Loading...
Pipeline 01 02 2009N E W S LETTER Public Works Engineering Code Enforcement Public Works T,nh;Pipe1'in_enua,.=,=009 4w4pp, A The Parks Crew checked the warming houses daily and flooded the ice rinks. The door handle at Friendly Hills warming house was repaired. "Thin Ice" signs were made up for the aerator at Rogers Lake. They plowed cul-de-sacs, ice rinks, parking lots and pedways. Rich plowed the lift station parking lots and cul-de-sacs. He also checked for bad spots on Winston Court, Downing Street, Highway 13, Victoria easement, Mayfield Heights easements, South Freeway Road, Timmy Street, Pontiac Place, Williams Court, Apache Street, Keokuk, Theresa Street, Caren Road and Decorah Street. 1900 Wachtler called for a blocked service with roots and the City's sanitary sewer line was checked and found to be clean. The Streets Crew mixed sand and salt. John Ambrose welded wing rub plates and put new ones on plow trucks 303, 304 and 312. Snow Events: Date: Amount: Response: 12-20-08 3.6" 11:00 A.M. start - plow all streets 12-21-08 4.5" 12:00 P.M. start - plow all streets and sand 12-23-08 1" 3:00 P.M. start - plow all streets and sand 12-30-08 2" plow all streets and sand 12-31-08 replow some streets, mains and sand as needed Engineering Several watermain breaks were repaired on January 1st by Saint Paul Water. Breaks were reported on Winston Court, Cheyenne Lane, and Pontiac Place. The watermain breaks were repaired the same day. Work is continuing on putting together the City's Stormwater Ordinance. This is a requirement of our MPCA Stormwater Permit and should be ready for Council Review sometime in January. Staff continues to work with the Mendota Mall Associates, LLC development group on details pertaining to their re -development proposal. The application is scheduled to be tn before Council on January 6