.2
1
6.2
2
kaas wilson architects
Lexington Heights AptsFLOOR PLANS
3.4 2/25/2026
1" = 30'-0"1 Level 4
Page 96 of 124
Page 97 of 124
kaas wilson architects
Lexington Heights AptsEXTERIOR MATERIALS
6.0 2/25/2026
EXTERIOR MATERIALS
Material Mark Description Image
4.2 04-Brick-SiouxCity-Running-BadlandsVelour
4.3 Environmental Stoneworks - San Domino Grezzo
5.4 Metal - Dark Bronze
7.1 07-Siding-JamesHardie-AlternatingLap-4/4/8-Smoo
th-Khaki Brown
EXTERIOR MATERIALS
Material Mark Description Image
7.10 EDCO Vertical Siding - Cedarwood
7.11 07-Siding-JamesHardie-Lap6Reveal-Cedarmill-Timb
er Bark
8 COMPOSITE WINDOWS; BLACK
8.1 08-Glass
Page 98 of 124
kaas wilson architects
Lexington Heights AptsRENDERINGS
5.0 2/25/2026
Page 99 of 124
COMPLIMENTARY
SECONDARY
MATERIAL
PROMINENT ADDRESS
GLASSY ENTRANCE
CANOPY ESTABLISHES
HORIZONTAL BREAK
PROMINENT MAIN
ENTRY
kaas wilson architects
Lexington Heights AptsEXTERIOR ELEVATIONS
6.2 2/25/2026
NEW BRICK COLOR TO
MATCH EXISTING BRICK
TONE
4TH FLOOR METAL PANEL
SELECTED TO MINIMIZE VISUAL
PROMINENCE AND RECEDE
WITHIN THE OVERALL MASSING
COLOR TONE
COMPLIMENTARY
EQUAL TWO-LITE
FENESTRATION PATTERN
SLIDING PATIO DOOR TO
PRIVATE DECK
SURFACE MOUNTED
MECHANICAL TERMINATIONS
Page 100 of 124
This page is intentionally left blank
9.b
REQUEST FOR CITY COUNCIL ACTION
MEETING DATE: April 7, 2026
AGENDA ITEM: Resolution 2026-25 Approving a Conditional Use Permit for 655 Callahan
Place [Planning Case No. 2026-04]
ITEM TYPE: New and Unfinished Business
DEPARTMENT: Community Development CONTACT: Sarah Madden, Community
Development Manager
ACTION REQUEST:
Adopt Resolution 2026-25 Approving a Conditional Use Permit (CUP) for M&M Home
Contractors to allow for a residential building height of 20-ft at 655 Callahan Place
BACKGROUND:
M&M Home Contractors is the Applicant and Owners’ Representative of the property located
at 655 Callahan Place, and are requesting a Conditional Use Permit (CUP) to allow for a
residential building height of 20-ft for the construction of a new single-family home located at
655 Callahan Place. The subject property is located on the north side of Callahan Place, a street
which is generally west of Two Rivers High School’s football field. The subject property is part
of the Willow Spring subdivision, originally platted in 1947. The existing lot is currently vacant,
but previously was developed with a single-family home which was demolished in 2025. The
proposed project is to construct a new 5,621 sq-ft home on the property.
While the R-1 district permits a maximum building height of 25 feet, infill development is
subject to additional height restrictions per Section 12-4A-7, which limits building height to
the average height of the principal structures on the immediately adjacent lots. The applicant
is proposing a height of 20 feet, and the adjacent residential homes are both single-level
homes estimated to be no taller than 15-ft in height. The ordinance states that when
averaging building heights of the adjacent structures, the maximum cannot be set lower than
15-ft. For this new proposed home, the CUP is required because the proposed roof height is
taller than the ordinance-set maximum of 15-ft.
At the March 31, 2026, Planning Commission meeting, a planning report was presented. A duly
noticed public hearing was held, and two persons spoke related to the application. The
residents who spoke at the public hearing expressed concerns with the size of the proposed
home, and the possibility of shading their yard due to the height and depth of the home, as
well as concerns with drainage from the roof and where that may be directed. The applicant
Page 101 of 124
was present and available to answer questions of the Commission. The applicant and staff
confirmed that the proposed front setback of the home is consistent with adjacent structures.
The applicant stated a willingness to discuss the project with adjacent property owners relating
to drainage.
A copy of the 03/31/2026 planning report with attachments and an excerpt from the
unapproved minutes are attached to this memo. As noted in the attachment, staff
recommended approval of the application request. Following their discussion, the Planning
Commission affirmed the staff recommendation and voted unanimously (5-0) to recommend
to the City Council approval of this CUP with findings-of-fact and certain conditions, as
outlined in the attached [draft] Resolution.
FISCAL AND RESOURCE IMPACT:
Not Applicable
ATTACHMENTS:
1.Resolution 2026-25 Resolution Approving a Conditional Use Permit for Residential
Building Height at the Property Located at 655 Callahan Place
2.Unapproved Planning Commission Minutes 3-31-26
3.March 31, 2026, Planning Commission Staff Report
CITY COUNCIL PRIORITY:
Economic Vitality & Community Vibrancy
Page 102 of 124
Resolution No. 2026-25 Page | 1
CITY OF MENDOTA HEIGHTS
DAKOTA COUNTY, MINNESOTA
RESOLUTION 2026-25
RESOLUTION APPROVING A CONDITIONAL USE PERMIT FOR RESIDENTIAL
BUILDING HEIGHT AT THE PROPERTY LOCATED AT 655 CALLAHAN PLACE
PLANNING CASE 2026-04
WHEREAS, M&M Home Contractors, (the “Applicant and Owners’ representative”)
made an Application for a Conditional Use Permit for residential building height at the property
located at 655 Callahan Place, and legally described in Exhibit A (the “Subject Property”); and
WHEREAS, the Subject Property is guided LDR-Low Density Residential in the 2040
Comprehensive Plan and zoned R-1 Low Density Residential; and
WHEREAS, pursuant to City Code Title 12-4A-7: Structure Height Standards, a
Conditional Use Permit is required for new single-family home infill development which exceeds
the calculated average height of adjacent structures, and the proposed 20-ft height requires these
approvals; and
WHEREAS, on March 31, 2026, the Mendota Heights Planning Commission held a public
hearing on this Conditional Use Permit request, whereby planning reports were presented and
received by the Commission, and comments from the applicant and public were allowed, and
whereupon closing the hearing, the Commission recommended unanimously (5-0 vote) to approve
the request from M&M Home Contractors for the Conditional Use Permit, which would allow the
proposed height for a new single-family home at 655 Callahan Place, as proposed and presented
under Planning Case No. 2026-04, with certain conditions and findings-of-fact to support said
approval.
NOW, THEREFORE, BE IT RESOLVED by the Mendota Heights City Council that
the recommendation from the Planning Commission on Planning Case No. 2026-04 is hereby
affirmed, and may be approved based on the following findings-of-fact:
1.The proposed construction of a new single family home is consistent with the 2040
Comprehensive Plan and the Zoning Ordinance for property within the R-1 Low
Density Residential Zoning District.
2.The proposed project will not be detrimental to the health, safety or general welfare
of the community; should not cause any serious traffic congestion nor hazards; will
not seriously depreciate surrounding property value; and said use appears to be in
harmony with the general purpose and intent of the City Code and the Comprehensive
Plan.
Page 103 of 124
Resolution No. 2026-25 Page | 2
3.The construction of the home as shown in the provided plans represents reinvestment
in a residential neighborhood that is consistent with the Comprehensive Plan’s goals
for residential land uses; and is consistent with current single-family development
pattern of the neighborhood.
BE IT FURTHER RESOLVED, by the Mendota Heights City Council that the
Conditional Use Permit requested for the property located at 655 Callahan Place is hereby
approved, with the following conditions:
1.A building permit must be approved and issued by the City prior to the commencement
of any work. All applicable zoning and building requirements shall be met prior to
issuance of a building permit.
2.The building height shall not exceed 20 feet, as measured per the definition of Building
Height in City Code.
3.The building shall be constructed in substantial conformance with the plans submitted
and dated 1/29/2026.
Adopted by the City Council of the City of Mendota Heights this 7th day of April 2026.
CITY COUNCIL
CITY OF MENDOTA HEIGHTS
________________________________
Stephanie B. Levine, Mayor
ATTEST:
Nancy Bauer, City Clerk
Page 104 of 124
Resolution No. 2026-25 Page | 3
EXHIBIT A
Address: 655 Callahan Place
PIN: 27-84300-00-280
Legal Description:
The East ½ of Lot 28, Willow Spring Addition, Dakota County, Minnesota
Page 105 of 124
DRAFT/UNAPPROVED MINUTES
EXCERPT FROM DRAFT/UNAPPROVED 3/31/26 PLANNING
COMMISSION MINUTES
B) PLANNING CASE 2026-04
M&M HOME CONTRACTORS, 655 CALLAHAN PLACE – CONDITIONAL USE PERMIT
Community Development Manager Sarah Madden explained that M&M Home Contractors is the
applicant and owner’s representative of the property located at 655 Callahan Place and
has requested a Conditional Use Permit (CUP) to allow for a residential building height
of 20 feet for the construction of a new single-family home located at 655 Callahan Place.
Hearing notices were published and mailed to all properties within 350 feet of the site; no
comments or objections to this request were received.
Community Development Manager Sarah Madden provided a planning staff report and a
presentation on this planning item to the Commission (which is available for viewing
through the City’s website).
Staff recommended approval of this application based on the findings and with conditions.
Commissioner Johnson asked about the roof height of the two neighboring properties.
Community Development Manager Sarah Madden provided information on the estimates that
were used to determine the average of 15 feet.
Commissioner Corbett opened the public hearing.
Brian Ross, 653 Callahan Place, stated that he lives to the east of this property and expressed
concerns with the height of the building proposed. He commented that this home is being
setback further on the property, and he expressed concerns with the shadowing that could
occur on his property. He asked that the build revise their plan to a lesser building height.
Rosemary Husbands, 659 Callahan Place, stated that she lives to the west of the subject property
and asked that the builder consider the trees along the property line. She wanted to ensure
that the root systems were not damaged during construction. She commented on the
drainage patterns from the previous home and expressed concerns that there would be
more runoff from a larger roof. She asked that the runoff from this property not go onto
her property. She asked that there be consideration for low wattage lighting to ensure that
a building of this size remain understanded rather than overstated. She did not want to see
bright spotlights or lighting that could impose itself on wildlife or the native habitat.
Mike Fritz, M&M Homes, stated that their goal is to work with the neighbors to ensure there are
no issues and/or address any existing issues. He stated that they are pulled all the way to
the front setback, and 93.4 feet remains from the home to the back of the lot. He stated
that the proposed home would be a 4,200 square foot rambler and provided information
on the roof pitches. He stated that this application is for a CUP for the building height
Page 106 of 124
DRAFT/UNAPPROVED MINUTES
and noted that he would be willing to speak with the neighbor to address her concerns with
the trees and runoff. He stated that they tried to manage the front and back setbacks as
best they could.
Commissioner Johnson asked if the front setback is in alignment with the other two homes.
Mr. Fritz replied that the front setback is 50.5.
Public Works Director Ryan Ruzek explained that the garage extends in front of the home, and the
front of the garage is evenly aligned with the homes on either side.
Commissioner Johnson asked for clarification on the proposed building height.
Mr. Fritz replied that the tallest midpoint is 17.6. He recognized that both neighboring homes are
around 13 feet, which is under the Code maximum.
Seeing no one further coming forward wishing to speak, Commissioner Corbett asked for a motion
to close the public hearing.
COMMISSIONER NATH MOVED, SECONDED BY COMMISSIONER UDELL, TO CLOSE THE
PUBLIC HEARING.
AYES: 5
NAYS: 0
Commissioner Nath noted that the request is related to the peak in the middle of the home, which
should alleviate the issue of shade mentioned by the neighbor. He supported the request.
Commissioner Johnson stated that while she does have concerns for the neighbors, she was happy
to hear that the builder was willing to work with them. She noted that this request falls
within the requirements of the City Code.
COMMISSIONER UDELL MOVED, SECONDED BY COMMISSIONER GOLDADE, TO
RECOMMEND APPROVAL OF THE REQUESTED CONDITIONAL USE PERMIT BY
M&M HOME CONTRACTORS FOR THE PROPERTY AT 655 CALLAHAN PLACE WITH
THE FOLLOWING CONDITIONS:
1. A BUILDING PERMIT MUST BE APPROVED AND ISSUED BY THE CITY PRIOR TO
THE COMMENCEMENT OF ANY WORK. ALL APPLICABLE ZONING AND
BUILDING REQUIREMENTS SHALL BE MET PRIOR TO ISSUANCE OF A BUILDING
PERMIT.
