Loading...
2004-01-13 Parks and Rec Comm Agenda PacketCITY OF MENDOTA HEIGHTS DAKOTA COUNTY, MINNESOTA AGENDA PARKS AND RECREATION COMMISSION Tnesday January 13, 2004 6:30 p.m. —Council Chambers 1. Call to Order 2. Roll Call 3. November 13, 2003 Minutes 4. Recreation Programmer's Update 5. Clifford Timm: Snowmobiles on Rogers Lake 6. Changes to "Rules and Rental Fees for Use of City Parks and Property" 7. Txail Planning 8. Grant Programs Available 9. Verbal Updates • Playground Improvements in 2004 • Wagon Wheel Trai]/Rogers Lake Improvements • Buckthorn Control • Clifford Timm Article • E-mail Addresses • Police Report 10. Other Comments I1. Adjourn Auxiliary aids for persons with disabilities are available upon request at least 120 hours in advance. If a notice of less than 120 hours is received, the City of Mendota Heights will make every attempt to provide the aids. This may not, however, be possible on short notice. Please contact City Administration at (651) 452-1850 with requests. CITY OF MENDOTA HEIGHTS DAKOTA COUNTY, MINNESOTA PARKS AND RECREATION COMMISSION MINUTES NOVEMBER 13, 2003 The regular meeting of the Mendota Heights Parks and Recreation Commission was held on Thursday, November 13, 2003 in the Council Chambers at City Hall, 1101 Victoria Curve. The meeting was called to order at 6:30 p.m. The following Commissioners were present: Chair Richard Spicer and Commissioners Larry Craighead, Paul Portz, Stan Linnell, and Raymond Morris. Commissioners Dave Libra and Missie Hickey were excused from the meeting. City Staff present were Recreation Programmer Teresa Gangelhoff, Parks Project Manager Guy Kullander and Administrative Assistant Patrick C. Hollister. Mr. Hollister took the minutes. MINUTES Commissioner Portz moved to approve the September 9, 2003 minutes with revisions. Commissioner Morris seconded the motion. AYES: NAYS: RECREATION PROGRAMMER'S UPDATE Ms. Gangelhoff presented the Recreation Programmer's Update. WAGON WHEEL TRAIL UPDATE Mr. Kullander reported that the scheduled closing of Wagon Wheel Trail would occur on Thursday, November 6"', when removal of trees and brush was originally scheduled to begin. The roadway may reopen following this operation, but once excavation equipment or project materials begin to arrive the roadway will be barricaded. Scheduled excavation cannot begin until the Xcel power lines had been "cut and dropped" in the area where the excavators and cranes will be working. Electrical service to the residents east and west of the construction area on Wagon Wheel Trail will be "back -fed" and these residents should experience little, if any, disruption in service. Beginning next week a gas line will be re- routed around the excavation area and the water main exposed and off -set. Installation of coffer dams and de -watering of the site will also begin next week followed by the installation of support pilings for the replacement cross culvert. If no other unforeseen delays occur the project should still be completed by the first week in December. PILOT KNOB EAW Mr. Hollister provided an update on the Pilot Knob EAW process. COMMISSION APPOINTMENTS Mr. Hollister reported that there are a number of Commission appointments that expire on January 31, 2004: Planning Commission: Eric Hesse, Chris Dolan, Sally Lorberbaum; Parks and Recreation Commission: Paul Portz, Dave Libra; Airport Relations Commission: Vern Edstrom, and John Roszak. Mr. Hollister said that the City Council has asked those Commissioners who are interested in being reappointed to please send a letter to the City expressing their desire to serve again. Mr. Hollister said that letters should be directed to Linda Shipton, and should be received no later than November 15'h. 2004 PARK PLANNING BUDGET Mr. Kullander reminded the Commission that at their September meeting they had amended the Parks Commission's budget request to the Council from $7000 for invasive species eradication to $5000 for a parks referendum study as a first priority, with invasive species eradication as a secondary priority. Mr. Kullander informed the Commission that the Council would be holding a budget workshop next Wednesday, November 19, 2003. Mr. Kullander said that he would provide a memo to Council conveying the Parks Commission's request for $5,000 for park planning. Chair Spicer asked how the Parks Commission could advocate for this $5,000 more strongly. Mr. Hollister invited Chair Spicer to call City Administrator Jim Danielson to talk about the issue. LEXINGTON TRAIL PROJECT UPDATE Mr. Hollister presented materials submitted by Civil Engineer Marc Mogan on the Lexington Avenue Trail. Commissioner Craighead complemented Mr. Mogan on his progress with the Lexington Avenue Trail. OTHER COMMENTS Commissioner Li el asked if the Town Center redevelopment would include a trail on the east side of Dodd Road from Highway 110 to Marie Avenue. Mr. Kullander said that as part of the Town Center development, the trail would go from Highway 110 to the edge of the church property, but that continuing the trail all the way to Marie Avenue was not planned at this time. Mr. Kullander said that continuing the trail all the way to Marie would involve boulevard areas in front of residents' homes and that they may object to such a trail. Commissioner Linnet said that he would like to see the trail eventually go all the way up to Marie Avenue. Commissioner Craighead complemented the Public Works Staff s efforts in removing roots from the Lexington Avenue Trail north of Highway 110, Chair Spicer asked about the status of the bench donation program. Mr. Kullander said that four benches were donated in 2002, and that none have been donated so far in 2003. Chair Spicer asked about the status of the playground equipment. Mr. Kullander said that he had sent out RFPs for four parks and had also ordered the skateboard park. Mr. Kullander said that he anticipated placing this item on the January Parks Commission agenda. Commissioner Linnet suggested that the topic of trail planning be on the January Parks Commission agenda. Commissioner Linnel said that it would be good to get outside money to help with upgrading the Valley Park trail as part of the NURT trail program. ADJOURN Motion made to adjourn by Linnet and seconded by Portz. AYES: NAYS: The meeting adjourned at 7:35 p.m. CITY OF MENDOTA HEIGHTS IANMMAI1zIBig] hjI Date: JANUARY 7, 2004 To: PARKS AND RECREATION COMMISSION From: TERESA GANGELHOFF RE: NOVEMBER, DECEMBER PARKS AND RECREATION REPORT Celebrate Mendota Heights Look for the Park Celebration to be held next June 5t". If you would like to sponsor an event or donate time please contact Teresa. Senior Trips We now have winter/spring trips planned. All our trips are co -sponsored with West. St. Paul Seniors and Thompson Park Senior Center. A list is attached of the upcoming senior trips. Youth Trips The Holiday Break trips on December 29 h (bowling and movie) was popular with 21 kids from Mendota Heights taking part. We have 3 spring break trips in the works. Ski Trips Ski trips are cancelled we did not get enough kids to fill the bus between the three cities. Skating Lessons Our skating instructor -Rebecca Rehn will be offering lessons on Saturdays starting in January at Friendly Hills Rink. We needed to add two more classes -Smalls and Tails and another beginners class but dropped the freestyle and adult lessons. Ice Rinks Ice Rinks opened December 17 and have been closed only 3 days so far because of weather. I hired 4 new attendants and one sub. We opened for the first time on New Years day at the request of the Mayor and all three rinks were very busy that day. Tennis I will be adding a pre-school tennis program on Thursday's this summer. The rest of the program is in place to run the same as last year except we will run the lessons according to ability. 