Public Works _
Engineering June 5, 2009
Code Enforcement
r -
Public Works
The Parks crew put down mulch around newly planted trees and around the trees that
needed mulch. Dirt was hauled to Hastrom King Park where construction work was done.
A sprinkler line was repaired at City Hall. Sprinkler heads were replaced at Kensington
Park South. They worked on preparing Mendakota Park for Saturday's park celebration.
Rich watered trees. He sprayed right-of-ways with roundup (a total weed killer) for the
Streets Crew. He checked the 2009 mill and overlay area manholes and found 18 needing
ring work. Tree roots were cut on Pontiac Place and Decorah Lane. Nick Williams, Rich's
summer helper, started.
The Streets Crew dug up a storm basin on Medallion Drive. They made up forms to hold it
in place and mudded it up. The storm sewer was dug up on Northland Drive and bricked
up under the basin. Blacktopping was done on Medallion Drive. Northland Drive, Summit
Lane and Avanti Drive for seal coating work. New street signs were put up on Decorah
Lane, Apache Street and the yield signs were also replaced.
Engineering
Dodd Road/Highway 110 Pedestrian Feasibility Study - The consultant is compiling
information for the Metropolitan Council Transportation Enhancement grant application.
The application is due June 15th
2009 Road Rehabilitation Project (Cherry Hills 212 -dl - The project has been advertised and
Construction Plans are available for contractors to review. Bid opening will be on June
10th at 10:OOam at City Hall, and the contract award is anticipated for the June 16th
Council Meeting.
Highway 55 & Mendota Heights Road Intersection - The consultant has begun preparing
the preliminary plans for the intersection improvement. The geotechnical (soil) analysis
contract was approved by Council on June 2nd, and the consultant will be in the field
taking soil samples next week.
We have been notified by MnDOT that our cooperative agreement share has slipped 1
fiscal year to FY2011. The $424,841.00 grant for construction was originally scheduled
for FY2010, but due to budgetary constraints, the funding was moved out one more year.
This change in funding year should not impact our design efforts, and will actually benefit
the City in the ability to fund the design and the remaining balance of the construction
project out of out State -Aid account. A copy of the MnDOT notification is attached.
790 Ridge Place - Staff served notice to the property owner at 790 Ridge Place that her
fence was constructed in violation of conditions as part of her 2005 Conditional Use Permit
approval for the fence. Staff informed the property owner that she is welcome to re -apply
for a new CUP and that the remaining fence can stay in place until the new approval
process is completed. If the property owner does not make application for a new CUP by
July 6th, the existing fence is ordered to be removed by July 7th
694 Ocala Lane - Staff served notice to the property owner at 694 Ocala Lane that the
pergola style lean-to shelter on the northwest side of his house was to be removed by
June 15th. At the October 21St, 2008 Council meeting, Council denied a side yard setback
variance application from the property owner and ordered the structure be removed by
December 31St, 2008. As of June 3rd, 2009, the structure was still standing. Staff will
update Council on the status of this removal at the June 16th meeting.
Callahan Place Reconstruction - The contractor returned to Callahan Place this past week
to finish landscape and to place the wear course of asphalt on the road. There are minor,
punch -list style items that still need to be completed, but it is anticipated the project will
be at substantial completion by the fall.
2009 Crackseal and Sealcoat Program - The contractor has begun cracksealing and is
anticipating proceeding with sealcoating (chip seal) next week. Streets included in this
program are:
■ Crackseal Only: Overlook Road, Overlook Lane, Lilac Road, Summit Lane (Marie to
Overlook), Rolling Green Curve, Windwood Court, Oxford Court, Stratford Road,
Coventry Court.
■ Sealcoat Only: Mendakota Drive, Executive Drive, Northland Drive (Hwy 55 to
Mendota Heights Road)
■ Crackseal & Sealcoat: Summit Lane (south of Marie), Faro Lane, Avanti Drive, Twin
Circle Drive, Bwana Court, West Circle Court, Vail Drive