Loading...
Pipeline 10 24 2014NEWS LETTER Public Works Engineering Code Enforcemeni Public Works The Pipeline October 24, 2014 The Parks Crew top dressed the fields at Kensington and Mendakota Parks. They aerated and over seeded the soccer fields at Mendakota Park. Stump grindings were dug out. Black dirt and seed was put down in low spots at Marie Park. Leaves were mulched in the parks. They met with a contractor at Marie Park for the building the new hockey rink boards. The Utilities Crew checked the lift stations daily. New HVAC filters were installed in the main lift station. Two sanitary sewer inspections were done. Manholes were checked in this year's Victoria Avenue construction area. Assisted the Parks Crew paint over the graffiti in the Valley Park tunnel, and helped the Streets Crew with blacktop patching. The fencing, gates, posts and caution tape were put up at the bonfire site. Fire hydrants were painted on Mendakota Court and Mendakota Drive. The Streets Crew fixed catch basins. blacktopped around the catch basins. Anderson. Potholes were patched on Maple Park Drive, Victoria Curve and Beebe Avenue and Dodd Road. Engineering City Projects (construction year) They prepped them and then Signs were picked up at Earl F. Pond Haven, Apache, Huber Drive, Centre Pointe. A sign was replaced at Highway 13 Trail Connection (20141 - The project is underway. Saint Paul Regional Water Service is lowering a water main and the trail construction will begin when this work is complete. The new trail segment will connect The Summit to Lilydale Road along Highway 13. Project completion is expected by mid-November. Victoria Road Reconstruction & Rolling Green Neighborhood Rehabilitation (2014/2015 - Final lift of asphalt on Victoria has been installed, and trail work will be completed within the next week or two. Landscaping on Victoria is complete, and the contractor will be watering for the remainder of the season. Public meetings on the second phase of the project (south of Marie Avenue) are expected in November/December of this year. Wentworth Avenue & Pilot Knob Road Trail Rehabilitation Projects (2014) -- Both the Wentworth and Pilot Knob Trail pavements have been replaced. Landscape work will be completed by the end of the month. Marie Avenue/I-35E Erosion Repairs (2014) - Staff has been working with MnDOT on a project to repair erosion that has taken place in the northeast quadrant of the Marie Avenue and I -35E intersection. This project is now complete. Kensington Neighborhood Rehabilitation (20151 - City Council authorized staff to produce a Feasibility Report for the project. This Feasibility Report was accepted at the Council's October 7t" meeting, but Council did not call for a public hearing to advance the project to its next phase. Council chose to wait until after the Capital Improvement Plan (CIP) Budget is presented in November to make a decision on when this project would take place. The project is being developed at the request of the Kensington Homeowners Association. Storm Drainage System Repairs (20141 - City Council approved purchase orders for culvert repairs associated with the storm that took place earlier this summer. The contractor should begin work on the culverts on Willow Lane and northeast of Dodd Road and Marie Avenue within the next week or two. County Projects River to River Greenway Realignment (2014/2015) - Construction is nearing completion for this year. The new trail has been paved along Warrior Drive and north to Marie Avenue. The remainder of Marie Avenue trail will be paved next week. Pedestrian access point along Warrior Drive will also be paved next week. The "speed table" has been installed on the Henry Sibley High School drive entrance off Warrior Drive, and there are discussions between the County and the contractor as to how effective the table will be for speed control. Parking on the east side of Warrior Drive is anticipated to be restored on November 3rd. No Parking areas necessitated by the County as part of the project will be presented to City Council at their November 5t" meeting, and permanent signs will go up after Council approval. These will be at the two pedestrian access points (50 feet of no parking each) and the 250 feet immediately south of the Henry Sibley High School entrance drive. Parking on the west side of Warrior Drive remains prohibited per City Code. For more information, please contact the Dakota County Project Manager, Chris Hartzel, at (952-891-7106, Chris. Hartzell@co.dakota.mn.us). River to River Greenway Master Plan - The North Urban Regional Trail (NURT) has been re -named by Dakota County as the River to River Greenway. Dakota County has begun the process of developing a Master Plan for the entire Greenway, which runs from the Big Rivers Regional Trail in Lilydale (near the Pool and Yacht Club) and the Mississippi River Regional Trail in South Saint Paul. Staff me with County staff and their consultants on Thursday to discuss the development of the Master Plan. An update is scheduled to be provided at the December 2nd City Council meeting. State Projects Highway 149 (Dodd Road) Reconstruction (I-494 to Highway 55 - Eagan) - This project is nearing completion. The project reconstructed Dodd Road from the I-494 Interchange to Highway 55 in Eagan. Construction is expected to be complete by the end of November. Contact the City of Eagan for more information. Other Activities Future Cities Competition - Staff met with Future Cities team members at Friendly Hills Middle School on Monday to continue work on this year's project. This year's theme is, "Feeding a Future City," and will focus on urban and suburban agricultural services for city population. In addition to the normally required land use planning, and infrastructure development, students will have to incorporate the growth and production of one protein and one vegetable in such a quantity to feed their city population. Students have completed their draft essays and begun their SimCity computer models. Friendly Hills Staff is in the process of selecting the teams that will advance to the State competition, which is held on the University of Minnesota campus in January. Metropolitan Council Environmental Services (MCES) 2015 Sanitary Sewer Rate and Surcharge - Staff has been working with representatives from MCES for the past several weeks on resolving issues surrounding their proposed rates for sanitary sewer service for 2015. The proposed rate increase for 2015 is 12%, and there is a proposed surcharge over and above the rate increase due to the City exceeding our allowed daily discharge amount on June 19, 2014 (the day of the big rain storm). The City is negotiating with MCES on reducing or eliminating the surcharge and a decision on the surcharge should be forthcoming. Once resolved, we can begin to negotiate the rate increase. Sanitary Sewer Rates for 2015 will be set at a City Council meeting in December.