Loading...
Pipeline 07 17 2009NEWS LETTER Public Works Engineering Code Enforcemen Public Works he Pipeline July 17, 2009 The Parks Crew repaired the men's bathroom faucet at Mendakota Park. They prepared the fields and worked the tournament for AAU Baseball. The fence lines and backstops were sprayed with total weed kill. The jump box in the skate park at Rogers Lake was repaired by welding the square tubing. The area around the playground at Victoria Highlands Park was leveled off and seeded. Rich cleaned the sanitary sewers on Chippewa Avenue, Spring Street, Fremont Avenue, Winston Court, Diego Lane, Junction Lane, John Street and Esther Lane. Catch basins that were filled with leaves were vacuumed and cleaned on Chippewa Avenue and Decorah Lane. The Streets Crew cleaned out the ditch line on Highway 13. A vandalized stop sign was replaced on at Vandal Street. A missing stop sign was replaced on Ashley Lane and Norma Lane. A speed sign was reinstalled on Evergreen Knoll. Street patching was done on Marie Avenue from Lexington to Delaware Avenue. There was a hold in a storm pipe, which caused the street to cave in on Chippewa Avenue. Rich helped lamp the storm pipe to see where the broken pipe is. Engineering John and Ryan met with representitives from Mn/Dot regarding street turn backs. Currently Victoria Curve, Center Pointe Curve, Dakota Drive and Carmen Lane are in state right of way. These streets and right of way should become city owned by the end of 2009. John and Ryan met with Bonestroo regarding the intersection improvements on Hwy 55 and Mendota Heights Road. The project has been delayed until 2011. Bonestroo will also be trying to minimize the scale of the project.