The Parks Crew repaired the men's bathroom faucet at Mendakota Park.
They prepared the fields and worked the tournament for AAU Baseball. The
fence lines and backstops were sprayed with total weed kill. The jump box
in the skate park at Rogers Lake was repaired by welding the square tubing.
The area around the playground at Victoria Highlands Park was leveled off
and seeded.
Rich cleaned the sanitary sewers on Chippewa Avenue, Spring Street,
Fremont Avenue, Winston Court, Diego Lane, Junction Lane, John Street
and Esther Lane. Catch basins that were filled with leaves were vacuumed
and cleaned on Chippewa Avenue and Decorah Lane.
The Streets Crew cleaned out the ditch line on Highway 13. A vandalized
stop sign was replaced on at Vandal Street. A missing stop sign was
replaced on Ashley Lane and Norma Lane. A speed sign was reinstalled on
Evergreen Knoll. Street patching was done on Marie Avenue from Lexington
to Delaware Avenue. There was a hold in a storm pipe, which caused the
street to cave in on Chippewa Avenue. Rich helped lamp the storm pipe to
see where the broken pipe is.
Engineering
John and Ryan met with representitives from Mn/Dot regarding street turn
backs. Currently Victoria Curve, Center Pointe Curve, Dakota Drive and
Carmen Lane are in state right of way. These streets and right of way
should become city owned by the end of 2009.
John and Ryan met with Bonestroo regarding the intersection improvements
on Hwy 55 and Mendota Heights Road. The project has been delayed until
2011. Bonestroo will also be trying to minimize the scale of the project.