Loading...
2023-11-14 PRC Agenda PacketCITY OF MENDOTA HEIGHTS PARKS AND RECREATION COMMISSION Tuesday, November 14, 2023- 6:30 P.M. Mendota Heights City Hall-Council Chambers AGENDA 1.Call to Order 2.Roll Call 3.Pledge of Allegiance 4.Approval of Agenda 5.Approval of Minutes a.September 12, 2023 Regular Meeting Minutes b.October 3, 2023 Work Session Minutes 6.Public Comment Period (for items not on the agenda) *See guidelines below 7.Acknowledgement of Reports a.Par 3 Update b.Recreation Update c.Park Improvement Update 8.New Business a.Review Park System Master Plan Draft b.2024 Fee Schedule Recommendation 9.Unfinished Business a.Parks and Recreation Strategic Planning Update 10.Staff Announcements 11.Student Representative Update 12.Commission Comments and Park Updates 13.Adjourn Auxiliary aids for persons with disabilities are available at least 120 hours in advance. If a notice of less than 120 hours is received, the City of Mendota Heights will make every attempt to provide the aids. This may not, however, be possible on short notice. Please contact City Administration at 651-452-1850. Guidelines for Citizen Comment Period: The Citizen Comments section of the agenda provides an opportunity for the public to address the commission on items which are not on the agenda. All are welcome to speak. Comments should be directed to the Chair. Comments will be limited to 5 minutes per person and topic; presentations which are longer than five minutes will need to be scheduled with the Recreation Program Coordinator to appear on a future Parks and Recreation commission agenda. Comments should not be repetitious. Citizen comments may not be used to air personal attacks, to air personality grievances, to make political endorsements, or for political campaign purposes. Commissioners will not enter into a dialogue with citizens, nor will any decisions be made at that presentation. Questions from the Commission will be for clarification only. Citizen comments will not be used as a time for problem solving or reacting to the comments made, but rather for hearing the citizen for information only. If appropriate, the Chair may assign staff for follow up to the issues raised. 1 CITY OF MENDOTA HEIGHTS, DAKOTA COUNTY, MINNESOTA DRAFT PARKS AND RECREATION MEETING MINUTES SEPTEMBER 12, 2023 The September meeting of the Mendota Heights Parks and Recreation Commission was held on Tuesday, September 12, 2023, at Mendota Heights City Hall, 1101 Victoria Curve. 1. Call to Order – Chair Jaffrey Blanks called the meeting to order at 6:30 p.m. 2. Roll Call – The following Commissioners were present: Chair Jaffrey Blanks, Commissioners: Stephanie Meyer, Michelle Muller, Jo Schifsky, Dan Sherer, and Michael Toth; absent: Commissioner Tica Hanson. Student Representative: Meg Murphy. Staff present: Parks and Recreation Manager Meredith Lawrence, Recreation Program Coordinator Willow Eisfeldt, and Public Works Director Ryan Ruzek. 3.Pledge of Allegiance The Pledge of Allegiance was recited. 4. Approval of Agenda Motion Sherer/second Muller to approve the agenda AYES 6: NAYS 0 5.a Approval of Minutes from August 8, 2023 Regular Meeting Motion Muller/second Schifsky to approve the minutes of the August 8, 2023 Parks and Recreation Commission Regular Meeting. AYES 6: NAYS 0 6. Citizen Comment Period (for items not on the agenda) None. 7.Acknowledgement of Reports Chair Blanks read the titles of the three updates (Par 3, Recreation, and Park Improvement Updates) and polled the Commissioners for questions. 7.a Par 3 Update Parks and Recreation Manager Meredith Lawrence briefly reviewed the report, noting that the June financial report was also included and provided an overview. She highlighted record breaking rounds in both June and July and also noted that concession sales have increased as well. She commented that August was also a strong month and September has been strong thus far as well. She stated that all of the equipment that was ordered in 2021 has now been delivered and aeration was completed the previous week. She highlighted additional improvement projects that have been completed or will still be completed this season. 7.b Recreation Update Recreation Program Coordinator Willow Eisfeldt provided an overview of the different events held during the Parks Celebration weekend. She highlighted upcoming events and programming opportunities. Commissioner Muller thanked staff for their efforts for the Parks Celebration events. She commented that the events were great and there were many volunteers of all ages. She noted 5a.2 that the Makers Market follows the District’s 5K and encouraged people to participate in the 5K as well. Commissioner Schifsky asked for details on Cycles and Cider and asked who the fixers would be. Recreation Program Coordinator Willow Eisfeldt stated that she reached out to Dakota County and was able to secure some volunteers that assist with County bike fix it events. She stated that a staff member also has a family member with that skill that will be volunteering. Commissioner Muller thanked staff for incorporating the new event. 7.c Parks Improvement Update Parks and Recreation Manager Meredith Lawrence provided an overview of the report highlighting progress on the different improvement projects. Commissioner Muller asked if skaters should remain off the concrete at Rogers Lake Park. Ms. Lawrence confirmed that there are signs that the park is closed as the concrete needs to cure for 30 days. She stated that people will be made aware of when the concrete is available for use. Commissioner Schifsky stated that perhaps better signage is needed as she saw people skating on her way into the meeting tonight. Ms. Lawrence noted that there is also caution tape but noted that staff will need to find something better to block off that area. 8.New Business 8.a Establish Master Plan RFP Subcommittee Parks and Recreation Manager Meredith Lawrence stated that staff is seeking two or three commissioners to serve on a Master Plan RFP Subcommittee. She stated that staff would like to begin working on the RFP now, explaining that if the project is included in the budget for 2024, they would be able to begin work much quicker than if the creation of the RFP is delayed until 2024. She recognized that all members may want to provide input and therefore once the subcommittee work is completed, it would come before the Commission for input. She stated that if the item is included in the budget, staff would issue the RFP in December. Commissioners Meyer and Schifsky volunteered. Commissioners Sherer and Toth commented that their schedules would not allow participation in the subcommittee. Chair Blanks commented that he could also participate. Motion Blanks/second Muller to appoint Chair Blanks, Commissioner Meyer, and Commissioner Schifsky to a subcommittee to establish a Master Plan RFP. AYES 6: NAYS 0 8.b Parks Tour Agenda 3 Parks and Recreation Manager Meredith Lawrence stated that the Commission annually holds a park tour and at the last meeting, October was chosen as the month for that tour. She noted that the tour will take the place of the regularly scheduled October meeting. She reviewed the parks that were included in the tour for the previous year. She noted that Valley Park has been requested as one of the locations and welcomed input on the other park locations. Chair Blanks asked the next park assigned for remodel. Ms. Lawrence noted that would be Ivy Hills. She stated that Valley was included in the CIP for next year but was pushed back to allow trail work to be completed. Commissioner Meyer suggested Marie to review the pickleball courts. She noted that could be the last visit to allow staff to get back to City Hall easily. Commissioner Sherer suggested Friendly Hills as well to compare the pickleball courts. Commissioner Toth asked if they should focus on parks that need attention and have upcoming projects. Commissioner Muller noted that Valley would be a good location because of the need for improvements and commented that would also give them an opportunity to look at the pavilion as the pavilion improvements keep getting put off. Commissioner Meyer stated that perhaps Victoria Highlands would be a good choice because of the age of the swing set, as the swings were not replaced at the same time as the playground. She stated that she would not be opposed to Mendakota but has spent a fair amount of time there this summer as may have other members of the Commission. Commissioner Muller noted that Mendakota could be a good fit as they go into the master planning process. Ms. Lawrence provided details on the potential for that playground to be fully accessible, noting that is scheduled for five years out. She stated that they would be soliciting outside funding for that project and therefore it would be a different process than typical playground replacement projects. Commissioner Sherer stated that Kensington could be another opportunity as they move into soccer season as it has nice fields but not a lot of parking. Ms. Lawrence replied that facility is maxed out for the allowed soccer field hours, although it does not get large tournaments. Commissioner Muller noted that would also provide an opportunity to review the fencing issue that was declined by the City Council. Ms. Lawrence confirmed the parks as Valley, Marie, Friendly Hills, and Kensington and commented that staff would solidify the order of the visits. 