2. THE BUILDING HEIGHT SHALL NOT EXCEED 20 FEET, AS MEASURED PER THE
DEFINITION OF BUILDING HEIGHT IN CITY CODE.
3. THE BUILDING SHALL BE CONSTRUCTED IN SUBSTANTIAL CONFORMANCE
WITH THE PLANS SUBMITTED AND DATED JANUARY 29, 2026.
AYES: 5
Page 107 of 124
DRAFT/UNAPPROVED MINUTES
NAYS: 0
Community Development Manager Sarah Madden advised the City Council would consider this
application at its April 7, 2026, meeting.
Page 108 of 124
Planning Commission
Meeting Date: March 31, 2026
Agenda Item: CASE No. 2026-04 Conditional Use Permit Application of M&M Home
Contractors for a Conditional Use Permit (CUP) for residential building
height for a new single-family home at 655 Callahan Place
Department: Community
Development
Contact: Sarah Madden,
Community Development
Manager
Introduction:
M&M Home Contractors is the Applicant and Owners’ Representative of the property located
at 655 Callahan Place, and has requested a Conditional Use Permit (CUP) to allow for a
residential building height of 20-ft for the construction of a new single-family home located at
655 Callahan Place.
A public hearing notice for this item was published in the Pioneer Press and notice letters were
mailed to all surrounding properties within 350-feet of the subject property. No written public
comments were received as of the submittal of this report.
Background:
The applicant is requesting a Conditional Use Permit (CUP) to allow a new single-family home
to exceed the calculated average building height required for infill development in the R-1 Low
Density Residential zoning district.
The subject property is located on the north side of Callahan Place, a street which is generally
west of Two Rivers High School’s football field. The subject property is part of the Willow
Spring subdivision, originally platted in 1947. The existing lot is currently vacant, but previously
was developed with a single-family home which was demolished in 2025. The proposed
project is to construct a new 5,621 sq-ft home with a walkout basement on the property. The
site plan for the proposed home shows the location as meeting all minimum required setbacks
for the R-1 zoning district.
While the R-1 district permits a maximum building height of 25 feet, infill development is
subject to additional height restrictions per Section 12-4A-7 (listed below), which limits building
height to the average height of the principal structures on the immediately adjacent lots. The
applicant is proposing a height of 20 feet, and the adjacent residential homes are both single-
level homes estimated to be no taller than 15-ft in height. The ordinance states that when
averaging building heights of the adjacent structures, the maximum cannot be set lower than
15-ft. For this new proposed home, the CUP is required because the proposed roof height is
taller than the set maximum of 15-ft.
"12-4A-7: STRUCTURE HEIGHT STANDARDS:
C. Height Standards for Infill Development in R-1 Zoning District. The following height
Page 109 of 124
standards are established for any infill lot in the R-1 Zoning District:
1. The permitted maximum height shall be determined by taking the average of the two
adjacent principal residential structures, but in no case shall the maximum be set lower than
15-feet.
2. To exceed the maximum height established in C.1, a Conditional Use Permit must be
obtained. In no case shall the permitted height exceed 25-feet unless a Variance is also
obtained."
The proposed roof pitch and other design features of the new single-family home are
consistent with R-1 Low Density Residential zoning district standards.
Analysis:
Pursuant to Title 12-5B-5, the city recognizes that the development and execution of Zoning
Code is based upon the division of the city into districts within which regulations are specified.
It is further recognized that there are special or conditional uses which, because of their unique
characteristics, cannot be properly classified in any district or districts without consideration, in
each case, of the impact of those uses on neighboring land or the public need for the particular
location.
To provide for these needs, the city may approve a conditional use for those uses and
purposes, and may impose conditions and safeguards in such permits to ensure that the
purpose and intent of this chapter is effectively carried out.
The City may grant a conditional use provided the proposed use demonstrates the following:
a.Use will not be detrimental to the health, safety or general welfare of the community,
b.Use will not cause serious traffic congestion nor hazards,
c.Use will not seriously depreciate surrounding property value, and
d.Use is in harmony with the general purpose and intent of this chapter and
the comprehensive plan.
A-C) The proposed use will not be detrimental to the health, safety or general welfare of
the community; will not cause serious traffic congestion or hazards; nor depreciate
surrounding property value.
Staff Response: The proposed building height remains below the R-1 district’s maximum
permitted height of 25 feet and meets all applicable zoning standards for roof pitch. No
adverse impacts to health, safety, or welfare have been identified. The proposed height
increase does not alter the single-family residential use or generate additional traffic.
Access and onsite parking remain consistent with code requirements. The proposed
structure is compatible in scale and character with surrounding development. Both adjacent
homes are rambler/ranch style single-story homes, and the proposed height of 20-ft is not
inconsistent with that scale. The new home will meet setback standards for single-family
development in R-1. Staff finds no evidence that the height request as proposed in this CUP
application would negatively impact property values.
D) The use is in harmony with the general purpose and intent of this chapter and the
Comprehensive Plan.
Staff Response: The project supports the Comprehensive Plan’s goals for neighborhood
reinvestment and compatibility in infill development. The proposed height is modest,
reasonable, and consistent with the intent of the zoning ordinance and Comprehensive
Plan.
Page 110 of 124
Alternatives:
1. Approve the CUP request for 655 Callahan Place, which would allow for the
construction of a new single-family home based on the findings-of-fact that the
proposed project is compliant with the purpose and intent of the zoning ordinance and
Comprehensive Plan, with certain conditions; or
2. Deny the CUP request for 655 Callahan Place, based on the revised or amended
findings-of- fact that the application does not meet certain policies and standards of City
Code as determined by the Planning Commission; or
3. Table the request and request additional information from staff and/or the applicant;
Staff will extend the review period an additional 60 days, in compliance with Minnesota
State Statute 15.99.
Staff Recommendation:
Attachments:
1. Findings of Fact for Approval
2. Site Location Map
3. Site Plan
4. 655 Callahan Place - Construction Plans, dated 1/29/26
Page 111 of 124
Planning Case 2026-04 (CUP for 655 Callahan Place) Page 1 of 1
FINDINGS-OF-FACT FOR APPROVAL
Conditional Use Permit (CUP)
for
655 Callahan Place
The following Findings of Fact are made in support of approval of the proposed requests:
1. The proposed construction of a new single family home is consistent with the 2040 Comprehensive
Plan and the Zoning Ordinance for property within the R-1 Low Density Residential Zoning
District.
2. The proposed project will not be detrimental to the health, safety or general welfare of the
community; should not cause any serious traffic congestion nor hazards; will not seriously
