Pipeline 10 23 2009Public Works
The Parks Crew cleaned out the utility rooms at Mendakota Park and Kensington Park
South. The water was pumped down in the water pipes where water meters were
hooked up for the summer. The tool box on #501 was repaired. The shelves in back
of the shop were rearranged for storage.
Rich mulched leaves at the Veronica lift station. He cleaned the grease off the floats
at Centre Pointe and St. Thomas lift stations. All panel heaters were turned on at the
lift stations. The HVAC heating at Mendota Heights Road #1 lift was turned on.
The Streets Crew put up signs around the Halloween bonfire fire dumping site. The
brush pile was pushed up everyday. They helped Blue Chip Tree Company take the
tops of the five walnut trees between Second and Third Avenues alleyway. When the
soil dries out they will take down the tree trunks. The new Mack truck came in that is
replacing the 1994 Ford. It will be taken to ]-Craft to have the box plow wing and
sander installed.
Engineering
Visitation Drive & Mendota Heights Road Roundabout - Council approved the Final
Plans and authorized bid advertisement for the roundabout at the October 20th Council
Meeting. Council also authorized Staff to begin the process for closing Lake Drive.
Staff will be sending a letter to Rogers Lake neighborhood residents outlining the
proposal and requesting feedback. A Public Hearing on the project will be held over
the winter, and implementation is anticipated for the summer of 2010 in conjunction
with the roundabout construction. Staff is interested in hearing public opinion on the
Lake Drive closure concept and timeline.
Water Tower Rehabilitation - The consultant hired at the October 6th Council Meeting
has begun surveying the water tower in order to provide plans and specifications for
the tower rehabilitation. Staff anticipates the consultant giving Council an update at
the November 3rd meeting, completing the design package by the end of November,
and having the rehabilitation under construction during the summer of 2010.
Trunk Highway 55 & Mendota Heights Road Intersection Improvement - City Staff met
with the consultant on Monday to go over the revised plans to scale down the scope of
improvements to get the project within budget for the City's share of the construction
cost. The consultant revised the plans and pending some final detail modification,
Staff is confident the project will now come in within our originally anticipated budget.
The project is a MnDOT State Aid Cooperative Agreement Project whereby MnDOT has
allocated $424,821.00 toward the construction cost, and the City has agreed to cover
October 23, 2009 P-1
the balance. The estimated City contribution to the construction project is
$350,000.00.
2010 Road Reconstruction Project - Council accepted the Feasibility Report and
ordered the Public Hearing for the 2010 Road Reconstruction Project. Streets included
in next year's project are Simard Street, Miriam Street, Valley Lane, View Lane, Esther
Lane, John Street, Spring Street, and Diego Lane. A Neighborhood Meeting is
scheduled for October 28th, and the Public Hearing before Council is scheduled for
November 3rd
Dakota County Regional Visioning Study (Delaware/494 Interchange) - Staff attended
the monthly stakeholder meeting last week to learn about the progress the consultant
has made since last month. Nobody from Mendota Heights attended the meeting in
September due to schedule conflicts and illnesses. This turned out to be unfortunate
from the perspective of the City's traditional stance on the Delaware /494 interchange
issue. After the September meeting, representatives from the consultant, Dakota
County, and the City of Inver Grove Heights met with the Federal Highways
Administration (FHWA) to discuss the Delaware/494 Interchange Option. The Cities of
Mendota Heights and Sunfish Lake were not invited to the meeting with
FHWA. Prior to this meeting, the opinion of FHWA had been, "no new access to I-
494." After the meeting however, FHWA is now advocating for the interchange
at Delaware & I-494 coupled with either a partial or full closure of the
interchange at Dodd Road, and to have Delaware Avenue serve as the
primary north/south corridor north of I-494. Staff strenuously objected to the
new FHWA opinion and the process by which the new opinion was generated. The
next public meeting for the Visioning Study will be November 10th at the
Inver Grove Heights Community Center from 4:30pm to 7:00pm. The
consultant will be presenting the final conclusions of the study to Council sometime
over the winter.
Council Member Krebsbach Meeting - Staff from Public Works and Code Enforcement
met with Council Member Krebsbach on Wednesday as the conclusion to her request
to meet with City Staff. Staff discussed work load and responsibilities as well as
policies and priorities. Council Member Krebsbach met with Engineering Staff in
August.
Delaware Reconstruction Project(110 to Marie) - Staff attended the Public Open
House put on by Dakota County in conjunction with this project. The meeting was
well attended, largely by residents of West Saint Paul affected by the project. The
project is proposing to widen Delaware Avenue from a 2 -lane facility to a 3 -lane
facility, creating a center turn lane to better allow for left turns into Henry Sibley High
School. A new bituminous trail is also proposed as part of the project that would
connect Marie Avenue and the Mendota Road frontage road. The trail will be on the
Mendota Heights side of Delaware Avenue. Independent School District 197 is
supportive of the project. Design should be complete this year, with easement
acquisition taking place in 2010, and construction in 2011. The Dakota County point
of contact for the project is Tom Anton. He can be reached at 952-891-7120.
October 23, 2009 P-2