Pipeline 10 23 2009Public Works The Parks Crew cleaned out the utility rooms at Mendakota Park and Kensington Park South. The water was pumped down in the water pipes where water meters were hooked up for the summer. The tool box on #501 was repaired. The shelves in back of the shop were rearranged for storage. Rich mulched leaves at the Veronica lift station. He cleaned the grease off the floats at Centre Pointe and St. Thomas lift stations. All panel heaters were turned on at the lift stations. The HVAC heating at Mendota Heights Road #1 lift was turned on. The Streets Crew put up signs around the Halloween bonfire fire dumping site. The brush pile was pushed up everyday. They helped Blue Chip Tree Company take the tops of the five walnut trees between Second and Third Avenues alleyway. When the soil dries out they will take down the tree trunks. The new Mack truck came in that is replacing the 1994 Ford. It will be taken to ]-Craft to have the box plow wing and sander installed. Engineering Visitation Drive & Mendota Heights Road Roundabout - Council approved the Final Plans and authorized bid advertisement for the roundabout at the October 20th Council Meeting. Council also authorized Staff to begin the process for closing Lake Drive. Staff will be sending a letter to Rogers Lake neighborhood residents outlining the proposal and requesting feedback. A Public Hearing on the project will be held over the winter, and implementation is anticipated for the summer of 2010 in conjunction with the roundabout construction. Staff is interested in hearing public opinion on the Lake Drive closure concept and timeline. Water Tower Rehabilitation - The consultant hired at the October 6th Council Meeting has begun surveying the water tower in order to provide plans and specifications for the tower rehabilitation. Staff anticipates the consultant giving Council an update at the November 3rd meeting, completing the design package by the end of November, and having the rehabilitation under construction during the summer of 2010. Trunk Highway 55 & Mendota Heights Road Intersection Improvement - City Staff met with the consultant on Monday to go over the revised plans to scale down the scope of improvements to get the project within budget for the City's share of the construction cost. The consultant revised the plans and pending some final detail modification, Staff is confident the project will now come in within our originally anticipated budget. The project is a MnDOT State Aid Cooperative Agreement Project whereby MnDOT has allocated $424,821.00 toward the construction cost, and the City has agreed to cover October 23, 2009 P-1 the balance. The estimated City contribution to the construction project is $350,000.00. 2010 Road Reconstruction Project - Council accepted the Feasibility Report and ordered the Public Hearing for the 2010 Road Reconstruction Project. Streets included in next year's project are Simard Street, Miriam Street, Valley Lane, View Lane, Esther Lane, John Street, Spring Street, and Diego Lane. A Neighborhood Meeting is scheduled for October 28th, and the Public Hearing before Council is scheduled for November 3rd Dakota County Regional Visioning Study (Delaware/494 Interchange) - Staff attended the monthly stakeholder meeting last week to learn about the progress the consultant has made since last month. Nobody from Mendota Heights attended the meeting in September due to schedule conflicts and illnesses. This turned out to be unfortunate from the perspective of the City's traditional stance on the Delaware /494 interchange issue. After the September meeting, representatives from the consultant, Dakota County, and the City of Inver Grove Heights met with the Federal Highways Administration (FHWA) to discuss the Delaware/494 Interchange Option. The Cities of Mendota Heights and Sunfish Lake were not invited to the meeting with FHWA. Prior to this meeting, the opinion of FHWA had been, "no new access to I- 494." After the meeting however, FHWA is now advocating for the interchange at Delaware & I-494 coupled with either a partial or full closure of the interchange at Dodd Road, and to have Delaware Avenue serve as the primary north/south corridor north of I-494. Staff strenuously objected to the new FHWA opinion and the process by which the new opinion was generated. The next public meeting for the Visioning Study will be November 10th at the Inver Grove Heights Community Center from 4:30pm to 7:00pm. The consultant will be presenting the final conclusions of the study to Council sometime over the winter. Council Member Krebsbach Meeting - Staff from Public Works and Code Enforcement met with Council Member Krebsbach on Wednesday as the conclusion to her request to meet with City Staff. Staff discussed work load and responsibilities as well as policies and priorities. Council Member Krebsbach met with Engineering Staff in August. Delaware Reconstruction Project(110 to Marie) - Staff attended the Public Open House put on by Dakota County in conjunction with this project. The meeting was well attended, largely by residents of West Saint Paul affected by the project. The project is proposing to widen Delaware Avenue from a 2 -lane facility to a 3 -lane facility, creating a center turn lane to better allow for left turns into Henry Sibley High School. A new bituminous trail is also proposed as part of the project that would connect Marie Avenue and the Mendota Road frontage road. The trail will be on the Mendota Heights side of Delaware Avenue. Independent School District 197 is supportive of the project. Design should be complete this year, with easement acquisition taking place in 2010, and construction in 2011. The Dakota County point of contact for the project is Tom Anton. He can be reached at 952-891-7120. October 23, 2009 P-2