Loading...
Pipeline 07 24 2009NEWS LETTER The Pipelinf Public Works Engineering July 24, 2009 Code Enforcement Public Works The Parks Crew repaired the men's room toilet at Mendakota Park. They painted the white hockey rink surface at Friendly Hills Park. They worked a tournament for Mendota Heights Association. Downed tree limbs were cleaned from the pedways. They set up for the end of the year tennis party at the Visitation tennis courts. Rich cleaned the sanitary sewer lines on Butler Avenue, Kirchner easement, and Ivy Hill easement. He watered trees for the parks department. He cleaned and vacuumed the Mendota Heights Road lift station. The Streets Crew blacktopped Marie Avenue west from under the 35E bridge to the intersection of Callahan Place. They cleaned storm sewer grates. The blacktop around a hole on Chippewa Avenue was saw cut. The pedway on Marie Avenue was blacktopped from Trail Road approximately 10 feet, dropping down along curb and large cracks were filled. They started digging up Chippewa Avenue to fix the storm pipe. Engineering Visitation Roundabout - The consultant has been progressing on the design of the roundabout, and Staff met with representatives from Visitation School to discuss small roadway easement areas that will be necessary to construct the roundabout. Visitation is willing to grant the easements, and they are planning on splitting payment of their pledged contribution by paying 50% this year and 50% in 2010. In addition, we are discussing the possibility of providing an access from the Visitation parking lot north onto Lake Drive. This access will be necessary during the construction of the roundabout, and Visitation has asked that it remain as a permanent access post -construction. This issue, along with information about the roundabout itself will be discussed at the upcoming Open House which is scheduled for July 30th from 5:OOpm to 7:OOpm at the Visitation School. Trunk Highway 55 and Mendota Heights Road Intersection - Staff met with the consultant to go over the preliminary plans and to discuss project progress. The consultant will be looking to modify the design to get the project to fit within existing grades, and to reduce the length of improvements along Mendota Heights Road. Page - 1 N E W S LETTER Public Works Engineering Code Enforcement The Pipelini 46 0 --1 00�1 July 24, 2009 �� The next set of plans is scheduled for review at the end of August. Project design is anticipated to be complete in December, and construction will likely take place during the summer of 2011 as the project is currently programmed for MnDOT funding in Fiscal Year 2011. Hiring the Civil Engineer I Position - John and Ryan have been combing over the 67 applications received for the Civil Engineer I position advertised to replace Sam Kuchinka who is leaving the City on July 31s' to attend Medical School. Staff hopes to schedule interviews for the week of August 3rd, and have a selection made by the following week. There have been a number of excellent applications reviewed thus far. Although Sam will be difficult to replace, Staff is confident that a suitable replacement will come out of the crop of applications received. 2010 Street Reconstruction Project - Staff continues compiling information for the Feasibility Report for the 2010 Street Reconstruction project. Streets proposed for reconstruction next summer are: Simard Street, Miriam Street, Valley Lane, View Lane, Esther Lane, John Street and Spring Street. It is anticipated that the Feasibility Report and the Public Hearing will be completed during the 2009 calendar year. Planning Cases - Staff has sent a good deal of time working with residents on upcoming Planning Cases. Specifically, Staff has spent substantial time with a neighbor of the Conditional Use & Wetland Permit application at 790 Ridge Place. This case is on the agenda for the July 28th Planning Commission Meeting, and should be before Council on August 4th Page - 2