Pipeline 03 06 2009NEWS
LETTER -
The Pipeline
Public Works
Engineering ���c
Code Enforcement , s"�J�'March 6, 2009
'A
Public Works
The Parks Crew assembled picnic tables for the parks. Satellites were ordered for
the parks for the summer. The flooding hoses were dried out and rolled up for
summer storage. Equipment maintenance was done on the trucks, snow blower
and broom.
Rich plowed when needed. He cut roots in the sanitary sewer line on Keokuk and
Marie Avenue. He treated roots with chemicals on Keokuk and Lexington Avenue.
There was a sewer back up on James Court. The blockage was caused by roots
that were cut from the homeowner's service. The root clump then got stuck in a
"drop" manhole downstream. Rich also attended a traffic safety seminar.
The Streets Crew mixed sand and salt. After plowing and sanding the City's
streets twice, they did mailbox repair after Thursday's seven inch snow storm.
They attended a seminar put on by Highway Technologies with Rich and Tom for
work zone traffic control. The bridge decks and sidewalks on Wagon Wheel Trail
and Mendota Heights Road were cleaned of snow.
A couple of complimentary phones calls from last Thursday's snowstorm -
A resident from 1/2 Dorset Road called and wanted to thank the Public Works snow
plow driver (George Noack) who helped shovel her out and push her car at 5:30
P.M. on Thursday. She said he was super and very helpful!
A resident on Trail Road called to say he was very impressed with the snow plow
driver on Trail Road - (Andy Quinlan) he went slow and did a superb job!
Engineering
John recently returned from the Air National Guard Intermediate Development
Course (Commanders' School) in Knoxville, Tennessee. He is now eligible to
assume a command position within the Minnesota Air National Guard.
Staff was notified this week that MnDOT State Aid Office has granted the City
$424,821 of FY2010 funds for the reconstruction of the Highway 55 and Mendota
Heights Road intersection. This project will be designed in 2009 and ready for
award in the spring of 2010.
N E W S
LETTER
Public Works
Engineering
Code Enforcement
Engineering
The Pipeline
March 6, 2009
r
Page 2
Staff has 'shelved" the Hunter Lane and Orchard Place project per the decision of
Council. Staff will remain busy, however, working on the Highway 13 and Dodd
Road Trails project, relocating a sanitary sewer trunk main on the CDA property
north of South Plaza Drive, and getting a head start on next year's proposed
reconstruction project (Simard Street, Miriam Street, Valley Lane, View Lane,
Esther Lane, John Street, and Spring Street).
Staff received the first periodic update from SRF Consulting Group, the consultant
hired to produce the Feasibility Report on pedestrian improvements at Dodd Road
and Highway 110. A copy of this update is attached.
Staff has been working with our City Attorney and Mendota Mall Associates, LLC to
finalize the Developers' Agreement for the re -development of the Mendota Plaza
Mall at Dodd Road and Highway 110.
Ryan has been attending the Master Skills Development for Project Management
Program seminar provided by MnDOT. This program is designed to develop and
improve communication skills with project stakeholders. Ryan is enjoying the
seminar and says he is getting a lot of good information.
Attachment:
Project Progress Memo - TH110/Dodd Road Intersection - Pedestrian
Improvements
CONSULTING GROUP, INC.
ENGINEERS I PLANNERS I D E S I G N E R S
PROJECT PROGRESS MEMORANDUM
TO: John R. Mazzitello, PE
Public Works Director/City Engineer
FROM: Chris Trboyevich, PE
MINNEAPOLIS
FARGO
MADISON
SRF No. 008 6719
DATE: March 6, 2009
SUBJECT: TH 110/DODD ROAD (TH 149) INTERSECTION — PEDESTRIAN IMPROVEMENTS
The intent of this project status memorandum is to provide the City with a regular project report detailing
the summary of work in the previous two weeks and outlining the anticipated work within the next two
weeks. This first memorandum will outline the actions that have occurred since the notice to proceed.
Progress Actions Initiated/Completed from February 11, 2009 to February 27, 2009
• Held client kick-off meeting on February 11, 2009 to gather additional information concerning the
project. Team meeting between SRF and City staff.
• Received and logged information provided by John Mazzitello from February 12-13, 2009.
• Began development of project area base map using GIS data from Mendota Heights and Dakota County.
• Contacted Gopher State One Call on February 24, 2009 to initiate a 15 -Day Design Locate to gather
private utility data within the project area.
• Held internal meeting on February 26, 2009 with Marie Cote, PE, to discuss anticipated pedestrian
counts and potential funding sources for improvements.
Anticipated Progress Actions for March 2, 2009 to March 13, 2009
• Begin working on key figures specific to feasibility report, i.e., base map, project location map, as
well as feasibility report outline.
• Coordinate with SRF internal staff to flesh out the alternatives to be evaluated in preparation for
upcoming stakeholder meeting.
• Identify appropriate N/hVDOT signal personnel to invite to the project stakeholder meeting.
• Schedule project stakeholder meeting with City of Mendota Heights staff, Dakota County staff, and
Mn/DOT staff (initially anticipated to have stakeholder meeting in mid-March).
The previous actions defined are subject to change based on continuing project development and may be
amended as necessary based on subsequent client, stakeholder, or consultant needs. If there are questions
based on the outline progress actions, please contact Chris Trboyevich at your earliest convenience.
1
cc: Matt Hansen, SRF
File
H.•IProjects167191H1-MLADOCIProject Status Memol.doc