Loading...
Pipeline 04 03 2009NEWS The PipelineLETTE R - Public Works Engineering April 3, 2009 Code Enforcement f _ Public Works The Parks Crew placed satellites in the parks for the upcoming season. Light bulbs were replaced around buildings and under pavilions at Mendakota Park, Kensington, and Rogers Lake Park. A fallen tree was removed from the pedway between the ponds off of Huber Drive. Trees are being trimmed along the pedways. The parks trailer is being worked on by removing old decking and cleaning up the rusty spots. Rich cleaned and vacuumed the lift stations on Northland Drive, Centre Pointe Drive, and Veronica. The Mendota Heights Road sanitary sewer line was cleaned from Lloyds BBQ to the lift station. The lift station was then cleaned because of all the grease. Root X (a root killing chemical) was added to the sanitary sewer line on Marie Avenue. The Streets Crew filled a pothole at 815 Park Place Drive with class 5 and then compacted it with the tractor. A hole by the catch basin on Medallion Drive was filled with UPM mix. Potholes were patched on the north end of the City. A couch was picked up off the street on Round Hill Road. They helped flip the bus, brought barricades and sand for the drill on Wednesday night. Street sweeping has been set for April 20tH Engineering Staff has been coordinating with the consultant on the Highway 110 & Dodd Road Pedestrian Feasibility Study. There is a neighborhood meeting scheduled for Wednesday April 15th ay City Hall. John testified before the Local Government Division of the State and Local Government Operations Reform, Technology, and Elections Committee of the State House on the status of the Critical Area Bill (HF424). Although there are still issues to be worked out, the bill, as amended by State Representative Hansen, is a far more acceptable version than the original bill. Staff will continue to work out details with Rep. Hansen's office. 4/3/09 Page - 1 The Pipeline cont. Staff has continued to work with our City Attorney and the development team on the Developers Agreement for the Mendota Mall redevelopment. A final draft of the Developers Agreement is scheduled for hearing before Council on April 7th Staff is working to set up a meeting with representatives from the DNR, Dakota County, and Rogers Lake area residents to meet with State Representative Hansen to discuss issues pertaining to recreational opportunities at Rogers Lake. This meeting is tentatively scheduled for Wednesday April Stn Staff opened bids on the 2009 Sanitary Sewer Inspection and Cleaning contract. This program has been instrumental in virtually eliminating charges to the City for sewer back up problems. The contract award will be before Council on April 7th, and this year's work is scheduled to be completed by June 31St Staff has been working with the Technical Advisory Committee and the selected consultant for the Dakota County Northeast Eagan/Northwest Inver Grove Heights Regional Roadway Visioning Study. This study analyzes traffic patterns and congestion from I -35E to Robert Street, and from Highway 110 to Cliff Road. Part of this study is to analyze the purpose and need for a potential interchange at Delaware Avenue and I-494. Public meetings, as well as meetings before Council, are anticipated as part of this study. Staff will keep Council informed as to the dates and times of these meetings. Staff has continued progress on the 2009 Cherry Hills subdivision rehabilitation project. The Feasibility Study was accepted by Council on March 17th, and the neighborhood meeting is scheduled for Thursday April 16th at City Hall. 4/3/09 Page - 2