Loading...
Pipeline 09 26 2014N E W S The Pipeline LETTER Public Works Engineering s Code Enforcement September 27, 2014 -lt, Public Works The Parks Crew installed the lift gate on the new truck. Soccer fields were striped. A parking lot was laid out and striped for the Patrick Family Benefit on Saturday. The herbicide sprayer was cleaned out and put away. The Kensington soccer fields were fertilized. Trees were trimmed along the walking paths. The Utilities Crew attended a safety class on welding, cutting, and brazing of metals at the West Saint Paul City Hall. The lift stations were checked daily. They assisted the police with miscellaneous help for the Patrick Family Benefit on Saturday. The Abbey Way sewer easement was flushed. The floor scrubber was worked on at the fire hall. New mulch was put around trees at the Veronica lift station and fire station. The Streets Crew picked up the barricades that were used last weekend by Lilydale and 2nd Avenue residents. They mowed road side weeds with the bobcat. A blade broke on a mower, so more blades were purchased and installed. Custom brackets were made for the snow plow trucks and the two new pickups. An oil leak from a garbage truck was cleaned up on Monet Court. Cones were dropped off for the Patrick Family Benefit on Saturday. New signs were ordered to replace ones that are missing. Garske Construction picked up gravel, class 5 and black dirt for the John Street storm sewer project. Engineering City Projects (construction year) Highway 13 Trail Connection (20141 - Saint Paul Regional Water Service is working with the contractor to schedule the lowering of a water main line. The contractor is ready to start immediately after the water main correction. Completion is expected in October. Victoria Road Reconstruction & Rollina Green Neiahborhood Rehabilitation (2014/2015 - Pavement (first lift) was placed yesterday. Caren Road at Victoria is closed for the duration of the project. The Lilydale portion of the project has been paved (first lift), and all that remains for the rehabilitation portion of the project is the wear course (second lift) of asphalt. Substantial completion date for this phase of the project is tomorrow, and it appears the contractor will meet the substantial completion obligation. Final lift of asphalt will be installed later this year on Victoria, and trail work will be completed next week. An assessment hearing is scheduled during the October 7t" City Council Meeting. Public meetings on the second phase of the project are expected in November/December of this year. Wentworth Avenue & Pilot Knob Road Trail Rehabilitation Projects (20141 - The Pilot Knob Trail pavement has been replaced. Landscape work will take place within the next week or two. The Wentworth Trail rehabilitation is underway. A fire hydrant has been relocated as part of this project. Pavement completion is expected today, followed by landscape restoration. Marie Avenue/I-35E Erosion Repairs (2014) - Staff has been working with MnDOT on a project to repair erosion that has taken place in the northeast quadrant of the Marie Avenue and I -35E intersection. Construction is underway, and should last 3-4 weeks. No detours are expected during this project, but the north shoulder of Marie Avenue may be periodically closed during the project, and there will be construction traffic crossing Marie Avenue during the project. Kensington Neighborhood Rehabilitation (2015 - City Council authorized staff to produce a Feasibility Report for the project. Once complete, the Feasibility Report will be presented to City Council (scheduled for the October 7t" meeting), and they will decide whether or not to proceed with the project design. The project is being developed at the request of the Kensington Homeowners Association. County Projects North Urban Regional Trail Greenway Realignment (2014/2015) - Dakota County's contractor will be building the entire trail this fall, including the section along Warrior Drive and Marie Avenue on Henry Sibley High School property. Parking on the east side of Warrior Drive has been prohibited during construction (approximately September 2nd through October 31St) Parking on the west side of Warrior Drive remains prohibited per City Code. The contractor has removed the old trail segments and has begun grading for the new trail location. For more information, please contact the Dakota County Project Manager, Chris Hartzel, at (952-891- 7109, Chris. Hartzell@co.dakota.mn.us) . State Projects Highway 149 (Dodd Road) Reconstruction (I-494 to Highway 55 - Eagan) - This project is underway, and will reconstruct Dodd Road from the I-494 Interchange to Highway 55 in Eagan. Construction is expected to be substantially complete by the end of November. Contact the City of Eagan for more information. Other Activities Future Cities Competition - Staff met with Future Cities team members at Friendly Hills on Wednesday to continue work on this year's project. This year's theme is, 'Feeding a Future City," and will focus on urban and suburban agricultural services for city population. In addition to the normally required land use planning, and infrastructure development, students will have to incorporate the growth and production of one protein and one vegetable in such a quantity to feed their city population. Representatives from Le Cordon Bleu in Mendota Heights will also be assisting the students in developing their localized food sources. Between now and the finals State competition in January, students will model a city using SimCity software, write an essay and narrative brief about their city, build a scale model, and make an oral presentation about their city.