Pipeline 12 18 2009The Pipeline
L E T T E R
Public Works
Engineering December 18, 2009
code Enforcement
Public Works
The Parks Crew plowed the cul-de-sacs, parking lots and pedways after the
3'-' snowfall. They continue to flood the skating rinks. The warming houses
are being prepared for opening today at noon. The cutting edges were
changed on the pick plow trucks (#501 and #503).
Rich replaced the manhole casting and cover on Dodd Road that was hit by
a MnDOT plow. Northstar Pump replaced the lower seal on pump 2 at the
Mendota Heights Road lift station. He helped plow the cul-de-sacs. The
Northland lift station vent was hit by a car and will be repaired in the spring.
The Streets Crew did maintenance on the plow trucks; they sanded the
wings and sanders. The wing cutting edge was changed on plow truck
#312. They salted areas with water main breaks at Brompton Place, ivy Hill
Drive and Butler Avenue.
Date:
Snow Events for the Week:
Event: Response:
Monday, December 14 3"
Engineering
Plow and salt all streets (early start)
Staff met with MN/DOT regarding future storm sewer improvements to Dodd
Road (TH 149) between Wentworth Avenue and Emerson Avenue. Two
existing culverts will be replaced with a new catch basin system. Dodd Road
is expected to be closed down and detoured around Somerset Country Club
during this work. The city will be responsible for relocating a portion of its
water main; potential costs have not been calculated yet.
1
The City entered into an agreement with Foth Infrastructure and
Environment to provide consultation with the Dakota County Regional
Visioning Study. The Sunfish Lake/Mendota Heights ad hoc committee met
d future ------ plans- with addressing issues within fd
Friday to discuss futu the study.-
The
tu y.
The Lower Mississippi Watershed Management Organization (LMRWMO) held
its final visioning meeting on Thursday. The WMO will be sending out
requests for proposals to update their management plan in January of 2010.
The LMRWMO is also funding a study pertaining to drainage issues in
Lilydale. The city will be responsible for a share of the costs to alleviate the
issues. Initial cost estimates are in the neighborhood of $500,000,
stakeholders' shares in the project have yet to be identified. Stake holders
include: MN/DOT, Lilydale, Mendota Heights, private condominiums, Dakota
County and the DNR.
Staff continues to final out past projects. Record plans for the Avenues
project are currently being completed by the consultant. Callahan Place and
Cherry Hills 2nd project will be finaled at the next council meeting. The final
payment initiates the one-year warranty period for the project.
Funding for the TH55/Mendota Heights Road intersection improvement has
been moved back up to FY2010. The city will need to acquire a small
portion of right-of-way prior to funding being let. Construction of the
improvement may also be moved up to summer of 2010.
The Mendota Heights Road/Visitation Drive Roundabout continues to
generate great interest from prospective contractors.
Two emergency water main breaks occurred within the city this week. The
first was on Saturday morning on Butler Avenue and Spring Street. The
second, slowly leaking for approximately a week, was addressed on Tuesday
and is located on Brompton Place.