Loading...
Pipeline 07 11 2014NEWS LETTER Public Works Engineering Code Enforcement Public Works The Pipeline July 11, 2014 The Parks Crew striped the lacrosse, soccer and ball fields. Culvert repair work was done in Valley Park. Irrigation repair was done at Kensington and Mendakota Parks. Grass was mowed. The tennis courts were cleaned up at Valley Park. The hockey rink boards were removed at Marie Park. The Streets Crew cleaned up the dump. They hauled trees away. Blacktopping was done. The Utilities Crew checked the lift stations daily. The sanitary sewer lines were cleaned on Glen Toro Road. Cracks were sprayed on the pedways with total weed kill. The backstops, playgrounds and fence lines were also sprayed with total weed kill. A sanitary sewer inspection was done at Southview Design's new building on Commerce Drive. Both generators were exercised. They assisted the Parks Crew with the hockey board demolition at Marie Park.