Loading...
Pipeline 08 07 2009NEWS LETTER The Pipeline Public Works Engineering August 7, 2009 Code Enforcement Public Works The Parks crew fertilized the soccer and ball fields at Mendakota Park, Kensington Park and Civic Center ball field. The goal mouths at the Kensington and Mendakota soccer fields were repaired. Dirt was hauled into the fields, leveled off and seeded. A faucet in the women's restroom was repaired at Kensington Park South. A sprinkler head was repaired at City Hall. Rich cleaned the sanitary sewer lines in the Ivy Keep I & II easements and Maple Park Drive. He painted hydrants in the Copperfield neighborhood. New wood mulch was put down around the landscaping at the Culligan lift station. The Streets crew blacktopped Mendota Heights Road. Sand was picked up from Bituminous Roadway and used to cover the new pipe on Chippewa Avenue which is being repaired by Gartzke Construction. Engineering Visitation Roundabout - The City's consultant is completing the preliminary review package for MnDOT submittal early next week. Once MnDOT reviews the package and provides comments, the consultant can proceed with final design documents. The City Council, by process, will be asked to accept the final plans and authorize the advertisement of the project and the collection of bids. It is anticipated that this will take place at either the second Council meeting in October, or the first Council meeting in November. Hiring the Civil Engineer I Position - The hiring panel for the Civil Engineer I position completed interviews this past week. We interviewed 10 candidates and three of the ten stood far above the others. Staff will be checking references and intends on offering the position to the lead Page - 1 NEWS LETTER Public Works Engineering Code Enforcement The Pipeline August 7, 2009 candidate on Monday. If the offer is accepted, a hiring authorization will be before City Council at the August 18th Council meeting. Sanitary Sewer Analysis - Staff has been analyzing the Sanitary Sewer Utility Fund for the past several weeks, and has completed a proposal for the future of the fund that will be included in the upcoming budget workshop packets sent to Council. At issue is the revenue side of the Utility Fund and the available cash balance. Staff is proposing a rate increase to address the issues brought up by the auditor in the Audit Report presented to Council on Tuesday night. Traffic Safety Committee - The quarterly meeting of the Traffic Safety Committee was held on Tuesday afternoon. Five issues brought forth from area residents were discussed and recommendations will be forwarded to City Council at the August 18th Council meeting. Bituminous Roadways - Staff is reviewing the Building Permit plans for the Bituminous Roadways site development on Commerce Drive. Staff has also been working on the issue of an easement vacation for the proposed Bituminous Roadways site. There is an existing easement from an older plat that is no longer used for utility or roadway. The public hearing and decision on vacating the easement is scheduled to be before City Council for the September 1st Council meeting. Page - 2