Pipeline 05 15 2009N E W S The Pipeline
LETTER
Public Works
Engineering
Code Enforcement May 15, 2009
Public Works
The Parks Crews cut grass, dragged, striped and chalked ball fields. The lawn
sprinklers were started up at Mendakota Park, Kensington Park and City Hall.
Sprinkler heads were repaired as needed. A broken toilet in the men's room was
repaired at the Kensington South Park. Home plate was replaced on field #2 at
Mendakota Park. A downed tree on the pedway in Valley Park was cut up and
removed.
Rich sprayed for weeds at Friendly Hills Park, Marie Park, Valley Park, Victoria
Highlands Park, Friendly Hills tot lot, and the City of Mendota Heights sign on Dodd
Road. He was called in on Wednesday night at the Northland lift station for a high
water alarm. There was a rock stuck in pump 1 and Cliff helped Rich.
The Streets Crews started sod damage repair that caused by plowing. They are
also finishing up on mailbox repairs. Black dirt was picked up in Farmington and
two loads were brought to the Par 3. An illegal dump was cleaned up on City
property.
Engineering
Dodd Road/Highway 110 Pedestrian Feasibility Study - The consultant submitted
their Final Feasibility Report for Staff review on Tuesday. Staff provided
comments and the Final Report will be presented at Council on May 19th. Council
will be asked to provide guidance on their desire to proceed and with which option
they would like to pursue. Council will also be asked if pursuit of funding from the
Metropolitan Council is desired, and whether a consultant should be used to assist
staff in preparing the funding application.
2009 Road Rehabilitation Project (Cherry Hills 2nd - Construction Plans are
finalized. Council will be asked to authorize advertisement for bids at the May 19th
Council meeting.
Page - 1
NEWS
L E T T E
RThe Pipeline
_
Public Works -r+
Engineering
Code Enforcement J �;
May 15, 2009
Highway 55 & Mendota Heights Road Intersection - The consultant has
completed the wetland review and is gathering background information for the
design of the project. The City has been asked to provide geotechnical (soil)
analysis for the area, so Staff is working with a consultant to gather this
information. It is anticipated that preliminary plans will be provided to Staff for
review by the end of June. Construction of the project is scheduled for the
summer of 2010.
2009 Street Maintenance (Cracksealing & Sealcoating) Project - At the request of
a resident on Avanti Drive, City staff is surveying residents on the street to
determine their preference of road treatments. Avanti Drive is scheduled for a
crackseal and sealcoat treatment in 2009. The resident requested the City not
perform this maintenance, and rehabilitate (mill & overlay) the street in 2010. A
letter was sent to all property owners along Avanti Drive and responses with their
preferences were requested by May 15t". Most of the responses to date have
favored the sealcoat option. Staff will inform Council of our determination after
the comment deadline.
Energy Efficiency & Conservation Block Grant (EECBG� - Staff is continuing to
research opportunities for funding under the EECBG program. Under the Federally
funded program, Mendota Heights is not eligible for a direct grant because the City
has a population of under 35,000 people. Staff has been working with
representatives from Dakota County on other grant sources from similar
programs. Staff will prepare a summary of their findings when research is
complete.
Page - 2