The Parks Crew cleaned out the buildings at Mendakota and Kensington Parks.
Sprinkler systems were blown out at Mendakota Park, Kensington Park South, and
at the Fire Hall and City Hall. The 3" sprinkler line was repaired at Kensington
South soccer field. They attended a Safety Assure meeting on tree trimming and
defensive driving.
Rich assisted the Parks Crew by helping blow out the sprinkler systems at
Kensington South and City Hall. He inspected the water and drywell alarm at the
Mendota Heights Road lift station. He load tested the generator batteries at the
Mendota Heights Road lift station.
The Streets Crew salted the bridge decks on Mendota Heights Road and Wagon
Wheel Trail. The plows and sanders were put on the trucks. They blacktopped
around the manhole that Rich raised up on Vail Drive. Pot holes were patched on
Overlook Road, and Lilac Lane. No parking signs were put up on Coleshire Lane
for Neil in the Police Department.
Engineering
Visitation Roundabout - Staff continued to answer questions form the public this
week. Staff also worked out the final detail design issues with the consultant and
Final Plans have been prepared. The Final Plans will be before City Council at the
October 20th meeting for Council approval along with a request for Council to
authorize advertisement for bids. Many of the issues brought forward by members
of the public have either been addressed within the plan set, or otherwise
explained in the staff memorandum to Council that will be part of the October 20th
agenda packet.
Water Tower Rehabilitation - The consultant hired at the October 6th Council
Meeting has begun surveying the water tower in order to provide plans and
specifications for the rehabilitation project. Staff anticipates the consultant giving
Council an update at the November 3rd meeting, completing the plans and
specification package by the end of November, and having the rehabilitation under
construction during the summer of 2010.
Trunk Highway 55 & Mendota Heights Road Intersection Improvement - City Staff
will be meeting with the consultant next week to go over the revised plans that
P-1
will scale down the scope of improvements to get the project within budget for the
City's share of the construction cost. Upon review of the preliminary plans, Staff
observed the construction cost estimate for the project was in excess of what the
City has allocated for our share of the expense. In reviewing the consultant's
assumptions, Staff discovered they were using a traffic growth factor that was
inconsistent with the City's Comprehensive Plan. Staff provided the consultant
with the proper growth figures, and they are adjusting the design accordingly.
The project is a MnDOT State Aid Cooperative Agreement Project whereby MnDOT
has allocated $424,821.00 toward the construction cost, and the City has agreed
to cover the balance. The estimated City contribution to the construction project
is $350,000.00.
2010 Road Reconstruction Project - Council accepted the Feasibility Report and
ordered the Public Hearing for the 2010 Road Reconstruction Project. Streets
included in next year's project are Simard Street, Miriam Street, Valley Lane, View
Lane, Esther Lane, John Street, Spring Street, and Diego Lane. A Neighborhood
Meeting is scheduled for October 28th, and the Public Hearing before Council is
scheduled for November 3rd
2009 Road Rehabilitation Project (Cherry Hills 2nd Addition) - This project is
substantially complete, and an assessment hearing is scheduled for the October
20th Council Meeting. Staff has already begun receiving pre -payments for the
assessed amount from residents in the project area.
Dakota County Regional Visioning Study (Delaware/494 Interchange) - Staff
attended the monthly stakeholder meeting on Tuesday of this week to learn about
the progress the consultant has made since last month. Nobody from Mendota
Heights attended the meeting in September due to schedule conflicts and
illnesses. This turned out to be unfortunate from the perspective of the City's
traditional stance on the Delaware /494 interchange issue. After the September
meeting, representatives from the consultant, Dakota County, and the City of
Inver Grove Heights met with the Federal Highways Administration (FHWA) to
discuss the Delaware/494 Interchange Option. The Cities of Mendota Heights
and Sunfish Lake were not invited to the meeting with FHWA. Prior to this
meeting, the opinion of FHWA had been, "no new access to I-494." After the
meeting however, FHWA is now advocating for the interchange at Delaware
& I-494 coupled with either a partial or full closure of the interchange at
Dodd Road, and to have Delaware Avenue serve as the primary
north/south corridor north of I-494. Staff strenuously objected to the new
FHWA opinion and the process by which the new opinion was generated. The
next public meeting for the Visioning Study will be November loth at the
Inver Grove Heights Community Center. A time for the meeting will be
announced in the very near future.