Pipeline 12 16 2014NEWS
LETTER
Public Works
Engineering
Code Enforcement
Public Works
The Pipeline
6
January 2, 2015
The Parks Crew did ice rink maintenance and worked on the MSDS database.
Snow was plowed on Saturday after our snowfall. The parking lots, rinks and
pedways were cleared of snow. Rink flooding started again with the colder
weather. Plow truck maintenance was done. The thin ice signs were installed at
Rogers Lake and the aerator started.
The Utilities Crew checked the lift stations daily. He was called Saturday
night to the St. Thomas hockey rink to check for a possible sanitary sewer
back up. The City's sanitary sewer line was fine, the backup was in the
owners sanitary sewer line. Roots were cut and cleaned in the sanitary
sewer lines on Dodd Road, Callahan Place, Victoria Road easement, and in
the Mendakota Court easement. Roots were cut and the storm sewer
cleaned on Arcadia Drive. He plowed and shoveled the lift stations. The
antifreeze was changed on the generator at the main lift station. He plowed
the cul-de- sacs and middle area of the city on Saturday.
The Streets Crew filled the trucks with salt. A sign was moved at Victoria
Road and Celia. All trucks were washed and waxed. Streets were plowed
after Saturday's snow.