0 2004 SENIOR TRIPS (You may register now at Mendota Heights City Hall for the following trips. Register early as trips fill quickly!) a A "I DO! I DO!" AT THE SHOWBOAT � Board the Minnesota Centennial Showboat docked at Harriet Island and enjoy lunch brought directly from D'Amico (three -cheese lasagna with roasted red peppers, artichokes &mushrooms with tomato basil sauce, � caesar salad with garlic croutons and shaved parmesan, seasonal vegetables, freshly baked bread with sweet butter, Chef s choice of assorted bars, coffee (regular & decaf) or iced tea). After lunch take a seat in the Auditorium and enjoy the performance of "I DO! I DO!" presented by the Actors Theatre of Minnesota. Date: Wednesday, February 18, 2004 Cost: $53 Depart: 12:00 noon - Mendota Heights City Hall Return: 4:00 PM Deadline for registration: Monday, January 19 MILL CITY MUSEUM (Thompson Park pick up only on this trip but you may still register at Mendota Heights City Hall) Take a riding tour of the new Mill City Museum and see the birthplace of Minneapolis at St. Anthony Falls and 0 the historic riverfront area. Learn about mining and the "Mississippi Mile". The guide points out many Minneapolis institutions along with a few art and civic locations. Enjoy lunch at the Mill City Museum Cafe G with catering by D'Amico and even visit the gift shop at the Museum after lunch. Take a tour of the new ® Museum that reveals the roots of "Mill City". 0 Date: Thursday, March 25, 2004 Cost: $47 Depart: 10:00 AM Arrive: 3:00 PM at Thompson Park Activity Center Deadline for registration: Monday, March 8 Q TIM CONWAY & HARVEY KORMAN -TOGETHER AGAIN (Thompson Park pick up only on this trip but you may still register at Mendota Heights City Hall) ® There will be lots of laughs when these two are back TOGETHER AGAIN onstage. You will remember them best from THE CAROL BURNETT SHOW where they entertained audiences for years with humorous skits and antics. They also have a long list of movie, theatre and T.V. credits. The bus will stop on the way home at a fast food restaurant (TBD-on your own -not included in Q price) so you won't have to worry about cooking dinner after the show! PLEASE NOTE: We were only able to obtain balcony seating for this show. Please be advised that this theatre DOES NOT have an elevator and you will have to use steps. Date: Sunday, April 18, 2004 Cost: $57.00 Depart: 3:00 p.m. Return: approx. 7:45 p.m. at Thompson Park Activity Center. Deadline for registration: WEDNESDAY, FEBRUARY 18 EDGEWATER 8 SPRING CONCERT Enjoy a lunch at the Medina Entertainment Center along with a performance by the Edgewater 8. Edgewater 8 will perform a Special Tribute to the Big Bands, a Live Version of the radio show The Kraft Music Hall, music from Julie Andrew's first Broadway show "The Boy Friend", and the always popular "Sentimental Medley". Date: Tuesday, April 20, 2004 Cost: $53 Depart: 10:15 AM Return: 3:50 at Mendota Heights City Hall Deadline for registration: Monday, March 29 0 Watch the next Heights Highlites and 55+ Newsletter for more information and registration for these upcoming trips: May 6-Isn't it Romantic at the Chanhassen Dinner Theatre May 26-Pirates of Penzance at the Guthrie d Week of June 21-Trip to Minnesota Arboretum and lunch. August 22-Throughly Modern Millie at the Ordway Center 0 Q City of Mendota Heights MEMORANDUM January 6, 2004 Memo to: Parks and Recreation Commission From: Guy Kullander, Parks Project Manger/ Subject: Request from Clifford Timm to allow Snowmobiles on North Roger's Lake for the purpose of "herding" fish Background: Mr. Clifford Timm wishes to use a snowmobile(s) on the north portion of Roger's Lake to "herd" or drive fish from the north portion of the lake into that portion of the lake south of Wagon Wheel Trail where the lake aerator is installed in Roger's Lake Park. The recently installed culvert allows a water depth of up to three and a half feet below the top of the lake control structure that should be "open" throughout the winter months. Mr. Timm is convinced that sound or loud noise can be used to scare or "drive" the fish thereby lowering the potential winter kill of fish in the north portion of the lake. Existing City ordinances do not allow the use of snowmobiles within the City Limits, Discussion: I informed Mr. Timm that he should make a formal request (see attached letter) first to the Park and Recreation Commission and then the City Council, because this request is similar in nature to the yearly request from St. Thomas Academy to allow a motorized boat on Roger's Lake for its environmental and water quality testing each spring. Recommendation: Mr. Timm will be present at tonight's meeting to further explain his request. Action Required: Make a recommendation to the City Council. l -- -- - je - -- r �Cmy�A/LJ- __. - - - _e9tC Mr. CIII[ord W. Timm 1167Smith Ave.S d i� W. Saint Paul, MN 5511H �J �, ....�_.. City of Mendota Heights Memorandum January 8, 2004 TO: Guy Kullander /Park Board FR: Mike Aschenbrener RE: Herding Fish by snowmobile Introduction 1 have received a request to grant permission for Clifford Timm to use a snowmobile on Rogers Lake to move fish from the north lake to the south lake. Backoround The City of Mendota Heights prohibits the use of snowmobiles on public and private property by ordinance 6-6-2. To use them on private property you are required to have permission from the property owner. We have received two complaints about snowmobiles operating illegally with in the City during the winter of 2003-2004. Having used a snowmobile and ATV to ice on many occasions I do not believe that herding of fish would be achieved by operating a snowmobile on the ice of Rogers Lake. The Police Department would not be against the operation on a weekday during a specific time period. Mr. Timm should notify each of the property owners and the City in writing as to the date and times that he would be driving his snowmobile. It would be appreciated if some monitoring was done during herding to determine if it was an effective effort. Recommendations Allow Clifford Timm to herd fish on these conditions: • The City has no liability for parties on the ice of Rogers Lake • Notification of all affected parties is done, including date and times • Herding occurs on a weekday after mid morning • Monitor the culvert to determine effectiveness Attached City Ordinance 6-6-2: Snowmobiles C:\DOCUME-1\L,INDAS-1.MH7�LOCALS—I\Temp\Herding Fish.doc City of Mendota Heights MEMORANDUM January 8, 2004 Memo to: Parks &Recreation Commission From: Guy Kullander, Parks Project Manager./k Subject: Update "Rules and Rental Fees for use of City Parks &Property" Background: The last update to the rules and rental fees for use of City park facilities was adopted by the City Council in 1996, Discussion: Attached for your review are recommended modifications to the existing policy. A majority of the proposed changes are clarification of specific items brought to the attention of staff over the past several years or ones that were not clearly defined. There are three recommendations that may be of concern to previous groups that reserve park facilities. First would be the imposition of a $25.00 Reservation Fee for all permits issued that is non-refundable, with no exceptions. This would also apply to reservations of neighborhood parks for picnics or family events. The intent