Public Works
The Parks Crew placed satellites in the parks for the upcoming season. Light
bulbs were replaced around buildings and under pavilions at Mendakota
Park, Kensington, and Rogers Lake Park. A fallen tree was removed from
the pedway between the ponds off of Huber Drive. Trees are being trimmed
along the pedways. The parks trailer is being worked on by removing old
decking and cleaning up the rusty spots.
Rich cleaned and vacuumed the lift stations on Northland Drive, Centre
Pointe Drive, and Veronica. The Mendota Heights Road sanitary sewer line
was cleaned from Lloyds BBQ to the lift station. The lift station was then
cleaned because of all the grease. Root X (a root killing chemical) was
added to the sanitary sewer line on Marie Avenue.
The Streets Crew filled a pothole at 815 Park Place Drive with class 5 and
then compacted it with the tractor. A hole by the catch basin on Medallion
Drive was filled with UPM mix. Potholes were patched on the north end of
the City. A couch was picked up off the street on Round Hill Road. They
helped flip the bus, brought barricades and sand for the drill on Wednesday
night. Street sweeping has been set for April 20tH
Engineering
Staff has been coordinating with the consultant on the Highway 110 & Dodd
Road Pedestrian Feasibility Study. There is a neighborhood meeting
scheduled for Wednesday April 15th ay City Hall.
John testified before the Local Government Division of the State and Local
Government Operations Reform, Technology, and Elections Committee of the
State House on the status of the Critical Area Bill (HF424). Although there
are still issues to be worked out, the bill, as amended by State
Representative Hansen, is a far more acceptable version than the original
bill. Staff will continue to work out details with Rep. Hansen's office.
4/3/09 Page - 1
The Pipeline cont.
Staff has continued to work with our City Attorney and the development
team on the Developers Agreement for the Mendota Mall redevelopment. A
final draft of the Developers Agreement is scheduled for hearing before
Council on April 7th
Staff is working to set up a meeting with representatives from the DNR,
Dakota County, and Rogers Lake area residents to meet with State
Representative Hansen to discuss issues pertaining to recreational
opportunities at Rogers Lake. This meeting is tentatively scheduled for
Wednesday April Stn
Staff opened bids on the 2009 Sanitary Sewer Inspection and Cleaning
contract. This program has been instrumental in virtually eliminating
charges to the City for sewer back up problems. The contract award will be
before Council on April 7th, and this year's work is scheduled to be completed
by June 31St
Staff has been working with the Technical Advisory Committee and the
selected consultant for the Dakota County Northeast Eagan/Northwest Inver
Grove Heights Regional Roadway Visioning Study. This study analyzes
traffic patterns and congestion from I -35E to Robert Street, and from
Highway 110 to Cliff Road. Part of this study is to analyze the purpose and
need for a potential interchange at Delaware Avenue and I-494. Public
meetings, as well as meetings before Council, are anticipated as part of this
study. Staff will keep Council informed as to the dates and times of these
meetings.
Staff has continued progress on the 2009 Cherry Hills subdivision
rehabilitation project. The Feasibility Study was accepted by Council on
March 17th, and the neighborhood meeting is scheduled for Thursday April
16th at City Hall.