9.Unfinished Business 9.a Parks and Recreation Strategic Planning Update 4 Parks and Recreation Manager Meredith Lawrence provided an update on the progress on the strategic goals. Commissioner Meyer referenced community engagement, noting that it is great to do new and different things in the future. She noted that one of the intentions was to inform people about the Park Commission, encourage interested people to serve, and receive input in a less formal setting. She commented that she feels that it is important to meet people where they are rather than asking them to come to City Hall, where they may not feel as comfortable sharing their thoughts. Ms. Lawrence recognized that community engagement is up to the Commission and if that is something the Commission wants to do, staff would support that, but staff will not take the lead. Commissioner Meyer agreed, noting that she believed that they did get benefits out of the previous sessions. Chair Blanks agreed as well, noting that he would like to increase visibility of the Commission at different events, suggesting t-shirts which would allow the public to know they are part of the Commission. He agreed that they did get a lot out of the engagement focusing on visibility and programing. He stated that they are not necessarily not doing community engagement anymore, but perhaps that is done more through interactions in the community rather than the focus groups. Ms. Lawrence stated that they could move more quickly with nametags for the group, while t- shirts may take a bit longer to design. Commissioner Schifsky agreed that nametags would be a good start. Chair Blanks stated that he would also like to do t-shirts. Ms. Lawrence confirmed that she could work with Chair Blanks and Commissioner Muller to develop a draft design for the shirts that could be presented to the Commission for review. Commissioner Sherer encouraged the members of the Commission to engage with residents and groups, informally, to continue to gather input and different perspectives. 10.Staff Announcements Parks and Recreation Manager Meredith Lawrence shared the following announcements: •She will contact the subcommittee members to begin that process •Seasonal employment positions have been posted on the website for the winter season •Thanks to staff as it has been a busy few months with the summer recreation and event season •Other events can be found on the City’s website 11. Student Representative Update Student Representative Murphy commented that it is great to see the Par 3 doing well and there appear to be some fun activities coming up in the next few weeks. 5 12. Commission Comments and Park Updates Commissioner Sherer •Everything is in good shape at Hagstrom King with the playground and basketball court are getting a lot of use and some teams are still using the fields •The contractor did a fabulous job at Civic Center on the baseball field Commissioner Toth •Asked how often the woodchip material is leveled back out at Mendakota •Spoke with a resident at Friendly Hills that was gathering acorns to feed the squirrels during the winter and a number of residents were playing pickleball Parks and Recreation Manager Meredith Lawrence provided details on the monitoring of park condition done by season and regular parks staff. Commissioner Muller •Rogers Lake has been very active with people enjoying fishing and canoeing and noted people skating on the concrete •Asked about a pedestrian trail crossing •Kensington looks great but the fencing is rusted Public Works Director Ryan Ruzek provided an update on the timing of that pedestrian crossing as part of a MnDOT project. Chair Blanks •Market Square is great and there is a new restaurant open •Valley Park is a great park, and the basketball court was being used by young children Commissioner Schifsky •Was impressed with the new concrete pad at Rogers Lake, noting that she also saw people skating on the surface •Ivy Hills looks great •It is great to see the projects underway at Wentworth Commissioner Meyer •Marie has been busy with pickleball play •Valley View Heights is also wonderful with the new playground equipment •Echoed thanks to staff for the events that have occurred this year and those yet to come 13. Adjourn Motion Muller/Second Toth to adjourn the meeting at 7:31 PM AYES 6: NAYS 0 Minutes drafted by: Amanda Staple TimeSaver Off Site Secretarial, Inc. 6 CITY OF MENDOTA HEIGHTS DAKOTA COUNTY STATE OF MINNESOTA DRAFT Minutes of the Parks and Recreation Commission Work Session October 3, 2023 Pursuant to due call and notice thereof, a work session of the Parks and Recreation Commission, City of Mendota Heights, Minnesota began at Kensington Park: 2627 Concord Way, Mendota Heights MN. CALL TO ORDER Chair Jaffrey Blanks called the meeting to order at 4:32pm. Commissioners Muller, Schifsky, Toth, Meyer (arrived at 4:45pm) and Hanson were also present. Commissioner Sherer was absent. City staff present included Meredith Lawrence, Parks and Recreation Manager and Ryan Ruzek, Public Works Director. TOUR OF KENSINGTON PARK The commission took a look at the fence at Kensington Park on the Southern portion of the park that backs up to Highway 494. Staff discussed that this project was not included in the 2024 budget and that the next year will be a good opportunity to seek potential alternatives to a chain-link fence replacement. The Commission discussed with staff the usage of the fields and the concession stand, as well as the process to obtain a permit for the picnic shelter. Commissioner Muller commented that the new lilac bushes look wonderful. Public Works Director Ruzek discussed with the commission the potential greenway project and trail connection that is proposed to go through Kensington Park. TOUR OF FRIENDLY HILLS PARK The Commission reviewed the pickleball courts and discussed the surface and potential options for additional pickleball courts at the park moving forward. Commissioner Schifsky suggested that the courts be repositioned in the future and that 10 courts are included in the hockey rink in the future. The Commission discussed the need for dedicated pickleball courts within the community as a whole. Commissioner Muller brought up concerns in the park regarding trail connectivity from the parking lot, in addition to the lack of accessibility. Parks and Recreation Manager Lawrence discussed recent vandalism at Friendly Hills Park within the tennis courts and next steps for remedying the issue. The Commission reviewed the playground at the park and discussed the need for the replacement of the swing set. The Commission discussed options when the playground is replaced. This project is currently slated for a replacement in 2026. Commissioner Schifsky suggested a nature-based playground be considered. Staff discussed potential opportunities and constraints with a nature-based playground moving forward. 5b.7 TOUR OF VALLEY PARK The Commission reviewed the current state of the trail system through Valley Park. Public Works Director Ruzek discussed Dakota County taking over the greenway and the potential changes the park and trail system will undergo. Public Works Director Ruzek discussed with the Commission that Dakota County offered to replace the existing tennis courts with new pickleball courts free of cost to the City due to the potential encroachment of the tennis fence, but that the City Council was not in favor of that idea. The Commission discussed the importance of adding electricity to the new picnic shelter replacement at Valley Park in the future. In reviewing the playground, the Commission discussed the importance of providing inclusive playgrounds that provide opportunities to all residents regardless of ability or physical limitations. TOUR OF MARIE PARK The Commission was excited to see the tennis courts being used at Marie Park and commented that each park that was visited that evening with tennis courts had residents using them which was positive. The Commission reviewed the surface of the pickleball courts within the hockey rink and enjoyed seeing the lights being used for nighttime pickleball play. Commissioner Hanson asked if the nets could be replaced with real pickleball nets and staff said they would look into it. The Commission reviewed the playground and discussed how positive and successful this project has been. Staff discussed with the commission that included in the preliminary budget for 2024 included funding for the addition of dugouts at the field and infield renovation