of this fee is to offset office administrative costs for recording and processing of permits. I expect that the total revenue from imposition of this fee will be in the $2,500.00 to $3,000.00 range per year (100 to 120 permits). Last year there were approximately 75 + picnic and 30 + field reservations issued. Second would be collection of rental fees at Mendakota Park for the invitational tournaments) sponsored by the MHAA baseball program. All in-house tournaments as well as school or religious groups would retain their current exemption from rental fees and as has been past practice, only pay for requested field preparation or other extras. Rental fees for use of the Mendakota Park facility for invitational tournaments would be approximately $250,00 for a two-day tournament and $350,00 for a three-day event, not including any additional requested services. Due a clerical lapse or misunderstanding these fees have not been collected the past few years. Third would be the lifting of the MHAA exemption of not having to provide a damage deposit(s) for their special events/tournaments. Damage deposits are necessary so that the City can draw from this deposit for extraordinary clean up or trash removal, or when repair of damage to the facility is required. This deposit does not have to be per event but could be collected on a seasonal basis to cover multiple events. All other groups that rent the facility for tournament use provide damage deposits. Recommendation: Review the information provided. Action Required: If the Commission desires to revise the existing policy they should make a recommendation to the City Council. - C h ? N C m wE _ o E w �T a c�dy m � z!4 o O N E CL o Lb" MOO O .cooOn— c -Doti ti NU' �� n s vc �mma omy�N "�i = - - 3 ^ w EL a ooa fOIl o a u c w a V m m � c m i gym' tov o °m v ° �0-m2�m- 0' zm' -mO c Z o v Eu. a yaa`m? 12 O OB a FMm UA a m o c 2'-y w` m x Y O t=�a z �� z°Ou t. Qa ma ad O m co c G U wO A W O'0 N 0.5 _�0 0 U {� \\ � w. A W T •� F 9 m v 'S�o o mm A '0 oOr w ado T �x•o'�oi itl U G b A In io 41 Oo '9 o i.� o �q�'� o oo� .I' 0PJJ nQ ptA7 ,qzqT���° °° •b d' O 6 Ai a° 3 � V ,a� a 3 .a 1 i0 0 y Q 8 'o / i`� N .0 °a s o fi > o o rw fl 24 Ig Utg oVc P4 o IOU 012 0w a a plu a �l R'z Pi z Z 'i Ci m A iL W V 6D w z o m o h m q O .� m a 7 A p O w a is � aw �\ m N w 'O .� � �. .a a�.,.� T � O W'a a `Rj 3: $ � a � h 4 °a' O v O ��w �Q�Wz;� .�Ntn d' V1b m w a a •� 8� A a o N 'O •� T �: °a .� A A as"a o � a .� .� a�� �pp,,� d W Q w �� 2 aim-�-o � v o d v m n � u o m � � ;... >. o m o'�> E ^� o w N 9 G +L+ W >� �.O b.-�_ c m g a3 t6 � N u1 E°.mn �cmv 'o �eEw � m E - E •- m -a• N L N U a � a o. � c � 3vmm 0 o „w-,a o .3 0 0 0 �a m�' `o a�� m ._ c :� m �a�E a ui F 'wo V d N O c 01L U N N w � � E � O w -wo cai�`m Q aU �, N a a O U O C a a m m 0 0 � o a o > m c 0 a m E o � d c cpi - - m C O O O 3 OI d � W G N — m m � � _v m O U �p w U �' ° E v �° o ��� '``o p J o 9 .. m � T � N w � r� O Y O a � d m r rn p � � m m >.a 3 � � � m w v T E E L m � d ma o `" � E � � o m = c m a y a m � o � m o c.wca � m w o a_ E a�0io �' 4= wit N ` V- O � G N � _ A L L N w N 3 .O � Ci � I O a O I N� a.3,a ma Id m I aI 'ov �q .� •� � m � q � �c d ... � I p a � 4 0 s° tn" �o� i p>y v L I, ° � �°�� iv', g i�: w �a �g A�� ,�al� pGni.' .p 'a'v `�. � ❑ O M � � ❑i N F: ::..pp �➢ ..9 � � � � a'. �,� I•� ' � � � •. may, � :� � U ..qq y .o � ;� a O �� �N, i off ww � O� O!WpA N L,a❑ ., H � i T" a � 'gpy t" 'U � 'o I � .p. .yi � N � w y A C4 O '� I� '�: N w 0 H g❑ �4 .o y�yq '9 Q p q Grp. $ �'� ") a q O G G • m yy 1 N .� '�' 4 � .� '% � .apt' o O .i3 a� A �' '��l � .� C 5� .�`"� a� t�' � m d c'`o a A o � o w ❑ q �p ,,qq ,,pp WW AN A N'.qb �r� n H� H U U Ci N a C7 `J: � ��. '� � N 4 > > N c v o a� $'m Y mm o. s MID A as m - °�° +,L dmrn C - v s Y d v w 3 KWdWWJ n O,aM ui cmn u9 wm N O y N U N N L y of 'm �l° \ odd -�>.Tv m E 88 ma o._o vEE i. <n na°.mOm .�°. ° m Ma �o00c � .n..'srWWW u- mg v MIR Mom �cv Yv A�w� E a ci -m vU v 9acciimci wco ww .WWWWW�0 WWWWW�.- c _ a.Z5 Et �� c� nO°� oo'�.vc ��'a EOww'So sM -m�a :E� N'm �WWpW-... 6.yvc w.n v m c va m v �Et=o:E_o o.c ,cod oLv9 N..- oavim3m� WWW,as E2 c3m� m>,w w vmv�o :EQ0 0 0��aa ma v�Emm 'E �p WWWWW,9m �d °_ 6o2, vS v -mom2=o•c Eom o�v mcoaE�3N 0. ��cc `momo`oo v' Q. >, `.'c L Tirn iio v E'o w m o v»-»'-Wn -o y, OE �C° -o .ago on vvv �y: o...12 o..�� hoc -�aWS o,t o'7�5°cnm i°. E.,Jo� �mE �vo�n o.No N� Al oW%WWa vm U y W L N Na 4rWWW w j K� rvyv 6 (o norm WO acv QEa�i '� I-3o ���i Fia 0Wo Q LLI _ U d �T. N d yy N g 0 9 Q q B ci II w I u; d r- L N a m � a U m m N O m C ai m E 0 v m d o `m a�4 Ec 0 m 0 D E m c m O o o 0 a c m a E m m 0 m O K N m c m mm O Imn w N m +m-• 0° -E0Em c a9 0 0 c M o `my aonm o n c> t a o m.0v.0n 0 m YL X D.- aTmrnms� m '- �i3zLmaW' m E w m m N w ty �a Tm j O ° E O m aE`° oEm'ca -a o m c N N m m �Evaz 0 O a N O w ZLLo oEo v9 w m 0x m� N C � d G `aE= m o c a o OY m 0 o F=2 o1O- ou0o�� ° 0 - von u j N N w w w (9 N -_ > 0 0 w v - �mwm m3 EE o.° aQm>°' ma rouI-EE oai mEE aiIv w U O (n�NM m m 3 =- O O 0 0 1D s yr ao o 0c r o0 m � c m N � C m m y� 3 � Z � d w a 0 m d P m C = o 3 0 ar C T � yl 6 m -0 'wEov�m.�mrn iri ,y K v ,°c m ox=moo ccm J E d o ma-c-'3 m (Li 0 Q�ma udZ U � N M U w o= m� �z 0� 0 as N� o� ICI!= N O _ Z y C O 9 u m m � oa m x o m m m 0 oa i n u T'E 10 0 O C N a tL _c n ° o c°io K`o m a ° m m c 0 0 m� 0 oYr m c m a E Oz C9 �p u N m v o W0 O N N ,gym 5 ttl *H •ri rl m F� a ,q w° m w m� " qpo o qq H N 1I H .i a �y9� N •rl tJ� roOC°WH o m �okmo°" dW�NWS+ ° ma a N' U P4 v M x0,wo u�oa ��p N m� •p �`' i qqp{ 'O�A�tlWWb 1�pIE1iJ1,Iyal i AWON�'�F+ [0 It• {gm0I�Q�• �td� fA r°J 'm❑�•�pm{i u Al UHVqNr UOQ° NWU Ht 43 Ho x ON Wu°b"°°ro @b NQOTO 1P 8 AIn .i qW O a14 q tlN rd *Sri, w�i u ow &rod �° `a ° ° °P4 0� • N N bi.,1 •COI •rmi w' o pig ' bi W m 4° Ary .{A� mm 1tl p b ei 'i L,.rri W y, U N 0 ' O H H aw°oW' ab WWO WO•.ipp ' 1Aa wA gO;l � t m a o dm`mm m c ca.o N X OL`• �, N w N w n Q m a o m O y o "WEE aO Ty° ca'�—m "m 'a m o. mo .c �aU=a oc"c E='oo E m"m mv'om a u° W O N E c r a E x d N U n7�5 O.'O C N m a c '> Q m m 0 w m 0 0 E d O) O) -C M m m- f0 m as _ M. N N L O U .3y.3s 3a c« c¢ N m o 0 o c o mom E m o �poo_= 0Nxd��om ow a (0 N C mmE�c @m .ojw'-m mzv o�mmaaiparn wmccw mmL Sa�m` c awi m `omw a c o 0i.a°13a cn Ud��c N.c dU °mwm m ° a o U N N U N NL m" L E a N m t-amm Fm�£amwo Op �' to •p G W m w O ' 8. W ° O O O op o 24 14 � U jj ° P o tElo w o rg Igp �3 m :a Q p o A Do P q O U •O A '� •y .,end ? 'O •� m E .0N0ryryry b°n ga ! en •" o.4 ^E y°n •� � au'� '�°� �36 'gym �Lx �� M N rn 0 c $ a o Z OF E.. y '� 0 mca I.m .cc va m o u) .y w rn O E > .�• rn'3 0 .E o ~ m m O E c c C m M "It o wE O N S �� o m « m J= a w c a c° rn d c° c a N m vo a o O u T.10c E O o O> N Jo �° I. w o v c's 9 m E `p_ O O O M 0 T Q c 0 n o 0 a� > ,,A, 0 N E a c y 0 r. o= m O m N N V C w d d O a E— E J o W v O y W 0 n C L> d m `-''E c O E'c 0 d c `m O'm >`�°„`'= 0 a'�- u o, ° m'm� >p m=m- cmmU �c TOOT do'c oo ��SE LG ° OY rnmpc= a o .o Toa0 0c w a co 10 N O w U N 'C �" 0 0_' - O !' N ,:: C l0 0 of w=W=3 0M cdw" cN0Mn E�-°om m as=_ om�cm 'E n� co O`o?a� c.E o°`oc m=OO cK > c'ti? 3 c E c.`c 'w E E d �y m m N N aatq m m E c� aai oEP�>'NVU n0>i >cm o M'=L av 46 ar m0 �m WII— Ina oNo *moJ=•� m`m3�-� Q o q0_ 9CQ0 N00CM N 0'a 1w 0 > y0md'JO U0' : N0 JOA a c w m o =o. o-m° °'c 1. '0 J 3 0, a c c=.O rn' c w me MM mm m'O mE awQ m0 0 w._ m•_•-o„ mo �O�ym«_Ec cm �. O;°om o,Sano 0SE2 o. wm mmOM �2amy3cnme— ESE _=s .so .30 Oc �t �000= w °o c 2 m o O w o m w 3 E _= d O > c o w 02 JO0" U OLOOOOw '0 y0 Oy.GJ.O L�NS!n'�O DOO G m Z c'- Jt ucio= Z �c.00ma EO m?