The Parks Crew fertilized the Kensington South soccer fields, Mendakota ball fields
and soccer fields, the fire hall, the old fire hall site, city hall, and the Civic center
ball field. They set up fields for a baseball tournament by installing pitching
mounts and moving bases to 75 feet. Trees were picked up that were donated by
the Moms Club. They set up the tents and tables for the Pilot Knob dedication.
Rich cleaned the sanitary sewer lines on Dorset Road, Mears Road, Delaware
Avenue and Staples Avenue. He cleaned the storm sewer on Fourth Avenue where
there were a lot of tree roots. He cut roots with the root saw on Ocala Lane. He
vacuumed out the sump manholes and dropped in mosquito briquettes.
The Streets Crew swept the curb and gutters on Acacia and Pilot Knob Road to
Highway 13 with the help of Resurrection Cemetery. Brush was cut way from the
guardrails on Wagon Wheel Trail. They worked on the new truck specifications
with Cliff. A hotbox was installed in the dump box of a truck and John Ambrose is
doing the welding and fabricating to install the hotbox.
Engineering
Visitation Roundabout - It is finally official! The City of Mendota Heights was
notified on Thursday that we are the recipients of $310,000.00 in Federal funds
under the American Recovery and reinvestment Act (ARRA), commonly referred to
as the Economic Stimulus Bill. The funds are programmed for Federal Fiscal Year
2010, so contract award for construction will need to be after October 1st, 2009.
Physical construction of the project is anticipated for the summer of 2010 during
the school's summer vacation.
The consultant will be surveying the intersection next week and finalizing the
preliminary design of the roundabout over the next 2-3 weeks. Staff and the
consultant met with Visitation to discuss the location of a temporary access to
their parking lot off Lake Drive that will need to be utilized during project
construction. Staff is working with Visitation staff and the consultant to schedule a
public neighborhood meeting in late July to go over the plans for the project.
Page - 1
NEWS
The Pipeline
LETTER
Public Works
Engineering June 26, 2009 a
Code Enforcement
Dakota County Regional Visioning Study - Staff attended the Public Open House
held on Wednesday evening at Henry Sibley High School. The meeting was
attended by representatives from MnDOT, Dakota County, the County's consulting
engineer, as well as representatives from the Cities of Inver Grove Heights, Eagan,
Mendota Heights, and Sunfish Lake. The Open House saw approximately 75
people come through the meeting over the 2.5 hours it was open. Most of the
comments and questions from the public centered around specific intersections
with Argenta/TH55, Dodd Road/TH55, 70th Street/South Robert Trail, and
Argenta/Delaware/494. Results and opinions from the Open House will be used in
the alternatives analysis portion of the Visioning Study, and will be incorporated
into the final Study Report.
MnDOT Plan Review - Staff has been reviewing plans from MnDOT for upcoming
projects during the 2009 construction season.
2010 Budget - Staff has been compiling information for the 2010 proposed
budget. The completed forms are due back to the City Clerk's office by July 2nd
Dakota County Transportation Engineer Meeting - Staff met with Mark Krebsbach,
the Dakota County Transportation Engineer on Tuesday to go over the County's
plans for Delaware Avenue north of Highway 110, and to discuss potential budget
cuts to the County maintenance program. Mr. Krebsbach will be sending the City
a copy of their proposed 2010 Maintenance Program in the coming weeks.