Pipeline 07 10 2009NEWS LETTER T e Pipeline Public Works EngineeringJuly 10, 2009 K-1 Code Enforcement IOU Public Works The Parks Crew cleaned up a downed oak tree in Friendly Hills Park. Sprinkler heads and a broken sprinkler line were repaired at the Fire Hall. Parks also cleaned up the clean fill at Victoria Highlands Park around the playground equipment. Rich cleaned the sanitary sewer lines on Beebe Avenue, Ashley Lane, Dodd Road, Miriam Street, Hiawatha Avenue and Somerset. Weeds were pulled at the Culligan and Veronica lift stations. The Streets Crew completed pothole patching on Orchard Place, Orchard Circle, Hunter Lane, Culligan Lane, Glen Hill Road, Veronica Lane, Diane Road, Rae Court, Douglas Road, Barbara Court Eagle Ridge Road and Nina Court. A hole in the pedway in Park Place was blacktopped. A water box on Trail Road was blacktopped and a residential driveway was fixed where it was breaking up a curb. A street patch on Mendota Heights Road was blacktopped. Streets also helped Ryan and Sam haul in and spread mulch at the First Avenue rain gardens. North Star Mudjacking was shown the curb to be raised on the east and west sides of Lilac Lane. Fill was hauled out of Victoria Highlands Park to the Pilot Knob site. Engineering Visitation Roundabout - The consultant has been progressing on the design of the roundabout, and Staff met with representatives from Visitation School to discuss small roadway easement areas that will be necessary to construct the roundabout. Visitation is willing to grant the easements, and they are planning on splitting payment of their pledged contribution by paying 50% this year and 50% in 2010. MnDOT Plan Review - Staff has been reviewing plans from MnDOT for upcoming projects during the 2009 construction season. These projects include: -- Interstate 35E Tension Cable Guardrail Installation from County Road 42 in Burnsville to north of Wagon Wheel Trail -- Trunk Highway 13 Tension Cable Guardrail Installation from south of Interstate 494 to Trunk Highway 55 -- Trunk Highway 55 Tension Cable Guardrail Installation from Trunk Highway 110/13 Split to Mendota Heights Road Staff has requested that MnDOT inform the City of the construction schedule as early as possible. Page - 1 July 10, 2009 2010 Budget - Staff has completed the 2010 proposed budget. Budgets for Engineering, Parks, Utility and Storm Sewer Utility are proposed to remain relatively flat. An issue has been discovered on the revenue side of the Sanitary Sewer Utility, however. Staff is currently analyzing past years, forecasting for future need, and will be forwarding further information to Council in the near future. Trunk Highway 55 and Mendota Heights Road Intersection - Staff is currently reviewing the preliminary design documents provided by the consultant. Staff also compiled storm sewer data and forwarded it to the consultant so they could continue progressing with the design. Final Plans are anticipated by the end of the year, the project should be able to be bid in early 2011 (delay is due to MnDOT funding program), and the project is projected to be under construction during the summer of 2011. 2010 Street Reconstruction Project - Staff has begun compiling information to prepare the Feasibility Report for the 2010 Street Reconstruction project. Streets proposed for reconstruction next summer are: Simard Street, Miriam Street, Valley Lane, View Lane, Esther Lane, John Street and Spring Street. It is anticipated that the Feasibility Report and the Public Hearing will be completed during the 2009 calendar year. Retirement of Tom Knuth - Engineering bid farewell to Tom Knuth after 28 years of employment and nearly 40 years of total service to the City of Mendota Heights. Tom chose to retire, and City staff sent him off with a luncheon at City Hall on Monday. Tom will be well missed and Engineering Staff hopes he comes by to visit between golf games. Tom's position will be filled by Bobby Crane who has been working with the City for the past 3 months in our Summer Intern position. If you have not met Bobby yet, stop by Engineering and welcome him to his new position. Resignation of Sam Kuchinka - Sam is headed to Medical School at the University of Minnesota in August. Although this is a great opportunity for Sam, the Engineering Department will be losing his services effective July 31St. The City has advertised to hire a replacement for Sam, but his dedication to his job and to the Mendota Heights community will be difficult to replace. We wish Sam all the best as he embarks on this new phase of his career. Partial Retirement of Guy Kullander - Guy has been offered the opportunity to partake in the newly authorized Partial Retirement Program through the Public Employees Retirement Association (PERA). Guy will begin working a reduced work schedule while he begins to draw from his retirement account. This program offers the Engineering Department the opportunity to transition Guy's duties to other staff, and it provides Guy the opportunity to take advantage of his retirement while still contributing to the City. When Guy's final retirement date arrives in May of 2010, he will have worked for the City for nearly 29 years! Congratulations Guy, and thank you for sticking around one more year. Page - 2