work to provide a better and safer playing surface for users. Parks and Recreation Manager Meredith Lawrence summarized the comments heard from the commissioners and discussed upcoming recreation programs and events. The commission adjourned the meeting at 6:35pm. Minutes Taken By: Meredith Lawrence Parks and Recreation Manager 8 DATE: November 14, 2023 TO: Parks and Recreation Commission FROM: Meredith Lawrence, Parks and Recreation Manager SUBJECT: Par 3 Update Concrete Leveling Staff hired a contractor to raise the concrete on the West side of the clubhouse near the patio. Over the years the concrete has become severely uneven and staff is concerned regarding the safety of the unevenness for staff and customers. This project was completed on September 25. Financial Update The finance report for August is included in the packet. Staff will review this with the commissioners at the meeting. Turf Conditions Overall the turf is in great condition as the 2023 season ends. The turf was the healthiest it has been in the past five years. The snow mold application on the greens has been applied. End of Season The Par 3 closed for the season on Friday, October 27. In the month of August, the course had a total of 3,052 rounds of golf played and a total of $45,921 in monthly revenue. The 2023 year-to- date revenue total including August is $252,379. The course’s August expenditures totaled $29,425. The year-to-date expenditure total is $177,286. As of now the course is showing a $75,093 operating surplus. 2024 Capital Projects •Additional Patio Benches and Tables $12,000 •Greens Roller Replacement $16,000 •Fiber (Door Access/Cameras) $100,000 These projects are what staff proposed for 2024 and will need Council approval before moving forward. During budget work sessions, the City Council was unsure regarding the need for a few of the proposed capital items/projects. 7a.9 Round Recap Year 2018 2019 2020 2021 2022 2023 March 0 0 0 748 0 0 April 0 576 327 1678 896 1181 May 1710 1521 3138 2285 2797 2923 June 1674 1542 2881 2305 2839 3365 July 1744 1784 2470 2673 3213 3753 August 1681 1888 2568 2306 3042 3052 September 861 785 1962 1758 1798 2043 October 246 76 937 1157 1077 1168 November 20 0 0 257 207 0 Additional 0 152 0 451 377 478 Total 7936 8324 14283 15618 16246 17963 League Rounds Womens League 983 Junior League 566 Senior League 58 Total 1607 Senior Golf Pass 190 GRANT TOTAL 19760 10 MONTHLY EXPENDITURE REPORT AUGUST 2023 MENDOTA HEIGHTS PAR 3 BUDGET TO ACTUAL REPORT AUGUST 2023 (66.67% OF YEAR) August REVENUES August YTD YTD YTD BUDGET 2023 2023 %2022 GREENS, LEAGUE & TOURN FEES $150,000 $36,421 $173,704 115.80%$143,520 RECREATION PROGRAMS $45,000 $2,341 $49,038 108.97%$51,358 CONCESSIONS $22,500 $7,145 $29,503 131.13%$27,949 SUNDRY REVENUE $0 $13 $134 100.00%$303 INTEREST $450 $0 $0 0.00%$0 INSURANCE CLAIM $0 $0 $0 0.00%$0 PAR 3 FUND REVENUE TOTAL $217,950 $45,921 $252,379 115.80%$223,130 EXPENDITURES August YTD YTD YTD BUDGET 2023 2023 %2022 CLUBHOUSE SALARIES $42,300 $9,607 $32,244 76.23%$31,273 ADMINISTRATIVE SALARIES $30,722 $2,370 $19,685 64.07%$16,554 FICA/PERA $12,952 $1,476 $6,654 51.37%$7,016 MEDICAL INSURANCE $7,187 $599 $4,792 66.67%$4,567 U/E & W/C INSURANCE $3,255 $238 $5,602 172.12%$3,103 RENTALS $6,000 $1,660 $4,617 76.95%$6,298 UTILITIES $14,495 $1,808 $8,732 60.24%$8,590 PROFESSIONAL FEES - AUDIT $2,990 $0 $3,304 110.50%$2,877 PROF FEES - CONSULTING FEES $1,100 $0 $61 0.00%$0 PROF FEES - GROUNDS MGMT $7,250 $0 $0 0.00%$3,728 PROF FEES - GROUNDS WAGES $25,000 $2,797 $13,998 55.99%$11,920 PROF FEES - TREE MAINTENANCE $1,500 $0 $2,779 185.25%$5,300 LIABILITY/AUTO INSURANCE $4,800 $0 $3,365 70.11%$3,885 OPERATING COSTS/SUPPLIES $8,850 $788 $8,763 99.02%$9,889 FUEL $2,600 $343 $1,409 54.20%$1,971 REPAIRS & MAINTENANCE $54,750 $5,918 $46,332 84.63%$31,574 SUNDRY/DUES/MILEAGE/CLOTHING $12,750 $24 $6,999 54.89%$2,463 CONTINGENCY $0 $0 $0 0.00%$0 ONLINE REG & CREDIT CARD FEES $7,975 $1,797 $7,949 99.68%$6,495 PAR 3 EXPENDITURES TOTAL $246,476 $29,425 $177,286 71.93%$157,503 7a1.11 DATE: November 14, 2023 TO: Parks and Recreation Commission FROM: Willow Eisfeldt, Recreation Program Coordinator SUBJECT: Recreation Update Trick-Or-Teeing Update Trick-Or-Teeing 2023 occurred on Saturday, October 21 from 5-7pm. We saw over 700 people come out to the Mendota Heights Par 3 Community Golf Course for two hours of Halloween fun including trick-or-treating, mini golf, s’mores making, hot cider, crafts and more. Staff would personally like to thank the businesses and City departments that came out to help run such a successful event: •Mendota Heights Police Department •Brighter Minds Music •Dustin Stifter-State Farm Insurance Agency •Hush Therapeutic Massage •Dr. Jennifer with Lakeside Orthodontics •Lions United Fitness Barktober Barktober was held at the Mendota Heights Off-Leash Dog Park on Saturday, October 14. The event saw over 50 owners and pups come out for play-time, puppy painting, a photo booth and more. The event was successful and staff heard positive comments, as well as feedback to improve the event in upcoming years. Coffee, Cribbage, and Cards Coffee, Cribbage and Cards is back by popular demand at the Mendota Heights Par 3 Community Clubhouse. This reoccurring program will be held every other Wednesday starting November 15 from 9am-11am. Games are intended to be non-competitive, with a focus on socializing. This is a free event but we ask that everyone registers prior to joining. 7b.12 Tour De Rec Tour De Rec has seen a high number of attendees this fall and we are excited to continue the programming throughout the winter and into spring. The next dates are included below: •Thursday, December 7 at Mendota Elementary Gymnasium: Ninja Night •Thursday, January 4 at the West St. Paul Dome: Sports Spectacular •Thursday, February 1 at the Harmon Park Neighborhood Building: Crafts and Cookies Blade with the Blue Blade with the Blue has been added to the calendar in partnership with West St. Paul Parks and Recreation, Mendota Heights Police Department, and West St. Paul Police Department. This event will be held on Saturday, January 27 from 1-3pm at Wentworth Park in Mendota Heights. More information to come. Frozen Fun Fest Frozen Fun Fest has also been added to the calendar for February 9 through February 11. Staff is working to prepare this event and will give further updates in the coming weeks. Winter Seasonal Jobs Mendota Heights Parks and Recreation has many seasonal positions available this winter for individuals looking for some part-time work. The City is looking for Warming House/Rink Attendants and Ice Skating Instructors and Assistants. More information on available positions can be found here: www.mendotaheightsmn.gov/jobs 13 DATE: November 14, 2023 TO: Parks and Recreation Commission FROM: Meredith Lawrence, Parks and Recreation Manager SUBJECT: Park Improvement Update Budget/2023 Project Update Included in the 2023 budget for parks capital improvement projects are: •Civic Center Foul Ball Fencing/Infield Maintenance: $40,000 COMPLETE •Wentworth Park Warming House: $100,000 (project scope similar to Marie and Friendly Hills Warming Houses) IN PROGRESS •Roger’s Lake Skate Park Improvements: $225,000 IN PROGRESS •Wentworth Park Tennis Court Resurfacing: $90,000 IN PROGRESS •Valley View Heights Playground Replacement: $75,000 COMPLETE Wentworth Warming House: Staff received three bids for this project. On June 6, the City Council approved a contract with the low bidder in the amount of $58,800 to construct the new warming house. Not included in the contract price is the new heater and the electrical quote. The City Council approved a purchase order for the electrical work, which equaled $15,100. In addition, the City will also need to pay the City building permit fees. Thus, the total project cost is estimated to be $78,000. The new warming house will be ready by the 2023-2024 season. Roger’s Lake Skate Park: The construction of the Skate Park base began on August 14. The concrete was poured in the beginning of September and cured by the beginning of October. The contractor has a few strips that they are in the process of removing and replacing. The features will be delivered and installed in the Spring of 2024. Wentworth Tennis Courts: Staff has submitted a grant application to the United States Tennis Association (USTA) National and USTA Northern and received $30,000 in grant funding for this project. Staff hosted a bid opening for the reconstruction of the two tennis courts at Wentworth Park on August 9, with the low bid coming in at $118,800. Once the project began, the metro area received over four inches of rain between September 23-25. When Bituminous Roadways removed the existing asphalt base of the tennis court they discovered that the aggregate base was saturated and not suitable for paving. The contractor dug down and further discovered there was approximately eight inches of aggregate base but over a silty clay which had