depreciate surrounding property value; and said use appears to be in harmony with the general
purpose and intent of the City Code and the Comprehensive Plan.
3. The construction of the home as shown in the provided plans represents reinvestment in a
residential neighborhood that is consistent with the Comprehensive Plan’s goals for residential land
uses; and is consistent with current single-family development pattern of the neighborhood.
Page 112 of 124
6666666666666666666666666666666666666666666666666 666!"
"
"!!"
""
"!
³
"
"
*"
""
"
"
³
""
"6666666666666666666666!!2 !!2 !!2 !!2
!!2
!!2 !!2 !!2
!!2 !!2
!!2
648 646
1871
1861675
647651653
652
655
656
659
660666
681
685
672
645
646676654650
672
668 664 658
688
682
1851
696
657
675 663 653 649 647 645679
642
651
687
1852
1862645
MARI E AVE
CALLAHAN PL
W E S L E Y C T Nearmap U S Inc, Dakota County, MN
Sit e Location/Aerial Map655 Callahan Place
Date: 3/27/2026
City ofMendotaHeights0125
SCALE IN FEET
GIS Map Disclaimer:This data is for informational purposes only and should not be substituted for a true title search, property appraisal, plat,survey, or for zoning verification. The City of Mendota Heights assumes no legal responsibility for the information containedin this data. The City of Mendota Heights, or any other entity from which data was obtained, assumes no liability for any errorsor omissions herein. If discrepancies are found, please contact the City of Mendota Heights.
Contact "Gopher State One Call" at 651-454-0002 for utility locations, 48 hours prior to any excavation.
Page 113 of 124
Page 114 of 124
SQUARE FOOTAGE CALCULATIONSFINISHED SQ. FTG. 2385 SQ.FT.GARAGE SQ. FTG. 877 SQ.FT.OVERALL FIRST FLOOR SQ. FTG. 3262 SQ.FT.FINISHED SQ. FTG. 2135 SQ.FT.UNFINISHED SQ. FTG. 224 SQ.FT.OVERALL BASEMENT SQ. FTG. 2359 SQ.FT.TOTAL FINISHED SQ. FTG:4520 SQ.FT.GRAND TOTAL SQ. FTG: 5621 SQ.FT.DRAWING TITLE:1−29−26LOCATION:PAGEPAGE DESCRIPTION:L DLITTFINDESIGN.COMMLITTFIN@HOTMAIL.COM320−224−7844WINSTED, MNCURRENTDATE:REVISION:REV. DATE:ALL PLANS & DESIGNS SHOWNARE THE PROPERTY OF LITTFINDESIGN. USE OF THESE PLANSON ANY OTHER PROJECT/LOTOTHER THAN NOTED ON THISTITLEBLOCK WITHOUT THEWRITTEN CONSENT OF LITTFINDESIGN IS PROHIBITED.THIS PLAN PROVIDES BUILDING DETAILS FOR A PROJECT TO BE BUILT IN ACCORDANCE WITH INTERNATIONAL BUILDING CODES AS WELL AS ANY LOCAL CODES. CONTRACTOR, OWNER, AND/OR TRADES ARE RESPONSIBLE FOR ANY FINES, PENALTIES FOR CODE, ORDINANCE, REGULATION OR BUILDING PROCESS VIOLATIONS. LITTFIN DESIGN IS NOT RESPONSIBLE FOR OMISSIONS OR ERRORSMADE DURING DESIGN, BIDDING, OR CONSTRUCTION PHASES. ANY AND ALL SITE REVIEW IS TO BE PERFORMED BY OTHERS SUCH AS THE CONTRACTOR, OWNER, SURVEYOR, OR OTHER TRADES RESPONSIBLE FOR SITE CONDITIONS. LITTFIN DESIGN IS NOT RESPONSIBLE FOR CONTRACTOR/TRADE ERRORS, UNKNOWN CODE ADJUSTMENTS AT THE TIME OF PLAN CREATION OR CONSTRUCTION.SHEET INDEX::::1. ALL EXTERIOR WALLS TO BE 16" O.C. WITH DOUBLE TOP PLATE UNLESS NOTED OTHERWISE.(U.N.O.)2. WALL FRAMING SHALL BE S.P.F. STUD GRADE ORBETTER UNLESS NOTED OTHERWISE.3. ALL HEADERS SHALL BE PER PLAN.4. ALL EXTERIOR HEADERS SHALL HAVE (1)2X6BEARING STUD & (1) 2X6 FULL HEIGHT KING STUDON EACH SIDE U.N.O. (REVIEW PLANS)5. ALL INTERNAL HEADERS & BEAMS SHALL HAVE (1)2X6 OR (1)2X4 BEARING STUD ON EACH SIDE U.N.O.6. EXTERIOR SHEATHING SHALL BE 7/16" MATERIALCONSISTING OF ORIENTED STRAND BOARD (OSB).ALL FLOOR AND CEILING SYSTEMS TO BECHECKED AND DESIGNED BY THE DESIGNATEDMANUFACTURER. FLOOR PLANS TO BE ON SITE.7. HEADER SIZES ARE TO BE USED PER PLAN AND DEVIATION FROM ANY SIZE MUST BE APPROVEDBY DESIGNERS.8. PRESSURE TREADED WOOD IS TO BE USEDWHERE WOOD IS IN CONTACT WITH CONCRETEAND AT 2X6 MUD SILL. TREATED MEMBERS TO BES.Y.P.#2 OR BETTER.9. FOR OPENINGS IN EXTERIOR WALLS OR WALLSWITH LATERAL LOADING:a. 0'-0" - 4'-0" = 1 JACK STUDb. 4'-0" - 8'-0" = 2 JACK STUDSc. 8'-0" - 12'-0" = 3 JACK STUDSd. 12' OR GREATER AT OPENINGS = CONSULT ENGINEERING10.POSTS CALLED OUT ARE NUMBER OF REQUIRED TRIMMER/JACK STUDS PER SIDE OF OPENING.1. ALL CONCRETE FOOTINGS AND FOUNDATIONSYSTEMS ARE DESIGNED FOR A 2000 P.S.F.SOIL.2. FOUNDATION WALLS SHALL BE FULL HEIGHT ATUNBALANCED FILL GREATER THAN 3'4".3. 1/2" ANCHOR BOLTS EMBEDDED 7" MIN. @ 6' O.C.MAX. 12" MIN. FROM EACH END. MIN. OF 2 BOLTS INEACH SILL PLATE (REFER TO STRUCTURALPAGES) OR SEPARATE REBAR DESIGNS BYOTHERS.4. PAD FOOTING REINFORCEMENT IS TO BELOCATED (3") FROM BOTTOM OF FOOTING TYP. (WHEN REQUIRED) REFER TO STRUCTURALPAGES FOR ADDITIONAL INFORMATIONREGARDING RE-BAR/ETC.5.1. ALL EXTERIOR WALLS AND RIMS TO HAVE AMINIMUM RATING OF R-20.2. ALL ATTIC SPACES ARE TO HAVE A MINIMUM RATING OF R-49.3. ALL FLOOR SPACES OVER UNCONDITIONEDSPACE OR CANTILEVERED ARE TO BE INSULATEDTO MIN. R-30.CCOVERSHEETSCALED PRINT @ 24X361. CEILINGS ARE TO HAVE 5/8" NON-SAG GYPSUMBOARD UNLESS OTHERWISE NOTED.2. ALL WALLS ARE TO HAVE 1/2" GYPSUM BOARDON INTERIORS U.NO.3. GARAGE CEILING AND WALLS THAT ADJOINHOUSE WALLS ARE TO BE 5/8" GYPSUM BOARDPER CODE.1. ALL WINDOWS AND DOORS TO BE DOUBLEPANE GLASS PANELS WITH LOW-E RATINGS.2. WINDOWS WITHIN 24" OF A DOOR SWING MUSTBE TEMPERED PER CODE.3. ANY WINDOW ABOVE A TUB/WET AREA MUSTBE TEMPERED PER CODE.4. ANY WINDOW WITHIN A STAIRWAY MUST BETEMPERED PER CODE, UNLESS 4' ABOVEHEIGHT OF WALKING PATH.5. WINDOW GLAZING MUST BE AT LEAST 18" A.F.F.WHEN WINDOW IS ABOVE 6' FROM GRADE. IFWITHIN 18", WINDOW MUST BE TEMPERED.6. ALL BEDROOMS TO HAVE AT LEAST ONEWINDOW THAT HAS A CLEAR EGRESS OPENINGOF 5.7 SQ. FT. WITH MIN. DIMENSIONS OF 24" INHEIGHT & 20" IN WIDTH, SILL HEIGHT NOT TOBE GREATER THAN 44" A.F.F.7. WINDOWS WITH SILLS WITHIN 2' OF THEFLOOR THEY SERVE AND ARE 72" ABOVE GRADE MUST EITHER HAVE A FALL PREVENTION OR OPENING LIMITER DEVICEPER CODE.1. ALL ELECTRICAL AND MECHANICALEQUIPMENT TO BE VERIFIED AND INSTALLEDPER CODE BY APPROVED TRADES ANDINSTALLERS.2. HVAC CONTRACTOR TO VERIFY LAYOUT FORDUCT-RUNS BEFORE INSTALLATION, IFMODIFICATION IS REQUIRED, REPORTINFORMATION/CHANGES TO CONTRACTOR &LITTFIN DESIGN.C COVERA1 FRONT ELEVATIONA2 REAR ELEVATIONA3 LEFT ELEVATIONA4 RIGHT ELEVATIONA5 ROOF PLANA6 FOUNDATION PLANA7 FINISHED BASEMENT PLANA8 FIRST FLOOR PLANSINGLE FAMILY CONSTRUCTION TYPE IRC-1-2020 MINNESOTA STATE RESIDENTIAL CODE-2023 NATIONAL ELECTRICAL CODE-2020 MINNESOTA STATE MECHANICAL & FUEL GAS CODE-2020 MINNESOTA STATE FIRE CODE-2020 MINNESOTA PLUMBING CODEDESIGNED WITH 2000 PSF SOILS, ALL FOUNDATION CONSTRUCTION MUST FACTOR IN THIS AT AMINIMUM.DESIGNED WITH "EXPOSURE B" CLASSIFICATIONS AND WIND GUSTS OF 115 MPH PER 2020 MNRESIDENTIAL CODE REGULATIONS.-ALL FOUNDATION WALL STRUCTURAL INFORMATION USED TO CONSTRUCT THE FOUNDATIONSYSTEM IS TO BE ON SITE WHENPOURING OR BUILDING WALLS.-ALL STRUCTURAL BEAMS, POSTS & TALL WALLS ARE TO BE BUILT PER I-LEVEL SPECIFICATIONS.-ALL MANUFACTURED FLOOR & ROOF TRUSSES ARE TO BE INSTALLED PER MANUFACTURERSSPECIFICATIONS.-ALL MANUFACTURED FLOOR & ROOF TRUSS SPECIFICATIONS ARE TO BE ON SITE DURINGINSTALLATION.Page 115 of 124
