Loading...
1984-04-10 Council Special Meeting Packetl_INN=MWNN� L City of Mendota Heights Dakota County, Minnesota ' SPECIAL MEETING April 10, 1984 7:30 P.M. 1. Call to Order. 2. Roll Call. 3. Continue closed -door session regarding Krajniak litigation. (Engineering Conference Room) 4. Joint meeting with Parks and Recreation Commission - 8:00 P.M. (Community Room) a. Curley's Addition bike trail. b. Acquisition of Wachtler property. c. Other park priorities (ie. District 197 property, and bike trail). d. Financing options, including bond issue. 5. Adjourn. Note to the Parks Commission You will be convening your regular meeting at 7:30 P.M. in the Community Room downstairs. i The Council and staff will join you at 8:00 P.M. for the joint discussions. Staff is preparing background information of cost esti- mates and bond considerations, which will be presented Tuesday night. Jim Danielson will also have a report on the bike trail that runs from Rogers Lake Park, along the 35E right-of-way to Curley's Addition. CITY OF MENDOTA HEIGHTS MEMO April 9, 1984 TO: Mayor, City Council, Park and Recreation Commission and City Administrator FROM: Kathleen Swanson, City Clerk SUBJECT: Estimated Costs for Park Bond Issue Referendum If conducted as part of the primary election on September 11, 1984, it is estimated that a Special City Election on a park bond issue will cost approximately $1,475.00. The estimate reflects the costs for additional judges time, publication requirements, absentee ballot printing and postage, sample ballots, additional ballot pages, cards and envelopes. An ordinary primary election usually generates a 227 to 257 turnout of registered voters. It is anticipated that a bond referendum along with the primary will generate a turnout of 757 of registered voters. If a referendum is conducted as part of the general election, our ordinary 859 to 927 voter turnout should not be appreciably changed. It is estimated that if conducted on November 6th, the referendum would cost approximately $250.00. Costs for a referendum on November 6th would increase election costs only in terms of increased absentee ballot printing, ballot pages, two additional judges, publication requirements and sample ballot printing. 11 PHASE VICTORIA ROAD VIA MARIE AND I TO HIGHWAY 13 VALLEY PARK SPEC. REF. ITEM QUANTITY UNIT UNIT PRICE AMOUNT 2101.502 Clearing 50 Each $ 40.00 $ 2,000.00 2101.507 Grubbing 50 Each 20.00 11000.00 2112.501 Subgrade Preparation 6,500 L.F. 1.00 6,500.00 2211.501 Crushed Aggregate Base, Class 5 1,400 Ton 8.00 11,200.00 2341.504 Bituminous Material for Mix 40 Ton 200.00 8,000.00 2341.508 Wearing Course 650 Ton 20.00 13,000.00 2501.511 30" C.S. Arch Pipe 50 L.F. 30.00 1,500.00 2511.501 Random Rip -Rap 40 Ton 20.00 800.00 2557.501 Chain Link Fence 200 L.F. 12.00 2,400.00 2575.501 Seeding 6,500 L.F. 0.40 2,600.00 Other Costs Signs, Striping, Miscellaneous 11000.00 Total Cost $50,000.00 +4,07, 0-4) (*cv4jnj, 2 CIO et; 701 00() Construction Schedule. %CITY OF MENDOTA HEIGHTS 750 South Plaza Drive Mendota Heights, Minnesota PHASE II MENDOTA HEIGHTS ROAD* LEXINGTON AVENUE TO PILOT KNOB ROAD SPEC. REF. ITEM OUANTITY UNIT UNIT PRICE AMOUNT 2112-501 Subgrade Preparation 5,200 L.F. 1.00 $5,200.00 2211.501 Crushed Aggregate Base, Class 5 1,200 Ton 7.00 8,400.00 2341.504 Bituminous Material for Mix 32 Ton 200.00 6,400.00 2341.508 Wearing Course 520 Ton 15.00 7,800.00 2575.501 Seeding 5,200 L.F. 0.25 1,300.00 2104.501 Remove Curb and Gutter 125 L.F. 4.00 500.00 2531.501 Replace Curb and Gutter, Design 125 L.F. 10.00 1,250.on B-618 Other Costs Signs, Striping, Miscellaneous Total Cost .$32'31,000.00 +4c% &5� 04.) CcOitV 0o * = includes upgrading Pilot Knob Road - Northland Drive intersection Construction Schedule. CITY OF MENDOTA HEIGHTS 750 South Plaza Drive Mendota Heights, Minnesota PHASE III LEXINGTON AVENUE MARIE AVENUE TO MENDOTA HEIGHTS ROAD SPEC. REF. ITEM QUANTITY UNIT UNIT PRICE AMOUNT 2101.502 Clearing 10 Each $ 50.00 $ 500.00 2101.507 Grubbing 10 Each 50.00 500.00 2104.501 Remove Bituminous Curb 50 L.F. 6.00 300.00 2105.523 Common Borrow, C.V. 15,000 C.Y. 4.00 60,000.00 2112.501 Subgrade Preparation 9,200 L.F. 2.00 18,400.00 2211.501 Crushed Aggregate Base, Class 5 2,000 Ton 7.00 14,000.00 2341.504 Bituminous Material for Mix 55 Ton 200.00 11,000.00 2341.508 Wearing Course 900 Ton 15.00 13,500.00 2422.508 Treated Timber Retaining Wall 1,200 S.F. 10.00 12,000.00 2501.511 Extend Culverts 300 L.F. 20.00 6-9000.00 2535.501 Replace Bituminous Curbing 20 L.F. 5.00 100.00 2575.501 Seeding 9,200 L.F. 1.00 9,200.00 nt.hpr , rnqtq Signs, Striping, Miscellaneous 1,500.00 Total Cost $147,000.00 +40% sig, 400 � k:z I Construction Schedule. %CITY OF MENDOTA HEIGHTS 750 South Plaza Drive Mendota Heights, Minnesota