Pipeline 07 18 2014News A, --I The Pipeline LETTER Public Works Engineering July 18, 2014 Code Enforcement Public Works The Parks Crew dug and installed a drainage ditch at the Kensington soccer fields. The tennis courts were cleaned. Soccer fields were fertilized. The Valley Park trail repair was paved. Downed brush was hauled out of the parks. The Marie Park hockey rink removal was finished. The Utilities Crew checked the lift stations daily. The transducer went bad at the Centre Pointe lift station and a new one was installed. The high water alarm went off at the St. Thomas lift station because rags were stuck in pump. Two rags were removed. Sanitary sewer lines were cleaned along High Point Road, Field Stone Drive, Copperfield Drive, Watersedge Terrace, Pond View Drive and Court, Stone Road, and High Point Court. Weeds were pulled at the Culligan and Lilydale lift stations. The Streets Crew did sign work. The dump gate was fixed. Mowing of weeds was finished. Some of the barricades were removed from Jacks Manufacturing. Centre Point Drive was blacktopped. Concrete was broken up at the storage site so it could be hauled away. Engineering City Projects (construction year) Hunter Lane/Orchard Place Neighborhood Improvements (20131 - The project is considered substantially complete and minor repairs have been made to the base course of asphalt. The wear course (final lift) is scheduled for installation by the end of July, depending on weather. Highway 13 Trail Connection (20141 - Construction is anticipated to begin shortly. A water main will need to be lowered in conjunction with this project. Saint Paul Regional Water Service will lower the main as soon as they have a crew free to do the work. The contractor is ready to start immediately after the water main correction. Victoria Road Reconstruction & Rolling Green Neighborhood Rehabilitation (2014/20151 - The first (2014) phase of the project will reconstruct Victoria Road from Highway 13 in Lilydale to Marie Avenue and rehabilitate the Stratford/Walsh/ Rolling Green neighborhood. Construction is underway. Temporary water main has been installed, and removal of the old roadway along with water main replacement has begun. Reclaimed pavement material is being temporarily stored at Marie Park. Substantial completion date for the project is September 27tH Wentworth Avenue & Pilot Knob Road Trail Rehabilitation Projects (2014) -- The trails on Wentworth (Wachtler to Dodd) and Pilot Knob Road (I-494 to Highway 13) are scheduled for rehabilitation this summer. Tree trimming and removal along the trails has begun, and construction is anticipated in late July or early August. Preventative Maintenance (Crack Sealing & Sealcoating) Contract (2014) - Crack sealing is complete, and sealcoating will follow later this month for designated neighborhoods. Those scheduled to receive a chip seal coat on their streets are Park Place, Highland Heights including Mayfield Heights Road, Copperfield, and North Ivy Falls. Additional neighborhoods are receiving crack sealing only. Homeowners are not assessed for this work, and will have access to their properties during construction. Temporary (hourly) no parking areas will be posted on streets being seal coated. Marie Avenue/I-35E Erosion Repairs (2014) - Staff has been working with MnDOT on a project to repair erosion that has taken place in the northeast quadrant of the Marie Avenue and I -35E intersection. The project is being advertised. Bid opening is scheduled for July 30th. Kensington Neighborhood Rehabilitation (2015 - City Council authorized staff to produce a Feasibility Report for the project. Once complete, the Feasibility Report will be presented to City Council (anticipated for the August 19th meeting), and they will decide whether or not to proceed with the project design. The project is being developed at the request of the Kensington Homeowners Association. County Projects Delaware Avenue Resurfacing (2014 - Dakota County will be resurfacing Delaware Avenue from Highway 110 south to I-494. This project will not widen or alter the lane alignment of Delaware, but will provide a new asphalt driving surface and new striping. The 2-3 week construction project is expected to begin the first week in August. Lexington Crosswalk at Victoria (20141 - This project will install a center median in Lexington on the north side of the Victoria intersection and provide for a crosswalk to connect the trails on the east and west of Lexington. The left turn lane from southbound Lexington to eastbound Victoria will be removed. Construction is expected to begin during the first half of August. Lexington Avenue Sealcoating (2014) - Dakota County will be seal coating (chip seal) Lexington Avenue from Vail Drive to Mendota Heights Road in July. This is a preventative maintenance measure to increase the life of the pavement that was put down in 2012 as part of the mill and overlay project. State Projects Highway 149 (Dodd Road) Reconstruction (I-494 to Highway 55 - Eagan) - This project is underway, and will reconstruct Dodd Road from the I-494 Interchange to Highway 55 in Eagan. Construction is expected to be substantially complete this summer. Detours will be posted as needed. I -35E Guardrail Installation (2014) - MnDOT will be installing new guardrails along I -35E between Highway 13 and the Marie Avenue bridge. Staff attended the pre -construction meeting on Tuesday morning. The work is part of a metro -wide project, and the Highway 13 portion could happen anytime between August and September of next year. Notice will be given to the City prior to work beginning. Lane closures and traffic delays should be expected during off-peak travel times. Installation work is expected to last less than 2 weeks. Other Activities MN2050 - Staff attended the quarterly meeting of the MN2050 group on Monday. MN2050 is producing a series of documentaries on the current state of our infrastructure and the importance infrastructure has on our daily lives. The documentaries are being produced in conjunction with TPT. The first documentary about water supply and sewers, "Liquid Assets," is already airing, and the second documentary about roads and bridges, "State of Repair" will begin airing in late September on TPT2 and TPT17. The group is starting work on the third episode which will focus on rails, ports, and airports.