visible water coming up through it. 7c.14 On October 17 the City Council agreed to move forward a change order that included the following: Add additional aggregate base with light weight equipment, pave a 2.5-inch base course and assess in the spring. If dry enough, the remaining 1.5 inches of asphalt would be paved. Ideally, the weight of the pavement would keep the water saturation of the base material from continuing to be saturated. This option may result in a shortened life of the asphalt base if there is movement during freeze/thaw cycles. The option increased the bid price by $18,000. The Wentworth Park Tennis court was paved on October 31 with the first lift. The second lift will not be paved until next spring. It will then have to cure for around 30 days before the acrylic can be applied so the court is not likely to be open until early summer. Marie Park Ice Rink LED Light Conversion The City Council approved at the October 17 meeting the conversion of the Marie Park Ice Rink lights to LED bulbs. The eight flood lights at the Marie Park Hockey Rink are currently high- pressure sodium bulbs. Over the last year, the city has had a handful of bulbs that have needed to be replaced and staff thought it was prudent to replace all eight bulbs within the facility to LED bulbs prior to the winter skating season. The total cost of the project is $6,600. Marie Park Pond Dredging Included in the packet is the plan set for the Marie Park pond Dredging. This work is proposed to be done this winter with final restoration in the spring. This is a large pond and the project is estimated around $180,000. It will have noticeable changes as the project will also remove all ash trees, buckthorn, and other undesirable vegetation which will open up the pond. The city will replant trees next year and this may provide a location to add a bench overlooking the pond. Special Park Fund Balance Currently the Special Parks Fund is showing an estimated balance of approximately $442,000 as of November 1, 2023: Allocated Expenses for 2023: • Dugouts at Valley, Victoria Highlands, and Civic Center: $53,574 • Skate Park Equipment Deposit: $108,938 • Valley View Heights Playground: $16,147 • Skate Park Concrete: $174,471 15 K:\023734-000\Cad\Plan\023734-000-C-TITL.dwg 10/20/2023 10:46:31 AMMARIE PARK POND IMPROVEMENTS CITY OF MENDOTA HEIGHTS PROJECT LOCATION MAP F G EXISTING PLAN SYMBOLS PROPERTY LINES/RIGHT-OF-WAY UTILITY EASEMENT TREE LINE SIGN DECIDUOUS TREE SHRUB CONIFEROUS TREE EXISTING UTILITY SYMBOLS FIBER OPTIC LINE GAS LINE COMMUNICATIONS PEDESTAL POWER POLE ELECTRIC BOX CATCH BASIN STORM APRON CCOMMUNICATION LINE EELECTRIC POWER LINE ||WATER MAIN > >> SANITARY SEWER STORM SEWER GATE VALVE HYDRANT SANITARY SEWER MANHOLE STORM SEWER MANHOLE COUNTY:DAKOTA PROJECT LOCATION THE SUBSURFACE UTILITY INFORMATION IN THIS PLAN IS UTILITY QUALITY LEVEL D. THIS UTILITY QUALITY LEVEL WAS DETERMINED ACCORDING TO THE GUIDELINES OF CI/ASCE 38-02, ENTITLED "STANDARD GUIDELINES FOR THE COLLECTION AND DEPICTION OF EXISTING SUBSURFACE UTILITY DATA." GOPHER ONE CALL TICKET NUMBER: 232764164 APPROVED BYSHEET NO.DATE PLAN REVISIONS ALL APPLICABLE FEDERAL, STATE, AND LOCAL LAWS AND ORDINANCES WILL BE COMPLIED WITH IN THE CONSTRUCTION OF THIS PROJECT. THIS PLAN SET CONTAINS 3 SHEETS I HEREBY CERTIFY THAT THIS PLAN WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION, AND THAT I AM A DULY LICENSED PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF MINNESOTA. LICENSE NUMBER:DATE:MM/DD/2023 49170 JACOB H. NEWHALL, P.E., P.E. SHEET 3 OF WSB PROJ. NO. 023734-000 PROJECT LOCATION MARIE POND 1 THIS PLAN SET HAS BEEN PREPARED FOR: CITY OF MENDOTA HEIGHTS 1101 VICTORIA CURVE MENDOTA HEIGHTS, MN 55118 (651) 255-1850 A CALL TO GOPHER STATE ONE (651-454-0002) IS REQUIRED A MINIMUM OF 48 HOURS PRIOR TO PERFORMING ANY EXCAVATION. EXCAVATION NOTICE SYSTEM GOVERNING SPECIFICATIONS UTILITY INFORMATION THE 2020 EDITION OF THE MINNESOTA DEPARTMENT OF TRANSPORTATION "STANDARD SPECIFICATIONS FOR CONSTRUCTION" SHALL GOVERN. ALL TRAFFIC CONTROL DEVICES SHALL CONFORM TO THE LATEST EDITION OF THE MINNESOTA MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES, INCLUDING THE LATEST FIELD MANUAL FOR TEMPORARY TRAFFIC CONTROL ZONE LAYOUTS. E ST S N SCALE IN FEET 0 H: 800 1600 HORIZONTAL DATUM: NAD83 VERTICAL DATUM: NAVD88 CITY PROJ. NO. 2023-XXX OUOVERHEAD UTILITY PLAN SET INDEX Sheet Number Sheet Title 1 TITLE SHEET 2 GRADING PLAN 3 MISC DETAILS 7c1.16 EEE EE860861862863864 86086587085785885986186286386486686786886987187287386286 3 8 6 4 8658748738728718708698688678668658 6 0 8 5 6 8 5 7 8 5 8 8 5 9 8 6 1 8 6 2 86 3 86 4 SB SB-2 SB SB-1855854856857858859 855854856857858859855 854 856857858 859 27" River Birch,Good 50" River Birch,Good 15" River Birch,Good 12" Black Walnut,Good 10" American Elm,Fair 15" Green Ash,Dead or Dying 10" Siberian Elm,Fair 2" Hackberry,Good 23" Green Ash,Dead or Dying 7" Black Walnut,Good 10" American Elm,Poor 9" American Elm,Good 12" American Elm,Poor 8" American Elm,Fair 6" Swamp White Oak,Good 1" Pagoda Dogwood,Good 28" Boxelder,Fair 8" Black Walnut,Good 13" Black Walnut,Fair 21" Black Walnut,Fair 11" Black Walnut,Good 14" Black Walnut,Good 6" Green Ash,Poor 11" Boxelder,Poor 7" Green Ash,Poor 18" Green Ash,Good18" Black Willow,Fair 9" Siberian Elm,Fair 16" Boxelder,Poor 6" Green Ash,Good 7" Green Ash,Good 6" Green Ash,Fair10" Green Ash,Fair 6" Green Ash,Dead or Dying8" Green Ash,Fair K:\023734-000\Cad\Plan\023734-000-C-GRAD-PLAN.dwg 10/20/2023 10:46:44 AMSCALE: PLAN BY: DESIGN BY: CHECK BY: SHEET OF WSB PROJECT NO.I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION,OR REPORT WAS PREPARED BY ME OR UNDER MYDIRECT SUPERVISION AND THAT I AM A DULYLICENSED PROFESSIONAL ENGINEER UNDER THELAWS OF THE STATE OF MINNESOTA.LIC. NO:DATE:REVISIONSNO.DATEDESCRIPTIONCLIENT PROJECT NO.MARIE PARK POND IMPROVEMENTSCITY OF MENDOTA HEIGHTS023734-000 2023-___JACOB H. NEWHALL49170__/__/____3 AS SHOWN KJF JHNCKJ 2 N SCALE IN FEET 0 H: 30 60 GRADING PLAN LOCATION GENERAL CONSTRUCTION NOTES LEGEND CLASS III RIPRAP FIELDSTONE PARCEL LINE STABILIZED CONSTRUCTION ENTRANCE. UNLESS OTHERWISE NOTED, RESTORE USING SEED MIX 25-131 (220 LBS/ACRE) WITH FERTILIZER TYPE 3 (350 LBS/ACRE) & TYPE 3 MULCH (2 TONS/ACRE) WITH DISC ANCHOR. EXISTING CONTOUR (MAJOR)1019 EXISTING CONTOUR (MINOR)1019 EXISTING STORM STRUCTURE EXISTING STORM SEWER PIPE>> PROPOSED CONTOUR (MAJOR)1019 PROPOSED CONTOUR (MINOR)1019 SEED MIX 33-261 (35 LBS/ACRE) WITH FERTILIZER TYPE 4 (150LBS/ACRE), SEED MIX 21-111 (100 LBS/ACRE), & CATEGORY 20 ROLLED EROSION PREVENTION PRODUCT. TEMPORARY STABILIZATION: TYPE 3 MULCH WITH DISC ANCHOR APPROX. CONSTRUCTION LIMITS PROPOSED STORM STRUCTURE PROPOSED STORM SEWER PIPE>> SB SOIL BORING LOCATIONS TREE REMOVAL (INCIDENTAL TO CLEARING AND GRUBBING PAY ITEM) EXISTING DUCK HOUSE K:\023734-000\Cad\Plan\023734-000-C-GRAD-PLAN.dwg 10/20/2023 10:46:44 AMREMOVE AND REPLACE 18" CMP FES.LILAC LANE1.CONTRACTOR RESPONSIBLE FOR THE DAMAGE TO STREETS, PARKING LOTS, CONCRETE CURB AND GUTTER, TRAIL, AND TREES NOT SHOWN FOR REMOVAL. 2. AT A MINIMUM, DAILY STREET SWEEPING REQUIRED DURING HAULING OPERATIONS, MORE OFTEN AS NEEDED OR DIRECTED BY THE ENGINEER. 3. ALL STOCKPILES MUST HAVE DOWN GRADIENT PERIMETER SEDIMENT CONTROL IMPLEMENTED AND MAINTAINED AT ALL TIMES. STOCKPILES TO RECEIVE TEMPORARY STABILIZATION IF UNWORKED FOR 7 DAYS 4. DEWATERING/DEICING TO TAKE PLACE PRIOR TO EXCAVATION AND SHALL BE COMPLETED BY DECEMBER XX, 2024 OR AN ALTERNATE DATE AS APPROVED BY ENGINEER. ICE IS TO BE STOCKPILED ON SITE AND PUT BACK IN POND FOLLOWING THE EXCAVATION AND IS INCIDENTAL TO THE DEWATERING PAY ITEM. DEWATERING PLANS MUST BE SUBMITTED AND APPROVED BY THE PROJECT ENGINEER 10 DAYS PRIOR TO PUMPING. PLANS MUST INCLUDE OPERATIONS FOR PREVENTING THE DISCHARGE OF TURBID WATER, AND MUST INCLUDE METHODS FOR CONTROLLING EROSION AND SCOUR. 5. CONTRACTOR SHALL PERFORM ALL DEWATERING AND EXCAVATION ONSITE AND OFF OF ROADWAY, AND LOAD AND HAUL OUT USING ACCESS ROUTE. 6. CONTRACTOR TO GRADE AROUND EXISTING STORM SEWER STRUCTURES AS DIRECTED BY THE ENGINEER. 7. CONTRACTOR TO COORDINATE ACCESS LIMITS WITH THE ENGINEER IN THE FIELD. 8. EXISTING POND CONTOURS DEVELOPED FROM PRE-DESIGN SURVEY. 9. CLEARING AND GRUBBING WILL BE REQUIRED FOR ACCESS AND TO COMPLETE EXCAVATION WORK AS SHOWN. TREES PROPOSED TO BE REMOVED AS PART OF THE PROJECT ARE SHOWN ON THE PLANS AND WILL BE INCIDENTAL TO THE CLEARING AND GRUBBING PAY ITEM. 10. WORK ASSOCIATED WITH PROTECTING AND/OR REMOVING AND REINSTALLING FENCES, STREET SIGNS, LAWN IRRIGATION SYSTEMS AND OTHER ITEMS SHALL BE CONSIDERED INCIDENTAL TO THE PROJECT. 11. EXISTING DUCK HOUSES SHOULD BE PROTECTED OR REMOVED AND REPLACED DURING POND EXCAVATION WORK (INCIDENTAL TO PROJECT). 18" PVC FES INV: 860.02 PROTECT EXISTING LIFT STATION AND UTILITY BOXES (INCIDENTAL). 18" FES INV: 859.10 REMOVE AND REPLACE 36" RCP FES. INV: 858.12 (AS-BUILT) PROTECT EXISTING GRILL COORDINATE ACCESS WITH THE CITY AND ENGINEER DURING CONSTRUCTION. 