Pipeline 10 31 2014N E W S The Pipeline L E TT E RM Public Works Engineering" October 31, 2014 Code Enforcement Public Works The Parks Crew mulched leaves at City Hall, Friendly Hills Park, Fire Hall and Rogers Lake Park. Brush was brought to the bonfire site. They helped the Utilities Crew jet the sanitary sewer lines. The fence was repaired at the Friendly Hills rink. New wax rings were installed on the toilets at Kensington Park. The Utilities Crew repaired the water boxes on Pilot Knob Road, Commerce Drive, and Wagon Wheel Court. The sanitary sewer lines were cleaned along Huber Drive; there was a lot of gravel in in the line. Roots were cut in the sanitary sewer line along the Pagel Road easement down to Mohican Lane. A sanitary sewer inspection was done on Oak Street. They assisted the Parks Crew with leaf clean up, and picked up brush on Dodd Road after a storm sewer repair. The Streets Crew did blacktop patching on Pond Circle East, South Plaza Drive, the fire station, Mendakota Court, and Ivy Hill Drive. The bonfire pile was pushed up during the week. The new street maintenance crew member, started on Monday. Leaf sweeping will start on Monday and one crew will start on the north end and one crew will start on the south end. Engineering City Projects (construction year) Highway 13 Trail Connection (2014) - The project is underway. Saint Paul Regional Water Service has completed lowering a water main and the trail construction will begin shortly. The new trail segment will connect The Summit to Lilydale Road along Highway 13. Project completion is expected by mid- November. Victoria Road Reconstruction & Rollina Green Neiahborhood Rehabilitation (2014/2015) - Staff is hoping to finalize this project in the coming weeks. Most work is complete. Minor striping and punch list items remain. Public meetings on the second phase of the project (south of Marie Avenue) are expected in November/December of this year. Wentworth Avenue & Pilot Knob Road Trail Rehabilitation Projects (2014h - Both the Wentworth and Pilot Knob Trail pavements have been replaced. Backfilling around new pavement and final landscape seeding is underway. Kensington Neighborhood Rehabilitation (2015) - City Council authorized staff to produce a Feasibility Report for the project. This Feasibility Report was accepted at the Council's October 7t" meeting, but Council did not call for a public hearing to advance the project to its next phase. Council chose to wait until after the Capital Improvement Plan (CIP) Budget is presented at the November 5t" City Council meeting to make a decision on when this project would take place. The project is being developed at the request of Kensington Homeowners Associations. Storm Drainage System Repairs (2014) - City Council approved purchase orders for culvert repairs associated with the storm that took place earlier this summer. The contractor should begin work on the culverts on Willow Lane and northeast of Dodd Road and Marie Avenue within the next week or two. County Projects River to River Greenway Realignment (2014/2015) - Construction is nearing completion for this year. The new trail has been paved along Warrior Drive, north to Marie Avenue, and east to the Ridgewood Lane crosswalk. The remainder of the Marie Avenue trail will be paved in the coming week. Pedestrian access points along Warrior Drive are prepped and scheduled to be paved next week. The "speed table" has been installed on the Henry Sibley High School drive entrance off Warrior Drive. Parking on the east side of Warrior Drive is anticipated to be restored next week. No Parking areas necessitated by the County as part of the project will be presented to City Council at their November 5t" meeting, and permanent signs will go up after Council approval. These will be at the two pedestrian access points (50 feet of no parking each) and the 250 feet immediately south of the Henry Sibley High School entrance drive. Parking on the west side of Warrior Drive remains prohibited per City Code. For more information, please contact the Dakota County Project Manager, Chris Hartzel, at (952-891-7106, Chris.Hartzell@co.dakota.mn.us). River to River Greenway Master Plan - The North Urban Regional Trail (NURT) has been re -named by Dakota County as the River to River Greenway. Dakota County has begun the process of developing a Master Plan for the entire Greenway, which runs from the Big Rivers Regional Trail in Lilydale and the Mississippi River Regional Trail in South Saint Paul. Staff me with County staff and their consultants on Thursday to discuss the development of the Master Plan. An update is scheduled to be provided at the December 2nd City Council meeting. State Projects Highway 149 (Dodd Road) Reconstruction (I-494 to Highway 55 - Eagan) - This project is nearing completion. Modifications are underway at the exit/ entrance ramps from Dodd Road to I-494. Construction is expected to be complete by the end of November. Contact the City of Eagan for more information. Other Activities Future Cities Competition - Staff met with Future Cities team members at Friendly Hills Middle School on Wednesday to continue work on this year's project. This year's theme is, "Feeding a Future City," and will focus on urban and suburban agricultural services for city population. In addition to the normally required land use planning, and infrastructure development, students will have to incorporate the growth and production of one protein and one vegetable in such a quantity to feed their city population. Although all 6t", 7t", and 8t" grade students are completing the program, only three teams can advance to the State competition, which is held on the University of Minnesota campus in January. The three teams have been selected, and they are preparing for the competition. Students have completed their project essays and are working on their SimCity computer models. Next, the teams will write their project narrative, build a scale model of their City, and develop an oral presentation that will be made at the State competition. Metropolitan Council Environmental Services (MCES) 2015 Sanitary Sewer Rate and Surcharge - Staff has been working with representatives from MCES for the past several weeks on resolving issues surrounding the proposed rates for sanitary sewer service for 2015. The proposed rate increase for 2015 is 12%, and there is a proposed surcharge over and above the rate increase due to the City exceeding our allowed daily discharge amount on June 19, 2014 (the day of the big rain storm). The City is negotiating with MCES on reducing or eliminating the surcharge and a decision on the surcharge should be forthcoming. Once resolved, we can begin to negotiate the rate increase. Sanitary Sewer Rates for 2015 will be set at a City Council meeting in December.