Loading...
Pipeline 10 09 2009NEWS LETTER Public Works Engineering Code Enforcement Public Works The Pipeline October 9, 2009 PREVEN �N The Parks Crew set up and took down tents, tables and chairs at the Pilot Knob site on Sunday for the "pipe ceremony". They took the basketball game, tables and chairs to Boltz Tae Kwon Do to celebrate their anniversary. The soccer fields were striped. They prepared information for research on the skating rinks at Ivy Falls Park. Northern Pump did check ups on the lift stations for the electronics, pumps and overall station condition. St. Paul Regional Water Services made repairs to the hydrants in the Ivy Falls area. The Streets Crew put down black dirt and grass seed at 677 Arcadia, 675 Marie Avenue and 1280 Dodd Road. Blacktopping was done on Wagon Wheel Trail, Swan Court, Rogers Court, Alice Court the fire station parking lot, and around the two water boxes on the pedway behind Parkview Plaza. No dumping signs were put up along with a fence around the old Halloween bonfire site. The Streets Crew and Tom Olund attended the St. Cloud Fall Street Equipment Expo in St. Cloud. Engineering Visitation Roundabout - Staff has met with representatives of Visitation School and have provided the easement documents necessary for construction of the roundabout. Mother Superior of Visitation Convent is on a retreat in conjunction with her 50th anniversary jubilee and will sign the documents upon her return. Once signed by Visitation, the easements will be before Council for approval either at the October 20th or November 3rd meeting. Staff has also discussed with Visitation and Dave Bjorklund options for access to their properties on Condon Court. Any access to the Roundabout will need to be agreed upon by Visitation as they are the owners of the property between the Bjorklund properties and the roundabout. Their discussions are ongoing. Water Tower Rehabilitation - Staff met with representatives from the design team of MSA Professional Services and KLM Engineering for a kickoff meeting on the Water Tower Rehabilitation project. The consultant team hopes to have plans and specification ready by the end of November, and will likely be presenting a project update to Council at the November 3rd Meeting. Construction of the rehab project is anticipated for 2010. P-1 NEWS LETTER The Pipeline Public Works Engineering October 9, 2009 Code Enforcement x Trunk Highway 55 & Mendota Heights Road Intersection Improvement - The City's consultant engineer is adjusting the plans to reduce the overall construction cost of the project. Upon review of the preliminary plans, Staff observed the construction cost estimate for the project was in excess of what the City has allocated for our share of the expense. In reviewing the consultant's assumptions, Staff discovered they were using a traffic growth factor that was inconsistent with the City's Comprehensive Plan. Staff provided the consultant with the proper growth figures, and they are adjusting the design accordingly. The project is a MnDOT State Aid Cooperative Agreement Project whereby MnDOT has allocated $424,821.00 toward the construction cost, and the City has agreed to cover the balance. The estimated City contribution to the construction project is $350,000.00. 2010 Road Reconstruction Project - Council accepted the Feasibility Report and ordered the Public Hearing for the 2010 Road Reconstruction Project. Streets included in next year's project are Simard Street, Miriam Street, Valley Lane, View Lane, Esther Lane, John Street, Spring Street, and Diego Lane. A neighborhood meeting is scheduled for October 28th, and the public hearing before Council is scheduled for November 3rd P-2