27" FES INV: 859.00 15" FES (BURIED) SUPPLEMENT WITH 14 CY CL III RIPRAP (FIELDSTONE). 5 CY CL III RIPRAP (FIELDSTONE). CLEAR SEDIMENT AND VEGETATION IN FRONT OF FES REMOVE 3,015 CY OF LEVEL 1 SEDIMENT. REMOVE 6 ASH TREES CLEAR WILLOW (NO GRUB). REMOVE 1,407 CY OF LEVEL 3 SEDIMENT. REMOVE GREEN ASH TREE. PROTECT WILLOW TREE. REMOVE SIBERIAN ELM TREE. PROTECT HACKBERRY TREE. 17 OVERLAP LONGITUDINAL JOINTS MINIMUM OF 6" OVERLAP END JOINTS MINIMUM OF 6" AND STAPLE OVERLAP AT 1.5' INTERVALS. ANCHOR TRENCH (SEE DETAIL AND NOTES BELOW) STAPLE DENSITY SHALL BE A MINIMUM OF 3 U-SHAPED 8", 11 GAUGE METAL STAPLES PER SQUARE YARD (THIS MAY VARY AS DIRECTED BY THE CITY). ANCHOR TRENCH 1. DIG 6" X 6" TRENCH 2. LAY BLANKET IN TRENCH 3. STAPLE AT 1.5' INTERVALS 4. BACKFILL WITH NATURAL SOIL AND COMPACT 5. BLANKET LENGTH SHALL NOT EXCEED 100' WITHOUT AN ANCHOR TRENCH 6" 6" 1' TO 3' DI R E C T I O N O F SU R F A C E F L O W SCALE: 2 3 RIPRAP DETAIL FOR FLARED END SECTION NO SCALESCALE: 1 3 FLARED END SECTION WITH TRASH GUARD NO SCALE SCALE: 3 3 EROSION CONTROL BLANKET INSTALLATION DETAIL NO SCALE K:\023734-000\Cad\Plan\023734-000-C-MISC-DTLS.dwg 10/20/2023 10:46:56 AM3 MISC DETAILS SCALE: PLAN BY: DESIGN BY: CHECK BY: SHEET OF WSB PROJECT NO.I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION,OR REPORT WAS PREPARED BY ME OR UNDER MYDIRECT SUPERVISION AND THAT I AM A DULYLICENSED PROFESSIONAL ENGINEER UNDER THELAWS OF THE STATE OF MINNESOTA.LIC. NO:DATE:REVISIONSNO.DATEDESCRIPTIONCLIENT PROJECT NO.MARIE PARK POND IMPROVEMENTSCITY OF MENDOTA HEIGHTS023734-000 2023-___JACOB H. NEWHALL49170__/__/____3 AS SHOWN KJF JHNCKJ 18 DATE: November 14, 2023 TO: Parks and Recreation Commission FROM: Meredith Lawrence, Parks and Recreation Manager SUBJECT: Review Park System Master Plan Draft INTRODUCTION: The Commission’s number one budget priority for 2024 was the development of a Park System Master Plan for Mendota Heights. Staff met with the Park System Master Plan Subcommittee to review master plans from other cities to determine what should be included in the Request for Proposals (RFP) for Mendota Heights. Staff built out a Park System Master Plan RFP draft for the Commission to review. BACKGROUND: A Park System Master Plan is a common document found within cities and is used to complete the following: Assess the current and future recreation needs of the community, establish a long-range vision, determine gaps within the park system and reduce redundancy, provide strategies to fill gaps, scientific community engagement which garners support, establish priorities, potential for and promotion of partnerships, tool to be used for grant applications, opportunities for the development of potential future park land, plan for park amenity life cycle, align investment and budget with the community’s needs, and education of the public. The proposed timeline for the project is as follows: •November 14, 2023 Commission Review Draft RFP •November 21, 2023 Staff Request City Council Approval to Release the RFP •November 22, 2023-December 15, 2023 Consultants Submit Proposals •December 18, 2023-January 3, 2024 Staff and Subcommittee Review Proposals •January 9, 2024 City Council Approval of Consultant Attachment: Park System Master Plan Draft RFP DISCUSSION: The commission should review the draft RFP and determine if there is anything included that should be removed or if there is anything missing within the scope of the project. It is important to note that the current budget for the project may not support all functions of the scope of the project, so the project scope may need to be refined once proposals are received. 8a.19 BUDGET IMPACT: Staff budgeted $75,000 for this project in the FY2024 budget and anticipates this project to be funded from the Special Parks Fund. No costs for this project will be incurred prior to the approval of a consultant’s contract which will take place in 2024. RECOMMENDATION: Staff is confident the scope of the Master Plan RFP draft positively reflects the proposed goals of this project and the gaps within the department’s needs. ACTION REQUESTED: If the commission concurs, it should, review the Master Plan RFP draft and formally recommend approval of the issuance of the RFP to the City Council. 20 City of Mendota Heights REQUEST FOR PROPOSALS Park System Master Plan PROPOSAL DEADLINE: December 15, 2023  11:00am Released: November 22, 2023 8a1.21 Section 1: General Information Contract Administration All correspondence regarding this RFP (Request for Proposals) and the proposed services must be addressed to: Meredith Lawrence, Parks and Recreation Manager City of Mendota Heights 1101 Victoria Curve Mendota Heights, MN 55118 Phone: 651-255-1354 Email: mlawrence@mendotaheightsmn.gov Submission must be sent by email. One PDF copy of the proposal and any relevant attachments should be sent to the mailing address above. Due Date: December 15, 2023 at 11:00am Anticipated Award of Contract: January 9, 2024 Target Deliverables Due Date: August 1, 2024 Acceptance of Proposals Contents The contents of this RFP and the proposal will become contractual obligations if a contract ensues. Failure of the consultant to meet these obligations may result in cancellation of the award. All information in the proposal is subject to disclosure under the provisions of Minnesota Statutes Chapter 13—Minnesota Government Data Practices Act. Section 2: Project Overview Project Overview and Purpose The City of Mendota Heights is connected by its parks and recreational green space. Having a variety of different neighborhood and community parks, along with larger recreational facilities has allowed the city to create the feeling of a vibrant, healthy city while also maintaining a personal experience with nature and outdoor activities. The City of Mendota Heights wants to continue upon this foundation for its residents and visitors and foster a sense of community that is fun, safe, and friendly. This RFP outlines the nature and scope of the professional services requested for the development of a Park System Master Plan for the City of Mendota Heights. The plan must comprise of the following: • Establish a clear, 15-year vision for Mendota Heights parks, open and public spaces to ensure it is positioned to meet future community needs and is aligned with the Mendota Heights 2040 Comprehensive Plan 22 •Evaluate the existing park system features and amenities related to community need and accepted national standards to identify where changes are warranted •Evaluate the ways in which the residents are or are not currently served through access to the City of Mendota Heights recreation services (keeping in mind that local government entities also provide programming as well as private groups) •Create an equity-based master plan which seeks balance in the park system to meet the needs of Mendota Heights residents, businesses and stakeholders, considering usability, access and differences in physical ability, race, age, income, housing status, language and culture •Develop a prioritization strategy to guide decision-making and investment in the city’s park system •Identify and prioritize park system needs, desires, and interests of the community today and in the next 15 years based on anticipated demographic, economic and recreation trends, preferences, and social changes •Establish a detailed implementation program for achieving the plan’s vision including identifying funding opportunities and gaps, anticipated needs for staff resources, and producing high level cost-estimates for identified high-priority actions •Consider the interrelation of the park system to transportation, housing, land use, economic development, utilities and infrastructure, natural resources and public safety •Involve robust community and stakeholder engagement as part of the process and find ways to include underrepresented populations voices Background The City of Mendota Heights offers a robust system of recreational and open space options, which includes regional trails, lakeside parks, scenic bluffs, and nature preserves. The City’s facilities provide unique features that shape the character of Mendota Heights beyond the ordinary. The City’s parks provide a visual identity to the City, in addition to contributing to the quality of life for those who recreate in the community. Mendota Heights has over 771 acres of parks and open spaces, which include both active and passive recreation areas, along with other state and private parks. The City’s 33 miles of trails offer an excellent opportunity for exercise and relaxation. Opportunities for walking, bicycling, bird watching, cross country skiing, golfing and nature hiking are sprinkled throughout Mendota Heights. The City’s parks are supplemented by three golf courses: Mendakota Country Club, Somerset Country Club, and the Mendota Heights Par 3 Community Golf Course. These contribute to open space views and recreational opportunities for residents. 