Loading...
Pipeline 09 03 2009so N E W S The P --ftefine ''I L E T T E R Public Works Engineerin September 3, 20090 Code Enforcement Public Works The Parks Crew repaired the washed out pedway in Wentworth Park near the pond. New gravel was put down and then it was blacktoinpped. Graffiti in was removed on the pedway Mendakota Park near the ba Pp cage. The soap dispenser was repaired the men's bathroom at Mendakota Park. The toilet was repaired in the women's bathroom at Kensington South Park. Rich sprayed broadleaf weeds at Kensington Park, kdakota Park, Fire Hall, Rogers Lake Park, City Hall and Friendly HillsPar The Streets Crew fixed a washout along the road by 1840 Hunter Lane. The washout was filled with mix and a blacktop curb was rnthehtoprevewashing out again.' Blacktopping was done along new curb that from and Chippewa Avenue from the broken storm was put in at Junction Lane pipe. On Mendota Heights Road at Delaware Avenue cracks and potholes were blacktopped. Engineering RF P's were mailed to four consultants for the rehabilitation of the city water tower. The tower is in need of having the existing lead-based paint removed and recoated as well as other structural modifications. T.H. 55 and Mendota Heights Road intersection improves sss of analare still in the . the procezing the design phase. The city and consultant are in hin iny itial cost estimate. scope of the improvement to keep the project wit Visitation Drive and Mendota Heights Road intersection improvement has been a hot topic within the city. Staff has fielded numerous inquiries regarding the project. The project will be discussed at the September 15, 2009 city Council meeting. Cherry Hill 2nd Rehabilitation project is currently under constructtart ion. on The contractor is scheduled to begin milling and paving streets ng Tuesday September 8th.