Loading...
Pipeline 04 23 2009NEWS LETTER Public Works Engineering Code Enforcement Public Works The Pipeline April 24, 2009 n� The Parks Crew striped foul lines, soccer fields and lacrosse fields in the parks. Ball fields were dragged and chalked. Mendakota Fields were prepared for the Henry Sibley girls fast pitch tournament. Crab grass preventative was applied in Mendakota and Kensington parks. The faucet in the women's restroom was repaired at Mendakota Park. Rich installed a new cover on the St. Thomas wet well with Cliff's help. The sanitary sewer line was jetted in front of 1025 William Court which had roots in it. With Cliff's help Rich cleaned out the jet truck's water tank. The Streets Crew hauled class 5 to the alley way at Hiawatha Avenue and Fremont Avenue and graded it with the bobcat. The rest of the time was spent working with the street sweeping contractor. Engineering Dodd Road/Highway 110 Pedestrian Feasibility Study - The consultant presented the Draft Feasibility Report to Council on April 21St and received comments and answered questions of both Council and the public in attendance at the meeting. Pedestrian counts will be completed in May, and the Final Report will be presented to Council either on May 19th, or on June 2nd. Funding application for Metropolitan Council consideration is due on June 15th. When reviewing the Final Report, Council should keep this date in mind and advise staff of their desire to move forward with the project. Congresswoman McCollum and State Representative Hansen are both aware of this project, and are now receiving regular updates (see item below). 2009 Road Rehabilitation Project (Cherry Hills 2nd - The Public Hearing was held at the April 21St Council meeting and the Council ordered plans and specs to be produced. Construction of the project will take place this summer. Mendota Mall Re -Development - The Developers' Agreement, Final Plat, and Final PUD were approved by Council at the April 21St Council meeting. Staff has begun working with the developer on construction plans for building permit application. Page - 1 NEWS ThePipelineLETTER Public Works 14April EngineeringCode Enforcement 24, 2009 Visitation/Saint Thomas Roundabout - Staff has been working with both schools for the past several months to determine the best fix for the traffic issues at Mendota Heights Road and Visitation Drive. At the request for the schools the City made application for funding under the ARRA for a local transportation safety project. The two schools have pledged matching funds of $45,000.00 combined to help increase the chances of receiving the Federal Funds. The City has pledged to match the $45,000.00 out of our State -Aid account. On April 15th the Metropolitan Council decided not to spend the "local money" from the ARRA on the Interstate 494/ US Highway 169 interchange in Eden Prairie. As a result, a list of local projects will be sent to the Metropolitan Council Transportation Advisory Board for approval, and the Visitation Drive roundabout project is on the list. We have NOT been officially notified of our receipt of ARRA funds, but it looks increasingly like we will get this project funded through the ARRA. Congresswoman McCollum is very interested in this project as well (see item below). Highway 55 & Mendota Heights Road Intersection - The Professional Services contract award for design of the project was awarded by Council on April 21St Staff will hold a kickoff meeting with the consultant in the next week to start the design of the project. The City has received $424,821.00 of Fiscal Year 2010 money from MnDOT to assist in paying for the intersection reconstruction. Preliminary construction estimates have the project costing nearly $800,000.00. The balance of the construction cost, as well as the engineering and administrative costs is scheduled to be paid out of our State -Aid account. Meeting with Congresswoman Betty McCollum - John met with Congresswoman Betty McCollum on Monday evening at an open forum concerning the re- authorization of SAFETEA-LU, the Federal Transportation Funding Authorization Bill. Our efforts for pedestrian improvements at Dodd Road and Highway 110 were brought to her attention, and she requested a brief presentation at her open forum. Congresswoman McCollum was very grateful to hear from Mendota Heights, and to learn about what we are doing within the City. She was also very interested in the Saint Thomas/Visitation roundabout project, and requested an update on our efforts on that project as well. Her office will be kept informed of our progress for both projects. Page - 2