Loading...
Pipeline 01 16 2009NEWS L E T T E The Pipe Public Works Engineering January 16, 2009 Code Enforcement • Public Works The Parks Crew check the warming houses, rinks and Rogers Lake aerator daily. They continue to flood; broom and snow plow the rinks. They also plowed the cul-de-sacs, pedways and parking lots. Rich put up the "thin ice" signs for the Rogers Lake aerator and started the pump for the winter. He plowed cul-de-sacs and lift station parking lots. He painted the floor at the Mendota Heights Road main lift station. The Streets crew mixed more sand and salt. They did maintenance on all plow trucks and greased the wings and sanders. The bridge decks were cleaned on Mendota Heights Road and Wagon Wheel Trail. Snow Events for the Week: Date: Amount: Response: 1-11-09 1/2"snow Plow all streets and sand 1-12-09 4" snow Plow all streets and sand 1-14-09 1/2"snow Plow all streets and sand Engineering Staff is putting the finishing touches on the Feasibility Reports for the 2009 street construction season. Feasibility studies should be before Council for acceptance and ordering of Plans & Specification in February. Staff is continuing to coordinate with Mendota Mall Associates, LLC on their application for re -development of the Mendota Mall. Application is scheduled for vote at Council on January 20tH Staff has finished editing the new City Stormwater Management and Erosion Control Ordinance. It has been sent back to our consultant for final version production. The Ordinance is anticipated to be before Council for adoption in February. John met with the collaborative committee on the NW Inver Grove Heights and NE Eagan long-range development & traffic study to discuss the scope of work for the 30 year traffic study being completed by Dakota County. Of interest in this study is the potential of an interchange at Interstate 494 and Delaware Avenue. The final scope for the study and advertisement of the RFP is expected sometime in February 2009. The cold weather took its toll on our watermain system. The city had two separate breaks this week. The first one on Wednesday was on Delaware Avenue near Sibley High School and the second was on Downing Street. St. Paul Water Services identified where the leaks were occurring and made repairs in sub -zero temperatures.