December 12, 2014
The Parks Crew trimmed trees along the pedways. New cabinets were
installed in the maintenance rooms at Mendakota Park and Kensington Park.
Maintenance was done on the hockey rinks.
The Utilities Crew checked the lift stations daily. Brush was chipped from
the tree trimmings at the Northland lift station. Assisted the Parks Crew
with tree trimming along the pedways. Grease was cleaned off the floats at
the Lilydale lift station.
The Streets Crew excavated a trench for the roof gutter drains at City Hall
and took the excess dirt to the city's staging area. Sign work was done on
Mendota Heights Rod. They worked on welding plow shoes for truck 312.
Engineering
City Projects (construction year)
Highway 13 Trail Connection (2014/2015) - This project is buttoned up for
the winter. Saint Paul Regional Water Service has completed the lowering
of the water main, and cover has been established over the pipe. The
reminder of the project will be completed in the spring.
Victoria Road Reconstruction & Rolling Green Neighborhood Rehabilitation
(2014/2015 - The first phase of the project is complete. Design of the
second phase (Marie to Lexington) is underway. A neighborhood meeting is
anticipated in late January/early February to discuss site specific design
requirements.
Storm Drainage System Repairs (2014 - Staff has submitted project data
to the State for reimbursement. A decision on reimbursement is anticipated
by February.
County Projects
Highway 110 Trail Underpass (2017) - This project will construct an
underpass (tunnel) under Highway 110 for the future construction of the
Mendota -Lebanon Hills Greenway Trail. Dakota County has received a
$1,000,000 grant from the Metropolitan Council for construction. County
staff has issued a Request For Proposal (RFP) to consulting firms for design
services. Proposals received will be reviewed in January. Dakota County is
planning on presenting the project to City Council in February.
State Projects
2015 State Project List - The list of metro projects for 2015 has been
released. Projects that will have an impact on Mendota Heights include:
- A sealcoat will be applied to Dodd Road (Highway 149) from The
Village south to Lake Drive.
- Highway 110 between Highway 13 to I -35E will receive surface
pavement rehabilitation (overlay).
I-94 Weekend Closure - Eastbound I-94 between I -35E and Mounds
Boulevard will be closed this weekend from 10:OOpm Friday (12/12)
through 5:OOam Monday (12/15). This closure is for work on the
Highway 52 Bridge.
Other Activities
Future Cities Competition - Staff met with Future Cities team members at
Friendly Hills Middle School on Wednesday to continue work on this year's
project. This year's theme is, 'Feeding a Future City," and will focus on
urban and suburban agricultural services for city population. Although all
6t", 7t", and 8t" grade students are completing the program, only three
teams can advance to the State competition, which is held on the University
of Minnesota campus in January. Competing teams are constructing their
scale models and developing their presentations for competition. Non -
competing teams are completing the program with smaller scaled models
and will present their cities within their classes.
2015 Sanitary Sewer Rate Increase - Metropolitan Council Environmental
Services (MCES) has provided the amount that they will charge to Mendota
Heights for 2015. This fee is charged to municipal governments to treat
sanitary sewage sent to the MCES treatment plants. The Mendota Heights
fee increased 12.3% for 2015. Most of this increase can be attributed to
the extremely wet spring we experienced; specifically, the number of sump
pumps that discharge to the sanitary sewer system. As a result, the City
needs to increase the amount billed to property owners. The City Council
approved a 50/b rate increase that will take effect for the 1st quarter of 2015
(April billing cycle). The City is able to reconcile the differences in rate
increases by postponing some capital improvement projects until future
years. This rate increase remains consistent with increases from previous
years. The City has successfully negotiated the elimination of the penalty
surcharge due to increased flow from the June 19th storm.
River to River Greenway (R2RG) Master Plan Meeting - Staff attended a
meeting with Dakota County engineering staff and their consultant on
Thursday to discuss progress on the development of the trail Master Plan.
The R2RG was formerly known as the North Urban Regional Trail (NURT).
The County is developing this Master Plan as a mechanism to scope and
schedule improvement for the trail to become completely compliant with
regional trail and greenway standards. City Planner, Nolan Wall, will
present a Master Plan update at the December 16th City Council Meeting. A
Public Open House meeting is anticipated in early February.
Lower Mississippi River Watershed Management Organization (LMRWMOJ -
Staff attended the monthly meeting of the LMRWMO Board of Directors on
Wednesday. The amendment to the Watershed Management Plan that adds
in the portion of Mendota Heights formerly part of the Gun Club Lake WMO
is nearing completion. Final approval should be received by February. The
Joint Powers Agreement that governs the LMRWMO has also been amended
to reflect the additional area. The drainage and erosion project in Cherokee
Heights Regional Park was also discussed.