Loading...
Pipeline 12 16 2014NEWS LETTER Public Works Engineering Code Enforcement Public Works The Pipeline 6 January 2, 2015 The Parks Crew did ice rink maintenance and worked on the MSDS database. Snow was plowed on Saturday after our snowfall. The parking lots, rinks and pedways were cleared of snow. Rink flooding started again with the colder weather. Plow truck maintenance was done. The thin ice signs were installed at Rogers Lake and the aerator started. The Utilities Crew checked the lift stations daily. He was called Saturday night to the St. Thomas hockey rink to check for a possible sanitary sewer back up. The City's sanitary sewer line was fine, the backup was in the owners sanitary sewer line. Roots were cut and cleaned in the sanitary sewer lines on Dodd Road, Callahan Place, Victoria Road easement, and in the Mendakota Court easement. Roots were cut and the storm sewer cleaned on Arcadia Drive. He plowed and shoveled the lift stations. The antifreeze was changed on the generator at the main lift station. He plowed the cul-de- sacs and middle area of the city on Saturday. The Streets Crew filled the trucks with salt. A sign was moved at Victoria Road and Celia. All trucks were washed and waxed. Streets were plowed after Saturday's snow.