Pipeline 02 27 2009NEWS '�
The Pipeline"('�'/
LETTER Aw
Public Works L_
Engineering
Code Enforcement February 27, 2009
Public Works
The Parks Crew stained the new picnic table boards to prepare them for
assembly. They replaced the broken shift level on truck #502. The snow
blower and broom were washed. They plowed the cul-de-sacs, pedways
and parking lots.
Rich changed the pump oil in the jet truck pump. He jetted frozen storm
sewers on Orchard Lane at Lexington Avenue and Culligan Lane at Huber
Lane. Cliff prepared 404 for DOT approval. He plowed the lift station
parking lots.
The Streets Crew picked up junk and trash on Huber Drive and Mendota
Heights Road that was dumped on the side of the road. Dorset Road and
Mears Road was sanded due to snow melting. Maintenance was done on all
plow trucks. The bridge deck and side walks on Wagon Wheel Trail and
Mendota Heights Road were cleaned.
Snow Events for the Week:
Date: Amount: Response:
2/21/09 4" snow Plow and sand all streets (early start)
2/26/09 6" snow Plow and sand all streets (never went
home)
Engineering
Engineering is eagerly awaiting Tom Knuth's arrival back to work on
Wednesday March 4t"I He is enjoying the warm, sunny weather in Florida.
John was out of the office this week attending a Commanders' School with
the Air National Guard.