� O°ia °"m ma2iomEO '3 .vo m>. `o >,a o_ oIV $ °• ai .0 9 C d 0 �` E d a m .Z w 2 w E E a O a n� "->' O m a m 00 a=Qd rn mmmLNENa Icu° .0aorn� �00O2oa came waai � y a 5 .d LL ,�; w -- d N ._. 0 � O a L° m E rn._ 6 a` = L2 a`, a coi >'mrn = rnosOwmm Voa a�wo° �r >.ocsO r`m 0w N h 0 L 'N '� N m 0) 0 ,a° n 0 R 0 '- 0 O C w O I- - H F JO 0, O c ii u)..20 A .._S mz ma m� 1- no. 1-� TO..=.. U` m .o ci u_ m no_$ ri a�b City of Mendota Heights MEMORANDUM January 8, 2004 Memo to: Parks &Recreation Commission From: Guy Kullander, Parks Project Manager Subject: Trail Planning Background: At the November meeting the Commission suggested that Trail Planning be a future agenda item. The 2004 City Budget does not provide direct funding for Park Planning but within the Public Works Budget for Parks there are funds available for "Professional Fees -Engineering". This line item, based on previous year's expenditures, was established to compensate the Engineering Department for time spent on park projects, preparation of park improvement feasibility studies, or staff time attending Commission meetings. 9iscussion: Without a defined goal or project I am reluctant to expend too much time on this topic. I keep abreast of upcoming planning issues within the City and will update the Commission when there are possible trail connections or links that could be part of any future project. Recommendation: If the Commission has a specific trail project or goal in mind pass a motion directing me to prepare a feasibility study for consideration at a future Commission meeting. City of Mendota Heights January 8, 2004 Memo to: Parks and Recreation Commission From: Guy Kullander, Parks Project Manager Subject: Grant Programs Available Background: From time to time the Commission has requested staff to keep abreast of possible funding grant opportunities that may be applicable to a current or future City project. The following recent projects received outside funding support: 1. DNR installation of fishing pier at Roger's Lake Park - $20,000 2. DNR installation of permanent lift station for aerator in Roger's Lake - $35,000 3. DNR shoreline restoration project in Roger's Lake Park - $8,000 4. DNR Metro Greenway Planning Grant for development of a Natural Resources Management Plan for Mendota Heights - $101000 5. Private donation from Cliff Timm for Roger's Lake culvert project - $50,000 Attached is a request for proposal recently forwarded to me by Commissioner LinnellI Discussion: The City Council declined to include funding in the 2004 City Budget for Park Planning efforts. Without support from the City Council or some community group(s) I do not believe that funding to support an in-house or outside planning effort would be authorized by the Council. Recommendation: If the Commission has a particular projects) they would like to see developed they should direct staff to prepare a feasibility study for consideration at a future Commission meeting. Legislative Commission on Minnesota Resources December 2003 REQUEST FOR PROPOSALS FUNDING BEGINNING: JULY 1, 2005 DEADLINE TO SUBMIT: FEBRUARY 20, 2004 FIRM DEADLINE: POSTMARKED BY OR RECEIVED AT THE LCMR OFFICE BY 4:30 P.M. Background Information........... Pg. 2 2005 Funding Priorities ........... Pg. 3 Matching Grant Programs .......... Pg. 4-5 Continuation Projects ............. Pg. 5 Evaluation Criteria..... I ..........Pg. 6 Submission Requirements .........Pg. 7 Proposal Format. . . ............ w . Pg. 6-9 Eligible & Non -eligible Costs ........ Pg, 10 Process Timeline... w . w ........... Pg. 11 MS 116P Trust Fund Expenditures ... Pg. 12 The LCMR has identified the following funding priorities for the 2006-2007 biennium. . Water . Habitat . Energy . State Parks, Recreation Areas, Trails and other enhancements to the State Outdoor Recreation System . Matching Grant Programs . Continuation Projects f` FUNDING SOURCES: MN Environment & Natural Resources Trust Fund - $30 million Great Lakes Protection Account —to be determined Land &Water Conservation Fund (LAWCON) - $1.6 million **all dollar amounts are estimates** Page 2 BACKGROUND INFORMATION LCMR MEMBERS SENATORS Jim Vickerman, Chair Ellen Anderson D. Scott Dibble Dennis Frederickson Linda Higgins Pat Pariseau Carrie Ruud Dallas Sams David Tomassom Charles Wiger REPRESENTATIVES Lyndon Carlson Doug Fuller Tom Hackbarth Larry Howes Phyllis Kahn Jim Knoblach Mark Olson Joe Opatz Dennis Ozment Kathy Tingelstad Membership as of December 2003 DEADLINE FOR SUBMISSION: February 20, 2004 at 4:30 p.m. This is a firm deadline. Hard copies must be postmarked by or received at the LCMR office by 4:30 p.m. FINAL PROPOSALS MUST BE SUBMITTED IN HARD COPY. Final proposals sent by e-mail or fax cannot be accepted. SUBMIT PROPOSALS TO: Legislative Commission on MN Resources Room 65, State Office Building 100 Rev. Dr. Martin Luther King Jr. Blvd. St, Paul, MN 55155 ELIGIBILITY —OPEN TO EVERYONE: Application is open to everyone, as long as there is a demonstrated public benefit. The LCMR is an ADA/equal opportunity employer. The spirit and intent of the LCMR is to provide access to EVERYONE who has innovative ideas for environmental and natural resource projects with a distinct public benefit which reflect the Commission's adopted Funding Priorities. No grant -making or lobbying assistance is necessary for success. The R LCMstaff will assist in proposal development. For a complete list of eligible and non - eligible costs see page 10. PROJECT IMPLEMENTATION: Projects are intended for atwo-year duration (July 2005 to June 2007), however, LCMR will consider requests for multiple biennium funding. PROPOSAL ASSISTANCE: LCMR staff are available to assist proposers and answer questions or review draft proposals. If you would like proposal development assistance, staff can assist you by phone, e-mail, fax or by appointment. Phone:(651)296-2406 Fax:(651)296-1321 e-mail: Icmr@commissions.leg. state.mn.us FUNDING BACKGROUND: Funding Priorities are reviewed and adopted every two years. The priorities are for projects to begin July 2005. The order of the Funding Priorities does not reflect any prioritization. Although other proposals may be considered, adopted priorities will be given first consideration. The priorities apply to all funding sources. Proposers are requested to respond to a funding priority not a funding source. Reinvest in Minnesota: RIM related activities are eligible and may be recommended for funding by the LCMR. (M.S. 84.95) If land acquisition is part of the priority it includes both conservation easements and purchase of development rights. LCMR Page 3 2005 FUNDING PRIORITIES The LCMR has identified the following funding priorities for seeking proposals for the 2006-2007 biennium. WATER CITIZEN "u Improve the quality and/or quantity of ground and surface ADVISORY waters. COMMITTEE (CAC) for the Trust Fund HABITAT A the Governor Acquire, restore or protect fish, wildlife and native plant PPointedb r habitat. District 1 & At Large John Kvasnicka ENERGY District 2 Develop and promote efficient energy resources which are Nalani Mccutcheon a clean, renewable and/or innovative. District 3 Janet McMillan District 4 t STATE PARKS, RECREATION Greta Hesse Gauthier AREAS TRAILS AND OTHER District ®f' ENHANCEMENTS TO THE STATE Nancy Gibson, Chair e OUTDOOR RECREATION SYSTEM James Nelson (AS DEFINED IN MS 86A.04) District 5&At Large David Hartwell District 6 MATCHING GRANT PROGRAMS Catherine Thayer Nicholson The LCMR intends to recommend money to support the four District 7 matching grant programs: 1) Local Initiative Grants Kristin Eggerling Program, 2) Local &Regional Trails, 3) Metropolitan Regional Parks & Trails, and 4) Local Water Management District 8 Matching Challenge Grants, listed on page 4 & 5. Submit Ann Glumac to the identified program, not the LCMR. Vacancy If interested in serving on the CAC contact the Secretary of State's Office, Open Appoint- �1° C. O N T I N U A T I O N PROJECTS ments, at 651-2e6-5845 or i wwwsos.state.mn.us/ In an effort to continue the work started by LCMR funding, consideration will be given to the list of projects listed on Membership as of pg. 5. December 2003 Page 4 MATCHING GRANT PROGRAMS If your proposal fits one of the grant programs listed, DO NOT submit a proposal to the LCMR. The LCMR intends to recommend money to these programs. Directly contact the individuals listed for grant proposal format and information. The format on pages 8 & 9 is not applicable to these programs. 