Public Works
The Parks Crew repaired the washed out pedway in Wentworth Park near
the pond. New gravel was put down and then it was blacktoinpped. Graffiti
in
was removed on the pedway Mendakota Park near the ba Pp
cage. The
soap dispenser was repaired the men's bathroom at Mendakota Park.
The toilet was repaired in the women's bathroom at Kensington South Park.
Rich sprayed broadleaf weeds at Kensington Park, kdakota Park, Fire
Hall, Rogers Lake Park, City Hall and Friendly HillsPar
The Streets Crew fixed a washout along the road by 1840 Hunter Lane. The
washout was filled with mix and a blacktop curb was rnthehtoprevewashing out again.' Blacktopping was done along new curb that
from and Chippewa Avenue from the broken storm
was put in at Junction Lane
pipe. On Mendota Heights Road at Delaware Avenue cracks and potholes
were blacktopped.
Engineering
RF
P's were mailed to four consultants for the rehabilitation of the city water
tower. The tower is in need of having the existing lead-based paint
removed and recoated as well as other structural modifications.
T.H. 55 and Mendota Heights Road intersection improves
sss of analare still in the
. the procezing the
design phase. The city and consultant are in hin iny
itial cost estimate.
scope of the improvement to keep the project wit
Visitation Drive and Mendota Heights Road intersection improvement has
been a hot topic within the city. Staff has fielded numerous inquiries
regarding the project. The project will be discussed at the September 15,
2009 city Council meeting.
Cherry Hill 2nd Rehabilitation project is currently under constructtart ion. on The
contractor is scheduled to begin milling and paving streets ng