Loading...
Pipeline 10 16 2009NEWS LETTER The Pipeline Public Works 4 Engineering c Code Enforcement October 16, 2009 Public Works The Parks Crew cleaned out the buildings at Mendakota and Kensington Parks. Sprinkler systems were blown out at Mendakota Park, Kensington Park South, and at the Fire Hall and City Hall. The 3" sprinkler line was repaired at Kensington South soccer field. They attended a Safety Assure meeting on tree trimming and defensive driving. Rich assisted the Parks Crew by helping blow out the sprinkler systems at Kensington South and City Hall. He inspected the water and drywell alarm at the Mendota Heights Road lift station. He load tested the generator batteries at the Mendota Heights Road lift station. The Streets Crew salted the bridge decks on Mendota Heights Road and Wagon Wheel Trail. The plows and sanders were put on the trucks. They blacktopped around the manhole that Rich raised up on Vail Drive. Pot holes were patched on Overlook Road, and Lilac Lane. No parking signs were put up on Coleshire Lane for Neil in the Police Department. Engineering Visitation Roundabout - Staff continued to answer questions form the public this week. Staff also worked out the final detail design issues with the consultant and Final Plans have been prepared. The Final Plans will be before City Council at the October 20th meeting for Council approval along with a request for Council to authorize advertisement for bids. Many of the issues brought forward by members of the public have either been addressed within the plan set, or otherwise explained in the staff memorandum to Council that will be part of the October 20th agenda packet. Water Tower Rehabilitation - The consultant hired at the October 6th Council Meeting has begun surveying the water tower in order to provide plans and specifications for the rehabilitation project. Staff anticipates the consultant giving Council an update at the November 3rd meeting, completing the plans and specification package by the end of November, and having the rehabilitation under construction during the summer of 2010. Trunk Highway 55 & Mendota Heights Road Intersection Improvement - City Staff will be meeting with the consultant next week to go over the revised plans that P-1 will scale down the scope of improvements to get the project within budget for the City's share of the construction cost. Upon review of the preliminary plans, Staff observed the construction cost estimate for the project was in excess of what the City has allocated for our share of the expense. In reviewing the consultant's assumptions, Staff discovered they were using a traffic growth factor that was inconsistent with the City's Comprehensive Plan. Staff provided the consultant with the proper growth figures, and they are adjusting the design accordingly. The project is a MnDOT State Aid Cooperative Agreement Project whereby MnDOT has allocated $424,821.00 toward the construction cost, and the City has agreed to cover the balance. The estimated City contribution to the construction project is $350,000.00. 2010 Road Reconstruction Project - Council accepted the Feasibility Report and ordered the Public Hearing for the 2010 Road Reconstruction Project. Streets included in next year's project are Simard Street, Miriam Street, Valley Lane, View Lane, Esther Lane, John Street, Spring Street, and Diego Lane. A Neighborhood Meeting is scheduled for October 28th, and the Public Hearing before Council is scheduled for November 3rd 2009 Road Rehabilitation Project (Cherry Hills 2nd Addition) - This project is substantially complete, and an assessment hearing is scheduled for the October 20th Council Meeting. Staff has already begun receiving pre -payments for the assessed amount from residents in the project area. Dakota County Regional Visioning Study (Delaware/494 Interchange) - Staff attended the monthly stakeholder meeting on Tuesday of this week to learn about the progress the consultant has made since last month. Nobody from Mendota Heights attended the meeting in September due to schedule conflicts and illnesses. This turned out to be unfortunate from the perspective of the City's traditional stance on the Delaware /494 interchange issue. After the September meeting, representatives from the consultant, Dakota County, and the City of Inver Grove Heights met with the Federal Highways Administration (FHWA) to discuss the Delaware/494 Interchange Option. The Cities of Mendota Heights and Sunfish Lake were not invited to the meeting with FHWA. Prior to this meeting, the opinion of FHWA had been, "no new access to I-494." After the meeting however, FHWA is now advocating for the interchange at Delaware & I-494 coupled with either a partial or full closure of the interchange at Dodd Road, and to have Delaware Avenue serve as the primary north/south corridor north of I-494. Staff strenuously objected to the new FHWA opinion and the process by which the new opinion was generated. The next public meeting for the Visioning Study will be November loth at the Inver Grove Heights Community Center. A time for the meeting will be announced in the very near future. P-2