23 Throughout the last fifteen years the City has made improvements and developed new parks. It has also made efforts to maintain existing open space such as purchasing the 17-acre Mendota Heights Par 3 Community Golf Course. The City recently joined in partnership with other public entities and purchased the 25.5 acre Oheyawahe area, which will be retained as open space. Protection of the Oheyawahe area as an important Dakota site has been identified as a critical issue for many residents within the City. Oheyawahe was placed on the National Register of Historic Places in 2017. A task force has been formed to pursue short and long-term goals for the preservation of and improvements to Oheyawahe, in addition to the creation of an interpretive plan for the site. The City has 17 public parks throughout the community, including Oheyawahe. These parks contain over 295 acres of land area. In the 1990’s, a majority of the most recent park upgrades were made due to a voter approved parks focused referendum. While the need and interest for recreational opportunities has increased over the years, the improvement of park equipment and infrastructure has not occurred due to poor funding and a lack of proactive planning. Section 3: Scope of Work Scope of Services/Tasks The following is the general description of the tasks to be required of the consultant. A final scope of services will be negotiated and finalized once a consultant is selected. In preparing a proposal, the consultant is free to modify, revise, or otherwise amend the list of tasks to best satisfy the requirements of the plan. A.Assess Existing Park Conditions and Opportunities City staff has developed an Asset Management Plan and Capital Improvement Plan. The City of Mendota Heights would like a third party to review our asset management plan to ensure it aligns with professional standards. A more expanded analysis of the condition and opportunities is expected within this plan. The consultant will: •Prioritize a list of improvements to parks and park amenities based upon an agreed upon prioritization methodology •Assess the functionality of the assets against projected 2040 needs and community desires during the community engagement phase •Prioritize future investment based on community needs and desires and current conditions •Review existing built infrastructure and make recommendations for improved accessibility and universal access measured against National Recreation and Park Association (NRPA) metrics •Determine gaps in the park system and provide opportunities to fill the locations that do not have a park within walking distance 24 •Review existing maintenance standards and schedule of identified and unidentified deferred infrastructure maintenance-- provide recommendations on prioritization •Provide a concept plan for redevelopment opportunities at Mendakota Park, which is the City’s flagship park that hosts many City and private events and programs B.Assess Existing Recreation Programs and Services and Forecast Future Opportunities City staff has developed a robust number of recreation programming and services. A list of programs, events, and services will be provided in addition to participation rates and associated costs. The consultant will: •Prioritize recreation services based upon agreed upon prioritization methodology •Assess the functionality of the recreation services and community desires based off the community engagement phase •Prioritize future investment of recreation services based on community need, desires and current offerings C. Community Engagement The consultant team is expected to lead a robust and inclusive engagement process to drive the development of the plan. Minimum expectations include: •Meetings with City Officials: Meet a minimum of four times (two times with the Park and Recreation Commission and two times with the City Council) •Meetings with Stakeholders and Partners: Conduct coordinated meetings with stakeholder groups and key partner agencies and organizations. The City will provide a complete list of contact information for key stakeholders and assist in meeting logistics and notifications •Community Engagement: Lead and actively engage in community engagement throughout the planning process. There should be many varied opportunities for resident engagement and a plan to include underrepresented populations voices is imperative •City Staff and Project Team Coordination: Meet regularly with City staff throughout the project to ensure tasks and activities are progressing in a timely manner and to address issues and opportunities that arise D.Funding Systems The consultant team is expected to provide a roadmap for the successful funding of the resulting initiatives and projects with the understanding that Mendota Heights has a conservative tax base and park dedication fee revenue will not be a feasible funding source in the future as the City is nearly fully developed. 25 •Review current and recommend future funding strategies related to the staffing, operations, enhancement, and maintenance of the Park System •Benchmark the City’s parks finances against other comparable park agencies, broken into the following categories: o Recreation o Park Maintenance o Park Capital Improvements o Municipal Par 3 Golf Course •Determine what strategic actions the City must take in order to meet financial needs of the Park System in the future as defined in this new master plan E.Implementation Plan The Park System Master Plan will compile and summarize the findings regarding the needs, desires, challenges, and opportunities of the community today and over the next 15 years based on anticipated demographic, economic, social, and recreational changes. The Master Plan should provide clear goals, objectives, guiding principles and a vision that will provide the framework for decision-making regarding development, redevelopment, and enhancement of park and open space facilities and the provision of recreational opportunities and services. The implementation plan is a critical component of the Master Plan and will describe the, “what, when, and how” to achieve the vision, goals and objectives. At a minimum the implementation plan should include: •Prioritization Strategy: describes a process and criteria for prioritizing investments and modifying practices including recommended priorities regarding: o Replacement, consolidation, and/or repurposing of facilities o Parkland acquisition o Changes to programs, events and services o Changes to maintenance and required staffing (level of service) o Integrating equity considerations in decision-making o Improve sustainability of resources (natural, fiscal, and social) facilities and operations •Identify the highest priorities for investment as well as near, mid, and long-range priorities •Prepare cost estimates, including inflationary expectations based on market studies, for high priority investments •Assess the City’s staffing and funding levels in relation to regional averages and comparative to cities of similar size in relation to parks and recreation. The consultant will provide a budget and staffing analysis needed for current level of service, an adequate level of service and a desirable level of service. The analysis will also include funding and staffing requirements for future growth and 26 operation in line with priority recommendations. The Consultant will also provide suggested funding strategies Approach The consultant is asked to keep in mind the following approaches as the plan is developed: •Regional to Community to Neighborhood Focus: This project should consider the park amenities outside of the City, but also within a reasonable distance from Mendota Heights as potential amenities for residents of Mendota Heights to utilize. It is a goal of the City of Mendota Heights to have parks and open space within a reasonable walking and/or biking distance from every home. Somewhere between regional and neighborhood amenities are community amenities—those that might require a longer trip but are not economical to have as close to every home. What amenities are reasonable to view as neighborhood amenities, community amenities, and regional amenities? Where are the gaps in the community? •Community Building Driven: This project should be driven by what the community needs and wants, but recommendations should also consider the power of parks and recreation amenities and services to build community by bringing people together. •Future Focused: While the needs and wants of the community today are important, it is also important to consider changing demographics and likely changes to demands as those demographics’ changes. Twenty years ago, no one would have expected pickleball to be as popular as it is today. What types of changes in demand do we expect because of changing demographics as well as culture? The City anticipates that this is a team approach between the consultant, the City organization, and the