6' CONCRETE STAIRS W/ 7 34 " MAX. RISERS & 12"TREADS INSTALL 3' TALL CODE RAIL WHEN MORETHAN 3 RISERS OR 30", BUILD STAIRS INTO PORCHSCALE: 1/4" = 1'-0" FRONT ELEVATION1METAL ROOFMETAL ROOF(3) 2'4"X4' FX WINDOWW/ BLACKBACKER(3) 2'4"X4' FX WINDOWW/ BLACKBACKER5'-0 3/4"5'-0 3/4"5'-0 3/4"PITCH CHANGEBOXED OUT GABLE AREA HELD OFF GABLE WALL 8"W/ 4" TRIM AROUND - ABOVE (4) 4"X4"X4" DECORATIVECEDAR BLOCKS - TYP. PER SPEC - SPACED AS SHOWNBOXED OUT GABLE AREA HELD OFF GABLE WALL 8"W/ 4" TRIM AROUND - ABOVE (4) 4"X4"X4" DECORATIVECEDAR BLOCKS - TYP. PER SPEC - SPACED AS SHOWNBOXED OUT GABLE AREA HELD OFF GABLE WALL 8"W/ 4" TRIM AROUND - ABOVE (4) 4"X4"X4" DECORATIVECEDAR BLOCKS - TYP. PER SPEC - SPACED AS SHOWN1'X1' STRAIGHT COLUMN W/ 8"CAP & 8" BASE, PER DETAIL.2'X2' DECO. BRACKETPER DETAIL1'X1' DECO. BRACKETPER DETAIL12" TRIM BOARDPER SPEC.5'-2 1/4"16'-10 1/2"21'-6"6"10'-1 1/8"3'-4"9'-8 1/4"1'-8 1/4"9'-0"9'-1 1/8"8'-0"6"10'-9 1/2"1'-7"2'-5"2'-5"4"X4"X4" DECORATIVECEDAR BLOCKS,SPACED AS SHOWN12" TRIM W/5" SHADOWBOARD PER SPEC.20'-0"8'-0"SCALE: 1/2" = 1'-0" 2'X2' DECORATIVE BRACKET32" 45 DEGREECHAMFER ENDS2' x 2' BRACKET MADE OF 4" x 6" CEDARW/ 45 DEGREE ANGLED AND ARCHEDCENTER ELEMENT W/ 2" 45 O CHAMFER ENDSAS SHOWN - PER SPEC3/4" = 1'-0" 12"X12" COLUMN DETAIL2CEILING/DROPPEDBEAM PER PLAN8" TRIM BOARDMETAL CONNECTOR@ TOP12" COLUMN FINISHMATERIAL PER SPEC.CENTER POST, VERIFYWITH PLAN.CENTER POST, VERIFYWITH PLAN.SECTIONTOPBASECENTER POST, VERIFYWITH PLAN.12" COLUMN FINISHMATERIAL PER SPEC.METAL CONNECTOR@ BASE8" TRIM BOARD12" COLUMN FINISHMATERIAL PER SPEC.@ ALL SIDES.2X FRAMING AT MIDDLETO SUPPORT FINISHES.1'-0"7 1/4"7 1/4"SCALE: 1/2" = 1'-0" 1'X1' DECORATIVE BRACKET42" 45 DEGREECHAMFER ENDS1' x 1' BRACKET MADE OF 3" x 4" CEDARW/ 45 DEGREE ANGLED AND ARCHEDCENTER ELEMENT W/ 2" 45 O CHAMFER ENDSAS SHOWN - PER SPEC1. ICE AND WATER BARRIER @ BOTTOM 6' OF ALL ROOF LINES,EXTEND BARRIER MIN. 3' ON EACH SIDE OF VALLEY, COVERENTIRE FACE OF ROOF SADDLES. VERIFY ADDITIONALLOCATIONS OF ICE AND WATER BARRIER AS NEEDED INFIELD.2. PROVIDE ROOF AND SOFFIT VENTS PER IRC CODEREGULATIONS.3. ALL FURNACE FLUES, PLUMBING VENTS, FIREPLACE VENTS,AND OTHER PENETRATIONS THROUGH ROOF OR WALLS TOEXTEND THROUGH REAR OF HOME WHENEVER POSSIBLE.4. ALL PENETRATIONS THROUGH EXTERIOR WALLS ORROOFING MUST BE SEALED AND FLASHED PERMANUFACTURE. SPECIFICATIONS AND IRC CODEREGULATIONS.5. SUPPLY AT LEAST 6" OF SPACE BETWEEN BOTTOMS OFWINDOWS AND ROOFS.6. ALL BEAMS HOLDING UP PORCH ROOFS ARE TO BEDROPPED UNLESS OTHERWISE NOTED.7. SUPPLY DRIPCAPS ON ALL WINDOWS AND DOORS.8. ALL EXTERIOR TRIM TO BE FLASHED PER CODE9. SUPPLY SEPARATION BETWEEN WOOD, COMPOSITE WOOD,AND ANY OTHER WOOD MATERIAL PER SPECIFICATIONS.10. HOLD STONE OFF GRADE MINIMUM OF 3" OR PER TRADESPECIFICATIONS.11. REFER TO MANUFACTURE SPECIFICATIONS FOR STONE.12. GARAGE BUCK BOARD MATERIAL IS TO BE COMPOSITEWOOD AND SIZED TO COVER THE EDGE OF STONE.13. GRADE CONDITIONS MAY VARY ON SITE.-MATERIAL: SMART-SIDING,VERIFY W/ SPEC.-MATERIAL: SMART-SIDING,VERIFY W/ SPEC.-MATERIAL: SMART-SIDING,VERIFY W/ SPEC.A.) 8" FASCIA PER SPEC.C.) VENTILATED SOFFIT AT OVERHANGSD.) 4" TRIM PER SPEC.A.) 6" TRIM PER SPEC.B.) WINDOW PER PLANB.) 6" FRIEZE PER SPEC.E.) SIDING PER PLANDRAWING TITLE:1−29−26LOCATION:PAGEPAGE DESCRIPTION:L DLITTFINDESIGN.COMMLITTFIN@HOTMAIL.COM320−224−7844WINSTED, MNCURRENTDATE:REVISION:REV. DATE:ALL PLANS & DESIGNS SHOWNARE THE PROPERTY OF LITTFINDESIGN. USE OF THESE PLANSON ANY OTHER PROJECT/LOTOTHER THAN NOTED ON THISTITLEBLOCK WITHOUT THEWRITTEN CONSENT OF LITTFINDESIGN IS PROHIBITED.THIS PLAN PROVIDES BUILDING DETAILS FOR A PROJECT TO BE BUILT IN ACCORDANCE WITH INTERNATIONAL BUILDING CODES AS WELL AS ANY LOCAL CODES. CONTRACTOR, OWNER, AND/OR TRADES ARE RESPONSIBLE FOR ANY FINES, PENALTIES FOR CODE, ORDINANCE, REGULATION OR BUILDING PROCESS VIOLATIONS. LITTFIN DESIGN IS NOT RESPONSIBLE FOR OMISSIONS OR ERRORSMADE DURING DESIGN, BIDDING, OR CONSTRUCTION PHASES. ANY AND ALL SITE REVIEW IS TO BE PERFORMED BY OTHERS SUCH AS THE CONTRACTOR, OWNER, SURVEYOR, OR OTHER TRADES RESPONSIBLE FOR SITE CONDITIONS. LITTFIN DESIGN IS NOT RESPONSIBLE FOR CONTRACTOR/TRADE ERRORS, UNKNOWN CODE ADJUSTMENTS AT THE TIME OF PLAN CREATION OR CONSTRUCTION.A1FRONTELEVATIONSCALED PRINT @ 24X36Page 116 of 124
1. ICE AND WATER BARRIER @ BOTTOM 6' OF ALL ROOF LINES,EXTEND BARRIER MIN. 3' ON EACH SIDE OF VALLEY, COVERENTIRE FACE OF ROOF SADDLES. VERIFY ADDITIONALLOCATIONS OF ICE AND WATER BARRIER AS NEEDED INFIELD.2. PROVIDE ROOF AND SOFFIT VENTS PER IRC CODEREGULATIONS.3. ALL FURNACE FLUES, PLUMBING VENTS, FIREPLACE VENTS,AND OTHER PENETRATIONS THROUGH ROOF OR WALLS TOEXTEND THROUGH REAR OF HOME WHENEVER POSSIBLE.4. ALL PENETRATIONS THROUGH EXTERIOR WALLS ORROOFING MUST BE SEALED AND FLASHED PERMANUFACTURE. SPECIFICATIONS AND IRC CODEREGULATIONS.5. SUPPLY AT LEAST 6" OF SPACE BETWEEN BOTTOMS OFWINDOWS AND ROOFS.6. ALL BEAMS HOLDING UP PORCH ROOFS ARE TO BEDROPPED UNLESS OTHERWISE NOTED.7. SUPPLY DRIPCAPS ON ALL WINDOWS AND DOORS.8. ALL EXTERIOR TRIM TO BE FLASHED PER CODE9. SUPPLY SEPARATION BETWEEN WOOD, COMPOSITE WOOD,AND ANY OTHER WOOD MATERIAL PER SPECIFICATIONS.10. HOLD STONE OFF GRADE MINIMUM OF 3" OR PER TRADESPECIFICATIONS.11. REFER TO MANUFACTURE SPECIFICATIONS FOR STONE.12. GARAGE BUCK BOARD MATERIAL IS TO BE COMPOSITEWOOD AND SIZED TO COVER THE EDGE OF STONE.13. GRADE CONDITIONS MAY VARY ON SITE.SCALE: 1/4" = 1'-0" REAR ELEVATION1SCREENBY OTHERSSCREENBY OTHERSSCREENBY OTHERS36" CODE RAILING 36" CODE RAILING36" CODE RAILING8"X8" BUILT-UPSTRAIGHTCOLUMN,PER DETAIL.8"X8" BUILT-UPSTRAIGHTCOLUMN,PER DETAIL.5'-0 3/4"5'-0 3/4"PITCH CHANGEBOXED OUT GABLE AREA HELD OFF GABLE WALL 8"W/ 4" TRIM AROUND - ABOVE (4) 4"X4"X4" DECORATIVECEDAR BLOCKS - TYP. PER SPEC - SPACED AS SHOWNBOXED OUT GABLE AREA HELD OFF GABLE WALL 8"W/ 4" TRIM AROUND - ABOVE (4) 4"X4"X4" DECORATIVECEDAR BLOCKS - TYP. PER SPEC - SPACED AS SHOWN12" TRIM BOARDPER SPEC.12" TRIM BOARDPER SPEC.8'-0"6"10'-1 1/8"3'-4"8'-9 1/2"1'-6 3/4"7'-0"10'-7 1/4"10" TRIM BOARDPER SPEC.8'-0"6"10'-1 1/8"3'-4"8'-9 1/2"1'-6 3/4"7'-0"2'-5"2'-5"SECTIONTOP3/4" = 1'-0" 8"X8" COLUMN DETAIL2CEILING/DROPPEDBEAM PER PLANMETAL CONNECTOR@ TOP8" COLUMN FINISHMATERIAL PER SPEC.CENTER POST, VERIFYWITH PLAN.CENTER POST, VERIFYWITH PLAN.CENTER POST, VERIFYWITH PLAN.8" COLUMN FINISHMATERIAL PER SPEC.METAL CONNECTOR@ BASE8" TRIM BOARD8" COLUMN FINISHMATERIAL PER SPEC.@ ALL SIDES.2X FRAMING AT MIDDLETO SUPPORT FINISHES.-MATERIAL: SMART-SIDING,VERIFY W/ SPEC.-MATERIAL: SMART-SIDING,VERIFY W/ SPEC.-MATERIAL: SMART-SIDING,VERIFY W/ SPEC.A.) 8" FASCIA PER SPEC.C.) VENTILATED SOFFIT AT OVERHANGSD.) 4" TRIM PER SPEC.A.) 6" TRIM PER SPEC.B.) WINDOW PER PLANB.) 6" FRIEZE PER SPEC.E.) SIDING PER PLANDRAWING TITLE:1−29−26LOCATION:PAGEPAGE DESCRIPTION:L DLITTFINDESIGN.COMMLITTFIN@HOTMAIL.COM320−224−7844WINSTED, MNCURRENTDATE:REVISION:REV. DATE:ALL PLANS & DESIGNS SHOWNARE THE PROPERTY OF LITTFINDESIGN. USE OF THESE PLANSON ANY OTHER PROJECT/LOTOTHER THAN NOTED ON THISTITLEBLOCK WITHOUT THEWRITTEN CONSENT OF LITTFINDESIGN IS PROHIBITED.THIS PLAN PROVIDES BUILDING DETAILS FOR A PROJECT TO BE BUILT IN ACCORDANCE WITH INTERNATIONAL BUILDING CODES AS WELL AS ANY LOCAL CODES. CONTRACTOR, OWNER, AND/OR TRADES ARE RESPONSIBLE FOR ANY FINES, PENALTIES FOR CODE, ORDINANCE, REGULATION OR BUILDING PROCESS VIOLATIONS. LITTFIN DESIGN IS NOT RESPONSIBLE FOR OMISSIONS OR ERRORSMADE DURING DESIGN, BIDDING, OR CONSTRUCTION PHASES. ANY AND ALL SITE REVIEW IS TO BE PERFORMED BY OTHERS SUCH AS THE CONTRACTOR, OWNER, SURVEYOR, OR OTHER TRADES RESPONSIBLE FOR SITE CONDITIONS. LITTFIN DESIGN IS NOT RESPONSIBLE FOR CONTRACTOR/TRADE ERRORS, UNKNOWN CODE ADJUSTMENTS AT THE TIME OF PLAN CREATION OR CONSTRUCTION.A2REARELEVATIONSCALED PRINT @ 24X36Page 117 of 124
