Pipeline 10 31 2014N E W S The Pipeline
L E TT E RM
Public Works
Engineering" October 31, 2014
Code Enforcement
Public Works
The Parks Crew mulched leaves at City Hall, Friendly Hills Park, Fire Hall and
Rogers Lake Park. Brush was brought to the bonfire site. They helped the Utilities
Crew jet the sanitary sewer lines. The fence was repaired at the Friendly Hills
rink. New wax rings were installed on the toilets at Kensington Park.
The Utilities Crew repaired the water boxes on Pilot Knob Road, Commerce Drive,
and Wagon Wheel Court. The sanitary sewer lines were cleaned along Huber
Drive; there was a lot of gravel in in the line. Roots were cut in the sanitary sewer
line along the Pagel Road easement down to Mohican Lane. A sanitary sewer
inspection was done on Oak Street. They assisted the Parks Crew with leaf clean
up, and picked up brush on Dodd Road after a storm sewer repair.
The Streets Crew did blacktop patching on Pond Circle East, South Plaza Drive, the
fire station, Mendakota Court, and Ivy Hill Drive. The bonfire pile was pushed up
during the week. The new street maintenance crew member, started on Monday.
Leaf sweeping will start on Monday and one crew will start on the north end and
one crew will start on the south end.
Engineering
City Projects (construction year)
Highway 13 Trail Connection (2014) - The project is underway. Saint Paul
Regional Water Service has completed lowering a water main and the trail
construction will begin shortly. The new trail segment will connect The Summit to
Lilydale Road along Highway 13. Project completion is expected by mid-
November.
Victoria Road Reconstruction & Rollina Green Neiahborhood Rehabilitation
(2014/2015) - Staff is hoping to finalize this project in the coming weeks. Most
work is complete. Minor striping and punch list items remain. Public meetings on
the second phase of the project (south of Marie Avenue) are expected in
November/December of this year.
Wentworth Avenue & Pilot Knob Road Trail Rehabilitation Projects (2014h -
Both the Wentworth and Pilot Knob Trail pavements have been replaced.
Backfilling around new pavement and final landscape seeding is underway.
Kensington Neighborhood Rehabilitation (2015) - City Council authorized staff to
produce a Feasibility Report for the project. This Feasibility Report was accepted
at the Council's October 7t" meeting, but Council did not call for a public hearing to
advance the project to its next phase. Council chose to wait until after the Capital
Improvement Plan (CIP) Budget is presented at the November 5t" City Council
meeting to make a decision on when this project would take place. The project is
being developed at the request of Kensington Homeowners Associations.
Storm Drainage System Repairs (2014) - City Council approved purchase orders
for culvert repairs associated with the storm that took place earlier this summer.
The contractor should begin work on the culverts on Willow Lane and northeast of
Dodd Road and Marie Avenue within the next week or two.
County Projects
River to River Greenway Realignment (2014/2015) - Construction is nearing
completion for this year. The new trail has been paved along Warrior Drive, north
to Marie Avenue, and east to the Ridgewood Lane crosswalk. The remainder of
the Marie Avenue trail will be paved in the coming week. Pedestrian access points
along Warrior Drive are prepped and scheduled to be paved next week. The
"speed table" has been installed on the Henry Sibley High School drive entrance
off Warrior Drive. Parking on the east side of Warrior Drive is anticipated to be
restored next week. No Parking areas necessitated by the County as part of the
project will be presented to City Council at their November 5t" meeting, and
permanent signs will go up after Council approval. These will be at the two
pedestrian access points (50 feet of no parking each) and the 250 feet
immediately south of the Henry Sibley High School entrance drive. Parking on the
west side of Warrior Drive remains prohibited per City Code. For more
information, please contact the Dakota County Project Manager, Chris Hartzel, at
(952-891-7106, Chris.Hartzell@co.dakota.mn.us).
River to River Greenway Master Plan - The North Urban Regional Trail (NURT) has
been re -named by Dakota County as the River to River Greenway. Dakota County
has begun the process of developing a Master Plan for the entire Greenway, which
runs from the Big Rivers Regional Trail in Lilydale and the Mississippi River
Regional Trail in South Saint Paul. Staff me with County staff and their
consultants on Thursday to discuss the development of the Master Plan. An
update is scheduled to be provided at the December 2nd City Council meeting.
State Projects
Highway 149 (Dodd Road) Reconstruction (I-494 to Highway 55 - Eagan) - This
project is nearing completion. Modifications are underway at the exit/ entrance
ramps from Dodd Road to I-494. Construction is expected to be complete by the
end of November. Contact the City of Eagan for more information.
Other Activities
Future Cities Competition - Staff met with Future Cities team members at Friendly
Hills Middle School on Wednesday to continue work on this year's project. This
year's theme is, "Feeding a Future City," and will focus on urban and suburban
agricultural services for city population. In addition to the normally required land
use planning, and infrastructure development, students will have to incorporate
the growth and production of one protein and one vegetable in such a quantity to
feed their city population. Although all 6t", 7t", and 8t" grade students are
completing the program, only three teams can advance to the State competition,
which is held on the University of Minnesota campus in January. The three teams
have been selected, and they are preparing for the competition. Students have
completed their project essays and are working on their SimCity computer models.
Next, the teams will write their project narrative, build a scale model of their City,
and develop an oral presentation that will be made at the State competition.
Metropolitan Council Environmental Services (MCES) 2015 Sanitary Sewer Rate
and Surcharge - Staff has been working with representatives from MCES for the
past several weeks on resolving issues surrounding the proposed rates for sanitary
sewer service for 2015. The proposed rate increase for 2015 is 12%, and there is
a proposed surcharge over and above the rate increase due to the City exceeding
our allowed daily discharge amount on June 19, 2014 (the day of the big rain
storm). The City is negotiating with MCES on reducing or eliminating the
surcharge and a decision on the surcharge should be forthcoming. Once resolved,
we can begin to negotiate the rate increase. Sanitary Sewer Rates for 2015 will
be set at a City Council meeting in December.