1) LOCAL INITIATIVES GRANTS PROGRAM The LCMR intends to recommend money to support the matching grants program in the Department of Natural Resources (DNR) for Local Initiative Grants for the following types of projects: Outdoor Recreation Matching Grant Program (for counties, cities and townships) for acquisition, development and/or redevelopment costs of local parks and recreation areas. Regional Park Matching Grant Program (for cities, counties, townships located outside the seven county metropolitan area) for acquisition, development and/or redevelopment costs of regional parks. Natural and Scenic Area Matching Grant Program (for cities, counties, townships and school districts) for acquisition of natural and scenic areas (up to $500,000). Conservation Partners Matching Grant Program (for private/nonprofit organizations and local governments, including cooperative projects involving local governments) provides assistance (up to $20,000) for projects that enhance fish, wildlife and native plant habitat or for research or survey projects related to habitat enhancement. Environmental Partnerships Matching Grant Program (for private/nonprofit organizations) to help carry out a variety of projects to help protect and enhance our natural environment (up to $20,000). For further information about the Local Initiative Grants Program and submitting a proposal contact: Wayne Sames, (651) 296-1567, or e-mail: wayne.sames@dnr.state.mn.us Do not submit proposals to the LCMR, submit directly to the Local Initiative Grants Program. 2�xt C AND REGIONAL TRAILS The LCMR intends to recommend money to support the Local and Regional Trails program during the biennium beginning July 2005. Local Trail Connections Matching Grant Program (for cities, counties and townships) to develop trail connections between communities and existing park and trail facilities (up to $100,000). Regional Trail Matching Grant Program (for es, counties and townships) to develop new long distance trails of regional significance (up to $250,000). For further information about the Local and Regional Trails Grants and submitting a proposal contact: Tim Mitchell, (651) 297-1718, or e-mail: .mitchell@dnr.state.mn.us Do not submit proposals to the LCMR, submit directly to the Local and Regional Trails program. METROPOLITAN REGIONAL PARKS AND TRAILS The LCMR intends to recommend money to support Metropolitan Parks and Trails programs during the biennium beginning July 2005. Projects eligible for funding through the Metropolitan Parks and Open Space program will only be considered as part of the Metropolitan Council's 2004-2009 Regional Parks Capital Improvement Program (CIP). For information about the 2004-2009 Regional Parks Capital Improvement Program, please contact: Arne Stefferud, (651) 602-1360 or e-mail: ame.stefferud@metc.state.mn.us Do not submit proposals to the LCMR, submit directly to the Metropolitan Council and Parks Open Space Commission Capital Improvement (CIP) Program. 439 LOCAL WATER MANAGEMENT MATCHING CHALLENGE GRANT The LCMR intends to recommend money to support the implementation of priority activities identified in state approved local water management plans via the Board of Water and Soil Resources Local Water Management Challenge Grant Program during the biennium beginning July 2005. Eligible applicants are counties, watershed management organizations, watershed districts and soil and water conservation districts that have been delegated under the M.S. 103B.301 local water management program. Potentially fundable implementation categories and some example activities include: Land and Water Treatment includes activities applied to the land or a water resource such as erosion control structures, shoreline protection measures, in - lake restoration projects. Planning and Environmental Controls includes the development of lake management plans, official controls relating to water, linking comprehensive plans to land use plans. Monitoring and Modeling includes activities such as citizen monitoring networks, modeling ground water flow or surface water runoff. Inventory and Mapping includes conducting detailed inventories of drainage systems, wetlands or feedlots. Education and Information includes workshops and seminars. For further information about the Local Water Management Challenge Grant Program and submitting a proposal contact: Marybeth Block, (651) 297-7965, or e-mail: marybeth.block@bwsr. state.mn.us Do not submit proposals to the LCMR, submit directly to the Local Water Planning Challenge Grant Program. Page 5 CONTINUATION PROJECTS Continued from page 3 .. . To be considered, the following Continuation Projects proposals must be submitted and meet all application requirements. The continuation project proposals will be evaluated according to the same criteria as all other proposal submissions. These projects include: ML 2003, Ch. 128. Art. 1, Sec. 9, Subd. • 5(h) Developing Pheromones for Use in Carp Control • 5(i) Biological Control of European Buckthorn & Spotted Knapweed • 6(f) Gitchi-Gami State Trail • 6(h) Mesabi Trail • 7(b) Accelerating & Enhancing Surface Water Monitoring for Lakes & Streams- Results 1 & 2 • 8(a) Minnesota County Biological Survey • 8(b) Updating Outmoded Soil Survey ML 2001. 1st Snecial Session. Ch. 2, Sec. 14. Subd • 8(a) Evaluating Timber Harvesting and Forest Management Guidelines Page 6 EVALUATION CRITERIA • LCMR members will review ALL of the proposals for consideration. • No proposals will be eliminated by the LCMR staff or the Citizen Advisory Committee (CAC). • LCMR staff will sort all proposals by Funding Priorities and rank them according to the Criteria for use by the LCMR & CAC members during their initial selection process. • Trust Fund expenditures must conform to the Trust Fund law (MS 116P.08— see back page) • All projects are subject to additional proposal requirements: accessibility, data availability, land acquisition, and recyclable material requirements. Information located at www.lcmr.leg.mn Project Managers and partners must be accountable and able to complete project objectives. The criteria will be applied as one part of the proposal evaluation and recommendation process. The total potential score for each criterion is written in parentheses. All points will be awarded on a sliding scale. (up to 50 points total) • Long-term Impact (up to 10 pts) • Demonstrated Outcomes (up to 10 pts) • Project Readiness (up to 7.5 pts) • Innovation (up to 7.5 pts) • Statewide/Regional Significance (up to 5 pts) • Partnerships (up to 5 pts) • Leverage Other Funds &Resources (up to 5 pts) Total possible points (up to 50 pts) LCMR Page 7 SUBMISSION REQUIREMENTS Please Submit: 4 Items - 3 Copies of Each 1) Proposal - 3 page limit. 