SCALE: 1/4" = 1'-0" LEFT ELEVATION1SCREENBY OTHERS36" CODE RAILING2'X2' DECO. BRACKETPER DETAIL8"X8" BUILT-UPSTRAIGHTCOLUMN,PER DETAIL.1'X1' STRAIGHT COLUMN W/ 8"CAP & 8" BASE, PER DETAIL.1'X1' DECO. BRACKETPER DETAIL12" TRIM BOARDPER SPEC.6"10'-1 1/8"3'-4"9'-8 1/4"8'-0"6"10'-1 1/8"3'-4"8'-9 1/2"1'-6 3/4"7'-0"1'-0"1. ICE AND WATER BARRIER @ BOTTOM 6' OF ALL ROOF LINES,EXTEND BARRIER MIN. 3' ON EACH SIDE OF VALLEY, COVERENTIRE FACE OF ROOF SADDLES. VERIFY ADDITIONALLOCATIONS OF ICE AND WATER BARRIER AS NEEDED INFIELD.2. PROVIDE ROOF AND SOFFIT VENTS PER IRC CODEREGULATIONS.3. ALL FURNACE FLUES, PLUMBING VENTS, FIREPLACE VENTS,AND OTHER PENETRATIONS THROUGH ROOF OR WALLS TOEXTEND THROUGH REAR OF HOME WHENEVER POSSIBLE.4. ALL PENETRATIONS THROUGH EXTERIOR WALLS ORROOFING MUST BE SEALED AND FLASHED PERMANUFACTURE. SPECIFICATIONS AND IRC CODEREGULATIONS.5. SUPPLY AT LEAST 6" OF SPACE BETWEEN BOTTOMS OFWINDOWS AND ROOFS.6. ALL BEAMS HOLDING UP PORCH ROOFS ARE TO BEDROPPED UNLESS OTHERWISE NOTED.7. SUPPLY DRIPCAPS ON ALL WINDOWS AND DOORS.8. ALL EXTERIOR TRIM TO BE FLASHED PER CODE9. SUPPLY SEPARATION BETWEEN WOOD, COMPOSITE WOOD,AND ANY OTHER WOOD MATERIAL PER SPECIFICATIONS.10. HOLD STONE OFF GRADE MINIMUM OF 3" OR PER TRADESPECIFICATIONS.11. REFER TO MANUFACTURE SPECIFICATIONS FOR STONE.12. GARAGE BUCK BOARD MATERIAL IS TO BE COMPOSITEWOOD AND SIZED TO COVER THE EDGE OF STONE.13. GRADE CONDITIONS MAY VARY ON SITE.SCALE: 1/2" = 1'-0" 2'X2' DECORATIVE BRACKET32" 45 DEGREECHAMFER ENDS2' x 2' BRACKET MADE OF 4" x 6" CEDARW/ 45 DEGREE ANGLED AND ARCHEDCENTER ELEMENT W/ 2" 45 O CHAMFER ENDSAS SHOWN - PER SPECSECTIONTOP3/4" = 1'-0" 8"X8" COLUMN DETAIL2CEILING/DROPPEDBEAM PER PLANMETAL CONNECTOR@ TOP8" COLUMN FINISHMATERIAL PER SPEC.CENTER POST, VERIFYWITH PLAN.CENTER POST, VERIFYWITH PLAN.CENTER POST, VERIFYWITH PLAN.8" COLUMN FINISHMATERIAL PER SPEC.METAL CONNECTOR@ BASE8" TRIM BOARD8" COLUMN FINISHMATERIAL PER SPEC.@ ALL SIDES.2X FRAMING AT MIDDLETO SUPPORT FINISHES.SCALE: 1/2" = 1'-0" 1'X1' DECORATIVE BRACKET42" 45 DEGREECHAMFER ENDS1' x 1' BRACKET MADE OF 3" x 4" CEDARW/ 45 DEGREE ANGLED AND ARCHEDCENTER ELEMENT W/ 2" 45 O CHAMFER ENDSAS SHOWN - PER SPEC-MATERIAL: SMART-SIDING,VERIFY W/ SPEC.-MATERIAL: SMART-SIDING,VERIFY W/ SPEC.-MATERIAL: SMART-SIDING,VERIFY W/ SPEC.A.) 8" FASCIA PER SPEC.C.) VENTILATED SOFFIT AT OVERHANGSD.) 4" TRIM PER SPEC.A.) 6" TRIM PER SPEC.B.) WINDOW PER PLANB.) 6" FRIEZE PER SPEC.E.) SIDING PER PLAN3/4" = 1'-0" 12"X12" COLUMN DETAIL5CEILING/DROPPEDBEAM PER PLAN8" TRIM BOARDMETAL CONNECTOR@ TOP12" COLUMN FINISHMATERIAL PER SPEC.CENTER POST, VERIFYWITH PLAN.CENTER POST, VERIFYWITH PLAN.SECTIONTOPBASECENTER POST, VERIFYWITH PLAN.12" COLUMN FINISHMATERIAL PER SPEC.METAL CONNECTOR@ BASE8" TRIM BOARD12" COLUMN FINISHMATERIAL PER SPEC.@ ALL SIDES.2X FRAMING AT MIDDLETO SUPPORT FINISHES.1'-0"7 1/4"7 1/4"DRAWING TITLE:1−29−26LOCATION:PAGEPAGE DESCRIPTION:L DLITTFINDESIGN.COMMLITTFIN@HOTMAIL.COM320−224−7844WINSTED, MNCURRENTDATE:REVISION:REV. DATE:ALL PLANS & DESIGNS SHOWNARE THE PROPERTY OF LITTFINDESIGN. USE OF THESE PLANSON ANY OTHER PROJECT/LOTOTHER THAN NOTED ON THISTITLEBLOCK WITHOUT THEWRITTEN CONSENT OF LITTFINDESIGN IS PROHIBITED.THIS PLAN PROVIDES BUILDING DETAILS FOR A PROJECT TO BE BUILT IN ACCORDANCE WITH INTERNATIONAL BUILDING CODES AS WELL AS ANY LOCAL CODES. CONTRACTOR, OWNER, AND/OR TRADES ARE RESPONSIBLE FOR ANY FINES, PENALTIES FOR CODE, ORDINANCE, REGULATION OR BUILDING PROCESS VIOLATIONS. LITTFIN DESIGN IS NOT RESPONSIBLE FOR OMISSIONS OR ERRORSMADE DURING DESIGN, BIDDING, OR CONSTRUCTION PHASES. ANY AND ALL SITE REVIEW IS TO BE PERFORMED BY OTHERS SUCH AS THE CONTRACTOR, OWNER, SURVEYOR, OR OTHER TRADES RESPONSIBLE FOR SITE CONDITIONS. LITTFIN DESIGN IS NOT RESPONSIBLE FOR CONTRACTOR/TRADE ERRORS, UNKNOWN CODE ADJUSTMENTS AT THE TIME OF PLAN CREATION OR CONSTRUCTION.A3LEFTELEVATIONSCALED PRINT @ 24X36Page 118 of 124
SCALE: 1/4" = 1'-0" RIGHT ELEVATION16"10'-1 1/8"3'-4"9'-8 1/4"8"X8" BUILT-UPSTRAIGHTCOLUMN,PER DETAIL.SCREENBY OTHERSSCREENBY OTHERS2'X2' DECO. BRACKETPER DETAIL8'-0"6"10'-1 1/8"3'-4"8'-9 1/2"1'-6 3/4"7'-0"6" TRIM PER SPEC.1. ICE AND WATER BARRIER @ BOTTOM 6' OF ALL ROOF LINES,EXTEND BARRIER MIN. 3' ON EACH SIDE OF VALLEY, COVERENTIRE FACE OF ROOF SADDLES. VERIFY ADDITIONALLOCATIONS OF ICE AND WATER BARRIER AS NEEDED INFIELD.2. PROVIDE ROOF AND SOFFIT VENTS PER IRC CODEREGULATIONS.3. ALL FURNACE FLUES, PLUMBING VENTS, FIREPLACE VENTS,AND OTHER PENETRATIONS THROUGH ROOF OR WALLS TOEXTEND THROUGH REAR OF HOME WHENEVER POSSIBLE.4. ALL PENETRATIONS THROUGH EXTERIOR WALLS ORROOFING MUST BE SEALED AND FLASHED PERMANUFACTURE. SPECIFICATIONS AND IRC CODEREGULATIONS.5. SUPPLY AT LEAST 6" OF SPACE BETWEEN BOTTOMS OFWINDOWS AND ROOFS.6. ALL BEAMS HOLDING UP PORCH ROOFS ARE TO BEDROPPED UNLESS OTHERWISE NOTED.7. SUPPLY DRIPCAPS ON ALL WINDOWS AND DOORS.8. ALL EXTERIOR TRIM TO BE FLASHED PER CODE9. SUPPLY SEPARATION BETWEEN WOOD, COMPOSITE WOOD,AND ANY OTHER WOOD MATERIAL PER SPECIFICATIONS.10. HOLD STONE OFF GRADE MINIMUM OF 3" OR PER TRADESPECIFICATIONS.11. REFER TO MANUFACTURE SPECIFICATIONS FOR STONE.12. GARAGE BUCK BOARD MATERIAL IS TO BE COMPOSITEWOOD AND SIZED TO COVER THE EDGE OF STONE.13. GRADE CONDITIONS MAY VARY ON SITE.SCALE: 1/2" = 1'-0" 2'X2' DECORATIVE BRACKET32" 45 DEGREECHAMFER ENDS2' x 2' BRACKET MADE OF 4" x 6" CEDARW/ 45 DEGREE ANGLED AND ARCHEDCENTER ELEMENT W/ 2" 45 O CHAMFER ENDSAS SHOWN - PER SPECSECTIONTOP3/4" = 1'-0" 8"X8" COLUMN DETAIL2CEILING/DROPPEDBEAM PER PLANMETAL CONNECTOR@ TOP8" COLUMN FINISHMATERIAL PER SPEC.CENTER POST, VERIFYWITH PLAN.CENTER POST, VERIFYWITH PLAN.CENTER POST, VERIFYWITH PLAN.8" COLUMN FINISHMATERIAL PER SPEC.METAL CONNECTOR@ BASE8" TRIM BOARD8" COLUMN FINISHMATERIAL PER SPEC.@ ALL SIDES.2X FRAMING AT MIDDLETO SUPPORT FINISHES.-MATERIAL: SMART-SIDING,VERIFY W/ SPEC.-MATERIAL: SMART-SIDING,VERIFY W/ SPEC.-MATERIAL: SMART-SIDING,VERIFY W/ SPEC.A.) 8" FASCIA PER SPEC.C.) VENTILATED SOFFIT AT OVERHANGSD.) 4" TRIM PER SPEC.A.) 6" TRIM PER SPEC.B.) WINDOW PER PLANB.) 6" FRIEZE PER SPEC.E.) SIDING PER PLANDRAWING TITLE:1−29−26LOCATION:PAGEPAGE DESCRIPTION:L DLITTFINDESIGN.COMMLITTFIN@HOTMAIL.COM320−224−7844WINSTED, MNCURRENTDATE:REVISION:REV. DATE:ALL PLANS & DESIGNS SHOWNARE THE PROPERTY OF LITTFINDESIGN. USE OF THESE PLANSON ANY OTHER PROJECT/LOTOTHER THAN NOTED ON THISTITLEBLOCK WITHOUT THEWRITTEN CONSENT OF LITTFINDESIGN IS PROHIBITED.THIS PLAN PROVIDES BUILDING DETAILS FOR A PROJECT TO BE BUILT IN ACCORDANCE WITH INTERNATIONAL BUILDING CODES AS WELL AS ANY LOCAL CODES. CONTRACTOR, OWNER, AND/OR TRADES ARE RESPONSIBLE FOR ANY FINES, PENALTIES FOR CODE, ORDINANCE, REGULATION OR BUILDING PROCESS VIOLATIONS. LITTFIN DESIGN IS NOT RESPONSIBLE FOR OMISSIONS OR ERRORSMADE DURING DESIGN, BIDDING, OR CONSTRUCTION PHASES. ANY AND ALL SITE REVIEW IS TO BE PERFORMED BY OTHERS SUCH AS THE CONTRACTOR, OWNER, SURVEYOR, OR OTHER TRADES RESPONSIBLE FOR SITE CONDITIONS. LITTFIN DESIGN IS NOT RESPONSIBLE FOR CONTRACTOR/TRADE ERRORS, UNKNOWN CODE ADJUSTMENTS AT THE TIME OF PLAN CREATION OR CONSTRUCTION.A4RIGHTELEVATIONSCALED PRINT @ 24X36Page 119 of 124
PITCH CHANGEPITCH CHANGE4:12SLOPE4:12SLOPERIDGE VENTRIDGE VENTRIDGE VENTRIDGE VENT12:12SLOPERIDGE VENTPITCH CHANGERIDGE VENT8:12SLOPE8:12SLOPE8:12SLOPE12:12SLOPE12:12SLOPE12:12SLOPE12:12SLOPE12:12SLOPE12:12SLOPE8:12SLOPE12:12SLOPE12:12SLOPE12:12SLOPE12:12SLOPE12:12SLOPE12:12SLOPE2'-0" TYP2'-0" TYP2'-0" TYP1'-0" TYP2'-0" TYP9" TYP2'-0" TYP1'-0" TYP1'-0" TYP1'-0" TYP6" TYP2'-0" TYP1'-0" TYP1'-0" TYP1'-0" TYP2'-0" TYP2'-0" TYP1'-0" TYP1'-0" TYP1'-0" TYP2'-0" TYP1'-6" TYP1'-0" TYP6" TYPR ID G E RIDGERIDGER ID G ERIDGE
RADON -OUTV A L L E YVALLEYVALLEYVALLEY
V A L L E Y VALLEYRIDGERIDGERIDGERIDGEV A L L E Y
