Res 1997 - 27 Authorizing Staff to Issue a Building Permit & a Variance of 16 Feet to the Rear Yard Setback for an Office/Warehouse Development at George's Golf TeeCITY OF MENDOTA HEIGHTS
DAKOTA COUNTY,IVIINNESOTA
RESOLUTION NO. 97-27
A RE50LUTION AUTHORIZING STAFF TO ISSUE
A BiTILDING PERMIT AND A VARIANCE OF SIXTEEN FEET
TO THE REAR YARD SETBACK FOR AN OFFICE/WAREHOUSE
DEVELOPMENT AT GEORGE' S GOLF TEE
WHEREAS, Mr. Cook and Mr. Bangasser representing Opus and AMB have
requested a Building Pernut and a 16' rear yard setback Variance which would allow the
construction of an offce-warehouse development on a parcel west of and adjacent to
Highway 55 at the site formerly known as George's Golf Tee, all as proposed on plans
and documents on file in Planning Case No. 97-09 and listed in Exhibit A attached to this
Resolution; and
WHEREAS, the City Council first discussed this application at their regularly
scheduled meeting on April 1, 1997 and decided to solicit input from the Planning
Commission; and
WHEREAS, the Planning Commission of the City of Mendota Heights met to
discuss this application at their Apri129, 1997 meeting; and
WHEREAS, The Planning Commission voted 7-0 on Apri129, 1997 to advise the
City Council that said application conforms to the Zoning Ordinance in all aspects; and
WHEREAS, The City Council has since determined at their regularly scheduled
meeting on May 6, 1997, that the office/warehouse building as proposed would need a 16'
rear yard setback Variance. ,
NOW, THEREFORE, IT IS HEREBY RESOLVED by the City Council of the
City of Mendota Heights that a 16' rear yard setback Variance which would allow the
construction of an office-warehouse development at George's Golf Tee shall be granted
and that the Code Enforcement office shall be authorized to issue a building permit, all as
proposed on plans and documents on file in Planning Case No. 97-09 and listed in Exhibit
A attached to this Resolution subject to the following conditions:
That the Applicant submit elevations showing the rear of the building finished in
Cream, Tan and Blue in the same manner and with the same materials as the other
sides of the building, per the Applicant's representation on the evening of June 3,
1997.
�
2. That any changes to the exterior of the building or any other aspect specified in any
document in Exhibit A be approved in advance by the Council.
3. That the Developer and the City draft and adopt a Developer's Agreement regulating
issues including but not limited to T� Increment Finance participation on the part of
the City of Mendota Heights.
4. That neither the mere passage of this Resolution nor the mere execution of the
aforementioned Developer's Agreement constitute prior approval of any structural
modifications or resubdivision of land which would legally or physically join this parcel
or building to any adjacent parcel or building. Such pernussion must be applied for
separately by the Developer at such time as the Developer desires to make this change,
and may be denied, approved, or approved with conditions by the Council at that time.
BE IT FiTRTHER RESOLVED by the City Council of the City of Mendota
Heights that the proposed Building Permit and 16' rear yard setback Variance which
would allow the construction of an office-warehouse development at George's Golf Tee,
all as proposed on plans and documents on file in Planning Case No. 97-09 and listed in
Exhibit A attached to this Resolution under the conditions described above will have no
adverse impact on the health, safety or general welfare of the citizens of the community
and the surrounding land, and would not be adverse to the general purpose and intent of
the Zoning Ordinance.
Adopted by the City Council of the City of Mendota Heights
this 3rd day of June, 1997. �
ATTEST:
By '
Kat een M. Swanson, City Clerk
CITY COUNCIL
CITY OF MENDOTA HEIGHTS
By �..� �, G� .�s
Charles E. Mertensotto, Mayor
DRAWINGS/MAPS
• 3/25/97:
� 3/25/97:
• 4/17/97:
• 4/17/97:
• 4/17/97:
• 4/17/97:
• 4/17/97:
• 4/17/97:
• 4/17/97:
EXHIBIT A
Color Site Plan by OPUS
Color Elevations by OPUS
T1 Title Sheet by OPUS
AS-1 Site Plan by OPUS
A3 Exterior Elevations by OPUS
A1 Floor Plan by OPUS
L1 Planting Plan by OPUS
ES-1 Electrical Site Plan by OPUS
(no number) Crrading, Utility, and Erosion Control Plan by OPUS
C� _M_:1 ' 1 �Z�li1► ���f[�•�
• 3/26/97:
• 4/7/97:
• 4/17/97:
• 4/18/97:
• 4/24/97:
• 4/30/97:
• 5/9/97:
• 5/14/97:
• 5/29/97:
Letter from OPUS to the City of Mendota Heights
Letter from AMB to the City of Mendota Heights
Letter from OPUS to the City of Mendota Heights
Letter of Intent from OPUS to the City of Mendota Heights
TIF Request from OPUS to the City of Mendota Heights
Letter from OPUS to the City of Mendota Heights
Geotechnical Evaluation by Braun Intertec Corporation
Letter from OPUS to the City of Mendota Heights
Letter from AMB to the City of Mendota Heights