2) Map - showing project site(s) - "The format is designed to 1 page limit, black & white. be simple and does not 3) Project Manager Qualifications require pro and Organization Description - 1 grantsma page limit. 4) Letter or Resolution - For non -profits and local units of government (state/federal agencies and universities are excluded) submit a letter or resolution authorizing proposal submission. fessional king. " 1) Proposal-3 page limit • Send 3 copies of proposal (maximum of three 8 1/2 x 11 sheets - single sided). • Leave a blank one inch margin at the bottom. • The proposal must be in the format explained on pages 8-9 and is limited to three single sided pages. • Minimum font -type size is 12. This page is typeset on 12 points. • Project title should be clearly marked on the top of each page. • Plastic covers, plastic bindings, and staples will NOT be accepted. • The proposal format is designed to provide concise information. It begins with a brief project summary of intended results, followed by a description of specific project results and budgets associated with completion of the activities of the project. • Proposal Template: A template of the proposal format is available on the LCMR web page at: http://www.lcmr.leg.mn 2) Map Send 3 copies of a map (maximum of one 8 1/2 x 11 sheet - single sided). Should be easy to duplicate. NO COLOR MAPS. Be site specific to the project. Maps should be clearly legible, with enough orientation to bring a reader to a quick understanding of the location of the project within the city, county, region and/or state. 3) Project Manager Qualifications & Organization Description Send 3 copies of Project Manager Qualifications and Organization Description (maximum of one 8 1/2 x 11 sheet - single sided). In this document include the project manager description 01 qualifications and responsibilities pertaining to this specific project proposal. It does not need to be a complete resume. The organization description should be a simple, brief explanation of the organization and its mission. One to two sentences. e.g. Local Government Unit, 501 (c)(3) etc. 4) Letter or Resolution (if applicable) Send 3 copies of the letter or resolution. For non- profits and local units of government send a letter or resolution authorizing proposal submission from their governing board. State / federal agencies and universities are excluded from submitting this. LCMR staff are available to assist proposers, answer questions and review draft proposals. PROPOSAL FORMAT (3 PAGE LIMIT) LCMR Proposal 2005 (repeat this phrase in the upper let hand corner) Title: (limit 8 words) -repeat on the top ofeach page submitted, including submissions ofmap and of project manager qualifications and organization description. Total Biennial Project Budget: (requested f•om LCMR) $ Other Funds (explain in IV. B.) Priority: (state the title of the funding priority responding to, e.g. Water) Manager: (One name only. Note: list team members under IV. A. Project Partners) Affiliation: Mailing Address: Telephone Number: (be sure to provide a reliable phone number in case of questions) E-Mail: (if available) Fax: (if available) Web Address: (if available) Location: (Where will the work impact? Be as specific as possible e.g. county, city, township, stream or lake name, and map coordinates.) I. PROJECT SUMMARY AND RESULTS: The summary is LIMITED TO 30 WORDS and must be a fee standing summation of the project. Be specific. Provide a clear, concise summary of the proposed project and its results. It is important that the summary be able to stand on its own as a description of the proposal because it will be used with the project title as the project description during the proposal review. II. DESCRIPTION OF PROJECT RESULTS: Begin this section with a brief explanation as to WHY this project needs to be done and the specific outcomes of the project. Break the project into specific results. Indicate the budget for each result. FOR EXAMPLE: Result I "Title of Activity" Budget: $Assign a lump sum cost (budget) to each discrete result. Give a detailed description of the activity you are proposing to do and the outcomes. Be specific. For example, indicate miles of trail acquired and developed, acres impacted, number ofpeople reached. Further breakdown the Result budget dollar amount into these categories. ONLY LIST THE CATEGORIES THAT APPLYTO THE RESULT LISTED: Personnel: $ Equipment: $ Development: $ Acquisition: $ Other (Spec): $ LCMR PROPOSAL FORMAT Result 2 "Title QfActivity" Budget: $Assign a lump sum cost (budget) to each discrete result. Give a detailed description of the activity you are proposing to do and the outcomes. Be specific. For example, indicate miles of trail acquired and developed, acres impacted, number of people reached. Further break down the Result budget dollar amount into these categories. ONLY LIST THE CATEGORIES THATAPPLY TO THE RESULT LISTED: Personnel : $ Equipment: $ Development: $ Acquisition: $ Other: (Spec) $ ADD ADDITIONAL RESULTS AS NEEDED: SAME FORMAT AS ABOVE III. TOTAL PROJECT REQUEST BUDGET: (In this section describe the details ofyaur budget. The budget for each result above will be a summary.) All Results: Personnel: $ (who is getting paid to do what, their % of full time employment for the project period) All Results: Equipment: $ (what equipment, to be rented or purchased — a general description and cost) All Results: Development: $ (improvement to land or building) All Results: Acquisition: $ (how many acres, also who will hold the title to the land) All Results: Other: $ (Describe the specific activity and cost): TOTAL BUDGET: $ (requested from LCMR) IV. OTHER FUNDS &PARTNERS: A. Project Partners: Ifthe project has cooperators (project team), list rxames and agency/entity affiliate. Specifically state the dollar amount each cooperator will receive fi•om the dollars requested in this proposal. B. Other Funds being Spent during the Project Period: What additional money will be spent on the project during the fundingperiod, cash or inkind? State the source of the other funds. C. Past Spending: List the money spent or to be spent on this specific project, cash or inkind for the 2-year time frame prior to July 1, 2005. D. Time: If the proposed project will exceed two years, explain completely the additional time and funding requirements. Page 10 ELIGIBLE & NON -ELIGIBLE COSTS ELIGIBLE COSTS Eligible costs aze those costs drectly incurred through Project activities that are solely related to and necessary for producing the work products described in the approved Work Program during the appropriation period. All dollars are awarded on a reimbursement basis, unless specifically authorized. Eligible costs may include the following and are eligible only if specified in the approved Attachment A of the Work Program. Eligible costs must be documented as specified in the Reimbursement Manual available from the authorized contract person for the State: Expenditures incurred only after the effective date is the approved Work Program. No expenditures will be allowed after June 30, 2007 unless approved by specific law; Capital expenditures for facilities, equipment & other capital assets as expressly approved in the Work Program. For expenditures greater than $3,500, the Recipient must include in the Work Program an explanation as to how all the equipment purchased with the appropriation will continue to be used for the same program through its useful life, or, if the use changes, a commitment to pay back to the Environment & Natural Resources Trust Fund an amount equal to either the cash value received or a