VALLEYVALLEYV A L L E Y VALLEYSCALE: 1/4" = 1'-0"ROOF PLAN16" TYPROOFSADDLE1:300 CALCULATION FOR ROOFVENTING. ROOF AREA IS 4211 SQ FT.,INSTALL CORRECT # OF VENTS PERSQ. FT. STATED ABOVE IN THESEAPPROXIMATE LOCATIONS.1. ICE AND WATER BARRIER @ BOTTOM 6' OF ALL ROOF LINES,EXTEND BARRIER MIN. 3' ON EACH SIDE OF VALLEY, COVERENTIRE FACE OF ROOF SADDLES. VERIFY ADDITIONALLOCATIONS OF ICE AND WATER BARRIER AS NEEDED INFIELD.2. PROVIDE ROOF AND SOFFIT VENTS PER IRC CODEREGULATIONS.3. ALL FURNACE FLUES, PLUMBING VENTS, FIREPLACE VENTS,AND OTHER PENETRATIONS THROUGH ROOF OR WALLS TOEXTEND THROUGH REAR OF HOME WHENEVER POSSIBLE.4. ALL PENETRATIONS THROUGH EXTERIOR WALLS ORROOFING MUST BE SEALED AND FLASHED PERMANUFACTURE. SPECIFICATIONS AND IRC CODEREGULATIONS.5. SUPPLY AT LEAST 6" OF SPACE BETWEEN BOTTOMS OFWINDOWS AND ROOFS.6. ALL BEAMS HOLDING UP PORCH ROOFS ARE TO BEDROPPED UNLESS OTHERWISE NOTED.7. SUPPLY DRIPCAPS ON ALL WINDOWS AND DOORS.8. ALL EXTERIOR TRIM TO BE FLASHED PER CODE9. SUPPLY SEPARATION BETWEEN WOOD, COMPOSITE WOOD,AND ANY OTHER WOOD MATERIAL PER SPECIFICATIONS.10. HOLD STONE OFF GRADE MINIMUM OF 3" OR PER TRADESPECIFICATIONS.11. REFER TO MANUFACTURE SPECIFICATIONS FOR STONE.12. GARAGE BUCK BOARD MATERIAL IS TO BE COMPOSITEWOOD AND SIZED TO COVER THE EDGE OF STONE.13. GRADE CONDITIONS MAY VARY ON SITE.DRAWING TITLE:1−29−26LOCATION:PAGEPAGE DESCRIPTION:L DLITTFINDESIGN.COMMLITTFIN@HOTMAIL.COM320−224−7844WINSTED, MNCURRENTDATE:REVISION:REV. DATE:ALL PLANS & DESIGNS SHOWNARE THE PROPERTY OF LITTFINDESIGN. USE OF THESE PLANSON ANY OTHER PROJECT/LOTOTHER THAN NOTED ON THISTITLEBLOCK WITHOUT THEWRITTEN CONSENT OF LITTFINDESIGN IS PROHIBITED.THIS PLAN PROVIDES BUILDING DETAILS FOR A PROJECT TO BE BUILT IN ACCORDANCE WITH INTERNATIONAL BUILDING CODES AS WELL AS ANY LOCAL CODES. CONTRACTOR, OWNER, AND/OR TRADES ARE RESPONSIBLE FOR ANY FINES, PENALTIES FOR CODE, ORDINANCE, REGULATION OR BUILDING PROCESS VIOLATIONS. LITTFIN DESIGN IS NOT RESPONSIBLE FOR OMISSIONS OR ERRORSMADE DURING DESIGN, BIDDING, OR CONSTRUCTION PHASES. ANY AND ALL SITE REVIEW IS TO BE PERFORMED BY OTHERS SUCH AS THE CONTRACTOR, OWNER, SURVEYOR, OR OTHER TRADES RESPONSIBLE FOR SITE CONDITIONS. LITTFIN DESIGN IS NOT RESPONSIBLE FOR CONTRACTOR/TRADE ERRORS, UNKNOWN CODE ADJUSTMENTS AT THE TIME OF PLAN CREATION OR CONSTRUCTION.A5ROOFPLANSCALED PRINT @ 24X36Page 120 of 124
FOUNDATION PLAN1RADON -UP36" CODE RAILINGSTEP FULL FOUNDATIONWALL DOWN TO LOOKOUT HEIGHT.VERIFY LOCATION IN FIELD.STEP FULL FOUNDATIONWALL DOWN TO LOOKOUT HEIGHT.VERIFY LOCATION IN FIELD.STEP LOOKOUT FOUNDATIONWALL DOWN TO WALKOUT HEIGHT.VERIFY LOCATION IN FIELD.STEP LOOKOUT FOUNDATIONWALL DOWN TO WALKOUT HEIGHT.VERIFY LOCATION IN FIELD.UP (16) EQ. R.& 10" TREADSW/ 1" NOSING8765432191011124" CONCRETE SLAB W/FIBERMESH REINFORCEMENTOVER COMPACTED FILLFOUNDATIONS @ LIVING/BASEMENTAREAS ARE HELD IN 2" WITH A 2X8 SILLPLATE OVER 2" EXT. FOAM INSULATIONPER DETAILS. AREAS ADJACENT TOSTOOPS, GARAGE, OR WALKOUTS HAVE CANTILEVERED SILLS.FOUNDATIONS @ LIVING/BASEMENTAREAS ARE HELD IN 2" WITH A 2X8 SILLPLATE OVER 2" EXT. FOAM INSULATIONPER DETAILS. AREAS ADJACENT TOSTOOPS, GARAGE, OR WALKOUTS HAVE CANTILEVERED SILLS.FOUNDATIONS @ LIVING/BASEMENTAREAS ARE HELD IN 2" WITH A 2X8 SILLPLATE OVER 2" EXT. FOAM INSULATIONPER DETAILS. AREAS ADJACENT TOSTOOPS, GARAGE, OR WALKOUTS HAVE CANTILEVERED SILLS.FOUNDATIONS @ LIVING/BASEMENTAREAS ARE HELD IN 2" WITH A 2X8 SILLPLATE OVER 2" EXT. FOAM INSULATIONPER DETAILS. AREAS ADJACENT TOSTOOPS, GARAGE, OR WALKOUTS HAVE CANTILEVERED SILLS.4" CONCRETE SLAB OVER6 MIL. VAPOR BARRIER OVER2" RIGID FOAM UNDER SLABOVER 6" GRANULARCOMPACTED FILLC JC JC JC JC JC JC JC J C JC JC JC JC J C J C JC JC JC JC JC JC JC JC JC JC JC JC JC JC JC JC JDEPRESS T/WALLEL = (-) 0'-6"DEPRESS T/WALLEL = (-) 0'-6"2" SLAB LEDGE2" SLAB LEDGE2" SLAB LEDGE2" SLAB LEDGE2" SLAB LEDGE2" SLAB LEDGE2" SLAB LEDGE2" SLAB LEDGE2" SLAB LEDGEMIN. 4" DIA. FTG DRAIN TILEW/ 2" MIN. GRANULAR BASE& 8" MIN. GRANULAR COVERMIN. 4" DIA. FTG DRAIN TILEW/ 2" MIN. GRANULAR BASE& 8" MIN. GRANULAR COVERMIN. 4" DIA. FTG DRAIN TILEW/ 2" MIN. GRANULAR BASE& 8" MIN. GRANULAR COVERMIN. 4" DIA. FTG DRAIN TILEW/ 2" MIN. GRANULAR BASE& 8" MIN. GRANULAR COVERMIN. 4" DIA. FTG DRAIN TILEW/ 2" MIN. GRANULAR BASE& 8" MIN. GRANULAR COVERMIN. 4" DIA. FTG DRAIN TILEW/ 2" MIN. GRANULAR BASE& 8" MIN. GRANULAR COVER6"10"6"8"6"8"6"8"6"8"6"8"6"8"6"8"6"8"6"8"6"10"6"8"8"8"2"8"8"6"8"6"8"6"8"6"8"6"8"6"8"8"8"7'-4 1/2"11'-9 1/2"9'-0"12'-2 3/4"6'-3 1/4"5'-0"5'-0"8'-0"8'-0"4'-9"4'-9"6'-7 3/4"8'-4 1/4"6'-2"2"2"21'-0"25'-6"2'-0"8'-2"20'-4"8'-2"13'-6"25'-6"2'-6"18'-0"2'-6"6"9'-0"1'-6"18'-0"23'-0"11'-0"77'-6"2'-0"2'-0"10'-0"5'-10"8"8"14'-10"8"6'-9"8"6'-9"8"8"7'-3"8"7'-5"16'-0"70'-8"12'-8"15'-6"18'-6"15'-6"15'-6"77'-8"6'-6"70'-8"18'-8"4'-3 1/2"16'-0"15'-0"5'-8 1/2"17'-8 1/2"3'-2"5'-4"9'-10"GIRDER TRUSS ABV.C JC JC JC J10 1/2"10'-1"29'-8"8"2'-0"1. ALL HEADERS TO BE SUPPORTED BY A MINIMUM OF (1)TRIMMER. (UNLESS NOTED OTHERWISE)2. ALL HEADERS TO HAVE AT LEAST (1) KING STUD (UNLESSNOTED).3. ALL STUD CALLOUTS @ SIDES OF WINDOWS/DOORS ARETRIMMERS, MINIMUM (1) KING STUDS @ SAID LOCATIONSTO BE INCLUDED AS WELL.4. BLOCKING @ ROOF & FLOOR PLAN PER TRUSSMANUFACTURER.5. POINT LOADS TO BE CARRIED THROUGH FLOOR AREASAND DOWN TO FOUNDATION FOR SUPPORT. USE SAMEMATERIAL AS COLUMN SUPPORTING MEMBER ABOVE,BLOCKING MAY BE "BROKEN" BETWEEN LEVELS U.N.O.6. ALL HANGERS & CONNECTORS PER TRUSSMANUFACTURER, SUPPLIERS & CONTRACTOR.7. ALL EXTERIOR SHEATHING TO BE 7/16" OSB ORPLYWOOD SHEATHING & NAILED PER CODE (MAY BEREFERRED TO AS 1/2" NOMINAL THICKNESS).8. ROOF DECKING TO BE 12" NOMINAL (OR 1532") OSB DECKINGW/ CLIPS, NAILED TO ROOF FRAMING W/ MIN. 8d COMMONNAILS, 6" O.C. @ EDGES/12"O.C. @ FIELD. ATL: 16 GA 1-34",3" @ EDGES/ 6" AT FIELD.9. FLOOR DECKING TO BE 34" PLYWOOD DECKING, NAILEDOR SCREWED TO FLOOR SYSTEM PER CODE W/ADHESIVE PER SPEC. (OR) MIN. 6d COMMON NAILS 6" O.C.@ EDGES/12" O.C. @ FIELD (CODE MINIMUM).10.REFER TO WALL BRACING PLANS FOR ADDITIONALFRAMING INFORMATION.1. FOUNDATIONS TO BE POURED PER SITE SOILCONDITION- VERIFY ON SITE.2. ALL REINFORCING IS TO BE INSTALLED PER IRCREGULATED STRUCTURAL DESIGN BY CONCRETETRADES.3. PROVIDE 12" ANCHOR BOLTS EMBEDDED 7" MIN., SPACEDPER CODE AND 12" MAX FROM EACH END OF SILL PLATE,MIN 2 PER SILL. REFER TO COVER SHEET.4. PROVIDE CONTROL JOINTS PER PLAN, JOIST TO CONSISTOF HIDDEN ZIP STRIP EMBEDDED INTO THE SLABS.5. ALL ANGLED WALLS ARE TO BE 45 DEGREES UNLESSNOTED OTHERWISE.6. SLOPE CONCRETE TO FLOOR DRAINS WITHIN 5' OFDRAINS.7. ALL WOOD MATERIAL CONTACTING DIRECTLY TOCONCRETE MUST BE TREATED.8. PROVIDE DRAIN TILE AROUND PERIMETER AS SHOWN.LATERAL SOIL PRESSURE ASSUMED TO BE 30 PSF/FT.9.-SH3'X5' =SINGLE HUNG 3'0" BY 5'0"-FX2'6"X2'6" = FIXED 2'6" BY 4'6"-CASE3'X5' = CASEMENT 3'0" BY 5'0"-2'8"X6'8" @ DOOR =2'8" WIDE BY 6'8" TALL-2'8"X8'0" @ DOOR =2'8" WIDE BY 8'0" TALL 110V, INTERCONNECTED SMOKE DETECTOR 110V, INTERCONNECTED SMOKE DETECTOR / CARBON MONOXIDE DETECTOR COMBO EXHAUST FAN1. FOR EASE OF UNDERSTANDING, GRADE AT FRONT ORFRONT OF GARAGE DOORS IS CONSIDERED 0'0" ON THISFOUNDATION PLAN2. ALL STAIRWAYS (INTERIOR AND EXTERIOR) ARE TO BEILLUMINATED AT EACH LANDING PER CODE3. SUPPLY CONTINUOUS HANDRAIL PER CODE AT ALLSTAIR LOCATIONS, CODE HANDRAIL IS TO CONTINUE TOLANDINGS/ TOP & BOTTOM OF STAIRS. CONTRACTOR &INSTALLER TO VERIFY IF ADDITIONAL GRASPABLEHANDRAIL IS INSTALLED OR IF DECORATIVE HANDRAILTO CONTINUE.4. 1/2" GYPSUM BOARD TO BE APPLIED TO UNDERSIDE OFSTAIRS PER CODE.5. INDICATES INTERIOR BEARING WALL,16" O.C. STUDS6. PERMANENTLYATTACHED LADDER PER CODE & MINIMUM 3'X3' EGRESSAREA BUILT PER IRC7. FILL EGRESS WELL W/GRAVEL BACKFILL & INSTALL DRAIN TILE CONNECTIONTO DRAIN EGRESS PROPERLY.8. INSTALL DRAFT STOPPING WITHIN FLOOR SYSTEM PERIRC CODE SECTION 302.12, MIN. 12" GYPSUM BOARD (OR) 38"STRUCTURAL BOARD ADEQUATELY SUPPORTED BY 2X4MIN. MATERIAL, PARALLEL WITH FLOOR FRAMING,SEPARATING AREAS WITH MAXIMUM SPACE OF 1000SQ.FT.