Pipeline 11 21 2014N E W S
LETTER
Public Works
Engineering
Code Enforcement
Public Works
The Pipeline
November 21, 2014
The Parks Crew plowed snow and flooded the ice rinks. Hydrant repairs
were done at Ivy Hill Park. Trash was picked up in the parks.
The Utilities Crew plowed the pedways and lift stations. Pump 1 at the
Northland lift station was cleaned of rags stuck inside the pump.
The Streets Crew plowed snow and salted the streets. Signs were replaced
where needed. Equipment repairs were done on the trucks.
Engineering
City Projects (construction year)
Highway 13 Trail Connection (20141 - Saint Paul Regional Water Service has
completed lowering a water main and the trail construction is underway.
The new trail segment will connect The Summit to Lilydale Road along
Highway 13. Early winter may delay completion of the project in 2014.
Victoria Road Reconstruction & Rolling Green Neighborhood Rehabilitation
(2014/20151 - The first phase of construction is complete. A neighborhood
meeting was held Wednesday night with residents who live along the second
phase of the Victoria Project (Marie to Lexington). A public listening session
was held at the November 18th City Council meeting. Staff will begin
designing the project for 2015 construction.
Wentworth Avenue & Pilot Knob Road Trail Rehabilitation Projects (20141 -
This project is complete. Touch-up landscaping will take place in the spring.
Kensington Neighborhood Rehabilitation (2015 - City Council authorized
staff to produce a Feasibility Report for the project. This Feasibility Report
was accepted at the Council's October 7th meeting. City Council decided in a
workshop on November 10th that construction of this project will be put off
until 2019. The project is being developed at the request of Kensington
Homeowners Associations.
Storm Drainage System Repairs (20141 - Both storm damage repair
projects are complete. Staff is seeking partial reimbursement through State
emergency funds.
County Projects
Highway 110 Trail Underpass (2017) -The project will construct an
underpass (tunnel) under Highway 110 for the future construction of the
Mendota -Lebanon Hills Greenway Trail. Dakota County is planning on
presenting the project to City Council in February.
State Projects
Highway 149 (Dodd Road) Reconstruction (I-494 to Highway 55 - Eagan) -
This project is substantially complete. Modifications are underway at the
exit/entrance ramps from Dodd Road to I-494. Construction is expected to
be complete by the end of November. Contact the City of Eagan for more
information.
Other Activities
Lower Mississippi River Watershed Management Organization (LMRWMO) -
Staff attended the monthly meeting of the LMRWMO Board of Managers on
Wednesday. An update on the Cherokee Heights Drainage Improvements
project was provided and a summary of the Citizen Assisted Monitoring
Program (CAMP) utilized by member cities for assessing and tracking water
quality in area lakes. Mendota Heights utilizes the CAMP program for
Rogers and LeMay Lakes.
Metropolitan Council Environmental Services (MCES) 2015 Sanitary Sewer
Rate and Surcharge - Staff has been working with representatives from
MCES for the past several weeks on resolving issues surrounding the
proposed rates for sanitary sewer service for 2015. The proposed rate
increase for 2015 is 12%, and there is a proposed surcharge over and
above the rate increase due to the City exceeding our allowed daily
discharge amount on June 19, 2014 (the day of the big rain storm). The
City is negotiating to reduce or eliminate the surcharge. Once resolved, we
can begin to negotiate the rate increase. Sanitary Sewer Rates for 2015 will
be set at a City Council meeting in December.