Pipeline 11 13 2009NEWS
LETTER
Public Works
Engineering
Code Enforcement
Public Works
The Pipeline
November 13, 2009
The Parks Crew removed graffiti from the playground equipment at
Mendakota Park. The pea gravel was removed from the walkway surface
around the playground equipment at Mendakota Park. Dirt was brought in
at Friendly Hills along the pedway and to Kensington Park South where a
water main line broke when the sprinkler system was being blown out. The
area was level out and grass seed put down. The bases were taken out at
Hagstrom King Park and the Civic Center Park and stored for the winter.
Rich painted the panel at the Lilydale lift station that someone had
vandalized with spray paint. The standby generator was run at the Mendota
Heights Road lift station. He assisted the Streets Crew in painting curbs.
He winterized the phase convertor at the Culligan lift station.
The Streets Crew finished loading the dumpsters with the Halloween bonfire
ashes. The bonfire site was cleaned up. The storm sewer at Park Place was
bricked and mudded.
Engineering
Dakota County Regional Visioning Study (Delaware/494 Interchange) - Staff
attended the Public Open House on Tuesday afternoon/evening. The meeting was
very well attended, predominately by residents of Mendota Heights and Sunfish
Lake. Most of the comments received at the Public Open House centered around
the need for the interchange, the change in traffic patterns should the interchange
be constructed, increased traffic on Delaware Avenue, and the impacts to Mendota
Heights if the Dodd Road interchange is partially or totally closed. Prior to the
November 10th Public Open House, this item was discussed by Council at the
November 3rd meeting. Council directed Staff at that meeting to provide
recommendations on how to best counter the efforts aimed at recommending the
interchange. A proposal will be presented at the November 17th Council meeting
for the formulation of an ad-hoc team to keep very close tabs on the remaining
phases of the Visioning Study.
Page - 1
NEWS
P
The Pipeline
LETTER
Public Works
Engineering November 13, 2009,,
Code Enforcement
Proposed Lake Drive Closure - Staff has sent notification to the Rogers Lake
Neighborhood (Wagon Wheel to Mendota Height Road and Rogers Lake to Dodd
Road) as well as to Visitation School, Saint Thomas Academy, and Patterson
Dental with the proposal to close Lake Drive from Saint Thomas Academy to Swan
Drive. This issue came out of the public testimony for the Visitation Drive and
Mendota Heights Road roundabout project, and Council directed staff to begin the
process. The letter included the concept closure presented to Council on October
20th, and asks for the neighborhood's input. It also set a tentative date for a
Public Hearing on the project for January 19th at the regularly scheduled Council
meeting.
Deployment Time has Arrived!!! - Engineering Staff got together on
Thursday afternoon to discuss the division of duties for both the pending
retirement of Guy Kullander in May and the deployment with the Minnesota
Air National Guard of the Public Works Director. Staff is confident that all
duties and responsibilities will be met during the PWD's absence.
All:
I am grateful and humbled by the overwhelming support I and my
family has been given and will be given during my deployment to
Afghanistan. I look forward to my return, and am absolutely
positive that the City is in good hands. Please Give Ryan the same
high level of support you have given me as the Public Works
Director, and I will see you all again in July!
John R. Mazzitello, PE, PMP
Public Works Director/City Engineer
Page - 2