-SEPARATE INTO EQUAL SPACES.SDSDSQUARE FOOTAGE CALCULATIONSFINISHED SQ. FTG. 2385 SQ.FT.GARAGE SQ. FTG. 877 SQ.FT.OVERALL FIRST FLOOR SQ. FTG. 3262 SQ.FT.FINISHED SQ. FTG. 2135 SQ.FT.UNFINISHED SQ. FTG. 224 SQ.FT.OVERALL BASEMENT SQ. FTG. 2359 SQ.FT.TOTAL FINISHED SQ. FTG:4520 SQ.FT.GRAND TOTAL SQ. FTG: 5621 SQ.FT.DRAWING TITLE:1−29−26LOCATION:PAGEPAGE DESCRIPTION:L DLITTFINDESIGN.COMMLITTFIN@HOTMAIL.COM320−224−7844WINSTED, MNCURRENTDATE:REVISION:REV. DATE:ALL PLANS & DESIGNS SHOWNARE THE PROPERTY OF LITTFINDESIGN. USE OF THESE PLANSON ANY OTHER PROJECT/LOTOTHER THAN NOTED ON THISTITLEBLOCK WITHOUT THEWRITTEN CONSENT OF LITTFINDESIGN IS PROHIBITED.THIS PLAN PROVIDES BUILDING DETAILS FOR A PROJECT TO BE BUILT IN ACCORDANCE WITH INTERNATIONAL BUILDING CODES AS WELL AS ANY LOCAL CODES. CONTRACTOR, OWNER, AND/OR TRADES ARE RESPONSIBLE FOR ANY FINES, PENALTIES FOR CODE, ORDINANCE, REGULATION OR BUILDING PROCESS VIOLATIONS. LITTFIN DESIGN IS NOT RESPONSIBLE FOR OMISSIONS OR ERRORSMADE DURING DESIGN, BIDDING, OR CONSTRUCTION PHASES. ANY AND ALL SITE REVIEW IS TO BE PERFORMED BY OTHERS SUCH AS THE CONTRACTOR, OWNER, SURVEYOR, OR OTHER TRADES RESPONSIBLE FOR SITE CONDITIONS. LITTFIN DESIGN IS NOT RESPONSIBLE FOR CONTRACTOR/TRADE ERRORS, UNKNOWN CODE ADJUSTMENTS AT THE TIME OF PLAN CREATION OR CONSTRUCTION.A6FOUNDATIONPLANSCALED PRINT @ 24X36Page 121 of 124
CONCRETELVPWOODLVP29'X32'7"/26'3"FINISHED BASEMENT PLAN1CARPET12'X13'CARPET12'11"X12'1"TILETILERUBBER11'8"X18'2"6"6"6"6"6"6"6"6"6"6"6"6"4 1/2"6"4 1/2"6"7'-4 1/2"5'-3 1/2"6'-6"6'-3 1/2"6'-5 3/4"6'-3 1/4"5'-0"5'-0"8'-0"8'-0"4'-9"4'-9"6'-7 3/4"8'-4 1/4"12'-9 1/2"2'-8 1/2"5'-9"12'-9"12'-8"15'-6"18'-6"16'-0"15'-0"8'-2"2'-0"2'-0"10'-0"10'-9 1/2"9'-6"6'-2"3'-11 3/4"7'-0"10'-0 1/4"4 1/2"4 1/2"2'-1 1/2"4'-0"5'-10"5'-8"2'-11 1/2"4'-3 1/2"22'-5"11'-1"3'-11 1/2"5'-3 1/2"5"3'-11 1/2"9'-3 1/2"9 1/4"4'-0"4'-3 1/2"4'-7 3/4"4'-6 3/4"5'-9 1/2"3'-11"2'-0"3'-0"3'-0"1'-6"1'-4 1/2"3'-6"1'-9"1'-10 1/2"5 1/2"12'-0"9'-3"5'-9 1/2"12'-10 1/2"2'-2"6'-5 1/2"6'-5"3'-0"12'-4"11'-9 1/2"7'-2"7'-3"6'-6 1/2"2'-10 1/2"3'-2 1/2"1'-0 1/4"4'-2 3/4"3'-0 1/2"5'-8 1/2"5'-10"8"8"14'-10"8"6'-9"8"6'-9"8"8"7'-3"8"7'-5"21'-0"2"3'-0"5'-6"3'-0"5'-0"(1)SHELF/(1)ROD(1)SHELF/(1)RODRADON -UP36" CODE RAILING(1)SHELF/(1)ROD(1)SHELF/(1)ROD10"(1)S./(1)R.1'-10"FRAME OUT 2X4 WALL @ LOOKOUTFOUNDATION WALL, HOLD OFF WALL 1" &SHEETROCK FINISHED SIDE PER DETAILS- FINISH W/ WOOD CAP AS NEEDEDSTEP FULL FOUNDATIONWALL DOWN TO LOOKOUT HEIGHT.VERIFY LOCATION IN FIELD.FRAME OUT 2X4 WALL @ FULLFOUNDATION WALL, HOLD OFFWALL 1" & SHEETROCKFINISHED SIDE PER DETAILS.FRAME OUT 2X4 WALL @ FULLFOUNDATION WALL, HOLD OFFWALL 1" & SHEETROCKFINISHED SIDE PER DETAILS.STEP FULL FOUNDATIONWALL DOWN TO LOOKOUT HEIGHT.VERIFY LOCATION IN FIELD.STEP LOOKOUT FOUNDATIONWALL DOWN TO WALKOUT HEIGHT.VERIFY LOCATION IN FIELD.FRAME OUT 2X4 WALL @ LOOKOUTFOUNDATION WALL, HOLD OFF WALL 1" &SHEETROCK FINISHED SIDE PER DETAILS- FINISH W/ WOOD CAP AS NEEDEDSTEP LOOKOUT FOUNDATIONWALL DOWN TO WALKOUT HEIGHT.VERIFY LOCATION IN FIELD.3'-9 1/2"5'-3 1/2"UP (16) EQ. R.& 10" TREADSW/ 1" NOSING8765432191011126'-6"15'-6"15'-6"1. ALL HEADERS TO BE SUPPORTED BY A MINIMUM OF (1)TRIMMER. (UNLESS NOTED OTHERWISE)2. ALL HEADERS TO HAVE AT LEAST (1) KING STUD (UNLESSNOTED).3. ALL STUD CALLOUTS @ SIDES OF WINDOWS/DOORS ARETRIMMERS, MINIMUM (1) KING STUDS @ SAID LOCATIONSTO BE INCLUDED AS WELL.4. BLOCKING @ ROOF & FLOOR PLAN PER TRUSSMANUFACTURER.5. POINT LOADS TO BE CARRIED THROUGH FLOOR AREASAND DOWN TO FOUNDATION FOR SUPPORT. USE SAMEMATERIAL AS COLUMN SUPPORTING MEMBER ABOVE,BLOCKING MAY BE "BROKEN" BETWEEN LEVELS U.N.O.6. ALL HANGERS & CONNECTORS PER TRUSSMANUFACTURER, SUPPLIERS & CONTRACTOR.7. ALL EXTERIOR SHEATHING TO BE 7/16" OSB ORPLYWOOD SHEATHING & NAILED PER CODE (MAY BEREFERRED TO AS 1/2" NOMINAL THICKNESS).8. ROOF DECKING TO BE 12" NOMINAL (OR 1532") OSB DECKINGW/ CLIPS, NAILED TO ROOF FRAMING W/ MIN. 8d COMMONNAILS, 6" O.C. @ EDGES/12"O.C. @ FIELD. ATL: 16 GA 1-34",3" @ EDGES/ 6" AT FIELD.9. FLOOR DECKING TO BE 34" PLYWOOD DECKING, NAILEDOR SCREWED TO FLOOR SYSTEM PER CODE W/ADHESIVE PER SPEC. (OR) MIN. 6d COMMON NAILS 6" O.C.@ EDGES/12" O.C. @ FIELD (CODE MINIMUM).10.REFER TO WALL BRACING PLANS FOR ADDITIONALFRAMING INFORMATION.1. FOUNDATIONS TO BE POURED PER SITE SOILCONDITION- VERIFY ON SITE.2. ALL REINFORCING IS TO BE INSTALLED PER IRCREGULATED STRUCTURAL DESIGN BY CONCRETETRADES.3. PROVIDE 12" ANCHOR BOLTS EMBEDDED 7" MIN., SPACEDPER CODE AND 12" MAX FROM EACH END OF SILL PLATE,MIN 2 PER SILL. REFER TO COVER SHEET.4. PROVIDE CONTROL JOINTS PER PLAN, JOIST TO CONSISTOF HIDDEN ZIP STRIP EMBEDDED INTO THE SLABS.5. ALL ANGLED WALLS ARE TO BE 45 DEGREES UNLESSNOTED OTHERWISE.6. SLOPE CONCRETE TO FLOOR DRAINS WITHIN 5' OFDRAINS.7. ALL WOOD MATERIAL CONTACTING DIRECTLY TOCONCRETE MUST BE TREATED.8. PROVIDE DRAIN TILE AROUND PERIMETER AS SHOWN.LATERAL SOIL PRESSURE ASSUMED TO BE 30 PSF/FT.9.-SH3'X5' =SINGLE HUNG 3'0" BY 5'0"-FX2'6"X2'6" = FIXED 2'6" BY 4'6"-CASE3'X5' = CASEMENT 3'0" BY 5'0"-2'8"X6'8" @ DOOR =2'8" WIDE BY 6'8" TALL-2'8"X8'0" @ DOOR =2'8" WIDE BY 8'0" TALL 110V, INTERCONNECTED SMOKE DETECTOR 110V, INTERCONNECTED SMOKE DETECTOR / CARBON MONOXIDE DETECTOR COMBO EXHAUST FAN1. FOR EASE OF UNDERSTANDING, GRADE AT FRONT ORFRONT OF GARAGE DOORS IS CONSIDERED 0'0" ON THISFOUNDATION PLAN2. ALL STAIRWAYS (INTERIOR AND EXTERIOR) ARE TO BEILLUMINATED AT EACH LANDING PER CODE3. SUPPLY CONTINUOUS HANDRAIL PER CODE AT ALLSTAIR LOCATIONS, CODE HANDRAIL IS TO CONTINUE TOLANDINGS/ TOP & BOTTOM OF STAIRS. CONTRACTOR &INSTALLER TO VERIFY IF ADDITIONAL GRASPABLEHANDRAIL IS INSTALLED OR IF DECORATIVE HANDRAILTO CONTINUE.4. 1/2" GYPSUM BOARD TO BE APPLIED TO UNDERSIDE OFSTAIRS PER CODE.5. INDICATES INTERIOR BEARING WALL,16" O.C. STUDS6. PERMANENTLYATTACHED LADDER PER CODE & MINIMUM 3'X3' EGRESSAREA BUILT PER IRC7. FILL EGRESS WELL W/GRAVEL BACKFILL & INSTALL DRAIN TILE CONNECTIONTO DRAIN EGRESS PROPERLY.8. INSTALL DRAFT STOPPING WITHIN FLOOR SYSTEM PERIRC CODE SECTION 302.12, MIN. 12" GYPSUM BOARD (OR) 38"STRUCTURAL BOARD ADEQUATELY SUPPORTED BY 2X4MIN. MATERIAL, PARALLEL WITH FLOOR FRAMING,SEPARATING AREAS WITH MAXIMUM SPACE OF 1000SQ.FT.-SEPARATE INTO EQUAL SPACES.SDSDSQUARE FOOTAGE CALCULATIONSFINISHED SQ. FTG.2385 SQ.FT.GARAGE SQ. FTG. 877 SQ.FT.OVERALL FIRST FLOOR SQ. FTG. 3262 SQ.FT.FINISHED SQ. FTG. 2135 SQ.FT.UNFINISHED SQ. FTG. 224 SQ.FT.OVERALL BASEMENT SQ. FTG. 2359 SQ.FT.TOTAL FINISHED SQ. FTG:4520 SQ.FT.GRAND TOTAL SQ. FTG: 5621 SQ.FT.DRAWING TITLE:1−29−26LOCATION:PAGEPAGE DESCRIPTION:L DLITTFINDESIGN.COMMLITTFIN@HOTMAIL.COM320−224−7844WINSTED, MNCURRENTDATE:REVISION:REV. DATE:ALL PLANS & DESIGNS SHOWNARE THE PROPERTY OF LITTFINDESIGN. USE OF THESE PLANSON ANY OTHER PROJECT/LOTOTHER THAN NOTED ON THISTITLEBLOCK WITHOUT THEWRITTEN CONSENT OF LITTFINDESIGN IS PROHIBITED.THIS PLAN PROVIDES BUILDING DETAILS FOR A PROJECT TO BE BUILT IN ACCORDANCE WITH INTERNATIONAL BUILDING CODES AS WELL AS ANY LOCAL CODES. CONTRACTOR, OWNER, AND/OR TRADES ARE RESPONSIBLE FOR ANY FINES, PENALTIES FOR CODE, ORDINANCE, REGULATION OR BUILDING PROCESS VIOLATIONS. LITTFIN DESIGN IS NOT RESPONSIBLE FOR OMISSIONS OR ERRORSMADE DURING DESIGN, BIDDING, OR CONSTRUCTION PHASES. ANY AND ALL SITE REVIEW IS TO BE PERFORMED BY OTHERS SUCH AS THE CONTRACTOR, OWNER, SURVEYOR, OR OTHER TRADES RESPONSIBLE FOR SITE CONDITIONS. LITTFIN DESIGN IS NOT RESPONSIBLE FOR CONTRACTOR/TRADE ERRORS, UNKNOWN CODE ADJUSTMENTS AT THE TIME OF PLAN CREATION OR CONSTRUCTION.A7FINISHEDBASEMENTPLANSCALED PRINT @ 24X36Page 122 of 124
