Loading...
Pipeline 07 25 2014N E W S LETTER Public Works Engineering to Code Enforcement Public Works The Pipeline July 25, 2014 •o • The Parks Crew besides their regular duties of cutting grass and regular ball field preparations were busy this week preparing Mendakota Park for another tournament this weekend. They also repaired the bride decking in Valley Park. The Utilities Crew checked the lift stations daily. The Saint Thomas lift station had heavy "unusual flow" this week. Upon investigating, it was found it was overflow issue with St. Thomas' air conditioning system. The storm lift got new power cords. The old power cords were chewed on by muskrats and turtles. Sanitary sewer lines were cleaned along Huber Drive, High Point Road and High Pointe Court. The Par 3 was sprayed for clover. The Streets Crew cleaned up the city dump. Blacktopping was done on Chippewa Avenue. Trees were trimmed on Lilac Lane and where they were removed grass seed was put down.