residual value approved by the director of the LCMR if it is not sold; c. Computers, if unique to the project and specifically approved m the work program; d. Materials and supplies specific to the project and incoming freight charges for them; e. Publication & printing costs (including the process of composition, plate -making, press work, & binding & the end products produced) necessary for contract administration; work products production; &biennial reports relating to work program accomplishments; f. Transportation &travel expenses such as lodging, meals, & mileage of personnel involved in the Project in the same manner and in no greater amount than provided for in the current "Commissioner's Plan" promulgated by the Commissioner of Employee Relations and as provided by LCMR or, for University of Minnesota (U of M) projects, the University of Minnesota plan found at http://www.fpd.fmop.umn.edu/groups/ppd/doc=ents/ policy/travel.cfin. Allowable meal & lodging expenses are for employees only. Purchasing meals for others is not an allowable expense. All out of state travel must be explicitly approved in the Work Program; Wages &expenses of salaried Recipient employees if specified and documented in the Work Program. For State Agencies: use of unclassified staff only OR request approval for the use of classified staff accompanied by an explanation of how the agency will backfill that part of the classified staff salary proposed to be paid for with this appropriation. This is subject to specific discussion and approval by LCMR; Fringe benefit costs limited to salary, FICA/Medicme, retirement, and health insurance of Recipient's employees if specified in the Work Program; Professional services specified in the approved Work Program that are rendered by individuals or organizations not a part of the Recipient; j. Eligible expenditures incurred after the effective date of the approved Work Program and before the effective date of their Agreement. NON -ELIGIBLE COSTS Non -eligible costs for reimbursement mean all costs not defined as eligible costs, including but not limited to the following: a. Any costs incurred before the project is authorized, 7uly 1, 2005 or Work Program approval; whichever is later; b. Fund raising; c. Taxes, except sales tax on goods and services; d. Insurance, except title insurance; e. Attorney fees, except for acquisition and clearing title to land; f. Loans, grants, or subsidies to persons or entities for development; g. Bad debts, late payment fees, finance charges or contingency funds; Interest, Investment management fees; h. Lobbyists, Political contributions; i. Memberships (including subscriptions and dues); j. Indirect costs, such as office maintenance, office utility costs, refreshments for staff, decorations, office material & supplies; k. Directors or officers salary; I. Office rental fees (including storage space rental); m. Publications & periodicals; n. Merit awards and bonuses; o. Employee worksite parking; p. Entertainment; Gifts and prizes; Food and refreshments; q. Audio visual equipment; r. Advertising costs; s. Communication costs incurred for telephone calls, postage, and similar services. Purchase of communication devices such as pagers, cell phones, personal data assistants (PDAs); t. Computers (unless unique to the project & specifically approved in the work program). LCMR §��M0 • 101 AUGUST-OCTOBER "� • Resource Evaluation and state-wide site visits. • Citizen Input Forum on Natural Resource funding priorities on web site. Over 475 responses were received. • LCMR Commission & Citizen Advisory Committee joint Strategic Planning Seminar on priorities & criteria for Trust Fund expenditures • Citizen Advisory Committee develop a draft strategic plan for the Trust Fund as advice to the LCMR. NOVEMBER • The CAC presented recommended draft Strategic Plan for the Trust Fund to the LCMR Commission DECEMBER • LCMR adopted Strategic Plan & RFP for the Trust Fund • The Request for Proposals (RFP) is issued electronically mid -December. RFP mailed end of December. 2004 FEBRUARY February 20, 2004 at 4:30 p.m. This is a firm deadline. Hard copies must be postmarked by or received at the LCMR office by 4:30 p.m. Faxed or e-mailed proposal will not be accepted. MARCH—APRIL • Staff and outside review ofproposals—criteria applied and proposals scored and ranked. Page 11 PROCESS TIMELINE MAY • The CAC determine advice to the LCMR for proposals to be asked in for a presentation. • LCMR initial review of proposals received. • LCMR selects proposals for further review to be asked in for presentations. All proposers will be notified (first cut) whether or not they have been selected for further review. JUNE - JULx • Presentations on proposals selected for further review • After presentations, CAC meets to determine advice to the LCMR for Trust Fund funding. • LCMR meets to determine final recommendations to the 2005 Legislature. • Revised proposals are due to the LCMR on recommended projects. OCTOBER—NOVEMBER • Research projects are reviewed by an outside scientific peer review panel. 2005 JANUARY • LCMR recommendations presented to the Legislature FEBRUARY - APRIL Legislative review and appropriation. • MAY —TUNE • Final legislative actions on proposals, signed by governor • LCMR meets to adopt work programs DULY • July 2005—June 2007: Project Implementation. LCMR Staff* MS 116P.08 TRUST FUND John Velin, Director Susan Thornton Susan Von Mosch Sandy Smith Information from this document may be copied and distributed to others. This publication can be made available in alternate formats, such as large print or cassette tape, upon request. Any suggestions or questions can be sent to the address below. Phone: 651-296-2406 TTY: 651-296-9896 OR 1-800-657-3550 Fax: 651-296-1321 Email: Ican@commissions.leg.statema.us Web Address: www.lcmr.leg.mn EXPENDITURES; EXCEPTIONS. . Subdivision 1. Expenditures. Money in the (7) administmtive and investment expenses trust fund may be spent ONLY for: incurred by the state board of investment in investing deposits to the trust fund; (1) the reinvest in Minnesota program as and provided in section 84.95, subdivision 2; (2) research that contributes to increasing the (3) collection and analysis of information that assists in developing the state's envi- ronmental and natural resources policies; (4) enhancement of public education, aware- ness, and understanding necessary for the protection, conservation, restoration, and enhancement of air, land, water, forests, fish, wildlife, and other natural resources; (5) capital projects for the preservation and protection of unique natural resources; (6) activities that preserve or enhance fish, wildlife, land, air, water, and other natu- ral resources that otherwise may be sub- stantially impaired or destroyed in any area of the state; (8) administrative expenses subject to the Subdivision 2. Exceptions. Money from the trust fund may not be spent for: (1) purposes of enduonmental compensation and liability under chapter I I5B and re- sponse action under chapter 115C; (2) purposes of municipal water pollution control under the authority of chapters 115 and 116; (3) costs associated with the decommission- ing of nuclear power plants; (4) hazardous waste disposal facilities; (5) solid waste disposal facilities; or (6) projects or purposes inconsistent with the strategic plan. Legislative Commission on Minnesota Resources 100 Rev. Dr. Martin Luther ICin9 7r. Btvd. Rm. 65 - State Office Building .Paul, MN 55155 PRSRT FI RST CLASS US POSTAGE PAID Permit No. 8314 Saint Paul, MN This document was printed on 100% post