Pipeline 07 11 2014NEWS
LETTER
Public Works
Engineering
Code Enforcement
Public Works
The Pipeline
July 11, 2014
The Parks Crew striped the lacrosse, soccer and ball fields. Culvert repair
work was done in Valley Park. Irrigation repair was done at Kensington and
Mendakota Parks. Grass was mowed. The tennis courts were cleaned up at
Valley Park. The hockey rink boards were removed at Marie Park.
The Streets Crew cleaned up the dump. They hauled trees away.
Blacktopping was done.
The Utilities Crew checked the lift stations daily. The sanitary sewer lines
were cleaned on Glen Toro Road. Cracks were sprayed on the pedways with
total weed kill. The backstops, playgrounds and fence lines were also
sprayed with total weed kill. A sanitary sewer inspection was done at
Southview Design's new building on Commerce Drive. Both generators
were exercised. They assisted the Parks Crew with the hockey board
demolition at Marie Park.