community. The consultant is responsible for bringing expertise, new ideas and challenging the old way of thinking. The preparation of the final deliverables will be the responsibility of the consultant. Final Document The Plan should be in a reader-friendly document with an emphasis on maps, charts, photos, graphics and tables to convey information rather than using lengthy text. The Plan should be formatted in such a way that it is easy to update on a routine basis. •Printed Material o Seventeen printed copies of the final Park System Master Plan should be provided to the City in the following format: Spiral-bound book, with individual sections marked by label dividers Printing to be double sided (back-to-back) 8.5” x 11” paper except for maps, charts, or diagrams that may be on folded 11” x 17” paper Color copies of pages including graphics, maps and photographs 27 •Electronic Materials o The documents and graphics should be available in a digital format compatible with the City’s software (e.g. Adobe Creative Suite package, ESRI GIS products, MS Word). The final products, as well as all presentation materials (i.e. Power Point presentations, maps, graphics, etc.) used throughout the planning process, shall become property of the City of Mendota Heights, who shall have all- inclusive rights for reproduction and distribution. The material will be provided to the City via a secure file sharing website or via USB Flash Drive. Section 4: Proposals The proposal shall contain the type of information summarized below. Additional information is allowable, provided it is directly related to the proposed project. The proposal should follow the Table of Contents listed below. The four (4) sections of the proposal should be separated using tabs. 1). Project Approach 2). Proposed Project Team and Experience 3). Schedule 4). Fee Quotation 1). Project Approach Provide specific approaches and methods that will be utilized to complete this project as outlined and to accomplish the work items listed under Section 3 of this RFP. Include philosophy on designing improvements for parks. Explain why the consultant’s firm should be selected to perform the services for this project. 2). Proposed Project Team and Experience •Provide identification of the offering firm (s), including name, address and telephone number of each firm •List the name, title, address, email address, and telephone numbers of contact person during period of proposal evaluation •Provide history, years in business and background on the firm •List any subcontracted professionals that will be used on the project •Identify the key project team members and describe their specific roles on the project •Include resumes for key members of the project team •Describe relevant experience and provide information on at least three (3) reference projects completed in the last five (5) years •Include specific descriptions of proposed team members’ roles on relevant projects. Provide a contact name and information for each of the references 28 3). Schedule Provide a proposed timeline with projected completion dates. The City’s expectation is to complete the Master Plan by August, 2024. 4). Fee Quotation Proposals shall include a total cost for completion of the project described that is based on an hourly fee not to exceed the contract amount. The cost should include detailed estimates of the number of hours to be worked by specific team members on each major (numbered) work item under section 3 of this RFP. A cost estimate summary for each of the work items outlined in the RFP shall also be included. The estimate shall clearly identify as additions, overhead, and reimbursable expenses. Submission of Proposal Submission must be sent by email to mlawrence@mendotaheightsmn.gov One PDF copy of the proposal and any relevant attachments should be sent to the mailing address above. Proposals will be accepted until December 15, 2023 at 11:00am. Section 5: Consultant Selection Proposals will be reviewed and evaluated by City staff and the Parks and Recreation Commission Master Plan Subcommittee on the basis of the following criteria: •Consulting firm and key project staff experience with similar projects •Proven track record in successfully completing similar projects on time and within budget •Successful experience of both the firm and the individual team members will be considered •Proposed approach to completing the project •Components and details of the scope of the project •Proposed fee Following review of the RFPs by the City, staff will recommend a consultant to enter into a contract with to the City Council. It is anticipated that a proposed contract will be brought to the City Council for consideration at their January 9, 2024 meeting. Section 6: Terms and Conditions Upon selection of a Consultant, a contract shall be entered into by the City and Consultant. It is expected that the contract will provide for compensation for actual hours expended on a not- to-exceed basis. In addition: 1.Deletions of specific components, such as individual project meetings, will be at the discretion of the City. Payment or reimbursement shall be made based on actual hours worked on the various tasks required for the project plus necessary subcontractor work 29 (as applicable) and out of pocket expenses. Billing that exceeds the not to exceed will not be compensated unless a contract extension has been approved by the City Council. 2.If, for any reason, a firm is not able to commence the services in that firm’s proposal within 30 days of the award, the City reserves the right to contract with another qualified firm. 3.The City shall not be liable for any expenses incurred by the Consultant prior to the signing of a contract including, but not limited to, proposal preparation or final contract negotiations. 4.The proposal must be signed in ink by an official authorized to bind the consultant to its provisions. The proposal must include a statement as to the period during which the proposal remains valid. This period must be at least 90 days from the date of the proposal deadline. 5.The City shall retain ownership of all plans, maps, reports, models, and data prepared under this proposal. 6.The City reserves the right to reject any and all proposals or to request additional information from any or all consultants. Section 7: Attachments Consultants interested in submitting a proposal will be sent the following documents by requesting them from Meredith Lawrence, Parks and Recreation Manager: •Mendota Heights Parks Asset Management Plan •Mendota Heights Capital Improvement Plan •Mendota Heights Bike and Pedestrian Plan •Mendota Heights Parks and Recreation Strategic Plan •Mendota Heights Natural Resource Management Plan 30 DATE: November 14, 2023 TO: Parks and Recreation Commission FROM: Meredith Lawrence, Parks and Recreation Manager SUBJECT: 2024 Fee Schedule Recommendation INTRODUCTION: Each year the City Council approves the fee schedule that will be used to assess fees for services. Staff would like the Parks and Recreation Commission to review the City’s current Parks and Recreation-based fees in order to make a recommendation to the City Council for their December 21, 2023 meeting. BACKGROUND: The Mendota Heights Par 3 Community Golf Course fees were last amended to include a $1- per-round increase in 2023 and the 10-round-pass was increased from $90 to $100 in 2019. In 2021, the City Council approved a new Senior Golf pass which was added to the fee schedule. The Field and Facility fees were last amended in 2019. Staff’s estimate is that Picnic Shelter rental fees have not been increased for approximately 10 years. The City Council last met to review the Field and Facility Use Policy and Fees in conjunction with the user groups on October 18, 2022. At that meeting the consensus of the council was to keep the fees the same for 2023 as they were for 2022. Tennis court fees were last amended in 2021, in which the fees changed from strictly an application fee with unlimited play, to an hourly charge for use. Canoe Rack Rental fees have not changed since the canoe racks were installed at Rogers Lake. Attachments: 1. 