TILEWOODWOODTILEWOOD15'x15'8"WOOD18'X22'TILEWOODTILETILEWOOD6'X12'WOODWOOD12'3"X12'FIRST FLOOR PLAN1CONCRETE33'X25'6"6"5 1/2"6"6"6"6"6"6"6"6"6"6"6"6"6"6"6"5 1/2"6"6"6"6"5 1/2"6"6"6"6"2'-0"11'-3 1/2"3'-7 1/2"3'-10 1/2"7'-6 1/4"7'-5 3/4"9'-6 1/4"8'-11 3/4"5'-6"4'-6"8'-0"8'-0"8"1'-6"8"3'-0"8"8"4'-3 1/4"8"4'-3 1/2"8"4'-3 1/4"8"8"3'-4"8"3'-4"4'-0"8'-0"4'-0"6"6"6"2'-6"8'-0"2'-3 1/2"9'-8 1/4"5'-2 1/4"12'-9 1/2"14'-10 1/2"25'-0"16'-0"52'-8"2'-0"70'-8"2'-0"7'-6"5'-8"15'-0"28'-2"18'-6"15'-6"15'-6"3'-7 1/2"12'-4 1/2"16'-0"14'-8"6'-6"10'-0"2'-0"30'-8"1'-0"7'-0"13'-6"7'-4"8"8"8'-4"9'-0"4'-0"7'-0"5'-6"4'-11 1/2"4'-7"6'-5 1/2"6"4'-3 1/2"9'-10 1/2"1'-0"16'-0"5 1/2"5'-6"5'-6"5 1/2"3'-7 1/2"3'-7 1/2"3'-1 1/2"3'-7 1/2"4'-8 3/4"4'-8 3/4"3'-9 1/2"9'-11"3'-7"1'-0"7'-3"1'-11"6'-9"3 1/2"9'-2"17'-3 1/2"1'-0"15'-11"26'-9"2'-6"18'-0"2'-6"6"9'-0"1'-6"23'-0"11'-0"18'-0"8'-0"2'-0"70'-8"77'-8"77'-8"3'-2 1/2"1'-7 1/4"6'-4"1'-8 1/4"9 1/4"8'-10 1/2"4'-3 1/2"10'-2"3'-0"4'-0 1/2"9'-2"2'-3 1/2"7'-6 1/2"7'-5 1/2"2'-0"1'-9 3/4"7'-3 1/4"3'-0"3'-0"3'-0"3'-0"3'-0"3'-0"4'-0"5 1/2"5 1/2"5 1/2"9 1/4"9 1/4"3'-0"4'-6"2'-2 1/2"5 1/2"6'-3 1/2"7'-0"5'-9"6'-0"5'-0"6'-0"10'-0"13'-6"3'-10 1/2"1'-6"6'-0"4'-0"5'-0"9"5'-9 1/2"7'-0"2'-7 3/4"4'-9 3/4"7'-5"TEMP.TEMP.TEMP.TEMP.TEMP.TEMP.TEMP.TEMP.TEMP. TEMP.TEMP.2'-6"2'-0"11'-8 1/2"2'-0"2'-0"11'-0 1/2"2'-0"5'-6"7 1/4"5'-9 1/2"7 1/4"7'-0"5 1/2"2'-0 1/2"5'-2 1/2"2'-0"2'-0"13'-3 1/2"2'-0"(1)SHELF/(1)ROD(1)SHELF/(1)ROD(1)SHELF/(1)ROD(1)SHELF/(1)ROD(1)SHELF/(1)ROD(1)SHELF/(1)ROD(1)SHELF/(1)ROD(1)SHELF/(1)ROD(1)SHELF/(1)ROD4'-0"3'-8 1/2"RADON -UP2'-6 3/4"36" CODE RAILING36" CODE RAILING36" CODE RAILING36" CODE RAILING36" CODE RAILINGASSUME STONE TOCEILING FOR FLOORLOADING @ F.P.FLOOR MANUFACTURERTO ASSUME ADDITIONALWEIGHT @ COUNTERTOPSASSUME STONE TOCEILING FOR FLOORLOADING @ F.P.4:12SLOPE4:12SLOPE4' WIDE CEDAR STAIRS W/ 7-3/4" MAX. RISERS& 10" TREADS - INSTALL 3' TALL CODE RAILWHEN MORE THAN 3 RISERS OR 30"6' CONCRETE STAIRS W/ 7 34 " MAX. RISERS & 12"TREADS INSTALL 3' TALL CODE RAIL WHEN MORETHAN 3 RISERS OR 30", BUILD STAIRS INTO PORCHDN (16) EQ. R.& 10" TREADSW/ 1" NOSING9101112131415168765432ROOF TRUSS SYSTEMABV. 24" O.C. (OR) PERTRUSS PER MANUF.ROOF TRUSS SYSTEMABV. 24" O.C. (OR) PERTRUSS PER MANUF.ROOF TRUSS SYSTEMABV. 24" O.C. (OR) PERTRUSS PER MANUF.ROOF TRUSS SYSTEMABV. 24" O.C. (OR) PERTRUSS PER MANUF.ROOF TRUSS SYSTEMABV. 24" O.C. (OR) PERTRUSS PER MANUF.ROOF TRUSS SYSTEMABV. 24" O.C. (OR) PERTRUSS PER MANUF.ROOF TRUSS SYSTEMABV. 24" O.C. (OR) PERTRUSS PER MANUF.ROOF TRUSS SYSTEMABV. 24" O.C. (OR) PERTRUSS PER MANUF.ROOF TRUSS SYSTEMABV. 24" O.C. (OR) PERTRUSS PER MANUF.ROOF TRUSS SYSTEMABV. 24" O.C. (OR) PERTRUSS PER MANUF.ROOF TRUSS SYSTEMABV. 24" O.C. (OR) PERTRUSS PER MANUF.ROOF TRUSS SYSTEMABV. 24" O.C. (OR) PERTRUSS PER MANUF.15'-0"1. ALL HEADERS TO BE SUPPORTED BY A MINIMUM OF (1)TRIMMER.2. ALL HEADERS TO HAVE AT LEAST (1) KING STUD (UNLESSNOTED).3. BLOCKING @ ROOF & FLOOR PLAN PER TRUSSMANUFACTURER.4. POINT LOADS TO BE CARRIED THROUGH FLOOR AREAS ANDDOWN TO FOUNDATION FOR SUPPORT. USE SAME MATERIALAS COLUMN SUPPORTING MEMBER ABOVE.5. ALL HANGERS & CONNECTORS PER TRUSS MANUFACTURER,SUPPLIERS & CONTRACTOR.6. ALL EXTERIOR SHEATHING TO BE 7/16" OSB OR PLYWOODSHEATHING & NAILED PER CODE (MAY BE REFERRED TO AS1/2" NOMINAL THICKNESS).7. ROOF DECKING TO BE 12" NOMINAL (OR 1532") OSB DECKING W/CLIPS, NAILED TO ROOF FRAMING W/ MIN. 8d COMMONNAILS, 6" O.C. @ EDGES/12"O.C. @ FIELD.8. FLOOR DECKING TO BE 34" PLYWOOD DECKING, NAILED ORSCREWED TO FLOOR SYSTEM PER CODE W/ ADHESIVE PERSPEC. (OR) MIN. 6d COMMON NAILS 6" O.C. @ EDGES/12" O.C.@ FIELD (CODE MINIMUM).9. REFER TO WALL BRACING PLANS FOR ADDITIONAL FRAMINGINFORMATION.1. ALL NON-BEARING FRAMING IS TO BE 16" O.C.UNLESS OTHERWISE NOTED.2. ALL WALLS TO HAVE A DOUBLE TOP PLATEUNLESS OTHERWISE NOTED.3. ALL EXTERIOR WALLS ARE TO BE 2X6 WOODSTUDS WITH 7/16" OSB SHEATHING, UNLESSNOTED OTHERWISE.4. ALL INTERIOR WALLS ARE TO BE 2X4 WOODSTUDS UNLESS NOTED OTHERWISE.5. ALL COLUMN SIZES ARE TO BE CONTINUEDTHROUGH FLOOR TRUSS SPACES WHENSPANNING MORE THAN 1 FLOOR.6. ALL WOOD MATERIALS ARE TO BE PROTECTEDPER CODE & MANUF. SPECIFICATIONS WHILEBEING STORED ON SITE.-SH3'X5' =SINGLE HUNG 3'0" BY 5'0"-FX2'6"X2'6" = FIXED 2'6" BY 4'6"-CASE3'X5' = CASEMENT 3'0" BY 5'0"-2'8"X6'8" @ DOOR =2'8" WIDE BY 6'8" TALL-2'8"X8'0" @ DOOR =2'8" WIDE BY 8'0" TALL 110V, INTERCONNECTED SMOKE DETECTOR 110V, INTERCONNECTED SMOKE DETECTOR / CARBON MONOXIDE DETECTOR COMBO EXHAUST FAN1. FOR EASE OF UNDERSTANDING GRADE ISCONSIDERED 0'0" ON THIS FOUNDATION PLAN2. ALL STAIRWAYS (INTERIOR AND EXTERIOR) ARETO BE ILLUMINATED AT EACH LANDING PER CODE3. SUPPLY CONTINUOUS HANDRAIL PER CODE ATALL STAIR LOCATIONS, CODE HANDRAIL IS TOCONTINUE TO LANDINGS/ TOP & BOTTOM OFSTAIRS. CONTRACTOR & INSTALLER TO VERIFY IFADDITIONAL GRASPABLE HANDRAIL IS INSTALLEDOR IF DECORATIVE HANDRAIL TO CONTINUE.4.12" GYPSUM BOARD TO BE APPLIED TO UNDERSIDEOF STAIRS PER CODE.5. INDICATES INTERIOR BEARINGWALL, 16" O.C. STUDS6. INDICATES EXTERIOR WALLSTUDS SPACED AT 12" O.C. 1.55E TIMBERSTRANDMATERIAL OR BETTER (2-PLY TIMBER-STRANDKING STUDS @ EACH SIDE OF OPENINGS INWALL).7. INSTALL DRAFT STOPPING WITHIN FLOORSYSTEM PER IRC CODE SECTION 302.12, MIN. 12"GYPSUM BOARD (OR) 38" STRUCTURAL BOARDADEQUATELY SUPPORTED BY 2X4 MIN. MATERIAL,PARALLEL WITH FLOOR FRAMING, SEPARATINGAREAS WITH MAXIMUM SPACE OF 1000SQ.FT.-SEPARATE INTO EQUAL SPACES.SDSDSQUARE FOOTAGE CALCULATIONSFINISHED SQ. FTG.2385 SQ.FT.GARAGE SQ. FTG. 877 SQ.FT.OVERALL FIRST FLOOR SQ. FTG. 3262 SQ.FT.FINISHED SQ. FTG. 2135 SQ.FT.UNFINISHED SQ. FTG. 224 SQ.FT.OVERALL BASEMENT SQ. FTG. 2359 SQ.FT.TOTAL FINISHED SQ. FTG:4520 SQ.FT.GRAND TOTAL SQ. FTG: 5621 SQ.FT.DRAWING TITLE:1−29−26LOCATION:PAGEPAGE DESCRIPTION:L DLITTFINDESIGN.COMMLITTFIN@HOTMAIL.COM320−224−7844WINSTED, MNCURRENTDATE:REVISION:REV. DATE:ALL PLANS & DESIGNS SHOWNARE THE PROPERTY OF LITTFINDESIGN. USE OF THESE PLANSON ANY OTHER PROJECT/LOTOTHER THAN NOTED ON THISTITLEBLOCK WITHOUT THEWRITTEN CONSENT OF LITTFINDESIGN IS PROHIBITED.THIS PLAN PROVIDES BUILDING DETAILS FOR A PROJECT TO BE BUILT IN ACCORDANCE WITH INTERNATIONAL BUILDING CODES AS WELL AS ANY LOCAL CODES. CONTRACTOR, OWNER, AND/OR TRADES ARE RESPONSIBLE FOR ANY FINES, PENALTIES FOR CODE, ORDINANCE, REGULATION OR BUILDING PROCESS VIOLATIONS. LITTFIN DESIGN IS NOT RESPONSIBLE FOR OMISSIONS OR ERRORSMADE DURING DESIGN, BIDDING, OR CONSTRUCTION PHASES. ANY AND ALL SITE REVIEW IS TO BE PERFORMED BY OTHERS SUCH AS THE CONTRACTOR, OWNER, SURVEYOR, OR OTHER TRADES RESPONSIBLE FOR SITE CONDITIONS. LITTFIN DESIGN IS NOT RESPONSIBLE FOR CONTRACTOR/TRADE ERRORS, UNKNOWN CODE ADJUSTMENTS AT THE TIME OF PLAN CREATION OR CONSTRUCTION.A8FIRST FLOORPLANSCALED PRINT @ 24X36Page 123 of 124
This page is intentionally left blank
9.c
REQUEST FOR CITY COUNCIL ACTION
MEETING DATE: April 7, 2026
AGENDA ITEM: Municipal Campus Project Update
ITEM TYPE: New and Unfinished Business
DEPARTMENT: Administration CONTACT: Cheryl Jacobson, City
Administrator
ACTION REQUEST:
Informational. A project update will be provided by city staff and/or ICS.
BACKGROUND:
The Mendota Heights Municipal Campus project is the construction of a new city hall/police
facility and the re-envisioning of the existing site to meet the current and future needs of
Mendota Heights residents. The new building will replace the current facility, which faces
significant health, safety, infrastructure, security and accessibility challenges. The project aims
to create a modern, welcoming, and resilient civic hub that supports city operations and public
safety. Key goals include improved safety and security, inclusive and accessible design, flexible
and functional spaces, and responsible, sustainable use of public resources.
FISCAL AND RESOURCE IMPACT:
None for this project update.
ATTACHMENTS:
None
CITY COUNCIL PRIORITY:
Premier Public Services & Infrastructure
Page 124 of 124