Res 1991 - 80 Ordering Preparation of Feasibility Report for Ivy Falls Creek Phase II Construfction & Preparation of a Proposal for Implementation of a Storm Water Utility Program (Improvement No. 91, Project No. 7)City of Mendota Heights
Dakota County, Minnesota
RESOLx➢TION NO. 91- 8 �
RESOL�i°rION ORDERING PREPARATION OF FEASIBILITY
REPOR°r' I�OR IVY FALIS CREEK PHA.SE II CONSZ°RIIC'T'ION
AND PREP�TION OF A PROPOSAL FOR IMPT�'�ATION
OF A STORM WATER IITILITY PROGRAI�I
( IlKP'ROVffi�NT NO. 91, PRO�TECT NO. 7)
�REAS, numerous erosion problems have occurred in the Ivy Creek
Drainage system; and
�AS residents in the area have periodically, informally
requested the City to address possible solutions; and
�REAS the City Engineer has completed Phase I of the feasibili-
ty report; and
�REAS the cost for Ivy Creek improvements and other storm water
projects are difficult to assess and prove benefit.
NOi�T T�RSFORE, IT IS HBRLBY RESOL`i73D by the City Council of the
City of Mendota Heights, Minnesota, as follows:
1. That the City Engineer be and is hereby authorized and
directed to prepare a feasibility study as to whether said
proposed improvements are feasible, whether said improve-
ments should best be made as proposed or in connection with
some other improvement, and as to the estimated cost of said
improvement.
2. The City Engineer be directed to prepare a proposal for the
implementation of a City wide storm water utility program to
finance new and existing storm water systems throughout the
City.
Adopted by the City Council of the City of Mendota Heights this 19th
day of November 1991.
CITY COUNCIL
CITY OF MENDOTA HEIGHTS
By �.,�. -� �r�r.,��,.�
Charles E. Mertensotto, Mayor
ATTEST:
��
thleen M. Swanson
City Clerk