2024 Draft Fee Schedule 2.Golf Fee Analysis of Comparable Courses DISCUSSION: Staff is recommending keeping the 2023 fees in place for the field and facility use fees, tennis fees, picnic shelter fees, and canoe rack rental in 2024. The fees seem fair and somewhat in line with neighboring cities fees. 8b.31 Staff is recommending a $1 per round increase for rounds of golf at the Mendota Heights Par 3 Community Golf Course. Many surrounding courses have increased their fees due to the cost of supplies, equipment, and labor increasing over the last few years. Staff has included in the packet a golf fee analysis that local Superintendents develop yearly to compare the prices of other local comparable golf courses. Staff is recommending increasing the 10-round pass from $100 to $110 and the Senior Golf Pass from $200 to $220. In addition, increasing pull carts from $3 a round to $4 per round and gas carts from $10 per round to $12 per round. As for the Park Bench Donation fee, staff is recommending increasing the fee from $1,000 to $1,500, which would cover half of the total costs of the donated bench and installation. BUDGET IMPACT: In reviewing wages for the Mendota Heights Par 3 Community Golf Course positions, staff is recommending an increase due to market competitiveness. A $1 increase in round fees would help to cover the proposed increased labor costs for 2024 and supply cost increases. RECOMMENDATION: Staff is recommending a $1 increase for golf rounds at the Par 3 for 2024, an increase in the 10- round-pass to $110 and an increase in the Senior Golf Pass to $220. Staff is recommending park bench donation fees increase from $1,000 to $1,500. In addition, staff is recommending the other fees included in the fee schedule remain the same for 2024, as they were 2023. ACTION REQUESTED: The commission should review the Parks, Recreation, and Par 3 Fee Schedule and make a recommendation to the City Council for the 2024 fees. 32 Golf Course Survey Par 3 Municipal Survey (Completed October 2023)ParGreens Fee Weekend Holiday2nd nineSr. RateJr. RateHyland Bloomington (Forward Tees) 2022 27 $17.00 $17.00 $17.00 $13.00 $13.00 2023 $18.00 $18.00 same $14.00 $14.00 2024 same same same same same Mendota Heights Par 3 2022 27 $12.00 $14.00 $6.00 $11/$13 $11/$13 weekday/weekend for seniors and juniors 2023 $13.00 $15.00 same $12/$14 $12/$14 weekday/weekend for seniors and juniors 2024 Theodore Wirth Par 3 1240 yards 2022 27 $13.00 $13.00 $9.00 $10.50 $10.50 2023 $14.00 $14.00 $9.00 $11.00 $11.00 2024 $15.00 $15.00 $9.00 $12.00 $12.00 Roseville Cedarholm 1342 yards *2022 27 $14.75 $15.25 $8.00 $13.75 $9.99 2023 $15.25 $15.75 $8.50 $14.25 same 2024 $15.75 $16.25 $9.00 $14.50 same Brookview (Golden Valley) 1287 yards * 2022 27 $13.50 $13.50 $8.50 $10.50 $10.50 2023 $14.50 $14.50 $9.50 $11.50 $11.50 2024 $15.50 $15.50 $9.50 $12.50 $12.50 New Hope Municipal 1331 yards 2022 27 $15.50 $15.50 $9.00 $13.50 $9.50 Last increase in green fees was $0.50 in 2023 2023 $16.00 $16.00 $9.00 $14.00 same 2024 $17.00 $17.00 $10.00 $15.00 $10.00 Birnamwood 2022 27 $14.75 $15.50 50%off regular rate $13.50 $13.50 2023 $15.75 $16.50 same $14.50 $13.50 2024 $16.75 $17.50 same $15.65 $14.50 Centerbrook (City of Brooklyn Center)2022 27 $18.00 $18.00 $15.00 $15.00 $10.00 2023 $19.00 $19.00 same same same 2024 same same same same same Area Executive Courses Eagle Lake (Three Rivers Park District) 2022 31 $18.00 $18.00 same $18.00 $14.00 2023 same same same same same 2024 same same same same same Brookland Golf Park (City of Brooklyn Park)2022 30 $15.50 $15.50 $5.00 $14.00 $13.00 2023 $16.50 $16.00 $6.00 $15.00 same 2024 same same same same same.$16.50 $6.00 $15.00 * Do not include tax 8b1.33 PARKS AND RECREATION 2023 2024 Application Fee Charged pPer permit season for all field / facility, permit application reservations. Due upon application. Non-refundable. $ 25 Concessions Building Reservation Food/beverage license required $25/event/day Tennis Court Reservations $5/hour Picnic Area/Shelter Resident $25 Resident Business $50 Non-Resident $50 Non-Resident Business $100 NOTE: Mendota Heights schools, city events, non-profit are fee exempt for Picnic Area/Shelter rental fees. Picnic Table additional on-site $15/day Canoe Rack Rental canoe storage @ Rogers Lake Park $50/summer Park Bench Donation $1,000/bench $1,500/bench PAR-3 GOLF Footgolf $8/round Greens Weekday Juniors, Seniors $12/round $13/round Weekday $13/round $14/round Weekend/Holiday Juniors, Seniors $14/round $15/round Weekend/Holiday $15/round $16/round Senior Pass Excludes golf cart $200/year $220/year 10-Round Pass $100 $110 Pull Cart Rental $3/round $4/round Power Cart Rental $10/round $12/round Formatted: Font color: Red Formatted Table Formatted: Font: Bold, Font color: Red Formatted Table Formatted: Font: Bold, Font color: Red Formatted Table Formatted: Font: Bold, Font color: Red Formatted: Font: Bold, Font color: Red Formatted: Font: Bold, Font color: Red Formatted: Font: Bold, Font color: Red 8b2.34 RINKS 2023 Ice Rink Reservation Priority 3 $4/hour/rink Priority 4 $6/hour/rink Priority 5 $4/hour/rink Priority 6, 7 $8/hour/rink FIELDS Reservation - tournament Priority 3, 4, 5, 6, 7 baseball, softball, soccer, football, lacrosse $50/day/field Reservation - non-tournament Priority 3 baseball, softball, soccer, football, lacrosse $7/player/season Priority 4, 5 $10/player/season Priority 6, 7 $15/hour/field Preparation - non-tournament $35/field/day Preparation - tournament Priority 3, 4 Required $35/field/day Preparation - tournament Priority 5, 6, 7 Optional $35/field/day Drying Agent No Charge, included in Preparation fee 35 DATE: November 14, 2023 TO: Parks and Recreation Commission FROM: Meredith Lawrence, Parks and Recreation Manager SUBJECT: Parks and Recreation Strategic Planning Update BACKGROUND INFORMATION: Included is the planning calendar that staff is utilizing to ensure progress. Each month staff will provide an update on the strategic planning calendar. RECOMMENDATION: Informational Only. 9a.36 ACTION ITEM STRATEGIC INITIATIVE RESPONSIBILITY TIMELINE Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec UPDATE Receive Educa�on on Poten�al Funding Sources (Referendum, Charitable Gambling, Franchise Fees, Sponsorships) Sustainable Funding Source for Parks and Recrea�on City Administrator/ Parks and Recrea�on Manager The City Council (and two commissioners atended) met in June to learn the poten�al funding op�ons moving forward for the City for items including Parks and Recrea�on. Finalize Sponsorship, Dona�on, Naming Rights, Legacy Program Policy Sustainable Funding Source for Parks and Recrea�on Parks and Recrea�on Manager Staff will be seeking direc�on from the Council on this topic at the November Council work session. Work with businesses (Village and Plaza) for Event Engagement A Leading Community with Invested Partners Parks and Recrea�on Manager/Recrea�on Program Coordinator The Cupid’s Valen�ne Crawl event was held in February, 2023. The Concert in the Park Series took place this Spring, Summer and early Fall. Trick or Teeing included businesses handing out candy at the holes. Work with the City of West Saint Paul to determine if a joint facility is feasible. A Leading Community with Invested Partners City Administrator/ Parks and Recrea�on Manager The City of West Saint Paul has signed a contract with Mend Consul�ng for their Parks System Master Plan. Included in their plan is a feasibility study for a community center. Results are an�cipated in the next few months. Staff atended a focus group and is looking at a community survey. Host Joint Work Session with Natural Resource Commission Greater Connec�on to the Natural Environment Parks and Recrea�on Manager A joint work session was held on March 22. Create Trail CIP Program Greater Connec�on to the Natural Environment Public Works Director Staff is working to create some maps for this project as a visual. The Trail CIP should be available for distribu�on to the Commission this Fall. Host Bike Clinic/Fix It Clinic with a Local Bike Shop A Safe, Connected, Walkable and Bikeable Community Recrea�on Program Coordinator/ Parks and Recrea�on Manager Staff hosted a bike fix-it clinic to be on Wednesday, September 20 from 5:30 PM- 6:30 PM at Market Square Park called “Cycles & Cider.” Update Trail Maps to Be More Accessible A Safe, Connected, Walkable and Bikeable Community Parks and Recrea�on Manager/Senior Engineering Technician The Senior Engineering Technician has received the necessary informa�on from the Parks and Recrea�on Manager and is pu�ng finishes touches on this to launch. Increase Senior Programming Vibrant and Diverse Community Programming Recrea�on Program Coordinator First ever Coffee, Cards and Cribbage series was hosted in January and February, 2023 and will take place this Winter. The Summer Adult Walking group took place this Summer. An Adult Pain�ng Group will take place this Fall and Winter. Develop a Pre-K Program Vibrant and Diverse Community Programming Recrea�on Program Coordinator Staff Comple�on of a 15 Year CIP Ac�ve Recrea�onal Facili�es for All Parks and Recrea�on Manager Staff has completed a Parks CIP, which was reviewed at work sessions in May and July. Look at Op�ons to Expand Teen Programming Opportuni�es Indoors Ac�ve Recrea�onal Facili�es for All Parks and Recrea�on Manager Add QR Codes on Signage within Parks Effec�ve Two-Way Communica�on with an Informed Community Parks and Recrea�on Manager Signs have been delivered and will be installed this Fall as �me allows for Public Works. Con�nue Community Engagement Mee�ngs Effec�ve Two-Way Communica�on with an Informed Community Parks and Recrea�on Commissioners Chair Blanks and Vice Chair Muller have determined that they are not moving forward with organized community engagement for 2023. 9a1.37