Pipeline 09 24 2009NEWS
LETTER
The Pipeline
Public Works __ ��q����V •.r ,y :w
Engineering I y r• w�
Code Enforcement September 24, 2009 IBJ a
Public Works
The Parks Crew checked all lights around the buildings at Mendakota and
Kensington Parks. They watered the newly planted trees to prepare for fall.
The pump on the paint striper for striping the soccer fields was repaired.
Rich applied root killer in the storm sewer on Fourth Avenue. He watered
and fertilized 41 trees in the parks for the Parks Crew. He also attended a
League of Minnesota Cities safety seminar.
Dead trees that were on city right-of-way were cut down by Wright Tree
Services on Valley Curve and picked up by the Streets Crew. All for storm
sewer patches were blacktopped on Swan Drive, Bluebill Drive and Cheri
Lane. They finished blacktopping the potholes and cracks on Mendota
Heights Road from the bridge to Dodd Road. Trash and papers were picked
up from Mendota Heights Road and Lake Drive.