Loading...
Pipeline 09 19 2014NEWS LETTER Public Works v Engineering Code Enforcement Public Works The Pipeline September 19, 2014 The Parks Crew repaired a line marker at Mendakota Park. The door closer was repaired at the Mendakota Park bathroom. Graffiti was cleaned up at the skate park. A downed tree was cut up and removed from the Friendly Marsh Trail. The soccer fields were striped. Weeds were sprayed at Ivy Falls Park. They started aerating the parks. The Utilities Crew checked the lift stations daily and assisted with the interviews for the Maintenance Worker I opening. Weeds were sprayed on Westview Court where weeds were growing in the street. Weeds were also sprayed around the manholes on Mendota Heights Road to keep the buckthorn back from the manholes. Shrubs were trimmed around the fire hydrant on Diane Road. A manhole cover and casting were put back on Victoria Road. The storm sewer was jetted on Watersedge Terrace. The Streets Crew installed 15 plastic "no parking" signs with steel posts along Warrior Drive. Roadside weeds were cut. Tires were replaced on the parks one ton truck. The street sign head was worked on at Huber Drive and Delaware Avenue but more parts are needed. Barricades were brought down to Lilydale for their weekend celebration. Barricades were dropped off on Second Avenue for a neighborhood picnic. Four crime watch signs were dropped off at the police department. Interviews were held for the Maintenance Worker I position open for the streets department. Engineering City Projects (construction year) Highway 13 Trail Connection (20141 - Saint Paul Regional Water Service is working with the contractor to schedule the lowering of a water main line. The contractor is ready to start immediately after the water main correction. Completion is expected in October. Victoria Road Reconstruction & Rolling Green Neighborhood Rehabilitation (2014/2015 - All utility installations are complete and curbing has been placed. Pavement (first lift) is expected next week. Caren Road at Victoria is closed for the duration of the project. The Lilydale portion of the project has been paved (first lift), and all that remains for the rehabilitation portion of the project is the wear course (second lift) of asphalt. Substantial completion date for this phase of the project is September 27th. An assessment hearing is anticipated during the October 7th City Council Meeting. Public meetings on the second phase of the project are expected in November/December of this year. Wentworth Avenue & Pilot Knob Road Trail Rehabilitation Projects (20141 - The trails on Wentworth (Wachtler to Dodd) and Pilot Knob Road (I-494 to Highway 13) will be rehabilitated in conjunction with the Victoria and Rolling Green Neighborhood project. The Pilot Knob Trail pavement has been reclaimed and pavement is expected next week. The Wentworth Trail will be reclaimed and repaved after Saint Paul Regional Water Service relocates a fire hydrant to accommodate a better trail alignment. Temporary parking restrictions should be anticipated during construction. Marie Avenue/I-35E Erosion Repairs (2014) - Staff has been working with MnDOT on a project to repair erosion that has taken place in the northeast quadrant of the Marie Avenue and I -35E intersection. Construction is set to begin next week, and should last 3-4 weeks. No detours are expected during this project, but the north shoulder of Marie Avenue may be periodically closed during the project. Kensington Neighborhood Rehabilitation (2015 - City Council authorized staff to produce a Feasibility Report for the project. Once complete, the Feasibility Report will be presented to City Council (anticipated for the October 7th meeting), and they will decide whether or not to proceed with the project design. The project is being developed at the request of the Kensington Homeowners Association. County Projects North Urban Regional Trail Greenway Realignment (2014/2015) - Dakota County's contractor will be building the entire trail this fall, including the section along Warrior Drive and Marie Avenue on Henry Sibley High School property. Parking on the east side of Warrior Drive has been prohibited during construction (approximately September 2nd through October 31St) Parking on the west side of Warrior Drive remains prohibited per City Code. The contractor has removed the old trail segments and has begun grading for the new trail location. Grading activity is expected to increase along Warrior Drive and Marie Avenue next week. For more information, please contact the Dakota County Project Manager, Chris Hartzel, at (952-891- 7109, Chris. Hartzell@co.dakota.mn.us). State Projects Highway 149 (Dodd Road) Reconstruction (I-494 to Highway 55 - Eagan) - This project is underway, and will reconstruct Dodd Road from the I-494 Interchange to Highway 55 in Eagan. Construction is expected to be substantially complete by the end of November. Contact the City of Eagan for more information. Other Activities Metropolitan Council Transportation Policy Plan (TPP) Meeting - Staff attended a public meeting sponsored by the Met Council to review their proposed 2014 TPP. There are some significant changes in policy regarding funding eligibility that may impact Mendota Heights' and other Dakota County Cities' ability to secure grants through the Met Council. Dakota County has volunteered to take the lead on consolidating comments from area Cities, and will be providing a consolidated list by October 1St Future Cities Competition - Staff met with Future Cities team members at Friendly Hills on Wednesday to kick off this year's project. City Planner, Nolan Wall, provided the students with an overview of City planning, zoning, and general layout desired criteria for them to think about as they develop their cities. This year's theme is, "Feeding a Future City," and will focus on urban and suburban agricultural services for city population. In addition to the normally required land use planning, and infrastructure development, students will have to incorporate the growth and production of one protein and one vegetable in such a quantity to feed their city population. Representatives from Le Cordon Bleu will also be assisting the students in developing their localized food sources. Between now and the finals State competition in January, students will model a city using SimCity software, write an essay and narrative brief about their city, build a scale model, and make an oral presentation about their city.