104 14114 'kk
The Parks Crew picked up trash daily during the week. The chipper was hauled out to
Pilot Knob and back for cutting and chipping of trees for the Great River Greening Project.
The aerator at Rogers Lake was shut down. All of the summer equipment was taken out
of winter storage in the water tower and prepared for spring. The light bulbs were
changed out in the storage area of the water tower, and new park trail signs were posted.
The lifts were checked daily. There was a power outage at the Lilydale lift station on
Sunday at 11:30 a.m. and the power remained out until 1:30 p.m. Apparently a goose
flew into a power line and caused the power outage. The root saw was rebuilt with new
seals, bearings and gears. A jet was frozen in the culvert on Culligan Lane and Glen Hill
Road.
The Streets Crew picked up a dead deer at Checker Auto on Pilot Knob Road; the deer
Was found near the front steps of the building. They worked on the chipper by greasing it
and checking it over in preparation for chipping trees at the Pilot Knob site. They did
general maintenance on all of the plow trucks and washed the salt and sand from the
dump boxes. The wings on the sanders were greased. Started filling potholes on the
frontage road near Crown Point, Twin Circle Drive, and Victoria, Marie and Lexington
Avenues.
Engineerinci
Staff met with Mr. Steve McComas of Blue Water Science to go over the 2006 evaluation
report for Rogers Lake. Residents have requested weed removal efforts be undertaken by
the City for increased recreational opportunities on the Lake.
Engineering staff continued working with Legal staff on finalizing the Developers'
Agreement for the proposed Mendota Mall redevelopment. It is anticipated that the
Developers' Agreement will be before Council on April 7th
Staff attended the agency coordination meeting for the Pedestrian Improvements
Feasibility Study at Dodd Road and Highway 110. The consultant has been progressing on
the report and their bi-weekly update report is attached.
John accompanied the newly appointed citizen representative, Larry Craighead, to the
Gun Club Lake Watershed Management Organization meeting on Wednesday.
Ryan has continued his participation in the Leadership in Project Management Seminar
course sponsored by MnDOT. Ryan reports that the seminar is productive and that he is
learning a lot about project communications.
CONSULTING GROUP, INC.
C h1GiNFGRS I f LAVN[RS I D F-SIGNI:RS
TO: John R. Mazzitello, PE
Public Works Director/City Engineer
M INN [APO L(S
FARGO
MADtSOe4
SRF No. 008 6719
FROM: Chris Trboyevich, PE
DATE: March 17, 2009
SUBJECT: TH 11 O/DODD ROAD (TH 149) INTERSECTION — PEDESTRIAN IMPROVEMENTS
The intent of this project status memorandum is to provide the City with a regular project report detailing
the summary of work in the previous two weeks and outlining the anticipated work within the next two
weeks. This first memorandum will outline the actions that have occurred since the notice to proceed.
Progress Actions Initiated/Completed from March 2, 2009 to March 13, 2009
• Begin working on key figures specific to feasibility report, i.e., base map, project location map, as well
as feasibility report outline. Draft figures are available for concept level discussions for the March 19th
meeting.
• Coordinate with SRF internal staff to develop the alternatives to be evaluated in preparation for the
upcoming stakeholder meeting.
• Identify appropriate Mn/DOT signal personnel to invite to the project stakeholder meeting. Those
individuals have been identified and invited.
• Schedule a project stakeholder meeting with City of Mendota Heights staff, Dakota County staff,
and Mn/DOT staff (initially anticipated to have stakeholder meeting in mid-March). This coordination
meeting has been scheduled for March 19, 2009.
Anticipated Progress Actions for March 16, 2009 to April 7, 2009
• Agency Coordination Meeting on March 19`h at the Mendota Heights City Hall. At this meeting verify
information received thus far, and request any additional information potentially needed. Develop and
distribute meeting minutes from the Coordination Meeting.
• Update work on key figures of the feasibility report as needed, on direction from the March 19, 2009
meeting. Compile and review crash history data.
• Develop cost estimates of alternatives to be discussed in the feasibility report.
• Coordinate with the City to schedule a date when pedestrian counts can be obtained.
• Potentially have a Rough Draft document for Mendota Heights staff review by April 7, 2009.
The previous actions defined are subject to change based on continuing project development and may be
amended, as necessary, based on subsequent client, stakeholder, or consultant needs. If there are questions
based on the outline progress actions, please contact Chris Trboyevich at your earliest convenience.
cc: Matt Hansen, SRF
File SRR Vol3VMProjectsl67191HI-MIIIDOC1Project Status Memo2.doc
www. srfconsul ting. com
One Carlson Parkway North, Suite'150 I Minneapolis, MN 55447-4443 j 763.475.0010 Fax: 763.475.2429
Aa Equal Opportunity Employer