Pipeline 05 15 2009N E W S The Pipeline LETTER Public Works Engineering Code Enforcement May 15, 2009 Public Works The Parks Crews cut grass, dragged, striped and chalked ball fields. The lawn sprinklers were started up at Mendakota Park, Kensington Park and City Hall. Sprinkler heads were repaired as needed. A broken toilet in the men's room was repaired at the Kensington South Park. Home plate was replaced on field #2 at Mendakota Park. A downed tree on the pedway in Valley Park was cut up and removed. Rich sprayed for weeds at Friendly Hills Park, Marie Park, Valley Park, Victoria Highlands Park, Friendly Hills tot lot, and the City of Mendota Heights sign on Dodd Road. He was called in on Wednesday night at the Northland lift station for a high water alarm. There was a rock stuck in pump 1 and Cliff helped Rich. The Streets Crews started sod damage repair that caused by plowing. They are also finishing up on mailbox repairs. Black dirt was picked up in Farmington and two loads were brought to the Par 3. An illegal dump was cleaned up on City property. Engineering Dodd Road/Highway 110 Pedestrian Feasibility Study - The consultant submitted their Final Feasibility Report for Staff review on Tuesday. Staff provided comments and the Final Report will be presented at Council on May 19th. Council will be asked to provide guidance on their desire to proceed and with which option they would like to pursue. Council will also be asked if pursuit of funding from the Metropolitan Council is desired, and whether a consultant should be used to assist staff in preparing the funding application. 2009 Road Rehabilitation Project (Cherry Hills 2nd - Construction Plans are finalized. Council will be asked to authorize advertisement for bids at the May 19th Council meeting. Page - 1 NEWS L E T T E RThe Pipeline _ Public Works -r+ Engineering Code Enforcement J �; May 15, 2009 Highway 55 & Mendota Heights Road Intersection - The consultant has completed the wetland review and is gathering background information for the design of the project. The City has been asked to provide geotechnical (soil) analysis for the area, so Staff is working with a consultant to gather this information. It is anticipated that preliminary plans will be provided to Staff for review by the end of June. Construction of the project is scheduled for the summer of 2010. 2009 Street Maintenance (Cracksealing & Sealcoating) Project - At the request of a resident on Avanti Drive, City staff is surveying residents on the street to determine their preference of road treatments. Avanti Drive is scheduled for a crackseal and sealcoat treatment in 2009. The resident requested the City not perform this maintenance, and rehabilitate (mill & overlay) the street in 2010. A letter was sent to all property owners along Avanti Drive and responses with their preferences were requested by May 15t". Most of the responses to date have favored the sealcoat option. Staff will inform Council of our determination after the comment deadline. Energy Efficiency & Conservation Block Grant (EECBG� - Staff is continuing to research opportunities for funding under the EECBG program. Under the Federally funded program, Mendota Heights is not eligible for a direct grant because the City has a population of under 35,000 people. Staff has been working with representatives from Dakota County on other grant sources from similar programs. Staff will prepare a summary of their findings when research is complete. Page - 2