Loading...
Pipeline 12 12 2014NEWS LETTER Public Works Engineering Code Enforcement Public Works p The Pipeline � a December 12, 2014 The Parks Crew trimmed trees along the pedways. New cabinets were installed in the maintenance rooms at Mendakota Park and Kensington Park. Maintenance was done on the hockey rinks. The Utilities Crew checked the lift stations daily. Brush was chipped from the tree trimmings at the Northland lift station. Assisted the Parks Crew with tree trimming along the pedways. Grease was cleaned off the floats at the Lilydale lift station. The Streets Crew excavated a trench for the roof gutter drains at City Hall and took the excess dirt to the city's staging area. Sign work was done on Mendota Heights Rod. They worked on welding plow shoes for truck 312. Engineering City Projects (construction year) Highway 13 Trail Connection (2014/2015) - This project is buttoned up for the winter. Saint Paul Regional Water Service has completed the lowering of the water main, and cover has been established over the pipe. The reminder of the project will be completed in the spring. Victoria Road Reconstruction & Rolling Green Neighborhood Rehabilitation (2014/2015 - The first phase of the project is complete. Design of the second phase (Marie to Lexington) is underway. A neighborhood meeting is anticipated in late January/early February to discuss site specific design requirements. Storm Drainage System Repairs (2014 - Staff has submitted project data to the State for reimbursement. A decision on reimbursement is anticipated by February. County Projects Highway 110 Trail Underpass (2017) - This project will construct an underpass (tunnel) under Highway 110 for the future construction of the Mendota -Lebanon Hills Greenway Trail. Dakota County has received a $1,000,000 grant from the Metropolitan Council for construction. County staff has issued a Request For Proposal (RFP) to consulting firms for design services. Proposals received will be reviewed in January. Dakota County is planning on presenting the project to City Council in February. State Projects 2015 State Project List - The list of metro projects for 2015 has been released. Projects that will have an impact on Mendota Heights include: - A sealcoat will be applied to Dodd Road (Highway 149) from The Village south to Lake Drive. - Highway 110 between Highway 13 to I -35E will receive surface pavement rehabilitation (overlay). I-94 Weekend Closure - Eastbound I-94 between I -35E and Mounds Boulevard will be closed this weekend from 10:OOpm Friday (12/12) through 5:OOam Monday (12/15). This closure is for work on the Highway 52 Bridge. Other Activities Future Cities Competition - Staff met with Future Cities team members at Friendly Hills Middle School on Wednesday to continue work on this year's project. This year's theme is, 'Feeding a Future City," and will focus on urban and suburban agricultural services for city population. Although all 6t", 7t", and 8t" grade students are completing the program, only three teams can advance to the State competition, which is held on the University of Minnesota campus in January. Competing teams are constructing their scale models and developing their presentations for competition. Non - competing teams are completing the program with smaller scaled models and will present their cities within their classes. 2015 Sanitary Sewer Rate Increase - Metropolitan Council Environmental Services (MCES) has provided the amount that they will charge to Mendota Heights for 2015. This fee is charged to municipal governments to treat sanitary sewage sent to the MCES treatment plants. The Mendota Heights fee increased 12.3% for 2015. Most of this increase can be attributed to the extremely wet spring we experienced; specifically, the number of sump pumps that discharge to the sanitary sewer system. As a result, the City needs to increase the amount billed to property owners. The City Council approved a 50/b rate increase that will take effect for the 1st quarter of 2015 (April billing cycle). The City is able to reconcile the differences in rate increases by postponing some capital improvement projects until future years. This rate increase remains consistent with increases from previous years. The City has successfully negotiated the elimination of the penalty surcharge due to increased flow from the June 19th storm. River to River Greenway (R2RG) Master Plan Meeting - Staff attended a meeting with Dakota County engineering staff and their consultant on Thursday to discuss progress on the development of the trail Master Plan. The R2RG was formerly known as the North Urban Regional Trail (NURT). The County is developing this Master Plan as a mechanism to scope and schedule improvement for the trail to become completely compliant with regional trail and greenway standards. City Planner, Nolan Wall, will present a Master Plan update at the December 16th City Council Meeting. A Public Open House meeting is anticipated in early February. Lower Mississippi River Watershed Management Organization (LMRWMOJ - Staff attended the monthly meeting of the LMRWMO Board of Directors on Wednesday. The amendment to the Watershed Management Plan that adds in the portion of Mendota Heights formerly part of the Gun Club Lake WMO is nearing completion. Final approval should be received by February. The Joint Powers Agreement that governs the LMRWMO has also been amended to reflect the additional area. The drainage and erosion project in Cherokee Heights Regional Park was also discussed.