Loading...
Pipeline 09 12 2014NEWS LETTER Public Works Engineering Code Enforcement Public Works The Pipeline September 12, 2014 The Parks Crew installed wood chips in the play areas at Rogers Lake and Friendly Hills Parks. They repaired the trailer, slit seeder, truck #304, and the fire boat motor. Hockey boards were painted as needed. A large soccer field was laid out at Kensington Park. All fields were striped and dragged. The blacktop was painted at the Friendly Hills Park skating rink. The Utilities Crew checked the lift stations daily. A sanitary sewer inspection was done at LCS Metal Stamping on old Highway 13 and at the new home on Oak Street. An inspection was also done on the Dodd Road storm pipe that runs from homes to the manhole. Pedways were sprayed for weeds on the north end. Ivy Falls and Wentworth Parks were sprayed for broadleaf weeds. The sanitary sewer line was cleaned on Mendota Heights Road and the lift station cleaned. The Lilydale lift station was also cleaned. The Streets Crew cut weeds on the west end of the city. A tree was down on Sylvandale Road and pushed off the street. A dead mink was picked up on Wagon Wheel Trail. Locates were called in for Beebe Avenue and Dodd Road for sign installation. A new sign head was installed on John Street and Chippewa Avenue. Heavy duty "No Parking" signs will be installed on Warrior Drive. They are helping the sweepers that are sweeping up the seal coat area. Plow damage repairs were made on Winston Court. Black dirt and grass was put down. Engineering City Projects (construction year) Highway 13 Trail Connection (20141 - Saint Paul Regional Water Service is working with the contractor to schedule the lowering of a water main line. The contractor is ready to start immediately after the water main correction. Completion is expected by the end of September. Victoria Road Reconstruction & Rolling Green Neighborhood Rehabilitation (2014/2015 -Water main replacement on Victoria is complete and the temporary water service has been removed. Caren Road at Victoria is closed for the duration of the project. Rehabilitation of the Rolling Green neighborhood is nearly complete, and the Lilydale portion of the project has been reclaimed and repaved. Storm sewer installation is complete in the reconstruction area, and curb and gutter installation is scheduled for next week. Substantial completion date for this phase of the project is September 27th. An assessment hearing is anticipated during the October 7th City Council Meeting. Public meetings on the second phase of the project are expected in November/December of this year. Wentworth Avenue & Pilot Knob Road Trail Rehabilitation Projects (20141 - The trails on Wentworth (Wachtler to Dodd) and Pilot Knob Road (I-494 to Highway 13) will be rehabilitated in conjunction with the Victoria and Rolling Green Neighborhood project. Tree trimming and removal along the trails is complete, and construction on the trail is anticipated soon. Temporary parking restrictions should be anticipated during construction. Marie Avenue/I-35E Erosion Repairs (2014) - Staff has been working with MnDOT on a project to repair erosion that has taken place in the northeast quadrant of the Marie Avenue and I -35E intersection. Construction is set to begin the week of September 15th, and should last 3-4 weeks. Kensington Neighborhood Rehabilitation (2015 - City Council authorized staff to produce a Feasibility Report for the project. Once complete, the Feasibility Report will be presented to City Council (anticipated for the October 7th meeting), and they will decide whether or not to proceed with the project design. The project is being developed at the request of the Kensington Homeowners Association. County Projects Lexington Avenue Sealcoating (2014) - Dakota County will be seal coating (chip seal) Lexington Avenue from Vail Drive to Mendota Heights Road once the crosswalk and median construction is complete. This is a preventative maintenance measure to increase the life of the pavement that was put down in 2012 as part of the mill and overlay project. Actual construction time frame has not been established, and there is a possibility this work wil move to 2015. North Urban Regional Trail Greenway Realignment (2014/2015) - Dakota County's contractor will be building the entire trail this fall, including the section along Warrior Drive and Marie Avenue on Henry Sibley High School property. Parking on the east side of Warrior Drive has been prohibited during construction (approximately September 2nd through October 31St) Parking on the west side of Warrior Drive remains prohibited per City Code. The contractor has removed the old trail segments and has begun grading for the new trail location. For more information on the NURT construction project, please contact the Dakota County Project Manager, Chris Hartzel, at (952-891-7109, Chris. HartzellC@co.dakota.mn.us). North Urban Regional Trail Greenway Master Plan - Staff attended a Technical Advisory Committee (TAC) meeting on Thursday to go over the early stages of the Master Plan development. Dakota County is looking at improving the current NURT by adding interpretive signage, adding vegetation and landscaping. A presentation before the City Council will take place in November to go over the Master Plan and its goals. State Projects Highway 149 (Dodd Road) Reconstruction (I-494 to Highway 55 - Eagan) - This project is underway, and will reconstruct Dodd Road from the I-494 Interchange to Highway 55 in Eagan. Construction is expected to be substantially complete by the end of November. Contact the City of Eagan for more information. I -35E Guardrail Installation (2014) - MnDOT will be installing new guardrails along I -35E between Highway 13 and the Marie Avenue bridge. The work is part of a metro -wide project, and the Highway 13 portion could happen anytime between August and September of next year. Notice will be given to the City prior to work beginning. Lane closures and traffic delays should be expected during off-peak travel times. Installation work is expected to last less than 2 weeks. Other Activities Lower Mississippi River Watershed Management Organization (LMRWMO) - Staff attended the monthly meeting of the LMRWMO on Wednesday. A project to repair erosion west of Cherokee Park in Saint Paul was discussed, as was the ongoing study of Rogers and Augusta Lakes. The next meeting is scheduled for October 8t" at West Saint Paul City Hall. Future Cities Competition - Staff is again volunteering at Friendly Hills Middle School assisting Middle School students with the annual competition. This year's theme is, 'Feeding a Future City," and will focus on urban and suburban agricultural services for city population. In addition to the normally required land use planning, and infrastructure development, students will have to incorporate the growth and production of one protein and one vegetable in such a quantity to feed their city population. Between now and the finals State competition in January, students will model a city using SimCity software, write an essay and narrative brief about their city, build a scale model, and make an oral presentation about their city.