Pipeline 12 04 2009NEWS
LETTER
Public Works
Engineering
Code Enforcement
The Pipeline
a
December 4, 2009
Public Works
The Parks crew serviced the summer equipment and put it away for winter
storage in the water tower. They worked on the new hockey goals and
installed netting on the goals. The warming houses are being prepared for
the winter season. The furnaces were serviced the hoses and fittings were
hauled out for flooding. The plows were hooked up to the pickups and
serviced as needed. Fertilizer was ordered for 2010 and stored for next
spring.
Rich did a final inspection at Bituminous Roadways and pulled the mandrill
through the sanitary sewer line. He jetted the culverts on Hunter Lane, and
at the Orchard and Lexington intersection. 748 Pontiac Place called and said
they had their service line cleaned so Rich cleaned the sanitary sewer line.
The Mendota Heights Road lift station is in the process of being repaired.
Pump #2 had a lower seal fail and it let water into the oil.
The Streets Crew put on the plow, wing, and sander on plow truck #303.
Cliff and Tim worked on a wiring problem. No parking signs were installed
on Lake Drive for St. Thomas Academy. The street name signs were moved
for Kay Avenue and Walsh Lane. The new snow plow was taken to J -Craft in
Lake Crystal so they could install it on the new plow truck.
Engineering
Bobby Attended the Aggregate Production Training class at MN/DOT. The
MN/DOT certifications are a requirement to inspect road construction
projects.
Mendota Heights Road/Visitation Drive Roundabout - The city received
federal authorization to advertise for bids. The bid opening date is set for
December 30th, 2009.
Water Tower Rehab - Staff met with MSA/KLM on the reconditioning of the
water tower. Plans are on schedule for a February bid date. Construction is
anticipated to run from April to September.
Staff has submitted a Wetlands permit to the planning commission for
approval to dredge a pond at the Par 3 Golf Course.