The Parks Crew mulched leaves in Marie Park, Hagstrom King Park, Ivy Falls Park
and at the Veronica lift station. Mower repairs were done. The aerator was put in
Rogers Lake. Vandalism repair was completed at the skateboard park. Hockey
rink boards are nearly complete at Marie Park.
The Utilities Crew checked the lift stations daily. He helped the Parks Crew with
leaf clean up in the parks. The check valve drain at the main lift station was
replaced. Rip rap was placed around the storm sewer on Lexington Avenue.
Debris from the Marie Park ice rink was hauled away.
The Streets Crew helped the contractor sweep leaves off the streets. Sweeping
should be completed today. Ashes from the bonfire were hauled to SKB Landfill.
New signs were replaced at; Chippewa Avenue and Ellen Street, Chippewa Avenue
and Dodd Road, Trail Road and Marie Avenue, Lake Drive and Dodd Road.
Blacktop and three loads of dirt were brought to Marie Park for the ice rink.
Engineering
City Projects (construction year)
Highway 13 Trail Connection (2014) - Saint Paul Regional Water Service has
completed lowering a water main and the trail construction is underway. The new
trail segment will connect The Summit to Lilydale Road along Highway 13. Project
completion is expected by mid-November.
Victoria Road Reconstruction & Rolling Green Neighborhood Rehabilitation
(2014/2015) - The first phase of construction is complete. Public meetings on the
second phase of the project (south of Marie Avenue) are expected in
November/December of this year.
Wentworth Avenue & Pilot Knob Road Trail Rehabilitation Projects (2014h -
This project is complete. Touch-up landscaping will take place in the spring.
Kensington Neighborhood Rehabilitation (2015) - City Council authorized staff to
produce a Feasibility Report for the project. This Feasibility Report was accepted
at the Council's October 7th meeting, but Council did not call for a public hearing to
advance the project to its next phase. Council chose to wait until after the Capital
Improvement Plan (CIP) Budget is presented at the November 5th City Council
meeting. The CIP will be discussed in a work session on November 10th at
5:OOpm. A decision on when this project would take place is anticipated after the
work session meeting. The project is being developed at the request of
Kensington Homeowners Associations.
Storm Drainage System Repairs (2014) - Both storm damage repair projects are
complete. Staff is seeking partial reimbursement through State emergency funds.
County Projects
River to River Greenway Realignment (2014/2015) - Construction is nearing
completion for this year. The new trail has been paved along Warrior Drive and
Marie Avenue. Parking on the east side of Warrior Drive will be restored Monday.
No Parking areas necessitated by the County as part of the project were approved
at the November 5th City Council meeting. These will be at the two pedestrian
access points (50 feet of no parking each) and the 250 feet immediately south of
the Henry Sibley High School entrance drive. Parking on the west side of Warrior
Drive remains prohibited per City Code. For more information, please contact the
Dakota County Project Manager, Chris Hartzel, at (952-891-
7106, Chris. Hartzell@co.dakota.mn.us).
State Projects
Highway 149 (Dodd Road) Reconstruction (I-494 to Highway 55 - Eagan) - This
project is nearing completion. Modifications are underway at the exit/ entrance
ramps from Dodd Road to I-494. Construction is expected to be complete by the
end of November. Contact the City of Eagan for more information.
Other Activities
Future Cities Competition - Staff met with Future Cities team members at Friendly
Hills Middle School on Wednesday to continue work on this year's project. This
year's theme is, "Feeding a Future City," and will focus on urban and suburban
agricultural services for city population. Although all 6th, 7th, and 8th grade
students are completing the program, only three teams can advance to the State
competition, which is held on the University of Minnesota campus in January. The
three teams have been selected, and they have completed their project essays,
nearly completed their project narratives, and are working on their SimCity
computer models. Next, the teams will build a scale model of their City, and
develop an oral presentation that will be made at the State competition.
Metropolitan Council Environmental Services (MCES) 2015 Sanitary Sewer Rate
and Surcharge - Staff has been working with representatives from MCES for the
past several weeks on resolving issues surrounding the proposed rates for sanitary
sewer service for 2015. The proposed rate increase for 2015 is 12%, and there is
a proposed surcharge over and above the rate increase due to the City exceeding
our allowed daily discharge amount on June 19, 2014 (the day of the big rain
storm). The City is negotiating to reduce or eliminate the surcharge. Once
resolved, we can begin to negotiate the rate increase. Sanitary Sewer Rates for