Pipeline 09 19 2014NEWS
LETTER
Public Works v
Engineering
Code Enforcement
Public Works
The Pipeline
September 19, 2014
The Parks Crew repaired a line marker at Mendakota Park. The door closer
was repaired at the Mendakota Park bathroom. Graffiti was cleaned up at
the skate park. A downed tree was cut up and removed from the Friendly
Marsh Trail. The soccer fields were striped. Weeds were sprayed at Ivy
Falls Park. They started aerating the parks.
The Utilities Crew checked the lift stations daily and assisted with the
interviews for the Maintenance Worker I opening. Weeds were sprayed on
Westview Court where weeds were growing in the street. Weeds were also
sprayed around the manholes on Mendota Heights Road to keep the
buckthorn back from the manholes. Shrubs were trimmed around the fire
hydrant on Diane Road. A manhole cover and casting were put back on
Victoria Road. The storm sewer was jetted on Watersedge Terrace.
The Streets Crew installed 15 plastic "no parking" signs with steel posts
along Warrior Drive. Roadside weeds were cut. Tires were replaced on the
parks one ton truck. The street sign head was worked on at Huber Drive
and Delaware Avenue but more parts are needed. Barricades were brought
down to Lilydale for their weekend celebration. Barricades were dropped off
on Second Avenue for a neighborhood picnic. Four crime watch signs were
dropped off at the police department. Interviews were held for the
Maintenance Worker I position open for the streets department.
Engineering
City Projects (construction year)
Highway 13 Trail Connection (20141 - Saint Paul Regional Water Service is
working with the contractor to schedule the lowering of a water main line.
The contractor is ready to start immediately after the water main correction.
Completion is expected in October.
Victoria Road Reconstruction & Rolling Green Neighborhood Rehabilitation
(2014/2015 - All utility installations are complete and curbing has been
placed. Pavement (first lift) is expected next week. Caren Road at Victoria
is closed for the duration of the project. The Lilydale portion of the project
has been paved (first lift), and all that remains for the rehabilitation portion
of the project is the wear course (second lift) of asphalt. Substantial
completion date for this phase of the project is September 27th. An
assessment hearing is anticipated during the October 7th City Council
Meeting. Public meetings on the second phase of the project are expected
in November/December of this year.
Wentworth Avenue & Pilot Knob Road Trail Rehabilitation Projects (20141 -
The trails on Wentworth (Wachtler to Dodd) and Pilot Knob Road (I-494 to
Highway 13) will be rehabilitated in conjunction with the Victoria and Rolling
Green Neighborhood project. The Pilot Knob Trail pavement has been
reclaimed and pavement is expected next week. The Wentworth Trail will
be reclaimed and repaved after Saint Paul Regional Water Service relocates
a fire hydrant to accommodate a better trail alignment. Temporary parking
restrictions should be anticipated during construction.
Marie Avenue/I-35E Erosion Repairs (2014) - Staff has been working with
MnDOT on a project to repair erosion that has taken place in the northeast
quadrant of the Marie Avenue and I -35E intersection. Construction is set to
begin next week, and should last 3-4 weeks. No detours are expected
during this project, but the north shoulder of Marie Avenue may be
periodically closed during the project.
Kensington Neighborhood Rehabilitation (2015 - City Council authorized
staff to produce a Feasibility Report for the project. Once complete, the
Feasibility Report will be presented to City Council (anticipated for the
October 7th meeting), and they will decide whether or not to proceed with
the project design. The project is being developed at the request of the
Kensington Homeowners Association.
County Projects
North Urban Regional Trail Greenway Realignment (2014/2015) - Dakota
County's contractor will be building the entire trail this fall, including the
section along Warrior Drive and Marie Avenue on Henry Sibley High School
property. Parking on the east side of Warrior Drive has been prohibited
during construction (approximately September 2nd through October 31St)
Parking on the west side of Warrior Drive remains prohibited per City Code.
The contractor has removed the old trail segments and has begun grading
for the new trail location. Grading activity is expected to increase along
Warrior Drive and Marie Avenue next week. For more information, please
contact the Dakota County Project Manager, Chris Hartzel, at (952-891-
7109, Chris. Hartzell@co.dakota.mn.us).
State Projects
Highway 149 (Dodd Road) Reconstruction (I-494 to Highway 55 - Eagan) -
This project is underway, and will reconstruct Dodd Road from the I-494
Interchange to Highway 55 in Eagan. Construction is expected to be
substantially complete by the end of November. Contact the City of Eagan
for more information.
Other Activities
Metropolitan Council Transportation Policy Plan (TPP) Meeting - Staff
attended a public meeting sponsored by the Met Council to review their
proposed 2014 TPP. There are some significant changes in policy regarding
funding eligibility that may impact Mendota Heights' and other Dakota
County Cities' ability to secure grants through the Met Council. Dakota
County has volunteered to take the lead on consolidating comments from
area Cities, and will be providing a consolidated list by October 1St
Future Cities Competition - Staff met with Future Cities team members at
Friendly Hills on Wednesday to kick off this year's project. City Planner,
Nolan Wall, provided the students with an overview of City planning, zoning,
and general layout desired criteria for them to think about as they develop
their cities. This year's theme is, "Feeding a Future City," and will focus on
urban and suburban agricultural services for city population. In addition to
the normally required land use planning, and infrastructure development,
students will have to incorporate the growth and production of one protein
and one vegetable in such a quantity to feed their city population.
Representatives from Le Cordon Bleu will also be assisting the students in
developing their localized food sources. Between now and the finals State
competition in January, students will model a city using SimCity software,
write an essay and narrative brief about their city, build a scale model, and
make an oral presentation about their city.