- June 12, 2009
r
The Parks Crew repaired sprinkler heads at Kensington South Park. They set up and
took down tents, barricades, cones, and tables for the parks celebration. They also
worked the tournament. Flowers were planted at Mendakota Park.
Rich cleaned the floats at the Lilydale lift station.
12 ducklings were rescued by Rich from the storm sewer catch
basin at Sibley Heights. He was called at 4:30 P.M. on
Saturday because of problems at the St. Thomas lift station.
Water got into the panel and shorted out the pump controller.
Braun Pump installed a new controller. He cut roots and cleaned sanitary sewer lines
in the Glenhill Road easement, Caren Road easement, Mendakota Court easement,
Caren Road, Downing Street, Highway 13 (Freemont Avenue to Garden Lane)
Annapolis Street (near Chippewa Avenue), Miriam Street and Simard Street.
The Streets Crew finished blacktopping the seal coat area. The storm sewer grates
were checked and cleaned as needed. A new mailbox was installed on Decorah Lane.
The street sweepings were hauled to Dakota County in Rosemount.
Engineering
Dodd Road/Highway 110 Pedestrian Feasibility Study - The consultant has completed
the Metropolitan Council application package for Transportation Enhancement funds.
The application is requesting $492,800.00 of federal money for a project estimated at
$616,000.00. If the project is selected for funding, the remaining $123,200.00 will
need to be paid by the City and can be expended form our State -Aid account. The
application will be sent to the Metropolitan Council on June 15th
2009 Road Rehabilitation Project (Cherry Hills 2`1 - The project has been advertised
and we conducted a bid opening on June 10th at City Hall. 5 bids were received and
the low bidder was $20,000.00 below the engineer's estimate. The contract award
will be before Council the June 16th Council Meeting. Construction is anticipated to
begin in early July.
Highway 55 & Mendota Heights Road Intersection - The consultant has begun
preparing the preliminary plans for the intersection improvement. The geotechnical
Page - 1
soil) analvsis contract was approved by Council on June 2nd, and the
consultant will be in the field taking soil samples next week.}
N E W S
LETTER
The Pipeline
-�
Public Works
June 12, 2009 ry-
Engineering .•
Code Enforcement
r
We have been notified by MnDOT that our cooperative agreement share has
slipped 1 fiscal year to FY2011. The $424,841.00 grant for construction was
originally scheduled for FY2010, but due to budgetary constraints, the funding was
moved out one more year. This change in funding year should not impact our
design efforts, and will actually benefit the City in the ability to fund the design
and the remaining balance of the construction project out of out State -Aid
account. A copy of the MnDOT notification is attached.
2009 Crackseal and Sealcoat Program - The contractor has begun cracksealing
and is anticipating proceeding with sealcoating (chip seal) next week. This
program will be ongoing throughout the summer as the contractor works from
subdivision to subdivision. All neighborhoods will be notified as to their respective
work schedules. Streets included in this program are:
■ Crackseal Only: Overlook Road, Overlook Lane, Lilac Road, Summit Lane
(Marie to Overlook), Rolling Green Curve, Windwood Court, Oxford Court,
Stratford Road, and Coventry Court.
■ Sealcoat Only: Mendakota Drive, Executive Drive, and Northland Drive (Hwy
55 to Mendota Heights Road).
■ Crackseal & Sealcoat: Summit Lane (south of Marie), Faro Lane, Avanti
Drive, Twin Circle Drive, Bwana Court, West Circle Court, and Vail Drive.
Visitation Roundabout - It is anticipated that on June 12th (today) the amendment
to the State Transportation Improvement Plan (STIP) will be
approved and Mendota Heights will be the recipient of $310,000.00 for the
construction of a roundabout at the intersection of Visitation Drive
and Mendota Heights Road. The funding is through the American
Recovery and Reinvestment Act (ARRA), better known as the
Economic Stimulus Bill passed by congress earlier this year. The
funding will be programmed for FY 2010, and construction is
anticipated for June of 2010. A resolution awarding the design of
the roundabout will be before Council at the June 16th meeting.
Page - 2
N E W S The Pipeline
LETTER
Public Works June 12, 2009
Engineering
Code Enforcement 4
Delaware/494 Interchange - On Tuesday afternoon, staff met with representatives
from the Cities of Eagan, Inver Grove Heights, and Sunfish Lake, as well as with
representatives from Dakota County, MnDOT, and Metropolitan Council as part of
the ongoing Regional Roadways Visioning Study that is looking at future traffic
improvements in the region bounded by Interstate 35E, Highway 110, Highway
52, and County Road 26 (Diffley Road).
A major point of focus of the Visioning Study is an analysis as to whether or not an
interchange is warranted at Delaware Avenue and Interstate 494. The County's
consultant engineer will be making a presentation about the preliminary efforts of
the Study team at the June 16th City Council meeting. A public Open House is
scheduled for Wednesday June 24th from 4:30pm to 7:OOpm at Henry Sibley High
School. Dakota County and their consultant will be advertising the Open House.
The Avenues - The contractor has begun curb repair and replacement for the
Avenues project. They are also marking and raising manhole castings in
anticipation of asphalt wear course installation. The wear course of pavement is
expected to be installed by the end of June.
Callahan Place - A rainwater garden was planted on Callahan Place as part of the
city's SWPPP.
Multiple locations « �'
were identified n
during the Callahan r
Place reconstruction
-
as viable spots for
stormwater
infiltration. This
however was the
only location where
the homeowners
expressed an fi
interest in
maintaining the ;r
plants.
Page - 3
t�Neso,q
�b
Minnesota Department of Transportation
Metro District
Office of State Aid
1500 West County Road B2
Roseville, MN 55113-3174
June 2, 2009
Mr. John R. Mazziteilo
Public Works Director/City Engineer
City of Mendota Heights
1101 Victoria Curve
Mendota Heights, MN 55118
Office Tel: 651-234-7780
Office Fax: 651-234-7765
robert.vasek@dot.state.mn.us
RE; Deferral of FY 2010 Municipal Agreement Program Funding to FY 2011
TH 55 at Mendota Heights Road
in the City of Mendota Heights
Dear Mr. Mazzitello:
Due to a recent State Fund Revenue Reduction of $66 Million in FY 2010 and 2011 the Metro District
had to rebalance the Metro Construction Program which included deferral of projects to later years. Per
our prior discussion you indicated that a deferral of the Mn/DOT funding for this project from FY 2010
to FY 2011 would be acceptable. Please confirm via letter or email that the deferral is acceptable to
Mendota Heights.
The FY 2011 funding for the project becomes available on July 1, 2010 and the project must be let/bid by
June 30, 2011. There is a possibility that FY 2010 funding may become available again after August of
this year and we will contact you regarding that option should it happen. I would recommend that you
maintain a project development schedule that would enable a.Spring 2010 letting if that option is
something you would pursue. Please contact me with any questions or concerns.
Sincerely,
�?w
Obert (Bob) asek, P.E.
Cooperative Agreement Engineer
cc: Greg Coughlin, Mn/DOT-Metro State Aid *
Lynn Clarkowski, Mn/DOT-South Area Manager
Ken Johnson, Mn/DOT-South Area Engineer
Sheila Kauppi, Mn/DOT-Trac Area Engineer
Jim Myers, Mn/DOT-Metro State Aid *
Matt Shands, Bonestroo and Associates