consumer recycled paper. City of Mendota Heights MEMORANDUM January 8, 2004 Memo to: Park &Recreation Commission �% From: Guy Kullander, Parks Project Manager Subject: Buckthorn Removal Background: At the request of the Commission the City Council included $7,000.00 in the 2004 City Budget for control of Buckthorn and other invasive plants. Discussion: The City Council approved a contract with Prairie Restorations to remove buckthorn from Hagstrom-King Park and a portion of the Copperfield Ponds area (see attached memo). Removal of buckthorn utilizing the slash and cut method is scheduled for Monday, Wednesday and Thursday (January 12in 14tn and 15tn) weather permitting. This memo is for information onl City of Mendota Heights MEMORANDUM December 31, 2003 Memo to: Mayor, Council Members, and City Administrator From: Guy Kullander, Parks Project Manager Subject: Approve Contract for Buckthorn Control/Management Background: The City Council has designated eradication and control of Buckthorn from City parks and property as a "high priority" and established a budget of $7,000.00 in 2004 to begin this effort. Buckthorn is an invasive plant that grows quickly, spreads rapidly, and chokes out native plants. Effective programs to rid an area of buckthorn can take from five to seven years with the majority of the effort required expended in the first year followed by periodic oversight and treatments for several years to prevent re-establishment of the plants. Discussion: I met with Prairie Restorations, Inc. (a firm engaged by the City since 1992 to manage the native plantings at Ivy Pond and more recently Kensington Pond and Roger's Lake beach area) to discuss various proven control measures that we can pursue to begin managing, what will be a multi -year task, control of Buckthorn in City parks. Uprooting of plants disturbs the soil bringing dormant seed to the surface that then germinates. Burning, although effective, is often times not acceptable in residential areas. Cutting and treatment with herbicides is very cost effective and is most often done from October thru February, depending on snow cover. Once cut there are several options available. The total plant can be left in place to decompose (cheapest method), the branches and trunk(s) can be cut into small pieces and left to decompose (cost effective), the plants can be cut and hauled away (very labor intensive -costly), or the plants can be cut and burned on site (less costly then hauling, but the issue of burning comes into play). All cut methods include specific herbicide treatment of the cut trunk which is left a couple of inches above the ground followed by a broadcast herbicide in the spring to control newly germinating plants. With a working budget of $5,000,00 Prairie Restorations estimates that they could completely clear all of Hagstrom-King Park and a part of the Copperfield Ponds area, or if the Copperfield Ponds area is the first priority they estimate that a majority of the pond area can be done within that budget. COPY If approved, work would begin in mid -January if conditions (snow cover) allow. A letter informing homeowners in the vicinity of the proposed operation(s) describing this work effort plus information on Buckthorn control will be sent before cutting begins. Recommendation: I recommend that the City Council authorize staff to issue a Purchase Order to Prairie Restorations, Inc. for a time and materials contract, not to exceed $5,000.00, for removal of Buckthorn plants in Hagstrom-King Park and Copperfield Pond area, utilizing the "slash -and -cut' method (plants cut into small pieces and left in place to decompose). Cut stems will be treated with herbicide as they are cut. A follow up contract, next spring/summer for a "broadcast herbicide application" of the same area will be under a future purchase order/contract. Action Required: If the City Council desires to begin removal and control of Buckthorn in Hagstrom-King Park and/or Copperfield Pond area they should authorize staff to issue a Purchase Order with a not to exceed budget of $5,000,00 to Prairie Restorations. \} 0 � § a /IL _ \� ,AY § 2 0 � / & � may(. d®� � \� � Y PONDS CITY OF MENDOTA HEIGHTS Copperfield Ponds v DARSOW POND POND December 2003 C18 • Sunday DECEMBER 28, 2003 iww.startrlbunexc M/outdoors * S'�arTribune The main thing is ill can make for better fishing. That's what pleases me." —Cliff Timm, West St PaulK Cliff Timm to fish. Always has. Now the 84-year-old West St. Paul man is contributing his dollars to ensure that other anglers find good fishing for years to come. By Jon Lentr Special to the Star Tribune hen Cliff Timm was grow- VVing up on a farm in south- ern Minnesota, he would fish every chance he got. With nothing more than a wil- low pole, a piece, of string, a safety in and some worms, he'd ramble off to a nearby lake or the Minneso- ta River to catch sunfish. "I just loved to fish," Timm, 84, said. "I'd get up early in the morning with my flashlight —it'd be dark yet — and go down on the dock By the time they rung the bell [for break- fast] at 7 a.m., I'd have 70 or 80 sun- fish. It'd be one right after another." "Sometimes when I was sup- posed to be hoeing corn I'd sneak off down by the river," he added with unrepentant cheerfulness. A longtime resident of West St. Paul, Timm earned a reputation as a supporter of metro, area, fishing projects. His thin, slightly hunched figure is familiar at metro area city council meetings and legislative sessions, where he relentlessly pro- motes fish -feeding programs, geese control, and water preserva- tionprojects. He donates tens oI thousands of dol- 1 is for piers, aera- tors and pond -relat- ed research — in- cluding about $70,000 already this year. And when he has time, usually at least once a week, he still does some fishing. "The main thing is if I can make for better fishing," MENDOTA HEIGHTS POLICE DEPARTMENT INCIDENT SUMMARIES - PARKS 4: 03003806 OFFENSE/INCIDENT: Suspicious Occupied Vehicle DATE: 11/08/2001 13:01:Ot OFFICER: Lambert,B 2234 LOCATION: Valley Park 01-07-2004 SYNOPSIS: Responded to area on suspicious occupied vehicle. A Budget moving van, driven by an adult Asian male, was parked in Valley park lot. Two other vehicles were also parked in lot. Party was reading the newspaper. Nothing suspicious seen and officer cleared. CN: 03003809 OFFENSE/INCIDENT: Theft from Vehicle DATE: 11/08/2003 14:18:0 OFFICER: Lambert, B 2234 LOCATION: Scenic Overlook SYNOPSIS: Registered owner of MN lie. JSNI68, Crawford, reported damage to/theft from his vehicle. The vehicle was parked, secured, in Scenic Overlook parking lot at 1230 hours. Crawford jogged the trails for one hour. When he returned to the vehicle, he found the rear driver's side, side window. broken out. Both front doors were unlocked and property was taken. A Treo 300 Pahn Pilot/cellphone was removed from a small black carrying case. The $500 item is described as being 3"X5"X3/4" thick and grey in color. The phone number for the Sprint cellular phone feature is (612) 964-7493. Sprint has been notified. Crawford's ID, credit cards and cash were also in the black carrying case. That property was left behind. Numerous, unsecured, bank account information was stored on the Palm Pilot. He was advised to contact all related banks about the theft. Serial number is pending. There are no leads at this time. .: 03004121 OFFENSE/INCIDENT: Bench in Roadway DATE: 12/02/2003 19:21:0• OFFICER: Rosse, T 2237 LOCATION: Marie Park SYNOPSIS: Responded to the above address where I located a picnic bench clear of roadway. P WG notified via day officers.