Pipeline 06 19 2009NEWS The Pipelin
LETTER
Public Works 0`' June 19, 20090
Engineering �� V
Code Enforcements Happy Father's Day Ha P/
Public Works
The Parks Crew hauled rec rock to Mendakota Park and the Civic Center field to fill
in low spots. Fields was prepped at Mendakota for a baseball tournament by
moving the bases to 75 feet and mounds were installed. Graffiti was removed from
the pavilion walls at Rogers Lake. The gate to the hockey rink at Marie Park was
repaired.
Tom Olund was called in at 5:15 A.M. on Tuesday for the high water alarm at the
St. Thomas lift station (Rich was out of town). Rich cut roots in the sanitary sewer
lines on Hazel Court and Pagel Road. The sanitary sewer line was jetted for
grease in front of Friendly Hills Middle School.
Curb sections were hammered out on Coleshire Lane and Hingham Circle. The
concrete dug outs were removed from behind the curbs and new cement forms
were installed. The new curbs were backfilled with black dirt and grass seed. The
street sweepings were hauled to Dakota County. Three trucks were used most of
the week for hauling the sweepings. Vandals pulled out signs and switched them
around on Coleshire Lane, Somerset Road, Emerson Avenue and Somerset Court.
The Streets Crew reinstalled the signs in the correct places. Weed whipping was
done around fire hydrants on Mendota Heights from Highway 13 to Delaware
Avenue and on Huber Drive.
Engineering
Dodd Road/Highway 110 Pedestrian Feasibility Study - The application for funding
through the Transportation Enhancement program was submitted and accepted by
the Metropolitan Council on Monday. The project selection process is expected to
take several weeks, and may take as long as 2+ months. Staff will provide
updates as they are received form Met Council.
2009 Road Rehabilitation Project (Cherry Hills 2nd - The project was awarded at
the June 16th Council Meeting, and the contractor intends to begin work during the
first week in August.
Page - 1
NEWS
LETTER
The Pipeline
Public Works
June 19, 2009 uIII�
Engineering _
Code Enforcement
Highway 55 & Mendota Heights Road Intersection - The consultant is finishing up
the preliminary set of plans for City and MnDOT review. The consultant schedule
states that plans will be delivered to the City for review by June 30th. The
geotechnical contractor completed soil borings this past week and will have their
report completed by the end of June.
As a reminder, we have been notified by MnDOT that our cooperative agreement
share has slipped 1 fiscal year to FY2011. The $424,841.00 grant for construction
was originally scheduled for FY2010, but due to budgetary constraints, the funding
was moved out one more year. This change in funding year should not impact our
design efforts, and will actually benefit the City in the ability to fund the design
and the remaining construction balance out of the State -Aid account.
2009 Crackseal and Sealcoat Program - The contractor has begun cracksealing
and is anticipating proceeding with sealcoating (chip seal) on June 29th. All
neighborhoods will be notified as to their respective work schedules. Streets
included in this program are:
■ Crackseal Only: Overlook Road, Overlook Lane, Lilac Road, Summit Lane
(Marie to Overlook), Rolling Green Curve, Windwood Court, Oxford Court,
Stratford Road, Coventry Court.
■ Sealcoat Only: Mendakota Drive, Executive Drive, Northland Drive (Hwy 55
to Mendota Heights Road)
■ Crackseal & Sealcoat: Summit Lane (south of Marie), Faro Lane, Avanti
Drive, Twin Circle Drive, Bwana Court, West Circle Court, Vail Drive
Visitation Roundabout - The consultant has started designing the roundabout
intersection at Visitation Drive and Mendota Heights Road. As part of their design
process, there will be a public neighborhood meeting to discuss the project. Two
aspects of the project are likely to draw interest from the surrounding
neighborhoods, as well as from the general public: 1) the proper navigation and
use of a roundabout; and 2) a proposed temporary access to the Visitation School
parking lot from Lake Drive during the construction phase. Both of these issues
will be presented and open for discussion at the Public Meeting. A date for the
Public Meeting has not been set yet.
Page - 2
NEWS
LETTER
The Pipeline
Public Works
Engineering June 19, 2009 bad
Code Enforcement
Delaware/494 Interchange - The Council heard form the Dakota County consultant
at the June 16th Council meeting. The Consultant presented the outline of the
Visioning Study, and took comments and questions from Council Members.
Sunfish Lake Council Member Dick Williams was also in attendance.
A public Open House is scheduled for Wednesday June 24th from 4:30pm to
7:OOpm at Henry Sibley High School. Dakota County and their consultant will be
advertising the Open House. City Staff is planning on attending.
Lower Mississippi Watershed (LMRWMO) - Staff and Council Member Schneeman
attended the monthly meeting of the LMRWMO on Thursday morning. A major
topic of discussion was the upcoming next generation Watershed Management
Plan. This will be discussed again at the next meeting, with the intention of
establishing a plan of action and a consultant award option for completing the plan
by December 31St, 2010 in accordance with the rules established by the Board of
Water and Soil Resources (BWSR). The next meeting is scheduled for July 30th at
9:OOam. The meeting will be at Inver Grove Heights City Hall.
Gun Club Lake Watershed (GCLWMO) - Staff and Resident Representative Larry
Craighead attended the quarterly meeting of the GCLWMO on Wednesday
afternoon. The GCLWMO budget and program continuation was a major topic of
discussion, as was the presentation from the City of Inver Grove Heights on their
Surface Water Management Program. The next meeting of the GCLWMO is
scheduled for September 16th at 4:OOpm. The meetings are held at the Moonshine
Park Retreat Center in Eagan. The City of Mendota Heights is scheduled to
present our Surface Water Management Program update at the September
meeting.
Page - 3